EnviCom 227
Terms of Reference
A Guide for Assessing and Managing
Environmental Restrictions on Dredging
and Disposal Operations
1. Background
Previous EnviCom Working Groups (WG) have developed procedures for the biological
assessment of dredged material evaluating whether sediments to be dredged are
appropriate for use beneficially or require special handling, as related to navigation and
port infrastructure, providing a scientific basis for making beneficial use decisions based
on sound science. These reports did not address specific tools, steps, and practices
needed to address restrictions currently being placed on dredging and dredging
placement / disposal operations. A new effort is proposed to fill this gap by developing a
practical guide through which a full range of management actions for reducing
environmental risks associated with dredging operations are identified, evaluated,
selected, and implemented. The approach will inform decision makers managing
environmental risks associated with dredging activities associated with navigation
infrastructure projects and identify opportunities to increase positive effects.
Release of sediments and sediment-borne constituents during dredging and dredged
material disposal activities may stress aquatic biota in various ways. Sources of potential
stress include exposure to elevated suspended sediment concentrations and turbidity,
and entrainment during dredging operations. Elevated suspended sediment
concentrations – and the resulting turbidity - may affect fish spawning, disrupt anadromous
fish migrations, and physical disturbance of habitat by increased sedimentation rates.
Dredging windows are a common management (mitigation) practice used to minimize or
avoid these dredging-related stresses on resident and transient biota. Dredging windows
are times during which dredging and dredged material disposal are allowed, whereas
seasonal restrictions are periods during which these activities are prohibited. Seasonal
restrictions are imposed based upon the assumption that potential detrimental exposures
could cause significant harm during these predetermined periods. Such time-of-year
constraints are associated with many navigation channels globally. These constraints
complicate contracting schedules (constricting them), availability of dredge plants, and
safety issues, substantially inflating the cost of dredging.
version 3 October 2019
2. Objective
The objective of the proposed WG is to provide a technically sound risk-based approach
to establishing dredging restrictions for waterborne transport infrastructure projects
applicable in both coastal and inland waterways. The approach will draw from existing
approaches and best practices worldwide and be written using understandable terms. It
will build on the WG175 report and show decision makers how to effectively manage risks
associated with dredging operations or choose alternative approaches. The WG will work
closely with other proposed WG related to Working with Nature (WwN) and ecosystem
goods and services (EGS) to ensure consistency among the WGs.
A methodology is required to inform risk management decision making for the
environmental risks associated with dredging operations pertinent to navigation
infrastructure. The WG should provide a practical methodology for managing the likely
effects of dredging in the context of natural variations in time (short to long term) and
space, (e.g., floods, storms, near field/far field), other activities that cause resuspension of
sediments (e.g., commercial shipping, storm runoff, etc.) and the ability of the identified
habitats or species to recover from or compensate for effects, i.e., temporary as opposed
to permanent effects (e.g., Building with Nature species response curves). The WG should
present case studies, summarizing the management actions taken that appropriately and
effectively managed the dredging risk.
Managing project risks involves considering multiple processes (e.g., physical, chemical,
biological, socioeconomic, etc.) operating over broad spatial and temporal scales. Large
uncertainties related to these processes prevent clear projections about the future
performance of risk management actions. The effectiveness and choice of the
management of risk involves both large economic and environmental costs, and is further
complicated by the diverse range of policies, perspectives, risk attitudes and personal
values that drive risk management decision making.
The resulting risk management framework and supporting methodologies will provide a
decision support foundation for environmental risk management. Building on accepted,
tested methods and tools developed in the fields of risk assessment, risk management, and
decision analysis, the approach is designed to determine plausible dredging windows
protective of the environment while avoiding unnecessary or even adverse restrictions.
3. Related Reports
The dredging restrictions report will appropriately integrate current knowledge from
existing reports and frameworks, such as those recently developed by the PIANC EnviCom
Permanent Task Group 3 on Climate Change (PTGCC). It will build on the existing PIANC
EnviCom Working Group 104 report “Dredged Material as a Resource: Options and
Constraints” (2009) and the PIANC EnviCOM WG 175 report “A Practical Guide to
Environmental Risk Management (ERM) for Navigation Infrastructure Projects.” Other
relevant sources of information include:
• CEDA Information Paper. 2010. Dredged Material as a Resource: Options and
Constraints (June)
• National Research Council (NRC). A Process for Setting, Managing, and Monitoring
Environmental Windows for Dredging Projects. Marine Board, Transportation Research
Board, Special Report 262. National Academy Press, Washington, D.C. 2001.
• IADC. 2016. Facts about Adaptive Management Practices.
• CEDA Information Paper. Environmental Turbidity Limits (in progress)
version 3 October 2019
4. Scope
The EnviCom WG will develop a report that develops a practical and structured
management process (framework) through which management actions for reducing
environmental risks associated with dredging operations are identified, evaluated,
selected, and implemented. The process developed should describe available
approaches and methods for comparing and evaluating alternative risk management
actions to inform decision-making. It should make clear that projects can differ
significantly, thus deferring risk management decisions from simply copying requirements
from other projects without substantiating their effectiveness. The process developed
should, where possible, be compatible with the WwN concept taking into account existing
methods for managing environmental risks while providing an open, deliberative, and
transparent decision-making process. The management process should:
• Define the concepts of risk and risk-informed decision making;
• Present an integrated approach / framework to dredging requirements that is
practical and implementable;
• Address such topics as uncertainty (e.g., short-term event-based related to
infrastructure operations), long-range risks (e.g., climate change), residual risk,
sustainability, resiliency, and collaborative processes;
• Review available methods that support risk-informed decision making so that the
uncertainties associated with managing environmental risk of dredging operations are
recognized and addressed;
• Present risk-informed decision making as a process of shifting toward more sustainable
practices for achieving multiple project benefits (i.e., environmental, social and
economic) so that the uncertainties associated with managing dredging risks are
recognized and addressed;
• Discuss the role of sustainability and life-cycle analysis in the context of risk
management of dredging operations; and,
• Incorporate adaptive management principles and practices, as appropriate.
In developing the approach, elements addressing issues associated with expert
knowledge of the system, including an understanding of the ecosystem, project
components and their different construction techniques as well as stakeholder
participation should be included as a means of developing a practical approach for
addressing environmental restrictions on dredging.
5. Intended Product
The report shall comprise:
• An introduction to dredging restrictions and how they fit into the existing knowledge
base from PIANC, CEDA, WEDA, IADC, and others;
• Discussion of progress and approaches developed through Engineering With Nature®
and Building with Nature programs being promoted elsewhere;
• A connection with the EGS WG for identifying, characterizing, and substantiating the
environmental and other benefits of WwN projects.
• A description of the approach / framework developed; the method should address
the steps and timing needed to meet project objectives in an ecosystem context. The
approach must show how stakeholders can be included in the process and identify
and exploit triple win solutions by systematically integrating social, environmental and
economic considerations into decision making and actions at every phase of a
dredging project.
• Potential impediments to applying the process and ways in which these can be
overcome.
version 3 October 2019
• A focused international survey of existing environmental risk management approaches
under consideration of legislative demands.
• An easily understood description of two or more case studies where determining
whether restrictions should be placed on dredging activities was informed by a
science-based approach as successfully applied in practice.
• A summary of existing PIANC, CEDA, IADC and other publications to ensure the process
developed is practical and integrates current knowledge.
6. Working Group Membership
Members of the WG should include representatives from the target audience, i.e.,
consultants, resource agencies, regulators and contractors, waterways managers,
environmental non-governmental organizations, and Port Authorities who are tasked with
making decisions. The range of expertise should cover at least practical port design and
construction knowledge and experience, geomorphology, physical processes, biology,
ecology and hydraulic as well as hydro-ecological modeling. One or more regulators
should be included to represent the regulatory perspective. To attract the interest of
regulators and resource agencies that sit outside PIANC and to more completely cover
wide-ranging regulatory jurisdictions, the WG will hold meetings in strategic locations in the
form of workshops where local and regional regulators / NGOs / resource agencies can
be invited to attend. Such workshops will achieve better outcomes, ensure wider
representation, and result in a report that is as widely applicable as possible.
7. Relevance to Countries in Transition
The primary audience in both developed and developing countries would be project
designers, waterways managers, contractors, ecologists, civil engineers, planners,
regulators and environmental stakeholders who have an influence on the decision-making
responsibility pertaining to placing restrictions on dredging operations. The report will be
written in a manner easily understood in both developed and transitional countries.
8. Climate Change
The dredging restrictions report will consider the role, influences, and implications of
climate change and will integrate current knowledge from reports produced by the PIANC
Permanent Task Group on Climate Change (PTGCC).
version 3 October 2019
Saatja: Kaidi Katus <
[email protected]>
Saadetud: 09.10.2019 13:52
Adressaat: Signe Paevere <
[email protected]>
Teema: Ed: PIANC setting up new Wg EnviCom 227 on 'A Guide for Assessing and Managing
Environmental Restrictions on Dredging and Disposal Operations'
Tähtsus: Kõrgeim
Manused: image001.jpg; image002.jpg; image003.jpg; image004.jpg; LETTER 227.pdf; TOR
227 Dredging Restrictions.pdf
Saatja: Sabine Vandevelde [mailto:
[email protected]]
Saatmisaeg: Wednesday, October 9, 2019 1:50 PM
Adressaat: Sabine Vandevelde <
[email protected]>
Teema: PIANC setting up new Wg EnviCom 227 on 'A Guide for Assessing and Managing Environmental
Restrictions on Dredging and Disposal Operations'
Tähtsus: Kõrge
Dear All,
See attached files,
Kind regards,
-------------------------
Chers,
Voir annexes,
Sincères salutations,
PIANC GENERAL SECRETARIAT
Graaf de Ferraris - 8th Floor
20, Boulevard du Roi Albert II B3 - 1000 Brussels - BELGIUM
Tel: + 32 2 553 71 61
E-mail:
[email protected]
Web: www.pianc.org
PIANC
The World Association for
Brussels, 9 October 2019.
Waterborne Transport Infrastructure
To the First Delegates of the
Qualifying Members of PIANC
To the National Sections’
Secretaries of PIANC
To the Platinum Partners of PIANC
To The Sister Associations of PIANC
Subject: Setting up of a new PIANC EnviCom Working Group 227 on “A Guide for Assessing and
Managing Environmental Restrictions on Dredging and Disposal Operations”.
Dear Madam,
Dear Sir,
The setting up of PIANC EnviCom Working Group 227 on “A Guide for Assessing and Managing
Environmental Restrictions on Dredging and Disposal Operations”, has duly been approved as well as its
terms of reference, which are herewith enclosed.
We kindly ask you to inform the secretariat of EnviCom by 31 December 2019 (copy to the General Secretariat
–
[email protected] ) about the name, qualification and (e-mail-) address of the expert,
proposed by your country/organisation. Please enclose a brief curriculum vitae of the proposed expert
together with some details about her/his professional experiences.
An additional expert per country/organisation, being a young professional, can participate in the Working
Group activities. Further I would like to remind you that Working Group Members should either be Individual
Member of PIANC, working for a Corporate Member or Platinum Partner, be an invited expert or a be a
member of a Sister Organisation.
We remind you that in accordance with PIANC rules, the costs incurred in taking part in Working Group
activities are borne by the member countries/organizations.
We thank you beforehand for your collaboration.
Yours sincerely,
Geert Van Cappellen,
Secretary-General.