PUBLICATION TITLE Ref. Ares(2019)3847376 - 17/06/2019
1st CISE Stakeholder Group meeting
held in Lisbon on 15 May 2019
Meeting minutes
Final Version
Date: 03/06/2019
Page 1 of 12
1st CISE STAKEHOLDER MEETING
1. Introduction
1.1 Background
The 1st CISE Stakeholder Group (CSG) meeting took place at EMSA on 15th of May 2019. The meeting was
convened by the CSG Chairman Mr Leendert Bal, EMSA.
The following CSG Member States and institutions were represented at the meeting: Belgium, Croatia, Finland,
France, Germany, Greece, Ireland, Italy, Lithuania, Malta, Portugal, Romania, Slovenia, Spain, The Netherlands,
United Kingdom, European Defence Agency, European Fisheries Control Agency, European Border and Coast Guard
Agency, European Union Satellite Centre, European Commission Joint Research Centre, European Commission
DGMARE, and European Commission DGMOVE (the full list of participants is in the Annex 5.1).
The meeting presentations can be downloaded at the following URL: http://emsa.europa.eu/workshops-a-events/188-
workshops.html
1.2 Document Contents
1. Introduction ......................................................................................................................................................... 2
1.1 Background ................................................................................................................................................. 2
1.2 Document Contents .................................................................................................................................... 2
2. Meeting session .................................................................................................................................................. 2
2.1 Welcome and Opening ............................................................................................................................... 2
2.2 CISE state of play ....................................................................................................................................... 3
2.3 Technical and operational support ............................................................................................................. 3
2.4 Transitional phase activities overview ........................................................................................................ 4
2.5 Legal services – Administrative Framework ............................................................................................... 4
2.6 EMSA’s possible data contribution ............................................................................................................. 5
2.7 JRC on development activities for the CISE nodes .................................................................................... 5
2.8 Status of the implementation of national nodes/adaptors and plans for the transitional phase ................. 5
3. Meeting outcomes .............................................................................................................................................. 6
3.1 Decisions .................................................................................................................................................... 6
3.2 Tasks .......................................................................................................................................................... 6
4. Conclusion .......................................................................................................................................................... 8
5. Annexes ............................................................................................................................................................... 9
5.1 List of Participants ...................................................................................................................................... 9
5.2 Agenda...................................................................................................................................................... 10
2. Meeting session
2.1 Welcome and Opening
Leendert Bal, Head of Department C - Operations, welcomed all Member States (MS) and Agencies to this first
meeting of the CISE Stakeholder Group.
Since the signature of the Grant Agreement on 16 April 2019 between EMSA and DG MARE, EMSA has been
preparing the basis on which it can take the project forward. The 1st CISE Stakeholder Group meeting is indeed the
opportunity to present what EMSA, JRC and DGMARE have organized to support the transitional phase and to share
the status and plan of the CSG members for the transitional phase.
On this matter, Mr Bal spoke of excellent cooperation with both the JRC and DG MARE. He also recognised and
appreciated the work that has already being done by the EUCISE2020 project.
The agenda was presented and adopted with some slight changes (see Annex 5.2)
Page 2 of 12
1st CISE STAKEHOLDER MEETING
2.2 CISE state of play
Christos Economou, Head of Unit at DG MARE, acknowledged the extensive efforts that went into building the bridge
between EUCISE2020 and the transitional phase, ensuring that no time would be lost.
In looking at the current state of play, Mr Economou said it was also important to look to the past. The whole idea of
CISE started ten years ago. The project underlined the value of information sharing from maritime surveillance,
showing that it was relevant to many. The objective is now to take it forward in a solid framework making it operational
by 2021.
EUCISE2020 ended with a conference in March 2019 which was attended by many of those present at the 1st CSG.
Since then, the IPR discussion has been advancing. A transfer agreement is in the pipeline and is expected to be
ready soon to form the basis of the transitional phase.
To achieve the operational stage of a sustainable CISE Mr Economou mentioned the draft proposal for the Regulation
for the maritime and fisheries fund (EMFF) post 2020. This proposal made by the Commission is now in negotiation
with the Member States
2.3 Technical and operational support
Gianluca Luraschi, EMSA Project Officer, presented the support processes for technical and operational activities.
The aims of these processes are to guarantee continuity of the CISE network during the CISE Transitional Phase, and
they should help to support the CSG members.
(for detailed information please see the presentation).
Questions & Answers
DE Germany noted the interest in the set-up of new nodes and wanted to find out more about where
the interest came from.
It was explained that more information on the interest raised for the installation of new nodes would be
given in the short format presentations scheduled for the afternoon session.
FR France mentioned that until now there was very much a project team approach and was pleased
to note the involvement at national level. It also welcomed the identification of a working group
to be involved at a technical level. France was happy with the proposal and acknowledged that
much work still needed to be done at national level.
GR Greece expressed a need for a more detailed assessment to look into both project and software
management as well as to examine the timeline for the various procedures.
BE Belgium asked whether or not the working group was only for those parties already with a node
installed and expressed a wish to see it open to all so that the momentum in CISE development
could be kept going more easily.
It was explained that the stakeholder group could decide on the composition of the working group.
NL The Netherlands proposed to change the name of the Architecture working group to avoid any
confusion in the term “Architecture”. The SG Member considered relevant to establish the
baseline from EUCISE2020 to understand better the progress during the CISE Transitional Phase.
The SG members agreed to change the name of the group to ‘Configuration Board‘.
To establish the baseline, Commission is still negotiating the transfer of the IPR of the results of the
EUCISE2020 project.
On the grounds of this presentation and discussion decisions: D1/1, D1/4, D1/5 were taken, see session 3 of this
document.
Page 3 of 12
1st CISE STAKEHOLDER MEETING
2.4 Transitional phase activities overview
Gianluca Luraschi, EMSA Project Officer, introduced how EMSA and JRC are going to address the activities defined
in the MSEG Activities paper, and a plan to address them was proposed.
(for detailed information please make reference to the presentation).
Questions & Answers
DE Germany expressed confidence in the planning of the transitional phase as well as willingness that
the work should begin quickly given that the entire framework would need to be looked into in depth
by the Member States.
Mr Bal said that he understood the concern but cautioned that priorities have to be set, a number of activities
have to be started, first the foundational phase has to be in place. It would not, he said, be realistic to start
all activities immediately.
EL Greece expressed concern over the level of involvement expected from each Member State.
Mr Bal explained that the activities certainly had to be looked at, as well as how to use the node and any
operational needs.
Bartel Meersman, from the JRC, explained that while there will be a lot of work to do on EMSA and the JRC
side, Member States also need to do their homework to determine which information and datasets to share.
DE Germany also expressed eagerness to have a best practice workshop held sooner rather than later,
to keep momentum and interest in the project high.
While Mr Bal appreciated the enthusiasm, a specific action will be taken to see if this request can be
accommodated earlier.
NL The Netherlands, speaking as a newcomer, explained that they were happy to see EMSA get involved
in the transitional phase. They were also keen to see progress, step by step, so that Member States
could get their own management in order first.
Mr Economou emphasised that CISE stakeholders have a key role to play in relaying back messages to
their national administrations. Particularly in explaining the many developments to CISE and that the club is
expanding beyond a set of specific members and authorities.
BE Belgium expressed interest to know more about the activities being taken forward as soon as
possible.
On the grounds of this presentation and discussion the decision D1/3 was taken, see session 3 of this document.
2.5 Legal services – Administrative Framework
Georg Troost, EMSA Legal Officer, presented the approach for establishing the agreements to exchange data
between CISE stakeholders.
(for detailed information please make reference to the presentation).
Questions & Answers
DE Germany expressed its full support for this approach and said that it considered the group
would be very lucky if it were to have this agreement in place by the end of the transitional
phase given the complexities involved.
FR France reminded those present of the philosophy behind CISE for a voluntary exchange of
information, consolidating information that in some cases the users didn’t even know
existed. France mentioned that it should be open to new data providers and that it considers
it important to have a legal framework in place.
Page 4 of 12
1st CISE STAKEHOLDER MEETING
Mr Bal explained that an initial document could be put together that the stakeholders could use as
an initial basis for discussion.
Mr Economou underlined that this is a very important part of the work that gives assurance to all
equally on what can be shared and with whom.
On the grounds of this presentation and discussion the decision D1/2 was taken, see session 3 of this document
2.6 EMSA’s possible data contribution
Catrin Egerton, EMSA Project Officer, gave an introduction to the Copernicus Maritime Surveillance Service which is
implemented by EMSA. Lukasz Bibik, EMSA Project Officer, introduced Automated Behaviour Monitoring tools and
Long Term Storage service.
(for detailed information please see the presentations).
2.7 JRC on development activities for the CISE nodes
David Berger, from the JRC, gave an explanation of how the JRC can support the Member States within the context of
the CISE activities.
(for detailed information please see the presentation).
2.8 Status of the implementation of national nodes/adaptors and plans for the
transitional phase
The following CSG members delivered presentations:
- Greece – Nikolaos Sourounis from the Hellenic Coast Guard;
- Spain – Vincente Solla Alvarez – Direccion general de la marina mercante;
- Belgium – Thierry Segers, lieutenant in Belgian Navy;
- Finland – Pietari Vuorensola from METO;
- Italy – Luigi Ciani from the Marina Militare Italiana;
- Malta – Michelle Formosa from the Malta Marittima Agency;
- Lithuania – Karolis Lileikis from the Lithuanian Navy/MRCC;
- Germany – Bernhard Wehner from Germany’s MoD;
- Slovenia – Vladimir Vladovic from the Slovenian Maritime Administration;
- Croatia – Ivan Kuseta from the Ministry of the Sea, Transport and Infrastructure;
- Netherlands - Henk Rohaan, Senior adviseur;
- Romania – Oprescu Mircea from the Romanian Border Police (presentation not available);
- Portugal (presentation available, although it was not delivered during the meeting);
- SatCen – Patricia Romeyro Mascarenhas.
The presentations can be downloaded at: http://emsa.europa.eu/workshops-a-events/188-workshops.html
Page 5 of 12
1st CISE STAKEHOLDER MEETING
3. Meeting outcomes
3.1 Decisions
The following decisions have been taken during the meeting:
Decision Description Note
number
D1/1 – To set-up the “Configuration Board” working group (WG). This
“Configuration WG comprises experts appointed by CSG to be consulted in
Board” case there is request of changes in the common and core
software. The configuration board will operate as
correspondence group. The CSG members that do not have the
node implemented can appoint an expert with the role of
observer.
D1/2 – To set-up the “Cooperation Agreement WG” working group.
“Cooperation This WG comprises experts appointed by CSG to be consulted
Agreement in order to establish the cooperation agreements for sharing
WG” information between CISE nodes. The working group will
operate as correspondence group after an initial workshop to
kick off the activity.
D1/3 – WBS The CSG agreed about the Work Breakdown Structure (WBS) - The possibility to anticipate the
and Plan and plan proposed to carry out the activities defined in the best practice workshop should be
MSEG Activities Paper. assessed.
The WBS and plan will be reviewed regularly in the CSG - During the 2nd CSG meeting the
meetings. “responsibility to share” activity
should be discussed and possibly
planned.
D1/4 – Single
[email protected] is the single point of contact for
point of the CSG members to request any technical and operational
contact support.
[email protected] is the single point of contact for
administrative requests/questions.
D1/5 – To cover the Technical and Operational needs the following
management procedures proposed by EMSA and JRC will be established:
procedure incident, problem, configuration, deployment and new
installation request.
Decision Number: CSG meeting / Decision number (i.e. D1/1 is the 1st decision agreed during the 1st CSG).
3.2 Tasks
The following tasks have been agreed during the meeting:
Page 6 of 12
1st CISE STAKEHOLDER MEETING
Task Description Decision Responsible deadline Note
number number
T1/1 Nominate the D1/1 Each CSG 31/08/2019 An email should be sent to
experts for the member
[email protected] specifying the name,
Configuration interested in e-mail account and phone number of the
Board participating in appointed expert.
the
Configuration
Board
T1/2 Nominate the D1/4, Each CSG 31/08/2019 An email should be sent to
“Node owner” D1/5 member that
[email protected] specifying the name,
has a node e-mail account and phone number of the
installed node owner.
