dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Rahandusministeerium
Väljaminev kiriAvalik

Reply: Analysis

Rahandusministeerium · 28. september 2020
Viit
10-2/6577-1
Registreeritud
28. september 2020
Dokumendi liik
Väljaminev kiri
Adressaat
European Commission, Directorate-General, Regional and Urban Policy, Audit I
Saabumis/saatmisviis
post
Funktsioon
10 VALITSUSE SISEKONTROLLISUSTEEMI KOORDINEERIMINE NING EUROOPA LIIDU TOETUSTE JA VÄLISABI AUDITEERIMINE
Sari
10-2 Kirjavahetus riigiasutuste ja organisatsioonidega
Toimik
10-2/2020
Vastutaja
Mart Pechter (Rahandusministeerium, Kantsleri vastutusvaldkond, Finantskontrolli osakond)

Failid

  • 📎28092020170432.pdf1783 KB

Sisu (failidest)

Mr. Axel Badrichani Ref. European Commission, Directorate-General, Regional and Urban eres(ZOZO)fZl AOOS Policy,Auditl - $rc1DO2O 1049 Bruxelles/Brussel BELGIQUE/BELGIE Our ref. 28.09.2020 10-2/6577-1 Repty: Analysis of documents submitted under Article 138(b) and (c) of Regulation (EU) No 1303/ 2013 Dear Mr. Badrichani, We received your letter conceming our presentation of the Annual Control Repo(, the Audit Opinion, the Management Declaration and the Annual Summary for the year 2019. We thank you for the points that you have brought up in that letter. As to the specific questions and comments we have the following answers. 1. Application of sub-sampling and calculation of the Total Error Rate You are correct in pointing out that we have mistakenly not projected the error found in one the project parhers to the operation. we have now double-checked the figures and methods and have come to the following results (using the ratio estimation method that you pointed out as appropriate): . Expenditure of the sample: EUR2792 445.93; . Sample total error: EUR 54 175.94; . Projected error rate (ratio estimation): 1.94%. Thus the Audit Authority remains with the opinion originally presented stating that the population is not misstated. We have corrected the errors in our calculation tools that led to this miscalculation and will present a correctly projected error rate in our future reports. We will likewise correct the errors of the previous years' calculations. Please see our calculations regarding those numbers from Annex I of this letter. 2. Corrections due to the mistakes of the Managing Authority In section 6.2 of the Annual Control Report, and section B of the Axnual Summary and in Annual Accounts Appendix 8 there is a reference to the conections due to the alleged calculation errors made by the Managing Authority in amount of €l 152 265.17. The Suur-Ameerika I / 10122 Tallinn / Estonia I +3j2 611 3558 / [email protected] www.rahandusministeerium.ee / Reg. c ode: 70000272 calculation errors stemmed from the fact that by mistake, cumulative financial data were submitted in the 4th payment application. The mistake was cleared and correct figures were submitted within the Annual Accounts. The Managing Authority called these calculation differences between the cumulative financial data and the correct interim payment application as calculation errors. 3. Assurance on the reliability ofthe Programme performance indicators The Audit Authority takes into account your comments and will include the information on the Programme performance data reliability in the future reports. 4. System audit report on the practice and reliability of the Programme output indicators a. The state of play of the recommendations is as follows: i. Finding No 1.1: The Managing Authority has updated the description of the management and control systems as necessary. ii. Finding No 3.1 : The Joint Secretariat and the Managing Authority have updated the description ofthe management and control systems as well as the Programme manual, eMS guidelines, the Progress report form and the Progress report checklist as necessary. iii. Finding No 4.1 : The Joint Secretariat has updated the site visit control form as necessary. iv. Finding No 5.1: The Joint Secretariat has updated the eMS guidelines as necessary. Please note that all recommendations pertaining to the Programme manual, the eMS guidelines and the Progress report form (which are documents to the beneficiaries) as well as the Progress report checklist and the Partner site visit control form (which are documents to the Programme authorities) have already been put into practice. The recommendations pertaining to the Description of Management and control Systems have been drafted but since the ctranges need to be approved by the Monitoring Committee, they will be included in the next version of the document. b. The auditor checked the following indicators during the audit: i. Participants at project events, except management meetings; ii. Jointly organized events, except management meetings; iii. Number of enterprises receiving non-financial support; iv. Joint products and services developed in cooperation; v. Joint marketing activitiesi vi. Number of enterprises receiving grants; vii. Number of enterprises receiving non-financial support; viii. Employment increase in supported enterprises; ix. Improved natural or cultural heritage sites; x. Products or services that are created based on cultural or natural heritage; xi. Cross-border networks that are established or which are strengthened in order to manage and promote the sites; xii. Public campaigns that are targeted at environmentally-friendlier behavior; xiii. Small-scale investments; xiv. Improved and revitalized cross-border joint urban area; xv. Small harbors with