dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 24. mai 2018
Viit
24.1-2/2018/4615
Registreeritud
24. mai 2018
Dokumendi liik
Sissetulev kiri
Adressaat
EV alaline esindus Euroopa Liidu juures
Saabumis/saatmisviis
e-post
Funktsioon
24.1 EL ja rahvusvahelise koostöö korraldamine
Sari
24.1-2 EL-ga seotud kirjavahetus (Arhiiviväärtuslik)
Toimik
24.1-2/2018
Vastutaja
Thea Palm (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Siseturu valdkond, Siseturuosakond, Toote ohutuse ja tarbijakaitse talitus)

Failid

  • 📎896_Draft_rules_of_procedure.pdf148 KB
  • 📎896.pdf111 KB
  • 📎896_Proposal_to_create_WG.pdf137 KB
  • 📎E-kiri.pdf249 KB

Sisu (failidest)

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR INTERNAL MARKET, INDUSTRY, ENTREPRENEURSHIP AND SMES Industrial Transformation and Advanced Value Chains Advanced Engineering and Manufacturing Systems RULES OF PROCEDURE FOR THE COMMITTEE ON CABLEWAY INSTALLATIONS The Committee on Cableway Installations , Having regard to Regulation (EU) 2016/424 of the European Parliament and of the Council of 9 March 2016 on cableway installations and repealing Directive 2000/9/EC 1 and in particular Article 44 thereof, Having regard to Regulation (EU) No 182/2011 of the European Parliament and of the Council of 16 February 2011 laying down the rules and general principles concerning mechanisms for control by Member States of the Commission's exercise of implementing powers2, and in particular Article 9(1) thereof, Having regard to the standard rules of procedure published by the Commission3, HAS ADOPTED THE FOLLOWING RULES OF PROCEDURE: Article 1 Convening a meeting 1. A meeting of the committee shall be convened by the chairperson, either on his/her own initiative, or at the request of a simple majority of members of the committee. 2. In the case referred to in the second subparagraph of Article 3(5) of Regulation (EU) No 182/2011, where the written procedure is terminated without result, the chairperson shall convene a committee meeting within a reasonable time. 3. Joint meetings of the committee with other committees may be convened to discuss issues coming within their respective areas of responsibility. 1 OJ L 81, 31.3.2016, p.1. 2 OJ L55, 28.2.2011, p.13. 3 OJ C 11, 12.7.2011, p.11 Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË — Tel. +32 22991111 Office: BREY 10/180 — Tel. direct line +32 229 98500 [email protected] Article 2 Agenda 1. The chairperson shall draw up the agenda and submit it to the committee. 2. The agenda shall make a distinction between: (a) draft Implementing Acts to be adopted by the Commission on which the Committee on cableway installations is asked to give an opinion, in accordance with the advisory procedure provided for in Article 44(2) of the Regulation (EU) 2016/424; (b) draft Implementing Acts to be adopted by the Commission on which the Committee on cableway installations is asked to give an opinion, in accordance with the examination procedure provided for in Article 44(3) of the Regulation (EU) 2016/424; (c) other issues put to the Committee on cableway installations for information or a simple exchange of views, either on the chairperson's initiative, or at the written request of a Member of the Committee on cableway installations. Article 3 Documentation to be submitted to Members of the Committee 1. For the purpose of the second subparagraph of Article 3(3) of Regulation (EU) No 182/2011, the chairperson shall submit the invitation, the draft agenda and the draft implementing act on which the Committee on cableway installations is asked to give an opinion to the Members of the Committee well in advance of the meeting, taking into account the urgency and the complexity of the matter, and no later than 14 calendar days before the date of the meeting. Other documents related to the meeting, in particular documents accompanying the draft implementing act, shall, as far as possible, be submitted within the same time limit. All documents shall be submitted in accordance with Article 12(2) of Regulation (EU) No 182/2011. 2. In duly justified cases, the chairperson may, on his/her own initiative or at the request of a Member of the Committee on cableway installations, shorten the time limit for submission of documents referred to in paragraph 1. Except in cases of extreme urgency, the time limit shall not be shorter than 5 calendar days. Article 4 Opinion of the Committee on cableway installations 1. The Committee on cableway installations shall deliver its opinion on a draft implementing act within the time limit laid down by the chairperson in accordance with the second subparagraph of Article 3(3) of Regulation (EU) No 182/2011. 2 2. Where the advisory procedure leads to a vote, the outcome of the vote shall be decided by a simple majority of the component Members of the Committee on cableway installations, in accordance with Article 4(1) of Regulation (EU) No 182/2011. Where the Committee on cableway installation's opinion is required under the examination procedure, the outcome of the vote shall be decided by a qualified majority, in accordance with Article 5(1) of Regulation (EU) No 182/2011. 3. Unless a Member of the Committee on cableway installations objects, the chairperson may, without proceeding to a formal vote, establish that the Committee has delivered a positive opinion, by consensus, on the draft implementing act. 4. The chairperson, in consultation with the members of the committee on cableway installations, may, on his/her own initiative or at the request of a member of the Committee, postpone a vote until the end of the meeting or to a later meeting. 5. In accordance with the second subparagraph of Article 3(4) of Regulation (EU) No 182/2011, the chairperson shall endeavour to find solutions which command the widest possible support within the Committee on cableway installations. Before the vote, the chairperson shall inform the Committee on cableway installations of the manner in which the discussions and suggestions for amendments have been taken into account, in particular as regards those suggestions which have been largely supported within the Committee. Article 5 Representation 1. Each Member State shall be considered to be one member of the Committee on cableway installations. Each member of the Committee on cableway installations shall decide on the composition of its delegation and inform the chairperson. With the chairperson's permission, the delegations may be accompanied by experts who are not part of the delegation. 