Majandus- ja Kommunikatsiooniministeerium 18.05.2018 nr 1.1-10/2018/474
Suur-Ameerika 1
10122 Tallinn
Avariireservelektrijaamade kasutamine puhta energia paketi valguses
Käesoleva kirja lisana saadame Teile Eesti ja Soome süsteemihaldurite Eleringi ning Fingridi ühise
positsiooni avariireservelektrijaamade kasutamise käsitluse kohta puhta energia paketis.
Lugupidamisega
/allkirjastatud digitaalselt/
Taavi Veskimägi
Juhatuse esimees
Elering AS
Lisad:
Lisa 1 Elering-Fingrid ühine positsioon
Elering AS | Registrikood/Reg. code 11022625 | Kadaka tee 42, 12915 Tallinn, Estonia
| + 372 715 1222 | + 372 715 1200 | www.elering.ee | Ametlik e-post/Official e-mail:
[email protected]
Joint position paper of the Finnish and Estonian
1 (1)
Transmission System Operators
14 May 2018
Fingrid and Elering support the Council’s General Approach on the Electricity
Directive to enable continued ownership of their emergency reserves
In November 2017, Fingrid and Elering circulated a joint position paper to their respective ministries
concerning the future rules governing TSO ownership of assets providing emergency reserve services
in light of the ongoing European legislative process to revise the Electricity Directive.
Since then, the European Parliament and Council of the European Union have consolidated their
respective negotiating texts for the Electricity Directive in advance of the upcoming ‘trilogue’ negotiations
later this year. It is, at this juncture, that Fingrid and Elering would restate their deep concern that future
provisions under Articles 40 and 54 of the draft Electricity Directive may prohibit Fingrid and Elering from
owning and operating their fleet of generating units that act as emergency reserves.
As outlined previously, Fingrid and Elering are operating relatively isolated power systems that sit at the
periphery of the EU electricity system. Both systems are, by European standards, exceptionally
vulnerable to unforeseen disconnections and supply shortfalls, while having limited resources on the
market to manage such risks. These events are rare, but necessitate both Fingrid and Elering to maintain
a sufficient level of emergency reserves to ensure operational security in these instances.
It must be emphasised that given the exceptional circumstances under which emergency reserves are
deployed, they do not have any distortionary impact on the market for ancillary services. It is for this
same reason that a functioning market for the provision of such services cannot exist. If Fingrid and
Elering are prohibited from owning these reserves, they will be forced to dispense of these assets on
unfavourable terms and procure the needed services from the new owners of the same reserves. Such
a mandatory sale of infrastructure that forms part of the TSOs’ regulated asset base would have to be
done at a discounted price and then subsequently re-contracted by the TSO at a far higher price than if
the assets were under TSO ownership. This would raise operating costs and directly result in higher grid
tariffs for consumers, with no benefits to the electricity market.
The versions of the Article 40 and 54 of the Electricity Directive contained in the European Parliament’s
Plenary Text, as well as the European Commission’s Proposal, would result in the prohibition of future
ownership.
To prevent such a scenario, Fingrid and Elering affirm their support for the versions of Article 40 and 54
contained in the Council’s General Approach. While these versions may provide sufficient scope for
TSOs to avoid the costly procurement of emergency reserves services it would still be preferable to
include an additional clause enabling TSOs to continue to directly own those assets providing ancillary
services which were owned prior to the entry into force of the Directive until the end of their serviceable
lifetime. These would be deployed only to ensure operational security when other ancillary services
procured from the market have been exhausted.
Fingrid and Elering are available to provide further detailed information on the issues outlined in this
paper and would strongly welcome further discussion to clarify their position.
Attachments Position paper of November 2017
1 (2)
8 November 2017
AMENDMENT PROPOSALS TO REV2 OF THE ELECTRICITY DIRECTIVE
Original Suggested amendment
4. In performing the task described in point (i) of paragraph 1, the 4. In performing the task described in point (i) of paragraph 1,
transmission system operators shall [ensure that the the transmission system operators shall [ensure that the
procurement of] procure balancing services [and, unless procurement of] procure balancing ancillary services
duly justified by a cost-benefit analysis, and approved [and, unless duly justified by a cost-benefit analysis,
by the competent authority, non- frequency ancillary and approved by the competent authority, non-
services, is] according to: frequency ancillary services, is] according to:
(a) transparent, non-discriminatory and market-based procedures; (a) transparent, non-discriminatory and market-based
procedures;
(b) ensures effective participation of all qualified electricity
undertakings and market participants including (b) ensures effective participation of all qualified electricity
renewable energy sources, demand response, energy undertakings and market participants including
storage facilities and [] electricity undertakings market renewable energy sources, demand response, energy
participants engaged in aggregation. For that storage facilities and [] electricity undertakings
purpose, [in particular by requiring] regulatory market participants engaged in aggregation. For
authorities [or] and transmission system operators shall, that purpose, [in particular by requiring] regulatory
in close cooperation with all market participants, [to] authorities [or] and transmission system operators
define technical modalities for participation in these shall, in close cooperation with all market participants,
markets on the basis of the technical requirements of [to] define technical modalities for participation in
these markets in accordance with the Commission these markets on the basis of the technical requirements
Regulation 2017/1485 establishing a guideline on of these markets in accordance with the Commission
electricity transmission system operation []. Regulation 2017/1485 establishing a guideline on
electricity transmission system operation [].
2 (2)
8 November 2017
5a. The requirements of paragraph 4 shall apply to the 5a. The requirements of paragraph 4 shall not apply to the
provision of non-frequency ancillary services by provision of non-frequency ancillary services by
transmission system operators, unless the regulatory transmission system operators, unless in cases where
authority shows that the market-based provision of the regulatory authority shows that the market-based
non-frequency ancillary services is economically not provision of non-frequency ancillary services is
efficient. This obligation does not apply to fully economically not efficient or in cases where facilities
integrated network components. providing ancillary services have been owned by
transmission system operators for at least two years
prior to the [date of entry into force of this Directive].
This obligation does not apply to fully integrated
network components.
Joint position paper of the Finnish and Estonian
1 (2)
Transmission System Operators
9 November 2017
TSO ownership of emergency reserve assets requires special consideration
under the future Electricity Directive
On 30 November 2016 the European Commission published its “Clean Energy for All Europeans”
Package. Fingrid and Elering, as firm believers in market based solutions, welcome its release and
supports the Package’s central objectives relating to the design of electricity markets. The legislative
proposals contained within the revised Electricity Regulation and Electricity Directive broadly
correspond to the measures necessary to enhance the efficiency, integration and flexibility of the
European electricity market. The focus on the consumer is also to be strongly welcomed.
Since its release Fingrid and Elering have had the opportunity to further examine the details and
implications of key elements of the Package. In particular, we have assessed the implications of draft
provisions relating to TSO ownership of ancillary services as specified under Articles 40 and 54 of the
draft Electricity Directive. These would prevent Fingrid and Elering continued ownership and
management of key ancillary services, which are used to ensure security of supply in an electricity
system subject to several critical and unique conditions and, which do not have a distortionary impact
on the electricity market.
The electricity markets of Finland and Estonia are, by European standards, geographically isolated as
their power systems sit at the periphery of the EU electricity system. Finland is heavily dependent on
imports with around 20 percent of total electricity consumption provided for by imports from within the
Baltic sea region and Russia while interconnection capacity is limited. Estonia on the other hand is a
transit country, operating cross-border interconnections with a capacity exceeding local demand.
These factors increase the relative vulnerability of their power systems to unforeseen disconnections
and supply shortfalls. This vulnerability is further compounded by small domestic reserve markets
which are characterised by low liquidity and a narrow pool of suppliers for balancing energy.
Furthermore, Estonia is part of Russian IPS/UPS synchronous area, where present agreements
require TSOs to hold a share of emergency reserves. This requires Elering to hold reserves to be used
in the synchronous area.
It is for these reasons that Fingrid and Elering have been granted permission by their national
authorities to own and operate a limited fleet of power generators providing emergency reserves.1
These reserves are deployed under exceptional circumstances when system security is endangered
such as the sudden and unforeseen trip of a large generating unit or outage of a major interconnector.
Such events are rare but can result in supply shortfalls corresponding to 10-20 percent of consumption.
The rarity of these events, which may only occur at intervals of less than once a year, negates the
establishment of a liquid and functioning market for such reserves. Furthermore, it is essential to note
that Fingrid and Elering owned emergency reserve assets are only deployed after all commercially
available balancing resources have been exhausted or used for exceptional congestion management
purposes for AC interconnections in the event a large generator trips.
These features of ancillary service ownership and deployment mean that there is no distortionary
impact on the market for reserves or, more generally, on the efficient functioning of the wholesale
1 Fingrid directly owns 935 MW of generating capacity comprising of 10 emergency reserve plants. In addition to
this, Fingrid has long-term contracts for the use of 263 MW of emergency reserve capacity. Elering directly owns
250 MW of generating capacity comprising of two emergency power plants.
Joint position paper of the Finnish and Estonian
2 (2)
Transmission System Operators
9 November 2017
electricity market. Attempting to procure these reserves commercially would be economically inefficient
and result in disproportionate costs to consumers2.
It is for these reasons that Fingrid and Elering strongly see the need for the future Electricity Directive
to recognise and take into account the particular conditions affecting the Finnish and Estonian power
systems, and the subsequent need for a derogation from any measures which may prevent the future
ownership and management of their emergency reserves, which ensure system security at the lowest
cost for consumers.
As a solution, Fingrid and Elering suggest specific amendments to the wording of the Council
REV2 of the Electricity Directive. These are annexed to this joint paper.
Fingrid and Elering remain at the disposal of the European institutions to provide more detailed
information on the issues outlined in this paper and would strongly welcome further discussion to clarify
their position.
Attachments Amendment proposal
2 As the only buyer of such services Fingrid and Elering would be in a very weak negotiating position and subject
to bids and pricing power from a small pool of domestic providers.