improved services; xvi. New and/or improved services forjob seekers and/orjob providers; xvii. Participants in cross-border mobility initiatives. The nine projects selected covered most of the indicators used in the Programme. Please note that as the findings describe, the auditor found no significant discrepancies or errors in achieving the projects' objectives. The main risks mentioned were caused by confusion of how best to count and report the indicators from the partner level. The Programme authorilies on the other hand demonstrated good understanding ofhow to check the data and how to communicate the need for clarifications to specific partners. The recommendations by the auditor were meant to further clarifu the guiding materials for the partners and to specify the uniform basics of indicator data checking for the programme authorities in order to mitigate those risks. c. The Audit Authority takes into account your comments and will pay attention that the future reports are presented to the Commission as promptly as possible. Unfortunately, in the current case the audit report was inserted into the system correctly on l4th of Febru ary 2020 (as was also noted in the Annual Control Report), but mistakenly the sending of the document was not confirmed and thus, the document not actually sent. 5. Analytical work on procurements for outsourcing project management services The analltical work was started as a result ofa potential risk detected from one project audit from our 2018 work plan. Based on the professional judgment of the auditors, ihe risk was evaluated to be related to one specific service provider offering project management services in territorial co-operation programmes. The risk was enhanced by the fact, that persons involved with the service provider had previous links to the programme's management authorities. The auditors' judgment is also supported with the results of resulting project audits, as no similar irregularities have been detected in other projects Based on the information entered in our programme's management information system (eMS), it was possible to sort out all projects, where this specific service provider had offered services (based on invoices). As a result, six projects were sorted out where the project management services were outsourced and the respective procurements included in our analytical work. In all these projects, the auditors detected restrictive selection criteria, the conclusions of which were presented to the Managing Authority. As the procedures carried out by the auditors were analytical by their nature (and not regarded as assuance providing work by the auditing standards) and no procedures were carried out on the level of project partners (which means no clarifying information was asked from the projects' itselfl, the auditors pointed out the Managing Authority's attention to the risks and recommended to carry out additional procedures on the level ofproject partners, with the aim to veriff the findings and receive additional clarifications directly from the contracting authorities. As a result, five decisions to reclaim the funds were compiled by the Managing Authority. In one cese the Managing Authority got the assurance that the procurement was carried out correctly and there were no restrictive selection criteria limiting the fair competition; this final opinion was also discussed with and approved by the auditors. Thus, the Audit Authority is in opinion that: -there was a systemic irregularity, which is most likely to be limited to one service provider; - the full extent of the inegularity has been determined and all contracts affected reviewed and corrected; - there is no reason to believe there might be other similarly affected contracts financed from the progr:rmme. The results of the project audits also do not confirm the risk. 6. Temporary set up of the Certifying Authority For preliminary information, the temporary set up of the certifuing Authority function will be permanent and the certifuing Authority for the cohesion Policy Funds will continue to act as the Certifying Authority for Estonia-Latvia co-operation programme. currently, there is a systems audit of the certifuing Authority for the cohesion Policy Funds being finalized. The results ofthe audit may be used to verify the functioning ofthe Certifying Authority for the Estonia-Latvia programme as well; if needed, programme specific additional procedures may be carried out. Kaur Siruli % Head of Financial Control Department Head of the Audit Authority Ministry of Finance of the Republic of Estonia Enclosed: Annex I (Calculations of the Total Error Rate) Mart Pechter +372 611 3152 [email protected] -{'E(@tmthl= ll i o C tt O = 1 (/1o f i r="rs3P 5 IE+ i a i+9;6- ^ --toi!+ o-;i!-X.Dal *i I F6_1i --r@-i g=&3.3i 3 *3: qi "=3-eF= r 9q { 'ro5 rD 6'l d; g ie e' : ?3eE I ag ragsE d ra:9=9_o $ i rE i. sbs,0-. 6:(ro ts fi 3 f3 aq ;q -5 :* Jao A[ E€ [E E e 3 c = = ^.= ; x!.r a or- = d o * -iJEt ^ui -O.r? s6E ;= .taq d f - re r.6 6q:f Jari= 9; vr o) c <lm o,Bi o- EpH g= (D 58.6 -9 NJ NJ @ PP{OIJs {\t(O(nPNJ.EO orl\J{(, }.(O !! (OF N5 ur O ur..J (oA 5ts5Pr.J,\J(^J(.'1 (oN)5{0o5\tNJ (o@gro 5(o (o @(oo{ \louJo) N,) ooPorJr(,l cD@c)o 00 ni -tn 0r u(,o\o(o(o(oaha t!!Nr(r5{oNJ5 \iurcEP (rr (, o N, s 'r.,r SOt\JXAt- qrP(o(n oq!@N) (o@(,o o\o O-J@O @(oor! \Jo9JOr o5 {|.lNJ@ (D5PO (IUJC)NJ o o -o999 oooo -o99-o oooo oooo oooo \] (,ooo (oooo 5000
Allikas: Rahandusministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel