SOODEVAHE INFRASTRUKTUURI HOOLDUSKESKUS
SOODEVAHE INFRASTRUCTURE MAINTENANCE CENTER
TÖÖPROJEKT DETAILED TECHNICAL DESIGN
DPS1 ÜLEMISTE-KANGRU DPS1 ÜLEMISTE-KANGRU
SOODEVAHE INFRASTRUKTUUR SOODEVAHE INFRASTRUCTURE
JUURDEPÄÄSUTEE 2 (OS05005) ACCESS ROAD 2 (OS05005)
SELETUSKIRI EXPLANATORY LETTER
SIDEVARUSTUS LOW VOLTAGE SYSTEMS
Ainuvastutus käesoleva väljaande eest lasub autoril. The sole responsibility of this publication lies with the author.
Euroopa Liit ei vastuta selles sisalduva teabe mistahes kasutamise eest. The European Union is not responsible for any use that may be made of the information contained therein.
TELLIJA / KONSULTANT / DATA /
2024-05-24
CLIENT CONSULTANT DATE
DOKUMENDI NIMI / DOCUMENT NAME
DOKUMENDI STATUS /
DOCUMENT STATUS SELETUSKIRI /EXPLANATORY LETTER
ESITATUD KINNITAMISEKS /
ISSUED FOR APPROVAL
LEPING Nr./ CONTRACT No. 2023-K086
PROJEKTI Nr. / PROJECT No. KMGInfra OÜ
RBDTDEEDS2DPS1_KMG_OS05007 Valukoja 8/2
11415 Tallinn, Estonia KUTSE. / NIMI / ALLKIRI / PROJEKTI KOOD / ASUKOHT / DISTSIPLIINI KOOD / EST /
Reg.no.16638472 QUALIF. NAME SIGN. PROJECT CODE LOCATION DISCIPLINE CODE ENG
Rail Baltic Estonia OÜ KOOSTAJA
A. Klibanov
ORIGINATOR
Veskiposti 2/1 ALLTÖÖVÕTJA /
SUB-CONTRACTOR Elektriohutuse A pädevusklass PROJEKTI
KUJUNDUSE NIMI / DESIGN NAME Tallinn, Eesti/Estonia Competence class A for electrical OSA KOHALIK
safety PROJEKT ID LÕIGU ID ALALÕIGU ID TSOON ASUKOHT RBR KOOD ETAPP
10138 SÜSTEEM KOOD
SOODEVAHE INFRASTRUKTUURI Reg. nr 12734109 KONTROLLIJA
A. Klibanov
PROJECT ID SECTION ID SUB-SECT. ID ZONE LOCATION RBR CODE PROJECT
CHECKER VOL. SYST. LOCAL CODE
HOOLDUSKESKUSE EHITUSE I ETAPP STAGE
Telefon/phone: Elektriohutuse A pädevusklass
+372 6867067 Competence class A for electrical
STAGE I OF THE SOODEVAHE INFRASTRUCTURE safety
e-mail:
[email protected]
SERVICE CENTRE’S CONSTRUCTION ÜLEVAATAJA
S. Veisalu
REVIEWER
Reaalprojekt OÜ RBDTD-EE DS2 DPS1 OS05005 ZZ ZZZZ LV EN TP/ DTD
ARHIIV Nr. / ARCHIVE NO.
Tallinna 45,
71008 Viljandi Estonia
Register code: KINNITAJA LEHEKÜLG / LEHED / REVISIOON /
APPROVER M. Leetberg DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
10765904
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 1 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
Projekti nimi: Soodevahe infrastruktuur. Juurdepääsutee 2 Project title: Soodevahe infrastructure. Access road 2
Projekteerimisteenused: Tööprojekt. DPS1 Ülemiste-Kangru Design Service: Detailed technical design. DPS1 Ülemiste-Kangru
Dokumendi pealkiri: RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 Document title: RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001
Dokumendi
Rev. Kuupäev Koostanud Kontrollinud Heaks kiitnud Vastu võtnud Rev. Date Doc Status Prepared Checked Approved Accepted
staatus
001 19/01/2024 Esitatud Artjom Klibanov Artjom Klibanov Sven Veisalu Margus Leetberg 001 19/01/2024 Submitted Artjom Klibanov Artjom Klibanov Sven Veisalu Margus Leetberg
002 07/03/2024 Esitatud Artjom Klibanov Artjom Klibanov Sven Veisalu Margus Leetberg 002 07/03/2024 Submitted Artjom Klibanov Artjom Klibanov Sven Veisalu Margus Leetberg
003 24/05/2024 Esitatud Artjom Klibanov Artjom Klibanov Sven Veisalu Margus Leetberg 003 24/05/2024 Submitted Artjom Klibanov Artjom Klibanov Sven Veisalu Margus Leetberg
Allkirjad Signatures
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 2 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
SISUKORD CONTENTS
1. PROJEKTI KOOSTAMISE EESMÄRK JA ALUSED ........................................................................ 4 PURPOSE AND BASIS OF PROJECT PREPARATION ...................................................................... 4
1.1 PROJEKTEERIMISE EESMÄRK.............................................................................................. 4 1.1 PURPOSE OF THE DESIGN ........................................................................................................ 4
1.2 ALUSDOKUMENDID................................................................................................................ 4 1.2 BASE DOCUMENTS ..................................................................................................................... 4
1.3 NORMDOKUMENDID JA JUHENDID ...................................................................................... 4 1.3 STANDARDS AND INSTRUCTIONS ............................................................................................ 4
2. OLEMASOLEVA OLUKORRA KIRJELDUS .................................................................................... 4 DESCRIPTION OF THE CURRENT SITUATION ................................................................................. 4
2.1 PROJEKTEERIMISALA PIIRITLUS.......................................................................................... 4 2.1 AREA OF THE DESIGN ................................................................................................................ 4
2.2 GEOTEETILISED UURINGUD ................................................................................................. 5 2.2 GEODETIC SURVEYS .................................................................................................................. 5
3. PROJEKTLAHENDUS .................................................................................................................... 5 PROJECT DESIGN .............................................................................................................................. 5
3.1 ÜLDIST .................................................................................................................................... 5 3.1 GENERAL ..................................................................................................................................... 5
3.2 SIDERAJATISED ..................................................................................................................... 6 3.2 COMMUNICATION FACILITIES .................................................................................................... 6
3.3 PAIGALDUSNÕUDED ............................................................................................................. 6 3.3 INSTALLATION REQUIREMENTS................................................................................................ 6
4. TÖÖDE TEOSTAMINE ................................................................................................................... 7 EXECUTION OF WORKS .................................................................................................................... 7
4.1 ÜLDOSA .................................................................................................................................. 7 4.1 GENERAL ..................................................................................................................................... 7
4.2 PINNAKATETE TAASTAMISE PÕHIMÕTTED......................................................................... 8 4.2 PRINCIPLES OF RESTORATION OF SURFACE COVERINGS ................................................... 8
4.3 KESKKONNAKAITSE ASPEKTID ............................................................................................ 8 4.3 ASPECTS OF ENVIRONMENTAL PROTECTION ........................................................................ 8
4.4 TÖÖDE DOKUMENTEERIMINE JA JÄRELEVALVE ............................................................... 8 4.4 DOCUMENTATION AND SUPERVISION OF WORKS ................................................................. 8
4.5 OHUTUSE TAGAMINE JA EHITUSAEGNE LIIKLUSKORRALDUS ......................................... 9 4.5 ENSURING SAFETY AND TRAFFIC ARRANGEMENT DURING CONSTRUCTION .................... 9
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 3 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
1. PROJEKTI KOOSTAMISE EESMÄRK JA ALUSED PURPOSE AND BASIS OF PROJECT PREPARATION
1.1 PROJEKTEERIMISE EESMÄRK 1.1 PURPOSE OF THE DESIGN
Käesoleva projekti eesmärgiks on tagada Soodevahe infrastruktuuri juurdepääsutee 2 ehitustööde alasse The aim of this project is to ensure the future operation of the communication facilities in the area of the
jäävate siderajatiste edasine toimimine. Käesoleva projektiga on lahendatud sidekanalisatsiooni Soodevahe infrastructure access road 2 construction works. With this project, the removal of communication
ehitusalast väljatõstmine ja sidekaablite ümberpaigutamine. sewers from the construction area and the relocation of communication cables have been solved.
1.2 ALUSDOKUMENDID 1.2 BASE DOCUMENTS
Projekti koostamisel on arvestatud järgmiste alusdokumentidega: The following basic documents have been taken into account during the preparation of the project:
1. Riigihanke tehniline kirjeldus: Soodevahe infrastruktuuri hoolduskeskuse ehituse I etapp 1. Technical specification of the public procurement: Stage I of the Soodevahe infrastructure service
(materjalide lao ettevalmistus) centre’s construction (material warehouse preparation)
2. Reaalprojekt OÜ geodeetiline alusplaan, töö nr G23180, 2023 2. Geodetic base plan of Reaalprojekt OÜ, work no. G23180, 2023
3. Reaalprojekt OÜ poolt koostatud põhiprojekt, töö nr RBDTD-EE-DS2-DPS1_IDO_RW0400- 3. Basic project prepared by Reaalprojekt OÜ, work no. RBDTD-EE-DS2-DPS1_IDO_RW0400-
ZZ_0001, SIDERAJATISED, 14.10.2022 ZZ_0001, TELECOMMUNICATION, 14.10.2022
4. Telia Eesti AS tehnilised tingimused nr 38465646, 30.11.2023 4. Telia Eesti AS technical conditions no. 38465646, 30.11.2023
1.3 NORMDOKUMENDID JA JUHENDID 1.3 STANDARDS AND INSTRUCTIONS
Projekti koostamisel on lähtutud järgmistest projekti koostamise ajal kehtinud normdokumentidest ja The preparation of the project is based on the following normative documents and instructions valid at the
juhenditest: time of preparation of the project:
1. Ehitusseadustik; 1. Building Code;
2. EVS 843:2016 Linnatänavad; 2. EVS 843:2016 Town Streets;
3. EVS 932:2017 Ehitusprojekt; 3. EVS 932:2017 Construction design documents;
4. Majandus- ja taristumistri 14. aprill 2016. a määrus nr 34 “Topo-geodeetilisele uuringule ja 4. 14. april 2016. Act no 34 “Requirements for topo-geodetic survey and performance surveying”;
teostusmõõdistusele esitatavad nõuded”; 5. Telia document “Requirements of Telia Eesti AS for construction geodetic surveys”;
5. Telia dokument “Telia Eesti AS nõuded ehitusgeodeetilistele uurimistöödele”; 6. Telia document “Design of line facilities and legalization of land use v5”;
6. Telia dokument “Liinirajatiste projekteerimine ja maakasutuse seadustamine v5”; 7. Telia document “General requirements for the preparation and coordination of construction projects
7. Telia dokument “Üldnõuded ehitusprojektide koostamiseks ja kooskõlastamiseks ning and construction in the protection zone of line facilities”;
ehitamiseks liinirajatiste kaitsevööndis”; 8. Instructions of the Transport Board ”Requirements for the design of utility networks and facilities”;
8. Transpordiameti juhend ”Nõuded tehnovõrkude ja -rajatiste teemaale kavandamisel” ; MA 2018- MA 2018-015.
015.
2. OLEMASOLEVA OLUKORRA KIRJELDUS DESCRIPTION OF THE CURRENT SITUATION
2.1 PROJEKTEERIMISALA PIIRITLUS 2.1 AREA OF THE DESIGN
Projektiga haaratud siderajatised paiknevad olemasoleva Raba tee juures. The communication facilities involved in the project are located at the existing Raba road.
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 4 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
Asukoha plaan Site plaan
2.2 GEOTEETILISED UURINGUD 2.2 GEODETIC SURVEYS
Topo-geodeetilised uuringud teostas Reaalprojekt OÜ, töö nr G23180. Topo-geodetic surveys were performed by Reaalprojekt OÜ, work No. G23180.
Topo-geodeetiline alusplaan on koostatud täpsusastmega M 1:500. Koordinaadid põhinevad L-Est 97 The topo-geodetic base plan has been prepared with a scale of accuracy of 1:1000. The coordinates are
koordinaatsüsteemil. Kõrgused põhinevad EH 2000 süsteemis. based on the L-Est 97 coordinate system. The heights are based on the EH 2000 system.
Topo-alusel esitatud piiriandmed on saadud Riigi Maa-ametist digitaalselt ja lisatud geoalusele seisuga Boundary data provided on a topo basis has been obtained digitally from the State Land Board and added
detsember 2023.a to the geobase as of December 2023
3. PROJEKTLAHENDUS PROJECT DESIGN
3.1 ÜLDIST 3.1 GENERAL
Kaevetööde teostamiseks tehnovõrkude kaitsevööndis tuleb sellest eelnevalt teavitada tehnovõrgu In order to carry out excavation works in the utility network protection zone, the holder of the utility network
valdajat ning vajadusel võtta temalt selleks täiendav tööde luba. Vajadusel tuleb koostöös must be informed in advance and, if necessary, an additional work permit must be obtained from him. If
kommunikatsioonivaldajaga täiendavalt märkida välja kõik töötsooni jäävad maa-alused necessary, in cooperation with the communication owner, all underground communications within the work
kommunikatsioonid. Töid trasside kaitsetsoonis tuleb teha käsitsi või väike-mehhanismidega. Töövõtjazone must be additionally marked. Work in the protection zone of routes must be done manually or with
peab enne tööde algust veenduma, et ta ei kahjustaks ühtegi olemasolevat rajatist ja kommunikatsiooni.
small mechanisms. Before starting work, the contractor must ensure that he does not damage any existing
Rajatiste, kommunikatsioonide rikkumise korral peab Töövõtja heastama ja taastama olemasoleva facilities and communications. In the event of a violation of facilities, communications, the Contractor must
olukorra ja katma kõik sellega seotud kulutused ja ametkondade nõuded. repair and restore the existing situation and cover all related expenses and the requirements of the
authorities.
Projekteeritava sidetrassi kaitsevöönd on piki sidetoru kulgev ala, mida mõlemalt poolt piiravad 1m The protection zone of the projected communication line is the area running along the communication pipe,
kaugusel paiknevad mõttelised vertikaaltasandid. Sidekaevu kaitsevöönd on 1m. which is bounded on both sides by imaginary vertical planes located at a distance of 1 m. The protection
zone of the communication well is 1m.
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 5 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
3.2 SIDERAJATISED 3.2 COMMUNICATION FACILITIES
Telia Eesti AS olemasoleva sidetrassi ümberehitamiseks projekteeritakse vaskkaabel VMOHBU For the reconstruction of the existing communication line of Telia Eesti AS, a copper cable VMOHBU
10x2x0,8 üheavalises sidekanalisatsioonis PVC OPTO D100 SN16. Projekteeritud vaskkaabel 10x2x0.8 is designed in a single-open communication sewer PVC OPTO D100 SN16. The designed copper
ühendatakse olemasoleva sidekaabliga muhvimise teel. Kaablite muhvimine teostada sirglõikudel, ning cable is connected to the existing communication cable by splicing. The splicing of cables should be realize
muhvimise kohad märkida pallmarkeriga. on straight sections, and mark the splicing places with a ball marker.
3.3 PAIGALDUSNÕUDED 3.3 INSTALLATION REQUIREMENTS
3.3.1 TELIA EESTI AS ÜLDNÕUDED SIDERAJATISTE ÜMBERPAIGUTAMISEL 3.3.1 TELIA EESTI AS GENERAL REQUIREMENTS FOR RELOCATION OF COMMUNICATION FACILITIES
1. Enne tööde algust sõlmida kolmepoolne koostöö leping. 1. Before starting the works, sign a tripartite cooperation agreement.
2. Telia sideehitiste ümbertõstmisega seotud kulud kannab huvitatud isik. 2. The costs related to the relocation of Telia's communications buildings shall be borne by the
3. Tagada nõuetekohased vahekaugused (kujad) teiste rajatistega ja kommunikatsioonidega. interested party.
4. Kõik seotud ehitusdokumentatsioon, rajatava sideehitiste kohta (teostusjoonised, kaetud tööde 3. Ensure proper distances (streets) with other facilities and communications.
aktid, ehituspäevikud, pildid, vastuvõtu akt jne.), esitada vastuvõtmiseks Telia B-12 keskkonda. 4. All related construction documentation, regarding the communication buildings to be built (execution
Teostatud tööde kohta koostada teostusjoonised L-EST-97 koordinaatsüsteemis, DWG drawings, records of covered works, construction diaries, pictures, acceptance report, etc.), to be
formaadis. submitted to the Telia B-12 environment for acceptance. Prepare execution drawings for the
5. Kõrvalekalded projektist fikseerida vastavates protokollides ja kooskõlastada kõigi huvitatud performed works in the L-EST-97 coordinate system, in DWG format.
instantsidega s.h. ehitusjärelevalvet teostava ametiisikuga, projektijuhiga ning maa valdajatega. 5. Deviations from the project should be fixed in the relevant protocols and coordinated with all
6. Telia sidekaablite ümberlülitustööd tellida Telia sidevõrgu hooldustööde partnerilt Connecto Eesti interested agencies, incl. with the official carrying out construction supervision, the project manager
AS. and the owners of the land.
6. To order the switching work of Telia's communication cables from Connecto Eesti AS, Telia's
communication network maintenance work partner.
3.3.2 KAABLITE PAIGALDAMISE SÜGAVUS 3.3.2 CABLE INSTALLATION DEPTH
Sõidutee all sidetrass paigaldatakse min 1,5m sügavusele, muudes kohtades paigaldatakse min 1,2m Under the roadway the communication line is installed at a depth of at least 1,5m, in other places it is installed
sügavusele. 11 Tallinna ringtee T41 kinnistul sidetrassi lõik paigaldatakse min 1,5m sügavusele. at a depth of at least 1,2m. The section of communication line is installed at a depth of at least 1,5m on the
property of 11 Tallinna ringtee T41.
3.3.3 ÜLDIST 3.3.3 GENERAL
Kaevetööde teostamiseks tehnovõrkude kaitsevööndis tuleb sellest eelnevalt teavitada tehnotrassi In order to carry out excavation work in the protection zone of utility networks, the holder of the technical
valdajat ning vajadusel võtta temalt selleks täiendav töödeluba. Vajadusel tuleb koostöös route must be notified in advance and, if necessary, an additional work permit must be obtained from him or
kommunikatsioonivaldajaga täiendavalt märkida välja kõik töötsooni jäävad maa-alused her. If necessary, in cooperation with the communication holder, all underground communications within the
kommunikatsioonid. Töid kaablikaitsetsoonis tuleb teha käsitsi või väike-mehhanismidega. work area must be additionally marked. Work in the cable protection zone must be carried out manually or
Mehhanismide kasutamisel kaablite või torutrasside kohal tuleb arvestada, et trass oleks eelnevalt kaetud with small mechanisms. When using mechanisms above cables or pipelines, it must be taken into account
vähemalt 25cm paksuse pinnase kihiga, kui pole teisiti määratud trassi valdaja poolt. Lahtikaevatud that the route is previously covered with a layer of soil at least 25 cm thick, unless otherwise specified by the
kaablid tuleb läbirippumise vältimiseks kinnitada ja mehhaanilise vigastamise eest kaitsta. Töökohad route owner. Unearthed cables must be secured to prevent hanging and protected against mechanical
tähistada hoiatusplakatitega. damage. Mark workplaces with warning posters.
Ehitustegevuse käigus tuleb välja selgitada kõikide projektialal paiknevate sideliinide sügavused ning During the construction activities, the depths of all communication lines in the project area must be
vajadusel tuleb sideliinid langetada normide kohastele sügavustele. Tee alla jäävad maakaablid kaitsta determined and, if necessary, the communication lines must be lowered to the standard depths. Protect
poolitatavate kaitsetorudega. Tööde teostamisel lähtuda projektile väljastatud tehnilistest tingimustest ja underground cables under the road with split conduits. When performing the works, proceed from the
kooskõlastuse tingimustest. technical conditions issued to the project and the conditions of approval.
Lahtise kaeviku korral juhinduda „Tüüpristlõiked“ joonisest: RBDTD-EE-DS2-DPS1_KMG_OS05005- In the case of an open trench, refer to „Typical cross-sections“ drawing: RBDTD-EE-DS2-
ZZ_ZZZZ_D3_LV-EN_DTD_006100. Tehnorajatise alla peab olema ehitatud liivapadi paksusega 10 cm. DPS1_KMG_OS05005-ZZ_ZZZZ_D3_LV-EN_DTD_006100. A sand pillow with a thickness of 10 cm must
Tehnorajatise ümber peab olema algtäide liivast. Selle paksus peab ületada tehnorajatise ülemist serva be built under the technical facility. There must be an initial filling of sand around the technical facility. Its
10 cm võrra. Tagasitäite materjal ei tohi sisaldada suuri kive (≥15 cm), kõrvalisi esemeid, turvast, pehmet thickness must exceed the upper edge of the technical facility by 10 cm. Backfill material must not contain
savi, puidu- või raadamisjäätmeid, jääd, lund ja külmunud pinnast (pinnasekamakaid), muid kahjustavaid large stones (≥15 cm), foreign objects, peat, soft clay, wood or deforestation waste, ice, snow and frozen
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 6 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
ainedi ning jäätmeid. Talvetingimustest kasutada tagasitäitena ainult sulasid ja kergesti tihendatavaid soil (lumps of soil), other harmful substances and waste. From winter conditions, use only molten and easily
materjale. Kraav peab alati olema piisavalt lai, et seda saaks masinaga tihendada. Kaevikud hoida compacted materials as backfill. Keep trenches free of water.
veevabad. After the completion of the construction work, restore the soil to its former condition in accordance with the
Peale ehitustööde lõppu taastada pinnase endine olukord vastavalt nõuetele. Korrastada kõik requirements. Arrange all construction traces. When filling the trench, take into account the subsequent
ehitusjäljed. Kaevise täitmisel arvestada pinnase hilisemat vajumist. subsidence of the soil.
