Sissetulev kiriAvalik

Taotlus

Majandus- ja Kommunikatsiooniministeerium · 6. oktoober 2015
Seotud ettevõtted
Balti Gaas OÜ (adressaat)
Viit
14-00813/004
Registreeritud
6. oktoober 2015
Dokumendi liik
Sissetulev kiri
Adressaat
Balti Gaas OÜ
Saabumis/saatmisviis
e-post
Funktsioon
17 Energeetikaalase tegevuse korraldamine
Sari
17-4 Energiaturuga seotud kirjavahetus (elekter, gaas, kütus)
Toimik
14-00813
Vastutaja
Jako Reinaste (Energeetika osakond)
Lahendamise tähtaeg
5. november 2015

Failid

  • 📎BaltiGaas_2015_2_application_form_part_a_final.pdf103 KB
  • 📎MKM approval taotlus 17092015.docx16 KB

Sisu (failidest)

Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A1 Proposal TENtec nr. DRAFT (26431304) Call: CEF-Energy-2015-2 General information on the project of common interest Commission Delegated Regulation 1391/2013 Project No. 8.1.2.2 Title of the PCI Paldiski LNG Energy sector Gas Priority corridor Baltic Energy Market Interconnection Plan in gas PCI description New onshore LNG terminal near Paldiski (including a reloading facility for bunkering or small scale distribution) with an annual send-out capacity of 2.5 BCM/year. The LNG storage capacity is of about 180.000 – 320.000 CM LNG and the maximum ship size of 165.000 CM LNG (or any standard LNG tanker capable to pass through the Danish Straits). Location of the Project of Common Interest Member State(s) EE Region(s) EE00 Eesti 3rd country (1) NUTS 2 nomenclature will be used for the regions. Proposal type Please select the proposal type: Work Study GENERAL INFORMATION ON THE PROPOSED ACTION Name of the Action Building and commissioning of Paldiski LNG terminal Start date of the Action 01/07/2015 End date of the Action 01/01/2020 Summary of the Action (up to 2000 characters). Please describe the main scope, goals and objectives of the action, the main needs addressed by the action and the technical data of the action to be funded. Page 1 The PCI (Paldiski LNG 8.1.2.2.) consists of one action: the building and commissioning of Paldiski LNG terminal. The aim of the Action is to build and commission the East Baltic Sea regional LNG import and regasification terminal. The project location is on the south coast of the Gulf of Finland, in Estonia. The port location on the north-eastern side of the Pakri peninsula has been chosen for its favourable ice conditions, easy navigational path, low impact on the environment and a large available safety radius. Since the project is planned on the BalticConnector (PCI 8.1.1.) land-fall, connectivity to grid is relatively inexpensive. Balti Gaas OÜ intends to build a Baltic regional terminal with 160 000 m3 storage tank capacity to be commissioned in the beginning of 2019 in order to provide a supply option for the Baltic States. The terminal would be large enough to assist with supply to the Finnish market through BalticConnector. It is designed to service both gas grid customers and off-grid customers, since pursuant to market analysis it is clear that the off-grid market will prove instrumental in this region. In connection to that, truck and LNGC loading facilities are developed to support off-grid markets as well as feeder terminals along the coast of the Baltic Sea. The terminal design flow for re-gasification is planned at around 4 MCM/day. The project is developed with the possibility of further enlargement subject to market conditions. The main needs addressed are ending the energy isolation of gas for Baltic States and together with Baltic Connector also for Finland, helping to implement a unified regional gas-market and ensuring security of supply by providing an alternative supply route for gas and allowing the storage of emergency reserves for interested Member States and TSO’s. Page 2 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A2.1 Proposal TENtec nr. DRAFT (26431304) Applicant nr. 1 APPLICANT Applicant's legal name Balti Gaas OÜ Administrative Data Legal address Street name Roseni Number 13 Town / city Tallinn Postal code 10111 Country Republic of Estonia Legal Status Of The Applicant Applicant's legal status Private undertaking/body in the EU According to article 43 (1) of the Commission Delegated Regulation (EU) No 1268/2012 (on the rules of application of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council on the financial rules applicable to the general budget of the Union), international organisations are: (a) international public sector organisations set up by intergovernmental agreements, and specialised agencies set up by such organisations; (b) the International Committee of the Red Cross (ICRC);(c) the International Federation of National Red Cross and Red Crescent Societies; (d) other non-profit organisations assimilated to international organisations by a Commission decision. Does the applicant have the legal personality in accordance with the applicable national legislation? YES NO If NO, then applicants must provide the statutes of the applicant (or the relevant abstract) as a supporting document to the application form to demonstrate that the representative of the applicant has the capacity to undertake legal obligations on its behalf. Page 3 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A2.2 Proposal TENtec nr. DRAFT (26431304) Applicant nr. 1 APPLICANT Applicant's legal name Balti Gaas OÜ Contact Points Person in charge (the person who will be contacted by the Commission in the first instance) Family name Piikmann First name(s) Karmo Function Analyst Is the address different from the legal address (of section A2.1)? NO Street name Roseni Number 13 Town / city Tallinn Postal code 10111 Country Republic of Estonia Phone +372 55 631 545 Fax - Email [email protected] Representative authorized to sign this application Family name Hääl First name(s) Marti Function Member of the board Is the address different from the legal address (of section A2.1)? NO Street name Roseni Number 13 Town / city Tallinn Postal code 10111 Country Republic of Estonia Phone +372 661 7731 Fax - Email [email protected] Date Stamp + signature Page 4 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A2.3 Proposal TENtec nr. DRAFT (26431304) Applicant nr. 1 APPLICANT Applicant's legal name Balti Gaas OÜ IF THE APPLICANT IS A THIRD COUNTRY, AN INTERNATIONAL ORGANISATION, A JOINT UNDERTAKING OR A PUBLIC OR PRIVATE UNDERTAKING/BODY ESTABLISHED IN THE EU, OR AN ENTITY ESTABLISHED IN A THIRD COUNTRY, THE MINISTRY OF THE EU MEMBER STATE CONCERNED BY THE PCI, PLEASE FILL IN THE SECTION BELOW ON THE MINISTRY OF THE EU MEMBER STATE APPROVING THIS PROPOSAL Ministry's legal name Ministry of Economic Affairs and Communication Administrative data Legal address Street name Harju Number 11 Town / city Tallinn Postal code 15072 Country Republic of Estonia Representative authorized to sign this proposal Family name First name(s) Function Is the address different from the legal address? YES/NO NO Street name Harju Number 11 Town / city Tallinn Postal code 15072 Country Republic of Estonia Phone Fax Email Date Stamp(*) + signature (*) Stamp of the competent Ministry. Page 5 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A2.4 Proposal TENtec nr. DRAFT (26431304) Applicant nr. 1 APPLICANT Applicant's legal name Balti Gaas OÜ If the applicant wishes to designate any affiliated entities to be involved in the implementation of the proposed Action, the following information should be completed: Page 6 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A3.1 Proposal TENtec nr. 26431304 INFORMATION ABOUT THE ACTION REQUESTING GRANTS UNDER CEF-ENERGY LOCATION OF THE PROPOSED ACTION Member States(s) Estonia Region(s) Third Country(ies) (1) NUTS 2 nomenclature will be used for the regions. ACTIVITIES OF THE PROPOSED ACTION Activity Activity name Activity description Start date End date Milestone(s) number 1 Applying for a The project needs a public grant, to be 01/07/2015 14/10/2015 1 public grant financially viable and for that an application in the Connecting Europe Facility, 2015 second call for proposals in the energy sector will be submitted. 2 The signing of As the project needs financing also by 01/10/2015 31/01/2016 1 the loan commercial lenders, then it is crucial to sign a agreement loan agreement with commercial bank(s) for the terminal project as well as an agreement for bridge financing for the public grant. 3 The The objective of this activity is to find the most 03/12/2015 18/03/2016 2 procurement suitable EPC partners, which conform to the for EPCs set parameters in the compiled EPC tendering packages. The construction and due to that also EPC will be divided into three parts: Tank and process part, Jetty and offshore part and Non-process part. 4 Construction of In the construction phase, the developer will 12/04/2016 13/06/2019 3 the terminal actively communicate with the EPC partners together with and monitor their progress. The successful monitoring cooperation and precise monitoring will be of key importance for the project to be commissioned as scheduled. 5 Construction of As the off-shore part has a shorter schedule 13/06/2016 12/12/2018 3 the off-shore for construction and a separate permitting part and jetty timeline, it is scheduled to start later. The expected construction time is two years and it should finish the same time as the on-shore part. 6 The start of the The different parts of the terminal are given 13/03/2019 30/06/2019 3, 4 commissioning over to the commissioning partner from the constructing partners and the testing of the terminal begins. Also, the teaching of the staff of the terminal operator will begin. Page 7 7 Ordering of the For the successful commissioning, all of the 02/01/2019 31/12/2019 4 first LNG infrastructure must be tested and the staff well shipment trained. For the purpose of commissioning, it is really important to receive the first shipment of LNG and to test the different functions needed, for the terminal to operate normally. 8 Finalising the Concurrently to the ordering of the first LNG 01/07/2019 31/12/2019 4 commissioning shipment, all of the needed procedures will be implemented in the terminal and all of the required permits will be applied for. The staff of the terminal operator is well trained and ready for everyday operations. MILESTONES OF THE PROPOSED ACTION Milestone Milestone name Milestone description Expected Means of verification number date 1 Final Investment Decision The next critical milestone 11/02/2016 The public grant financing is in the development of secured, the final commitment of Paldiski LNG terminal is commercial banks is received and the securing of financing the equity investments are and the Final Investment guaranteed Decision (FID). As the project is not commercially viable without a public grant, the most important part for FID is the awarding of public grant. The public grant is also the key ingredient in securing the other sources of financing. Both the commercial lenders as well as the main shareholder of Balti Gaas OÜ as the equity capital provider, have set the public funding in the extent to secure commercial viability as one of their preconditions for financing the project. The milestone will be achieved after the public grant is awarded to the project and also the commercial lender(s) and equity investor(s) have submitted their commitment for providing the capital needed for FID. 2 Procurement of EPC This is the first step after 18/03/2016 Signed EPC contracts FID, where the EPC tenders will be carried through. The EPC will be divided into three different EPC tenders: •Tank and Process Part •Jetty and Offshore Part •Non- Process Part All procurement of EPC tenders will be carried out simultaneously. The milestone will be reached, if all of the EPC contracts are signed and time schedules are in place. Page 8 3 Completion of The construction phase is 13/06/2019 All of the structures have been construction divided into three constructed and available for testing simultaneously running and commissioning areas: •Construction of the tank and process part; •Construction of Jetty and Offshore part •Construction of non- process part The construction phase can be considered completed in case all of the object are finished and available for testing. 4 Commissioning The last milestone is the 31/12/2019 The terminal has received the first full commissioning of the shipment of LNG, all of the functions terminal. For achieving and equipment has been tested and this milestone, the the personnel has been trained construction phase must be finished, all of the relevant coaching for the different staff involved should be carried out and a testing should be conducted, where the full cycle of LNG handling should be involved. Page 9 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A4.1 Proposal TENtec nr. DRAFT (26431304) Financial information on the project of common interest SOURCES OF FINANCING Financial Contribution (in euros) Applicant 60648000 EIB loan 0 Other loans 136374000 State budget(s) 0 Regional/local budgets(s) 0 Other EU funds (e.g. ESIF, EEPR, TEN-E, CEF, EIPA, 0 IPA, etc.) Contribution from CBCA (*) 0 Other sources 0 CEF-E financing requested 146969000 Total 343991000 (*) Please indicate the contribution from CBCA to be received by the respective applicant(s). For multi-beneficiary actions, please split the sources of financing by applicant. All amounts must be in euros. Exchange rate used for preparing the applications Please list all the Actions related to the Project of Common Interest co-financed by the EU (e.g. under CEF, ESIF, TEN-E, EEPR, EIPA, IPA, etc.), including the "Amount granted (in euros)" and "Grant Agreement Number" or "Decision Number" where available: Action Name Amount granted (in euros) Grant Agreement/Decision Number Building and commissioning of 0 DecisionNr Paldiski LNG terminal Page 10 Application Form Part A EUROPEAN COMMISSION CONNECTING EUROPE FACILITY ENERGY SECTOR A4.2 Proposal TENtec nr. DRAFT (26431304) Financial information on the action requesting grants under CEF SOURCES OF FINANCING Financial Contribution (in euros)(*) Applicant 58446000 EIB loan 0 Other loans 136374000 State budget(s) 0 Regional/local budgets(s) 0 Other EU funds (e.g. ESIF, EEPR, TEN-E, CEF, EIPA, 0 IPA, etc.) Contribution from CBCA (**) 0 Other sources 0 CEF-E financing requested 146969000 Total 341789000 (*) Contribution to eligible costs only. (**) Please indicate only contribution from CBCA expected from entities other than the applicant(s). For multi-beneficiary actions, please split the sources of financing by applicant. All amounts must be in euros. Indicative breakdown of estimated eligible costs of the proposed action by activity Activities 2015 2016 2017 2018 2019 2020 Total eligible costs 1.Direct costs 1 Applying for 0 50000 0 0 0 0 50000 a public grant 2 The signing 0 2000000 0 0 0 0 2000000 of the loan agreement 0 5744000 0 0 0 0 5744000 3 The procurement for EPCs 0 93827000 103365000 100315000 0 0 297507000 4 Construction of the terminal together with monitoring 0 0 21994000 10997000 0 0 32991000 5 Construction of the off- shore part and jetty 6 The start of 0 0 0 1997000 0 0 1997000 the commissionin g Page 11 7 Ordering of 0 0 0 1000000 0 0 1000000 the first LNG shipment 8 Finalising 0 0 0 500000 0 0 500000 the commissionin g Total eligible 0 101621000 125359000 114809000 0 0 341789000 costs Page 12 Hr Kristen Michal EV majandusminister Tallinn 1 7 .09 .2015 Hr minister, lubage pöörduda seoses Paldiski LNG terminali projektiga. 14.10.2013 kinnitas Euroopa Komisjon üleeuroopalise tähtsusega energiataristu ühishuviprojektide nimekirja, kus määratleti kla strina : Kiili-Paldiski (50km, DN700, 55bar), Paldiski- Inkoo (80km, DN500, 80bar) ja Inkoo-Siuntio (20km, DN500, 80bar) gaasitoru koos vastavate kompressorjaamadega merealuse osa mõlemas otsas („Balticconnector“) ning üks järgmistest LNG regionaalse terminali projektidest, kas Finngulf LNG ( Gasum projekt Inkoos ), Paldiski LNG (Alexela projekt Paldiskis), Tallinn LNG ( Vopaki projekt Muugal) või Latvian LNG ( Latvjas Gaze projekt Riias). Paldiski LNG terminali projekt on läbinud üldplaneeringu, keskkonnamõjude hindamise ja detailplaneeringu etapid koos selle edukalt lõppenud kohtuliku kontrolliga . K ehtestatud planeeringute kohaselt on võimalik terminal soovitud asukohta rajada. Rahvusvahelise konkursi võitnud T ractebel Engineering GDF SUEZ -iga koostöös on lõp p enud eel proje kteerimine ( FEED ) ja ettevalmistused rahvusvahelise ehituskonkursi (EPC) läbiviimiseks. Ehitusloa ja vee erikasutusloa menetlused on lõppjärgus ja ootavad lõplikku investeerimisotsust. Ei ole kahtlust, et eelviidatud kla stris on Paldiski LNG projekt kõige küpsem ja edu konkureerivate projektide ees on ajaliselt mõõdetav aastates. Samas lõpliku investeerimisotsuse üheks olulisimaks eelduseks nii arendajale kui ka finantseerimisest huvitatud pankadele on lõplik selgus, kas ja mis ulatuses riigiabi (siseriiklikud meetmed regioonis, CEF või mingi muu programm) Läänemere / Soome lahe regioonis LNG imporditerminalile osaks saab . Ei koorma käesolevat avaldust argumentatsiooniga , milliseid vaba turu moonutusi ja selle tagajärjel otsese i d kahju si d riigiabi otsustamine peale Paldiski LNG terminali valmimist tekitab. Vajadusel oleme meelsasti valmis seda selgitama. Tulenevalt eeltoodust oleme seisukohal, et lähtudes vabaturu põhimõtetest tuleks selline küsimus lahendada „las parim projekt võidab“ põhimõttel. 2014 suvel, kui avati CEF TEN-E programmi rahastustaotluste esimene voor, jätsime me Paldiski osas uuringute kaasrahastuseks taotluse esitamata, kuivõrd uuringud olid meil juba lõppfaasis ja Eesti-Soome vahel olid käimas kompromissiläbirääkimised. Teine rahastusvoor lõpeb 14.10.2015 ja me soovime Paldiski LNG terminali projekti ehitustööde kaasrahastamiseks selles voorus taotluse esitada. Vastavalt EL määruse 347/2013 sätetele, peavad liikmesriigid kooskõlastama nende territooriumile planeeritavate energiataristu ühishuviprojektid. Seetõttu palume kooskõlastada vastavalt EK vormile Paldiski LNG terminali taotlus (manuses) arvestades selle rahastusvooru sulgumise tähtajaga. Lugupidamisega digitaalallkirjastatud Marti Hääl, juhatuse liige Alexela Group OÜ Balti Gaas OÜ