T1/3 Nominate the D1/4, Each CSG 31/08/2019 An email should be sent to
“Node D1/5 member that
[email protected] specifying name, the
administrator” has a node e-mail account and phone number of the
installed administrator
T1/4 Nominate the D1/2 Each CSG 31/08/2019 An email should be sent to
members for member
[email protected] specifying, name the
the interested in e-mail account and phone number of the
“Cooperation participating in appointed expert
Agreement the Cooperation
WG” Agreement
working group
T1/5 CSG member D1/2 Each CSG 31/08/2019 An email should be sent to
are invited to member
[email protected]
submit any
best practice
documents or
clauses to be
taken into
account for
the
cooperation
agreement
T1/6 A document D1/5 EMSA and JRC delivered This document shall be delivered to all CSG
describing the members.
Technical and
Operational
support
introduced
during the 1st
CSG meeting
Page 7 of 12
1st CISE STAKEHOLDER MEETING
should be
drafted.
Task Number: CSG meeting / task number (i.e. T1/1 is the 1st task agreed during the 1st CSG).
4. Conclusion
The CSG approved the Work Breakdown Structure and the plan to implement the CISE Transitional Phase activities
as defined in the MSEG paper (see EMSA and JRC’s presentations) and subsequently a number of decisions and
tasks were agreed during the meeting starting their implementation (see section 3 of this document).
The 2nd CSG meeting is planned for the 1st week of October (CSG member interested to participate should save the
date: 2nd and 3rd of October).
Page 8 of 12
1st CISE STAKEHOLDER MEETING
5. Annexes
5.1 List of Participants
country firstname lastname city organization
Federal Public Service Mobility and
Belgium Els Claeys Brussels Transport - DG Shipping
Belgium Thierry Segers Brussels Belgian Navy
Ministry of the Sea, Transport and
Croatia Ivan Kuseta Zagreb Infrastructure
Ministry of the Interior, Border Guard
Finland Pietari Vuorensola Helsinki Department
France Ronan Chastanet PARIS SGMer
Germany Bernhard Wehner Bonn German MoD
Cologne /
Germany Elise Kleinsorgen Bonn (DEU) German Federal Ministry of Transport
Hellenic Navy General Staff Plans & Policy
Greece Ioannis Pantelis Athens Directorate
Greece Nikolaos Sourounis Athens Hellenic Coast Guard
Ireland Dymphna Keogh Brussels Irish Permanent Representation to the EU
Italy Luigi Ciani ROME MARINA MILITARE ITALIANA
Lithuania Karolis Lileikis Klaipeda Lithuanian Navy MRCC
Malta Michelle Formosa Luqa Malta Marittima Agency
Portugal Rui Serafim Lisbon DGRM
Joana Paião Lisbon DGRM
Portugal Fernando Braga Lisbon DGRM
Romania oprescu mircea bucharest Romanian Border Police
Slovenia Vladimir Vladovic Koper Slovenian Maritime Administration
DIRECCIÓN GENERAL DE LA MARINA
Spain Vincente Solla Alvarez LA CORUÑA MERCANTE
The
Netherlands Lisette van Oss Amsterdam NL Coastguard/NL Navy
The
Netherlands Henk Rohaan Den Haag MoDNL/ NLCG
The
Netherlands Jan Haverkorn Den Helder Coastguard
United
Kingdom Valerie Trojanowska London Department for Transport
Dirk Peters Brussels European Defence Agency
David Berger Ispra European Commission - JRC
Jesus Hermida Ispra European Commission, JRC
Paolo Salieri Brussels European Commission
Vytautas Lukas Vigo EFCA
Frontex - European Border and Coast
Lucian Filipoaia Warsaw Guard Agency
Romeyro
Patricia Mascarenhas Madrid SATCEN - European Union Satellite Centre
Elisabetta Pietrobon Brussels European Commission
Christos Economou Brussels European Commission
The following EMSA staff participated at the meeting:
- Maja Markovcic Kostelac (EMSA Executive Director to welcome the meeting participants)
Page 9 of 12
1st CISE STAKEHOLDER MEETING
- Leendert Bal (meeting Chairman)
- Gianluca Luraschi (CISE Project Manager)
- Georg Troost (introduced “Administrative framework”)
- Catrin Egerton (introduced “Copernicus services”)
- Lukasz Bibik (introduced “ABM and LTS services”)
-
5.2 Agenda
Wednesday, 15 May 2019
Time Agenda Item
09:00 – 09:30 Registration and coffee
09:40 – 10:00 CISE: state of play (DG MARE)
- State of play of CISE, results so far, objectives for the transition phase.
10:00 – 10:30 Technical and Operational support (EMSA/JRC)
- Description of the operational services that EMSA and JRC are planning to provide
during the Transition Phase to the authorities that have already implemented a CISE
node.
- Set-up a specific working group to address the CISE architecture and the management
of changes
10:30 – 11:00 Transition phase activities overview (EMSA)
- Work breakdown structure for the activities to carry out during the Transition Phase
(based on the MSEG activity paper – see annex).
- Proposal of the Transition Phase Plan.
11:00 – 11:20 Coffee break
11:20 – 11:50 Legal services – Administrative framework (EMSA)
- Approach and process to be discussed towards a Service Level Agreement and/or
Conditions of Use to allow the exchange of data between the CISE Stakeholders.
11:50 – 12:30 EMSA’s possible data contribution (EMSA)
- Presentation on Copernicus Maritime Surveillance Service and on ABM’s (Automatic
Behaviour Monitoring tools
12:30 – 13:00 Development activities for MS nodes (JRC)
- Description of the support for the implementation and maintenance of MS adaptors.
13:00 – 14:30 Lunch break
- EMSA will organize a visit to the EMSA Maritime Support Service (its operational
information centre). Stakeholder members interested to participate in this event, please
send an e-mail by the 10th of May to:
[email protected].
14:30 – 16:00 Status of the implementation of national nodes/adaptors and plans for the Transition
Phase (Stakeholder members – Member States and EU Agencies)
- Member States and EU Agencies are invited to give a short presentation.
16:00 – 16:20 Coffee break
16:20 – 16:40 Planning for the Transition Phase (EMSA)
- The plan introduced in the morning session “TP activities overview” will be reviewed and
consolidated based on the discussions held.
16:40 – 17:00 Summary and conclusions (EMSA)
Remarks
- Open discussion will be moderated at the end of each session.
Page 10 of 12
Electronically signed on 07/06/2019 11:27 (UTC+02)
Ref. Ares(2019)3847376 - 17/06/2019
Technical and Operational Support
Author: Gianluca Luraschi, David Berger, Jesus Hermida
Document version: 1.0
Document date: 12/06/2019
European Maritime Safety Agency (EMSA)
Praça Europa 4, Cais Do Sodré 1249-206 Lisbon, Portugal
Tel: +351 21 1209 415, Fax: +351 21 1209 217
Technical and Operational Support Version 1.0
Contents
Technical and Operational Support ................................................................................... 1
1. Introduction ............................................................................................................. 3
1.1 List of appendices ................................................................................................. 3
1.2 Change control history ........................................................................................... 3
1.3 Definitions and acronyms ....................................................................................... 3
2. Scope ....................................................................................................................... 4
3. Actors and Roles ...................................................................................................... 4
4. Support Levels ......................................................................................................... 6
5. Support Processes.................................................................................................... 7
5.1 Incident and Problem Management.......................................................................... 8
5.2 Node Configuration.............................................................................................. 10
5.3 Node Maintenance ............................................................................................... 11
5.4 Node Deployment ............................................................................................... 13
5.5 Adaptor Development .......................................................................................... 15
5.5.1 Technical Information on the Adaptor ................................................................ 15
5.5.2 Development of CISE services ........................................................................... 16
5.5.3 Sandbox service .............................................................................................. 17
5.6 Conformity Testing .............................................................................................. 18
5.6.1 Node Deployment Tests ................................................................................... 18
5.6.2 Adaptor Integration Tests ................................................................................. 19
6. Periods with only Level-0 Support.......................................................................... 20
7. Reporting Activities ................................................................................................ 20
8. Single Contact Point ............................................................................................... 21
Page 2 of 21
Technical and Operational Support Version 1.0
1. Introduction
1.1 List of appendices
The table below summarises the applicable appendices that shall be considered an integral part of
this documentation.
Appendix Title
A MSEG activity paper
1.2 Change control history
Version Date Edited by Description
1.0 15/05/2019 Authors Draft proposal to Member States
1.3 Definitions and acronyms
EMSA: European Maritime Safety Agency
JRC: European Commission, Joint Research Centre
Page 3 of 21
Technical and Operational Support Version 1.0
2. Scope
The CISE Transitional Phase pursues, among other specific objectives, the support of the technical
and operational activities for the CISE stakeholders. The document “CISE Transitional Phase:
Activities” defines Technical and Operational support as “technical support to the Member States for
enabling or keeping up and running the CISE network”.
To achieve the objectives of the CISE Transitional Phase, EMSA in cooperation with the JRC will carry
out the following specific activities:
• provide operational support during working hours (i.e. incident and problem management)
to Member States authorities for maintaining existing or configuring new services, building
on the results of the EUCISE2020 project;
• provide technical support for the implementation, deployment, integration, and tests
(including the development of the CISE’s compliance suite) of new CISE services in existing
or new adaptors;
• provide technical support for the deployment and test of two additional nodes (indicative
number);
• maintain the common building blocks software implemented during EUCISE2020 (including
release management). It is out of the scope of the transitional phase to implement new
node’s requirements, functionalities or any changes that can impact the existing national
adaptors;
• review and keep updated the CISE architecture as well as follow up on the standardisation
process.
To address these activities, EMSA and JRC have established a pre-operational organisation and
several support processes for the CISE stakeholders:
- incident and problem management;
- node configuration;
- node maintenance;
- node deployment;
- adaptor development;
- conformity testing.
The present document describes the proposed organisation and support processes, including the
main roles/actors involved and how the CISE stakeholders should request support during the CISE
Transitional Phase.
3. Actors and Roles
The following actors and roles participate in the processes for Technical and Operational Support:
Page 4 of 21
Technical and Operational Support Version 1.0
CISE
Stakeholders CSG Member
Group (CSG)
Configuration Configuration Node Adaptor
Board Board Member owner(s) owner(s)
Node
administrator(s)
EMSA JRC
Project Adaptor
Management Contractor(s) Support Team Development Contractor(s)
Office Team
Figure 1. Actors and roles in the Technical and Operational support.
CISE Stakeholders The CISE Stakeholders Group will provide the necessary guidance and orientations
Group (CSG) for the Technical and Operational support.
The CSG is periodically informed on the Technical and Operational support
activities.
CSG Member The members of the CISE Stakeholders Group represent and coordinate all the
stakeholders in their own Member States or EU Agency, including the node owners,
adaptor owners, and the members of the different working groups.
Configuration Board Technical working group within the CSG that analyses and provides feedback to
the CSG about the requests for change in the software of the CISE Node and the
topology of the CISE Network.
Decisions on the change requests will be taken by the board members with a CISE
Node. Other members can participate in the discussions as observers.
Node Owner Node owners are responsible for a CISE node. They are representatives of the
Member States’ authorities or EU Agencies.
Node Administrator Node administrators are in charge of the maintenance of the CISE nodes. They are
appointed by the node owners.
Node administrators can perform several technical tasks on their own or in
coordination with other ICT experts:
• Management of the CISE node’s hardware and software: to set up the
virtualisation environment (VMWare), to configure the different software
components of the CISE node, to monitor the activity (Nagios, log files, etc.)
and to run scripts and processes when needed, to update the software
components, among others.
• Management of the network (VPN connections) with the other CISE nodes: to
change the security parameters for a VPN, etc.
Page 5 of 21
Technical and Operational Support Version 1.0
EMSA EMSA is responsible for the operational and technical support activities and works
in cooperation with the JRC for the development activities.
JRC The JRC works in cooperation with EMSA for the technical and operational support
activities and it is responsible for the development activities with the Member
States.
Contractors EMSA will subcontract part of the Technical and Operational Support activities of
the CISE Node software and CISE Network. The contractors will support the
(external service
stakeholders as members of the Support Team.
providers)
The JRC may subcontract the development activities for some pilot projects. The
contractors will be part of the Adaptor Development Team.
Project Management EMSA set up a Project Management Office to plan and manage the activities
Office required to achieve the objectives of the CISE Transitional phase. The Project
Management Office works in coordination with the CSG. The Adaptor Development
team is composed by a group of ICT experts coordinated by JRC. The team will
participate in the development activities of the pilot projects with the Member
States. The team will also help assist Node Administrators to conduct the formal
tests of the CISE Nodes and adaptors following using the procedures and tools
available.
4. Support Levels
Support is organised in four levels with different tasks and actors/roles involved in them:
Level-0 Support
This entry level includes all the documentation and software tools available to the stakeholders
through the EMSA’s web site and the collaborative site. The stakeholders will use these resources to
perform the maintenance, development and operational activities.
At least, the following resources will be available for the CISE stakeholders:
• Online technical documentation on the CISE node, adaptors, CISE Data and service models,
etc.
• Tool for installation and maintenance of CISE nodes.
• Tool for developers of adaptors.
Level-1 Support
The Support team provides the first level of support to the stakeholders. The stakeholders can send
a support request to the single point of contact, managed by EMSA.
The objective in Level-1 is to provide an answer with the shortest delay possible. To achieve it, the
Support team will address the request using the resources from Level 0, predefined procedures (e.g.,
incident-handling procedures), and a knowledge base of support requests and predefined solutions
(from past cases). The Support team may request further information to the requester to clarify the
request and gather additional details.
If no predefined solution works, the support request is transferred to Level-2 Support.
Main tasks:
Page 6 of 21
Technical and Operational Support Version 1.0
• Register and classify the support requests according to the established support procedures.
• Find solutions from the documentation in Level 0 and the support knowledge base.
• Keep stakeholders informed about their requests’ status at agreed intervals.
• Monthly report on the status of the requests and issues related to the support process.
Level-2 Support
The Support team provides the second level of support, which deals with complex support requests.
The objective in Level 2 is to analyse in depth the gathered information and to provide an answer to
the stakeholder within an agreed timeframe. To achieve it, the Support team may conduct further
investigation and analysis using the available documentation and software tools. The Support team
may request further information to the requester. The Support team may also need to coordinate
their activities with different stakeholders and to collaborate with the node administrators.
If the support request involves any specific interventions in the software components (e.g., for the
CISE Node), it is transferred to Level-3 Support.
Main tasks:
• Investigate complex requests.
• Plan a set of specific activities with the requester.
• Coordinate interventions in the CISE Network with the node administrators.
• Register solutions in the support knowledge base.
• Monthly report on the status of the support requests and issues related to the support
processes.
Level-3 Support
This support level deals with support requests that require specific interventions in the software of
the CISE Node and/or the adaptors, e.g., bug investigation, analysis of change requests,
improvements to the installation procedures, test procedures, etc.
The Support Team will plan the activities with the stakeholder in coordination with the Project
Management Office.
Main tasks:
• Analyse software components (including the source code).
• Provide technical advice regarding the software components.
• Provide solutions, including bug fixes, to issues detected in the software components.
• Report on the status of the requests and any issue related to the support process.
5. Support Processes
Support processes ensure that CISE stakeholders can receive timely and appropriate support in their
operational and technical activities with the CISE nodes and adaptors.
The following diagram defines the activity categories in the scope of the Technical and Operational
support processes.
Page 7 of 21
Technical and Operational Support Version 1.0
Support
Technical Operational
Incident and
Node Adaptor Network Node
problem
Deployment Testing Development Testing Configuration Maintenance Configuration Maintenance
Figure 2. Taxonomy of activity categories.
This section presents the support catalogue1 available during the CISE Transitional Phase. The
implementation of the support processes will be gradual, starting from May 2019. CISE stakeholders
will be notified when a new process is available and/or the conditions of a service change.
The next sections describe each process in detail, including how the CISE stakeholders can request
it.
5.1 Incident and Problem Management
Name Incident and problem management
Description Incident management consists of the resolution of incidents within the CISE Network
based on pre-defined procedures. Incident management ensures the swift recovery
of the service in case of incidents.
Problem management deals with the resolution of problems in response to one or
more reported incidents with unknown cause.
During the CISE transition phase, the incident/problem resolution procedures will be
maintained and improved by the Support Team. The key objective is to guarantee
that incidents are handled accurately, completely, and in a timely manner.
Features The Support Team registers and manages incidents and problems using the ticketing
system.
Incident Management. The following activities will be performed when an incident
is reported:
1. Incident detection.
2. Initial support.
3. Investigation and diagnosis.
1 Based on the ITIL v3 Service Catalogue.
Page 8 of 21
Technical and Operational Support Version 1.0
4. Resolution and recovery.
5. Incident closure.
6. Incident communication.
During the incident management, the Support team will estimate the time to solve
the incident and the procedure to be applied.
In case there is no pre-defined procedure to solve the incident, the issue reported
shall be considered a problem. The transition from Incident to Problem management
is a Support Team’s internal task.
Problem Management. The following activities will be performed when a problem is
identified:
1. Problem analysis, categorisation, and prioritisation.
2. Problem investigation and diagnosis.
3. Provision of the solution.
Problem resolution times will be agreed on a case-by-case basis with the Support
Team. Problems that require changes in the software of the CISE Node will be
managed according to the process “Node Maintenance”.
Resources. At least the following resources (documentation, software) will be
available for the Support Team:
• FAQ – Troubleshooting information
• Software architecture of the CISE Node
Figure 3 shows an overview of this process workflow.
Category Support/Operational/Incident and Problem
Owner(s) EMSA
Provider Support Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group.
Business Contacts Node owners and administrators.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months
Security Rating Unclassified
Request Node administrators shall send an e-mail to the Support Team at cise-
Procedures
[email protected]
Page 9 of 21
Technical and Operational Support Version 1.0
Node Support Team Project Management Office Stakeholders
2. Possible solutions
Level-1 Support
Configuration Board
1. Request support
for incident
3. Problem or 5b. Request
Configuration opinion
4. Configuration 5. Request For Change (RFC) 5a. Request
Problem approval
Deployment
Node Level-2 Support EMSA PM CISE
administrator Stakeholders
Group
5c. Approved RFC
5d. Software Release
Level-3 Support
Figure 3. Incident, problem, configuration and maintenance workflow.
5.2 Node Configuration
Name Node configuration
Description The Node Administrator is responsible to manage the configuration of the node and
the services.
The Support Team can support node administrators on the configuration of their nodes
using the Administration Console. In particular, Node administrators can receive
support on the use of the service registry and the access rights matrix.
Features The Support Team registers and manages the support request using the ticketing
system.
Punctual support. The Support Team answers to the requests using the
documentation available and the support knowledge base. The support is provided by
e-mail, web conference or phone call.
Tutorial. JRC can offer a tutorial support to provide an introduction for the
management of the node.
Resources. The Support Team will make available the following resources
(documentation, software) thought the EMSA’s collaborative site:
• System User Manual
• Administrator Manual
Figure 3 shows an overview of this process workflow.
Category Support/Operational/Node/Configuration
Page 10 of 21
Technical and Operational Support Version 1.0
Owner(s) EMSA
Provider EMSA, JRC
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Node owners and administrators.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months.
Security Rating Unclassified
Request Node owners/administrators shall send an e-mail to the Support Team at cise-
Procedures
[email protected]
5.3 Node Maintenance
Name Node maintenance
Description The software of the CISE Node (Core and Common services) will be maintained during
the CISE Transitional phase.
Maintenance will address the development and release of software hotfixes, patches
and/or updates in the configuration files that fix defects, errors or bugs in the software
of the Core and Common Services with an impact in terms of appearance, operation,
functionality or performance.
EMSA will be in charge of the software maintenance process and will manage the new
versions resulting from the maintenance process.
The release of software versions requires the endorsement of the Configuration Board
and the approval of the CISE Stakeholder Group.
Features Change Management. EMSA will acquire, maintain and track the requirements and
change requests to the CISE Node’s software (software repository) in an online Web
tool. The change requests may come from:
• Feedback from EUCISE 2020 and the national interoperability projects.
• Problems identified by the Support team.
• Feedback from the stakeholders.
• Studies carried out during the CISE Transitional Phase.
Node Maintenance. The Support Team will develop and test a set of software
hotfixes, patches and/or updates in the configuration for the CISE Node, which will
result in the release of a new software update.
Page 11 of 21
Technical and Operational Support Version 1.0
In order to guarantee the interoperability of the national adaptors, EMSA shall consult
the changes/updates that will have an impact in the CISE Node’s architecture with the
Configuration Board, before the approval of the CISE Stakeholders Group.
Updates Management. In consultation with the CISE Stakeholders Group, EMSA will
define the release roadmap for the delivery of the software updates. When a new
release needs to be issued, EMSA provides to the Node administrators a plan for its
delivery.
During the release deployment, the Support Team and the Node Administrators will
cooperate by e-mail correspondence, or Web/phone call. Node administrators can
request additional support to deploy the updates if needed.
Figure 3 shows an overview of this process workflow.
Category Support/Operational/Node/Configuration
Owner(s) EMSA
Provider EMSA, Support Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Configuration Board
Node owners and administrators.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months.
Security Rating Unclassified
Request Change Management. Stakeholders can send their feedback to the Support Team at
Procedures
[email protected]
Updates Management. Node administrators shall send an e-mail to the Support Team
at
[email protected]
Page 12 of 21
Technical and Operational Support Version 1.0
5.4 Node Deployment
Name Node deployment
Description The Support Team will help the stakeholders deploy new CISE nodes. The deployment
of a CISE node entails the following activities:
a) Provision of the hardware resources: server, router.
b) Setup of the network connections to the other CISE Nodes (VPN).
c) Installation of the virtualisation infrastructure: VMWare (or other).
d) Installation of the virtual machines and operating systems.
e) Installation of the CISE Node modules.
f) Deployment tests.
For the installation of the CISE Node, the stakeholder must provide/purchase the
hardware (server and VPN router) and the virtual environment (hypervisor, virtual
machines).
During the CISE Transitional Phase, the Support Team will support:
• The deployment of two (indicative) additional CISE Nodes for the Member
States’ authorities – activities e, f.
The support team will require access to the authorities’ premises or remote
access to the authorities’ server, as well as the collaboration of the node
administrators for activities b, c and d.
• stakeholders that will deploy a CISE Node with their own resources –
activities b, c, d, e and f.
In this case, the node administrator(s) will conduct the installation and test
procedures with the help of the Support Team, if required.
The requests for the deployment of new nodes in the CISE network shall be approved
by the CISE Stakeholders Group. The Project Management Office will schedule the
requests based on the status and availability of the stakeholders.
Features The Support Team registers and manages any request using a ticketing system. The
Team will support the stakeholders by email, phone of web conference tools.
Deployment planning. The Project Management Office schedules the deployment
activities for the Support Team based on the stakeholders’ status and availability. The
deployment plan is submitted to the CISE Stakeholders Group for approval.
Network configuration. The Support Team supports node administrators in the
setup of the new VPN connections between the stakeholders’ premises.
Infrastructure setup. The Support Team can help node administrators in the setup
of the virtual infrastructure, including the virtual machines.
Node deployment. The Support team assesses if the requirements for the
deployment of the CISE node software are fulfilled. The Support Team launches the
installation scripts following the installation manual.
Deployment support. The Support Team helps the Node administrators to launch
the installation scripts according to the installation manual.
Reconfiguration of the nodes. With the current implementation of the CISE Node,
the CISE Nodes require an update in their configuration to enable the communication
with new nodes in the CISE network. The Support Team will contact the node
administrators to apply the configuration updates in each node after the deployment
tests.
Page 13 of 21
Technical and Operational Support Version 1.0
Testing. Please check the process “Node Deployment Tests”.
Resources. The Support Team will make available the following resources
(documentation, software) thought the EMSA’s collaborative site:
• CISE Node software (binary files).
• Architecture of the CISE Node.
• Simplified installation manual (including documentation and software).
• Administrator Manual of the CISE Node.
Figure 4 shows an overview of this process workflow.
Category Support/Technical/Node/Deployment
Owner(s) EMSA
Provider Support Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Node owners and administrators.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months.
Security Rating Unclassified
Request The stakeholders shall contact the Support team for support at cise-
Procedures
[email protected]. EMSA will communicate the requests to the CISE
Stakeholders’ Group for endorsement.
Page 14 of 21
Technical and Operational Support Version 1.0
Node Support Team Project Management Office Stakeholders
1. Request new node
Configuration Board
Node Level-1 Support 2. Request
owner new node
3b. Request
opinion
5. Node deployment 3. Request
6. Node deployment tests approval
5. Request For Change (RFC)
Node Level-2 Support EMSA PM CISE
administrator Stakeholders
Group
Level-3 Support
Figure 4. Node deployment workflow.
5.5 Adaptor Development
5.5.1 Technical Information on the Adaptor
Name Technical information on the adaptor
Description Support Team will provide the technical support for the deployment and testing of the
adaptors to any stakeholder.
Features The Support Team registers and manages any request using a ticketing system.
Punctual Support. The Support Team addresses any question or information request
on:
• technical specifications on the adaptor;
• the use of the CISE Data and Service model;
• the prototype adaptor (https://github.com/ec-jrc/cise-ais-adaptor);
• the use of the sample codes provided in the documentation;
• the integration tests for adaptors.
The Support Team can contact the stakeholders directly by email, phone or video
conferences if needed.
Resources. The Support Team will make available the following resources
(documentation, software) thought the EMSA’s collaborative site:
• Adaptor software interface.
• CISE Data and Service models: documentation, XML schemas and XML code
snippets.
Page 15 of 21
Technical and Operational Support Version 1.0
• Guidelines for the use of the CISE Data and Service models.
• Java libraries for the communication with the CISE Node.
• CISE AIS Adaptor, open-source adaptor prototype: https://github.com/ec-
jrc/cise-ais-adaptor
• Testing tools for developers.
Category Support/Technical/Adaptor/Deployment, Support/Technical/Adaptor/Test
Owner(s) EMSA
Provider Support Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Adaptors owners, node administrators.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months, before the CSG meeting.
Security Rating Unclassified
Request For any request, stakeholders shall contact the Support Team at cise-
Procedures
[email protected]
5.5.2 Development of CISE services
Name Development of CISE services
Description During the CISE Transitional Phase, JRC will launch several pilot projects with the
CISE stakeholders to develop new CISE services.
The pilot project will produce a set of CISE services, fully functional, in a new or
existing adaptor. At the end of the project, the JRC will release the software (incl.
source code) and the documentation to the stakeholder(s) involved in the project.
The stakeholder will be in charge of the maintenance and evolution of the software.
The duration of each pilot project will be limited in time (3 months avg.)
The JRC will schedule the activities of the Adaptor Development Team. Since the
resources available are limited, the CISE Stakeholder Group may need to agree on
the schedule of the pilot projects.
Features The Support Team registers and manages any request using a ticketing system.
Request analysis. The JRC works with the stakeholder to gather more information
on their status (readiness, legacy system’s status, etc.) and to propose a project plan
(including the project schedule).
Page 16 of 21
Technical and Operational Support Version 1.0
Project scheduling. The JRC schedules the pilot projects based on the availability of
the Adaptor Development Team, the stakeholders’ status and the schedule proposed
by the Public Authority. The CISE Stakeholder Group will agree on the schedule if
needed.
Project development. The Adaptor Development Team designs, develops and tests
the CISE services following the requirements of the Adaptor owner, and in
coordination with the Node administrator.
Testing. Please check the process “Adaptor Integration Tests”.
Software release. The JRC will package and officially release the software to the
Public Authority. The JRC will provide the source code and the documentation.
Category Support/Technical/Adaptor/Deployment, Support/Technical/Adaptor/Test
Owner(s) JRC
Provider JRC, Adaptor Development Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Adaptors owners, Node owners.
Service Level Not applicable to JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months.
Security Rating Unclassified
Request Node owners and/or adaptors owners shall contact the Support Team at cise-
Procedures
[email protected]
The request shall be submitted at least 3 months before the start of the pilot project.
5.5.3 Sandbox service
Name Sandbox service
Description To support the development of CISE services, the JRC offers an automatic sandbox
service to test the adaptors during the software development process. The service will
help adaptor developers to test their software and thus, to ensure the interoperability
of their CISE services from early development stages.
These tests should be conducted and passed before the adaptor integration tests.
The JRC will grant access to the Sandbox service and provide the documentation on
the request of the interested stakeholders.
This service will start in Q4 2019.
Features The Support Team registers and manages the access requests to the sandbox service
using a ticketing system.
Page 17 of 21
Technical and Operational Support Version 1.0
The JRC provides the remote access to the service to the interested stakeholders.
Resources. The Support Team will make available the following resources
(documentation, software) thought the EMSA’s collaborative site:
• Technical documentation on the sandbox service.
Category Support/Technical/Adaptor/Test
Owner(s) JRC
Provider JRC
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Adaptors owners, node owners.
Service Level Not applicable to JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Access requests will be processed during working days from 8.00 to 17.00 (UTC),
excluding public holidays.
Maintenance periods will be notified at due time.
Service Reviews Every three/four months.
Security Rating Unclassified
Request To get access to the sandbox server, Node owners and/or adaptors owners shall
Procedures contact the Support Team at
[email protected]
5.6 Conformity Testing
5.6.1 Node Deployment Tests
Name Node deployment tests (SAT test)
Description Before entering into production, the CISE nodes shall pass a set of tests to verify the
installation of the software components.
Therefore, node owners shall request the Support Team to test the node software
before connecting it to the CISE network. Support Team will run a set of deployment
tests.
Features The Support Team registers and manages any request using a ticketing system (JRC).
Request analysis. The Support Team will gather additional information from the
node administrator on the installation procedure and status.
Test design and scheduling. Based on the information provided, the Support Team
will propose a set of deployment tests and will agree with the node
owner/administrator when the tests will be conducted.
Page 18 of 21
Technical and Operational Support Version 1.0
Test execution. During the tests, the node administrators will follow the established
procedures to verify that the installation was successful with the support of the
Support Team.
The Support Team will conduct the tests for two CISE nodes (indicative), as described
in the process “Node Deployment”.
An automatic verification toolbox will be launched in 2020 to optimise the test
processes.
Test reporting. At the end of the test process, the Conformity test tool JRC reviews
the results from the Compliance test tool and reports the results.
Resources. The Support Team will make available the following resources
(documentation, software) thought the EMSA’s collaborative site:
• Administrator Manual of the CISE Node.
• Test procedure and test cases.
Category Support/Technical/Node/Test
Owner(s) EMSA
Provider Support Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group.
Business Contacts Adaptors owners, Node owners.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months.
Security Rating Unclassified
Request The stakeholders should submit a request for testing at least one month in advance
Procedures using the email:
[email protected]
5.6.2 Adaptor Integration Tests
Name Adaptor integration tests (INT test)
Description Before entering into production, the CISE services shall pass a set of integration tests
to verify their conformity with the interoperability specifications (i.e., the CISE Data
and Service models).
Adaptor owners shall request the Support Team to test the adaptor software before
the connection to the CISE Node. The Support Team will select and run a set of
integration tests adapted to the communication patterns supported and the
information to be exchanged.
Features The Support Team registers and manages any request using a ticketing system.
Page 19 of 21
Technical and Operational Support Version 1.0
Request analysis. The Support Team will request additional technical information to
the adaptor owner on the CISE services and the technical information of the adaptor.
Test design and scheduling. Based on the information provided, the Support Team
will propose a set of integration tests and will agree with the Public Authority when
the tests will be conducted.
Test execution. During the tests, the adaptor owners, with their IT team, will follow
the established test procedures with the support of the Support Team. Adaptor
owners may also request the support from the node administrator(s).
Test reporting. At the end of the test process, the Support Team reviews the results
of the tests and reports the results.
Category Support/Technical/Adaptor/Test
Owner(s) JRC
Provider Support Team
Business Service Catalogue
Business Owner(s) Members of the CISE Stakeholders Group
Business Contacts Adaptors owners, Node owners.
Service Level Not applicable to EMSA and JRC for the CISE Transitional Phase.
Agreement (SLA)
Service Hours Working days from 8.00 to 17.00 (UTC), excluding public holidays.
Service Reviews Every three/four months, before the CSG meeting.
Security Rating Unclassified
Request Public Authorities should request at least one month in advance the testing of their
Procedures service using the email:
[email protected]
6. Periods with only Level-0 Support
During the CISE Transition Phase, the Support Team will provide technical and operational support
during working days (from 8.00 to 17.00 UTC). The CISE stakeholders will be informed about the
holiday periods through the CISE collaborative site.
Out of the working days, Level-0 support will be available on the CISE collaborative site. CISE
stakeholders can send their support requests to the Single Contact Point at any time. The Support
Team will acknowledge and address the requests during working days.
7. Reporting Activities
The CISE Stakeholders Group will be informed about:
• the support activities carried out by the Support Team and the Adaptor Development Team;
Page 20 of 21
Technical and Operational Support Version 1.0
• Statistics on the requests received by the Support Team and their status;
• The deployment of new CISE Nodes in the CISE network;
• The availability of new CISE services on the CISE Network;
• The requests and status of pilot projects.
8. Single Contact Point
To request any Technical and Operational support, an email shall be sent to the Single Contact Point
for support:
[email protected]
The Support Team will register the requests in a ticketing system and will acknowledge the reception
with the shortest possible delay. The Support team may contact the requestor by e-mail or phone to
gather more information.
To request more information or any clarification about this document, the CISE stakeholders can
send an e-mail to:
[email protected]
Page 21 of 21
Saatja: Kersti Neeme <
[email protected]>
Saatmisaeg: esmasp�ev, 17. juuni 2019 14:29
Adressaat: '
[email protected]'; VA_eva
Koopia: Algis Kokka
Teema: FW: Minutes and Technical & Operational Support Report of the 1st CISE
Stakeholder meeting on 15 May 2019
Manused: 1st-Stakeholders-Meeting-Minutes-15-MAY-2019.pdf; ANNEX-
Technical&Operational-Support.pdf
Tere
Edastan EMSAlt saabunud materjalid
Heade soovidega
Kersti
Kersti Neeme
EV alaline esindus EL juures
Sekret�r
+32 2227 4342
Rue Guimard 11/13, 1040 Br�ssel
From: Esindus EL juures �ldaadress <
[email protected]>
Sent: Monday, June 17, 2019 12:49 PM
To: Kersti Neeme <
[email protected]>
Subject: FW: Minutes and Technical & Operational Support Report of the 1st CISE Stakeholder meeting
on 15 May 2019
From: VEGA MUNOZ Beate (EMSA) <
[email protected]> On Behalf Of BAL
Leendert (EMSA)
Sent: esmasp�ev, 17. juuni 2019 12:31
To:
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected]; Esindus EL juures �ldaadress <
[email protected]>;
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected];
[email protected]; ECONOMOU Christos (MOVE.DDG1.D.2)
<
[email protected]>;
[email protected]; MEERSMAN Bartel (JRC.B.7)
<
[email protected]>;
[email protected];
[email protected];
[email protected];
[email protected]
Cc: LURASCHI Gianluca (EMSA) <
[email protected]>
Subject: Minutes and Technical & Operational Support Report of the 1st CISE Stakeholder meeting on 15
May 2019
Dear Sir / Madam,
Please find attached a copy of the minutes of the 1st CISE Stakeholder Meeting together with the
Technical and Operational Support.
The meeting presentations can be downloaded at the following URL: http://emsa.europa.eu/workshops-a-
events/188- workshops.html
Best wishes,
Bea Vega Munoz
Administrative Assistant
Operations
EMSA / Pra?a Europa 4 / 1249-206 Lisbon / Portugal
Tel +351 21 1209 417 / Fax +351 21 1209 483
[email protected] / emsa.europa.eu