dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Sotsiaalministeerium
Muu lepingAvalik

Põhja- ja Baltimaade joogivee riskihindamise võimekuse tõstmise ekspertkohtumine - leping

Sotsiaalministeerium · 15. aprill 2024
Viit
2-2.1/2427-1
Registreeritud
15. aprill 2024
Dokumendi liik
Muu leping
Funktsioon
2 Välisabi ja struktuuritoetuste rakendamine
Sari
2-2.1 Välisabi vahenditest rahastatavate projektide lepingud koos aktidega
Toimik
2-2.1
Vastutaja
Ramon Nahkur (Sotsiaalministeerium, Kantsleri vastutusvaldkond, Terviseala asekantsleri vastutusvaldkond, Rahvatervise osakond)

Failid

  • 📎2-2.12427-1 15.04.2024 Muu leping.asice1564 KB

Sisu (failidest)

Project Agreement 1. Contracting parties and project information Contracting party Point of contact Swedish Food Agency Name: Erika Frenning, secretary for NMF Box 622 Tel: 46 18-17 44 16 751 26 Uppsala E-mail: [email protected] Sweden Ministry of Social Affairs of Estonia Name: Ramon Nahkur Public Health Department E-mail: [email protected] Suur-Ameerika 1 101 22 Tallin Estonia Hereinafter, jointly or individually, referred to as ”Parties” or ”Party”. Project Information Official name: Workshop on advancing risk-based surveillance of drinking-water quality: exchange of experience and capacity building (Nordic/Baltic network on water and health) Form: Conference Project schedule: 24.04.24 – 26.04.24 Project leader: Ramon Nahkur Description of project and expected The project is described in the Project application (appendix to this results: Agreement). 2. Roles of the Parties and subject of the Agreement The Swedish Food Agency provides chairmanship and secretarial functions for the Nordic Council of ministers Working Group for Food Safety and Consumer Information (NMF) and is responsible for the administration of NMF project funding. The Ministry of Social Affairs of Estonia is responsible for arranging and leading the project Nordic/Baltic network on water and health, which is funded by NMF. The purpose of this Agreement is to agree on the financing and reporting with regard to the project Nordic/Baltic network on water and health. 3. Nordic Council of Ministers’ conditions for project funding Projects that are granted funding must meet the Nordic Council of Ministers’ conditions, which are (i) connection with the Nordic Council of Ministers’ strategic platforms, (ii) inclusion of three Nordic countries in the project and (iii) projects must help to add Nordic value (https://norden.org/en/information/how- apply-funding-nordic-council-ministers). The Parties conclude that the project fulfils these conditions. 4. Funding Total amount 200 000 DKK Additional information Payment 100 % is paid to The Ministry of Social Affairs of Estonia after both Parties have signed this Agreement and account information for payment has been provided. Purpose of use The funding is exclusively for payment of expenses for arranging the mentioned project. Overheads and internal administrative costs of The Ministry of Social Affairs of Estonia are not covered by the funding. No additional funds will be granted should expenses exceed the total amount above. Unused funds Any funds not required for payment of expenses for the project must be returned to NMF/Swedish Food Authority by 30th September 2024. 5. Reporting, accounting and auditing The Ministry of Social Affairs of Estonia shall submit a final project report and financial report to NMF/Swedish Food Agency by 30th September 2024. The project funds must be included in the ordinary audit of The Ministry of Social Affairs of Estonia. The Ministry of Social Affairs of Estonia must keep all relevant financial information on the project, including accounting records, at least five years following the completion of the project. 6. Intellectual property rights and publication Issues regarding intellectual property rights and publication of material, results and reports from the project are outside the scope of this Agreement, as any such issue shall be resolved in accordance with the applicable policy and rules of the Nordic Council of Ministers. 7. Entry into force and term of the Agreement This Agreement enters into force when signed by both Parties and remains in force until complete fulfilment of all obligations under the Agreement. 8. Jurisdiction and dispute resolution This Agreement is governed by Swedish law excluding its provisions on conflict/choice of law. The Parties shall seek to resolve any disputes in connection to this Agreement by negotiation. Any dispute that cannot be solved by negotiation shall be submitted to the District Court of Uppsala. 9. Signatures There are two identical copies of this Agreement, one for each Party. The Parties undertake to ensure that the persons who have signed this Agreement have received representative authority from their respective organization. Swedish Food Agency ______________________________ Clarification: Maria Florin Position: Head of unit Date and Place: Ministry of Social Affairs of Estonia ______________________________ Clarification: Maarjo Mändmaa Position: Secretary General Date and Place: Appendix Project description “Workshop on advancing risk-based surveillance of drinking-water quality: exchange of experience and capacity building”. PROJECT DESCRIPTION (version 0.8 2021nov08) NB. Please read the instructions and relevant background material before entering the project description. The instructions and links to background material are at the end of this document. BASIC PROGRAMME DATA (TO BE FILLED OUT BY THE NORDICCOUNCIL OF MINISTERS’ SECRETARIAT) DINA ref. no. Budgetheading(s) U4 ref no. Prof. advisor BASIC PROJECT DATA 1. Project title Workshop on advancing risk-based surveillance of drinking-water quality: exchange of experience and capacity building 2. Organisation Ministry of Social Affairs (MoSA), Estonia, with support of the WHO Regional Office for Europe (WHO/Europe) 3. Contract signatory Name: Maarjo Mändmaa Tel.: +372 5550 5619 E-mail: [email protected] 4. Project manager Name: Ramon Nahkur Tel.: +3725047199 E-mail: [email protected] 5. Start date 01-01-2024 6. End date 26-04-2024 7. Total project budget (DKK) 200.000 NB. It is compulsory to attach a Council of Ministers’ budget form to the project description 8. Amount applied for (DKK) 200.000 9. Resubmission Yes: No: 10. Scandinavian summary 11. English summary Aim of the project is to hold an expert level workshop on advancing risk-based surveillance of drinking-water quality, for the purpose of exchanging of experience and capacity building. The meeting is planned for maximum of 30-50 participants from the Nordic and Baltic regions together with WHO experts. The meeting will be hosted by the Ministry of Social Affairs of Estonia and will take place in the premises of the ministry on 24-26.04.24. A: PROGRAMME OBJECTIVE/PURPOSE 12. What is the background to the project? The UNECE-WHO/Europe Protocol on Water and Health is a legal treaty for the WHO European Region that aims to protect human health and well-being through sustainable water management and by preventing and controlling water-related diseases. Several Nordic-Baltic countries are Parties to the Protocol (Estonia, Finland, Latvia, Lithuania, Norway). The Protocol's programme of work for the period 2023-2025 aims to support countries establishing effective national regulations and standards for drinking-water quality and the application of risk-based approaches in surveillance, in accordance with the WHO Guidelines for Drinking-water Quality and the (new) requirements of the recast 2020 EU Drinking Water Directive (DWD). To this end, the Protocol's work programme stipulates to conduct subregional national capacity-building and networking events to support exchange of country experiences and promote best practices and the adoption of risk-based surveillance approaches in regulations and practice. With his 1 PROJECT DESCRIPTION (version 0.8 2021nov08) backdrop, the proposed project intends to support the organization of the first subregional workshop focussing on Nordic-Baltic countries. Under the Protocol on Water and Health, Norway has been co-leading the work on water quality and disease surveillance; Estonia has been proposing a subregional exchnage on the subject matter to support implementation of both the Protocol's and EU DWD's provisions. 13. What overall problem does the project help to solve? Outbreaks of waterborne diseases are a common phenomenon in the Nordic-Baltic region, resulting in largely preventable adverse health outcomes and coming with economic costs. This situation underlines the need for improving/maintaining safely managed water supply services, as well as public health surveillance systems that verify the safety of drinking-water and collect reliable data to inform investments and decision-making in the water and health sectors. Several countries in the Nordic-Baltic region are currently transitioning to adopt risk-based approaches in drinking- water quality management and surveillance. Risk-based approaches in drinking-water management are internationally recognized as the most efective means in ensuring the continious supply of safe drinking- water. Such approach is also supported by the new requirements of the EU DWD. National approaches taken in adopting a risk-based approach by the water sector and by health surveillance agencies vary and depend on a country's institutional and governance setup. In order to advance the adoption of risk-based approaches at the national level, the project/workshop aims to identify effective solutions and best practices for maintaining risk-based drinking water quality surveillance systems that are feasible within the available resources (institutional, human, financial) while maximising the protection of public health. With this, the project/workshop will strengthen peer-to-peer networking among public health institutions in Nordic-Baltic countries that are mandated with drinking-water quality surveillance, and foster information exchange and mutual advice. In doing so, the workshop supports the implementation of the work programme of the Protocol on Water and Health and of the EU DWD. 14. How does the project contribute to the Nordic Council of Ministers’ Vision 2030, the strategic priorities and the 12 vision goals for 2021-2024? Safeguarding drinking-water supply services and quality is an essential pillar of achieving good, equal and secure health and welfare for all (goal/focus area 9). The provision of essential services, such as drinking-water supply, is a cornerstone of health prevention and well-being, and effective government surveillance functions are imperative to achieve this goal. The project/workshop fosters knowledge exchnage among Nordic-Baltic countries towards to this end and therefore strengthens approaches and efforts on how to safeguard the provision of quality drinking-water. By promoting exchange and networking among Nordic-Baltic countries, the project/workshop also supports goal/focus area 5 through contributing to international co-operation on the environment and climate - both of which presenting key determinants of drinking-water safety that require risk amangement and surveillance attaention. 15. What similar projects are being implemented under the auspice of the Nordic Council of Ministers? We are not aware of similar projects. B: SUSTAINABILITY, EQUALITY, CHILDREN AND YOUNG PEOPLE 16. How does the project contribute to Agenda 2030 and the 17 sustainable development goals? SDG target 6.1 requires countries to provide access to safe and equitable drinking-water for all in all settings. The risk-based water safety plan (WSP) approach, recommended by the WHO Guidelines for Drinking-water Quality, is the internationally recognized public health benchmark for the delivery of safe drinking-water. This approach also entails the establishment of risk-based approaches to surveillance in order to safeguard the safety of drinking-water and therebty meeting SDG target 6.1. The fullfillment of target 6.1 is also an enabler to attain several other SDGs, including SDG1 on poverty reduction, SDG3 on good health and well-being, SDG4 on quality education, SDG5 on gender equality and SDG11 on sustainable citues and communities, among others. 2 PROJECT DESCRIPTION (version 0.8 2021nov08) 17. How does the project contribute to improving equality between men and women? Access to safe drinking-water is a human right. All genders must have equal access to safe drinking-water. Effective surveillance safeguards drinking-water quality and thereby contributed to health settings and living conditions for all in all settings. 18. How does the project contribute to improving children and young people’s rights and living conditions? How will children and/or young people be involved/participate in the project? Children’s access to safe drinking-water is a right, not a privilege. Efforts in improving and safeguarding the quality of drinking-water available at home, in schools and other settings where children and young people live, play, learn and interact , is an important pillar in protecting their health and well-being. The availability of safe drinking-water and effective surveillance systems increase trust in consuming water from public supplies. This reduces the risk of children and young people using sugar-sweetened beverages, for example. While there is no direct participation of children and young people in statutory drinking-water surveillance, we intend to invite delegate/s of the European Environment and Health Youth Coalition (and/or another youth organization) to involve them in sharing their ideas on how drinking-water quality surveillance can be improved in key settings (e.g. schools). C: OBJECTIVES AND SUCCESS CRITERIAS 19. What are the project’s overall goals? The workshop is to (1) identify good practices and effective solutions among Nordic-Baltic countries in governing and implementing risk-based surveillance approaches to ensure the provision of safe drining-water; (2) promote approaches and tools recommended by the WHO Guidelines for Drinking-water Quality and the Protocol on Water and Health; and (3) offer a platform for peer-to-peer networking among health and regulatory authoroities in Nordic-Baltic countries mandated with drinking- water surveillance. 20. Describe the project milestones? Respond by completing Table 1 21. What are the project’s success criterias? Respond by completing Table 2 Table 1: Description of project milestones Description Milestone 1 Convene a two-day "Workshop on advancing risk-based surveillance of drinking-water quality" in Tallinn, Estonia, from 24 to 26 april 2024. Milestone 2 Release of a synthesis report of the workshop's findings and recommendations for presentation at the governing bodies of the Protocol on Water and Health. Milestone 3 Table 2: Description of the project’s success criteria, data and assumptions/prerequisites Success criteria Data and, if appropriate, method Assumptions/prerequisites of verification Milestone 1 Broad attendance by relevant Number of attendees from each Interest by all countries. Timely authorities of Nordic-Baltic country invitations to be sent. countries Milestone 2 Broad circulation of the Number of networks/addressees synthesis report among Nordic- reached out to and report shared Baltic countries and in the with Protocol on Water and Health community Milestone 3 3 PROJECT DESCRIPTION (version 0.8 2021nov08) D: DELIVERABLES AND ACTIVITIES 22. Which expected deliverables (end products and services) and activities must be delivered/completed for the project milestones to be reached, and when? Respond by completing Table 3 23. What quality requirements are there on the expected outcomes/deliverables and who is responsible for quality assurance? Either respond in this box or complete Table 4. Delete Table 4 if it is not needed. Table 3: Deliverables and activities No. Milestone Description of deliverables and activities Date of delivery 1. 1 Description of the scope and purpose of the workshop and provisional 23 February 2024 programme 2. 1 Implementation of two-day workshop 24 April -26 April 2024 3. 2 Final synthesis report of the workshop, edited and published according to 15 July 2024 WHO rules and procedures (Add the number of rows needed in the table) Table 4: Quality No. Quality requirements on delivery Quality controller 1. Quality assurance according to WHO rules and procedures WHO/Europe 2. Close coordination in the steering group on the workshop programming and close Steering group liaison with participating delegates regarding their expected inputs to be most informative to the workshop's objectives 3. Quality assurance according to WHO rules and procedures WHO/Europe 4. … (Add the number of rows needed in the table) E: COMMUNICATION 24. Who are the project’s 3–5 key stakeholders? Respond by completing Table 5. 25. What are the project’s key messages and how should they be communicated to stakeholders/target groups? Respond by completing Table 6. 26. How has civil society and other interested parties been involved in the project? Civil society has only a marginal role in the management and surveillance of drinking-water quality. Therefore, we do not plan engaging civil society in the project/workshop. Table 5: Stakeholders Priority Stakeholder Attitude to project Implications for the project, (e.g. interest, fear, resistance) any initiatives to address/involvement 4 PROJECT DESCRIPTION (version 0.8 2021nov08) 1. Public health and regulatory Strong interest in setting up and maintaining Workshop will be targeted authorities mandated with effective surveillance systems according their needs drinking-water surveillance 2. Water service providers Strong interest in maintaining effective and Workshop outcomes will trustful cooperation with health surveillance support building joint authorities understanding on risk-based surveillance (Add the number of rows needed in the table) Table 6: Key messages Stakeholder/target Key message Media Effect Person/entity responsible group Nos. 1 and 2 Uptake of risk-based water quality N.A. The messages, together with the above management and surveillance ensures outcomes of the workshop, will be the delivery of safe drinking-water for communicated to professional all stakeholders collaborating under the Protocol on Water and Health and through the WHO/Europe website (Add the number of rows needed in the table) F: NORDIC PARTICIPATION AND ORGANISATION 27. Describe the Nordic participation/Nordic partners here and use a minimum of 3 crosses in table 7. If you cross the box for other countries, indicate which country/countries are involved. See Table 7 28. How is the project organised? Either respond by completing Table 8 or attach an organisational chart that includes an explanation and brief description of roles played. Delete Table 8 if it is not needed. 29. How to organize cross-sectoral cooperation? Coorperation across health, environment and water sectors are essential in ensuring safe drinking-water supply. Representatives of the water and/or environment sector will be invited to the workshop to address the water resource management/protection aspect in risk-based management and survceillance of water supply. Table 7: Participating countries (minimum three Nordic countries, alternatively t wo Nordic countries + min. 1 non- Nordic country) Denmark (DK) The Faroe Islands (FO) Russia (RU) Finland (FI) Greenland (GL) Estonia (EE) Iceland (IS) Sweden (SE) Latvia (LV) Norway (NO) Åland (AX) Lithuania (LT) Other Country/countries: Table 8: Project organisation Role Name and (if Organisation Country appropriate) title Decision level Project owner Ramon Nahkur Ministry of Social Affairs Estonia (host country) (MoSA) 5 PROJECT DESCRIPTION (version 0.8 2021nov08) Steering group Oliver Schmoll WHO Regional Office for N.A. (supporting workshop Europe, European Centre programming and for Environment and Health implementation) Kjetil Tveitan Ministry of Health and Care Norway Services Susanne Hyllestad Norwegian Institute of Norway Public Health Implementation Workshop participants Public health and Public health and regulatory Countries indicated level environmental authorities mandated with in Table 7 health officers drinking-water surveillance (Add the number of rows needed in the table) G: RISK ASSESSMENT 30. What are the main risks in terms of the project’s implementation and expected outcomes? Respond by completing Table 9. Tabel 9: Risks Risk Probability Possible impact Preventative measures (Low/medium/high) (only if probability is high) Lack of interest/participation by Limited representation by country/ies Low invited countries/institutions and/or other stakeholders (Add the number of rows needed in the table) H: REPORTING, COMPLETION AND EVALUATION 31. How and how often should reports be submitted about progress and outcomes, e.g. to a steering group, the programme manager, the Nordic Council of Ministers’ Secretariat, etc.? One final synthesis report of the workshop outcomes will be delivered at the end of the project. 32. How will the project be phased out? Describe here the project’s exit strategy, including how the outcomes and experiences are expected to be used after the programme ends. An exit strategy will not be required as this is a one-off workshop. The workshop outcomes and recommendations shall nbe used by participating countries to inform their surveillance systems. 33. How will the project be organised? See Table 8 I: APPENDICES 34. List the attached appendices in Table 10. Tabel 10: List of appendices No. Name of appendix 1 Budget form (compulsory) 2 3 … (Add the number of rows needed in the table) 6 PROJECT DESCRIPTION (version 0.8 2021nov08) Instructions for completing the form NB. The project description must be max. 15 pages (excluding these instructions). Submit the completed project description to the Nordic Council of Ministers’ Secretariat by e-mail or by post to: The Nordic Council of Ministers’ Secretariat, Ved Stranden 18, DK-1061 Copenhagen K, Denmark 01. Insert the name of the project in Scandinavian and English 02. Under this point, name the body responsible for administering the grant from the Nordic Council of Ministers. The following information is compulsory: o Name of organisation/institution o Address of organisation/institution o National company number or personal registration number The lead institution is responsible for the technical and administrative aspects of the project, which must be run in accordance with national regulations and the conditions set out in the contract with the Nordic Council of Ministers. 03. Insert name, e-mail and tel. no. of the individual who will sign the contract with the Nordic Council of Ministers. 04. Insert the project manager’s name, e-mail and tel. no. 05. State the proposed start date for the project (DD/MM/YYYY) 06. State the proposed completion date for the project (DD/MM/YYYY) 07. Enter the total budget (DKK) for the project. NB. It is compulsory to submit a Nordic Council of Ministers ’ budget form along with the project description. 08. Insert the amount (DKK) applied for/expected to be received from the Nordic Council of Ministers. NB. It is compulsory to submit a Nordic Council of Ministers’ budget form along with the project description. 09. Indicate with a cross whether or not this is a resubmission of a previous application. (NB this only applies if your application has previously been rejected). If you are applying for the continuation of a previously funded project, you must submit a new project description. These cases are considered new applications rather than resubmissions. Do not complete this box if the Nordic Council of Ministers commissioned the project description. 10. Write a brief summary of the project, i.e. a brief description of its objectives, milestones, target a udience and main deliverables/activities, max. 800 characters (about 10 lines). The information will be kept in the Nordic Council of Ministers’ project database, which is publicly accessible via the Nordic Council of Ministers ’ website. Try to describe your project in such a way that conveys exactly what you want members of the public to know about your work. Readers must be able to ascertain what the project is about, in which country/countries/region(s) the project will be implemented and the partners in volved. Include specific, quantifiable information as far as possible. 11. Write a project description in English, as per the instructions under point 10. 7 PROJECT DESCRIPTION (version 0.8 2021nov08) 12. Describe the background to the project, including: o What/who initiated it? What makes it interesting? What makes it politically relevant? o Have you conducted a feasibility study or other specific research in advance of the project (e.g. market research, target-group analysis, gender analysis, meetings with relevant stakeholders, etc.)? o Who took part in the planning, and what role have the project’s stakeholders/partners played in the preparatory phase? o Does the project build on previous activities or projects? If yes, what experiences/evaluations are applicable to this project? o If resubmitting, what initiatives or studies have you conducted as a result of the rejection of the previously submitted application? 13. Describe the overall problem that you expect the project to help to solve in the long term, and the underlying causes of this problem. Prioritise and describe the underlying problems that this project will seek to ameliorate and why. This prioritisation should be based on the Nordic Council of Ministers’ vision statement, and on one or more of the strategic goals set forth in the horizontal strategies, sector-specific programmes for co-operation and/or the programme for the Presidency of the Nordic Council of Ministers. You may choose to insert a problem-analysis diagram in this section, or attach one to your project description. 14. Describe how the project contributes to the vision that the Nordic region will become the world's most sustainable and integrated region in the world, through one or more of the 12 vision goals and the strategic priorities 2021-2024 in Our Vision 2030. For inspiration and guidance, see Action Plan 2021-24 The Nordic region as the world's most sustainable and integrated region, cf. reference on page 10. 15. Describe, as briefly as possible, whether the Nordic Council of Ministers is currently funding any other initiatives that address themes, political problems, etc., similar to those covered by this project – and if so, your plans for knowledge sharing/co-operation. If no such similar initiatives exist, briefly describe how you have investigated and confirmed this. 16. Describe the project’s contribution to Agenda 2030 and the 17 UN Sustainable Development Goals (including relevant milestones). Conduct an evaluation that accounts for the way(s) in which the project will ensure economic, environmental and social sustainability. For inspiration and guidance, see the Agenda 2030 final document and the Nordic Council of Ministers’ sustainability portal GRO (see reference on page 10). The sustainability perspective must not be addressed solely under point 16, but must also be incorporated into your thinking about the project description as a whole, especially in points 19–32. If the sustainability perspective is not considered relevant to the project, briefly explain why. 17. Describe how the project contributes to improving equality between men and women. Describe how the project addresses girls and boys and women and men as both target groups and stakeholders. For inspiration and guidance, please refer to the Nordic Council of Ministers’ Co-operation Programme for Gender Equality. The gender equality perspective must not be addressed solely under point 17, but must also be incorporated into your thinking about the project description as a whole, especially in points 19–32. If the gender equality perspective is not considered relevant to the project, briefly explain why. 18. Describe how the project helps strengthen children and young people’s rights and improve their living conditions, as well as how and to what extent children and young people will be included/participate in the project. Think about which children and young people will be covered or not covered by the project, e.g. boys 8 PROJECT DESCRIPTION (version 0.8 2021nov08) and girls or children with disabilities. For inspiration and guidance, see the publications Do Rights! and Are You Wearing the Right Glasses? (see page 10). The children’s and young people’s perspective must not be addressed solely under point 18, but must also be incorporated into your thinking about the project description as a whole, especially in points 19–32. If the gender equality perspective is not considered relevant to the project, briefly explain why. 19. State the overall objective to which the project wishes to contribute (max. 2–3 lines). NB. A distinction is made between the project’s overall objective (i.e. the wider objective to which the project contributes but which cannot feasibly be achieved within the project period), and the specific milestones that the project is actually expected to achieve. The overall goal must reflect the overall problem identified in the problem analysis (point 14). This prioritisation should be based on the Nordic Council of Ministers ’ vision statement, its strategic horizontal strategies, sector-specific programmes for co-operation and/or the programme for the Presidency of the Nordic Council of Ministers. 20. Unlike the overall objective, the project milestones specify the outcomes achieved within the project period – in other words, the changes that will be delivered if the project is a success. Projects must have a maximum of three milestones. It is an advantage, but not a requirement, that you use the SMART method to quality -assure them. 21. Specify the success criteria for the project milestones, the data used to confirm/verify the success criteria (and, if appropriate, the methodology), as well as the underlying conditions/prerequisites necessary for successful implementation of the project. The success criteria are quantifiable criteria used to assess whether the project has achieved its stated objectives. They can also be used to monitor whether the project is progressing as planned. The success criteria must specify the minimum that needs to be achieved at a given time for the project to be deemed to have achieved its stated objectives. The criteria can be used to measure the degree of the project ’s immediate or long-term success, but success criteria are usually only stipulated for the project milestones (immediate), rather than the overall objective (long-term). Often, multiple success criteria need to be stipulated for each objective. To be suitable both for monitoring progress and for post-evaluation of a project, the success criteria must, as far as possible, be quality-assured using the SMART method. Ideally, it should be possible to detail the five questions: when (time), who (target audience), where (place), what happened (quality), how much happened (quantity). You must also stipula te the sources/data that will be used to verify whether the milestones have been reached, and the assumptions/prerequisites necessary before this can take place. The success criteria for project milestones may be more qualitative than quantitative, i.e. built on conversations, visits and surveys, rather than numbers and statistics. 22. Describe the project deliverables based on the milestones (remember, max. 3) and the activities that need to be undertaken to deliver them – use bullet points to list the activities if you want. Describe the content of each deliverable in brief, in the form of, e.g. a report, study, video, conference or similar. Describe in brief the activities that will facilitate delivery, e.g. any necessary planning or any meetings that may be required. Enter the dates for each deliverable. Attach an overall plan for the project milestones (if appropriate). 9 PROJECT DESCRIPTION (version 0.8 2021nov08) 23. Describe the quality requirements for the project deliverables, and who is responsible for ensuring that they meet the agreed standards. 24. You must conduct a stakeholder analysis to identify the project’s stakeholders. Stakeholders are defined as individuals, groups, associations, etc., who either exert influence on or are influenced by the project, e.g. councils of ministers, committees of senior officials, national representatives, working groups, expert groups, staff groups and the general public. Prioritise and describe the 3–5 most important stakeholders in table x. Explain the stakeholders’ importance to the project and how you envisage that they will be involved, including an assessment of stakeholder support and any opposition, as well as strengths and weaknesses in relation to the implementation of the project. You may wish to draw up a separate stakeholder analysis and attach it as an appendix. 25. Using the form below, describe the project’s key messages and how they will be communicated. Who is the stakeholder/target group? What message do you seek to communicate? Which media will be used? What is the expected impact of the communication? Who is responsible for initiating and following up on the communication? For example, this might include information about the content of the project, or about communicating the project outcomes to stakeholders and others. Please feel free to adapt the form if there are other areas of major interest to your project. You may wish to draw up a separate communication plan and attach it as an appendix. 26. Describe how civil society and other stakeholders have been involved in the project? For inspiration and guidance, see the publications “Guiding principles for cooperation with civil society”, see the list of background material. 27. To ensure that the project is motivated by the Nordic countries’ national needs, and that the outcomes remain relevant after the end of the project, it is important that the project enjoys support at national level, and that you are able to document this support. This includes listing the partners behind the project, who they will work with, and who will be involved in running the project and following up on the outcomes. At least three Nordic countries must be involved (Sweden, Finland, Norway, Denmark, Iceland, the Faroe Islands, Greenland and Åland). Alternatively, grants are also available to projects involving two Nordic countries and one ot her country. 28. Either complete Table 8 or insert an organisational diagram based on the descriptions of roles below. You may attach a CV or a list of achievements by the project manager and staff. o The project owner has overall responsibility for the project achieving its objectives and the expected outcomes being realised. Typically, the project owner will also chair the steering group. o The steering group and project owner are responsible for the day-to-day running of the project within the strategic, organisational and financial framework set by the grant from the Nordic Council of Ministers. As a rule, the steering group consists of max. 10 people, including the project manager. o Reference groups can help to ensure a more effective decision-making process in the steering group and that decisions are made on the best possible basis. A reference group is able to draw on a broader range of human resources than a steering group, which helps the relevant individuals take ownership of and assure the quality of the basis for making decisions on which the project manager operates. o The project manager is responsible for the day-to-day running and monitoring of the project within the steering group’s parameters for the timetable, budget, scope and quality. Multiple individuals cannot share the role of project manager. 10 PROJECT DESCRIPTION (version 0.8 2021nov08) o For large projects, the implementation level usually consists of a number of project participants, who can be divided into several groups working on the actual delivery of the agreed deliverables and activities. 29. Describe how the cross-sectoral co-operation is organized by informing, involving and entering into partnerships across the Council of Ministers and the Nordic institutions. The aim is to achieve a broader level of expertise and security for better quality and efficiency in the work through a higher degree of cross-sectoral cooperation. 30. Please submit a risk analysis of factors that may stop the project achieving its objective. Risks are defined as external factors that can prevent the project from reaching its milestones or significantly delay implementation, e.g. reactions from stakeholders, dependence on particular individuals, equipment or other projects. In this context, please describe what you will do to prevent these circumstances from arising, or describe the steps that will be taken to reduce their impact. For example, if the stated assumptions/prerequisites (Table 2) turn out not to be the case, or if other conditions change, how will you ensure that the project is adjusted accordingly? 31. Describe in brief the reporting requirements for the project in relation to information on progress and outcomes. For example, it may be a requirement that the project reports back to the programme management, the steering group, the Nordic Council of Ministers, etc. Describe, as far as possible, the type of reports required, as well as their purpose, frequency and recipients. 32. Briefly describe the project’s exit strategy, i.e. how it is expected that the project will be phased out or continued. For example, describe how the project might be able to continue without funding from the Nordic Council of Ministers, including how the outcomes/lessons learned will be collated and used in the future. If appropriate, stipulate who will be responsible for collating this information and for the work going forward. 33. In this section, you must describe how you expect the project to be evaluated – both during and after implementation – including how the experience and knowledge gained during the project process will be use d and/or communicated after the project ends. 34. Make a list of the attached appendices, e.g. a problem analysis diagram, objectives diagram, milestones plan, stakeholder analysis, communication plan, project manager’s CV, etc. You must complete the Nordic Council of Ministers’ budget form and attach it to the project description. Applications that do not fulfil this requirement will not be considered. 11 PROJECT DESCRIPTION (version 0.8 2021nov08) Useful tools for drawing up the project description The Nordic Council of Ministers’ sustainability portal GRO: http://gro.norden.org/ Final document for Agenda 2030: “Transforming our world: The 2030 Agenda for Sustainable Development” https://sustainabledevelopment.un.org/content/documents/21252030%20Agenda%20for%20Sustainable%20Development %20web.pdf Are You Wearing the Right Glasses?: A guide to integrating a child rights and youth perspective in the work of the Nordic Council of Ministers: http://norden.diva-portal.org/smash/record.jsf?pid=diva2%3A933516&dswid=3863 Do Rights!: Nordic perspectives on child and youth participation: http://norden.diva- portal.org/smash/record.jsf?pid=diva2%3A930511&dswid=3863 12 Total budget NB! Read the instructions before completing the budget form. The budget must be in DKK and must be attached as an appendix to the project description. Text may be entered in the grey fields. Add rows as needed – but make sure the codes in the spreadsheet still work properly. DINA case number (to be completed by the Nordic Council of Ministers): Project title: Workshop on advancing risk-based surveillance of drinking-water quality: exchange of experience and capacity building Date the budget form was completed: Nordic Council of Ministers’ funding Self-funding Total financing Total amount (DKK) Total amount (DKK) Total amount (DKK) 1. Project implementation 180 000 - 180 000 1.1 Fees to experts, etc., salaries to project staff - 1.2 Travel expenses 30 000 30 000 1.3 Subsistence expenses - 1.4 Meeting expenses 100 000 100 000 1.5 Other expenses 50 000 50 000 2. Communication (print, layout, website, etc.) - - - 2.1 Information about the project, e.g. for stakeholders, target audience, etc. - 2.2 Communication of results (publications etc.) - 2.3 Other expenses - 3. External evaluation (only if relevant, see instructions) - - - 3.1 Fees for consultancies/agencies - 3.2 Misc. expenses - 4. Contingencies (min. 6%, max. 10% of budget lines 1–3) 20 000 - 20 000 4.1 Unforeseen expenses 20 000 20 000 5. Total project costs 200 000 - 200 000 6. Auditing (only if relevant, see instructions) - - - 6.1 Auditing - 7. Subtotal 200 000 - 200 000 8. Overheads (only in special cases, see instructions) - - - 8.1 Overheads - 9. Total 200 000 - 200 000 Budget notes No. Description (no. refers to no. in the budget line) E.g. 1.4.1 E.g. 10 meetings (kick-off, training, workshop) with food and drink x DKK 3,000 per meeting = 30,000 You may insert rows to make room for additional notes. If the text does not fit in the row, adjust the row height manually or automatically using the Format menu (under “Home”) Budget overview Nordic Council of Ministers’ funding Self-funding Total financing Costs Total amount 1. Project implementation 180000 0 180000 2. Communication 0 0 0 3. External evaluation 0 0 0 4. Contingencies 20000 0 20000 5. Total project costs 200000 0 200000 6. Auditing (only if relevant, see instructions) 0 0 0 7. Subtotal 200000 0 200000 8. Overheads 0 0 0 Total (DKK) 200000 0 200000
Allikas: Sotsiaalministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel