dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Transpordiamet
Sissetulev kiriAvalik

Kiri

Transpordiamet · 9. jaanuar 2025
Seotud ettevõtted
Norte OÜ (adressaat)
Viit
7.1-1/25/516-1
Registreeritud
9. jaanuar 2025
Dokumendi liik
Sissetulev kiri
Adressaat
Norte OÜ
Saabumis/saatmisviis
e-post
Funktsioon
7.1 Teetaristuga seotud õiguste andmine
Sari
7.1-1 Riigitee ristmike kooskõlastamise ja ehitamise dokumendid
Toimik
7.1-1/2025
Vastutaja
Merike Joonsaar (Users, Teehoiuteenistus, Planeerimise osakond, Kooskõlastuste üksus)
Lahendamise tähtaeg
3. veebruar 2025

Failid

  • 📎01 Asendiplaan[22].pdf2153 KB
  • 📎E-kiri.eml3887 KB
  • 📎image002.png

Sisu (failidest)

be lt rete 59.54 nc ey or 58.78 co 60.64 nv 60.28 x= 6567450 60.60 co 59.64 60.14 x= 6567450 58.62 59.55 ble 60.69 59.70 60.63 60.62 y= 693400 60.42 y= 693800 rub c h 60.64 Dit 60.35 60.18 60.27 59.06 59.66 60.11 59.03 59.91 60.49 alt H 60.18 alt 60.33 ph rete ph ble as as rub co nc 60.16 60.40 ch 60.31 60.62 ble 59.56 Dit rub 60.35 60.60 lt 60.34 60.65 be or ey 59.84 ble 60.36 60.60 co nv rub 60.27 60.27 60.18 60.12 le 59.58 59.77 59.71 b rub Ditc h 60.16 60.18 alt ph 60.27 as 60.59 59.77 59.85 rete alt nc rete ph co 60.52 60.52 as co nc 60.30 alt 58.90 59.47 asph 59.60 60.11 60.57 ine r 60.34 59.49 59.49 co nta 60.21 60.15 ble 60.00 rub lt 60.15 p ha 59.49 59.65 as 60.55 59.96 60.07 60.26 60.57 ch rubble elt 59.76 Dit asph alt rb 59.92 60.22 60.31 60.68 ve yo n ble co 59.97 rub 60.36 60.07 co 59.96 nc 60.19 lt 59.54 ha rete le 60.18 p ru bb 60.63 as 59.43 60.14 59.80 60.56 60.14 60.20 60.64 60.55 59.84 60.31 H 60.20 60.38 60.67 60.39 59.77 61.73 rete 60.14 60.54 60.72 on c 60.05 60.23 c 59.75 60.14 60.50 rubble 60.66 60.32 ch 58.81 Dit 60.24 60.36 ble ble 60.58 rub be lt rub y or 60.39 59.81 60.21 n ve 60.17 co 60.14 60.10 a lt 60.62 ph ble 59.76 as rub 60.24 59.34 60.16 60.53 60.76 60.25 58.64 60.26 60.34 49802:002:0450 60.49 60.56 60.40 60.55 58.80 on c rete 60.24 60.21 60.36 Estonia tööstusala rubble c 60.34 59.55 60.16 rubble 60.72 60.56 60.27 60.37 ch Dit 60.34 lt 60.18 ble be rub ey or 60.39 60.76 60.40 60.86 on v 60.26 ble c 60.23 alt rub 60.47 59.03 60.39 ph 60.82 59.80 as 60.40 60.36 rete 60.26 nc 60.99 rubble co 60.39 60.77 ncrete ble rub co 60.62 60.40 60.44 rete ble nc rub co 60.64 te 60.79 60.49 60.49 n cre 60.88 60.39 co te rete 60.82 nc re 60.33 co nc 60.44 co 59.95 60.40 60.34 60.78 crete 61.16 rubble 60.41 ble 60.54 co