dokumendiregister.ee
OtsingAsutusedMCP
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel
Otsing›Rahandusministeerium
Väljaminev kiriAvalik

Auditi lõpparuande edastamine

Rahandusministeerium · 19. juuni 2020
Viit
10-5/4581-1
Registreeritud
19. juuni 2020
Dokumendi liik
Väljaminev kiri
Adressaat
Varbla Puhkeküla AS, Riigi Tugiteenuste Keskus, Riigi Tugiteenuste Keskus
Saabumis/saatmisviis
e-post
Funktsioon
10 VALITSUSE SISEKONTROLLISUSTEEMI KOORDINEERIMINE NING EUROOPA LIIDU TOETUSTE JA VÄLISABI AUDITEERIMINE
Sari
10-5 Riigieelarve ja välisvahendite auditi lõpparuanded koos tõendusmaterjali ja kirjavahetusega
Toimik
10-5/2020
Vastutaja
Elis Kõrvek (Rahandusministeerium, Kantsleri vastutusvaldkond, Finantskontrolli osakond, II auditi talitus)

Failid

  • 📎10-54581-1 19.06.2020 Väljaminev kiri.bdoc468 KB

Sisu (failidest)

Estonia-Latvia Cross-Border Co-operation Programme 2014-2020 Project No: Est-Lat 55 Project name: ESTLAT harbours Project Partners Name (LP/PP): Aktsiaselts Varbla Puhkeküla (PP) Fund:European Regional Development Fund Target objective:SO 3.1 An improved network of small harbours with good levels of service Audit No: ELP-12/2020 Audit organisation: Ministry of Finance Final audit report 18.06.2020 SUMMARY OF AUDIT RESULTS Audit outcome: Based on the audit work performed, the auditors have obtained reasonable assurance that the expenditure declared is in all material aspects legal and regular and in compliance with the programme rules. Audit opinion1: no audit findings. The project audit has been carried out in compliance with the International Standards for the Professional Practice of Internal Auditing. We wish to thank the auditee for the assistance and cooperation provided during the audit. We confirm that the final audit report consists of 6 pages. 1 Significant findings are those that have or may have a financial impact (i.e. ineligible expenditure). Non-significant findings are those that have no financial impact but whose correction will help the beneficiary to lower risks while implementing the project. 2 TABLE OF CONTENTS SUMMARY OF AUDIT RESULTS ............................................................................................................................... 2 TABLE OF CONTENTS ............................................................................................................................................ 3 PART A .................................................................................................................................................................. 4 1. AUDIT OBJECT AND AUDITED EXPENSES ..................................................................................................... 4 2. LIMITATIONS ......................................................................................................................................... 5 PART B .................................................................................................................................................................. 6 AUDIT FINDINGS ...................................................................................................................................... 6 3 PART A 1. Audit object and audited expenses 1.1 GENERAL INFORMATION ABOUT THE AUDIT Project name: ESTLAT harbours Project number: Est-Lat 55 Priority and target objective: SO 3.1 An improved network of small harbours with good levels of service Beneficiary (LP/PP): Aktsiaselts Varbla Puhkeküla Contact person: Heino Sabiin Date of subsidy contract: 13/10/2017 Audit scope and period: Period 4: 01.06.2018-30.09.2018; € 277,285.00 Period 5: 01.10.2018-31.01.2019; € 185,980.00 Period 6: 01.02.2019-31.05.2019; € 236,007.00 1.2 INFORMATION ABOUT THE AUDIT Basis: - Article 127(1) of the Regulation (EU) No 1303/2013 of the European Parliament and of the Council of 17 December 2103 - Audit Authority’s work plan for 2020. Objective: To provide an audit opinion that: - the operation was selected in accordance with the selection criteria for the operational programme; - the expenditure declared to the Commission corresponds to the accounting records and that the required supporting documentation demonstrates an adequate audit trail; - for expenditure declared to the Commission, outputs and results underpinning payments to the beneficiary have been delivered. Person(s) carrying out the audit: Elis Kõrvek, Financial Control Department, Audit Unit II, lead auditor Katrin Vaher, Financial Control Department, Audit Unit I, auditor Audit duration: 05.05.-18.06.2020 Methodology: Audit manual of the Estonia-Latvia Programme Audit procedures performed at the During the on-the-spot check, interviews were conducted with beneficiary: the persons involved in project implementation and analysis/evaluation was made of the following: 4 - project’s actual implementation, - documentation related to project implementation, - eligibility of costs, - arrangement of book-keeping related to the project, - existence of co-financing, - use of the logos. Sampling methodology (if applicable, then Not applicable information shall be provided by the AA ): 1.3 AUDITED EXPENSES Total amount of certified expenses subject Period 4: 01.06.2018-30.09.2018; €277,285.00 to auditors’ opinion on the basis of cost documents: Period 5: 01.10.2018-31.01.2019; €185,980.00 Period 6: 01.02.2019-31.05.2019; €236,007.00 Size of the sample (EUR; %)2: €699,272.00, 100% Ineligible expenditure identified (EUR): 0.00 National Private sector EU contribution public Total contribution contribution Ineligible amount (EUR): 0.00 0.00 0.00 0.00 Ineligible amount outside the audit scope 0.00 0.00 0.00 0.00 (EUR): Error rate (%)3: 0.00% 2. Limitations The audit procedures were carried out in compliance with internationally accepted auditing standards4 and the audit report was prepared using the principles of independence and objectivity. Auditors conclude that all data presented during the audit and other oral and written information made available during the audit presents a true and fair view of the activities performed during the project implementation and are sufficient to provide an opinion about the project. In case of additional information that was not provided or was not known to auditors, the conclusions reached by auditors might have been different. 2 If a sample was not used for auditing, the size of the sample is the total population in euros and the share of audited expenses to total population is 100%. 3 Share of ineligible expenses to audited expenses (%). If a sample was used for auditing, the share of ineligible expenses to the sample size shall be used. 4 The International Professional Practices Framework (IPPF) of the Institute of Internal Auditors. 5 PART B AUDIT FINDINGS 1. Use of funding as intended The funding has generally been used in material aspects in the intended manner, in a reasonable and efficient way and in accordance with the objectives and requirements laid down in the subsidy contract and the programme manual. 2. Accuracy of book-keeping records The book-keeping records for the project are in all material aspects in compliance with the current legislation. 3. Amount and timing of funding The granting of funding has in all material aspects been made available in the amount foreseen and on time, and the co-financing has been guaranteed. 4. Carrying out of public procurements The beneficiary, who is not contracting authority of public sector, has carried out a simplified procurement procedure with a reference number 190028 electronically in the e-procurement register in compliance with the programme rules. 5. Granting of state aid The state aid has been granted to the project and used by the beneficiary in correct manner, in accordance with the state aid rules. 6. Communication and publicity When informing and disclosing the use of funding, the beneficiary has in all material aspects followed the current legislation. We confirm that the final audit report has 6 pages. Audit manager: Audit supervisor: (Signed electronically) (Signed electronically) Elis Kõrvek Kadi Peets Lead Auditor of Audit Unit II Head of Audit Unit II Financial Control Department Financial Control Department Tallinn, 18/06/2020 6 Hr Heino Sabiin Varbla Puhkeküla AS Meie 19.06.2020 nr 10-5/4581-1 [email protected] Auditi lõpparuande edastamine Austatud härra Sabiin Edastame Teile Eesti-Läti INTERREG V-A programmi projekti „ESTLAT harbours“ (Est-Lat55) partneri Varbla Puhkeküla AS projektiauditi lõpparuande. Täname Teid auditi läbiviimise ajal üles näidatud abi ja koostöö eest. Lugupidamisega (allkirjastatud digitaalselt) Kaur Siruli Finantskontrolli osakonna juhataja Lisa: Auditi lõpparuanne kuuel (6) leheküljel Teadmiseks: Pr Ege Ello, Riigi Tugiteenuste Keskus ([email protected]) Pr Imbi Uusjärv, Riigi Tugiteenuste Keskus ([email protected]) Elis Kõrvek 611 3197 [email protected] Suur-Ameerika 1 / 10122 Tallinn / 611 3558 / [email protected] / www.rahandusministeerium.ee registrikood 70000272