Legend
Bal
ti
cConnect orPi
pel
i
ne– UnderConst
ruct
ion
EEZbor der
Ter
ri
tor
ialborder 0 2,
5 5 10
k
m
Finnish Traffic Administration Estonian Maritime Administration
Maritime Traffic Division Valge 4
PL 33, 00521 Helsinki 11413 Tallinn
Opastinsilta 12 A, 00520 Helsinki Estonia
Finland
Baltic Connector Oy
Porkkalankatu 1
FI-00180 Helsinki
Finland
RE: Final Balticconnector Pipeline Routing Drawings
GENERAL
The following memorandum presents discussion and comments related to the final designed
alignment of the Balticconnector pipeline project. The detailed design phase of Balticconnector is
planned to reach its closure stage at the end of June 2017. Invitation to Tender (ITT) packages
shall be released to pre-qualified bidders after final document preparation. In order to secure final
permits for the work from the Finnish Traffic Administration and the Estonian Maritime
Administration, Baltic Connector Oy have prepared final routing alignments for use by the
respective permitting authorities. These documents are attached to this covering letter.
DATA FORMAT
The routing alignments have been prepared in both PDF and GIS format for use by the permitting
authorities. The alignments have been prepared in the EUREF-FIN TM35 –coordinate system. In
the event that either the Finnish Traffic Administration or Estonian Maritime Agency shall require
these data in a different format, these shall be prepared upon request.
QUESTIONS AND COMMENTS
Questions and comments regarding the scope of work may be directed to Baltic Connector Oy for
resolution and additional explanation.
Yours Sincerely,
Espoo, Finland
09 June 2017
Baltic Connector Oy
Mauno Napari Michael Mengelt
Project Manager Engineering Manager
Balticconnector Project Balticconnector Project
Attachment: Final Pipe Routing GIS and PDF Data.
Baltic Connector Oy www.balticconnector.fi
Porkkalankatu 1 Y-tunnus 2716791-9
FI-00180 Helsinki Kotipaikka, Helsinki
0
!
0
!
10
!
20
! Eastern Light
10
!
30
!
40
!
50
!
60
!
70
!
³
Legend
Bal
ti
cConnect orPi
pel
i
ne– UnderConst
ruct
ion
EEZbor der
Ter
ri
tor
ialborder 0 2,
5 5 10
k
m
Saatja: Olavi Heinlo
Saatmisaeg: reede, 9. juuni 2017 16:10
Adressaat: Triin Rebane
Koopia: Dana Kuznetsova; Kaidi Katus; Are Piel; Darja G�nter
Teema: FW: Balticconnector Pipeline - Final "Under Construction"
Routing
Manused: BC_Pipeline Final Routing_20170609.pdf;
Balticconnector_PlannedRoute.zip;
BalticconnectorRoute_FTA_A3.pdf
J�reltegevuse lipp: J�reltegevus
Olekulipp: Lipuga m�rgitud
Tere Triin
Palun registreeri sisse tulnud info Balticconnector gaasitrassi
planeeritud asukohta kohta.
Kui ajakava paigaldamise kohta, siis anname trassi paiknemise eelteatena
ENC korrektuuris ja TM-is
navigatsioonikaartidele ning v�ljastame t��de teostamisele etappide
kaupa navigatsioonihoiatused.
Ma konsulteerin veel Soome kolleegidega kuidas neil on plaanis
navigatsiooniteave trassi paigaldamise
kohta v�ljastada.
Olavi
From: Michael Mengelt [mailto:
[email protected]]
Sent: Friday, June 9, 2017 1:04 PM
To: Olavi Heinlo <
[email protected]>;
[email protected];
[email protected];
[email protected]
Cc: Mauno Napari <
[email protected]>; Lars Eriksen
<
[email protected]>;
[email protected]; Tom Fr�mling
(
[email protected])
<
[email protected]>
Subject: Balticconnector Pipeline - Final "Under Construction" Routing
Terve,
Ohessa on Balticconnector kaasuputken viimeiset reitit. Putken reitti on
merkitty �Under Construction�
sinisell� linjalla. Ottakaa yhteytt� meille jos on kysymykset.
Attached are the final routing drawings of Baltic Connector. Pipe route
is labelled as �Under
Construction� with a blue line. Please take contact with us if you have
questions.
Michael Mengelt
Project Engineer
Offshore Pipeline, Owners Engineering
Porkkalankatu 1, FI-00180 Helsinki
+358 40 5955 567
[email protected]
www.balticconnector.fi