Repty: Analysis of documents
submitted under Article 138(b) and
(c) of Regulation (EU) No 1303/
2013
Dear Mr. Badrichani,
We received your letter conceming our presentation of the Annual Control Repo(, the Audit
Opinion, the Management Declaration and the Annual Summary for the year 2019.
We thank you for the points that you have brought up in that letter. As to the specific questions
and comments we have the following answers.
1. Application of sub-sampling and calculation of the Total Error Rate
You are correct in pointing out that we have mistakenly not projected the error found in one
the project parhers to the operation. we have now double-checked the figures and methods
and have come to the following results (using the ratio estimation method that you pointed
out as appropriate):
. Expenditure of the sample: EUR2792 445.93;
. Sample total error: EUR 54 175.94;
. Projected error rate (ratio estimation): 1.94%.
Thus the Audit Authority remains with the opinion originally presented stating that the
population is not misstated.
We have corrected the errors in our calculation tools that led to this miscalculation and will
present a correctly projected error rate in our future reports. We will likewise correct the errors
of the previous years' calculations.
Please see our calculations regarding those numbers from Annex I of this letter.
2. Corrections due to the mistakes of the Managing Authority
In section 6.2 of the Annual Control Report, and section B of the Axnual Summary and in
Annual Accounts Appendix 8 there is a reference to the conections due to the alleged
calculation errors made by the Managing Authority in amount of €l 152 265.17. The
Suur-Ameerika I / 10122 Tallinn / Estonia I +3j2 611 3558 /
[email protected]
www.rahandusministeerium.ee / Reg. c ode: 70000272
calculation errors stemmed from the fact that by mistake, cumulative financial data were
submitted in the 4th payment application. The mistake was cleared and correct figures were
submitted within the Annual Accounts. The Managing Authority called these calculation
differences between the cumulative financial data and the correct interim payment application
as calculation errors.
3. Assurance on the reliability ofthe Programme performance indicators
The Audit Authority takes into account your comments and will include the information on
the Programme performance data reliability in the future reports.
4. System audit report on the practice and reliability of the Programme output
indicators
a. The state of play of the recommendations is as follows:
i. Finding No 1.1: The Managing Authority has updated the description
of the management and control systems as necessary.
ii. Finding No 3.1 : The Joint Secretariat and the Managing Authority have
updated the description ofthe management and control systems as well
as the Programme manual, eMS guidelines, the Progress report form
and the Progress report checklist as necessary.
iii. Finding No 4.1 : The Joint Secretariat has updated the site visit control
form as necessary.
iv. Finding No 5.1: The Joint Secretariat has updated the eMS guidelines
as necessary.
Please note that all recommendations pertaining to the Programme manual, the eMS
guidelines and the Progress report form (which are documents to the beneficiaries) as well as
the Progress report checklist and the Partner site visit control form (which are documents to
the Programme authorities) have already been put into practice. The recommendations
pertaining to the Description of Management and control Systems have been drafted but since
the ctranges need to be approved by the Monitoring Committee, they will be included in the
next version of the document.
b. The auditor checked the following indicators during the audit:
i. Participants at project events, except management meetings;
ii. Jointly organized events, except management meetings;
iii. Number of enterprises receiving non-financial support;
iv. Joint products and services developed in cooperation;
v. Joint marketing activitiesi
vi. Number of enterprises receiving grants;
vii. Number of enterprises receiving non-financial support;
viii. Employment increase in supported enterprises;
ix. Improved natural or cultural heritage sites;
x. Products or services that are created based on cultural or natural
heritage;
xi. Cross-border networks that are established or which are strengthened
in order to manage and promote the sites;
xii. Public campaigns that are targeted at environmentally-friendlier
behavior;
xiii. Small-scale investments;
xiv. Improved and revitalized cross-border joint urban area;
xv. Small harbors with improved services;
xvi. New and/or improved services forjob seekers and/orjob providers;
xvii. Participants in cross-border mobility initiatives.
The nine projects selected covered most of the indicators used in the
Programme.
Please note that as the findings describe, the auditor found no significant discrepancies or
errors in achieving the projects' objectives. The main risks mentioned were caused by
confusion of how best to count and report the indicators from the partner level. The
Programme authorilies on the other hand demonstrated good understanding ofhow to check
the data and how to communicate the need for clarifications to specific partners. The
recommendations by the auditor were meant to further clarifu the guiding materials for the
partners and to specify the uniform basics of indicator data checking for the programme
authorities in order to mitigate those risks.
c. The Audit Authority takes into account your comments and will pay attention
that the future reports are presented to the Commission as promptly as possible.
Unfortunately, in the current case the audit report was inserted into the system
correctly on l4th of Febru ary 2020 (as was also noted in the Annual Control
Report), but mistakenly the sending of the document was not confirmed and
thus, the document not actually sent.
5. Analytical work on procurements for outsourcing project management services
The analltical work was started as a result ofa potential risk detected from one project audit
from our 2018 work plan. Based on the professional judgment of the auditors, ihe risk was
evaluated to be related to one specific service provider offering project management services
in territorial co-operation programmes. The risk was enhanced by the fact, that persons
involved with the service provider had previous links to the programme's management
authorities. The auditors' judgment is also supported with the results of resulting project
audits, as no similar irregularities have been detected in other projects
Based on the information entered in our programme's management information system
(eMS), it was possible to sort out all projects, where this specific service provider had offered
services (based on invoices). As a result, six projects were sorted out where the project
management services were outsourced and the respective procurements included in our
analytical work. In all these projects, the auditors detected restrictive selection criteria, the
conclusions of which were presented to the Managing Authority.
As the procedures carried out by the auditors were analytical by their nature (and not regarded
as assuance providing work by the auditing standards) and no procedures were carried out on
the level of project partners (which means no clarifying information was asked from the
projects' itselfl, the auditors pointed out the Managing Authority's attention to the risks and
recommended to carry out additional procedures on the level ofproject partners, with the aim
to veriff the findings and receive additional clarifications directly from the contracting
authorities.
As a result, five decisions to reclaim the funds were compiled by the Managing Authority. In
one cese the Managing Authority got the assurance that the procurement was carried out
correctly and there were no restrictive selection criteria limiting the fair competition; this final
opinion was also discussed with and approved by the auditors.
Thus, the Audit Authority is in opinion that:
-there was a systemic irregularity, which is most likely to be limited to one
service provider;
- the full extent of the inegularity has been determined and all contracts
affected reviewed and corrected;
- there is no reason to believe there might be other similarly affected
contracts financed from the progr:rmme. The results of the project audits
also do not confirm the risk.
6. Temporary set up of the Certifying Authority
For preliminary information, the temporary set up of the certifuing Authority function will be
permanent and the certifuing Authority for the cohesion Policy Funds will continue to act as
the Certifying Authority for Estonia-Latvia co-operation programme.
currently, there is a systems audit of the certifuing Authority for the cohesion Policy Funds
being finalized. The results ofthe audit may be used to verify the functioning ofthe Certifying
Authority for the Estonia-Latvia programme as well; if needed, programme specific additional
procedures may be carried out.
Kaur Siruli
%
Head of Financial Control Department
Head of the Audit Authority
Ministry of Finance of the Republic of Estonia
Enclosed: Annex I (Calculations of the Total Error Rate)
Mart Pechter +372 611 3152
[email protected]
-{'E(@tmthl=
ll i o C tt O = 1 (/1o f i r="rs3P 5
IE+ i a i+9;6-
^ --toi!+ o-;i!-X.Dal
*i I F6_1i
--r@-i g=&3.3i 3
*3: qi
"=3-eF=
r 9q {
'ro5 rD 6'l
d;
g ie e' : ?3eE I ag
ragsE d
ra:9=9_o
$ i rE i.
sbs,0-.
6:(ro
ts fi 3
f3
aq ;q
-5 :*
Jao
A[ E€
[E E
e
3
c
=
= ^.=
;
x!.r a
or-
=
d
o
*
-iJEt ^ui -O.r?
s6E ;= .taq d
f
-
re
r.6 6q:f
Jari=
9;
vr o)
c
<lm
o,Bi
o- EpH
g=
(D
58.6
-9
NJ NJ @
PP{OIJs
{\t(O(nPNJ.EO orl\J{(, }.(O
!!
(OF N5 ur O ur..J (oA
5ts5Pr.J,\J(^J(.'1
(oN)5{0o5\tNJ
(o@gro 5(o
(o
@(oo{
\louJo) N,)
ooPorJr(,l cD@c)o 00 ni
-tn 0r
u(,o\o(o(o(oaha
t!!Nr(r5{oNJ5 \iurcEP
(rr (, o N, s 'r.,r
SOt\JXAt-
qrP(o(n
oq!@N) (o@(,o
o\o O-J@O
@(oor!
\Jo9JOr
o5 {|.lNJ@
(D5PO (IUJC)NJ
o
o
-o999
oooo -o99-o
oooo
oooo oooo
\]
(,ooo
(oooo
5000