Väljaminev kiriAvalik
Kiri
Veeteede Amet · 5. juuli 2019
Seotud ettevõtted
- Viit
- 5-1-13/1588
- Registreeritud
- 5. juuli 2019
- Dokumendi liik
- Väljaminev kiri
- Adressaat
- Agmar OÜ
- Saabumis/saatmisviis
- pole vaja saata
- Funktsioon
- 5-1 Meresõiduohutus
- Sari
- 5-1-13 Kirjavahetus ja dokumendid laevade tehnilise järelevalve küsimustes
- Toimik
- 5-1-13/2019
- Vastutaja
- Kristjan Truu (Veeteede Amet, Kasutajad, Meresõiduohutuse teenistus, Laevade järelevalve osakond)
Failid
Sisu (failidest)
Saatja: Sander Linikoja <[email protected]>
Saadetud: 05.07.2019 14:58
Adressaat: Merle Tühis <[email protected]>; VA_eva <[email protected]>
Koopia: Kristjan Truu <[email protected]>
Teema: FW: Planning of initial certification company Agmar OÜ and ship Crystalwater
Tere
Palun registreerida.
Tervitades
Sander
From: Pavel Muhhin
Sent: reede, 5. juuli 2019 14:26
To: Maksim Onutšin <[email protected]>; Sander Linikoja <[email protected]>
Subject: Fw: Planning of initial certification company Agmar OÜ and ship Crystalwater
From: Agmar OÜ <[email protected]>
Sent: 05 July 2019 14:23
To: Pavel Muhhin
Subject: Re: Planning of initial certification company Agmar OÜ and ship Crystalwater
GD,
Kindly ask you to consider 11.07.2019 for company audit.
Brgds
Agmar OÜ
Aleksei Gorjatsev
+372 55947901
From: Pavel Muhhin <[email protected]>
Date: Wednesday, 3 July 2019 at 11:01
To: Agmar OÜ <[email protected]>
Subject: Planning of initial certification company Agmar OÜ and ship Crystalwater
Good day.
Please be informed that existing IDOC for company is valid till 25.07.2019. As according ISM
code 14.1 it can, for period not exceeding 12 months from verification, be reissued.
Hovever according international regulations The Company shall be furnished with a full term
DoC at the time of the expiration of the interim SMC.
As for the ship interim SMC will expire 22.08.2019.
Please be noted that EMA inspectors have vacations and if company prefers to have initial
audit before 25.07 then up to date 12.07 is suggested.
Other possibility is to prolong IDOC and carry out all audits in august 2019.
Best regards Pavel Muhhin