Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
1. Identification
Call
P3
1.1. Project name
Coordination for Innovation in the BSR
38 / 250 characters
1.2. Project acronym
PACINNO-2
9 / 20 characters
1.3. Priority
4. Institutional capacity for macro-regional cooperation
1.4. Programme specific objective
4.2 Coordination of macro-regional cooperation: To increase capacity of public administrations and pan-Baltic organisations for transnational coordination in implementing the EU Strategy for the Baltic Sea Region and
facilitating the implementation of common priorities with the partner countries.
1.5. Project duration
Contracting start 07/06/2018 Contracting end 30/09/2018
Implementation start 01/10/2018 Implementation end 30/09/2020
Duration of implementation phase (months) 24
Closure start 01/10/2020 Closure end 31/12/2020
1.6. Summary of the project
PACINNO-2 presents joint approach to the effective usage of innovation policy in the Baltic Sea Region. Combination of digital single market, research and innovation and cluster/SMEs development
provide us unique perspective for achieving a global competitive position of research and innovation.
PACINNO-2 activities are based on input and observations of the PACINNO project (2016-2018) and the PA-INNO Steering Committee, enhancing innovation by ensuring policy learning, strengthening and creating new
networks, aligning resources and regulations but also the possibilities to join forces in common programmes and investments.
PACINNO-2 takes into consideration cross-cutting issues as well as emerging areas as innovation drivers based on digital, knowledge and challenge driven economies. PACINNO-2 aims at the continuation of the
ongoing activities and initiatives:
- finalizing the review of EUSBSR Action Plan 2016-2020,
- initiating the preparation of the Strategy guide 2020+,
- going on with the kick-start activities that had been explored as greenfield acivities during PACINNO project (for example, further development of Real-Time Economy concept and talent management platform) into new
flagships,
- initiating new initiatives utilizing existing flagships' knowledge and experience and networks,
- exploring and mapping new partnerships, areas and financing sources,
- exploring new, greenfield activities (open topics at the moment).
PACINNO-2 develops further cooperation and horizontal activities with other policy areas as well as counterparts from other macro-regions. PACINNO-2 utilizes strategic forums, regional conferences, seminars, social
media and other ICT means to secure more publicity and visibility of PA INNO and by that the wider EUSBSR, as well as to communicate results and ambitions to stakeholders and potential partners.
The international PAC construction of Estonia, Poland and a new partner (to be involved in the implementation of the project as the Lead Partner), the pro-active attitude of Steering Committee members and full
transparency should give a preconditions for successful implementation of the project hereby defined.
The PA-INNO shall be a strong platform for enhanced macro-regional collaborative ecosystem for innovation, research, SMEs and digitalisation in the BSR. Clearly outlined themes and actions priorities are in the core
objectives of EUSBSRs Action Plan as well as are relevant for realizing strategic objectives of EUs Agenda.
2,512 / 3,000 characters
1/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
1.7. Project Budget Summary
Financial resources [in EUR] Planned project budget
NO co-financing 0.00
NO Own contribution NO 0.00
NO budget 0.00
ENI co-financing 0.00
ENI Own contribution ENI 0.00
ENI budget 0.00
RU co-financing 0.00
RU Own contribution RU 0.00
RU budget 0.00
Total Programme co-financing 141,950.00
TOTAL Total own contribution 176,050.00
Total budget 318,000.00
2/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
1.8. Lead Applicant Declaration
By signing this application form we on behalf of all project partners confirm that:
1. the project, neither in whole nor in part, has received or will receive any other additional EU funds (except for the funds indicated in this application form) for any of the activities presented in the work plan during the
whole duration of the project;
2. all organisations that will receive programme co-financing have been listed as project partners in this application form;
3. the project partners listed in the application form are committed to take part in the project’s activities and financing;
4. the project is in line with and the entire project partnership will act according to the relevant EU legislation, rules of Interreg Baltic Sea Region, as well as national/regional legislation and policies;
5. the project respects equal opportunities and non-discrimination and has no harmful impact on the environment;
6. information in this application form is accurate and true to the best of our knowledge.
In case of approval of the application by the Interreg Baltic Sea Region Monitoring Committee our organisation will take the role of the lead partner with all the responsibilities assigned to it.
Signature of the Leadpartner If applicable, stamp of the Lead Partner
Signatory's name Place and date
AhtiKuningas
Signatory's position
Deputy Secretary General for Transport, in behalf of Secretary General
3/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
2. Partnership
2.1. Overview: Project Partnership
Project Partners
Role Organisation (English) Organisation (Original) Country Organisation Type
PP 1 Ministry of Economic Affairs and Communications Majandus- ja Kommunikatsiooniministeerium EE National public authority
PP 2 Ministry of Science and Higher Education Ministerstwo Nauki i Szkolnictwa Wyższego PL National public authority
PP 3 Reserved Partner Reserved Partner R. P. Interest groups including NGOs
Associated Organisations
No associated organisations found
4/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
2.2 Project Partner Details - Partner 1
Partner Information
Organisation in original language Majandus- ja Kommunikatsiooniministeerium
42 / 250 characters
Organisation in English Ministry of Economic Affairs and Communications
47 / 250 characters
Department in original language Infoühiskonna teenuste arendamise osakond
41 / 250 characters
Department in English Department of Information Society Services Development
54 / 250 characters
Localisation
Address Suur-Ameerika 1
Country Estonia
15 / 250 characters
Postal Code 10122
NUTS1 code EESTI
5 / 250 characters
Town Tallinn
NUTS2 code Eesti
7 / 250 characters
Website www.mkm.ee
NUTS3 code Põhja-Eesti
10 / 100 characters
Organisation identification No. 70003158
8 / 100 characters
Type of register Taxoffice
9 / 250 characters
Contact Information
Legal Representative Contact Person
Position Deputy Secretary General for Transport, in behalf of Secretary Position Programme Manager
General
72 / 250 characters 18 / 250 characters
Given name Ahti Given name Reet
4 / 250 characters 4 / 250 characters
Family name Kuningas Family name Reismaa
8 / 250 characters 7 / 250 characters
Email
[email protected] Email
[email protected]
20 / 250 characters 19 / 250 characters
Phone + 3 726 256 311 Phone + 3 726 256 317
Mobile + 3 726 256 311 Mobile + 37 259 112 647
5/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
Partner Description
Legal status a) National (governmental), regional and local public authorities
Source of contribution public
Is your organisation entitled to recover No
VAT related to the EU funded project
activities?
Type of partner National public authority ministry, etc.
6/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
2.2 Project Partner Details - Partner 2
Partner Information
Organisation in original language Ministerstwo Nauki i Szkolnictwa Wyższego
41 / 250 characters
Organisation in English Ministry of Science and Higher Education
40 / 250 characters
Department in original language Departament Nauki
17 / 250 characters
Department in English Department of Science
21 / 250 characters
Localisation
Address ul. Wspólna 1/3
Country Poland
15 / 250 characters
Postal Code 00-529
NUTS1 code REGION CENTRALNY
6 / 250 characters
Town Warszawa
NUTS2 code Mazowieckie
8 / 250 characters
Website www.mnisw.gov.pl
NUTS3 code Miasto Warszawa
16 / 100 characters
Organisation identification No. 77424858067
12 / 100 characters
Type of register Taxoffice
9 / 250 characters
Contact Information
Legal Representative Contact Person
Position Director Position Chief Expert
8 / 250 characters 12 / 250 characters
Given name Aleksander Given name Tomasz
10 / 250 characters 6 / 250 characters
Family name Dańda Family name Jalukowicz
5 / 250 characters 10 / 250 characters
Email
[email protected] Email
[email protected]
29 / 250 characters 30 / 250 characters
Phone + 48 225 292 329 Phone + 48 225 292 293
Mobile + 48 693 204 457 Mobile + 48 609 359 039
7/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
Partner Description
Legal status a) National (governmental), regional and local public authorities
Source of contribution public
Is your organisation entitled to recover No
VAT related to the EU funded project
activities?
Type of partner National public authority ministry, etc.
8/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
2.3 Reserved Partner Details - Partner 3
Type of partner Interest groups including NGOs international organisation, trade union, foundation, charity, voluntary association, club, etc.
Fund Source ERDF
The latest date until when the project 03/12/2018
must apply for inclusion of the
reserved partner(s)
Reasons for not joining the project at The NCM has decided to leave the position of Lead Partner under PACINNO project as of July 31, 2018. Therefore the other PAC-s have been looking for a new Lead Partner for
the stage of application the project but the search need to be continued after the deadline of submission of the PACINNO 2 project application.
In the mean time PAC EE will fulfill the technical assignments of the Lead Partner.
376 / 2,000 characters
Responsibilty for reserved project DG Regio has announced call for showing interest in becoming new leading PA Inno co-PAC. EUSBSR National Coordinators group (Estonian Chair) will provide help and
partner search support with negotiations with possible candidates.
214 / 2,000 characters
9/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
3. Strategy
3.1 Contribution to the EUSBSR - policy and strategic aims
Innovation is of key importance to the BSR as a driver for increasing prosperity and highly relevant in order to realize the potential of all Policy Area of EU Strategy for the Baltic Sea Region. PACINNO-2 is derived
from the results of PACINNO project (2016-2018). The project aims at continuing the initiatives started under the previous project and develops the initiated greenfield activities further to flagships (e.g. Real-Time
Economy, Talent Management). All initiatives under the project are focused on boosting regional potential towards global competitiveness and growth which are relevant for either realizing the objectives of Europe
2020/ Digital Agenda or achieving three core policy objectives of EUSBSR.
Existing PA-INNO network and partnerships are a strong platform for enhanced macro-regional collaborative innovation ecosystem, SMEs and digitalisation in the BSR. PACINNO-2 shall pursue basic principles such
as close dialogue with member states and stakeholders and innovation communities as well as enhancing the effectiveness of existing efforts and structures.
PA-INNO Steering Committee shall continue to serve in comprehensive manner as a consultative platform among sectorial ministries and public agencies in the field of research and innovation. The broader structure
of PA-INNO gives an opportunity in pursuing potential synergies and new areas of collaboration.
The Stratey Guide (SG) for PA INNO (adopted in 2016) outlined main parts of PA-INNO logic of transnational interventions for the period 2016 - 2020. PACINNO-2 project aims at analyzing the achievements of the SG
and mapping the fields for further development and/or new areas of attention for the new Strategy Guide 2020+.
1,718 / 6,000 characters
3.2. Objectives and expected results of the project
Through this PACINNO-2 project, PA-INNO aims to develop further the dynamic position as a front runner within the EUSBSRs, actively contributing to the realization of EU-2020 objectives as well as of the EUSBSRs.
This has also been considered in development of the PA-INNO SG Impact Logic.
The PA-INNO Steering Committee will continue to be holding the leading role in developing and assessing the progression of the PA-INNO. The close dialogue with Members States, relevant DGs of European
Commission as well as regional actors and intermediaries shall be continued. To disseminate the results of the project, to guarantee the high-level input, interest and engagement in the SC and project activities,
aproximately 10 dissemination tours to the EUSBSR states has been foreseen during PACINNO-2 project.
PA-INNO shall continue being a frontrunner in exploiting cross-cutting actions and initiatives across the BSR. Through this PA-INNO will maintain the position as the strengthened collaborative platform for Member
States and relevant key stakeholders based on common interests and challenges.
PA-INNO is acknowledged as a leader in mapping and developing new areas and fields of transnational interventions resulting in new successful themes and actions. Initiatives started as greenfield activities under
the PACINNO project, will be developed to the flagships under PACINNO- 2 project (e.g. Real-Time Economy, Talent Management).
The project aims to strengthen further macro-to-macro region dialogue on innovation policy and create tangible impact by mapping and developing priorities for cross-border/transnational calls for proposals in different
sectoral programmes and funding streams,where appropriate. PA-INNO is developing to be widely recognized as a brand, which enables the labeling of new actions and initiatives as EU/BSR relevant, contributing
directly to the strategy objectives.
PA-INNO is seen as a key player in facilitating multilateral dialogue in the BSR as well as a key enabler for innovation policy dialogue through multi-level governance approach and mobilising relevant actors. The
partners of PACINNO- 2 project value highly and keep aiming at a constant dialogue with stakeholders, good internal and external communication, strong visibility as well as innovative and strong leadership.
The experience of developing the Strategic Guide (SG) will be utilized by reviewing and analyzing the outcomes of the present SG and developing the new SG for the period 2020+.
The project results shall be distributed to decision makers on national and EU level in order to contribute to the implementation of the EUSBSR.
PACINNO-2 will be implemented in close cooperation of three partners: PAC EE, PAC PL and a third partner to be acting as the Lead Partner.
2,788 / 4,000 characters
3.3. Level of cooperation
Joint development ✔
Joint implementation ✔
Joint staffing
Joint financing ✔
10/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
4. Activities
Project management and administration
Work package budget 100%
4.1. Description of strategic management of your Area/Action (applicable to PACs/HACs support only)
PACINNO-2 will be implemented in close cooperation of three partners: PAC EE, PAC PL and a third partner (reserved partner) to be acting as the Lead Partner.
The NCM has decided to leave the position of Lead Partner under PACINNO project as of July 31, 2018. Therefore the other PAC-s have been looking for a new Lead Partner for the project but the search need to be
continued after the deadline of submission of the PACINNO-2 project application. In the meantime PAC EE will fulfill the technical assignments of the Lead Partner. After assigning the Lead Partner, the overall strategic
management for PACINNO-2 project will be organised by the Lead Partner.
Below a description can be found by the main bodies which will in various ways contribute to the development of the Policy Area Innovation (PA-INNO) within the EU Strategy of the Baltic Sea Region:
- PA-INNO coordinators Poland and Estonia together with the Lead Partner will form a team with no hierarchy between the partners.
Project partners will meet regularly during the project period in addition the ad-hoc meetings during e.g. the dissemination tours, specific meetings in connection to PA INNO SC meetings etc. The partners will also
have regular Skype meetings and e-correspondence when so is necessary.
- POLICY AREA INNOVATION STEERING COMMITTEE (PA-INNO SC)
Aiming to involve the Steering Committee more actively, to disseminate the project results, to gather input for the new Strategy Guide 2020+ - minimum 5 meetings (addtional meetings if any Member State would
express an interest in organising the national-oriented showcase and/or discussion with SC members).
PA-INNO will continue, for the upcoming period October-2018--October 2020, to work with the Steering Committee (SC) as part of the PA-INNO governance structure. PA INNO SC has representatives from all EUSBSR /
EEA Member States, European Commission and Flagship initiative leaders. Flagship leaders participate in the role of other capacity in PA-INNO SC and do not form part of the decision making structure.
PA-INNO SC has contributed to the design of activities outlined in this PACINNO-2 proposal. PA INNO SC will be kept informed about the implementation of all PACINNO-2 activities and when necessary,
provide guidance to ensure a high quality implementation.
PA-INNO SC has the responsibility to:
- provide the final appraisal of Interreg-BSR Seed Money Applications, Concept Notes and Main Project Applications (including Flagship projects);
- approve initiatives with a EUSBSR Flagship status for Policy Area Innovation;
- give its evaluation to the analysis of the outcomes of implementation of the Strategy Guide 2016 - 2020;
- give strategic input in the development of the new Strategy Guide 2020+.
2,759 / 6,000 characters
4.2. Description of the daily administration and internal coordination
The PA-INNO activities will during the period 2018-2020 be centered around the implementation of the PA-INNO Strategic Action Plan 2016 - 2020. The activities of the project partners will be supported
by the strategic support of the Steering Committee. The overall framework of the project activities is based on the PA-INNO Strategy Guide 2016 - 2020 and the tasks of the policy area coordinators as it outlined in the
EUSBSRs Action Plan as well as renewed mandate of PACs by PA-INNO SC meeting in June 12, 2017.
MONITORING THE PROGRESS AND DEVELOPMENT OF POLICY AREA INNOVATION
1. Mid-term evaluation, including review of the indicators and targets set (on-going review of the Strategy Guide)
2. Mid-term evaluation, including review of the indicators and targets set (review of the Action Plan)
3. PACs INNO dissemination tours (10 - IS, NO, DE, DK, EE, SE, LT, LV, FI, PL) to Steering Committee member states and to meet policy makers
4. Steering Committee meetings (minimum 5)
DEVELOPING THE POLICY AREA INNOVATION (INCL DEVELOPMENT OF NEW ACTIONS AND FLAGSHIPS)
5. Capacity building/mentorship for new flagships
6. Greenfield activities (3-4 events / processes)
7. Additional financing and potential project parters’ mapping activities (EEA/Norway grants about Research/Innovation area – LT, LV, EE)
8. Preparation of the new Strategy Guide 2020+ (survey, evaluation), with (optional) ad hoc external expert group
9. Mapping exercise of the new areas (follow-up) with (optional) ad hoc external expert group
10. Stakeholder meeting / PACs Meeting
11. Panel plenary (Annual Forum Gdansk 2019 and Annual Forum 2020 TBA)
12. Kick-start initiatives (3-4); going on with activities that started as greenfield activities during PACINNO Project: e.g. Real-Time Economy concept, Talent Management, further support to ERDF MA-Network piloting
activities
ENSURING COMMUNICATION AND VISIBILITY OF THE PA INNO
13. Communication (on-going)
14. Promotion (on-going)
15. Other technical / administrative help / First Level Control (FLC; if needed by the Lead Partner)
2,063 / 6,000 characters
4.3. Additionality (applicable to PACs/HACs support only)
PAC Estonia will allocate expertise on digitalisation policy and working hours of one expert and management, also resources when arranging different meetings (PAC work meetings, Steering Committee meetings,
Round tables and seminars) in Estonia, such as seminar rooms and technical equipment. The general administrative support such as accountancy support and office support will be ensured.
PAC Poland will allocate expertise on PAINNO Research/Innovation policy and working hours of one expert and management, also resources when arranging different meetings (PAC work meetings, Steering
Committee meetings, Round-tables and seminars) in Poland, such as seminar rooms and technical equipment. The general administrative support such as accountancy support and office support will be ensured.
All partners (including the Reserved partner) are expected to contribute with administrative resources to secure the financial management of the project in an appropriate manner.
973 / 6,000 characters
4.4. Description of the project financial management
11/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
The Reserved partner will act as the Lead Partner and take the responsibility to ensure that a strong financial management system is developed within its own organization as well as supporting partner
organizations for the purpose of implementing PACINNO-2 project.
All PACINNO-2 partners will participate at the Interreg BSR meetings where information about the set up of the Interreg Vb BSR financial management system are provided. All partners in PACINNO-2 receive the
presentations and information distributed by the Interreg Vb BSR Secretariat regarding their financial management system. Future participation at Financial Management events arranged by Interreg Vb BSR shall be
considered
for partners when so is necessary.
The Lead Partner will establish the appropriate financial management structure regarding book keeping and other mandatory structures before the project starts. The Lead Partner will be responsible for book-keeping
and payment of invoices attached to the project implementation. The Lead Partner will assigne a coordinator who is assisting with the financial management tasks and duties. Each partner will use part of its working
time for Financial Management including financial reporting and progress reporting in addition to book-keeping, paying invoices and other financial management tasks and duties which will be additional work outside
the project.
Financial Management questions and issues will be a standard item to be discussed and explore at internal project partner meetings.
When so is necessary, all partners will be able to send financial management staff to training events organized by Interreg Vb BSR Secretariat.
Each organization participating in the project, has a good structure and terms for tendering procedures and access both to internal advisors as well as in-house experience from tender processes.
The Lead Partner will engage an external auditor for the First Level Control in line with the Interreg Vb BSR rules and regulations, if needed. The Polish and Estonian partner has a centralized system for First
Level Control. Optional funding for First Level Control has been reserved in the project budget.
2,167 / 4,000 characters
4.5. Financial control system
Please confirm that each partner in your project partnership is aware that project expenditure must be verified by a first level controller. ✔
Please confirm that partners with a decentralised first level control system have reserved sufficient funds in their partner budgets for these controls. ✔
Please confirm each partner is aware it has to identify the costs allocated to the project in its accounting system. ✔
Please confirm that the lead partner and its first level controller will monitor the progress report on finance and activities of each project partner before they are included in the project’s progress report that is ✔
submitted to the JS.
4.6. Further details of the financial control and reporting system of your project
Not applicable
14 / 2,000 characters
12/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
5. Output indicators
5.1 Priority specific output indicators
Number Output indicator Mark in Description Target value
case in number
output
indicator
not
relevant
5 PA-INNO SC meetings
3 Greenfield activities
3 Kick-start initiatives
1 No of transnational meetings held to facilitate implementation of the EUSBSR targets 4 Stakeholder and PAC meetings 15
102 / 1,000 characters
10 PA INNO dissemination tours and strategic meetings with policy
No of transnational meetings held to facilitate joint work on common priorities with the makers
2 10
partner countries
72 / 1,000 characters
1 Review of the PA INNO part of the EUSBSR Action Plan 2016-2020
1 Review of the PA INNO Strategy Guide 2016-2020
No of strategic policy documents supporting the implementation of the EUSBSR targets 1 mapping exercise and / or 1 flagship capacity building policy briefs
3 1 policy paper on innovation policy 4
and/or common priorities with the partner countries
220 / 1,000 characters
1 Draft of the PA INNO Strategy Guide 2020+
2 Strategy forum events (Annual Forums 2019 and 2020)
4 No of support measures provided to the EUSBSR 3
97 / 1,000 characters
13/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6. Budget
6.1 External expertise and services
Item Contract specification Group of activities no. Contracting partner Planned Planned award procedure
No. contract value
1 PAC Inno dissemination tours (10 - IS, NO, DE, DK, EE, SE, LT, 1 1. Ministry of Economic Affairs and C 1,500.00 No procurement
LV, FI, PL) ommunications
75 / 100 characters
2 Steering Committee meeting 4 1. Ministry of Economic Affairs and C 1,000.00 No procurement
ommunications
26 / 100 characters
3 Greenfield activities 6 1. Ministry of Economic Affairs and C 10,000.00 Bid-at-three
ommunications
21 / 100 characters
4 Stakeholder and PAC meeting 10 1. Ministry of Economic Affairs and C 750.00 No procurement
ommunications
27 / 100 characters
5 Kick-start initiatives 12 1. Ministry of Economic Affairs and C 18,000.00 Bid-at-three
ommunications
22 / 100 characters
6 Communication 13 1. Ministry of Economic Affairs and C 2,000.00 No procurement
ommunications
13 / 100 characters
7 Promotion 14 1. Ministry of Economic Affairs and C 1,000.00 No procurement
ommunications
9 / 100 characters
8 Technical/administrative assistance 15 1. Ministry of Economic Affairs and C 3,500.00 No procurement
ommunications
35 / 100 characters
9 Steering Committee meeting 4 2. Ministry of Science and Higher Ed 1,000.00 No procurement
ucation
26 / 100 characters
10 Greenfield activities 6 2. Ministry of Science and Higher Ed 10,000.00 Bid-at-three
ucation
21 / 100 characters
11 Additional financing and potential project partners’ mapping 7 2. Ministry of Science and Higher Ed 2,000.00 No procurement
activities (EEA / Norway Grants) ucation
93 / 100 characters
12 Stakeholder and PAC meeting 10 2. Ministry of Science and Higher Ed 2,500.00 No procurement
ucation
27 / 100 characters
13 Annual Forum 2019 11 2. Ministry of Science and Higher Ed 5,000.00 No procurement
ucation
17 / 100 characters
14 Kick-start initiatives 12 2. Ministry of Science and Higher Ed 5,000.00 No procurement
ucation
22 / 100 characters
15 Promotion 14 2. Ministry of Science and Higher Ed 1,000.00 No procurement
ucation
9 / 100 characters
16 Mid-term evaluation (review of the Strategy Guide) 1 3. Reserved partner 4,000.00 No procurement
50 / 100 characters
17 Mid-term evaluation (review of the Action Plan) 2 3. Reserved partner 2,000.00 No procurement
47 / 100 characters
18 Steering Committee meeting 3 3. Reserved partner 3,000.00 No procurement
26 / 100 characters
Total 119,000.00
14/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
Item Contract specification Group of activities no. Contracting partner Planned Planned award procedure
No. contract value
19 Capacity building/mentorship for new flagships 5 3. Reserved partner 10,000.00 Bid-at-three
46 / 100 characters
20 Greenfield activities 6 3. Reserved partner 10,000.00 Bid-at-three
21 / 100 characters
21 Preparation of the new Strategy Guide 2020+ (survey, 8 3. Reserved partner 5,000.00 No procurement
evaluation)
64 / 100 characters
22 Mapping exercise of the new areas (follow-up) 9 3. Reserved partner 1,000.00 No procurement
45 / 100 characters
23 Stakeholder and PAC meeting 10 3. Reserved partner 750.00 No procurement
27 / 100 characters
24 Annual Forum 2020 11 3. Reserved partner 5,000.00 No procurement
17 / 100 characters
25 Kick-start initiatives 12 3. Reserved partner 5,000.00 No procurement
22 / 100 characters
26 Communication 13 3. Reserved partner 3,000.00 No procurement
13 / 100 characters
27 Promotion 14 3. Reserved partner 3,000.00 No procurement
9 / 100 characters
28 Technical/administrative assistance/FLC 15 3. Reserved partner 3,000.00 No procurement
39 / 100 characters
Total 119,000.00
15/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6.2 Equipment
Item Category Group of activities Contracting partner Planned Planned award procedure
No. no. contract value
Category Additional Specification
1 Please select Please select 0.00 Please select
0 / 100 characters
Total 0.00
16/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
There is no investment selected.
17/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6.4 Expenditure for specific project activities (e.g. expenditure for large research activities on sea etc.)
This section is activated only in the exceptional cases defined in the Programme Manual and after a sucessful consultation with the JS.
18/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6.5 Breakdown of planned project costs per budget line & per partner
Partner BL1 - Staff costs BL2 - Office & BL3 - Travel & BL4 - External BL5 - Equipment Total project budget
administration accommodation expertise & services
PP 1 - Ministry of Economic Affairs and 35,000.00 5,250.00 14,000.00 37,750.00 0.00 92,000.00
Communications
PP 2 - Ministry of Science and Higher Education 30,000.00 4,500.00 14,000.00 26,500.00 0.00 75,000.00
PP 3 - Reserved partner 75,000.00 11,250.00 10,000.00 54,750.00 0.00 151,000.00
Total 140,000.00 21,000.00 38,000.00 119,000.00 0.00 318,000.00
19/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
There is no state aid relevant activity selected.
20/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6.7 Planned project budget per funding source & per partner
Partner Country Legal status Funding Co-financing rate Total Programme co-financing Own contribution
source [in %] [in EUR] [in EUR] [in EUR]
PP 1 - Ministry of EE National ERDF 85.00% 92,000.00 78,200.00 13,800.00
Economic Affairs and (governmental),
Communications regional and
local public
authorities
PP 2 - Ministry of PL National ERDF 85.00% 75,000.00 63,750.00 11,250.00
Science and Higher (governmental),
Education regional and
local public
authorities
PP 3 - Reserved n.a. ERDF 0.00% 151,000.00 0.00 151,000.00
partner
Total ERDF 318,000.00 141,950.00 176,050.00
Total 318,000.00 141,950.00 176,050.00
21/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6.8 Spending Plan - per reporting Period
EU partners (ERDF) Total
of it reserved partners
Period 1 98,375.00 0.00 98,375.00
[Month 1-6]
Period 2 75,875.00 0.00 75,875.00
[Month 7-12]
Period 3 86,875.00 0.00 86,875.00
[Month 13-18]
Period 4 56,875.00 0.00 56,875.00
[Month 19-24]
Total 318,000.00 0.00 318,000.00
22/23
Project Acronym: PACINNO-2
Submission Date : 07/05/2018 19:23:01
Project Number:
Project Version Number: 2
6.9 Net-revenues
This section is not available for the specific objective "Macro Regional Cooperation".
23/23
Janika Otsing
Rahandusministeerium
[email protected] Meie 11.07.2018 nr 1.8-5/18-0048/6141
Suur-Ameerika 1
10122, Tallinn
Sildfinantseerimise taotlus PACINNO-2
projektile
Austatud Janika Otsing
Taotleme 2018. aastaks sildfinantseerimist ERDF Intereg Baltic Sea Region-i vahenditest
rahastatavale projektile „Coordination of Innovation in the BSR -PACINNO-2“
Toetus laekub eelnevalt tehtud kulude hüvitisena.
Kinnitame, et taotletud välisabi laekumine sildfinantseerimise ulatuses ei ole kahtluse all ja oleme
nõus tähtaegselt tagastamata vahendite kinnipidamisega oma eelarvelistest vahenditest.
Lugupidamisega
(allkirjastatud digitaalselt)
Merike Saks
kantsler
Lisad: 1) lisa sildfinantseerimise taotlusele_MKM;
2) Application form PACINNO2.
Ülle Kallas
639 7634
[email protected]
Suur-Ameerika 1 / 10122 Tallinn / 625 6342 /
[email protected] / www.mkm.ee
Registrikood 70003158