n ch x= 6567350 rub 60.80 be lt 60.48 Dit x= 6567350 or Dit ch 60.46 ey nv 60.95 60.18 rubble co ble 60.83 59.55 ble 60.50 y= 693250 y= 693600 60.52 rub 60.37 60.93 60.46 60.49 rub 60.83 60.33 60.46 alt 60.45 59.68 as ph 60.44 rubble 60.39 60.75 61.06 59.63 60.46 60.51 60.51 N 60.61 61.01 60.56 co rubble Ditch nc 60.47 60.51 cre te 60.63 60.57 re 69.0 0 con 60.61 te 60.38 59.99 59.96 60.72 60.89 60.26 70.00 60.73 60.46 60.54 60.55 60.87 60.32 59.98 ch 60.85 Dit 0 60.60 .0 60.52 60.60 71 60.52 Ditch 60.15 60.46 73.00 60.95 60.58 60.66 60.52 60.73 60.63 60.56 60.67 60.62 60.13 rubble 60.48 0 60.63 60.64 60.49 60.63 74.0 S sand te be lt concre 0 r 60.64 a lt 5. 0 yo 61.10 ph 60.58 le 60.62 ve rubble as 76.00 7 b n 60.55 rub co 60.95 60.83 60.64 concrete 60.69 60.63 60.63 60.66 d 60.54 60.44 60.85 60.66 roa 60.42 ne Ditc 61.02 60.67 asphalt cra h 60.59 60.64 60.83 60.89 rubble 60.41 60.56 60.44 60.53 60.37 60.64 Ditch rubble rubble 60.81 rubble 60.45 60.50 74 60.51 0 .0 0 .0 75.0 76 0 .00 74 0 60.44 60.63 rubble 60.48 60.59 73.0 rubble 60.47 60.55 0 72.0 0 71.0 60.71 0 60.82 60.52 60.69 70.0 0 60.51 69.0 ble 60.53 asphalt rub 60.64 0 68.0 0 60.79 60.81 60.71 75 .00 67.0 rubble elt 60.75 rb 76.0 66.00 60.54 60.74 60.60 e yo 60.54 0 nv 60.92 60.16 0 co rubble 60.33 65.0 60.85 rubble rubble rubble d roa 0 rubble 64.0 60.34 Ditch .00 rubble ne 63 60.58 60.49 60.50 cra 62.00 60.66 60.35 60.33 60.56 60.21 rubble 60.42 60.46 59.80 rubble 61.35 60.41 60.23 76.0 Ditch 60.38 59.83 60.66 60.65 60.42 60.33 60.37 60.72 58.71 Ditch 60.49 0 60.66 59.48 60.31 60.40 60.36 Ditch 59.94 60.47 60.59 59.73 60.4060.24 60.31 60.32 .00 77 61.29 ble 60.39 59.58 concrete ru b rubble 60.42 60.14 59.56 59.76 60.54 60.62 60.83 rubble rubble 61.40 60.44 58.41 60.66 rubble 60.81 60.75 ble rubble 60.17 rub 60.43 60.84 as 61.27 60.52 59.71 60.60 60.70 60.58 ph ch rubble 61.25 Dit 60.62 59.62 60.69 alt 60.65 59.64 60.21 be lt 60.70 59.91 60.55 or rubble 60.66 Dit 60.49 v ey 60.65 ch 60.68 co nc 61.35 on re 0 60.58 c 60.32 te 77.0 77.00 ch 60.07 60.56 60.67 Dit 58.61 75.0 .00 60.86 0 76 0 59.62 60.02 78.0 60.57 60.27 60.74 61.46 73 74.00 60.48 60.34 60.31 60.06 60.17 61.21 60.77 rubble 60.4960.56 59.94 concrete 60.79 60.90 72.0 0 Ditch 61.18 .0 ch Ditch 58.95 60.38 60.57 Dit 59.02 71.0 0 rubble 60.36 Ditch 59.96 59.91 0 .00 60.38 60.51 60.05 59.29 79 59.47 69 .00 60.50 59.83 60.88 .00 60.77 60.04 60.72 70 61.37 60.55 59.88 60.53 67.0 .00 58.29 Ditch 59.09 60.58 60.87 60.42 59.79 60.02 68 59.30 60.75 66.0 0 60.19 78.00 Dit 59.59 0 0 60.68 ch 59.64 60.65 77.0 le 59.85 b le rubb 60.28 rubble rub 60.60 65.00 61.37 ble 60.76 59.58 59.96 as rub 61.30 ph alt 60.87 59.21 64.00 61.22 60.54 59.27 x= 6567250 60.40 60.66 60.00 60.34 58.54 rubble 60.82 63.00 ch 60.31 rubble rubble 59.65 61.38 60.51 Dit ch 60.07 Dit 60.40 rubble 60.77 ch 60.42 rubble 60.39 0 y= 693000 Dit 60.20 60.56 .0 60.09 62 59.64 60.48 lt 60.64 59.91 60.77 60.27 59.56 be 60.73 or ey 58.92 ch nv 59.77 Dit 60.26 61.44 59.56 co 61.29 59.41 59.49 59.77 60.07 60.27 Dit 61.26 60.54 59.95 60.44 59.94 ch 60.29 0 60.29 60.39 59.59 alt 60.75 alt .0 rub ble 59.78 60.47 asph asphalt 60.28 60.56 60.24 as ph 81 .0 0 59.98 59.79 59.83 60.51 80 .00 61.37 60.35 59.83 59.84 59.97 79 8.00 59.71 7 .00 77 projekteeritav madalpinge kaabelliin 60.41 60.23 58.88 58.83 59.16 concrete 59.79 60.00 concrete 60.17 60.69 60.55 60.30 60.07 .0 0 60.38 60.59 60.38 75 6.0 60.19 0 7 61.42 ble rubble 60.59 rub 61.38 59.67 61.33 60.37 59.83 60.05 rubble 60.33 Ditch 60.57 Ditch 61.33 60.22 rubble 59.90 60.30 H 0 0 60.57 .0 .0 60.05 60.27 74 73 .00 59.68 72 .00 itc h 59.71 D 58.7759.49 60.08 59.86 59.88 rubble 71 59.22 asphalt 60.62 70.0 0 61.52 60.10 60.39 60.62 59.76 57.8759.22 asphalt 59.91 60.11 .00 61.38 69 61.34 59.54 60.48 60.04 .00 60.16 H 68 60.17 59.78 60.12 60.32 0 60.31 lt 60.54 60.39 60.42 67.0 60.21 be concrete 59.91 61.29 ey or 60.42 59.92 0 59.91 nv concrete rubble 59.99 rubble 60.46 60.51 co 60.46 66.0 concrete 60.16 rubble 59.97 60.57 61.31 60.44 60.60 60.38 59.96 ble 2 60.01 60.65 0 rub 60.35 60.50 rubble 59.97 65 .0 61.33 rubble rubble 59.97 60.12 61.30 60.47 60.27 60.34 59.93 60.06 60.59 64.00 2 60.35 60.22 60.38 59.96 63.00 59.65 1 60.26 60.61 XW 60.39 rubble rubble 60.03 60.93 60.60 rubble rubble 61.30 59.89 60.37 60.10 rubble 60.69 Dit ch 60.49 60.33 0 61.35 2 59.77 62.0 60.43 1 60.61 60.15 rubble 60.82 60.24 61.20 XW concrete 61.23 59.45 asp 60.49 2 XW 60.01 60.19 halt 59.72 60.12 60.21 rubble 59.86 1 61.39 60.14 2 rubble 60.66 H gara 60.60 60.36 2 61.07 1 elt 60.21 rubble 59.79 59.69 až 60.73 XW 0 b 83.0 or 61.33 le 60.51 v ey 59.65 bb on 59.88 ru 61.22 rubble c rubble 60.71 61.20 60.51 a pile of rubble 59.62 0 82.0.00 60.36 asphalt a pile of rubble 81 .00 59.54 80 0 59.96 59.64 H H 60.01 rubble 79.0 rubble 59.64 78.00 61.16 77.00 0 Dit ch 60.61 H rubble .0 or 76 0 or 60.46 ey e r 60.36 59.75 75.0 61.20 ey r nv n s 0 nv s e co p e 74.0 60.45 co p e n dis 73.00 0 61.19 60.34 dis 59.68 59.77 72.0 0 61.18 59.64 71.0 0 .0 70 0 59.47 60.72 60.52 60.82 69.0 61.02 59.93 60.40 0 68.0 0 60.29 60.85 67.0 x= 6567170 60.39 rubble 59.74 60.80 .00 rubble elt 60.39 59.91 60.78 66 0 60.96 or b 60.33 65.0 0 ble ey a pile of rubble 64.0 rub 61.07 59.83 nv 60.41 60.28 60.15 59.65 co 60.30 60.41 59.61 59.69 y= 693119 0 61.03 60.38 63.0 59.51 H 59.24 59.47 asphalt rub rubble .00 60.88 59.74 ble 59.96 asp 62 rubble 60.02 rubble asphalt halt rubble ümberpaigaldatav purusti rubble rub ch or 60.55 60.74 Dit ey r 60.45 60.39 ble nv s e 60.20 60.42 co p e n 60.35 60.41 .00 59.36 dis 61 60.88 60.25 60.00 59.77 60.81 60.88 60.85 60.42 60.21 rubble rubble 60.95 59.07 59.80 60.72 60.40 59.64 59.88 60.89 59.64 59.94 59.63 60.90 59.60 60.59 x= 6567150 0 60.57 60.19 rubble 60.36 60.48 59.77 .0 87 0 60.33 60.33 86 .0 0 ble 59.90 rub y= 693650 .0 85 00 60.66 60.46 . 84 0 83 .0 60.65 60.47 x= 6567145 60.51 ümberpaigaldatav konveier 60.21 rubble H garaaž 59.98 0 58.85 60.34 .0 H 0 82 .0 y= 693135 81 .00 60.57 59.68 80 60.37 rubble 59.50 60.25 or 59.69 60.41 a pile of rubble 59.87 0 60.62 ey r .0 0 ch nv s e rubble 60.53 60.76 79 .0 Dit co p e n 78 dis 60.54 60.85 0 rubble 60.89 .0 .00 60.48 rubble 60.83 77 76 60.61 .00 60.44 60.84 75 0 60.48 60.80 .0 74 .00 58.82 60.37 60.32 60.63 59.23 60.34 60.33 60.50 73 0 60.29 .0 72 00 59.85 60.44 60.52 . 59.66 60.63 71 .00 60.17 70 .00 60.44 60.55 60.00 rub rubble 69 .00 le 60.63 bb ble asp 68 .00 ru 59.61 59.38 60.31 67 .00 60.66 halt 60.33 60.69 rub 60.29 rubble 66 0 60.35 ble .0 65 .00 60.49 60.17 58.81 Dit 64 rubble .00 60.31 60.31 ch 63 0 60.16 60.69 59.55 .0 60.26 60.41 61.02 60.56 60.71 62 59.94 59.71 59.47 60.77 rubble 60.35 60.73 rubble 60.55 60.18 60.76 60.61 .00 ch 60.68 60.72 Dit 60.75 60.73 61 60.59 60.64 .00 59.91 rubble rubble a pile of rubble 60 60.22 rubble rubble 60.44 60.79 60.43 rubble 60.53 60.57 60.21 60.18 60.09 60.68 60.00 x= 6567111 61.06 58.88 60.61 59.57 60.76 60.83 rubble 60.78 0 .0 59.98 60.12 59.85 y= 693495 59.71 60 59.92 60.51 ble 60.75 60.75 x= 6567105 60.71 60.69 rub 60.27 60.69 60.80 rubble 59.71 60.63 60.69 60.18 60.77 60.94 61.41 60.92 60.60 y= 693243 rubble 60.47 59.58 0 60.53 x= 6567100 60.37 60 .0 60.82 60.12 60.50 60.77 60.05 60.60 60.33 0 60.00 60.00 61.22 59.0 60.60 rubble 59.82 y= 692800 60.73 60.62 60.47 60.70 60.26 60.32 x= 6567094 59.0 0 60.38 rubble rubble 60.40 rubble 60.37 rubble 60.33 Dit y= 693167 rubble 60.54 60.90 0 ch rub 59.0 60.52 61.02 ble 60.76 60.66 asp 60.27 60.07 61.05 58.80 58.77 58.74 58.80 59.07 59.40 58.82 58.86 59.03 59.11 60.47 61.16 59.00 ha rub 60.76 60.89 rubble 60.29 lt 60.29 ble 60.01 rubble 60.80 60.40 60.31 59.92 60.28 60.47 60.25 59.19 59.00 60.46 60.25 60.46 60.30 60.75 60.50 60.86 60.42 0 60.64 60.14 61.13 .0 61.09 59.00 60.40 87 0 .0 86 .00 60.15 rubble 61.12 le 85 .00 60.96 60.35 59.00 bb ru 84 a pile of rubble rubble .0 0 rubble 59.99 60.97 61.28 rubble 60.11 83 59.93 rubble 61.43 60.57 60.93 61.30 61.05 60.37 rubble 0 rubble 60.55 82.0 .00 60.46 rubble 60.12 x= 6567068 60 58.72 58.71 58.81 58.70 58.79 58.76 58.97 58.81 58.73 58.75 58.94 58.91 58.98 60.24 0 rubble 81.0 60.49 60.26 61.44 60.14 60.35 y= 693184 0 60.98 ch 61.24 .0 61.02 Dit 60.34 80 60.93 60.26 61.76 0 60.49 .0 rubble 60.42 60.27 79 0 7 8.0 59.72 60.64 59.70 60.00 59.61 59.91 0 62.03 77.0 60.30 0 61.71 60.00 76.0 61.56 59.00 60.17 75.00 rub 60.14 59.74 61.04 60.15 ble x= 6567052 74.00 a pile of rubble rubble as 60.99 60.28 59.58 61.10 ph 61.10 59.0 rub alt rubble 61.01 0 0 ble .0 73 .00 60.67 61.60 y= 693602 72 0 60.54 59.59 60.12 ch 59.0 0 0 71.0 0 rubble Dit 61.73 0. 0 rubble 59.46 59.15 58.77 58.77 58.79 58.80 58.79 58.75 58.75 58.72 58.77 58.86 58.87 59.11 59.60 6 59.24 58.72 58.80 58.96 59.94 70.0 0 61.60 0 69 .0 60 .0 59.95 67 .00 60.57 rubble 60.43 59.0 0 66 .00 68 59.90 645.00 0 6 .0 59.54 0 0 59.51 .0 .0 63 0 0 60.09 59.0 .0 .00 62 Saatja: "Marven Aus" <[email protected]> Saaja: [email protected] Teema: Projekteerimistingimuste taotlus - 13110 Väike-Pungerja - Estonia kaevanduse tee Kuupäev: 2025-01-09 13:12 Tere! Palume väljastada projekteerimistingimused „13110 Väike-Pungerja - Estonia kaevanduse teelt“ Estonia tööstusalale (KÜ tunnus 49802:002:0450) mahasõidu projekteerimiseks. Kirjale on lisatud esialgne eskiisjoonis planeeritud mahasõidu asukoha ja esialgse lahendusega. Täiendavate küsimuste korral palun ühendust võtta. Regards Marven Aus Projekteerimise projektijuht Design Project Manager M: +372 5139049 E: <mailto:[email protected]> [email protected] <https://www.norte.ee/> norte.ee --- Kiri on saadetud väljastpoolt valitsemisala. Ärge avage kirjaga kaasa tulnud linke või manuseid enne, kui olete saatja õigsuses ja sisu turvalisuses kindel.
Allikas: Transpordiamet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel