dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Konkurentsiamet
OtsusAvalik

Otsus

Konkurentsiamet · 7. november 2024
Viit
7-26/2024-006
Registreeritud
7. november 2024
Dokumendi liik
Otsus
Funktsioon
7 Energiavaldkond
Sari
7-26 Elektrienergia võrgueeskirjade otsused
Toimik
7-26/2024
Vastutaja
Armin Ilisson (Konkurentsiamet, Regulatsiooniteenistus, Energiaturgude osakond)

Failid

  • 📎7-262024-006 07.11.2024 Otsus.asice6155 KB

Sisu (failidest)

All CE TSOs’ proposal for the dimensioning rules for FCR in accordance with Article 153(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 08.08.2018 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the dimensioning rules for FCR in accordance with Article 153(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation Contents 1 Whereas........................................................................................................................................ 3 2 Article 1 Subject matter and scope ...............................................................................................................3 3 Article 2 Definitions and interpretation ........................................................................................................4 4 Article 3 Dimensioning rules for the TSOs of th synchronous area CE .......................................................4 5 Article 4 Publication and implementation of the FCR dimensioning rules proposal ...................................4 6 Article 5 Language .......................................................................................................................................5 2 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the dimensioning rules for FCR in accordance with Article 153(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation All Transmission System Operators of synchronous area Continental Europe are taking into account the following; 7 Whereas 8 (1) This document is a common proposal developed by all Transmission System Operators of 9 synchronous area CE (hereafter referred to as “TSOs”) regarding the development of a proposal for 10 the dimensioning rules for FCR (hereafter referred to as “FCR dimensioning rules proposal”) in 11 accordance with Article 153 of the Commission Regulation (EU) 2017/1485 of 2 August 2017 12 establishing a guideline on electricity transmission system operation (hereafter referred to as “SO 13 GL”). 14 15 (2) The FCR dimensioning rules proposal takes into account the general principles and goals set in the 16 SO GL as well as Regulation (EC) No 714/2009 of the European Parliament and the Council of 17 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity 18 (hereafter referred to as “Regulation (EC) No 714/2009”). The goal of the SO GL is the 19 safeguarding of operational security, frequency quality and the efficient use of the interconnected 20 system and resources. It sets for this purpose rules to determine the reserve capacity for FCR 21 required for the synchronous area CE, which shall cover at least the reference incident, and also set 22 rules to determine the shares of the reserve capacity on FCR required for each TSO of CE as initial 23 FCR obligation. 24 25 (3) The scope of the FCR dimensioning rules proposal is to establish rules to dimension the reserve for 26 FCR required, while respecting the requirements set in Article 153(2) of the SO GL. 27 28 (4) According to Article 6 of the SO GL, the expected impact of the FCR dimensioning rules proposal 29 on the objectives of the SO GL has to be described. It is presented below. The proposed FCR 30 dimensioning rules proposal generally contributes to the achievement of the objectives of the 31 Article 4(1) of the SO GL. 32 33 (5) In particular, the FCR dimensioning rules proposal responds to the objectives of SO GL to 34 determine common operational security requirements, and to ensure the conditions for maintaining 35 operational security and frequency quality level throughout the Union, by establishing rules for the 36 adequate dimensioning capacity for FCR, which is essential to stabilize the system frequency at a 37 stationary value after any imbalance between generation and consumption. 38 39 (6) In conclusion, the FCR dimensioning rules proposal contributes to the general objectives of the SO 40 GL to the benefit of all market participants and electricity end consumers. 41 42 SUBMIT THE FOLLOWING FCR DIMENSIONING RULES PROPOSAL TO ALL REGULATORY 43 AUTHORITIES: 44 Article 1 45 Subject matter and scope 46 The FCR dimensioning rules as determined in this proposal shall be considered as the common proposal of 47 all TSOs of CE in accordance with Article 153(2) of SO GL. 3 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the dimensioning rules for FCR in accordance with Article 153(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 48 Article 2 49 Definitions and interpretation 50 1. For the purposes of the FCR dimensioning rules proposal, terms used in this document shall have the 51 meaning of the definitions included in Article 3 of the SO GL, Article 2 of Regulation (EC) 714/2009, 52 Article 2 of Directive 2009/72/EC and Article 2 of Commission Regulation (EU) 543/2013. 53 54 2. In this FCR dimensioning rules proposal, unless the context requires otherwise: 55 a) the singular indicates the plural and vice versa; 56 b) the table of contents and headings are inserted for convenience only and do not affect the 57 interpretation of this FCR dimensioning rules proposal; and 58 c) any reference to legislation, regulations, directive, order, instrument, code or any other enactment 59 shall include any modification, extension or re-enactment of it then in force. 60 Article 3 61 Dimensioning rules for the TSOs of th synchronous area CE 62 The FCR dimensioning for the synchronous area CE in positive and negative direction is equal to the 63 reference incident of 3000 MW, according to SO GL article 153(2b.i). 64 65 The shares of the reserve capacity on FCR required for each TSO 𝑃𝑖 as initial FCR obligation for a 66 considered calendar year 𝑡 shall be based on the following expression, according to Article 153(2d) for all 67 TSOs in SA CE: 𝐺𝑖,𝑡−2 + 𝐿𝑖,𝑡−2 𝑃𝑖,𝑡 = 𝐹𝐶𝑅𝑑𝑖𝑚𝑒𝑛𝑠𝑖𝑜𝑛𝑖𝑛𝑔 ∙ ( ) 𝐺𝑢,𝑡−2 + 𝐿𝑢,𝑡−2 68 With: 69  𝑃𝑖,𝑡 being the inital FCR obligation for TSO i for the calendar year 𝑡 ; 70  𝐹𝐶𝑅𝑑𝑖𝑚𝑒𝑛𝑠𝑖𝑜𝑛𝑖𝑛𝑔 being the FCR dimensioning value calculated for synchronous area CE; 71  𝐺𝑖,𝑡−2 being the electricity generated in the control area i (including the electricity production for 72 exchange of reserves and scheduled electricity production from jointly operated units or groups) 73 during the second last calendar year with respect to the considered year 𝑡; 74  𝐿𝑖,𝑡−2 being the electricity consumption in the control area i during the second last calendar year 75 with respect to the considered year 𝑡; 76  𝐺𝑢,𝑡−2 being the total (sum of) electricity production in all control areas of the synchronous area 77 CE during the second last calendar year with respect to the considered year 𝑡; 78  𝐿𝑢,𝑡−2 being the total consumption in all control areas of the synchronous area CE during the 79 second last calendar year with respect to the considered year 𝑡. 80 81 Every year but not later than March 31th, each TSO of the synchronous area CE shall provide to each other 82 the data regarding the generation and consumption in its control area in the previous calendar year. 83 Article 4 84 Publication and implementation of the FCR dimensioning rules proposal 85 1. The TSOs shall publish the FCR dimensioning rules proposal without undue delay after all NRAs have 86 approved the proposal or a decision has been taken by the Agency for the Cooperation of Energy 87 Regulators in accordance with Article 6 (1) and (8) of the SO GL. 88 4 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the dimensioning rules for FCR in accordance with Article 153(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 89 2. The TSOs shall implement the FCR dimensioning rules proposal provided one month after the 90 regulatory authorities have approved the proposal in accordance with Article 6(3) SO GL or a decision 91 has been taken by the Agency in accordance with Article 6(8) SO GL. 92 Article 5 93 Language 94 The reference language for this FCR dimensioning rules proposal shall be English. For the avoidance of 95 doubt, where TSOs need to translate this FCR dimensioning rules proposal into their national language(s), 96 in the event of inconsistencies between the English version published by TSOs in accordance with Article 8 97 of the SO GL Regulation and any version in another language, the relevant TSOs shall, in accordance with 98 national legislation, provide the relevant national regulatory authorities with an updated translation of the 99 FCR dimensioning rules proposal. 100 5 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Explanatory note for the FCR dimensioning rules proposal 08.08.2018 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Explanatory note for the FCR dimensioning rules proposal Explanatory note 1 An appropriate amount of FCR available in the synchronous area is essential to stabilize the system 2 frequency at a stationary value after any imbalance between generation and consumption. 3 The basic criterion used for FCR dimensioning is to withstand the reference incident in the synchronous 4 area by containing the system frequency within the maximum frequency deviation and stabilizing the 5 system frequency within the maximum steady-state frequency deviation. 6 The reference incident is defined as the maximum expected instantaneous power deviation between 7 generation and demand in the synchronous area for which the dynamic behaviour of the system is designed. 8 This expected instantaneous power deviation includes the losses of the largest power generation modules or 9 loads, loss of a line sector or a bus bar, or loss of a HVDC interconnector. The SO GL (Article 153 (2b.i)) 10 sets the reference incident for CE to 3000 MW in both directions. 11 This criterion assumes a balanced situation when the incident occurs. In order to consider prior imbalances 12 derived from changes in demand, renewable generation or the market-induced imbalances, the 13 dimensioning of FCR capacity can be calculated by combining the probability of forced instantaneous 14 outages with the probability of used FCR due to the already existing frequency deviations (not associated 15 with generation trips). 16 The SO GL (Article 153 2(c)) allows the possibility for the synchronous area CE to define and apply a 17 dimensioning approach to calculate the reserve capacity on FCR that must at least cover the reference 18 incident, and based on the principle of covering the imbalances in the synchronous area that are likely to 19 happen once in 20 years. This probabilistic methodology assumes the following starting hypothesis such as 20 full activation time of automatic FRR, tripping rates of the generation plants, patterns of load, generation 21 and inertia (including synthetic inertia), which are difficult to estimate and have a strong influence on the 22 results. 23 On the other hand, in the recent past, the FCR capacity dimensioned in CE (equal to the reference incident 24 3000 MW in both directions) has proven to be enough to ensure the conditions for maintaining the 25 frequency quality level and respecting the operational security requirements. 26 For all these exposed above, the FCR dimensioning capacity in CE shall be equal to the reference incident 27 for positive and negative directions. 28 According to the Article 153(2) of Commission Regulation (EU) 2017/1485 establishing a guideline on 29 electricity transmission system operation, by 12 months after entry into force of this Regulation, all TSOs 30 of a synchronous area shall jointly develop a common proposal regarding the dimensioning rules for FCR, 31 which shall comply with the following requirement: 32  The reserve capacity for FCR required for the synchronous area shall cover at least the reference 33 incident and, for the CE and Nordic synchronous areas, the results of the probabilistic dimensioning 34 approach for FCR carried out pursuant to point (c); 35  For the CE and Nordic synchronous areas, all TSOs of the synchronous area shall have the right to 36 define a probabilistic dimensioning approach for FCR taking into account the pattern of load, generation 37 and inertia, including synthetic inertia as well as the available means to deploy minimum inertia in real- 38 time in accordance with the methodology referred to in Article 39, with the aim of reducing the 39 probability of insufficient FCR to below or equal to once in 20 years. 40 This proposal takes into account all the previous requirements. 41 Finally, and according to the Article 6(3) this proposal shall be subject to approval by all regulatory 42 authorities of the synchronous area CE. 2 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 21 January 2021 Contents Whereas........................................................................................................................................ 3 Article 1 Subject matter and scope ...............................................................................................................5 Article 2 Definitions and interpretation ........................................................................................................5 Article 3 Additional properties of Frequency Containment Reserves ..........................................................6 Article 4 Publication and implementation of the FCR additional properties proposal.................................8 Article 5 Language .......................................................................................................................................9 Annex I – Normal vs Reserve Mode .........................................................................................................10 2 Whereas (1) This document regards the common additional properties of Frequency Containment Reserves (hereinafter referred to as “FCR additional properties”) for Synchronous Area Continental Europe (hereinafter referred to as “Synchronous Area CE”) in accordance with Article 154(2) of Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (hereinafter referred to as “SO Regulation”). (2) With respect to Article 154 of the SO Regulation which determines FCR technical minimum requirements, all TSOs of a synchronous area have the right to specify, in the synchronous area operational agreement developed pursuant to Article 118 of the SO Regulation, common FCR additional properties required to ensure operational security in the synchronous area, by means of a set of technical parameters and within the ranges set out in Article 15(2)(d) of Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a Network Code on requirements for grid connection of generators (hereinafter referred to as “RfG”) and in Articles 27 and 28 of Commission Regulation (EU) 2016/1388 of 17 August 2016 establishing a Network Code on Demand Connection (hereinafter referred to as “DCC”). These additional properties as detailed in this document are subject to approval by the NRAs of the synchronous area according to Article 6(3)(d)(iii) of the SO Regulation. (3) For Synchronous Area CE, the Synchronous Area Framework Agreement for Regional Group Continental Europe (hereinafter referred to as “SAFA”) entered into force on 14 April 2019, following the approval by NRAs according to Article 6(3)(d) of the SO Regulation. The SAFA at that time did not include any FCR additional properties. (4) To reflect the individual needs of the Synchronous Area CE, some common additional properties are nonetheless needed for FCR providing units and/or FCR providing groups with respect to the activation of FCR and to FCR availability in a stressed system status posing particular attention to the new technologies. To this extent particular conditions are specified for FCR providing units or FCR providing groups which are connected to the grid via inverters. However, the principle of non- discrimination is still respected since these conditions are based on the distinctive features of this technology without restricting the provision of FCR. (5) Once approved, these FCR additional properties shall be included in the SAFA, as an integral part of this document. (6) Where references to the RfG are cited, these references shall be intended as reflecting the possible extreme system status where FCR provision is essential for grid security. They shall not be deemed to contradict the application of RfG provisions only to new installations. (7) The FCR additional properties are expected to reduce the risk of inappropriate activation of FCR and of unavailability of FCR in a stressed system state. With this in mind, these properties will contribute to system stability and therefore to the achievement of the objectives of Article 4 of the SO Regulation. (8) The specification of activation of FCR has the goal to ensure fast response and therefore help to stabilise the system. Specifications for FCR providing units and/or FCR providing groups with limited energy reservoir (hereinafter referred to as “LER”) aim at ensuring sufficient availability also in stressed system status. Specifications for frequency measurement aim at ensuring availability of 3 independent functionality of FCR providing units and/or FCR providing groups in particular in case of system split or communication problems. The transition period is defined to avoid too abrupt change of requirements for already existing FCR providing units and/or FCR providing groups. (9) In conclusion, the FCR additional properties contribute to the general objectives of the SO Regulation to the benefit of all market participants and electricity end consumers. 4 Article 1 Subject matter and scope 1. The FCR additional properties as determined in this document shall be considered as the properties developed in accordance with Article 154(2) of the SO Regulation and shall establish the requirements in addition to those foreseen in Article 154 of the SO Regulation for FCR providing units and/or FCR providing groups. Article 2 Definitions and interpretation 1. For the purposes of the FCR additional properties, terms used in this document shall have the meaning of the definitions included in Article 3 of the SO Regulation, Article 2 of Regulation (EU) 2019/943, Article 2 of Directive (EU) 2019/944, Article 2 of Commission Regulation (EU) 543/2013 and Article 2 of RfG. 2. In addition, the following definitions shall apply: a) Active Energy Reservoir Management: active charging/discharging of the reservoir depending on the state of charge which results from FCR activation to avoid a status of a completely full/empty reservoir; b) Centralised Frequency Measurement or Centralised FCR Controller: principle of using a single frequency measurement for activation of a number of decentrally located technical entities forming a FCR providing unit or providing group. The application of this principle requires the respective transmission of the frequency signal to the individual FCR providing unit or FCR providing group; c) Decentralised Frequency Measurement: principle of using independent on-site frequency measurements at the connection points or below at site of generating units of the technical entities forming FCR providing units or FCR providing groups and activation of FCR based on this on-site measurement; d) Effective Energy Reservoir: the energy reservoir of a storage device which can effectively be used for energy feed/absorption; e) LER FCR Providing Units or LER FCR Providing Groups: FCR providing units or groups with limited energy reservoirs, fulfilling the criteria according to Article 3(5); f) Normal Mode: activation of FCR depending on the deviation of system frequency; g) Reserve Mode: activation of active power response depending on short-term frequency deviations in relation to the mean frequency deviation; h) Technical Entity: single power generating module or demand unit. 3. In this document, unless the context requires otherwise: a) the singular indicates the plural and vice versa; b) the table of contents and headings are inserted for convenience only and do not affect the interpretation of these common FCR additional properties; c) references to an “Article” are, unless otherwise stated, references to an Article of this document; d) references to a “paragraph” are, unless otherwise stated, references to a paragraph included in the same Article of this document where it is mentioned; and e) any reference to legislation, regulations, directive, order, instrument, code or any other enactment shall include any modification, extension or re-enactment of it then in force. 5 Article 3 Additional properties of Frequency Containment Reserves 1. Each TSO shall check the conformity of FCR providing units and of FCR providing groups with the rules under this Article and with the provisions set in Article 156(9), 156(10) and 156(11) of the SO Regulation in the course of the prequalification according to Article 155 of the SO Regulation and in addition by (ex-post) monitoring of activation of FCR according to Article 154(3) of the SO Regulation. Each TSO shall apply respective monitoring procedures. 2. Each TSO shall ensure that the activation of FCR providing units and FCR providing groups: a) is not artificially delayed and begins as soon as possible but no later than 2 seconds after a frequency deviation; and b) rises at least linearly. When one of the requirements a) or b) cannot be met, the FCR providing group or FCR providing unit shall provide technical evidence to the reserve connecting TSO. The reserve connecting TSO assesses these justifications and decides whether or not the unit or group can be qualified to provide FCR. A refusal to be qualified shall be duly motivated by the reserve connecting TSO. The motivated decision shall be communicated to the FCR provider and relevant regulatory authority. 3. According to Article 154(6) of theSO Regulation, each FCR providing unit or group shall be capable of activating FCR within the frequency range of 47,5 to 51,5 Hz and for time periods defined at national level by the competent entity according to Articles 7 and 13 of RfG, taking into account the technical boundary conditions of the respective FCR providing units or FCR providing groups. Each TSO shall, in coordination with the DSOs, ensure that distributed FCR is not significantly reduced by load shedding actions. 4. Each TSO shall require that FCR providing units and FCR providing groups continue to provide FCR and are not allowed to reduce activation in case of a frequency deviation outside the frequency range of +/- 200 mHz up to the frequency ranges as defined in paragraph 3. 5. FCR providing units or FCR providing groups are deemed as LER FCR Providing Units or LER FCR Providing Groups in case a full continuous activation for a period of 2 hours in either positive or negative direction might, without consideration of the effect of an Active Energy Reservoir management, lead to a limitation of its capability to provide the full FCR activation in accordance with Article 156(8) of the SO Regulation, due to the depletion of its energy reservoir(s) taking into account the Effective Energy Reservoir effectively available. For the avoidance of doubt, FCR providing units or groups that contain technical entities with unlimited energy reservoirs and technical entities with limited energy reservoirs shall not be considered LER FCR providing unit or group in case their energy reservoir does not limit the capability to provide FCR according to Article 156(7) of the SO Regulation. FCR providing units or groups not deemed as LER FCR providing units or groups that contain technical entities with limited energy reservoirs shall thus ensure to be able to fully activate their FCR provision in accordance with Article 156(7) of the SO Regulation. Technical entities with unlimited energy reservoir of FCR providing units or FCR providing groups shall not limit their FCR provision in case technical entities with limited energy reservoir (of that FCR 6 providing group/unit) are already exhausted in either the positive or negative direction according to Article 156(8) of the SO Regulation. For prequalification, the TSOs shall require that: • LER FCR Providing Units or LER FCR Providing Groups shall have an Active Energy Reservoir management. Active Energy Reservoir management shall ensure a continuous physical activation of FCR in normal state according to Article 156(9) of the SO Regulation. • In accordance with Article 156(9) of the SO Regulation, the FCR provider shall ensure that LER FCR Providing Units or LER FCR Providing Groups have an energy reservoir dimensioned to guarantee the minimum activation period set in accordance with Article 156(10) of the SO Regulation, by additionally taking into account possible frequency deviations that might happen before entering into alert state. • To enable an Active Energy Reservoir Management, LER FCR Providing Units or LER FCR Providing Groups may prequalify a power for FCR limited to 0.8 of the rated power (i.e. a ratio of rated power to prequalified power of at least 1.25:1); a deviation from this requirement is possible in case an alternative solution with an equivalent effect as in guaranteeing a continuous FCR provision while applying an Energy Reservoir Management. Any lead time for the charging process needs to be considered for Active Energy Reservoir management. • Active Energy Reservoir Management of LER FCR providing units and LER FCR providing groups shall not rely on over fulfilment of activation. • Besides ensuring that the energy reservoir is sufficient to continuously activate FCR in normal state and fully activate FCR in alert state for the time period pursuant to Article 156(9) of the SO Regulation, LER FCR providing units (either single or belonging to a LER FCR providing group) that are prequalified for the first time after the entry into force of the methodology and are technically capable (especially inverter-connected assets) shall ensure that close to the upper or lower bounds of the energy reservoir the remaining capacity is sufficient for keeping a proper response on short-term frequency deviations. Therefore, they shall switch from the Normal Mode (reaction to normal frequency deviation) into a Reserve Mode (reaction to zero-mean frequency deviation). Annex I provides the standard criteria governing the operation in Reserve Mode and the transition from Normal Mode to Reserve Mode and viceversa with reference to LER FCR providing units. Each TSO may decide the relevant criteria to be applied in its control area: if no criteria are defined, the standard ones referring to LER FCR providing units apply. 6. FCR providing units (either single or belonging to a FCR providing group) shall be equipped with local frequency measurement at least per connection point or below when it is technically feasible at the Technical Entity of the FCR providing unit. 7. FCR providing groups shall implement alternatively one of the following approaches: a) Decentralised Frequency Measurements at least per connection point in analogy to what is foreseen for FCR providing units in paragraph 6; b) a Centralised FCR Controller with Decentralised Frequency Measurements per connection point (based on local frequency measurement) to be used as a fallback solution to ensure an autonomous function and a proper activation in case of errors in the Centralised FCR Controller itself (e.g. outage of SCADA, faults of communication lines) or in case of a system split affecting the perimeter of the group; if the group includes FCR providing units, local frequency measurements available for these units pursuant to paragraph 6 shall be part of the fallback solution; or 7 c) an alternative solution with equivalent effect to the fallback solution pursuant to b), as in guaranteeing a proper activation in case of errors in the Centralised FCR Controller or in case of a system split. 8. In case the Decentralised Frequency Measurements are used as a fallback solution pursuant to paragraph 7(b): a) an observation function shall detect any kind of errors of the central control or frequency discrepancies among the technical entities within the perimeter of the group; b) the FCR provider shall immediately initiate appropriate counter-measures to ensure that the FCR provision is not significantly negatively impacted by switching to the Decentralised Frequency Measurements; and c) the minimum accuracy of the local frequency measurement used as a fallback solution can be reduced according to the national terms and conditions applicable to the reserve connecting TSO. 9. In case the alternative solution with equivalent effect pursuant to paragraph 7(c) is implemented: a) if the FCR providing group includes FCR providing units, the local frequency measurements available for these units pursuant to paragraph 6 may be integrated in the alternative solution; b) the FCR provider shall demonstrate the effectiveness of the alternative solution with respect to the decentralised frequency measurements; and d) the solution may be implemented only if allowed by the national terms and conditions, applicable to the reserve connecting TSO. 10. For a time period of 4 years after the entry into force of the FCR additional properties, the implementation of a Centralised FCR Controller non compliant with the requirement set in paragraph 7 is temporary allowed under the following conditions: a) To mitigate the risk of misbehavior of technical entities in case of errors of the Centralised FCR controller (e.g. outage of SCADA, faults of communication lines) and to limit the impact on frequency, a single non compliant Centralised FCR Controller shall not control a FCR capacity greater than 1% of the reference incident for Synchronous Area CE according to Article 153(2)(b)(i) of the SO Regulation . b) The reserve connecting TSO shall monitor the share of FCR capacity managed by non compliant Centralised FCR Controllers within the procurement process; in order to ensure operational security pursuant to Article 154(4) of the SO Regulation, in each LFC Block the amount of FCR capacity managed by centralised controllers shall not exceed 2.5% of the reference incident for Synchronous Area CE according to Article 153(2)(b)(i) of the SO Regulation . After 4 years after the entry into force of the FCR additional properties, Centralised FCR Controllers non compliant with the requirements set in paragraph 7 are no longer allowed. Article 4 Publication and implementation of the FCR additional properties proposal 1. The TSOs shall publish the FCR additional properties without undue delay after the approval by the NRAs of the Synchronous Area CE. 2. The TSOs shall start to implement the FCR additional properties as specified in this proposal immediately after the approval by all NRAs of the Synchronous Area CE. 8 3. The transitional period for the implementation of additional properties of FCR by the existing affected FCR providers shall be two years as of the NRAs’ approval: one year for TSOs to adapt their national Terms and Conditions and one additional year for FCR providers to implement the FCR additional properties. 4. Each TSO may recommend to extend the provisions of the Reserve Mode to existing LER FCR providing units which are connected to the grid by means of inverters: in this case the rules for the application of requirements to existing units reported in Article 4(1)(b) of RfG apply and the deadline for the implementation is set accordingly. Article 5 Language 1. The reference language for these FCR additional properties shall be English. For the avoidance of doubt, where TSOs need to translate these FCR additional properties into their national language(s), in the event of inconsistencies between the English version published by TSOs in accordance with Article 8 of the SO Regulation and any version in another language, the relevant TSOs shall, in accordance with national legislation, provide the relevant national regulatory authorities with an updated translation of the FCR additional properties. 9 Annex I – Normal vs Reserve Mode LER FCR Providing Units (either single or belonging to a LER FCR Providing Group) that are prequalified for the first time after the entry into force of the methodology and are technically capable (e.g. inverter- connected assets) shall be able to switch from Normal Mode to Reserve Mode when upper (socmax) or lower (socmin) state of charge limits are exceeded. These limits are defined by the amount of energy necessary to provide FCR for a time interval equal to full activation time of aFRR: 𝑃 ∗ ∆𝑡𝐹𝐴𝑇 𝑠𝑜𝑐𝑚𝑖𝑛 = 𝐶 𝑠𝑜𝑐𝑚𝑎𝑥 = 1 − 𝑠𝑜𝑐𝑚𝑖𝑛 where C is the storage capacity in MWh; P is the power offered for FCR provision in MW; ∆tFAT is the aFRR full activation time in h. When charge is restored, the unit shall revert to Normal Mode. During Normal Mode the unit shall react to the normal frequency deviation ∆f(t) while in Reserve Mode the unit shall react only on the short-term frequency deviation by following the zero-mean frequency: 𝑛(𝑡−∆𝑡𝐹𝐴𝑇 ) 1 ̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅ ∆𝑓𝑧𝑒𝑟𝑜−𝑚𝑒𝑎𝑛 (𝑡) = ∆𝑓(𝑡) − ∑ ∆𝑓 𝑛(𝑡 − ∆𝑡𝐹𝐴𝑇 ) 𝑖=0 During the transition period from Normal Mode to Reserve Mode and viceversa, the unit shall react on the combination freaction(t) of normal frequency deviation and short-term frequency deviation as described by the following equation: 𝑓𝑟𝑒𝑎𝑐𝑡𝑖𝑜𝑛 (𝑡) = ̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅̅ ∆𝑓𝑧𝑒𝑟𝑜−𝑚𝑒𝑎𝑛 (𝑡) ∙ 𝑇 + (1 − 𝑇) ∙ ∆𝑓(𝑡) where T is the weighting function defined as follows. For the transition from Normal Mode to Reserve Mode: 0 𝑡 < 𝑡𝑠𝑡𝑎𝑟𝑡 𝑡 − 𝑡𝑠𝑡𝑎𝑟𝑡 𝑇={ 𝑓𝑜𝑟 𝑡𝑠𝑡𝑎𝑟𝑡 ≤ 𝑡 < 𝑡𝑠𝑡𝑎𝑟𝑡 + ∆𝑡𝐹𝐴𝑇 ∆𝑡𝐹𝐴𝑇 𝑡 ≥ 𝑡𝑠𝑡𝑎𝑟𝑡 + ∆𝑡𝐹𝐴𝑇 1 where tstart is the time when upper or lower state of charge limits are exceeded. For the transition from Reserve Mode to Normal Mode 1 𝑡 < 𝑡𝑟𝑒𝑠𝑡𝑜𝑟𝑒 𝑡𝑟𝑒𝑠𝑡𝑜𝑟𝑒 − 𝑡 𝑇={ + 1 𝑓𝑜𝑟 𝑡𝑟𝑒𝑠𝑡𝑜𝑟𝑒 ≤ 𝑡 < 𝑡𝑟𝑒𝑠𝑡𝑜𝑟𝑒 + ∆𝑡𝐹𝐴𝑇 ∆𝑡𝐹𝐴𝑇 𝑡 ≥ 𝑡𝑟𝑒𝑠𝑡𝑜𝑟𝑒 + ∆𝑡𝐹𝐴𝑇 0 where trestore is the time when upper or lower state of charge limits are restored. 10 Both in normal as well as in Reserve Mode the interval for frequency sensitivity mode shall be respected (the full frequency range is used as input signal, but the FCR provision is limited to short term frequency deviations in Reserve Mode). 11 All CE TSOs’ proposal for the limits on the amount of exchange and sharing of FRR between synchronous areas in accordance with Article 176(1) and Article 177(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 08.08.2018 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of FRR between synchronous areas in accordance with Article 176(1) and Article 177(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation Contents 1 Whereas........................................................................................................................................ 3 2 Article 1 Subject matter and scope ...............................................................................................................4 3 Article 2 Definitions and interpretation ........................................................................................................4 4 Article 3 Limits on the amount of exchange and sharing of FRR between synchronous ............................5 5 Article 4 Publication and implementation of the FRR limits on exchange and sharing between 6 synchronous areas proposal ..........................................................................................................................5 7 Article 5 Language .......................................................................................................................................5 2 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of FRR between synchronous areas in accordance with Article 176(1) and Article 177(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation All Transmission System Operators of synchronous area Continental Europe are taking into account the following; 8 Whereas 9 (1) This document is a common proposal developed by all Transmission System Operators of 10 synchronous area CE (hereafter referred to as “TSOs”) regarding the development of the limits on 11 the amount of exchange and sharing of FRR between synchronous areas involving Continental 12 Europe (hereafter referred to as “FRR exchange and sharing limits between synchronous areas”) in 13 accordance with Articles 176(1) and 177(1) of Commission Regulation (EU) 2017/1485 14 establishing a guideline on electricity transmission system operation (hereafter referred to as “SO 15 GL”). This proposal is hereafter referred to as “FRR limits on exchange and sharing between SA 16 proposal”. 17 18 (2) The FRR exchange and sharing limits between synchronous areas proposal takes into account the 19 general principles and goals set in the SO GL, as well as Regulation (EC) No 714/2009 of the 20 European Parliament and of the Council of 13 July 2009 on conditions for access to the network for 21 cross-border exchanges in electricity (hereafter referred to as “Regulation (EC) No 714/2009”). The 22 goal of the SO GL is the safeguarding of operational security, frequency quality and the efficient 23 use of the interconnected system and resources. For this purpose, it sets requirements for limits on 24 the amount of exchange as well as sharing of aFRR and mFRR between synchronous areas. 25 26 (3) The FRR limits on exchange and sharing between synchronous areas proposal takes into account 27 the load-frequency control structure of each synchronous area in accordance with Article 139 of SO 28 GL. The operation of load-frequency control processes is based on operational areas, where every 29 area has their individual responsibilities with respect to the LFC structure. The superior structure is 30 the synchronous area in which frequency is the same for the whole area. 31 32 (4) Article 176(1) and 177(1) of SO GL require all TSOs of each synchronous area to define a method 33 to determine limits for the exchange and sharing of FRR with other synchronous areas in the 34 synchronous area operational agreement. In particular: 35  In accordance with Article 176(1), the method to determine limits for the exchange of FRR 36 shall take into account the operational impact between the synchronous areas; the stability of 37 the FRP of the synchronous area; the ability of the synchronous area to comply with the 38 frequency quality target parameters defined in accordance with Article 127 and the FRCE 39 target parameters defined in accordance with Article 128 of SO GL; and the operational 40 security. 41  In accordance with Article 177(1), the method for determining the limits for sharing of FRR 42 shall take into account: the operational impact between the synchronous areas; the stability of 43 the FRP of the synchronous area; the maximum reduction of FRR that can be taken into 44 account in the FRR dimensioning rules in accordance with Article 157 as a result of the FRR 45 sharing; the ability of the TSOs of the synchronous area to comply with the frequency quality 46 target parameters defined in accordance with Article 127 and the ability of the LFC blocks to 47 comply with the FRCE target parameters defined in accordance with Article 128; and the 48 operational security. 49 50 (5) The scope of the FRR limits on exchange and sharing between synchronous areas proposal is to 51 establish the limits on the amount of exchange and sharing of FRR between synchronous areas in 3 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of FRR between synchronous areas in accordance with Article 176(1) and Article 177(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 52 order to respect operational security. This proposal does not apply to exchange or sharing of FRR 53 within a synchronous area. 54 55 (6) According to Article 6(2)(d)(ix) of the SO GL, it requires all TSOs to develop methodologies, 56 conditions and values included in the synchronous area operational agreements in Article 118 57 concerning the definition of limits on the amount of exchange of FRR between synchronous areas 58 in accordance with Article 176(1) SO GL and limits on the amount of sharing FRR between 59 synchronous areas in accordance with Article 177(1) SO GL. The hereafter presented exchange 60 and sharing between synchronous areas proposal shall define the requested methodologies, 61 conditions and values. 62 63 (7) The FRR limits on exchange and sharing between synchronous areas proposal is to respond to the 64 objective of SO GL pursuant to Article 4(1) to ensure the conditions for maintaining a frequency 65 quality level of all synchronous areas throughout the Union, by permitting exchange and sharing 66 between synchronous areas under certain limits in order to avoid detrimental effect on each 67 synchronous area. 68 69 (8) In conclusion, the FRR limits on exchange and sharing between synchronous areas proposal 70 contributes to the general objectives of the SO GL to the benefit of all market participants and 71 electricity end consumers. 72 73 SUBMIT THE FOLLOWING FRR LIMITS ON EXCHANGE AND SHARING BETWEEN 74 SYNCHRONOUS AREAS PROPOSAL TO ALL REGULATORY AUTHORITIES: 75 Article 1 76 Subject matter and scope 77 The FRR limits on exchange and sharing between synchronous areas as determined in this proposal shall be 78 considered as the common proposal of all TSOs of CE in accordance with Article 176 and 177 of the SO 79 GL. This proposal does not apply to exchange and sharing of FRR within the synchronous area CE. 80 Article 2 81 Definitions and interpretation 82 1. For the purposes of the FRR limits on exchange and sharing between synchronous areas proposal, 83 terms used in this document shall have the meaning of the definitions included in Article 3 of the SO 84 GL, Article 2 of Regulation (EC) 714/2009, Article 2 of Directive 2009/72/EC and Article 2 of 85 Commission Regulation (EU) 543/2013. 86 87 2. In this FRR limits on exchange and sharing between synchronous areas proposal, unless the context 88 requires otherwise: 89 a) the singular indicates the plural and vice versa; 90 b) the table of contents and headings are inserted for convenience only and do not affect the 91 interpretation of this FRR limits on exchange and sharing between synchronous areas proposal; and 92 c) any reference to legislation, regulations, directive, order, instrument, code or any other enactment 93 shall include any modification, extension or re-enactment of it then in force. 4 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of FRR between synchronous areas in accordance with Article 176(1) and Article 177(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 94 Article 3 95 Limits on the amount of exchange and sharing of FRR between synchronous 96 1. A reserve receiving TSO of a LFC block involved in the exchange of aFRR and mFRR between 97 synchronous areas, where synchronous area of Continental Europe is the reserve receiving synchronous 98 area, shall ensure that at least 50 % of its total combined FRR capacity resulting from the aFRR and 99 mFRR dimensioning rules according to the Article 157 of the SO GL and before any reduction due to 100 the sharing of aFRR and mFRR according to Article 157(2) of the SO GL remains located within its 101 LFC block. 102 103 2. Each TSO of a LFC block shall have the right to perform sharing of aFRR and mFRR with a LFC block 104 in an adjacent synchronous area. In particular: 105 a) where the synchronous area CE is the reserve receiving synchronous area, the sharing of aFRR and 106 mFRR is possible within the limits set by the aFRR and mFRR dimensioning rules in Article 107 157(1), Article 157(2)(j, k) and Article 158 of the SO GL. 108 i. In case of sharing and pursuant to Article 157(2)(j, k) of the SO GL, the reduction of the 109 positive (resp. negative) reserve capacity on FRR of a LFC block shall be limited to the 110 difference, if positive, between the size of the positive (resp. negative) dimensioning incident 111 and the reserve capacity on FRR required to cover the positive (resp. negative) LFC block 112 imbalances during 99 % of the time, based on the historical records referred to Article 113 157(2)(a). Additionaly, the reduction of the positive reserve capacity shall not exceed 30 % of 114 the size of the positive dimensioning incident; 115 b) where synchronous area CE is the reserve connecting synchronous area, no limits shall apply. 116 Article 4 117 Publication and implementation of the FRR limits on exchange and sharing between 118 synchronous areas proposal 119 1. The TSOs shall publish the FRR limits on exchange and sharing between synchronous areas proposal 120 without undue delay after all NRAs have approved the proposal or a decision has been taken by the 121 Agency for the Cooperation of Energy Regulators in accordance with Article 6(8) of the SO GL. 122 123 2. The TSOs shall implement the FRR limits on exchange and sharing between synchronous areas 124 proposal provided one month after the regulatory authorities have approved the proposal in accordance 125 with Article 6(3) SO GL or a decision has been taken by the Agency in accordance with Article 6(8) 126 SO GL. 127 Article 5 128 Language 129 The reference language for this FRR limits on exchange and sharing between synchronous areas proposal 130 shall be English. For the avoidance of doubt, where TSOs need to translate this FRR limits on exchange and 131 sharing between synchronous areas proposal into their national language(s), in the event of inconsistencies 132 between the English version published by TSOs in accordance with Article 8 of the SO GL Regulation and 133 any version in another language, the relevant TSOs shall, in accordance with national legislation, provide 134 the relevant national regulatory authorities with an updated translation of the FRR limits on exchange and 135 sharing between synchronous areas proposal. 136 5 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Explanatory note for the limits on the amount of exchange and sharing of FRR between synchronous areas 08.08.2018 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Explanatory note for the limits on the amount of exchange and sharing of FRR between synchronous areas Explanatory note 1 Regarding Article 3: 2 The exchange and sharing of aFRR and mFRR between synchronous areas is a process TSOs do not foresee 3 to be implemented, at least before the implementation of the corresponding balancing platform performing 4 cross-border activation of aFRR and mFRR, according to EB GL. In this sense, TSOs at a first stage are not 5 able to perform security assessment of such exchange or sharing. TSOs’ intention is not to block any kind 6 of initiative in future, this is why the only rules considered for exchange or sharing of aFRR or mFRR, 7 where receiving synchronous area is synchronous area CE, are the same rules applied to LFC Blocks within 8 the synchronous area CE itself: i.e. at least 50% of the FRR capacity resulting from the FRR dimensioning 9 rules shall remain located in the LFC block in case of exchange. For the avoidance of doubt this limit is 10 applicable to the sum of sharing and exchange with TSOs from within and outside the synchronous area. 11 When synchronous area CE is the reserve connecting synchronous area, no limits are foreseen at this stage. 12 This proposal relies on the fact that if such an exchange or sharing of aFRR and mFRR is going to be 13 implemented in the future, specific security analysis studies will be needed in any case. Respective 14 requirements and a corresponding notification process among TSOs as well as procedures for reservation of 15 cross-border transmission capacities will have to be elaborated. Particularly, the ability of the synchronous 16 area to comply with the frequency quality target parameters defined and the FRCE target parameters 17 defined in accordance to Articles 176 and 177 of SO GL shall be considered. In this context additional 18 requirements in terms of limited amount of mFRR might be necessary, leading to amendments of this 19 proposal. In such a case, TSOs’ concerns would be as anticipated as possible with national regulatory 20 authorities. 2 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of RR between synchronous areas in accordance with Article 178(1) and Article 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 08.08.2018 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of RR between synchronous areas in accordance with Article 178(1) and Article 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation Contents 1 Whereas........................................................................................................................................ 3 2 Article 1 Subject matter and scope ...............................................................................................................4 3 Article 2 Definitions and interpretation ........................................................................................................4 4 Article 3 Limits on the amount of exchange and sharing of RR between synchronous areas......................5 5 Article 4 Publication and implementation of the RR limits on exchange and sharing between synchronous 6 areas proposal ...............................................................................................................................................5 7 Article 5 Language .......................................................................................................................................5 2 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of RR between synchronous areas in accordance with Article 178(1) and Article 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation All Transmission System Operators of synchronous area Continental Europe are taking into account the following; 8 Whereas 9 (1) This document is a common proposal developed by all Transmission System Operators of 10 synchronous area CE (hereafter referred to as “TSOs”) regarding the development of the limits on 11 the amount of exchange and sharing of RR between synchronous areas involving Continental 12 Europe (hereafter referred to as “RR exchange and sharing limits between synchronous areas”) in 13 accordance with Article 178(1) and 179(1) of Commission Regulation (EU) 2017/1485 of 2 14 August 2017 establishing a guideline on electricity transmission system operation (hereafter 15 referred to as “SO GL”). This proposal is hereafter referred to as “RR limits on exchange and 16 sharing limits between synchronous areas proposal”. 17 18 (2) The RR exchange and sharing limits between synchronous areas proposal takes into account the 19 general principles and goals set in the SO GL/Regulation as well as Regulation (EC) No 714/2009 20 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the 21 network for cross-border exchanges in electricity (hereafter referred to as “Regulation (EC) No 22 714/2009”). The goal of the SO GL is the safeguarding of operational security, frequency quality 23 and the efficient use of the interconnected system and resources. For this purpose it sets 24 requirements for limits on the amount of exchange as well as sharing of RR between synchronous 25 areas. 26 27 (3) The RR limits on exchange and sharing between synchronous areas proposal takes into account the 28 load-frequency control structure of each synchronous area in accordance with Article 139 of SO 29 GL. The operation of load-frequency control processes is based on operational areas, where every 30 area has their individual responsibilities with respect to the LFC structure. The superior structure is 31 the synchronous area in which frequency is the same for the whole area. 32 33 (4) Article 178(1) and 179(1) of SO GL require all TSOs of each synchronous area to define in the 34 synchronous area operational agreement a method to determine limits for the exchange and sharing 35 of RR with other synchronous areas. In particular: 36  In accordance with Article 178(1), the method to determine limits for the exchange of RR shall 37 take into account the operational impact between the synchronous areas; the stability of the 38 RRP of the synchronous area; the ability of the synchronous area to comply with the frequency 39 quality target parameters defined in accordance with Article 127 and the FRCE target 40 parameters defined in accordance with Article 128 of SO GL; and the operational security. 41  In accordance with Article 179(1), the method for determining the limits for sharing of RR 42 shall take into account: the operational impact between the synchronous areas; the stability of 43 the RRP of the synchronous area; the maximum reduction of RR that can be taken into account 44 in the RR dimensioning rules in accordance with Article 160 as a result of the RR sharing; the 45 ability of the TSOs of the synchronous area to comply with the frequency quality target 46 parameters defined in accordance with Article 127 and the ability of the LFC blocks to comply 47 with the FRCE target parameters defined in accordance with Article 128; and the operational 48 security. 49 3 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of RR between synchronous areas in accordance with Article 178(1) and Article 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 50 (5) The scope of the RR limits on exchange and sharing between synchronous areas proposal is to 51 establish the limits on the amount of exchange and sharing of RR between synchronous areas in 52 order to respect operational security. 53 54 (6) According to Article 6(2)(d)(x) of the SO GL, it requires all TSOs to develop methodologies, 55 conditions and values included in the synchronous area operational agreement in Article 118 56 concerning the definition of limits on the amount of exchange of RR between synchronous areas in 57 accordance with Article 178(1) SO GL and limits on the amount of sharing FRR between 58 synchronous areas in accordance with Article 179(1) SO GL. The hereafter presented exchange and 59 sharing between synchronous areas proposal shall define the requested methodologies, conditions 60 and values. 61 62 (7) The RR limits on exchange and sharing between synchronous areas proposal responds to the 63 objective of SO GL to ensure the conditions for maintaining a frequency quality level of all 64 synchronous areas throughout the Union, by permitting exchange and sharing between synchronous 65 areas under certain limits in order to avoid detrimental effects on each synchronous area. 66 67 (8) In conclusion, the RR limits on exchange and sharing between synchronous areas proposal 68 contributes to the general objectives of the SO GL and to the benefit of all market participants and 69 electricity end consumers. 70 71 SUBMIT THE FOLLOWING RR LIMITS ON EXCHANGE AND SHARING BETWEEN 72 SYNCHRONOUS AREAS PROPOSAL TO ALL REGULATORY AUTHORITIES: 73 Article 1 74 Subject matter and scope 75 The RR limits on exchange and sharing between synchronous areas as determined in this proposal shall be 76 considered as the common proposal of all TSOs of CE, in accordance with Article 178 and 179 of the SO 77 GL. This proposal does not apply to exchange or sharing of RR within the synchronous area CE. 78 Article 2 79 Definitions and interpretation 80 1. For the purposes of the RR limits on exchange and sharing between synchronous areas proposal, terms 81 used in this document shall have the meaning of the definitions included in Article 3 of the SO GL, 82 Article 2 of Regulation (EC) 714/2009, Article 2 of Directive 2009/72/EC and Article 2 of Commission 83 Regulation (EU) 543/2013. 84 85 2. In this RR limits on exchange and sharing between synchronous areas proposal, unless the context 86 requires otherwise: 87 a) the singular indicates the plural and vice versa; 88 b) the table of contents and headings are inserted for convenience only and do not affect the 89 interpretation of this RR limits on exchange and sharing between synchronous areas proposal; and 90 c) any reference to legislation, regulations, directive, order, instrument, code or any other enactment 91 shall include any modification, extension or re-enactment of it then in force. 4 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu All CE TSOs’ proposal for the limits on the amount of exchange and sharing of RR between synchronous areas in accordance with Article 178(1) and Article 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 92 Article 3 93 Limits on the amount of exchange and sharing of RR between synchronous areas 94 1. A reserve receiving TSO of a LFC block involved in the exchange of RR between synchronous areas, 95 where synchronous area CE is the reserve receiving synchronous area, shall ensure that at least 50 % of 96 its total RR capacity resulting from the RR dimensioning rules according to the Article 160 of the SO 97 GL and before any reduction due to the sharing of RR according to Article 160(5) of the SO GL, 98 remains located within its LFC block. 99 100 2. Each TSO of a LFC block shall have the right to perform sharing of RR with a LFC block in an 101 adjacent synchronous area. In particular: 102 a) in case the synchronous area CE is the reserve receiving synchronous area, the sharing of RR is 103 performed within the limits set by the RR dimensioning rules in Article 160(4,5) and in Article 161 104 of the SO GL. 105 b) in case the synchronous area of CE is the reserve connecting synchronous area, no limits shall 106 apply. 107 Article 4 108 Publication and implementation of the RR limits on exchange and sharing between 109 synchronous areas proposal 110 1. The TSOs shall publish the RR limits on exchange and sharing between synchronous areas proposal 111 without undue delay after all NRAs have approved the proposal or a decision has been taken by the 112 Agency for the Cooperation of Energy Regulators in accordance with Article 6(8) of the SO GL. 113 114 2. The TSOs shall implement the RR limits on exchange and sharing between synchronous areas proposal 115 provided one month after the regulatory authorities have approved the proposal in accordance with 116 Article 6(3) SO GL or a decision has been taken by the Agency in accordance with Article 6(8) SO GL. 117 Article 5 118 Language 119 The reference language for this RR limits on exchange and sharing between synchronous areas proposal 120 shall be English. For the avoidance of doubt, where TSOs need to translate this RR limits on exchange and 121 sharing between synchronous areas proposal into their national language(s), in the event of inconsistencies 122 between the English version published by TSOs in accordance with Article 8 of the SO GL Regulation and 123 any version in another language, the relevant TSOs shall, in accordance with national legislation, provide 124 the relevant national regulatory authorities with an updated translation of the RR limits on exchange and 125 sharing between synchronous areas proposal. 126 5 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Explanatory note for the limits on the amount of exchange and sharing of RR between synchronous areas 08.08.2018 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu Explanatory note for the limits on the amount of exchange and sharing of RR between synchronous areas 1 Explanatory note 2 Regarding Article 3: 3 The exchange and sharing of RR between synchronous areas is a process TSOs do not foresee to be 4 implemented at least before the implementation of the corresponding balancing platform performing cross- 5 border activation of RR according to EB GL. In this sense TSOs, at a first stage are not able to perform 6 security assessment of such exchange or sharing. TSOs’ intention is not to block any kind of initiative in 7 future, this is why the only rules considered for exchange or sharing of RR where receiving synchronous 8 area is synchronous area CE are the same rules applied to LFC blocks within the synchronous area CE 9 itself: i.e. at least 50% of the RR capacity resulting from the RR dimensioning rules shall remain located in 10 the LFC block in case of exchange. 11 When synchronous area CE is the reserve connecting synchronous area, no limits are foreseen at this stage. 12 This proposal relies on the fact that if such an exchange or sharing of RR is going to be implemented in the 13 future, specific security analysis studies will be needed in any case and respective requirements and a 14 corresponding notification process among TSOs as well as procedures for reservation of cross-border 15 transmission capacities will have to be elaborated. Particularly, the ability of the synchronous area to 16 comply with the frequency quality target parameters defined and the FRCE target parameters defined in 17 accordance to articles 178 and 179 of SO GL shall be considered. In this context, additional requirements in 18 terms of limited amount of RR might be necessary leading to amendments of this proposal. In such a case, 19 TSOs’ concerns would be as anticipated as possible with national regulatory authorities. 2 ENTSO-E AISBL • Avenue de Cortenbergh 100 • 1000 Brussels • Belgium • Tel + 32 2 741 09 50 • Fax + 32 2 741 09 51 • [email protected] • www. entsoe.eu OTSUS 07.11.2024 nr 7-26/2024-006 Mandri-Euroopa sünkroonala põhivõrguettevõtjate metoodikate, vastavalt Komisjoni määrus (EL) 2017/1485 artiklile 118 ning Komisjoni määrus (EL) 2017/2195 artikkel 50 lõikele 3 ja artikkel 51 lõikele 1, kooskõlastamise kohta 1. Haldusmenetluse alustamine Elektrituruseaduse (edaspidi ELTS) § 93 lõige 6 punkti 1 kohaselt kontrollib Konkurentsiamet Euroopa Parlamendi ja nõukogu määruses (EL) 2019/943 ning selle alusel kehtestatud komisjoni määrustes sätestatud tingimuste täitmist. ELTS § 93 lõige 6 punkti 6 kohaselt Konkurentsiamet väljastab ELTS-is sätestatud juhul kooskõlastamise otsuseid. Euroopa Komisjoni Määrusega (EL) 2017/1485 kehtestati elektri ülekandesüsteemi käidueeskiri (edaspidi ka SOGL või SOGL määrus)1. SOGL artikkel 6 lõike 1 kohaselt kiidab iga reguleeriv asutus või vajaduse korral koostööamet heaks tingimused või meetodid, mis põhivõrguettevõtjad on lõigete 2 ja 3 kohaselt koosatanud. Liikmesriigi määratud asutus kiidab heaks lõike 4 kohased põhivõrguettevõtjate väljatöötatud tingimused või metoodika. Kui liikmesriik ei ole sätestanud teisiti, on määratud asutus reguleeriv asutus. Enne tingimuste ja meetodite heakskiitmist vaatab reguleeriv asutus, koostööamet või määratud asutus pärast asjaomaste põhivõrguettevõtjatega konsulteerimist vajaduse korral ettepanekud läbi, et tagada nende kooskõla käesoleva määruse eesmärgiga ning aidata kaasa turgude lõimimisele, mittediskrimineerimisele, tõhusale konkurentsile ja turu nõuetekohasele toimimisele. SOGL artikkel 6 lõige 3 punkti d kohaselt peavad kõigi vaatlusaluse piirkonna reguleerivate asutuste heakskiidu saama artikkel 118 kohased sünkroonala talitluslepingutes sisalduvad meetodid, tingimused ja suuruste väärtused vastavalt järgmisele: i) sageduse kvaliteedi määramise näitajad ja sageduse kvaliteedi sihtnäitaja vastavalt artiklile 127; ii) sageduse hoidmise reservi (ingl frequency containment reserve ehk FCR) suuruse määramise eeskirjad vastavalt artiklile 153; iii) FCRi täiendavad omadused kooskõlas artikkel 154 lõikega 2; iv) Suurbritannia (GB) sünkroonala ja Iirimaa/Põhja-Iirimaa (IE/NI) sünkroonala jaoks meetmed energiamahutite taastamiseks vastavalt artikkel 156 lõige 6 punktile b; 1 https://eur-lex.europa.eu/legal-content/ET/TXT/?uri=CELEX%3A02017R1485-20210315 2 (6) v) Mandri-Euroopa sünkroonala ja Põhjamaade sünkroonala jaoks vähim käivitamisaeg, mille peavad tagama FCRi pakkujad vastavalt artikkel 156 lõikele 10; vi) Mandri-Euroopa sünkroonala ja Põhjamaade sünkroonala jaoks eeldused ja meetodid tasuvusanalüüsi tegemiseks vastavalt artikkel 156 lõikele 11; vii) muude sünkroonalade jaoks, välja arvatud Mandri-Euroopa, kui see on asjakohane, piirnormid FCRi vahetamiseks põhivõrguettevõtjate vahel vastavalt artikkel 163 lõikele 2; viii) GB sünkroonala ja IE/NI sünkroonala jaoks metoodika sünkroonalade vahel jagatava FCRi reservide vähimpakkumise normi kindlaksmääramiseks vastavalt artikkel 174 lõige 2 punktile b; ix) piirnormid sünkroonalade vahel vahetatava sageduse taastamise reservi (ingl frequency restoration reserve ehk FRR) kindlaksmääramiseks vastavalt artikkel 176 lõikele 1 ning piirnormid sünkroonalade vahel jagatava FRRi kindlaksmääramiseks vastavalt artikkel 177 lõikele 1; x) piirnormid sünkroonalade vahel vahetatava asendusreservi (ingl replacement reserve ehk RR) kindlaksmääramiseks vastavalt artikkel 178 lõikele 1 ning piirnormid sünkroonalade vahel jagatava RRi kindlaksmääramiseks vastavalt artikkel 179 lõikele 1. SOGL artikkel 6 lõike 1 kohaselt, iga reguleeriv asutus või vajaduse korral koostööamet kiidab heaks tingimused või meetodid, mis põhivõrguettevõtjad on lõigete 2 ja 3 kohaselt koostanud. Liikmesriigi määratud asutus kiidab heaks lõike 4 kohased põhivõrguettevõtjate väljatöötatud tingimused või metoodika. Kui liikmesriik ei ole sätestanud teisiti, on määratud asutus reguleeriv asutus. Enne tingimuste ja meetodite heakskiitmist vaatab reguleeriv asutus, koostööamet või määratud asutus pärast asjaomaste põhivõrguettevõtjatega konsulteerimist vajaduse korral ettepanekud läbi, et tagada nende kooskõla käesoleva määruse eesmärgiga ning aidata kaasa turgude lõimimisele, mittediskrimineerimisele, tõhusale konkurentsile ja turu nõuetekohasele toimimisele. SOGL artikkel 6 lõike 7 kohaselt, kui tingimuste või metoodika heakskiitmiseks vastavalt lõikele 3 või nende muutmiseks vastavalt artiklile 7 on vaja rohkem kui ühe reguleeriva asutuse otsust vastavalt lõikele 3, peavad pädevad reguleerivad asutused kokkuleppele jõudmiseks omavahel konsulteerima, tegema tihedat koostööd ja kooskõlastama oma tegevuse. Kui koostööamet esitab oma arvamuse, võtavad pädevad reguleerivad asutused seda arvesse. Reguleerivad asutused või vajaduse korral koostööamet teevad lõigete 2 ja 3 kohaselt esitatud tingimuste ja meetodite kohta otsuse kuue kuu jooksul pärast seda, kui koostööamet või reguleeriv asutus või asjakohasel juhul viimane asjaomane reguleeriv asutus on tingimused või meetodid kätte saanud. Ajavahemik algab järgmisel päeval pärast seda, kui ettepanek esitati koostööametile vastavalt lõikele 2 või viimasele asjaomasele reguleerivale asutusele vastavalt lõikele 3. SOGL artikkel 6 lõike 8 kohaselt, kui reguleerivad asutused ei ole jõudnud kokkuleppele lõikes 7 osutatud ajavahemiku jooksul või nende ühise taotluse korral või koostööameti taotlusel vastavalt määruse (EL) 2019/942 artikkel 5 lõike 3 kolmandale lõigule, võtab koostööamet kuue kuu jooksul vastavalt määruse (EL) 2019/942 artikkel 5 lõikele 3 ja artikkel 6 lõike 10 teisele lõigule vastu otsuse tingimuste või meetodite ettepanekute kohta. SOGL artikkel 7 lõike 1 kohaselt, kui koostööamet nõuab või kõik pädevad reguleerivad asutused ühiselt nõuavad vastavalt artikkel 6 lõigete 2 ja 3 kohaselt esitatud tingimuste või meetodite muutmist nende heakskiitmiseks, esitavad asjaomased põhivõrguettevõtjad muudetud tingimuste või meetodite ettepaneku heakskiitmiseks kahe kuu jooksul pärast koostööameti või reguleerivate asutuste sellekohast taotlust. Koostööamet teeb või pädevad 3 (6) reguleerivad asutused teevad muudetud tingimuste või meetodite kohta otsuse kahe kuu jooksul pärast nende esitamist. SOGL artikkel 7 lõike 3 kohaselt, kui pädevad reguleerivad asutused ei ole jõudnud kokkuleppele artikkel 6 lõigetes 2 ja 3 osutatud tingimuste või meetodite osas kahe kuu pikkuse tähtaja jooksul või nende ühise taotluse korral või koostööameti taotlusel vastavalt määruse (EL) 2019/942 artikkel 5 lõike 3 kolmandale lõigule, võtab koostööamet kuue kuu jooksul vastavalt määruse (EL) 2019/942 artikkel 5 lõikele 3 ja artikkel 6 lõike 10 teisele lõigule vastu otsuse muudetud tingimuste või meetodite kohta. Kui asjaomased põhivõrguettevõtjad ei esita ettepanekut muudetud tingimuste või meetodite kohta, kohaldatakse artikkel 5 lõikes 9 kirjeldatud menetlust. Euroopa Komisjoni Määrusega (EL) 2017/2195 kehtestati elektrisüsteemi tasakaalustamise eeskiri (EBGL)2. EBGL artikkel 5 lõige 3 punkti j kohaselt peavad kõigi asjaomase piirkonna reguleerivate asutuste heakskiidu saama, sellise geograafilise piirkonna jaoks, mis hõlmab kõiki põhivõrguettevõtjaid, kes vahetavad kavatsuslikult energiat sünkroonala piires, põhivõrguettevõtjate omavahelise arveldamise eeskirjad kavandatud energia vahetamisel vastavalt artikkel 50 lõikele 3. EBGL artikkel 5 lõige 3 punkti l kohaselt peavad kõigi asjaomase piirkonna reguleerivate asutuste heakskiidu saama iga sünkroonala jaoks põhivõrguettevõtjate omavahelise arveldamise eeskirjad kavatsematu energiavahetamise kohta vastavalt artikkel 51 lõikele 1. EBGL artikkel 5 lõike 6 kohaselt, kui tingimuste või metoodika heakskiitmiseks vastavalt käesoleva artikli lõikele 3 või nende muutmiseks vastavalt artiklile 6 on vaja rohkem kui ühe reguleeriva asutuse otsust, peavad asjaomased reguleerivad asutused kokkuleppele jõudmiseks omavahel konsulteerima, tegema tihedat koostööd ja kooskõlastama oma tegevuse. Kui koostööamet esitab oma arvamuse, võtavad asjaomased reguleerivad asutused seda arvesse. Reguleerivad asutused või vajaduse korral koostööamet peavad lõigete 2, 3 ja 4 kohaselt esitatud tingimuste ja meetodite kohta tegema otsused kuue kuu jooksul pärast seda, kui koostööamet või asjaomane reguleeriv asutus või asjakohasel juhul viimane reguleeriv asutus on tingimused või meetodid kätte saanud. Ajavahemik algab järgmisel päeval pärast seda, kui ettepanek esitati koostööametile vastavalt lõikele 2, viimasele asjaomasele reguleerivale asutusele vastavalt lõikele 3 või vajaduse korral asjaomasele reguleerivale asutusele vastavalt lõikele 4 EBGL artikkel 5 lõike 7 kohaselt, kui pädevad reguleerivad asutused ei ole jõudnud kokkuleppele lõikes 6 osutatud ajavahemiku jooksul või nende ühise taotluse korral või koostööameti taotlusel vastavalt määruse (EL) 2019/942 artikkel 5 lõike 3 kolmandale lõigule, võtab koostööamet kuue kuu jooksul alates esitamisest vastavalt määruse (EL) 2019/942 artikkel 5 lõikele 3 ja artikkel 6 lõike 10 teisele lõigule vastu otsuse tingimuste või meetodite kohta esitatud ettepanekute kohta. EBGL artikkel 6 lõike 1 kohaselt, kui koostööamet nõuab, kõik asjaomased reguleerivad asutused ühiselt nõuavad või asjaomane reguleeriv asutus nõuab artikkel 5 lõigete 2, 3 ja 4 kohaselt esitatud tingimuste või meetodite muutmist nende heakskiitmiseks, peavad asjaomased põhivõrguettevõtjad esitama muudetud tingimuste või meetodite ettepaneku heakskiitmiseks kahe kuu jooksul pärast koostööameti või asjaomaste reguleerivate asutuste taotlust. Koostööamet või asjaomased reguleerivad asutused teevad muudetud tingimuste või 2 https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32017R2195 4 (6) meetodite kohta otsuse kahe kuu jooksul pärast nende esitamist. EBGL artikkel 6 lõike 2 kohaselt, kui asjaomased reguleerivad asutused ei ole jõudnud tingimuste või meetodite osas kokkuleppele kahe kuu pikkuse tähtaja jooksul või nende ühise taotluse korral või koostööameti taotlusel vastavalt määruse (EL) 2019/942 artikkel 5 lõike 3 kolmandale lõigule, võtab koostööamet kuue kuu jooksul vastavalt määruse (EL) 2019/942 artikkel 5 lõikele 3 ja artikkel 6 lõike 10 teisele lõigule vastu otsuse muudetud tingimuste või meetodite kohta. Kui asjaomased põhivõrguettevõtjad ei esita ettepanekut muudetud tingimuste või meetodite kohta, kohaldatakse artiklis 4 kirjeldatud menetlust. Vastavalt SOGL artiklile 118 ning EBGL artikkel 50 lõikele 3 ja artikkel 51 lõikele 1, on kõik Mandri-Euroopa sünkroonala põhivõrguettevõtjad koostanud asjaomastele riiklikele reguleerivatele asutustele ettepaneku järgmiste metoodikate kohta (edaspidi Metoodikad): 1. FCRi suuruse määramise eeskirjad vastavalt SOGL artikkel 153 lõikele 2 (Lisa 1) 2. FCRi täiendavad omadused kooskõlas SOGL artikkel 154 lõikega 2 (Lisa 2) 3. Piirnormid sünkroonalade vahel vahetatava FRRi kindlaksmääramiseks vastavalt SOGL artikkel 176 lõikele 1 ning piirnormid sünkroonalade vahel jagatava FRRi kindlaksmääramiseks vastavalt SOGL artikkel 177 lõikele 1 (Lisa 3) 4. Piirnormid sünkroonalade vahel vahetatava RRi kindlaksmääramiseks vastavalt SOGL artikkel 178 lõikele 1 ning piirnormid sünkroonala vahel jagatava RRi kindlaksmääramiseks vastavalt SOGL artikkel 179 lõikele 1 (Lisa 4) 5. Sellise geograafilise piirkonna jaoks, mis hõlmab kõiki põhivõrguettevõtjaid, kes vahetavad kavatsuslikult energiat sünkroonala piires, põhivõrguettevõtjate vahelise arveldamise eeskirjad kavandatud energia vahetamisel vastavalt EBGL artikkel 50 lõikele 3 (Lisa 5) 6. Iga sünkroonala jaoks põhivõrguettevõtjate vahelise arveldamise eeskirjad kavatsematu energiavahetamise kohta vastavalt EBGL artikkel 51 lõikele 1 (Lisa 6) 19.09.2024 esitas Elering AS (edaspidi Elering) Konkurentsiametile kooskõlastamiseks kõikide Mandri-Euroopa sünkroonala põhivõrguettevõtjate ühised Metoodikate ettepanekud. 2. Menetlusosaline Elering AS, äriregistri kood 11022625, asukoht Kadaka tee 42, Tallinn, 12915, e-post: [email protected]. 3. Asjaolud ja menetluse käik 19.09.2024 esitatud Metoodikate kooskõlastustaotluses selgitab Elering, et Metoodikad on juba varasemalt heaks kiidetud Mandri-Euroopa sünkroonala riikide reguleerivate asutuste poolt. Seoses asjaoluga, et Eesti elektrisüsteem talitleb Venemaa ja Valgevene (IPS/UPS) sünkroonalas, ei ole Metoodikad Eesti elektrisüsteemile rakendatavad. Samas, seoses Eesti ja teiste Balti riikide elektrisüsteemide eelseisva sünkroniseerimisega on üheks sünkroniseerimise eelduseks nende Metoodikate kooskõlastamine Eesti ja teiste Balti riikide reguleerivate asutuste poolt ning Metoodikate rakendamine Balti põhivõrguettevõtjate poolt alates Mandri-Euroopa sünkroonalaga sünkroniseerimise hetkest 09.02.2025. 02.10.2024 pöördus Konkurentsiamet Läti ja Leedu riiklike reguleerivate asutuste poole seoses Metoodikate kooskõlastusprotsessiga. 02.10.2024 vastas Leedu riiklik reguleeriv asutus Konkurentsiametile, tuues vastuskirjas välja, et Leedu riiklik reguleeriv asutus on Metoodikad kooskõlastanud 29.08.2024. 5 (6) 02.10.2024 vastas Läti riiklik reguleeriv asutus Konkurentsiametile, selgitades vastuskirjas, et ka Läti reguleeriv asutus kavatseb Metoodikad kooskõlastada. 4. Konkurentsiameti seisukoht Võttes arvesse asjaolu, et Metoodikad on juba varasemalt heaks kiidetud Mandri-Euroopa sünkroonala riikide riiklike reguleerivate asutuste poolt ning seoses asjaoluga, et üheks Baltikumi sünkroniseerimise eelduseks Mandri-Euroopa sünkroonalaga on Metoodikate kooskõlastamine Eesti ja teiste Balti riikide riiklike reguleerivate asutuste poolt ja Metoodikate rakendamine Balti põhivõrguettevõtjate poolt alates Mandri-Euroopa sünkroonalaga sünkroniseerimise hetkest, tervitab Konkurentsiamet Metoodikate ettepanekut. Vastavalt SOGL artikkel 6 lõikes 7 ja EBGL artikkel 5 lõikes 6 sätestatule on Balti riiklikud reguleerivad asutused Metoodikate ettepaneku osas kokkuleppele jõudmiseks konsulteerinud, teinud tihedat koostööd ning kooskõlastanud oma tegevust. Balti riiklikud reguleerivad asutused on seisukohal, et Metoodikate ettepanek vastab SOGL ja EBGL sätetele ning et seda ettepanekut on võimalik kõikidel asjaomastel reguleerivatel asutustel siseriiklikult kooskõlastada. Asjaomased reguleerivad asutused annavad selle kohta välja siseriiklikud otsused. Kokkuvõte Konkurentsiamet töötas läbi 19.09.2024 Eleringi poolt ametile kooskõlastamiseks esitatud kõikide Mandri-Euroopa sünkroonala põhivõrguettevõtjate Metoodikate ettepanekud ning asub seisukohale, et nimetatud Metoodikad arvestavad kehtivast seadusandlusest tulenevate alusetega ning ei ole vastuolus SOGL-st ja EBGL-st tuleneva regulatsiooniga. SOGL artikli 8 kohaselt tingimuste või meetodite väljatöötamise eest vastutavad põhivõrguettevõtjad peavad need internetis avaldama pärast pädevatelt reguleerivatelt asutustelt saadud heakskiitu või, kui heakskiitu ei ole vaja, siis pärast nende tingimuste või meetodite väljatöötamist, välja arvatud juhul, kui selline teave on artikli 12 kohaselt konfidentsiaalne. EBGL artikkel 7 kohaselt tingimuste või meetodite väljatöötamise eest vastutavad põhivõrguettevõtjad peavad need internetis avaldama pärast asjaomastelt reguleerivatelt asutustelt saadud heakskiitu või, kui heakskiitu ei ole vaja, siis pärast nende tingimuste või meetodite väljatöötamist, välja arvatud juhul, kui selline teave on artikli 11 kohaselt konfidentsiaalne. Arvestades eeltoodut ja tuginedes ELTS § 93 lõige 6 punktile 6, SOGL artikkel 6 lõige 3 punktile d) ning EBGL artikkel 5 lõige 3 punktidele j) ja l) otsustan: kooskõlastada Elering AS poolt Konkurentsiametile esitatud kõikide Mandri-Euroopa sünkroonala põhivõrguettevõtjate metoodikad, vastavalt Komisjoni määrus (EL) 2017/1485 artiklile 118 ning Komisjoni määrus (EL) 2017/2195 artikkel 50 lõikele 3 ja artikkel 51 lõikele 1. Käesoleva otsusega mittenõustumise korral on õigus esitada kaebus otsuse tühistamiseks Tallinna Halduskohtule. Kaebuse halduskohtule võib esitada 30 päeva jooksul arvates 6 (6) käesoleva otsuse teatavaks tegemisest. (allkirjastatud digitaalselt) Evelin Pärn-Lee peadirektor Lisad: 1. All CE TSOs’ proposal for the dimensioning rules for FCR in accordance with Article 153(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 2. Additional properties of FCR in accordance with Article 154(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 3. All CE TSOs’ proposal for the limits on the amount of exchange and sharing of FRR between synchronous areas in accordance with Article 176(1) and Article 177(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 4. All CE TSOs’ proposal for the limits on the amount of exchange and sharing of RR between synchronous areas in accordance with Article 178(1) and Article 179(1) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 5. All continental European TSOs’ proposal for Common settlement rules for intended exchanges of energy as a result of the frequency containment process and ramping period in accordance with the Article 50(3) of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing 6. All continental European TSOs’ proposal for Common settlement rules for all unintended exchanges of energy in accordance with the Article 51(1) of Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing
Allikas: Konkurentsiamet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel