dokumendiregister.ee
Sissetulev kiriAvalik

Kiri

Veeteede Amet · 16. juuli 2019
Viit
6-1-6/1656
Registreeritud
16. juuli 2019
Dokumendi liik
Sissetulev kiri
Adressaat
Balticconnector
Saabumis/saatmisviis
e-post
Funktsioon
6-1 Navigatsiooni korraldamine
Sari
6-1-6 Kirjavahetus navigatsiooniteabe küsimustes
Toimik
6-1-6/2019
Vastutaja
Darja Jokk (Veeteede Amet, Kasutajad, Hüdrograafia ja navigatsioonimärgistuse teenistus, Kartograafiaosakond)

Failid

Sisu (failidest)

Saatja: Olavi Heinlo Saatmisaeg: 16. juuli 2019 9:56 Adressaat: Darja Jokk Koopia: Kaidi Katus Teema: FW: Balticconnector offshore pipeline construction work in the sea completed Tere Darja! Palun t�hista navigatsioonihoiatus Baltic Connectori ehitust��de kohta ja v�ta �hendust Priit Heinla-ga, et selgitada, millal saame teostusjoonised ning kas seoses Baltic Connectori ehitamisega paigaldatud veelaused seadmed (Hoiatus nr 41) on samuti eemaldatud v�i on need endiselt asukohtades. T�nan! Olavi From: Kaidi Katus Sent: Tuesday, July 16, 2019 9:41 AM To: Olavi Heinlo <[email protected]>; Kert S�smalainen <[email protected]> Subject: Ed: Balticconnector offshore pipeline construction work in the sea completed Olavi, selle teate alusel v�ib vast hoiatuse maha v�tta. Kaidi Saatja: Mauno Napari [mailto:[email protected]] Saatmisaeg: Tuesday, July 16, 2019 9:05 AM Adressaat: Kaidi Katus <[email protected]> Teema: Balticconnector offshore pipeline construction work in the sea completed Balticconnector offshore pipeline construction work in the sea completed Construction work in the sea for the Balticconnector project offshore pipeline was completed Friday 12 July 2019. Pipe laying was finished at the end of June, and the shielding work was begun in mid-June. Now that the shielding work has been finished, all construction work in the sea has been completed. Next, the offshore pipeline will be pressure-tested in July-August, after which the pipeline will be emptied and dried. "We are satisfied that the construction work for the offshore pipeline has progressed on schedule and that we can begin the final phases of the pipeline according to plan. We are progressing at a good pace towards the end of the year when the pipeline will be commissioned," says Tom Fr�mling, Baltic Connector Oy's Project Director. The offshore pipeline will be connected to the onshore pipelines in Finland and Estonia during the autumn. The Balticconnector pipeline will be fully ready at the end of 2019, and gas will start to flow in the pipeline on 1 January 2020 as the Finnish gas market opens. Hyv�� kes��, T. Manu Yours sincerely Mauno Napari Project Manager Offshore Pipeline, Owners Engineering Porkkalankatu 1, FI-00180 Helsinki +358 40 5955 567 [email protected] www.balticconnector.fi
Allikas: Veeteede Amet dokumendiregister →