If necessary, the soil suitable for backfilling will be stored and used to fill the area. Excess and unsuitable
Tagasitäiteks sobiv pinnas vajadusel ladustatakse ja kasutatakse piirkonna täitmiseks. Ülemäärane ja quantities of soil are to be disposed of by the contractor. Store the soil in the territory prescribed by the
tagasitäiteks mittesobivad pinnasekogused on töövõtja kohustatud utiliseerima. Pinnas ladustada municipality.
omavalitsuse poolt ettenähtud territooriumile. If necessary, protection/reserve pipe (s) are to be installed next to the route at the intersections or at a new
Vajadusel on kommunikatsioonidega ristumistel oleva trassi kõrvale või uude kohta (vastavalt location (subject to approval). If the depth is not specified, it must be taken into account when installing cable
kooskõlastusele) ette nähtud paigaldada kaitse/reservtoru(d). Kui sügavust ei ole eraldi välja toodud, siis ducts that the pipe to be installed must be at least 1.0 m above the ground. All ends of the reserve pipes
tuleb kaablitorude paigaldamisel arvestada, et paigaldatav toru peab jääma minimaalselt 1,0m must be covered (closed with caps) to prevent them from spilling into the ground. Unless otherwise indicated
sügavusele maapinnast. Kõik reservtorude otsad tuleb kinni katta (sulgeda korkidega), et takistada in the position plan, use Class A protective tubes with a strength of 750N.
nendesse pinnase sisse valgumist. Kui asendiplaanil ei ole näidatud teisiti, siis kasutada A-klassi
kaitsetorusid tugevusega 750N. When assembling the cable, observe the bending radii and tensile forces permitted by the cable
Kaabli montaažil jälgida kaablitootja poolt lubatud painderaadiusi ja tõmbejõudusid. Kaevamistööd teiste manufacturer. Excavation work in the protection zone of other communications must be performed manually.
kommunikatsioonide kaitsevööndis teostada käsitsi. Ehitustööde käigus näha ette meetmed During the construction works, measures shall be provided for the protection of existing line structures in
olemasolevate liinirajatiste kaitse tagamaks nende säilivus ehitustöödel, tagada normatiivsed sügavused order to ensure their preservation during the construction works, to ensure normative depths and distances.
ja vahekaugused. Kaabli paigaldamisel järgida nõutavat vähimat horisontaalset ja vertikaalset When installing the cable, observe the required minimum horizontal and vertical distance from other
vahekaugust teiste kommunikatsioonidega. Pinnasesse paigaldatud kaablid peavad olema varustatud communications. Cables installed in the ground must be equipped with a warning tape. The warning tape
hoiatuslindiga. Hoiatuslint peab olema kollast värvi ning sisaldama musta värviga hoiatust, et tegemist on must be yellow and contain a black warning that it is an electrical cable and information about the owner of
elektrikaabliga ja informatsiooni selle kaabli omaniku kohta. the cable.
Kõik maakaablid tähistada lipikutega, mille kirjed peavad olema pressitud ning kus peab olema peale All land cables are marked with labels, with pressed entres and must include the following information: cable
märgitud järgmised andmed: kaabli algus- ja lõpp-punkt, kaabli tootemark, kaabli pikkus meetrites, start and end point, cable brand, cable length in meters, main cable number. When installing the cables,
magistraalkaabli number. Kaablite paigaldamisel lähtuda järgnevas tabelis toodud vahekaugustest. observe the distances given in the following table.
Kõik maasse paigaldatud tehnorajatised tuleb märgistada hoiatuslindiga, mis peab asetsema 0,3 m All buried utilities must be marked with warning tape which is to be paced 0,3m above the utility.
tehnorajatisest ülevalpool.
Distance or depth, m
Vahekaugus või sügavus, m
Horizontal placement Vertical placement
Paralleelkulgemisel Ristumisel
Water- and sewage pipeline ≥ 1,0/ >1,0 ≥ 0,25/ ≥0,5
Vee- ja kanalisatsioonitoru ≥ 1,0/ >1,0 ≥ 0,25/ ≥0,5
Communication cable 0,25....0,5/ >0,5 ≥ 0,15/ ≥0,5
Sidekaabel 0,25....0,5/ >0,5 ≥ 0,15/ ≥0,5
Gas pipe ≥ 1,0/ 1,0 ≥ 0,2/ ≥0,5
Gaasitoru ≥ 1,0/ 1,0 ≥ 0,2/ ≥0,5
District heating pipe ≥ 2,0/ - ≥ 0,25/ ≥0,5
Kaugküttetorustik ≥ 2,0/ - ≥ 0,25/ ≥0,5
Electricity cables up to 20 kV ≥ 0,07/ ≥0,1 ≥0,1/≥0,25...0,5
Elektrikaabel ≥ 0,07/ ≥0,1 ≥0,1/≥0,25...0,5
Table 1. Cable installation distances and depth
Tabel 1. Kaablite paigaldamise vahekaugused ja sügavus
4. TÖÖDE TEOSTAMINE EXECUTION OF WORKS
4.1 ÜLDOSA 4.1 GENERAL
Töö tegija peab arvestama trassivaldajate kooskõlastuse tingimustega. Enne tööde algust tuleb Ehitaja The person doing the work must take into account the conditions of the approval of the route owners. Before
ja piirkonna meistriga üle vaadata objekti täpne asukoht ja kokku leppida tööde tegemise ajagraafik. Töö the work starts, the exact location of the object must be reviewed with the Builder and the foreman of the
tegija peab ehitustööde ajal pidama ehituspäevikut. area and the schedule for the work must be agreed upon. The person doing the work must keep a
construction diary during the construction work.
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 7 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
Enne ehitustööde algust on ehitajal kohustus võtta ühendust maaomanikega ja tööde piirkonnas olevate Before the start of the construction works, the builder is obliged to contact the landowners and the owners
rajatiste valdajatega, teatama ehitustööde aja ning arvestama maaomanike ja rajatiste valdajate of the facilities in the area of the works, to inform them of the time of the construction works and to take into
tingimuste ja nõudmistega. Samuti peab ehitaja võtma ühendust kohaliku omavalitsusega. account the conditions and requirements of the landowners and the owners of the facilities. The builder must
also contact the local government.
Ehitaja peab tagama kõigi kooskõlastustes esitatud nõuete ja tingimuste täitmise vastavalt The builder must ensure that all the requirements and conditions presented in the approvals are fulfilled in
projektlahendusele. accordance with the project solution.
Tellija, ehitaja, projekteerija ja omanikujärelevalve teatavad omal algatusel viivitamatult avastatud The customer, the builder, the designer and the owner's supervision shall immediately report on their own
vigadest, puudustest ja riskiteguritest projektdokumentatsioonis ning nendest abinõudest, millega saab initiative the discovered errors, deficiencies and risk factors in the project documentation and the remedies
tööd edendada ja paremate tulemuste saavutamist soodustada. Ehitaja peab teavitama projekteerijat that can be used to promote the work and encourage the achievement of better results. The builder must
kõigist projektis leitud ebaselgustest ning võimalikest vasturääkivustest enne, kui ta võtab vastu inform the designer of all ambiguities and possible inconsistencies found in the project before he takes a
konkreetse teostamise otsuse. specific implementation decision.
Teostada kasutuselevõtukontroll vastavalt kehtivale seadusandlusele. Kontrolli toimingud vormistatakse Carry out the commissioning inspection in accordance with the current legislation. Inspection actions are
kirjalikult ja allkirjastatakse. formalized in writing and signed.
4.2 PINNAKATETE TAASTAMISE PÕHIMÕTTED 4.2 PRINCIPLES OF RESTORATION OF SURFACE COVERINGS
Ehitaja peab taastama kaablitrassi pealiskihi vastavalt nende endisele kujule. Katete taastamisel on
The builder must restore the top layer of the cable route to their former shape. When restoring the
arvestatud et kaablite paigaldamine toimub sama aegselt tee ehitustöödega. Uute katete ehitamine
pavements, it has been taken into account that the installation of cables takes place at the same time as the
toimub pärast kaevikute tagasitäitmist. Antud projektiga on katete taastamine ette nähtud ainult väljaspool
road construction works. The construction of new covers takes place after the trenches are backfilled. With
tee projekti. this project, the restoration of pavements is provided only outside the road project.
Ehitaja peab taastama peale ehitustööde lõppu masintransportvahendite poolt tekitatud jäljed.The builder must restore the traces caused by the machine transport vehicles after the completion of the
construction work.
Tagasitäitmisel üle jääv pinnas ja ehitusjäätmed vedada ära lähimasse ametlikku ladustus- ja Transport the soil and construction waste remaining during backfilling to the nearest official storage and
käitluspaika. handling site.
4.3 KESKKONNAKAITSE ASPEKTID 4.3 ASPECTS OF ENVIRONMENTAL PROTECTION
Ehitusperioodil vastutab töövõtja ka keskkonnakaitse (oma ehitustegevuse ja muu sellest tuleneva piires) During the construction period, the contractor is also responsible for environmental protection (within the
eest ehitusobjektil ja selle kõrval oleval alal vastavalt Eesti Vabariigis kehtivatele seadustele ja nõuetele scope of his construction activities and other resulting from it) on the construction site and the adjacent area
ning Tellija poolsetele juhistele. in accordance with the laws and requirements in force in the Republic of Estonia and the instructions of the
Customer.
Vähendamaks ehituse sotsiaalseid mõjusid peavad kasutatavate mehhanismide summutid olema korras. In order to reduce the social impacts of the construction, the dampers of the mechanisms used must be in
Kuivaperioodil peab ette nägema tolmutõrjeks veega kastmise. Kogu tööde perioodil peavad olema order. During the dry season, watering with water must be provided to control dust. Access to buildings must
garanteeritud juurdepääsud hoonetele. Ehitustööde käigus ei tohi kahjustada ümbritsevat keskkonda. be guaranteed during the entire period of works. The surrounding environment must not be damaged during
Kõik ehitustööd tuleb teostada järgides kehtestatud keskkonnakaitse nõudeid ja ka vastavalt Rae valla the construction work. All construction work must be carried out in compliance with established
heakorraeeskirjale. environmental protection requirements and also in accordance with the rules of good order of Rae
municipality.
Kaevetööde teostamisel lähtuda Rae valla kaevetööde eeskirjast, Rae Vallavalikogu määrus nr 41, vastu When carrying out excavation works, follow the regulations for excavation works of the Rae municipality,
võetud 30.11.2010.a. Regulation No. 41 of the Rae Municipality Council, adopted on 30.11.2010.
Ehitusel tekkivad jäätmed käideldakse vastavalt kehtivale korrale. Täitematerjalide, mulla ja pinnase Waste generated during construction is handled in accordance with the current procedure. Storage locations
ladustamiskohad kooskõlastatakse kohaliku omavalitsusega. for aggregates, soil and soil are coordinated with the local government.
Pinnaseid ja ehitustehnikat ei tohi hoida/ladustada hoiumetsa aladel, et säilitada võimalikult palju Soils and construction equipment must not be kept/stored in reserve forest areas in order to preserve as
hoiumetsa ning alustaimestikku. Vajadusel tuleb ehituse ajal piirata ajutiste aedade/piiretega pääs metsa much of the reserve forest and understory vegetation as possible. If necessary, access to forest areas must
aladele. be restricted with temporary fences/fences during construction.
Kui ehitusmasinad kannavad teedele ratastega muda ja pori, selle peavad nad ise ära koristama. If the construction machines bring mud and dirt onto the roads with their wheels, they have to clean it up
themselves.
4.4 TÖÖDE DOKUMENTEERIMINE JA JÄRELEVALVE 4.4 DOCUMENTATION AND SUPERVISION OF WORKS
Ehitamine tuleb dokumenteerida vastavalt majandus- ja taristuministri 14.02.2020 määrusele nr 3 Construction must be documented in accordance with Regulation No. 3 of 14.02.2020 of the Minister of
„Ehitamise dokumenteerimisele, ehitusdokumentide säilitamisele ja üleandmisele esitatavad nõuded ning Economy and Infrastructure "Requirements for documentation of construction, preservation and transfer of
hooldusjuhendile, selle hoidmisele ja üleandmisele esitatavad nõuded“. construction documents and the requirements for the maintenance manual, its storage and transfer".
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 8 9 003
SOODEVAHE INFRASTRUKTUUR. JUURDEPÄÄSUTEE 2
SOODEVAHE INFRASTRUCTURE. ACCESS ROAD 2
Teostatud tööde kohta koostada teostusjoonis(ed) ja kaetud tööde aktid. Ehituse järelevalvet teostab Prepare execution drawing(s) and acts of covered works for the performed works. Construction supervision
tellija poolt volitatud isik või ettevõte. Kõrvalekalded projektist fikseerida vastavates protokollides ja is carried out by a person or company authorized by the customer. Deviations from the project should be
kooskõlastada kõigi huvitatud instantsidega (sh tellija ja ehitusjärelevalvet teostava ametiisikuga). recorded in the relevant protocols and coordinated with all interested agencies (including the client and the
official performing construction supervision).
4.5 OHUTUSE TAGAMINE JA EHITUSAEGNE LIIKLUSKORRALDUS 4.5 ENSURING SAFETY AND TRAFFIC ARRANGEMENT DURING CONSTRUCTION
Kaevetöödel ja lahtiste kaevikute kavandamisel tuleb juhinduda Tööinspektsiooni juhendist „Tööohutus Excavation work and the planning of open trenches must be guided by the instructions of the Labor
ehitusplatsil“, 2022. Inspectorate "Work safety on the construction site", 2022.
Töötamisel kaevandis, mis on sügavam kui 1,2 meetrit tuleb võtta tarvitusele meetmed varinguohu When working in a mine that is deeper than 1.2 meters, measures must be taken to reduce the risk of
vähendamiseks. collapse.
Ehitustöödega mõjutatav piirkond peab kogu tööperioodi vältel olema tähistatud ja vastavalt vajadusele The area affected by the construction works must be marked during the entire work period and, as necessary,
ka valgustatud nii, et tööde teostamine ei ohustaks piirkonda läbivate või seal töid teostavate inimeste elu also illuminated so that the execution of the works does not endanger the life, health and property of people
ja tervist ning vara. passing through the area or carrying out work there.
Tänavate sulgemine osaliselt või täielikult sõidukite liikluseks on võimalik ainult vastavalt Partial or complete closing of streets to vehicle traffic is only possible in accordance with the regulations in
omavalitsuspiirkonnas kehtivale korrale ja ehitusaegsele liiklusskeemile. force in the municipality and the traffic scheme during construction.
Tööde teostaja peab arvestama kõigi projekti teostamiseks vajalike liikluse sulgemisest, The executor of the works must take into account the expenses arising from the closure, diversion and
ümbersuunamisest ja endise liiklusolukorra taastamisest (näit. Olemasolevate liiklusmärkide restoration of the former traffic situation (e.g. removal of existing traffic signs, installation of temporary traffic
eemaldamine, ajutiste liiklusmärkide paigaldamine, jne.) tulenevate kulutustega. signs, etc.) necessary for the implementation of the project.
Tööde teostaja vastutab ajutiste tähiste, piirete ja liiklusmärkide säilimise ning nende puudumisest The contractor is responsible for the preservation of temporary signs, barriers and traffic signs and for
tekkinud kahjude hüvitamise eest. compensation for damages caused by their absence.
Ajutiselt mitte kasutusel olevad ehitusmasinad ning kasutamisjärge ootavad materjalid tuleb paigaldada Construction machines that are temporarily not in use and materials awaiting further use must be installed
nii, et nad ei häiriks liiklust ning ei takistaks ligipääsu hoonetele ning muudele objektidele. in such a way that they do not disturb traffic and do not obstruct access to buildings and other objects.
Töövõtja peab tööde tegemisel juhinduma Eestis kehtivatest seaduste, standardite, normdokumentide ja The contractor must be guided by the full texts of laws, standards, normative documents and instructions
juhendiste terviktekstidest. valid in Estonia when performing the work.
LEHEKÜLG / LEHED / REVISIOON /
DOKUMENDI KOOD / DOCUMENT CODE PAGE PAGES REVISION
RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_RP_LV-EN_DTD_003001 9 9 003
1 2 3 4 5 6 7 8 9 10 11
DO NOT SCALE FROM THIS DRAWING
Tingmärgid / Legend
A N / Proj. sidekanalisatsioon Des. communication pipeline A
Proj. vaskkaabli jätkumuhv Des. extension sleeve of copper cable
X X X X X Demonteeritav trass Demountable utility metwork
W E
Haljasala taastamine Restoration of green area
Varem proj. objektid (Reaalprojekt OÜ, töö nr Formerly des. objects (Reaalprojekt OÜ, job no
RBDTD-EE-DS2-DPS1_IDO_RW0400-ZZ_0001) RBDTD-EE-DS2-DPS1_IDO_RW0400-ZZ_0001)
S
B Märkused: B
1. Sõidutee all sidetrass paigaldatakse min 1,5m sügavusele, muudes kohtades
paigaldatakse min 1,2m sügavusele.
Notes:
1. Under the roadway the communication line is installed at a depth of at least 1,5 m, in
other places it is installed at a depth of at least 1,2m.
C C
Katte tü 20
üp 1
PK 0+
Katte tü 6.72
üp 1a
PK 0+5 1
üp
Katte tü
X X X 36.98
X X X 37.14
X PK 0+0
1.72
X X 0 37.32
X X X
PK 0+3
Sirge: L algus
=56,7m
X X 38.3 37.72
X X 38.3
X
---
X X 38.25 Demonteeritav sidekaabel.
11C101
PK 0+5 Demountable communication cable.
37.08 38. 0 Ltrass/route=141[m]
38.3
1----C-N
4
37.16 38.4 38.3
Sidekaabel pole töös.
D 37.24 The communication cable out of work. D
Proj. vaskkaabli jätkumuhv. Märkida pallmarkeriga. 37.31
Telje T-3
/
u algus
0
38.4
PK0+2
Des. extension sleeve of copper cable. Mark with a marker ball. 37.39
lõpp
9
PK0+2
PVC käänik Ø100 45°
Siirdekiil
u
R=50,0 : L=56,7m
2,3m
Siirdekiil
PVC bend Ø100 45°
/
m; L=2
38.1
.5
38
7,7 m
PVC OPTO Ø100 SN16
Sirge
38.0
m
=2 ,3
: L 22
VMOHBU 10x2x0,8 /
ge L=
Ltrass/route=138[m] PK
Sir 0m;
.4
Lkaabel/cable=142[m] 1+
38
0,
00
Kõver:
=5
.3
PVC käänik Ø100 45°
r: R
38
PVC bend Ø100 45°
ve
/
.2
Kõ
38
/
Antud lõigus paigaldussügavus min 1,5m.
37.9
E E
.1
In this section installation depth min 1,5m.
38
46 7m
,1m
L= 27,
m; L=
.1
0,0 e:
38
=5 Sirg
PERSPEKTIIVNE MAHASÕIT
(lahendatakse eraldi seisva projektiga)
r: R
/
/
ve
Kõ
.2
38
37.8
2x PVC käänik Ø100 45°
F / 2x PVC bend Ø100 45° F
/
/ Proj. vaskkaabli jätkumuhv. Märkida pallmarkeriga.
PK 1+50
/ Des. extension sleeve of copper cable. Mark with a marker ball.
/
38.3
2x PVC käänik Ø100 45°
/ 2x PVC bend Ø100 45° Katte tüüp 1a
Kõver: R=50,0m; L=46,1m PK 1+52.86
Sirge: L=190,0m Katte tüüp 1
G G
37.7
38.4
PK 1+77.86
H H
MUUDATUSED / REVISIONS Koostaja / Kontrollija / Kinnitaja / PROJEKT / PROJECT TELLIJA / CLIENT TÖÖVÕTJA / CONTRACTORKUUPÄEV / DATE MÕÕTKAVA / SCALEFORMAAT / JOONISE NIMETUS / DRAWING TITLE
Nr/No Kuupäev/Date Kirjeldus / Description Originator Checker Approver LEPINGU NR / CONTRACT NO. 2023-K086 PAPER SIZE
001 19/01/2024 A. Klibanov A. Klibanov M. LeetbergPROJEKTI NR / PROJECT NO. RBDTDEEDS2DPS1_KMG_OS05007 Rail Baltic Estonia OÜ 20/06/2024 1:500 A2 Soodevahe infrastruktuur. Juurdepääsutee 2
Side asendiplaan
Veskiposti 2/1, 10138 DRAWING STATUS
002 07/03/2024 A. Klibanov A. Klibanov M. Leetberg
003 24/05/2024 A. Klibanov A. Klibanov M. Leetberg
Tallinn, Estonia
Reg.no. 12734109
TP / DTD Soodevahe infrastructure. Access road 2
Telecommunication site plan
004 20/06/2024 A. Klibanov A. Klibanov M. Leetberg NIMI / NAME ALLKIRI/SIGNATUREKUUPÄEV/DATE
ALLTÖÖVÕTJA / SUB-CONTRACTOR KOOSTAJA / ORIGINATORA. Klibanov 20/06/2024 PROJEKTI KOOD / PROJECT CODE ASUKOHT / LOCATION ERIOSA / DISCIPLINE CODE
SOODEVAHE INFRASTRUKTUURI KONTROLLIJA / CHECKERA. Klibanov 20/06/2024 PROJEKTI ID LÕIGU ID ALALÕIGU ID OSA/SÜSTEEM TSOON/ ASUKOHT RBR KOOD KOHLAIK KOOD STAADIUM
KMG Infra OÜ PROJECT ID SECTION ID SUB-SECTION IDVOLUME/SYSTEM ZONE LOCATION RBR CODE LOCAL CODE PROJECT STAGE
HOOLDUSKESKUSE EHITUSE I ETAPP / Valukoja 8/2 ÜLEVAATAJA / REVIEWERS. Veisalu 20/06/2024
11415 Tallinn, Estonia RBDTD-EE DS2 DPS1 OS05005 ZZ ZZZZ LV EN TP/DTD
STAGE I OF THE SOODEVAHE KINNITAJA / APPROVER M. Leetberg 20/06/2024
MUUDATUS /
Reg.no. 16638472
J Kaasrahastab Euroopa Liit Euroopa ühendamise rahastu INFRASTRUCTURE SERVICE CENTRE’S Reaalprojekt OÜ LEHE PEALKIRI / SHEET NAME: REVISION J
Tallinna 45, 71008 RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_D1_LV-EN_DTD_004200
Co-financed by the Connecting Facility of the European Union CONSTRUCTION Viljandi, Estonia 003
ARHIIVI NR / ARCHIVE NO. Reg.no. 10765904 LEHE NUMBER / SHEET NUMBER: 1 of 1
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8
A A
DO NOT SCALE FROM THIS DRAWING
Haljasala taastamine Kaabli paigaldus sõidutee asfaltkatte alla
B Greenarea restoration Cable installation under the asphalt pavement of the roadway B
0,30
min 1,20
0,30
min 1,50
0,30
0,30
Hoiatuslint / Warning tape
Kaitsetoru / protection pipe Hoiatuslint / Warning tape
0,10
Kaabel / cable
0,30
Vastavalt / According to OS05005; RO-TL
0,10
0,10
Kaitsetoru / protection pipe
0,10
Murukülv (külvitihedus 20 g/m²) Grass seeding (seeding density 20 g/m²) Kaabel / cable
0,10
Sõelutud mineraalmuld kasvukihina Screened mineral soil as a growth layer 15cm 0,10
Tagasitäide (Kt=0.98, Kf≥0.5 m/ööp) (märkus 4) Backfill (Kt=0.98, Kf≥0.5 m/night) (note 4)
Vastavalt OS05005; RO-TL According to OS05005; RO-TL
Liivast algtäide Kf>0.5 m/ööp Initial filling of sand Kf>0.5 m/night)
C toruØ+10cm
Vastavalt OS05005; RO-TL According to OS05005; RO-TL C
Liivapadi Kf>0.5 m/ööp Sand pillow Kf>0.5 m/night 10cm
Vastavalt OS05005; RO-TL According to OS05005; RO-TL
Olemasolev pinnas Existing soil
Vastavalt OS05005; RO-TL According to OS05005; RO-TL
Vastavalt OS05005; RO-TL According to OS05005; RO-TL
Liivast algtäide Kf>0.5 m/ööp Initial filling of sand Kf>0.5 m/night) toru/ pipeØ+10cm
Liivapadi Kf>0.5 m/ööp Sand pillow Kf>0.5 m/night 10cm
Olemasolev pinnas Existing soil
D D
MÄRKUSED: NOTES:
1. Mulla huumuse sisaldus peab olema vähemalt 3%. Kasvumuld peab olema mineraalmuld nõrgalt happelise või neutraalse reaktsiooniga (ph 4.0...7.5). 1. The humus content of the soil shall be at least 3%. The growing soil must be mineral soil with a weakly acidic or neutral reaction (pH 4.0 ... 7.5). It is possible
Võimalik on kasutada olemasolevat kooritavat kasvupinnas, mis sialdada huumust, kuid ei sisalda suuri kive ja taimede kahjulikke jäätmeid ning tihendad nii, to use an existing peeling soil that contains humus, but does not contain large stones and harmful plant waste, and compacts so that there is no subsidence
et ei tekiks vajumisi ja vee kogumise lohkusid. and water collection depressions.
2. Ei tohi kasutada külmunud pinnast ja turvast. 2. Frozen soil and peat must not be used.
3. "Tee ehitamise kvaliteedi nõuded", MTM 03.08.2015, määrus nr. 101, lisa 10. 3. "Quality requirements for road construction", MTM 03.08.2015, regulation no. 101, Annex 10.
4. Täitematerjal ei tohi sisaldada suuri kive (≥15 cm), kõrvalisi esemeid, turvast, pehmet savi, puidu- või raadamisjäätmeid, jääd, lund ja külmunud pinnast 4. Aggregates must not contain large stones (≥15 cm), foreign objects, peat, soft clay, wood or deforestation waste, ice, snow and frozen soil (lumps of soil),
E (pinnasekamakaid), muid kahjustavaid ainedi ning jäätmeid. Talvetingimustest kasutada tagasitäitena ainult sulasid ja kergesti tihendatavaid materjale. other harmful substances and waste. From winter conditions, use only molten and easily compacted materials as backfill. E
5. Tehnoloogiliste abikaevikute suurused täpsustada ehitusekäigus sõltuvalt vajadusele. Kaevikute nõlvade lubatud kalded rajada vastavalt "Tööohutus 5. The sizes of the technological auxiliary trenches should be specified during the construction process depending on the need. Permissible slopes of the
ehitusplatsil" Tööinspektsiooni juhendile. slopes of the trenches should be built in accordance with the "Occupational safety on the construction site" instructions of the Labor Inspectorate.
MUUDATUSED / REVISIONS Koostaja / Kontrollija / Kinnitaja / PROJEKT / PROJECT TELLIJA / CLIENT TÖÖVÕTJA / CONTRACTORKUUPÄEV / DATE MÕÕTKAVA / SCALEFORMAAT / JOONISE NIMETUS / DRAWING TITLE
Nr/No Kuupäev/Date Kirjeldus / Description Originator Checker Approver LEPINGU NR / CONTRACT NO. 2023-K086 PAPER SIZE
001 19/01/2024 A. Klibanov A. Klibanov M. LeetbergPROJEKTI NR / PROJECT NO. RBDTDEEDS2DPS1_KMG_OS05007 Rail Baltic Estonia OÜ 24/05/2024 1:50 A3 Soodevahe infrastruktuur. Juurdepääsutee 2
Side tüüpristlõiked
Veskiposti 2/1, 10138 DRAWING STATUS
002 07/03/2024 A. Klibanov A. Klibanov M. Leetberg
003 24/05/2024 A. Klibanov A. Klibanov M. Leetberg
Tallinn, Estonia
Reg.no. 12734109
TP / DTD Soodevahe infrastructure. Access road 2
Telecommunication typical cross-sections
NIMI / NAME ALLKIRI/SIGNATUREKUUPÄEV/DATE
ALLTÖÖVÕTJA / SUB-CONTRACTOR KOOSTAJA / ORIGINATORA. Klibanov 24/05/2024 PROJEKTI KOOD / PROJECT CODE ASUKOHT / LOCATION ERIOSA / DISCIPLINE CODE
SOODEVAHE INFRASTRUKTUURI KONTROLLIJA / CHECKERA. Klibanov 24/05/2024 PROJEKTI ID LÕIGU ID ALALÕIGU ID OSA/SÜSTEEM TSOON/ ASUKOHT RBR KOOD KOHLAIK KOOD STAADIUM
KMG Infra OÜ
F HOOLDUSKESKUSE EHITUSE I ETAPP / Valukoja 8/2 ÜLEVAATAJA / REVIEWERS. Veisalu 24/05/2024
PROJECT ID SECTION ID SUB-SECTION IDVOLUME/SYSTEM ZONE LOCATION RBR CODE LOCAL CODE PROJECT STAGE
F
RBDTD-EE DS2 DPS1 OS05005 ZZ ZZZZ LV EN TP/DTD
STAGE I OF THE SOODEVAHE 11415 Tallinn, Estonia KINNITAJA / APPROVER M. Leetberg 24/05/2024
MUUDATUS /
Reg.no. 16638472 LEHE PEALKIRI / SHEET NAME:
Kaasrahastab Euroopa Liit Euroopa ühendamise rahastu INFRASTRUCTURE SERVICE CENTRE’S Reaalprojekt OÜ REVISION
Tallinna 45, 71008 RBDTD-EE-DS2-DPS1_KMG_OS05005-ZZ_ZZZZ_D3_LV-EN_DTD_006100
Co-financed by the Connecting Facility of the European Union CONSTRUCTION Viljandi, Estonia 003
ARHIIVI NR / ARCHIVE NO. Reg.no. 10765904 LEHE NUMBER / SHEET NUMBER: 1 of 1
1 2 3 4 5 6 7 8
Isikliku kasutusõigusega koormatava ala plaan
IKÕ ala Kinnistu Katastriüksuse tunnus, nimi IKÕ ala Trassi
Pos nr registriosa nr ja sihtotstarve pindala m2 pikkus m
Pos 1 12873750 65301:001:4836 73 37
11 Tallinna ringtee T41
Transpordimaa 100%
Kasutusõiguse ala
Kinnistu piir
/ Sidekanalisatsioon
/
/
/
1
/
Projekti nimi
Soodevahe infrastruktuur. Juurdepääsutee 2
Töö nr Koostaja Mõõtkava Formaat Leht Kuupäev
OS05005 Artjom Klibanov 1:500 A4 1/1 20.06.2024
Isikliku kasutusõigusega koormatava ala plaan
IKÕ ala Kinnistu Katastriüksuse tunnus, nimi IKÕ ala Trassi
Pos nr registriosa nr ja sihtotstarve pindala m2 pikkus m
Pos 2 10431502 65301:002:0327 89 45
Raba tee 1
Transpordimaa 100%
Kasutusõiguse ala
Kinnistu piir
/ Sidekanalisatsioon
/
/
2
/
Projekti nimi
Soodevahe infrastruktuur. Juurdepääsutee 2
Töö nr Koostaja Mõõtkava Formaat Leht Kuupäev
OS05005 Artjom Klibanov 1:500 A4 1/1 20.06.2024
Lp Sven Veisalu
Infragreen OÜ Teie 09.07.2024
[email protected]
Meie 16.07.2024 nr 7.1-2/24/2249-6
Tööprojekt DPS1 Ülemiste-Kangru
Soodevahe infrastruktuur Juurdepääsutee 2
(OS05005) sidevarustus projekti uue
versiooni kooskõlastamine riigitee nr 11 ja
nr 2850 maaüksuse piires ja tee
kaitsevööndis
Kooskõlastamiseks esitatud projekti uues versioonis on ette nähtud side maakaabelliini
demonteerimine ja paigaldamine riigitee maaüksuste piires ja tee kaitsevööndis.
Side maakaabelliin rajatakse riigitee maaüksustele 11 Tallinna ringtee T41 (katastritunnus:
65301:001:4836) ja Raba tee 1 (katastritunnus: 65301:002:0327). Kinnistute valitsejaks on
Kliimaministeerium ning volitatud asutuseks Transpordiamet.
Kinnistud asuvad riigitee nr 11 Tallinna ringtee km 4,78 – 4,83 ja riigitee nr 3850 2.Lagedi
ühendustee km 0,0 – 0,11 kaitsevööndis.
Võttes aluseks ehitusseadustiku (EhS) § 70 lg 3 § 99 lg 3, kooskõlastame „Tööprojekt DPS1
Ülemiste-Kangru Soodevahe infrastruktuur Juurdepääsutee 2 (OS05005) Sidevarustus“ projekti
uue versiooni (Konsultant: KMG Infra OÜ, Alltöövõtja; Reaalprojekt OÜ, töö nr OS05005).
Juhime tähelepanu, et kooskõlastuse objektiks on ainult projektis sisalduvad side maakaabelliini
rajatised ja muudele projekti asendiplaanil toodud ehitistele see ei laiene.
Käesoleva kooskõlastusega muutub kehtetuks Transpordiameti 20.03.2024 kirjaga nr 7.1-
2/24/2249-4 antud kooskõlastus.
Projekti realiseerimisel tuleb arvestada järgneva informatsiooni ja nõuetega:
1. Tehnovõrgu omanikul tuleb sõlmida Transpordiametiga leping riigitee maaüksusele
kasutusõiguse saamiseks. Kasutusõiguse ala kohta luua ruumikuju Maakatastri piiratud
asjaõiguste infosüsteemi (PARI) kaudu aadressil https://pari.kataster.ee ning esitada taotluses
ruumikuju tunnus PARI ID number koos aktiivse jagamislingiga. Taotlus tuleb esitada
Transpordiametile aadressil (
[email protected]). Lepingu taotluse vorm asub
www.transpordiamet.ee – Teehoid ja liikluskorraldus – Tee-ehituse juhendid – Riigimaade
kasutus – tehnovõrgud – Taotlus teemaale tehnovõrgu ja -rajatise ehitamiseks ja talumiseks
vajaliku isikliku kasutusõiguse seadmise lepingu sõlmimiseks. Sõlmitud leping on aluseks
liiklusvälise tegevuse loa väljastamiseks.
2. Enne riigitee maaüksusel ehitustööde alustamist tuleb huvitatud isikul:
Valge 4 / 11413 Tallinn / 620 1200 /
[email protected] / www.transpordiamet.ee
Registrikood 70001490
2.1. koostada liikluskorralduse projekt vastavalt liiklusseaduse § 7¹ lõike 4 alusel kehtestatud
Majandus- ja taristuministri 13.07.2018 määrusele nr 43 Nõuded ajutisele
liikluskorraldusele ning kooskõlastada see Transpordiametiga e-posti aadressil
[email protected].
2.2. saada Transpordiametilt liiklusseaduse § 7² lg 3 kohane liiklusvälise tegevuse luba.
Taotluse vorm on leitav: https://www.transpordiamet.ee/taotlused-blanketid#tood-ja-
piirangud-ma. Vastav taotlus palume saata e-posti aadressil
[email protected].
Taotlusele lisada kooskõlastuskiri ja ehitusaegse liikluskorralduse projekt.
3. Tööpäeva lõppedes ei ole lubatud jätta riigitee maaüksusele ega tee lähialale lahtiseid
kaevikuid. Materjalide ladustamine sõiduteele või selle vahetusse lähedusse on keelatud.
4. Riigitee maa tuleb peale tööde lõppu korrastada. Haljastus taastada kasvupinnase ja
murukülviga vastavalt „Teetööde tehniliste kirjelduste“ peatükk nr 9
„Maastikukujundustööd“ kvaliteedinõuetele.
5. Tehnovõrkude ehitustööde aeg tuleb kavandada nii, et riigitee teemaa korrastamise, riigitee
mahasõitude, jalgratta- ja jalgtee katendikonstruktsiooni nõuetekohase taastamise tööd oleks
teostatavad võimalikult lühikese aja jooksul. Kui ilmastikuolud ei võimalda riigitee teemaa ja
tee konstruktsioonide taastamist, tuleb projektikohaste tehnovõrkude ehitustööd riigitee
piirides peatada. Katted peavad olema taastatud ja teemaa korrastatud enne tehnovõrgule
kasutusloa andmist.
6. Ehitatav tehnovõrk peab vastama ehitusseadustikust tulenevatele normidele ning ei tohi
ehituse ajal ega kasutusele võtu järgselt seada takistusi liiklusele, tee ja teerajatiste teehoiule
(korrashoiule) või sademe- ja pinnasevete ärajuhtimisele riigitee transpordimaalt ja
kaitsevööndist.
7. Tööde lõpetamisel tuleb Transpordiametile esitada digitaalsed teostusjoonised 3D kujul .pdf
ja .dwg (.dgn) formaadis.
8. Kooskõlastatud projekti muutmisel riigitee piirides ja/või kaitsevööndis tuleb projektlahendus
Transpordiametiga uuesti kooskõlastada.
Kooskõlastus kehtib 2 aastat väljaandmise kuupäevast.
Lugupidamisega
(allkirjastatud digitaalselt)
Laur Kõiv
peaspetsialist
planeerimise osakonna tehnovõrkude üksus
Lisa: Seletuskiri
Asendiplaan
Kaevikute skeem
IKÕ plaanid
2 (3)
Laur Kõiv
55901417,
[email protected]
3 (3)