2. Within a reasonable time and no later than 5 calendar days before the date of an Committee on cableway installations meeting, the following information shall be communicated to the chairperson: (a) the composition of each delegation, except where such composition is already known to the chairperson; (b) the names and functions of any experts accompanying the delegations and the reasons for which their presence is required. If the chairperson does not object to the participation of an expert in advance of the Committee on cableway installations meeting, the permission referred to in paragraph 1 is considered to be granted. 3 3. The reimbursement of travel expenses by the Commission shall be paid in accordance with the applicable rules, subject to budgetary funds provided for this purpose. 4. A Member State delegation may represent a maximum of one other Member State. The Member State that is being represented shall inform the chairperson of this before the meeting, or, at the latest, before the vote. Article 6 Working groups 1. The Committee on cableway installations may create working groups to examine particular issues. The working groups shall be chaired by a representative of the Commission. 2. The working groups shall report back to the Committee on cableway installations under the responsibility of their chairperson. Article 7 Third parties and experts 1. The representatives of Iceland, Liechtenstein, Norway, Switzerland and Turkey shall be invited to attend the meetings of the Committee on cableway installations, in accordance with the European Economic Area Agreement4, the Mutual Recognition Agreement between the EU and Switzerland 5, and the Customs Union between the EU and Turkey6. 2. Representatives of acceding countries shall be invited to attend the meetings of the Committee on cableway installations as from the date of signature of the Treaty of Accession. 3. The chairperson may decide to invite representatives of other third parties or other experts to talk on particular matters, on his/her own initiative or at the request of a member of the Committee on cableway installations. However, a simple majority of the component members of the Committee on cableway installations may oppose their participation in the meeting. 4. Representatives of third parties and experts referred to in paragraphs 1, 2 and 3 shall not be present at and shall not participate in voting of the Committee on cableway installations. 4 OJ L 1, 3.1.1994, p. 3. 5 OJ L 114, 30.4.2002, p. 369. 6 OJ L 35, 13.2.1996, p. 1. 4 Article 8 Written procedure 1. The chairperson may obtain the Committee on cableway installation's opinion by written procedure in accordance with Article 3(5) of Regulation (EU) No 182/2011. In particular, the chairperson may use the written procedure to obtain the Committee on cableway installation's opinion in cases where the draft implementing act has already been discussed during an Committee on cableway installations meeting. 2. The chairperson shall inform the members of the Committee on cableway installations of the outcome of a written procedure without delay, and no later than 14 calendar days after the expiry of the time-limit. Article 9 Secretarial support The Commission shall provide secretarial support for the Committee on cableway installations and, if necessary, the working groups created pursuant to Article 6(1) of these rules. Article 10 Minutes and summary record of meetings 1. For the purpose of Article 3(6) of Regulation (EU) No 182/2011, the Minutes of each meeting shall be drawn up under the responsibility of the chairperson. Committee members shall have the right to ask for their position to be recorded in the minutes. The chairperson shall send the minutes to the Committee without delay and no later than 1 month after the meeting. The members of the Committee shall send any comments they may have on the draft minutes to the Chairperson in writing. If there is any disagreement, the matter shall be discussed by the Committee on cableway installations. If the disagreement persists, the relevant comments shall be annexed to the final Minutes. 2. For the purpose of Article 10 of Regulation (EU) No 182/2011, the Chairperson shall be responsible for drawing up a summary record briefly describing each item on the Agenda and the results of the vote on any draft implementing act submitted to the Committee on cableway installations. The summary record shall not mention the individual position of the members in the Committee's discussions. 5 Article 11 Attendance list and conflicts of interest 1. At each meeting, the Chairperson shall draw up an attendance list specifying the authorities and organisations to which the persons designated by the Member States to represent them belong. 2. At the beginning of each meeting, any person designated by the Member States, as well as experts who have been authorised by the Chairperson to participate in the meeting in accordance with Article 5(1) and Article 7(3) of these rules, and representatives of third parties who have been invited to attend the meeting in accordance with Article 7 of these rules shall inform the Chairperson of any conflict of interest7 with regard to a particular item on the Agenda. In the event of such a conflict of interest, the person concerned shall, at the request of the Chairperson, withdraw from the meeting whilst the relevant items of the Agenda are being dealt with. Article 12 Correspondence 1. Correspondence relating to the Committee on cableway installations shall be submitted to the Commission, for the attention of the Chairperson of the Committee. 2. Correspondence for members of the Committee on cableway installations shall be submitted to the Permanent Representations of the Member States, preferably by electronic means. Where a Permanent Representation indicates to the Commission a specific central electronic address for correspondence related to work of the committees, that address shall be used for correspondence. In addition, correspondence may be submitted directly to the persons designated by the Member States to represent them in the Committee. Article 13 Access to documents and confidentiality 1. Requests for access to Committee on cableway installations documents shall be handled in accordance with Regulation (EC) No 1049/2001 of the European 7 As an example, Article 52(2) of Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities (OJ L 248, 16.09.2002, p. 1) contains a specific definition of a conflict of interest. 6 Parliament and of the Council8. It is for the Commission to take a decision on requests for access to those documents pursuant to its Rules of Procedure as amended by Decision 2001/937/EC, ECSC, Euratom9. If the request is addressed to a Member State that Member State shall apply Article 5 of Regulation (EC) No 1049/2001. 2. The Committee on cableway installation's discussions shall be confidential. 3. Documents submitted to members of the Committee on cableway installations, experts and representatives of third parties shall be confidential 10, unless access is granted to those documents pursuant to paragraph 1 or they are otherwise made public by the Commission. 4. The members of the Committee on cableway installations, as well as experts and representatives of third parties, shall be required to respect the confidentiality obligations set out in this Article. The Chairperson shall ensure that experts and representatives of third parties are made aware of the confidentiality requirements imposed upon them. Article 14 Protection of personal data The processing of personal data by the Committee on cableway installations and its working groups shall be in conformity with Regulation (EC) No 45/2001 of the European Parliament and of the Council11, under the responsibility of the Chairperson acting as the controller, within the meaning of point (d) of Article 2 of that Regulation. Article 15 Transitional arrangement These Rules of Procedures shall not affect pending procedures or decisions taken before the entry into force of these Rules. Article 16 Entry into force (1) These Rules of Procedures enter into force on [insert date]. 8 OJ L 145, 31.5.2001 p. 43. 9 OJ L 345, 29.12.2001, p. 94. 10 In accordance with Article 339 TFEU, "[t]he members of the institutions of the Union, the members of committees, and the officials and other servants of the Union shall be required, even after their duties have ceased, not to disclose information of the kind covered by the obligation of professional secrecy, in particular information about undertakings, their business relations or their cost components". 11 OJ L 8, 12.1.2001 p. 1. 7 Tere Edastan Komisjoni kirja. Reg. number: 10.2-12.M/896 Reg. kuupäev: 22.05.2018 Sisu: Committee on cableway installations established under Article 44 of Regulation (EU) 2016/424 - Adoption of the Rules of Procedure of the Committee on cabelway installation by written procedure - Creation of the workind group on cabelway installations by written procedure Tervitades Kersti Neeme AEEL sekretär EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR INTERNAL MARKET, INDUSTRY, ENTREPRENEURSHIP AND SMES Industrial Transformation and Advanced Value Chains Advanced Engineering and Manufacturing Systems Proposal to create the Working Group to support the Committee on cableway installations established under Article 44 of Regulation (EU) 2016/424 Article 6, paragraph 1, of the Rules of Procedure of the Committee on Cableway installations foresees that the Committee may create working groups to examine particular issues. The working groups shall be chaired by a representative of the Commission. Paragraph 2 sets down that the working group shall report back to the Committee on cableway installations under the responsibility of their Chairperson. Several sectorial interested parties at EU level, in particular the European Standardisation Organisations (CEN and CENELEC), the conformity assessment bodies or notified bodies (through the European Notified body for cableway installations group), the associations of manufacturers, of trade unions, of consumers and others, have a specific role and/or interest in the application of Regulation (EU) 2016/424. In order to facilitate direct discussions and interchange of contributions and experiences with Member States responsible for the implementation of the Regulation, it is proposed to formally create the Working Group of the Committee which brings together all these parties. The Working Group of the Committee on cableway installations would continue the current activity of the Standing Committee on cableway installations already established under the previous Directive 2000/9/EC. On this basis, the Members of the Committee on cableway installations CREATE the Working Group of the Committee on cableway installations, composed of:  the Members of the Committee on cableway installations: representatives of the European Commission and of the EU Member States;  the observers of the Committee on cableway installations;  the representatives of the European Standardisation Organisations (CEN and CENELEC), as well as the HAS Consultant; Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË — Tel. +32 22991111 Office: BREY 10/180 — Tel. direct line +32 229 98500 [email protected]  the representatives of the Notified Bodies Group on Cableway installations;  the representatives of European-wide associations of manufacturers, trade unions and consumers;  the representatives of other relevant interested parties and organisations at EU level. The Working Group on cableway installations may examine any issue related to the application of Regulation (EU) 2016/424. The Working Group on cableway installations shall be chaired by the representative of the Commission services in charge of the Regulation (EU) 2016/424, who is the Head of Unit and/or, in his/her behalf, the Deputy Head of Unit and/or the Policy Officer responsible of the Regulation. The Working Group shall report back to the Committee on cableway installations under the responsibility of its Chairperson. As a communication tool for all its Members, the Working Group on cableway installations will use the CIRCABC tool, a specific new interested group will be created. 2
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel