dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Väljaminev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 23. juuli 2018
Viit
7-11/2018/6430
Registreeritud
23. juuli 2018
Dokumendi liik
Väljaminev kiri
Adressaat
European Commission
Saabumis/saatmisviis
post
Funktsioon
7 Raudteeinfrastruktuuri majandamise ja raudteeveo korraldamine
Sari
7-11 Raudtee komitoloogiaga seotud kirjavahetus (Arhiiviväärtuslik)
Toimik
7-11/2018
Vastutaja
Margus Tähepõld (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Transpordi valdkond, Teede- ja raudteeosakond, Raudteetalitus)

Failid

  • 📎7-11-2018-6430.pdf177 KB
  • 📎ERTMS L1 L2 cost estimation v 1207-18_eng.docx5610 KB

Sisu (failidest)

Glossary of terms AB - Automatic Line Block System ALSN – Continuous Automatic Train Signalling (АЛСН ) class B train protection standard ERTMS - European Rail Traffic Management System ERTMS L1 / L2 – ERTMS Level 1 / Level 2 OBU – On-Board-Unit R&D - Research and development TS – Technical Specification (part of tender documentation) Table SEQ Table \* ARABIC 1 Primary data used in the calculations and references to sources No. Description Cost Referenc es 1.0 Total length of the line in the project area 80 km (1) 1.1 Total length of the open double- track in the project area 27 km (2) 1.2 Total length of open single- track in the project area 53 km (2) 1.3 Total Estonian pool of rolling stock 418 pc (3) 1.4 Units of rolling stock that need to be equipped with ERTMS L1/L2 on-board equipment and at the same time retain class- B on-board equipment to ensure compatibility between the Baltic states and Russia. (Passenger trains only and one set of on-board equipment per composition.) 38 pc (3) 1.5 Minimum amount u nits of rolling stock (freight train locomotives) that are with great probability used in Lääne-Harju area and need to be equipped with ERTMS L1/L2 on-board equipment These locomotives have to be equipped at the same time retain class-B on-board equipment to ensure compatibility between the Baltic states and Russia. 10 pc (3) 1. 6 ERTMS/ETCS on-board equipment average R&D cost per OBU €47,468 (4) Figure 38 1. 7 ERTMS/ETCS on-board equipment average cost per OBU €318,000 (4) Figure 39 1. 8 Making the required changes to the existing on-board equipment (class B ALSN) on the rolling stock for it to be compatible and u seable in the same cabin with the ERTMS/ETCS equipment. Notional amount. Cost of the existing on-board class B equipment is approximately €50,000/OBU €34,532 (2) 1. 9 Cost of the r olling stock's ERTMS/ETCS on-board equipment when equipping a passenger train. The costs may actually increase because the passenger train has two locos. E.g. in "Liikennevirasto tutkimuksia ja selvityksiä 44/2014" Helsinki 2014 (978-952-317-009-4) pg 37 the unit price for equipping a composition is €720,000. €400,000 Sum of table 1 rows 1.4–1.6. 1. 10 Notional cost of certification/verification/validation that should be done for the rolling-stock series being in use before installing ERTMS/ETCS on-board-equipment € 750,000 (6) pg 36 1.1 1 Approximate number of station signalling units within the scope of the Lääne-Harju project (the exact need for signalling units will become apparent after design process of the CCS system). Open-track signalling units are not included because the estimate for open-track AB involves the use of the ERTMS/ETCS L2 system that allows forgoing signalling units. 194 pc (5) TS annex No. 30 1.1 2 Notional cost of signalling units for calculating the approximate cost of equipping stations with the ERTMS L1 equipment. The n otional cost was obtained by analysing four different categories (I–IV) of railway tracks and reducing the cost of equipment to get the notional cost of signalling units. NB! In order to ensure comparability, this does not include the cost of interlocking system. €48,600 (6) pg 44–45 and annex 2/2 (2) 1.1 3 Notional unit cost of the double-track ERTMS/ETC Level 2 solution [€/km] (R&D) €85,000 (4) Figure 44 1.1 4 Notional unit cost of the double-track ERTMS/ETC Level 2 solution [€/km] (Investment) €355,000 (4) Figure 44 1.1 5 Notional unit cost of the double-track ERTMS/ETC Level 2 solution [€/km] (Operation & Maintenance) €155,000 (4) Figure 44 1.1 6 Notional unit cost of the double-track ERTMS/ETC Level 1 solution [€/km] (R&D) €20,000 (4) Figure 44 1.1 7 Notional unit cost of the double-track ERTMS/ETC Level 1 solution [€/km] (Investment) €90,000 (4) Figure 44 1.1 8 N otional unit cost of the double-track ERTMS/ETC Level 1 solution [€/km] (Operation & Maintenance) €15,000 (4) Figure 44 1.1 9 I nterlocking system cost for the Lääne-Harju tender based on the average of 5 tenderers €9,159,733 (5) 1. 20 ERTMS Level 2 GSM-R radio block centre (reduced from 46MEUR cost for 739 ,97 km lines) € 4,979,900 (6) pg 50-51 1. 2 1 Notional unit cost of the GSM-R network km € 27,200 (6) pg 50 1.2 2 F or simplification , the cost calculations for installing ERTMS/ETCS on-board-equipment are based on assumption that there is only 2 series of locomotives in use on Lääne-Harju lines 2 series (2) A nalysis OPTION 1 The e stimate for the ERTMS L1 traffic management system covering the whole region: Figure SEQ Figure \* ARABIC 1 Solution for ERTMS L1 equipment Table SEQ Table \* ARABIC 2 ERTMS L1 investment cost estimation Costs for ERTMS L1 for the whole region 4,815,000 € 53 km of single - track and 27 km of double - track ERTMS L 1 without stations and interlocking (see Figure 1) 9,428,400 € ERTMS L 1 trackside systems in stations not including interlo c king (based on the notional cost of signalling units ) 9,159,733 € interlocking system cost for the Lääne-Harju tender based on the average of 5 tenderers see table 1 row 1.1 7 1 in total 23,403,133 € ERTMS L 1 investment for the whole region at the Lääne-Harju section (track between stations and stations ) Additional 750,000 € Locomotive series OBU approval (passenger trains) Additional 15,200,000 € Equipping passenger trains with the ERTMS/ETC equipment, 38 passenger trains 2 in total 39,353, 133 € Approx. 40 MEUR in total ( the ERTMS L 1 and passenger train equipment) Additional 750,000 € Locomotive series OBU approval (minimum needs for freight trains in Lääne-Harju area) Additional 4, 00 0, 000 € Equipping the locomotives with ERTMS/ETCS OBU-s f or minimum needs of freight t raffic on the Lääne-Harju lines 3 in total 44,103, 133 € Implementing the Option 1 in the s cope of the Lääne-Harju project Approximate cost for the entire scope of the Lääne-Harju project on the condition that 53 km of single tracks and 27 km of double tracks will be equipped with ERTMS L1 systems. The model provides the cost of track fixtures for open tracks only, excluding the cost of stations areas ERTMS equipment and in terlocking systems see table 1 row s 1.1; 1.2; 1.1 7 . 53 km *90 000 € km 2 +27 km *90 000 € km =4 815 000 € Approximate cost of ERTMS L1 equipment for stations does not include the cost of the centralisation system (interlocking) . The estimate uses the notional price of signalling units , which is €48,600 per unit, and the pre-designed total number of Lääne-Harju signalling units (this number may change during the designing process), see table 1 row s 1. 1 1 ; 1.1 2 . 194 tk *48 600 € pc = 9 428 400 € Because neither the ERTMS L1 notional u nit costs nor the cost estimate based on the notional cost of station signalling units include the cost of the centralisation system (interlocking) , the as sessment of investment costs of the region’s interlocking systems was based on the average of five tenderers for the public procurement for the Lääne-Harju CCS system modernization project (tender index 186866) with the resulting sum of €9,159,733 see table 1 row 1. 1 9 . ERTMS L1 investment for the whole Lääne-Harju region tracks between stations and stations (see calculations 1; 2; 3) : S ERTMS L1 track =4 815 000 € + 9 428 400 € + 9 159 733 € =23 403 133 € The cost of a single set of the ERTMS/ETCS on-board equipment has been obtained through the following calculation (see initial data from table 1 rows 1. 6 –1. 9 ): S ERTMS OBU =47 468 € +318 000 € +34 532 € =400 000 € We have pointed out in our application of derogation that the implementation of ERTMS systems is no t only limited to changing trackside and interlocking equipment and related subsystems . The compatibility requirement between the rolling stock and the tracks must be observed and the entire Estonian pool of rolling stock must be equipped with the ERTMS/ETCS on-board equipment in order to use the ERTMS system. In our application of derogation we have done a back-calculation for the cost of only equipping 38 passenger trains (see table 1 row s 1.4 ; 1. 9 ): S ERTMS rolling stock_passenger =38 pc *400 000 € pc = 15 200 000 € Notional cost of certification/verification/validation that should be done for the rolling-stock series being in use before installing ERTMS/ETCS on-board-equipment (see table 1 row 1.10 ) S ERTMS OBU rolling stock series approval =1 series *750 000 € series =750 000 € If we add the cost of equipping passenger trains with ERTMS/ETCS on-board equipment to the cost of ERTMS L1 track fixtures we get ( calc. 4; 6 ; 7 ) : S ERTMS L1 track and passanger rolling stock =23 403 133 € +15 200 000 € +750 000 € =39 353 133 € ≈ 40 000 000 € For freight trains on the Lääne-Harju lines the m inimum need for equipping the locomotives with ERTMS/ETCS OBU-s ( see table 1 row 1. 5; 1.9 ; 1.10 ) : S ERTMS rolling stock freight MIN =10 pc *400 000 € pc +750 000 € = 4 750 000 € Implementing the Option 1 in the scope of the Lääne-Harju project requires investments in a total of : S ERTMS L1 track and passanger rolling stock + S ERTMS rolling stock freight MIN = 39 353 133 € + 4 750 000 € = 44 103 133 € OPTION 2 The e stimate for the combination of ERTMS L1 and ERTMS L2 traffic management system s covering the whole region: Figure SEQ Figure \* ARABIC 2 Solution for combined ERTMS L1 and L2 equipment Table SEQ Table \* ARABIC 3 Combined ERTMS L1 and L2 investment cost estimation Costs for c ombination of ERTMS L1 and ERTMS L2 on the open lines (ERTMS L1 is covering station area s and single- track lines; ERTMS L 2 is used in double- track section ) 2 ,385, 000 € 53 km of single-track ERTMS L 1 (except stations area lines and interlocking ) 9 ,585, 000 € 27km of double-track line equipped with ERTMS L2 systems (except stations area lines and stations interlocking) 734, 400 € GSM-R network for ERTMS L2 section 4,979, 900 € Radio Block center GSM-R for ERTMS L2 9,428, 400 € ERTMS L1 trackside systems in stations not including interlocking (based on the notional cost of signalling units) 9,159, 733 € interlocking system cost for the Lääne-Harju tender based on the average of 5 tenderers see table 1 row 1.1 9 1 in total 36,272, 433 € Combined ERTMS L1 and L2 equipment on Lääne-Harju lines (see Figure 2 ) Additional 750,000 € Locomotive series OBU approval (passenger trains) Additional 15,200, 000 € Equipping passenger trains with the ERTMS/ETC S equipment, 38 passenger trains 2 in total 52,222, 433 € Combin ed ERTMS L1 and L2 equipment on Lääne-Harju lines and passenger trains with the ERTMS/ETC S OBU- equipment Additional 750,000 € Locomotive series OBU approval (minimum needs for freight trains in Lääne-Harju area) Additional 4,000, 000 € Equipping the locomotives with ERTMS/ETCS OBU-s for minimum needs of freight traffic on the Lääne-Harju lines 3 in total 56,972, 433 € Implementing the Option 2 in the s cope of the Lääne-Harju project Approximate cost for the entire scope of the Lääne-Harju project on the condition that 53 km of single tracks line will be equipped with ERTMS L1 systems. The model provides the cost of track fixtures for open tracks only, excluding the cost of stations areas ERTMS equipment and interlocking systems ( see table 1 rows 1.2; 1.1 7 ) . 53 km *90 000 € km 2 =2 385 000 € Approximate cost for the entire scope of the Lääne-Harju project on the condition that 27 km of double - tracks will be equipped with ERTMS L 2 systems ( see table 1 rows 1.1; 1.1 4 ) . 27 km *355 000 € km =9 585 000 € Approximate cost of ERTMS L1 equipment for stations does not include the cost of the centralisation system (interlocking) . The estimate uses the notional price of signalling units, which is €48,600 per unit, and the pre-designed total number of Lääne-Harju signalling units (this number may change during the designing process), see table 1 rows 1. 11 ; 1.1 2 . 194 pc *48 600 € pc = 9 428 400 € Because neither the ERTMS L1 notional unit costs nor the cost estimate based on the notional cost of station signalling units include the cost of the centralisation system (interlocking) , the assessment of investment costs of the region’s interlocking systems was based on the average of five tenderers for the public procurement for the Lääne-Harju CCS system modernization project (tender index 186866) with the resulting sum of €9,159,733 see table 1 row 1.1 9 . Approximate cost for the GSM-R network on the ERTMS L2 line ( table 1 rows 1.1; 1. 20 ; 1. 21 . ) S GSM-R network =27 km *27 200 € km =734 400 € S GSM-R network and radioblock centre =734 400 € +4 979 900 € =5 714 300 € ERTMS L1 L2 investment for the who le region track s between stations and in the stations area (see Table 3 ) : S ERTMS L1L2 track, GSM-R =2 385 000 € +9 585 000 € + 9 428 400 € + 9 159 733 € + 5 714 300 € =36 272 433 € The cost of a single set of the ERTMS/ETCS on-board equipment has been obtained through the following cal culation ( see table 1 rows 1. 6 –1. 9 ): 47 468 € +318 000 € +34 532 € =400 000 € We have pointed out in our application of derogation that the implementation of ERTMS systems is no t only limited to changing trackside and interlocking equipment and related subsystems . The compatibility requirement between the rolling stock and the tracks must be observed and the entire Estonian pool of rolling stock must be equipped with the ERTMS/ETCS on-board equipment in order to use the ERTMS system. In our application of derogation we have done a back-calculation for the cost of only equipping 38 passenger trains (see table 1 rows 1.4; 1. 9 ): 38 pc *400 000 € pc =15 200 000 € Notional cost of certification/verification/validation that should be done for the rolling-stock series being in use before installing ERTMS/ETCS on-board-equipment (see table 1 row 1.10) S ERTMS OBU rolling stock series approval =1 series *750 000 € series =750 000 € Combined ERTMS L1 and L2 equipment cost on Lääne-Harju lines added to the passenger trains ERTMS/ETCS equipment cost : 36 272 433 € +15 200 000 € + 750 000 € =52 222 433 € For freight trains on the Lääne-Harju lines the minimum need for equipping the locomotives with ERTMS/ETCS OBU-s ( see table 1 row 1. 5; 1.9; 1.10 ): S ERTMS rolling stock freight MIN =10 pc *400 000 € pc +750 000 € = 4 750 000 € Implementing the Option 2 in the scope of the Lääne-Harju project requires investments in a total of : S ERTMS L1 L2 track and passanger rolling stock + S ERTMS rolling stock freight MIN = 52 222 433 € + 4 750 000 € = 56 972 433 € OPTION 3 The e stimate for ERTMS L2 traffic management system s covering the tracks between stations and ERTMS L1 used in station area: Figure SEQ Figure \* ARABIC 3 So lution for ERTMS L2 equipment on the open lines and ERTMS L1 equipment in stations Table SEQ Table \* ARABIC 4 ERTMS L2 on the open lines and ERTMS L1 in stations area investment cost estimation Costs for ERTMS L 2 on open lines and ERTMS L 1 in stations 18,992, 500 € 53 km of single-track and 27 km of double-track ERTMS L2 without stations and interlocking (see Figure 3) 2,176, 000 € GSM-R network for ERTMS L2 section 4,979, 900 € Radio Block center GSM-R for ERTMS L2 9,428, 400 € ERTMS L1 trackside systems in stations not including interlocking (based on the notional cost of signalling units) 9,159, 733 € interlocking system cost for the Lääne-Harju tender based on the average of 5 tenderers see table 1 row 1.1 9 1 in total 44,736, 533 € ERTMS L1 L2 investment for the whole region at the Lääne-Harju area (ERTMS L2 on the track between stations and ERTMS L1 in stations) Additional 750,000 € Locomotive series OBU approval (passenger trains) Additional 15,200, 000 € Equipping passenger trains with the ERTMS/ETCS equipment, 38 passenger trains 2 in total 60,686, 533 € ERTMS L2 on the open lines; ERTMS L1 equipment in Lääne-Harju stations and passenger trains with the ERTMS/ETC S equipment Additional 750,000 € Locomotive series OBU approval (minimum needs for freight trains in Lääne-Harju area) Additional 4,000, 000 € Equipping the locomotives with ERTMS/ETCS OBU-s for minimum needs of freight traffic on the Lääne-Harju lines 3 in total 65,436, 533 € Implementing the Option 3 in the scope of the Lääne-Harju project Approximate cost for the entire scope of the Lääne-Harju project on the condition that 53 km of single tracks line and 27km of double-track line will be equipped with ERTMS L 2 systems. The model provides the cost of track fixtures for open tracks only, excluding the cost of stations areas ERTMS equipment and interlocking systems ( see table 1 rows 1.1; 1.2; 1.1 4 ) . 53 km * 355 000 € km 2 +27 km * 355 000 € km =18 992 500 € Approximate cost of ERTMS L1 equipment for stations does not include the cost of the centralisation system (interlocking) . The estimate uses the notional price of signalling units, which is €48,600 per unit, and the pre-designed total number of Lääne-Harju signalling units (this number may change during the designing process), see table 1 rows 1. 11 ; 1.1 2 . 194 tk *48 600 € pc = 9 428 400 € Because neither the ERTMS L1 notional unit costs nor the cost estimate based on the notional cost of station signalling units include the cost of the centralisation system (interlocking) , the assessment of investment costs of the region’s interlocking systems was based on the average of five tenderers for the public procurement for the Lääne-Harju CCS system modernization project (tender index 186866) with the resulting sum of €9,159,733 see table 1 row 1.1 9 . Approximate cost for the GSM-R network on the ERTMS L2 line ( table 1 rows 1.1; 1. 20 ; 1. 21 . ) S GSM-R network =80 km *27 200 € km =2 176 000 € S GSM-R network and radioblock centre =2 176 000 € +4 979 900 € =7 155 900 € ERTMS L2 investment for the who le region track s between stations and ERTMS L1 investment in stations (see table 1 row 1.1 9 and calculations 2 3 ; 2 4; 26 ): S ERTMS L1 stations L2 open lines =18 992 500 € +7 155 900 € +9 428 400 € + 9 159 733 € =44 736 533 € The cost of a single set of the ERTMS/ETCS on-board equipment has been obtained through the following calculation (see initial data from table 1 rows 1. 6 –1. 9 ): 47 468 € +318 000 € +34 532 € =400 000 € We have pointed out in our application of derogation that the implementation of ERTMS systems is no t only limited to changing trackside and interlocking equipment and related subsystems . The compatibility requirement between the rolling stock and the tracks must be observed and the entire Estonian pool of rolling stock must be equipped with the ERTMS/ETCS on-board equipment in order to use the ERTMS system. In our application of derogation we have done a back-calculation for the cost of only equipping 38 passenger trains ( see table 1 rows 1.4; 1. 9 ): 38 pc *400 000 € pc =15 200 000 € Notional cost of certification/verification/validation that should be done for the rolling-stock series being in use before installing ERTMS/ETCS on-board-equipment (see table 1 row 1.10) S ERTMS OBU rolling stock series approval =1 series *750 000 € series =750 000 € ERTMS L2 investment for the who le region track s between stations and ERTMS L1 investment in stations (see calculation 2 7 ) added to the passenger trains ERTMS/ETCS equipment and approval costs (see calculation 29; 30 ) : S ERTMS L1 L2 track and passanger rolling stock =44 736 533 € +15 200 000 € + 750 000 € =60 686 533 € For freight trains on the Lääne-Harju lines the minimum need for equipping the locomotives with ERTMS/ETCS OBU-s ( see table 1 row 1. 5; 1.9 ): S ERTMS rolling stock freight MIN =10 pc *400 000 € pc +750 000 € = 4 750 000 € Implementing the Option 3 in the scope of the Lääne-Harju project requires investments in a total of: S ERTMS L1 track and passanger rolling stock + S ERTMS rolling stock freight MIN = 60 686 533 € + 4 750 000 € = 65 436 533[€] OPTION 4 The estimate that includes the technology needed to be procured within the framework of the public procurement for the Lääne-Harju CCS system modernization project (tender index 186866): Figure SEQ Figure \* ARABIC 4 Solution that is implemented in the ongoing project Table SEQ Table \* ARABIC 5 Ongoing projects average investment cost and short description of the scope The s olution given in the Lääne-Harju procurement (includes the modernisation of class B train protection system (ALSN) without any changes in functionality) €27,003,157 The a verage offe r of five tenderers without the contracting authority reserve The investment includes inter alia the following components: - modernising the train detection solution and changing the related track fixtures (using tonal tracks circuits and axle counters) - modernising the train protection solution and the related track fixtures (modernisation and optimisation of signalling system , including modernisation trackside equipment of the ALSN system that belongs under class B systems; the functionality of class B systems will remain wholly unchanged to ensure the operation o f existing on-board equipment on the rolling stock and the compatibility of infrastructures and rolling stock between the Baltic states and Russia) . - modernising i nterlocking systems to safety integrity level SIL-4 - the CCS system modernization and preparing for enable the construction of a full-length double- track region between Keila and Pääsküla - renewing the entire cable capacity of the region; an isolated and doubled fiber-optic core network will be established to improve system continuity - creating modern equipment rooms with temporary or permanent workstations for station operator - modernising the automation systems of level crossings and increasing the safety and continuity level of the level crossing s - renewing the traction current canalisation system and designing it according to the traffic density and electrical parameters of modern electric train s - etc NB! There is no need to renew the existing on-board equipment of the rolling stock because the functionality of the class B system (ALSN) and the track / rolling stock interface will remain the same. Table SEQ Table \* ARABIC 6 cost of LCC phases divided based on the principles given in UIC ERTMS BENCHMARK PROJECT FINAL REPORT. The entire LCC has been divided based on a 20-year life cycle. Average costs per benchmark pool (rounded values) Approximate modelled cost estimates for the Lääne-Harju project, OPTIONS 1–4 LCC model 1 LCC model 2 LCC model 3 The ERTMS L1 solution uses the model 1 division The ERTMS L1 and L2 combined solution uses the model 1 division The ERTMS L1 stations and L2 open-track combined solution uses the model 2 division Public procurement for the Lääne-Harju CCS system modernization project (tender index 186866). Based on LCC model 1 LCC phase ERTMS L1 ERTMS L2 On-Board OPTION 1 OPTION 2 OPTION 3 OPTION 4 R&D €20,000 16% €85,000 14% €55,000 13% €9,800,696 16% € 12,660,541 16% € 15,268,524 14% €6,000,702 16% Investment €90,000 72% €355,000 60% €330,000 75% € 44,103,133 72% € 56,972,433 72% € 65,436,533 60% €27,003,157 72% O&M €15,000 12% €155,000 26% €55,000 13% € 7,350,522 12% € 9,495,406 12% € 28,355,831 26% €4,500,526 12% LCC in total €125,000 100% €595,000 100% €440,000 100% € 61,254,351 100% € 79,128,380 100% € 109,060,889 100% €37,504,385 100% Figure SEQ Figure \* ARABIC 5 LCC visualisation Option 1-4. In LCC phase distribution, is used the practice set out in the UIC report ( 4 ; Figure 44 ). Figure SEQ Figure \* ARABIC 6 Option 1-4 LCC Frames also shows the proportional ratio of the total cost Figure SEQ Figure \* ARABIC 7 LCC total for Option 1 – 4 (see table 6 ) Conclusion These calculations support our argument presented in Application for derogation (1) that installation of ERTMS is not justified from an economic point of view , as it raises the cost of the Project multiple times and in addition to changes in the infrastructure, it also requires the alteration of on-board equipment of all rolling stock in use and certification of locomotive series . As far as in the long run Estonia railway infrastructure should be modernised on a broad scope the total gap between options 1–3 and alternative option 4 would cause unsustainable economic burden. Reference s Application for Derogation According to Article 9.1.d of Directive 2008/57/EU Estonian Railways Ltd infrastructure rounded p arameters Information from Estonian Technical Regulatory Authority ( e-mail from Heigo Saare to Märt Ehrenpreis (Fri, 29.06.2018 11:56) ) UIC ERTMS BENCHMARK PROJECT FINAL REPORT Update 2010 (ISBN 978-2-7461-1976-5) ; https://uic.org/cdrom/2011/05_ERTMS_training2011/docs/benchmark/ERTMSFinalReport2010.pdf ; read on the 4th of July 2018 Technical specifications annex to the public procurement for the Lääne-Harju CCS system modernization project (tender index 186866) "Liikennevirasto tutkimuksia ja selvityksiä 44/2014" Helsinki 2014 (978-952-317-009-4) ; https://julkaisut.liikennevirasto.fi/pdf8/lts_2014-44_konkretiaa_eurooppalaisen_web.pdf ; read on the 4th of July 2018
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel