dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Tarbijakaitse ja Tehnilise Järelevalve Amet
Sissetulev kiriAvalik

RB Rail AS_Letter No. 6.1/107_Regarding the issuance of the Utility Requirements

Tarbijakaitse ja Tehnilise Järelevalve Amet · 7. juuni 2019
Viit
5-3/18/0016/29
Registreeritud
7. juuni 2019
Dokumendi liik
Sissetulev kiri
Adressaat
RB Rail AS
Saabumis/saatmisviis
e-post
Funktsioon
5 Euroopa Liidu struktuurivahenditest ja muudest välisabi fondidest finantseeritud projektide haldamine 2020 - ...
Sari
5-3 Muud EL kaasfinantseeritavad projektid
Toimik
5-3/18/0016
Vastutaja
Jaak Simon (Kasutajad, Transpordiosakond)
Lahendamise tähtaeg
7. juuli 2019

Failid

  • 📎E-kiri.pdf475 KB
  • 📎image002.png
  • 📎image004.png
  • 📎RBR Letter No 6.1.107_Regarding the izzuance of the Utility Requirements.edoc4579 KB

Sisu (failidest)

Ministry of Economic Affairs and Communications of the Republic of Estonia Suur-Ameerika 1, Tallinn, 10122, Estonia Ministry of Transport of the Republic of Latvia Gogoļa iela 3, Riga, LV-1743, Latvia Ministry of Transport and Communications of the Republic of Lithuania Gedimino av. 17, 01505 Vilnius Estonian Technical Regulatory Authority Sõle 23 A, Tallinn 10614, Estonia RAIL BALTIC ESTONIA OÜ Endla 16, Tallinn, 10142, Estonia Sabiedrība ar ierobežotu atbildību “EIROPAS DZELZCEĻA LĪNIJAS” Maskavas iela 12, Riga, LV-1050, Latvia AB “LIETUVOS GELEŽINKELIAI” Mindaugo g. 12, LT-03603 Vilnius, Lithuania Regarding the issuance of the Utility Requirements Introduction On 20 March 2019 the Rail Baltica Technical Reference Group endorsed Rail Baltica Utility Requirements manual prepared by RB Rail AS. On 13 May 2019 RB Rail AS management board approved Rail Baltica Utility Requirements manual endorsed by the Technical Reference Group (hereinafter – “the Requirements” ). Hereby RB Rail AS is glad to share the Requirements with the Beneficiaries and the Implementing Bodies. The main purpose of the Requirements The Requirements specify conditions for the design and construction of the utility networks and other engineering utilities (hereinafter – “the Utilities” ) in the territory of the Rail Baltica Railway line and adjacent to it. The issued Requirements should be binding to the third-parties applying for construction of their Utilities and other objects next to and/or crossing the Rail Baltica railway corridor. Issuance model of the Requirements At the moment RB Rail AS has no clear legal mandate to arrange the issuance of the conditions. Nevertheless, RB Rail AS sees advantages of the centralized issuance model and will be ready to provide such a service to Beneficiaries. Strengths of the centralized model: Rail Baltica is considered as one homogenous asset with centralized design, which justifies application of the Requirements in a similar centralized manner ; Centralized model ensures future operational homogeneity, ensuring aligned safety requirements, operational rules and principles; RB Rail AS personnel have necessary expertise and practical experience to issue the Requirements for linear infrastructure objects; RB Rail AS maintains BIM model, which facilitates population of the digital drawings with data from 3 rd parties; RB Rail AS is fulfilling role of the Quality Controller in Rail Baltica project implementation. RB Rail AS request RB Rail AS hereby kindly asks you to: Address the matter urgently and decide on the issuance model of the Requirements. In case if the centralized issuance model is preferred, please provide your principal confirmation on the centralized way of issuance of the Requirements to the third-parties by RB Rail AS at your earliest convenience, but not later than by 30 June 2019. If no answer will be received, centralized issuance model will be considered as accepted by the respective institution . In case another issuance model is preferred, please provide details of the target Requirements issuance model (responsibilities, supervision of compliancy, fulfillment of 3D models etc.) at your earliest convenience, but not later than by 30 June 2019. Upon receipt of approval from all addressees of this letter, RB Rail AS will contact each addressee separate ly to agree on the next steps required to issue the Requirements. Annexed (attachments are sent by e-mail only): Legal report in respect of the application of the Requirements for the Utilities on 79 pages. Technical Reference Group endorsed Rail Baltica Utility Requirements manual. Sincerely, _________________________ Timo Riihimäki RB Rail AS Chairperson of the Management Board _________________________ Mart Nielsen RB Rail AS Management Board Member THIS DOCUMENT IS SIGNED ELECTRONICALLY WITH A SAFE ELECTRONIC SIGNATURE AND CONTAINS A TIME STAMP Legal report Prepared for RB Rail AS in respect of the application of the Requirements for the Utilities Riga, 14 December 2018 Contents Section page Section 1 Scope of the Report 8 Section 2 Comparison of the main issues 11 Section 3 Regulation in Estonia 15 Section 4 Regulation in Latvia 29 Section 5 Regulation in Lithuania 45 Section 6 Manual for preparation and application of the UR 61 Section 7 Disclaimer 78 2 Glossary of Terms Term / Abbreviation Definition GENERAL Beneficiaries Ministry of Transport and Communications of the Republic of Lithuania, Ministry of Transport of the Republic of Latvia, Ministry of Economic Affairs and Communications of the Republic of Estonia Changes Changes to the Railway Line and its related objects identified within the CPTD and design stage. Client RB Rail AS Consolidated Preliminary Finalized results of the review, evaluation and optimization of the preliminary design’s solutions arising from interoperability, user Technical Design (CPTD) and railway business, optimum life cycle cost, efficiency, sustainable and environmentally friendly railway operation as well as the Rail Baltica Global Project perspective. CPTD covers the set of identified necessary modifications and improvements to be evaluated in detail within the design phase. The improvements identified might result in railway alignment modifications. CPTD is an additional voluntary designing stage and it does not fall within the scope of any of the design phases prescribed under the construction regulation. Contracting Scheme Agreement Agreement on The Contracting Scheme for The Rail Baltic / RAIL BALTICA between RB Rail AS, Ministry of Economic Affairs and (CSA) Communications of The Republic of Estonia, Ministry of Transport of The Republic of Latvia, Ministry of Transport and Communications of The Republic of Lithuania, Estonian Technical Regulatory Authority, Rail Baltic Estonia OU, Eiropas dzelzceļa līnijas SIA, Lietuvos geležinkeliai AB, Rail Baltica Statyba UAB on 30 September 2016. Detailed Technical Design The final stage of the design process in accordance with national construction law / building act regulations and it gives the right to (DTD) start construction works. UR (Utility Requirements) Requirements for various Utilities and Utilities networks like underground cables, electricity masts, and other Utilities which will be prepared by the Client and determine a minimal set of requirements that would become mandatory for any person interacting with the perspective Railway Line in the Baltic States. Implementing Bodies Rail Baltic Estonia OU and the Estonian Technical Regulatory Authority in Estonia, Eiropas Dzelzceļa līnijas SIA in Latvia, Rail Baltica Statyba UAB and Lietuvos geležinkeliai JSC in Lithuania. Inter-Beneficiary Agreement Inter-Beneficiary Agreement between RB Rail AS, Ministry of Economic Affairs and Communications of The Republic of Estonia and Ministry of Transport of The Republic of Latvia and Ministry of Transport and Communications of The Republic of Lithuania on 16 June 2016. Inter-Governmental Agreement Agreement between The Government of The Republic of Latvia, The Government of The Republic of Estonia, and The Government of The Republic of Lithuania on The Development of The Rail Baltic/Rail Baltica Railway signed on 31 January 2017. Master Design Consolidated approach of full design documentation package aimed towards detailed technical design by considering all legal requirements set out in national construction legislation and following the established design guidelines for the railway. The result 3 of the Master Design is a set of documents (incl. 3D model drawings) which clearly shows the scope of the project, includes a situation plan with an accurate placement of the railway, main signalling, contact line and electrical network details. The scope of this set has to be wide and precise enough so that the main details are clear. The Master Design is required by RB Rail AS as an additional requirement to align the Global Project solutions and at the early level of the detailed technical design preparation together with all requirements specified in the technical specification for the Master Design. Project Rail Baltica project in the territory of Latvia, Estonia and Lithuania, including the Railway Line and all related infrastructure and solutions. Railway Line European standard gauge public railway infrastructure line Rail Baltica in all three Baltic States. Report This legal report. Shareholders Agreement Shareholders' Agreement relating to RB Rail AS entered into between OÜ Rail Baltic Estonia, SIA "Eiropas dzelzceļa līnijas" and UAB "Rail Baltica statyba" on 28 October 2014, as amended. Utilities Engineering networks consisting of piping, cables, wires, equipment, devices and facilities, which are intended for the production, transmission (transport), storage or distribution of electricity, thermal energy, gas, electronic communications, water and other resources, as well as engineering and internal engineering networks. ESTONIA ACA Administrative Co-operation Act, adopted by Riigikogu on 29 January 2003 with subsequent amendments. Building Act Previous act that regulated building, repealed on 07 May 2015 and was substituted by the Building Code. Building Code Building Code, adopted by Riigikogu on 11 February 2015 with subsequent amendments. Building design document A document or set of documents that is prepared in the course of designing the construction work and that contains the information necessary to build the construction work. Building notice Notification of building construction work to the competent authority (usually local government). Must be submitted 10 days before commencement of construction work. Building permit Grants the right to build the construction work that corresponds to the building design documentation on the basis of which the building permit is issued. County-wide spatial plan Spatial plan for an entire county. It serves as the basis for the preparation of comprehensive plans for municipalities and cities, also it has to be followed when issuing building permits etc. EVS Estonian standards, adopted by Estonian standardisation bodies (Estonian Centre for Standardisation). IBCPA An Act to Implement the Building Code and the Planning Act, adopted by Riigikogu on 18.02.2015 with subsequent amendments. 4 LOPA Law of Property Act, adopted by Riigikogu on 9 June 1993 with subsequent amendments. Ministry Estonian Ministry of Economic Affairs and Communications. Planning Act Planning Act, adopted by Riigikogu on 28 January 2015 with subsequent amendments. Railway Line Corridor The position of Rail Baltica in Estonia, fixed in the county-wide spatial plans for Harju, Rapla and Pärnu counties. Consists of the land necessary for building the Railway Line, the protection zone surrounding the Railway Line and the shifting space (the area inside the Railway Line Corridor which can be used to change the alignment of the Railway Line if the planned alignment is not usable for some reason). TRA Estonian Technical Regulatory Authority. LATVIA Cabinet Cabinet of Ministers of the Republic of Latvia. Construction Law Construction Law, as adopted by Saeima on 9 July 2013 with subsequent amendments. LVS Latvian State Standards (Latvijas Valsts standarts), applied on voluntary basis unless otherwise indicated by the Cabinet Regulations. ONI Object of National Interests according to Article 7.1(11) and Article 17 of the Spatial Development Planning Law. ONI Territory The territory of the Railway Line in Latvia as defined in Order 467 and Order 468. Order 467 Order No.467 issued by the Cabinet of Ministers on 24 August 2016, approving the activities planned for the construction of the European standard gauge public railway infrastructure line Rail Baltica. Order 468 Order No.468 issued by the Cabinet of Ministers on 24 August 2016, determining the status of national interest object for the European standard gauge public railway infrastructure Rail Baltica. Protection Zone Law Protection Zone Law, as adopted by Saeima on 5 February 1997 with subsequent amendments. Railway Law Railway Law, as adopted by Saeima on 1 April 1998 with subsequent amendments. Regulations 240 Regulations of the Cabinet of Ministers No.240 dated 30 April 2013 “General Regulations for the Planning, Use and Building of the Territory”. Regulations 500 Regulations of the Cabinet of Ministers No.500 dated 19 August 2014 “General Construction Regulations”. Regulations 574 Regulations of the Cabinet of Ministers No.574 dated 30 September 2014 “Regulations on the construction standard LBN 008-14 “Layout of engineering networks". Regulations 79 Regulations of the Cabinet of Ministers No.79 dated 1 February 2005 “Exploitation requirements for the railway right of way". 5 Regulations 91 Regulations No.91 issued by the Cabinet of Ministers on 13 February 2018, determining regulations for use of national interest object - European standard gauge public railway infrastructure line Rail Baltica. Spatial Plan Spatial planning instrument of the whole territory of a local municipality, i.e., a municipality spatial plan as defined by the Spatial Development Planning Law. LITHUANIA Railway Transport Code Railway Transport Code adopted by the Parliament of Lithuania (Seimas) on 22 April 2004 with subsequent amendments. Construction Law Law on Construction adopted by Seimas on 19 March 1996 with subsequent amendments. Spatial Planning Law Law on Spatial Planning adopted by Seimas on 12 December 1995 with subsequent amendments. Land Law Law on Land adopted by Seimas on 26 April 1994 with subsequent amendments. Expropriation Law Law on Expropriation of Land for The Implementation of Projects of Specific National Importance adopted by Seimas on 12 April 2011 with subsequent amendments. Builder The initiator of Utility construction. LTSA Lithuanian Transport Safety Authority. SSPCA State Spatial Planning and Construction Authority under the Ministry of Environment of Lithuania. Decision on Special Plan Decision of the Government of the Republic of Lithuania No. 31 ‘On Agreement on Special Plan of European Standard Railway Line Kaunas-State Border of Lithuania and Latvia and the Beginning of the Expropriation for the Needs of the Society to Lay the European Standard Railway Line Kaunas-State Border of Lithuania and Latvia’ adopted on 11 January 2017. Special Plan Special Plan of European Standard Railway Line Kaunas - State Border of Lithuania and Latvia, approved by the Decision of the Government of the Republic of Lithuania No. 31, dated 11 January 2017. Decision on Special Land Decision of the Government of the Republic of Lithuania No. 343 ‘On Approving of Special Conditions for Land and Forest Usage’ Conditions adopted on 12 May 1992 with subsequent amendments. Decision on National Importance Decision of Seimas No. XI-1612 ‘On Declaring the Project ‘Rail Baltica’ as a Project of a National Importance’ adopted on 11 October Project 2011. CTR Structure Design Order No. D1-738 issued by the Minister of Environment on 7 November 2016 ‘On Approving the Construction Technical Regulation STR 1.04.04:2017 ‘Structure Design. Design Expertise’ with subsequent amendments. CTR Construction Permitting Order No. D1-878 issued by the Minister of Environment on 12 December 2016 ‘On Approving the Construction Technical Regulation Documents STR 1.05.01:2017 ‘Construction Permitting Documents. Completion of Construction. Suspension of Construction. Removal of the 6 consequences of wilful construction. Removal of consequences concerning construction under the illegally issued permission’ with subsequent amendments. CTR Construction Works Order No. D1-848 issued by the Minister of Environment on 2 December 2016 ‘On Approving the Construction Technical Regulation STR 1.06.01:2016 ‘Construction works. Supervision of the Constructions of the Structure’ with subsequent amendments. CTR Classification of Structures Order No. D1-713 issued by the Minister of Environment on 27 October 2016 ‘On Approving the Construction Technical Regulation STR 1.01.03:2017 ‘Classification of Structures’ with subsequent amendments. 7 SECTION 1: SCOPE OF THE REPORT Section 1. Scope of the Report 8 SECTION 1: SCOPE OF THE REPORT Scope of the Report 1 The Client’s Beneficiaries have recently approved the Design Guidelines for the Rail Baltica Project. The Design Guidelines determine a unified set of requirements for the Project in the three Baltic States. They are mandatory for the outsourced designers of the perspective railway track. Currently the Client’s technical team is drafting the Utility Requirements (hereinafter – the UR). The UR will determine a minimal set of requirements that would become mandatory for any person interacting with the perspective railway track in the three Baltic States. For example, if any person would like to build a new pipeline that would cross the Railway Line, the Client shall be able to enforce the UR and the respective third party would have to comply with the requirements of the UR. The UR will regulate, for instance, minimal horizontal clearances from underground Utilities to the perspective railway track, minimal horizontal distances between underground Utilities under the track, and other technical issues. In order to prepare the UR, the Client needs legal advice to ensure the possibility to effectively implement the UR towards third parties in the three Baltic States. It is also our understanding that the conclusions made herein will be applied throughout all the implementation stages of the Project – design, construction and operation of the Railway Line. The Client also intends to prepare and implement the documents identified as necessary in this Report for effective implementation of the UR. 2 According to the Client’s instructions, in this Report we have analysed three main legal issues: (1) if and how the fact that the land under the Railway Line is currently not owned by the Client, the Beneficiaries or Implementing Bodies affects the Client’s possibilities to implement the UR with a binding nature towards third parties; (2) whether it is possible to enforce the UR with stricter technical requirements than currently stated in the laws of the three Baltic States; (3) Client’s unclear interaction procedure with third parties, Beneficiaries, Implementing Bodies, state authorities or any other institutions in the three Baltic States regarding the implementation of the UR. We have also analysed if and how the enforcement of the UR would be affected in case the alignment of the Railway Line currently approved in all three Baltic States would be changed. 3 We have divided the Report in the three main Sections in each Section analysing and giving answers to the following questions with respect to each of the Baltic States: (1) Is it possible to enforce the UR in a manner that is binding to third parties while the Client, the Implementing Bodies and the Beneficiaries are not the owners of the land under the Railway Line? If no, how can this issue be solved? (2) If yes, is it possible to enforce the UR in a manner that is binding to third parties with stricter technical requirements than currently stated in the laws and regulations? (3) If the answer to question 1 is positive, how shall the Client interact with the third parties, Beneficiaries, Implementing Bodies, state authorities or any other institutions to actually enforce the UR? (4) If the answer to question 1 is positive, what documents (for example, letter, notification, order, power of attorney) shall the Client issue, to whom and when? We have also included a comparison of the regulations of all three Baltic States in the first Section and a practical manual in Section 6. 4 Please note that the legal analysis carried out in the framework of this Report reveals that no legislation in the Baltic States has been specifically adapted to the implementation of the Project - the objectives to be achieved by the Project have not been sufficiently assessed in the existing regulatory framework. However, with the understanding that the deadlines for the implementation of the Project cannot be extended until all national legislation is ideally arranged for smooth and successful implementation of the Project, in this Report we have drawn rather robust conclusions, based mainly on the interpretation of the legal framework in accordance with its purpose in light of the objectives of the Project and its international nature. 5 In this Report, we have not reviewed and analysed technical matters and requirements in substance (including national and EU construction standards), nor the agreements with designers and engineers already concluded or to be concluded. 6 We have assumed that the information provided to us for the purposes of this Report is complete and accurate, that all relevant information on public registers searched by us is complete, accurate and up to date at the time of the relevant search, that all copies are complete and correct copies of the originals, that all documents have been validly executed and are fully enforceable in accordance with their terms and any authorizations have not been revoked or rescinded within these documents. 9 SECTION 1: SCOPE OF THE REPORT 7 Our Report is based on the review and analysis of documents directly referred to in the Report, information provided by the Client during the course of preparation of the Report, as well as information available on the Client’s webpage and the following documents: a. Inter-Beneficiary Agreement on 21 (twenty-one) pages, its Amendment No 1 on 4 (four) pages; b. Shareholders Agreement on 51 (fifty-one) pages, its Amendment No 1 on 4 (four) pages; c. Contracting Scheme Agreement on 29 (twenty-nine) pages; d. Relevant Latvian, Estonian and Lithuanian law and case-law related to the task. 10 Section 2. Comparison of the main issues 11 SECTION 2: COMPARISON OF THE MAIN ISSUES Comparison of the main issues The table below shows a concise comparison of the main issues discussed in this Report between the three Baltic States. ESTONIA (Section 3) LATVIA (Section 4) LITHUANIA (Section 5) 1. Enforcement of the UR Possible via the issuance of the approval Possible via the issuance of the requirements Possible via the issuance of the in a manner that is of the Ministry to the building authority. for the construction in the ONI Territory requirements for construction in the binding to third (territory designated for the construction of railway protection zone (only after the parties the Railway Line) by the Ministry of railway protection zones are registered Transport. with the Register of Real Estate). 2. Involvement of the Direct involvement (towards the Direct involvement (towards third parties) Direct involvement (towards third parties) Client in determining building authority) possible. possible. possible. the binding A cooperation agreement between the A delegation agreement between the Client A cooperation agreement between the AB requirements for the Ministry and the Client to be concluded and the Ministry of Transport to be concluded Lietuvos geležinkeliai and the Client to be construction of the pursuant to which the Client is pursuant to which tasks under Regulations concluded pursuant to which the Client and Utilities authorized to issue the requirements to 91 are delegated to the Client – the Client AB Lietuvos geležinkeliai would agree on the building authority directly on behalf issues the requirements in its own name. the procedure of issuing consents to third of the Ministry. parties directly on behalf of AB Lietuvos geležinkeliai. Please see section 5.3 for further information. 3. Involvement of A letter to be sent inviting to take notice A letter to be sent: (1) reminding about the A letter to all relevant (inter alia – municipal of the county-wide spatial plans requirements under Regulations 91; (2) municipal) authorities participating in construction explanatory memorandum point 3.3.1 informing about the authorisations of the approving / supervising construction institutions and other and the cooperation agreement between Client set in the Inter-Governmental inviting them to take notice of the competent the Ministry and the Client upon Agreement and in the CSA (3) informing agreement between the Client and AB construction handling requests for permits and about the delegation agreement between the Lietuvos geležinkeliai and the authorities building notices in the Railway Line Client and the Ministry of Transport (if authorisations of the Client set in the Inter- Corridor. concluded before the letter is sent); (4) Governmental Agreement as well as in the inviting to inform about all significant CSA. construction initiatives in the territories adjacent to the ONI territory. 4. Stricter requirements Minimal clearances for the Utilities Minimal clearances for the Utilities mainly Minimal clearances for the Utilities mainly option regulated mainly by regulations and regulated by Cabinet Regulations. regulated by government regulations and non-mandatory standards. Although not clearly stated in the laws or standards. Stricter requirements should be possible case-law, stricter requirements should be Although not clearly stated in the laws or with a reasonable justification and with possible in case of a necessity if reasonable case-law, stricter requirements should be a reference to laws (if possible) and not justification exists. 12 SECTION 2: COMPARISON OF THE MAIN ISSUES exceeding maximum clearances if such possible with a reasonable justification in are stipulated. place. 5. Description of the process – main steps 5.1. Submission of the third The construction initiative of the third Submitted to the Ministry of Transport or to Submitted to AB Lietuvos geležinkeliai and party for issuance of party is submitted to the competent the Client directly if agreed so in the later forwarded to the Client according to the requirements for construction institution who requests delegation agreement. the cooperation agreement or without it. the construction in the the issuance of the approval of the territory of the Railway Ministry. Line 5.2. Issuance of the Issued by the Client to the competent Issued by the Client to the third party. Issued by the Client to the third party on requirements for the building authority on behalf of the behalf of AB Lietuvos geležinkeliai. For construction of the Ministry. more information please see Section 5.3. Utilities in the territory of the Railway Line 5.3. Further involvement of The Client may set a condition in the Approval of the technical design of the If construction permitting documents are the Client in the technical requirements to conduct on- respective Utility by the Client (if determined required for construction of the Utilities: construction process of site inspections. In case of issues with as a request in the technical requirements) 1) approvals of the technical design by the Utilities the construction (not built according to and involvement in the commissioning of the the Client on behalf of AB Lietuvos the building design document which has Utility structure (depending on the type of geležinkeliai and the LTSA; been amended with the technical the Utility) with inspection rights before the 2) site visits by the Client on behalf of requirements), the Client will notify the commissioning. AB Lietuvos geležinkeliai; law enforcement to take action. 3) participation in the commissioning procedures by the Client on behalf of AB Lietuvos geležinkeliai. If construction permitting documents are not required: 1) the Client’s consent for construction within the Railway Line protection zone on behalf of AB Lietuvos geležinkeliai; 2) site visits by the Client on behalf of AB Lietuvos geležinkeliai / 13 SECTION 2: COMPARISON OF THE MAIN ISSUES Client’s authorisations to act on behalf of AB Lietuvos geležinkeliai arise from Intergovernmental Agreement and SCA, however, shall be precisely stipulated in the cooperation agreement. Please see section 5.3 for further information. Disclaimers and time- Not necessary as requirements for A validity term may be included, approval of Not necessary as requirements for limits to be included in construction are definitively determined the technical design may be requested. construction are definitively determined by the requirements by the building authority (TRA or local the applicable legal acts. authority issuing the permit). 14 SECTION 3: REGULATION IN ESTONIA Section 3. Regulation in Estonia 15 SECTION 3: REGULATION IN ESTONIA Summary of Section 3 Is it possible to enforce the UR in a manner that is binding to Is it possible to enforce the UR in a manner that is binding to third parties while the Client, the Implementing Bodies and the third parties with stricter technical requirements than Beneficiaries are not the owners of the land under the Railway currently stated in the laws and regulations? Line? It is possible to enforce the UR in a manner that is binding to third parties while The regulations in Estonia that regulate the clearances usually set minimal the Client, the Implementing Bodies and the Beneficiaries are not the owners of clearances between Utilities, and between the Utilities and other objects. the land under the Railway Line. According to the county-wide spatial plans In large part these clearances are regulated by non-binding standards. explanatory memorandum point 3.3.1, it is required to ask for the Ministry’s Thus, it is possible to set stricter regulations for the clearances between opinion when planning to build any construction in the Railway Line Corridor the Utilities and objects of the Railway Line infrastructure in the technical that requires a building design document, building notice or building permit. requirements issued with the approval or non-approval of the Ministry, if Keeping in mind the purpose of the county-wide spatial plans and the the regulations or laws state that the clearances are minimal clearances importance of the Railway Line, this opinion must be interpreted as an approval and don’t stipulate a maximum clearance. When determining the stricter as stipulated in the Building Code. Therefore, the Ministry can set a binding UR requirements, the Ministry has to present reasonable justification for the on a case-by-case basis by refusing to give approval unless the conditions for need for such stricter requirements, referencing to concrete legal Utilities set by the Client have been met. requirement if possible. 16 SECTION 3: REGULATION IN ESTONIA How shall the Client interact with the third parties, Beneficiaries, What documents shall be issued, to whom and when in order Implementing Bodies and other institutions to actually enforce to enforce the UR? the UR? In order to enforce the UR, several options of action were analysed (for In order to enforce the UR, the following documents shall be issued: more detail please see Section 3.3 below) and the following one found to 1) a co-operation agreement between the Client and the Ministry by be the most appropriate, clear and less risk involving. which the Ministry authorizes the Client to give approvals along with In order to enforce the UR, the following actions have to be taken by the technical conditions on the Ministry’s behalf as established in the Client: county-wide spatial plans explanatory memorandum point 3.3.1 – 1) negotiation and conclusion of a co-operation agreement between the without delay; Client and the Ministry by which the Ministry authorizes the Client to 2) a letter to all relevant competent authorities (local governments in the give approvals along with technical conditions on the Ministry’s behalf three counties, TRA) inviting them to take notice of the county-wide as established in the county-wide spatial plans explanatory spatial plans explanatory memorandum point 3.3.1 and the co- memorandum point 3.3.1; operation agreement upon handling requests for permits and building 2) sending a letter to all relevant competent authorities (local notices in the Railway Line Corridor – without delay; governments in the three counties, TRA) inviting them to take notice 3) technical conditions under county-wide spatial plans explanatory of the county-wide spatial plans explanatory memorandum point 3.3.1 memorandum point 3.3.1 on the Ministry’s behalf to relevant and the co-operation agreement upon handling requests for permits competent authorities (on a case-by-case basis) – within 10 days of and building notices in the Railway Line Corridor; the receipt of respective requests by the Ministry. 3) issuing approvals on the Ministry’s behalf along with the technical requirements under county-wide spatial plans explanatory memorandum point 3.3.1 to competent authorities within 10 days after receipt of respective requests by the Ministry. 17 SECTION 3: REGULATION IN ESTONIA 3.1. Binding effect of the UR towards third parties Requirements In Estonia, the Railway Line Corridor has been fixed with county-wide spatial plans. The Railway Line will pass through Harju, Pärnu and Rapla set by the counties. Estonian county-wide spatial plans for Harju, Pärnu and Rapla counties all specify (explanatory memorandum point 3.3.1) that for county-wide the construction of the Railway Line, the Corridor must be kept free of all construction and whilst creating comprehensive plans and detailed spatial plans spatial plans, the Railway Line Corridor and road locations as defined in the spatial plans, must be considered. Also, until the land needed for (current the establishment of the Railway Line has been acquired by the Republic of Estonia, it is required to ask for the opinion of the Ministry whilst situation, planning to build any construction in the Railway Line Corridor that requires a building design document, building notice or building permit. before acquiring the Therefore, since there is no way to completely forbid construction work in the Railway Line Corridor, it is required to ask for the Ministry’s land) opinion. The entity who has to ask for the Ministry’s opinion depends on who the competent authority is who issues the building permit or to whom the building notice must be submitted. This is usually the local authority, in some cases it is the TRA. The TRA is also in charge of verifying whether construction work is safe to use and occupy after it has been built. One must differentiate between opinions and approvals in an administrative procedure. The final administrative act (e.g. building permit) is issued by the competent authority at the end of an administrative procedure. Asking for an opinion or an approval happens during the administrative procedure. An opinion is not binding to the competent authority responsible for the administrative procedure (i.e. a local government handling a request for a building permit). For example, Building Code § 42 subsection 8 stipulates that if observations are submitted concerning the proposal of a building permit in the course of the giving of approvals and opinions, the competent authority takes appropriate consideration of these observations or states the reasons for not taking them into consideration. This means that the competent authority may issue an administrative act (building permit) regardless of the fact that there was a request in the opinion to refuse the permit. Nevertheless, the competent authority is required to reason why the request of the opinion was left dissatisfied. On the other hand, an approval is usually given by another state or local governmental body to the competent authority and it may be legally binding to the latter. Therefore, if the body giving an approval refuses to agree with the issuing of an administrative act, the competent authority is not allowed to issue the administrative act (permit). An approval is binding to the competent authority (local authority or TRA) if the approval is based on the law or on an administrative act, including general or detailed plan. Please note that according to spatial plans, the local government handling a request for a building permit is obligated to ask for the Ministry’s opinion. It is however, reasonable to conclude that the opinion referred to in explanatory memorandum point 3.3.1 of the county-wide spatial plans is to be interpreted as an approval and not an opinion as mentioned previously. Due to the fact that explanatory memorandum point 3.3.1 of the spatial plans states that the Railway Line Corridor must be kept free of all buildings, it is justified to argue that the Ministry’s opinion has to be considered as an approval as stipulated in the Building Code, otherwise it wouldn’t be possible to ensure the safety and the proper construction of the Railway Line. 18 SECTION 3: REGULATION IN ESTONIA According to IBCPA § 13 subsection 2, spatial plans concerning the selection of the corridor of linear construction works that run through the territory of several local authorities are regarded as national designated spatial plans within the meaning of the Planning Act. Since the Railway Line Corridor runs through several local authorities, the county-wide spatial plans for Harju, Rapla and Pärnu Counties are therefore considered as national designated spatial plans. According to the Planning Act § 27 subsection 1, the aim of a national designated spatial plan is to erect a construction work which has a significant spatial impact and whose chosen location or whose functioning elicits significant national or international interest. Therefore, the Railway Line has significant national and international interest, which means that the safety of the Railway Line has to be prioritized over other construction work. Also, Building Code § 42 subsection 7 point 1 obligates the competent building authority to ask for approval from the institution in whom the law vests competencies that are related to the subject matter of the application for building permit. According to the explanatory memorandum of the Building Code, the building of Utilities and railways is in the competence of the TRA and therefore the competent authority must ask for the TRA’s approval. In turn, the TRA is within the area of government of the Ministry. Since the county-wide spatial plans explanatory memorandum point 3.3.1 refer to the Ministry regarding building in the Railway Line Corridor, it must be understood that the Ministry’s opinion as stipulated must be considered as an approval according to the Building Code § 42 subsection 7 point 1. In other words: the opinion of the Ministry is to be considered as a binding approval. According to the Building Code § 42 subsection 9, if the institution whose approval (or opinion) is requested has not within ten days from receiving the proposal of the building permit refused to give the approval or opinion or applied for an extension of the time-limit, the proposal of the building permit is deemed to have been tacitly approved by the institution or the person or institution is deemed to have declined to express an opinion regarding the proposal, unless otherwise provided by law. Therefore, if the Ministry or the Client acting on the basis of the delegation agreement concluded with the Ministry wishes to express non-approval to the planned building the Ministry or the Client must inform the competent authority of its position within 10 days of the receipt of the relevant documents. For example: Company A wishes to build a pipeline in the Railway Line Corridor in Tallinn. The local authority in Tallinn begins the building permit proceedings and asks for the approval of the Ministry. The Ministry forwards the request with the design documents to the Client (as explained in part 3.3 of the Report). The Client notices that Company A wishes to build the pipeline 3 meters below surface. In order to ensure the safety of the railway, the Client wants the pipeline to be 10 meters below surface and maybe set other conditions as well. The Client will then send conditional approval to the local authority in Tallinn which basically states that the Client (on behalf of the Ministry) gives its approval to building the pipeline, if the design meets the requirements set by the Client. If Company A refuses to change the design plan accordingly, the local authority in Tallinn is obligated to refuse the permit since the approval/non-approval of the Ministry is binding on the local authority. 19 SECTION 3: REGULATION IN ESTONIA The rights of According to the Building Code Annex 1, the construction of most utilities in Estonia requires a building permit. Others require just a building the land notice. For example, a sewage treatment unit with a capacity below 5 m 3 per 24-hour day requires a building notice and building design owner documentation for construction but not a building permit. (situation after acquiring It shall be noted that the Estonian spatial plans are rather general regarding restrictions for the land use in the Railway Line Corridor and only the land) stipulate that (i) the area must be kept free from buildings and (ii) if a person was to apply for a building permit or submit a building permit, the building authority (TRA or local government) will ask for the Ministry’s opinion (interpreted in this Report as an approval in the meaning of the Building Code). It is our understanding that it is not impossible that there might be some Utilities or constructions that relate to the Utilities that the Client wishes to set the conditions to but which do not require a building permit/submission of building notice at all. However, if this is the case, it is not possible to set the terms to these. Also, we believe that it is rather unlikely that there are many such structures which would impose a danger to the Railway Line but do not require a permit or a notice. Most Utilities need the approval of a building authority – please see Annex 1 of the Building Code for a list of these: https://www.riigiteataja.ee/tolkelisa/5030/7201/8002/1.pdf#. The difference between building permits and notices is that with building permits, there is usually a proceeding where the competent authority either gives a permit or declines. Building notices are given to the competent authority to notify them of building work 10 days prior to commencement of the work. According to § 42 subsection 6 of the Building Code, if the application for a building permit is not submitted by the owner of the registered immovable named in the application, the competent authority invites that owner to join in the proceedings and, if necessary, also invites the owners of the adjacent registered immovables. Building Code § 36 subsection 5 specifies that where needed, the competent authority carries out a verification of whether, in relation to the construction work or building work stated in the building notice, it is necessary to involve the owner of the registered immovable or the owners of adjacent registered immovables (p 4). If the competent authority decides to involve the owner or the neighbour, the rules established in relation to building permits are to be observed according to subsection 6 of the same paragraph. The situation is the same, if the competent authority decides to involve another administrative organ (in this case, the Ministry). Therefore, it is obligatory to include the owner of the property in building permit proceedings. When submitting a building notice, the competent authority has the discretion to decide whether or not to include the owner. However, building notices are usually required mostly in cases where the utility is meant to be used by a single property or to connect the property to another utility and are therefore usually submitted by the owner of the property. Also, even though the Building Code doesn’t mention it specifically (as it was stipulated in the previous Building Act), construction work on a property is usually not allowed without the consent of the owner of the property. However, there are certain deviations from this rule, especially for utilities. According to the LOPA § 158 and § 1581, the owner of a property is required to tolerate: 20 SECTION 3: REGULATION IN ESTONIA 1) utility networks and utility works (heating, water supply or sewerage systems, electronic communications or power networks, weak current installations, gaseous fuel installations, electrical installations or pressure assemblies and construction works necessary for servicing thereof) to be built on the owner's immovable on the ground, in the earth and in the airspace if these are necessary for the intended use or management of other immovables, the building thereof is not possible without using the immovable or the building thereof at another location would cause excessive expense. 2) utility networks or utility works on the immovable of the owner and permit the building thereof on the immovable if the utility networks or utility works are required in the public interest and there is no other technically and economically more expedient possibility to connect to utility networks or utility works the consumption site of a person who wishes to connect to the utility networks or utility works or to develop the utility networks or utility works. In the case provided for in LOPA § 158 subsection 1, the owner of the immovable may demand from the owner of the other immovable encumbering of the immovable with a real servitude. In the case provided for in LOPA § 1581 subsection 1, compulsory possession may be established. However, LOPA § 158 1 subsection 2 states that a person shall not be subject to the obligation to tolerate, if the restriction arising from the utility networks or utility works to the owner of the immovable is significantly greater than the public interest in the utility networks or utility works or the interest of the person who wishes to connect to the utility network in connecting to the utility network and there is a possibility of building the utility network or utility works so that the owner of another immovable is not placed in an equivalent or worse situation. Therefore, even if the Beneficiaries or the states become owners of the properties in the Railway Line Corridor, it is not always possible for the property owner to forbid the construction of Utilities altogether if the owner of another immovable has to use the property to build utilities or if the utilities are needed in the public interest. Due to this, it is important for the Client to have the right to issue UR to third-parties even after the state becomes the owner of the land. However, it is stated in the county-wide spatial plans explanatory memorandum point 3.3.2 that whilst building the Railway Line, under the permission of the land owner or possessor, it is permitted to store building materials, move construction machines and use private roads. This would insinuate that during the building of the Railway Line, the construction is not permitted. Requirements According to the county-wide spatial plans explanatory memorandum point 3.3.3, after the Railway Line is built, the protection zone set by the surrounding the Railway Line will be regulated by the Building Code. According to the Building Code, the protection zone of a railway includes protection the ground underneath the railway and extends up to 30 metres from the centre of the railway track or from the centre of the outermost zone railway track in the case of multitrack railways and railway stations. In the protection zone of a railway, it is prohibited to endanger rail traffic (situation and to obstruct visibility on the railway. after the Railway Line has been built) 21 SECTION 3: REGULATION IN ESTONIA The owner of the registered immovable, where the protection zone is located, is obligated to tolerate the presence of a construction work belonging to another and within which the use of the registered immovable and operations on the registered immovable are restricted for the purposes of safety and of ensuring the functionality of the construction work. Therefore, due to the protection zone, it is possible to restrict construction after the Railway Line is built, even in cases where as a land owner, the state would not be able to stop others from constructing. Conclusion In conclusion, before and after the state acquires the land needed for the Railway Line and before building the Railway Line, it is not possible to restrict construction of Utilities in the Railway Line Corridor completely since the county-wide spatial plans state the possibility to build in the Railway Line Corridor and the LOPA § 158 and § 1581 obligate land owners to tolerate the building of Utilities on their property to an extent. However, pursuant to the county-wide spatial plans explanatory memorandum point 3.3.1, it is required to ask for the Ministry’s opinion which shall be interpreted as the Ministry’s approval as stipulated in the Building Code and this could give the opportunity to set binding rules to third persons who wish to construct Utilities in the Railway Line Corridor. The “opinion” as stated in the county-wide spatial plans explanatory memorandum is not the same as an opinion mentioned in the Building Code, because in order to achieve the aim of the county-wide spatial plan and ensure the construction of the Railway Line, which has a significant national and international importance, the Ministry has to be able to set binding conditions. Therefore, it is grounded to conclude that the word “opinion” must be interpreted as an approval as stipulated in the Building Code. 22 SECTION 3: REGULATION IN ESTONIA 3.2. Legal regulation for technical requirements of the UR Legal In Estonia, the Building Code is very general when it comes to specific requirements. It sets very general principles and principal requirements regulation for building work. According to the Building Code, construction works must be designed, built and maintained according to good practice (§7), construction works, building work, the use of construction works and any other operations related to building work must be safe and construction works, building work, the use of construction works and any other operations related to building work are safe if they do not pose a danger to humans, property or the environment (§ 8), they must be as environmentally sound as possible (§ 9) and the principle of professionalism must be followed in all activities (§ 10). Building work must be carried out according to building design documentation and in conformity with the requirements for construction works and the requirements for building work (§ 12 subsection 1). The minister responsible for the area may make regulations to establish requirements for building work (§ 12 subsection 5) or specify the requirements for construction works (§ 11 subsection 4). Next to the Building Code, there are other laws that regulate specific areas regarding building but usually these don’t set any specific parameters either. Mostly, the requirements for building are stipulated in regulations given by ministers (see point 5.2 of this Report) under the Building Code § 12 subsection 5, § 11 subsection 4 and relevant paragraphs in specific laws that give ministers or the government the right to set more specific requirements for building or construction works. Since the Client wishes to regulate the horizontal and vertical clearances between the railway tracks and railway infrastructure objects and different Utilities, it is important to note that these clearances are mostly set in EVS standards which we have not reviewed and also in regulations given by ministers or the government. As in Latvia, EVS are usually not mandatory in Estonia. There has been some confusion in court practice as to what the EVS actually is and where it belongs in our legal hierarchy. It is usually perceived as being part of good practice as stipulated in § 7 of the Building Code. At the same time, these standards are mostly considered non-mandatory unless specifically said so in law. This means that even if the standard is referenced in law, it is not mandatory unless the law stipulates, for example, that “when building this line, EVS XXX must be followed.” This means that in most cases, EVS is not binding and therefore it is possible to deviate from the rules set in these standards, especially if the Client wishes to set higher standards than those stipulated in EVS. Possibility to The regulations we have reviewed mostly set the minimal clearances between the Utilities and between the Utilities and other objects, also set stricter vertical clearances. In some situations, laws may stipulate maximum clearances (see 5.2). It is our opinion that stricter regulations for the regulations clearances between the Utilities and the railway infrastructure objects may be determined by the Ministry in the technical requirements issued for the construction of Utilities in the Railway Line Corridor, if the clearances are stated as minimal requirements. As mentioned in point 3.1 of this Report, the Ministry will issue technical requirements as part of their approval or as conditions for their approval (if the building design documents don’t meet the Ministry’s requirements, they don’t issue their approval). These requirements are issued to the competent authority due to the fact that the giving of approvals and opinions is between administrative organs, these are not issued by the Ministry to the person directly. The competent authority (local government or TRA) will then communicate with the person requesting the building permit or submitting the building notice and if they do not change their building design documents accordingly, the 23 SECTION 3: REGULATION IN ESTONIA competent authority has to deny their request for a permit because they will not get the Ministry’s approval. However, according to Estonian case-law, the non-approval must be based on law. Therefore, if the legislation sets minimal requirements, the technical requirements could set higher requirements in order to ensure the safety of the Railway Line, public security, other properties, human life and the environment. This could be done by referencing § 8 of the Building Code (principle of safety) and § 12 subsection 2 which says that the construction work that is being built and the building work, must conform to the restrictions and spatial plans. Since the county-wide spatial plans set the general principle that the area must be kept free from constructions, one could argue that it is proportional to have higher demands regarding the construction, since even allowing construction in the Railway Line Corridor is an exception. Also, even though the protection zone will be formed once the Railway Line has been built, whilst issuing stricter regulations, the Client or the Ministry could reference the protection zone regulation in Chapter 8 of the Building Code. In the protection zone, it is prohibited to endanger the construction work or any use of the construction work that follows established procedure (§ 70 subsection 2 point 1) and in the protection zone of a railway, it is prohibited to endanger rail traffic (§ 73 subsection 2). Even though the regulation regarding the protection zone is not applicable at this point, these provisions could be used to justify the higher demands because the end-goal is to construct a railway that is safe and not compromised due to Utilities that are built in a way that could harm the integrity of the railway. As mentioned in Latvia’s point 4.2 of this Report, in case of a court dispute, the Ministry/Client will have to be ready to provide reasonable justification for the stricter requirements. This justification should also be included in the technical requirements issued by the Ministry. As an additional suggestion, we believe stricter rules could be enforced if the UR would be somehow incorporated into Estonian legislation, by the Ministry’s regulation for example. As mentioned, it is possible for ministers to give out regulations under the Building Code. The Ministry could give out a regulation with stricter demands regarding Utilities for the Railway Line and annex the UR. This could give the Ministry or the Client the opportunity to reference this regulation whilst issuing technical conditions on a case-by-case basis. Conclusion The regulations we reviewed mostly set the minimal requirements for clearances which means that if well grounded, it would be possible to deviate from the requirements set in regulations and set stricter requirements with the Ministry’s approval/non-approval. 24 SECTION 3: REGULATION IN ESTONIA 3.3. Interaction procedures and documents to be issued Possible We have formed our opinion based on the information we have, which is that the right to give opinions which must be considered as approvals involvement according to the county-wide spatial plans explanatory memorandum point 3.3.1 has been given to the Ministry. forms of the As previously explained, the county-wide spatial plans oblige local governments and the TRA to ask for the opinion of the Ministry and not the Client in Client. Since it is the Client’s wish to be able to give technical conditions, we have looked at different possibilities in this situation. issuing the technical We have identified the following possibilities based on the Client’s request: requirements in the Railway 1) Change of legislation in a way that directly gives the Client the right to issue approvals and set technical requirements; Line Corridor 2) The Ministry delegates the right to give approvals to the Client with a delegation agreement and the competent authorities will ask for the Client’s approval directly; 3) The Ministry forwards the request for approval to the Client and the Client issues the technical requirements with the approval/non- approval directly to the competent authority on behalf of the Ministry based on a co-operation agreement. Change of Since the Client sees this as an optional alternative, we will not go into much detail but shortly explain our suggestions. legislation The Inter-Governmental Agreement was ratified with a legal act by the Estonian Parliament (Riigikogu) on 19.06.2017. Article 5 of the (option 1) agreement states that the Client is the project coordinator. Our plan was to make amendments to this legal act or add implementing provisions that would require competent authorities to ask for the approval of the Client whilst planning to build any construction in the Railway Line Corridor that requires a building design document, building notice or building permit. Also, as mentioned in point 3.2 of the Report, we would have suggested that the Ministry could give out a regulation under the Building Code with stricter demands regarding Utilities for the Railway Line and annex the UR which the Client could then reference while giving their approvals or non-approvals and setting the technical conditions. The reason we wanted to suggest the changes in legislation was to specify the terms of the Inter-Governmental Agreement and the CSA in order to ensure that it is clear to outside parties that the Client has certain rights according to these agreements. However, we understand that changing legislation takes a lot of time and would not be the best option for the Client which is why we have proposed other, non- legislative options which we believe will give the Client the opportunity to be directly involved in giving legally binding conditions to third parties without having to change legislation. As we will explain in option 3, the agreement between the Ministry and the Client will be sent to competent building authorities as well and thus setting these terms with legislation will not be necessary. The Client as We considered the possibility to replace the Ministry with the Client in the issuance process of the approval and technical requirements to the direct competent authorities. This could be possible via a delegation agreement. issuer based As explained in point 4.3 of the Latvian Report, the Inter-Governmental Agreement and the CSA shall be interpreted in a way that the Ministry on a has actually authorized the Client to determine the requirements for construction of the Utilities in the Railway Line Corridor. delegation agreement Differently from the Inter-Governmental Agreement however, the CSA has not been ratified by the Estonian parliament, which makes the (option 2) validity of the authorization given in the CSA problematic, taking into account the way delegation of public duties has been regulated in Estonia. Also, since the wording of these agreements is quite general, we believe an additional agreement to set more exact terms regarding 25 SECTION 3: REGULATION IN ESTONIA the issuing of UR is necessary. Therefore, the CSA is both vague and also not ratified as a legal act and could therefore be in violation with the Building Code. Disregarding the fact that the CSA has not been ratified, we believe it could be argued that with the CSA, the Ministry has given the Client the right to give approvals since it is the Client’s duty to procure the DTD. Thus, we considered the possibility for the Client and the Ministry to conclude a delegation agreement that would give the Client the right to communicate with competent authorities directly and give out approvals or non-approvals with technical conditions on the Client’s behalf. The problem with this approach is that According to the ACA, this type of power delegation can’t be done without following public procurement procedure. According to ACA § 3 subsection 1, a local government, another legal person in public law, a legal person in private law or a natural person may be authorised to perform an administrative duty of the state by law, by an administrative act issued on the basis of law or by a contract under public law entered into under the conditions and pursuant to the procedure provided for in this Act on the basis of law. ACA § 13 subsection 1 states that the entry into a contract under public law with a person to grant the person authority to perform an administrative duty shall be based on the conditions for awarding a public service contract and the procedure for organisation of public procurement provided for in the Public Procurement Act. Therefore, it is in our opinion not possible to authorize the Client to perform this public duty instead of the Ministry without following the procedure of public procurement. Thus, we believe it would legally be a safer option to have the requests for approvals go through the Ministry, who will forward these to the Client who will then issue the technical conditions on the Ministry’s behalf to the competent authorities which we will explain in the next section. The Client as Our proposal is to have the Client be the issuer of these conditions but the request will go through the Ministry and the Client will issue the the issuer on conditions on the Ministry’s, not the Client’s behalf. In order to do this, the Client and the Ministry will conclude an agreement in Estonia as behalf of the well, referencing the CSA and explicitly stating the Client’s right to submit approvals on the Ministry’s behalf. The content of the agreement Ministry based will be that the Ministry is obligated to send all requests to the Client immediately and the Client has the right to give these approvals directly on a co- to the competent authorities, on behalf of the Ministry. This will be called the co-operation agreement. To avoid confusion among local operation governments, this agreement will be sent to them as well, also the TRA. agreement In this case the competent authorities (local governments and TRA) would submit their approval requests to the Ministry. The competent (option 3) authorities will be notified of the fact that they will receive approvals and technical conditions straight from the Client. The Client would then issue the approval and the technical requirements to the competent authority directly on the Ministry’s behalf. The competent authority will then pass these on to the third parties who will have to adjust their documentation or they will not get the approval of the Client (the Ministry) and the competent authority can’t issue a permit or allow the third person to start building work (according to Building Code § 44 point 6, they must refuse to issue a permit). If the third party adjusts the building design documents according to the technical requirements, the competent authority may issue the permit. 26 SECTION 3: REGULATION IN ESTONIA We consider that this solution would be the most efficient as it ensures a direct communication between the Client and the competent authorities when issuing building permits to third parties whilst making sure that the requests go through the Ministry as stipulated in the county-wide spatial plans explanatory memorandum. Building The Client also wanted to know, what are the possibilities regarding building permits which have already been issued but where building hasn’t permits started yet. already issued According to Building Code § 46 subsection 2, the competent authority may revoke the building permit if: 1) the holder of the building permit or the owner of the registered immovable requests the corresponding revocation, except where other persons have a legitimate interest in the validity of the building permit, or 2) the construction work or building work does not conform to the building design documentation, the detailed spatial plan, the design specifications, a national or local special spatial plan, or the requirements for construction works or for building work. Therefore, once Estonian state acquires the land, the owner has the right to ask for a revocation. Also, it is possible to argue that the building work does not conform to the county-wide spatial plan (if, when issuing the permits, the Ministry was not consulted for example) or that the building work or construction interferes with the railway as it has been set in the county-wide spatial plans. Terms for The county-wide spatial plans stipulate that the local governments must adhere to the dates set in the Building Code when asking for opinions. issuing the According to the Building Code § 42 subsection 9, if the institution whose approval (or opinion) is requested has not within ten days from requirements receiving the proposal of the building permit refused to give the approval or opinion or applied for an extension of the time-limit, the proposal and validity of the building permit is deemed to have been tacitly approved by the institution or the person or institution is deemed to have declined to period of express an opinion regarding the proposal, unless otherwise provided by law. these requirements Therefore, the Client should give their approval and necessary conditions within 10 days after receiving the request from the competent authority. Since these requests will be sent to the Ministry, the Ministry must forward these to the Client immediately. It is also possible to ask for an extension, however the law doesn’t state the length of the extension. Since the time-limit in Latvia is 20 days, we believe it would be reasonable to ask for an extra 10-day extension. However, it must be noted that it is important to give the approval or non-approval within this timeframe or ask for an extension because if the Ministry or the Client doesn’t answer to the request, it will be considered approved, as previously mentioned. Building Code § 42 subsection 5 states that the competent authority issues the building permit within 30 days of the submission date of the application. However, this doesn’t include the time period where the third party has to modify their application (building design documentation). There is no time-limit for the validity period of the approval (nor the conditions given with the approval) according to the Building Code. However, a building permit is valid for five years and commencement of work according to a building notice must be started within 2 years. Therefore, it is not possible or necessary to set a term for the validity of the approval since it is not a final administrative act but a measure within an administrative proceeding. Considering the above, it is also our opinion that it is not necessary to set disclaimers in the conditions due to the fact that the administrative act (building permit for example) will be issued by the competent authority. 27 SECTION 3: REGULATION IN ESTONIA Involvement According to Building Code § 130, the right to exercise state supervision is given to local authorities and the TRA who have the right to verify in the further whether construction works or the building of construction works conforms to the requirements. The county-wide spatial plans don’t give the construction Ministry nor the Client the right to do so. process Therefore, it is not possible for the Client to be further directly involved in the construction process according to legal acts. However, since the building permit will only be given by the local governments or TRA as long as the third party changes the design documentation based on the technical conditions (otherwise the design will not get the Client’s/Ministry’s approval), this will become part of the building permit. If the local government or TRA discover that the third party has not built according to the requirements, the third party can be fined and it is possible to have the construction demolished. According to Building Code § 132 subsection 3, law enforcement agency decides on the demolition of the construction work above all if: 1) the construction work does not conform to the requirements for construction works, and the non-conformity entails a significant or heightened danger; 2) the unlawful building of the construction work has resulted in a permanent negative impact on the owner of the registered immovable or the owners of the adjacent registered immovable, and that impact is excessively burdensome and it is not possible to sufficiently avoid or alleviate it. The Client could also set a condition in the approval letter that the third party has to allow the Client to do on-site inspections and make sure the construction has been conducted according to the building design document. The Client is not able to fine the third party or have the construction demolished, however they may make a suggestion to the law enforcement agency to do so as explained above, if the grounds for demolition stipulated in Building Code § 132 subsection 3 or the building violations stipulated in §§ 134-140 become known to the Client. Documents In order to enforce the UR, the following documents need to be prepared: that need to 1) a co-operation agreement between the Client and the Ministry by which the Ministry authorizes the Client to give approvals along with be prepared technical conditions on the Ministry’s behalf as established in the county-wide spatial plans explanatory memorandum point 3.3.1; 2) a letter to all relevant competent authorities (local governments in the three counties, TRA) inviting them to take notice of the county- wide spatial plans explanatory memorandum point 3.3.1 and the co-operation agreement upon handling requests for permits and building notices in the Railway Line Corridor; 3) technical conditions under county-wide spatial plans explanatory memorandum point 3.3.1 on the Ministry’s behalf to relevant competent authorities. 28 SECTION 4: REGULATION IN LATVIA Section 4. Regulation in Latvia 29 SECTION 4: REGULATION IN LATVIA Summary of Section 4 Is it possible to enforce the UR in a manner that is binding to Is it possible to enforce the UR in a manner that is binding to third parties while the Client, the Implementing Bodies and the third parties with stricter technical requirements than currently Beneficiaries are not the owners of the land under the Railway stated in the laws and regulations? Line? It is possible to enforce the UR in a manner that is binding to third parties on a The Latvian Construction Regulations determine only minimal clearances case-by-case basis while the Client, the Implementing Bodies and the between the Utilities and between the Utilities and other objects (including Beneficiaries are not the owners of the land under the Railway Line. Each railway tracks). The laws and case-law are silent as to whether the issuer of allowed construction initiative within the ONI Territory (except the state or the technical regulations can determine stricter regulations by requesting municipal transport infrastructure of public use) is to be coordinated with the greater clearances between the Utilities and other objects. We consider that Ministry of Transport and the Ministry of Transport would issue requirements in case of a substantiated necessity stricter regulations for the clearances (conditions) for the construction of engineering structures and engineering networks (i.e., Utilities) within the ONI Territory. The construction initiator has between the Utilities and the Railway Line infrastructure objects may be to comply with the requirements issued by the Ministry of Transport. If the UR determined in the binding requirements issued by the competent institution are incorporated in the requirements for construction issued by the Ministry of to third parties for the construction of the Utilities in the ONI Territory. When Transport (or by the Client on behalf of the Ministry of Transport) for the determining the stricter requirements, the competent institution (i.e., the construction within the ONI Territory, the UR will become binding to the Client) must have reasonable justification for the need for such stricter respective third party who intends to build the Utilities in the ONI Territory. requirements. 30 SECTION 4: REGULATION IN LATVIA How shall the Client interact with the third parties, Beneficiaries, What documents shall be issued, to whom and when in order Implementing Bodies and other institutions to actually enforce to enforce the UR? the UR? In order to enforce the UR, several options (for more detail please see In order to enforce the UR, the following documents shall be issued: Section 4.3 below) of action were analysed and the following one found to 1) Preparation step 1: provisions included in the delegation agreement to be the most appropriate, clear and less risk involving. be concluded between the Client and the Ministry of Transport regarding Accordingly, the following actions should be taken by the Client: the fulfilment of the administrative tasks towards third parties 3) further negotiations with the Ministry of Transport and incorporation of established in Regulations 91 – without delay; the Client’s rights and duties to perform the tasks established in 2) Preparation step 2: a letter to all relevant construction authorities Regulations 91 (Clause 7, in particular, but other clauses, like 6, 8 and inviting to take notice of Regulations 91 and the concluded delegation 10 might also be included) towards the third parties in the delegation agreement when reviewing construction initiatives in the ONI Territory agreement; – without delay; 4) a letter to all relevant (inter alia – municipal) construction authorities 3) Implementation: issuance (on a case-by-case basis) of technical with the following main content subjects: (1) invitation to take notice requirements (conditions) under Regulations 91 to the relevant third of Regulations 91 when reviewing construction initiatives in the ONI parties within 20 days of the receipt of a respective request, review and Territory, (2) information about the concluded delegation agreement approval of the technical project of the respective Utility, inspection on and the authorization of the Client to issue the binding requirements site before commissioning of the Utility structure. under Regulations 91; (3) invitation to inform the Client about other significant construction initiatives in the territories adjacent to the ONI Territory; 5) upon the respective specific request from a third party received via the Ministry of Transport (or directly): issuance of the requirements (conditions) for the construction in the ONI Territory under Regulations 91 to the third party. 31 SECTION 4: REGULATION IN LATVIA 4.1. Binding effect of the UR towards third parties Requirements Pursuant to the general principle stipulated in the Construction Law (Article 15), a construction permit is issued only if the construction intention set by the has been agreed with the owner of the land and the owner of the structure in case the construction works are intended in an existing structure, land owner or the owner of the land has been informed in case it is requested by laws. (situation To agree or not to agree to a construction on the land is the land owner’s prerogative (except for specific situations prescribed by laws). Thus, after before agreeing to a construction, the land owner may determine the requirements for the particular construction, including horizontal and acquiring the vertical clearances between different objects. The clearances set by the land owner may not be smaller than the minimal clearances defined land) by Cabinet Regulations, however, they could exceed them. Additional After the construction of the Railway Line, the requirements set by the Protection Zone Law, Railway Law and Regulations 79 will apply to the requirements protection zones of the Railway Line. The general principle of the Protection Zone Law states that all legal persons and individuals shall comply in the with the lawful requirements of the respective object owner. In addition, Article 42(2)c of the Protection Zone Law states that it is prohibited protection to carry out any construction or ground digging and displacement work without coordination with the railway infrastructure manager. Pursuant zones of the to Article 17(1) of the Railway Law, legal and natural persons may carry on any type of activity within the railway right of way, only with the railway (after permission of and under the supervision of the railway infrastructure manager. Article 17(3) of the Railway Law states that any placement, construction relocation, and renovation of the Utilities in the railway right of way must not diminish the operational quality of the railway infrastructure of the facilities or traffic safety. Article 7 of Regulations 79 lists the objects the placement of which is allowed in the railway rights of way (electro Railway Line) transmission lines and objects, access roads and squares, household buildings, other objects if they do not affect the operation of the railway and the safety of the train movement). Considering the above, after the Railway Line is constructed, the manager of the Railway Line will be able to determine lawful requirements for the construction works in the protection zone (railway right of way) of the Railway Line, including horizontal and vertical clearances between Utilities and the Railway Line infrastructure objects. Obligation to Agreement with the land owner on a construction in general should be separated from the legal obligation to obtain technical requirements receive and from certain institutions and comply with them. The existence or non-existence of the land ownership does not directly affect the obligation to comply with receive technical requirements if such an obligation is provided for in the legislative acts. technical Pursuant to Regulations 500 (Article 15), the building authority shall request the initiator of the construction to receive technical and special requirements requirements (lat.val. – “tehniskos un īpašos noteikumus”) from the state institutions, if it is stated in the laws and regulations of the relevant (current field. If the construction concerns protective zones for exploitation of objects and engineering networks, the technical requirements of the situation, owners of the relevant objects and engineering networks should be received for the design. before the land is Regulations 500 (Article 13) also state that before filing a submission for intent to construct, the initiator of the construction has the right to acquired) receive the technical and special requirements of the institutions, if the laws and regulations of the relevant field determine such a necessity for technical requirements, and also to receive technical requirements for connection (disconnection) or crossing of engineering networks from the owners of engineering networks. 32 SECTION 4: REGULATION IN LATVIA Regulations 500 (Article 16) state that technical and special requirements of the state and local government institutions should be drawn up and issued within 20 days of the receipt of the request. The building authority, upon receipt of the technical project ascertains that a consent of the issuer of technical requirements has been received for the solutions of the building design approving that all requirements of the technical requirements, and, where necessary, the requirements for accessibility of the environment and insolation have been complied with (Article 74 of Regulations 500). (Therefore, it is important to keep the municipal construction authorities informed and reminded of the requirements of the Ministry of Transport necessary for construction within the ONI Territory.) Considering the above, under Latvian construction regulations, not only the land owner may determine requirements for construction, but also state and municipal institutions if provided so by the laws. If the intended object crosses or shall be connected to (or disconnected from) engineering networks, technical requirements shall also be received from the owners of the engineering networks. The construction initiator has to comply with the received technical and special requirements. The usual practice is that the issuers of the technical and special requirements also approve the technical design, confirming that the design complies with the issued requirements. The building authority is obliged to verify if the issuers of the technical requirements have approved the technical design. Thus, the technical and special requirements of the public institutions (and the owners of the engineering networks) are binding to third parties (construction initiators). The current Regulations 91 define conditions for the use of the ONI Territory during the design and construction phases of the Railway Line. Regulations role of the 91, among others, stipulate the following: Ministry of 1) only short-term structures (the exploitation term does not exceed 5 years) can be constructed in the ONI Territory. After the Transport determined exploitation period, the owner has to demolish the structure at their own cost (Article 4); 2) the use of the territory which has been lawfully commenced may continue, as well as subject to conditions of Article 4 (short-term use and demolition) the following uses are allowed: (1) agricultural activities; (2) objects for tourism, recreation and sports; (3) transport infrastructure objects; (4) vegetable gardens (Article 5); 3) the allowed construction initiatives, as well as the exploitation period of the structures shall be coordinated with the Ministry of Transport (Article 6); 4) in order to develop a land use planning project or in order to construct any engineering structures or engineering networks (i.e., the Utilities) in the ONI Territory, the conditions (lat.val. – “nosacījumi”) from the Ministry of Transport shall be received (Article 7). Considering the above, any allowed construction initiative in the ONI Territory shall be coordinated with the Ministry of Transport, currently the Ministry of Transport shall determine the exploitation period of the structures and issue the conditions for the Utilities in the ONI Territory. Although no uniform terminology is used in Regulations 500 and Regulations 91, we have reasonable grounds to believe that the term “conditions” in Regulations 91 is to be interpreted as “technical requirements” under Regulation 500. Therefore, further in this Report we refer to the conditions of the Ministry of Transport under Regulations 91 as “technical requirements” or “requirements” in the meaning of the construction process under Regulations 500. 33 SECTION 4: REGULATION IN LATVIA Exception Regulations 91 are not applied to territories where the state or municipal transport infrastructure of public use is located. As indicated in the related to explanatory note of Regulations 91, as the ONI Territory is crossed by many state and municipal transport objects (streets, roads, railway), the public development of these objects may not be restricted. Thus, the Ministry of Transport will not be directly involved under Regulations 91 in transport construction/reconstruction projects of state or municipal transport infrastructure of public use. Therefore, coordination between the Client, infrastructure municipalities and state institutions responsible for transport infrastructure of public use in the ONI Territory should be ensured in order to guarantee that the interests of the Project are respected in the development of the transport infrastructure of public use in the ONI Territory. Taking into account the principles laid down in the Inter-Governmental Agreement, we would suggest that the letters to be sent to the construction authorities of the municipalities whose territory is crossed by the Railway Line, draw attention to the need to coordinate, as far as possible, the development of public use transport infrastructure with the Client, taking into account the objectives of the Project and the international nature of the Project. Objects It shall be noted that some structures are exempted from municipal permission procedures and may be constructed and placed without which do not submission of any documents to the construction authority. However, pursuant to the special construction regulations, these are rather require insignificant objects (benches, open terraces, child playing devices, sports equipment, separate lanterns and lighting bodies, flag masts with a construction height of up to 12 m, garden fireplaces, street indication poles, road marks, free-standing waste tanks, fence and first group sports areas permissions (without engineering networks) outside the public outdoor and other similar objects) and usually do not include permanent Utilities. Conclusion Our conclusion is that it is possible to enforce the UR in a manner that is binding to third parties on a case-by-case basis while the Client, the Implementing Bodies and the Beneficiaries are not the owners of the land under the Railway Line. According to the current legislation, each allowed construction initiative within the ONI Territory (except the state or municipal transport infrastructure of public use) should be coordinated with the Ministry of Transport and the Ministry of Transport would issue the requirements for the construction of the Utilities in the ONI Territory. The construction initiator has to comply with the requirements issued by the Ministry of Transport. If the UR are incorporated in the requirements for construction issued by the Ministry of Transport for construction in the ONI Territory, the UR will become binding to the respective third party who intends to build the Utilities in the ONI Territory. Further in Section 3.3 of this Report additional mechanisms are considered for the Client to step in the shoes of the Ministry of Transport for issuing the above-mentioned requirements. 34 SECTION 4: REGULATION IN LATVIA 4.2. Legal regulation for the technical requirements of the UR Legal It is our understanding that the Client would like to regulate the horizontal and vertical clearances between the railway tracks and railway regulations infrastructure objects and different Utilities which may be placed near the Railway Line and related infrastructure objects or which may cross the Railway Line. The UR will include the technical requirements for the horizontal and vertical clearances when placing Utilities near or across the Railway Line. The UR will be binding to the Client’s contracting partners (used for designing the Utilities necessary for the operation of the Railway Line) and should become binding to the third parties who intend to construct Utilities near or across the Railway Line. The Construction Law contains the most important construction rules for the construction process in Latvia. More detailed construction rules are contained in Regulations 500 and in other Regulations approved by the Cabinet regarding each type of the structure (buildings, roads, railway, other engineering structures etc.). However, it is mainly the procedural rules that are established by the mentioned Cabinet Regulations. Technical requirements are usually included in the Latvian Construction Regulations (in Latvian – Latvijas būvnormatīvi) also approved by the Cabinet in the form of Cabinet Regulations. There are a number of Latvian Construction Regulations (currently there are 34 Latvian Construction Regulations in force), however, only some of these relate to the Utilities. Latvian Construction Regulations LBN 008-14 “Layout of engineering networks”, which are issued as Cabinet Regulations 574, determine the minimal horizontal and vertical clearances between different Utilities and other objects. Regulations 574 shall be taken into account (1) in drawing up technical requirements and special regulations for construction projects, as well as in issuing a construction permit with the conditions contained therein; (2) in developing construction projects and technical schemes; (3) in carrying out the construction and installation of the Utilities. We have reviewed also other Latvian Construction Regulations determining technical requirements for the design and construction of the Utilities (Regulations No.328, No.335, No.341, No.329, No.327 and No.326 – please see sub-section 6.1 for details). Some of the mentioned Regulations (for example, No. 326 and No.341) contain additional requirements for minimal clearances in respect of the railway objects, and the others refer to Regulations 574 directly or indirectly. Additional technical requirements for structures are set by the Latvian State Standards (LVS). The application of the LVS is on a voluntary basis unless the Cabinet Regulations determine the application thereof as mandatory. Please note that for the purposes of this Report, we have not reviewed the LVS possibly regulating the clearances between the Utilities and the Utilities and other objects. It shall be also noted that in respect of design and construction of electric lines Latvian Electric Energy Standards exist (http://www.lekenergo.lv/) approved by the Latvian Association of Electric Energy Designers and Constructors. Some of the standards contain requirements for the minimal vertical and horizontal clearances between the electric lines and the railway infrastructure objects (for example, the standard LEK 015, Section 13.5, http://www.lekenergo.lv/sites/default/files/lek_015.pdf). The legal status of the Latvian Electric Energy Standards is unclear as they are not mentioned in the laws or Cabinet Regulations but are widely used in practice by the engineers of electric energy objects. We have not found that the application of these standards would be mandatory. Pursuant to Article 137 of Regulations 240, the local municipalities may determine the clearances between structures in the Spatial Plans. However, as the clearances between the Utilities and between the Utilities and other objects are already regulated by Regulations 574, the municipalities tend to determine only the distances between different buildings in their Spatial Plans. We have examined the Spatial Plans of the relevant 15 municipalities at general level (no detailed review was conducted) and we have found that the majority of the municipalities 35 SECTION 4: REGULATION IN LATVIA has not determined the clearances between the Utilities and between the Utilities and other objects. We have found that Ropazu district municipality has determined some horizontal clearances between Utilities and foundations of buildings and structures in Article 4.24.6 of the local Regulations on the Construction and Use of the Territory (adopted in 2006). Section 6.13.4 of Olaines district Regulations on the Construction and Use of the Territory (adopted in 2008) contains a reference to Cabinet Regulations regarding clearances between the Utilities that are not in force any more. Considering the above, we conclude that in general the municipalities have acknowledged that the clearances between the Utilities and the Utilities and other objects is the competence of the Cabinet of Ministers. In any case, if a conflict occurred between the Spatial Plans and the Cabinet Regulations in respect of the distances between the Utilities and other objects, the Cabinet Regulations prevailed as acts of higher legal force. No regulation It shall be noted that in Regulations 574 only the clearances between the Utilities and 1520 mm and 750 mm gauge railway tracks are for clearances regulated. However, there are reasonable grounds to believe that, if necessary, the same minimal clearances may be used in order to between the determine the technical requirements for the clearances between the Utilities and the Railway Line. Pursuant to the Administrative Procedure Utilities and Law (Article 17(2)), if an institution finds a gap in the system of law, it may rectify it by using the method of analogy, that is, by a systematic European analysis of the legal regulation of similar cases and by applying the principles of law determined as a result of this analysis to the particular gauge railway case. Thus, the clearances indicated in Regulations 574 may be used in order to determine and set the minimal clearances in the UR. On the other hand, the fact that only the clearances between the Utilities and 1520 mm and 750 mm gauge railway tracks are regulated, may be used as substantiation for the clearances in respect of the European standard gauge railway to be even greater if the necessary reasonable justification exists. The Client should also consider to commence communication with the Ministry of Economy to discuss the necessity for amendments to the Regulations 574 in relation to the clearances between the Utilities and the European gauge (1435 mm) railway with the aim to avoid disputes at the later stages of the implementation of the Project. Possibility to Regulations 574 and other Latvian Construction Regulations determine only minimal clearances between the Utilities and between the Utilities set stricter and other objects (including 1520 mm and 750 mm gauge railway tracks). The laws and case-law are silent as to whether the issuer of the regulations technical requirements can determine stricter requirements by requesting greater clearances between the Utilities and other objects. We have informally contacted the Ministry of Economy and their first view was that the technical requirements shall comply with all applicable regulations and therefore the issuer of technical requirements would not be entitled to determine stricter requirements than required by Cabinet Regulations. In the opinion of the Ministry of Economy, Regulations 574 protect also the interests of the Utility developers (managers) and therefore Regulations 574 should be followed by the issuers of technical requirements - stricter requirements could be determined only if mutually agreed with the respective third party. However, the Ministry of Economy did not exclude that, if required to ensure the essential requirements for a structure (as defined in Article 9 of the Construction Law), deviations from the minimal clearances by requesting greater clearances would be substantiated. A general advice was given to consult with the industry organizations and the Ministry of Transport in order to identify whether more stringent requirements can be set by means of interpretation of the existing framework or whether legislative amendments are necessary. We are of the opinion that in case of a substantiated necessity, stricter regulations for the clearances between the Utilities and the Railway Line infrastructure objects may be determined by the competent institution with the technical requirements issued for the 36 SECTION 4: REGULATION IN LATVIA construction of the Utilities in the ONI Territory. However, the competent institution, if requested (e.g., in case of a dispute), should be able to provide reasonable justification for the necessity to determine stricter regulations in respect of the clearances to be respected by third parties. In any case, the competent institution could not require clearances between the Utilities and between the Utilities and Railway Line objects that are unreasonable or for which any justification is missing. Reasonable Neither the laws nor the available case-law contain any indication or guidance of whether and what kind of justification should be available to justification impose stricter requirements in respect of the clearances between the Utilities and between the Utilities and other railway infrastructure for stricter objects. requirements We consider that the following considerations could be taken into account when determining the existence of reasonable justification for stricter technical requirements for construction of the Utilities in the ONI Territory: 1) Article 3 of Regulations 574 pursuant to which the location of engineering networks (the Utilities) in the territory shall be planned in such a way as to comply with the requirements of the Construction Law, as well as to ensure the quality of the environment, the rational use of the territory, energy and natural resources and the availability of the environment. 2) Article 12 of Regulations 574 pursuant to which it is prohibited to place all types of Utilities in the railway substructure (“dzelzceļa zemes klātnē”), except for technological communications of the railway. 3) Essential requirements for a structure (in this case – the Railway Line) in accordance with Article 9 of the Construction Law - mechanical strength and stability, fire safety, environmental protection and hygiene, including harmlessness, safety of use and accessibility of the environment, acoustics (noise protection), energy efficiency, sustainable use of natural resources. 4) Article 17(3) of the Railway Law pursuant to which any placement, relocation, and renovation of the Utilities in the railway right of way must not diminish the operational quality of the railway infrastructure facilities or traffic safety. 5) Impacts of vibration, maintenance requirements, possible consequences of an accident (damage or collapse of the respective Utility); 6) Any available international best practice for placement of the Utilities in the railway right of way of European gauge railway. 7) Any available technical expertise and expert’s suggestions for the horizontal and vertical clearances of the Utilities to be placed in the ONI Territory. 8) The regulatory framework contained in the Protection Zone Law as a guideline, which, among others, states that it is prohibited in the protection zones along railroads: (1) to perform activities that will result in the visibility of the railroad being decreased or covering with snow being increased; (2) to perform activities as a result of which the hydrological conditions in the railroad protection zone may deteriorate or the functioning of the amelioration systems and structures of the protection zone and adjacent to it or crossing it may be disturbed; (3) to perform any building or ground digging and displacement works without co-ordination with the manager of the railway infrastructure; (4) to block service roads and accesses to the servicing objects of the railway. Although the protection zone regulation is directly applicable after the object (railroads) has been constructed, it may as well assist in finding justification for determining stricter requirements for the clearances in the designing stage of the Railway Line. 37 SECTION 4: REGULATION IN LATVIA In addition, please note that we did not succeed in finding any court judgements where a dispute over the clearances between the Utilities and between the Utilities and other structures would have been reviewed. Therefore, we conclude that there is currently no sustainable case- law in Latvia on the issues concerned. Risks related Although the technical requirements issued by the competent institutions are not final administrative acts within the meaning of the to disputes Administrative Procedure Law, pursuant to the case-law example (the Supreme Court’s decision of 13 October 2009 in administrative case No. A42459807, SKA – 624/2009) the technical requirements might be disputed before the administrative courts if substantial addressee’s rights are infringed. Considering the above, a sufficient justification should be in place for determining stricter requirements for clearances as, in case of a court dispute, the Ministry of Transport (or the Client) would have to be able to provide reasonable justification for the stricter requirements. Consultations The option to consult the industry organizations could be considered to obtain the views of the largest Utility owners and administrators. The with the NGO “Inženierkomunikāciju turētāju Sadarbības Padome” (Cooperation Council of Utility Administrators) was indicated by the Ministry of industry Economy as the most prominent NGO to consult with. organizations Preparation of amendments to the legislative regulation (Regulations 79 or Regulations 574) in cooperation with the Ministry of Transport and and legislative the Ministry of Economy could also be considered to implement the UR in the legislative acts as special requirements for the European gauge changes railway and thus avoid the potential disputes over the interpretation of the existing legal framework. Conclusion The laws and case-law are silent as to whether the issuer of the technical regulations can determine stricter regulations by requesting greater clearances between the Utilities and other objects. We consider that in case of a substantiated necessity stricter regulations for the clearances between the Utilities and the Railway Line infrastructure objects may be determined in the binding requirements issued by the competent institution to third parties for the construction of the Utilities in the ONI Territory. When determining the stricter requirements, the competent institution (i.e., the Client) must have reasonable justification for the need for such stricter requirements. 38 SECTION 4: REGULATION IN LATVIA 4.3. Interaction procedures and documents to be issued Role of the As indicated in the previous sections of the Report, according to the current provisions, the Ministry of Transport is the competent institution Ministry of in Latvia which may issue requirements for the construction of the Utilities in the ONI Territory. The competence of the Ministry is established Transport by the Regulations 91, Article 7 and by the Land Management Law. Pursuant to Article 5(4) of the Land Management Law, in the territories necessary for the development of technical public infrastructure, in coordination with the institution which has proposed to reserve these territories, it is allowed to carry out activities that would not make it difficult to implement the intended public infrastructure project. In order to coordinate the intended activity, the owner, legal possessor or the user of the real estate shall apply to the respective institution informing about the intended activity. As the Ministry of Transport is the institution which proposed to reserve the territories necessary for the Railway Line as a result of which Order 467, Order 468 and Regulations 91 were adopted, the Ministry of Transport is appointed by the Land Management Law and Regulations 91 as the competent institution which currently shall coordinate construction initiatives in the ONI Territory and issue binding requirements to third parties. Possible We have considered the possible forms of Client’s involvement in issuing the technical requirements for third parties for the construction of involvement the Utilities in the ONI Territory. We have identified the following four options for the involvement of the Client: forms of the 1. Current situation – soft involvement (option 1): The Ministry of Transport issues the technical requirements by itself, but they are Client in based on the UR prepared by the Client. The Client has no direct or guaranteed impact on drafting the specific case-by-case based issuing the technical requirements. From the practical point of view, we understand that this option is unfit as the Ministry of Transport lacks the technical knowledge and capacity for issuing the technical requirements and evaluating the technical aspects and risks of each construction initiative requirements in the ONI Territory. Considering the above, we do not analyse this option in detail for the purposes of this Report. in the ONI Territory 2. Agreement with Ministry of Transport – invisible involvement (option 2): In case the legal and contractual framework remains unchanged, the technical requirements can be prepared by the Client and incorporated in the response letter of the Ministry of Transport to the respective third party or a copy of the technical requirements prepared by the Client can be enclosed to the response letter of the Ministry of Transport to the respective third party. The relations between the Ministry of Transport and the Client would remain unclear and unstable, i.e., based upon oral agreement or mutual understanding. It would also create a risk of lacking terms for the issuance of the technical requirements due to internal and the Ministry-Client procedures, since the final answer to the third party would still have to fit into the 20-day term. 3. Delegation by an agreement – direct involvement (option 3): The Ministry of Transport remains the authorised institution indicated in Regulations 91, but it enters into a delegation agreement (or the currently drafted delegation agreement is supplemented with the respective clauses) with the Client, delegating to the Client the task to issue technical requirements (and/or execute other tasks under the Regulations 91). Particular procedure would afterwards be the following: the Ministry of Transport forwards the request of the third party to the Client and the Client issues the technical requirements directly to the third party instead of the Ministry of Transport based on the delegation agreement. The third party may also file the request directly to the Client. 4. Delegation by Regulations 91 – direct indication (option 4): It is also possible to consider amendments to Regulations 91 to be adopted replacing the Ministry of Transport in all or some of the articles of Regulations 91 with the Client. In this case the technical requirements would be requested directly from the Client and the Client would issue the requirements directly to third parties without any 39 SECTION 4: REGULATION IN LATVIA mandatory involvement of the Ministry of Transport. However, we do not further analyse this possibility due to: (1) the Client’s instructions for seeking solutions that would remain within the current legal framework; (2) the time and effort consuming procedure for amending the Regulations 91; (3) a direct delegation to the Client incorporated in the Cabinet Regulations would not correspond to the best public task delegation practise.1 The Ministry of Having analysed the Inter-Governmental Agreement and the CSA, we are of the opinion that the Ministry of Transport has actually authorized Transport as the Client to determine the requirements for construction of the Utilities in the ONI Territory as this is a necessary part of the Client’s tasks the issuer in its role of “the project coordinator” and part of “the preparatory activities” under the Inter-Governmental Agreement. The Inter- based on the Governmental Agreement states that common technical guidelines for design and construction of the railway shall be established (Article 4(3)) information and that the preparatory activities and the construction of the railway until its completion and achieving full technical functionality shall be provided by coordinated by the project coordinator (Article 5). Also, under the CSA the Client as the Central Purchasing Body is authorized to procure the Client Design Guidelines, the CPTD, the Master Design and the DTD (Clause 3.1.2(a)). In order to enable the Client to procure the DTD, all the (option 2) Beneficiaries including the Ministry of Transport have authorized the Client to represent that Beneficiary in relation with any state or municipality institutions, natural persons or legal entities, with the right to sign, submit, and receive all the documents and ensure all the activities necessary and related to the preparation of the DTD (Clause 3.2.3(a)), as well as to perform other activities related to the performance of the given task (Clause 3.1.2(b)). There are no reasonable doubts that in order to prepare the DTD: (1) the necessary information regarding the existing and planned Utilities in the ONI Territory shall be collected and analysed; and (2) unified design guidelines for the Utilities servicing the Railway Line shall be in place to ensure its interoperability. No reasonable doubts exist that “the preparatory activities” under the Inter-Governmental Agreement and the CSA should include also the right of the Client to provide guidance to third parties on construction in the ONI Territory (although it is not directly (expressis verbis) indicated in the above documents), taking into account that the Client (and not the Ministry of Transport) is the entity who possesses all the technical information regarding the Railway Line. Considering the above, we are of the opinion that the Ministry of Transport should be obliged to respect the competence of the Client in determining binding requirements to third parties in respect of the placement of the Utilities in the ONI Territory on case-by case basis. Each time when the Ministry of Transport received a request to issue technical requirements under Regulations 91, the Ministry should inform the Client and request technical requirements from the Client, as well as forward the Client’s technical requirements to the respective third party. The technical requirements would be prepared by the Client and incorporated in the response letter of the Ministry of Transport to the respective third party or a copy of the technical requirements prepared by the Client could be enclosed to the response letter of the Ministry of Transport to the respective third party. In order to specify the mutual understanding of the competences under the Inter-Governmental Agreement and the CSA in the conventional order, for this scenario, it would be advisable that an agreement on cooperation is concluded between the Client and the Ministry of Transport 1 For more detail, please see page 188, Gala ziņojums: Valsts pārvaldes uzdevumu nodošanas analīze un rekomendācijas, available: https://www.tm.gov.lv/files/archieve/lv_jaunumi_1.pdf 40 SECTION 4: REGULATION IN LATVIA establishing the obligation of the Ministry to forward all respective requests under Regulation 91 to the Client and to incorporate all the requirements of the Client into the requirements and other consents issued by the Ministry of Transport to third parties. We understand that this scenario is currently being applied in respect of the requests by third parties under Regulations 91, having no specific agreement to cover mutual procedures and liabilities. However, we do not consider this being an optimal and reliable scenario for future as it involves a lengthy exchange of information and does not precisely envisage the role of the Client in the further process of the construction of the Utilities in the ONI Territory. The Client as The replacement of the Ministry of Transport with the Client in the issuance process of the technical requirements to third parties is possible the direct via a delegation agreement. Pursuant to the State Administration Structure Law, a public administration task may be delegated to a private issuer based individual by a regulatory enactment or a contract, if it is provided for in a regulatory enactment. In addition, the issuance of administrative on a acts may not be delegated to private persons, except cases when it is provided for in a regulatory enactment. delegation Although we believe that pursuant to the Inter-Governmental Agreement and the CSA the Ministry of Transport has actually authorized the agreement Client to determine the requirements for construction of the Utilities in the ONI Territory, the Client’s status versus third parties in the meaning (option 3) of the State Administration Structure Law in respect of determining binding requirements towards third parties should be precisely stipulated. We have carefully evaluated the mentioned documents and are of the opinion that they may imply that the intent of the Ministry of Transport in the above agreements was to delegate its administrative tasks towards third parties to the Client, however, it is advisable that this intent is supported by additional legal instruments in order to avoid situations in which third parties and the involved institutions unjustifiably question the authorisation of the Client. In addition, as the technical requirements to be issued by the Ministry of Transport may be disputed before administrative courts, they could be compared to administrative acts to some extent and therefore the delegation for the issuance thereof to the Client would require a clear statement in regulatory enactments (in the Inter-Governmental Agreement, Regulations 91 or elsewhere). However, in accordance with the statutes of the Ministry of Transport (issued as Cabinet Regulations No.242 on 29 April 2003), the Ministry coordinates the implementation of the Rail Baltica state public infrastructure project until the implementation of the project and, by concluding delegation agreements with the limited liability company “Eiropas dzelzceļa līnijas” and the joint stock company “RB Rail”, delegates to them the organization of the development (latv.val. – “izveide”) of the infrastructure (Article 5.25). The above article in the statutes of the Ministry of Transport were amended and put in the current wording with the direct intent of the Ministry of Transport to facilitate and give legal ground within the external legal enactment for the Ministry to enter into a delegation agreement. Such a delegation agreement could, inter alia, include a delegation for the Client to issue the technical requirements to third parties and perform other tasks under Regulations 91. In this case the third parties would submit their requests under Regulations 91 to the Ministry of Transport or directly to the Client. The Ministry would then forward them to the Client with a copy to the respective third party and with the indication that pursuant to the delegation agreement the technical requirements will be issued by the Client. The Client would then issue the technical requirements to the third party directly. We consider that this solution would be the most efficient as it ensures a direct communication between the Client and third parties and ensures the involvement (if necessary) of the Client in further construction stages of the Utilities in the ONI Territory. 41 SECTION 4: REGULATION IN LATVIA Terms for Regulations 91 do not contain any term for issuance of the requirements for the construction of Utilities in the ONI Territory. issuing the Pursuant to Article 16 of Regulations 500, the technical and special regulations of the state and municipal institutions shall be prepared and technical issued within 20 days of the receipt of the request. requirements Pursuant to Article 5(4) of the Land Management Law, in order to coordinate the intended activity, the owner (or the legal possessor or the user) of the real estate applies to the competent institution informing about the intended activity. If the institution has not sent a refusal to initiate the proposed activity within one month or has not requested additional information, the institution shall be deemed to have coordinated the action. Considering the above, the requirements to third parties for the construction in the ONI Territory should be issued within 20 days of the receipt of a respective request. If no requirements are issued within one month, the third party may consider the activity as approved by the competent institution. Involvement Pursuant to Article 74 of Regulations 500, upon receipt of the documents specified in the construction permit confirming the fulfilment of the in the further design conditions, the construction authority verifies that the technical design complies with the spatial planning documents, all necessary construction sections have been developed for the construction project, and the consent of the issuers of the technical requirements to the technical design process of solutions has been received, confirming that the technical design complies with all the technical requirements and, if necessary, environmental Utilities in the accessibility and insolation requirements. ONI Territory It may be concluded from the above, that the issuer of the technical requirements for the construction of the Utilities in the ONI Territory may request that the technical design for the Utilities is approved by the issuer of the technical requirements. For the approval of the submitted technical design the 30-day term would apply. If the compliance with the technical requirements is not possible, the deviations should be approved by the respective issuer of the technical requirements. Depending on the type of the Utility to be constructed in the ONI Territory and depending on the construction regulations applicable in each particular case, the issuer of the technical requirements may also be requested (within 14 days or within 10 working days depending on the particular Utility) to issue an opinion on the readiness of the structure for operation, its compliance with the technical requirements and requirements of regulatory enactments. This means that actually the issuer of the technical requirements is entitled to inspect the structure and refuse to issue its positive opinion in case the structure has not been constructed in accordance with the issued technical requirements. In case of a refusal, the structure will not be commissioned as positive opinions have to be submitted to the construction authority before commissioning of the structure. From the above we conclude that the issuer of the technical requirements will not only issue the requirements to third parties but may also request that the technical design for the Utilities is submitted for review and approval, as well as may participate in the commissioning of the structure (depending on the type of the respective Utility). All derogations from the technical requirements shall also be submitted for approval to the issuer of the technical requirements. 42 SECTION 4: REGULATION IN LATVIA Role of Construction permits are usually issued by the construction authorities of the municipalities except for specific structures (e.g. railroads, construction roads) in respect of which the role of the construction authority is conferred upon other institutions. The construction authority should indicate authorities in the construction permit’s conditions the state institutions from which technical requirements should be received. Thus, when issuing the construction permits for the construction of the Utilities in the ONI Territory, the construction authority should indicate in the construction permit that the technical requirements from the Client are to be received pursuant to Regulations 91. In order to remind the municipal and other construction authorities of the importance of this aspect, a letter could be sent to all relevant construction authorities drawing their attention to Regulations 91 and the obligation to include the Client in the list of the issuers of the technical requirements in the construction permits for structures in the ONI Territory. The letter should also invite the municipal and other construction authorities to maintain active communication with the Client in order to follow possible changes to the Railway Line alignment, and also to invite the municipal and other construction authorities to inform the Client of any significant construction intentions in the area adjacent to the Railway Line, so that, if necessary, the Client could address the Ministry of Transport with a request to exercise the rights provided for in Article 5(5) of the Land Management Law (if the Ministry considers that these rights can be exercised in respect of the lands outside the ONI Territory). Validity term No validity term for the technical requirements to be issued by the Ministry of Transport is indicated in Regulations 91. For comparison, the and other validity term of the technical requirements issued by the State Environment Service is 5 years. The validity term of the technical requirements conditions of issued by the JSC “Latvijas dzelzceļš” (Latvian railway) is 1 year with a prolongation option. the technical Thus, a reasonable validity term should be indicated in the technical requirements issued under Regulations 91, as well as the obligation to requirements submit the technical design for the approval to the issuer of the technical requirements. Documents to Considering the above analysis, we suggest that the following documents are prepared and issued: be issued 1) provisions included in the delegation agreement to be concluded between the Client and the Ministry of Transport regarding the fulfilment of the administrative tasks towards third parties established in Regulations 91 – without delay; 2) a letter to all relevant construction authorities inviting to take notice of Regulations 91 when reviewing construction initiatives in the ONI Territory – without delay; 3) a template for the technical requirements (to the extent possible considering the case-by-case approach to each construction initiative). Utilities We note that the possibility to control the construction of the Utilities via the technical requirements relates only to the ONI Territory. If any outside the Utilities are constructed outside the ONI Territory no technical requirements should be received from the Ministry of the Transport. Thus, ONI Territory neither the Client nor the Ministry of Transport may directly determine requirements for the Utilities and other structures to be built outside the current ONI Territory even in case the Changes in the alignment of the Railway Line are identified. Only after the inclusion of the respective additional territories in the ONI Territory, Regulations 91 will apply. In case additional territories necessary for the construction of the Railway Line have been identified by the Client but not yet included in the ONI Territory and any Utilities are constructed in that territory that will significantly burden the construction of the Railway Line, the measure provided for in Article 5(5) of the Land Management Law could be considered for application by the Ministry of Transport. Pursuant to the 43 SECTION 4: REGULATION IN LATVIA mentioned regulation, the competent institution may make a reasoned decision which prohibits to continue the commenced use of a real estate object for the construction, if the real estate object in accordance with the construction project in a minimum composition or the technical design, or an administrative act issued by the Cabinet or by a municipality will be expropriated for the needs of the society and the commenced use of the real estate burdens the implementation of the infrastructure project or substantially increases possible additional costs. 44 SECTION 5: REGULATION IN LITHUANIA Section 5. Regulation in Lithuania 45 SECTION 5: REGULATION IN LITHUANIA Summary of Section 5 Is it possible to enforce the UR in a manner that is binding to Is it possible to enforce the UR in a manner that is binding to third parties while the Client, the Implementing Bodies and the third parties with stricter technical requirements than currently Beneficiaries are not the owners of the land under the Railway stated in the laws and regulations? Line? It may be possible to enforce the UR in a manner that is binding to third parties The Lithuanian legal acts determine only minimal clearances between the on a case-by-case basis while the Client, the Implementing Bodies and the Utilities and between the Utilities and other objects (including railway Beneficiaries are not the owners of the land under the Railway Line once the tracks). The laws and case-law are silent as to whether the issuer of the special land condition – railway protection zone - is registered in the Register of technical conditions can determine stricter requirements by requesting Real Estate. greater clearances between the Utilities and other objects. However, it may Each allowed construction initiative within railway protection zone shall be be considered that stricter requirements could be determined in the coordinated with the Client on behalf of AB Lietuvos geležinkeliai and on the technical conditions / requirements on case-by-case basis issued by basis of a cooperation agreement by issuing the written consent for the competent subject for construction of Utilities in the railway protection zone, construction of Utilities in railway protection zone (please see section 5.3. for given that reasonable justification of the need for such stricter requirements detailed analysis). If the UR are incorporated in the requirements issued for is in place. construction in the railway protection zone, the UR should become binding to the respective third party who intends to build Utilities in the railway protection zone. Please see the comments regarding the possibility to set stricter clearances in the UR than established in Lithuanian legal acts in 5.2. 46 SECTION 5: REGULATION IN LITHUANIA How shall the Client interact with the third parties, Beneficiaries, What documents shall be issued, to whom and when in order Implementing Bodies and other institutions to actually enforce to enforce the UR? the UR? In order to enforce the UR, several options (for more detail please see Section 1) Preparation step 1: an agreement between the Client and AB Lietuvos 5.3 below) of action were analysed and the following one found to be the most geležinkeliai which would clearly stipulate the Client’s authorisations to preferable by the Client. perform actions in relation to construction initiatives in the railway protection zone of the Railway Line (as well as to participate in further Accordingly, if the Client chooses the option to issue written consent for stages of implementation of Utilities construction – issue design construction in the railway protection zone of the Railway Line directly to third approvals, visit the site, participate in Utilities commissioning parties (option 3) the following actions should be taken by the Client: procedures, etc.) and define the interaction process between the parties 1. further negotiations with AB Lietuvos geležinkeliai and incorporation of - without delay; the Client’s authorisations towards the third parties in the agreement; 2) Preparation step 2: a letter to all municipal and other relevant authorities participating in approving / supervising design and 2. a letter to all municipal and other relevant authorities participating in construction of Utilities within the territories crossed by the Railway Line approving / supervising design and construction of Utilities within the inviting them to take notice of the Inter – Governmental Agreement, territories crossed by the Railway Line inviting them to take notice of the CSA and the agreement between the Client and AB Lietuvos Inter – Governmental Agreement, CSA and the agreement between the geležinkeliai and drawing attention to the necessity to coordinate any Client and AB Lietuvos geležinkeliai (if concluded) and drawing attention construction initiatives within the railway protection zones of the to the necessity to coordinate any construction initiatives within the Railway Line – without delay. railway protection zones of the Railway Line; 3) Implementation: issuance (on a case-by-case basis) of consents, 3. upon the respective request from a third party received via AB Lietuvos including technical conditions / requirements, to the interested third geležinkeliai - issuance of the consent to the third party by the Client in parties by the Client in the name and on behalf of AB Lietuvos the name and on behalf of AB Lietuvos geležinkeliai. geležinkeliai. 47 SECTION 5: REGULATION IN LITHUANIA 5.1. Binding effect of the UR towards third parties Requirements Obligation to obtain technical requirements and design approvals for design and In Lithuania the planned Railway Line corridor and railway protection zones of the Railway Line have been established under the Special Plan. construction According to the Land Law the railway protection zones established for a particular land plot shall apply once they are registered with the set by public Real Estate Register. The railway protection zones of the Railway Line have been registered to certain land plots which are to be expropriated institutions and under the Decision on Special Plan (please find more details below). other subjects Pursuant to the CTR Construction Permitting Documents, if the designed structure falls into the protection zones of other structures, it is required to obtain the written approvals of the design, issued by the owners / managers of the structures, for which benefit the protection zones were established, before applying for the construction permitting document. If the Utilities are designed in the railway protection zone, it is required to obtain written consent of the public railway infrastructure manager (AB Lietuvos geležinkeliai). Prior to applying for the construction permitting document, it is required to obtain a written approval of the design by AB Lietuvos geležinkeliai, being the manager of the structures, for which benefit the protection zones were established, also by the Lithuanian Transport Safety Authority (the LTSA). Before issuing its approval of the design AB Lietuvos geležinkeliai and the Lithuanian Transport Safety Authority verifies if the required consent of AB Lietuvos geležinkeliai is obtained and whether the requirements issued by the AB Lietuvos geležinkeliai are observed in the design documentation (please see details below). If the intended Utility crosses or shall be connected to (or disconnected from) engineering networks, technical requirements (connection conditions) shall also be received from the owners of the respective engineering networks. Thus, while preparing the design of the Utilities in the railway protection zone, the Builder has to comply with the certain requirements (the Requirements) obtained from the competent authorities and other subjects as follows: - written consent to Utilities construction in the railway protection zone and technical requirements for Utilities construction set by public railway infrastructure manager; - connection to engineering networks and communications conditions issued by the owners of the respective networks and communications; - technical requirements / design approvals issued by other competent authorities / subjects, in cases when it is required under the CTR Construction Permitting Documents and other applicable legal acts. It shall be noted that according to the Construction Law the authorities and subjects which issued the requirements shall ensure their compliance with the requirements of the applicable legal acts of the Republic of Lithuania. Inspection of the Utilities design and issuing the construction permitting documents According to the Construction Law, the construction permitting documents (if required for construction of certain Utility depending on the type, technical parameters and specifics of the Utilities according to the CTR Classification of Structures) shall be issued by the administration of the respective municipality on which territory the Utilities shall be constructed. Before issuing the construction permitting documents for 48 SECTION 5: REGULATION IN LITHUANIA construction of Utilities in the railway protection zone, the compliance of the Utility design with the requirements of the legal acts and the obtained Requirements is inspected by the municipality administration, the LTSA, owners / managers of engineering networks and communications to which the Utilities are intended to be connected as well as other competent authorities (depending on the type and specifics of Utilities / structures) as established in the CTR Construction Permitting Documents. As mentioned above, prior to issuing the construction permitting document the Utilities design shall be approved by public railway infrastructure manager, as the manager of the structures, for which benefit the protection zones were established, also by the Lithuanian Transport Safety Authority (the LTSA). According to the Construction Law and CTR Construction Permitting Documents, the municipality administration inspects compliance of the Utilities design solutions concerning normative distances between structures (also between structures and sites) with the respective legal requirements, also verifies if the Builder has obtained all the required consents / approvals from the subjects indicated in the legal acts, including AB Lietuvos geležinkeliai. The LTSA inspects compliance of the Utilities design with the requirements of the legal acts regulating construction of railway objects. AB Lietuvos geležinkeliai verifies the compliance of the design with the requirements issued by AB Lietuvos geležinkeliai. Given that all the Requirements issued by the competent authorities / subjects are observed in the Utilities design documentation, the respective municipality issues the Utility construction permitting documents. It shall be noted that the consent of public railway infrastructure manager for any construction initiative within the railway protection zone is required, notwithstanding that for construction of certain Utilities / structures preparation of the design and obtaining construction permitting documents are not required under the legal acts. Railway On 11 January 2017, the Government of the Republic of Lithuania by the Decision on Special Plan approved the Special Plan for the Project Protection Zone and initiated the land expropriation procedures under the Expropriation Law. From the day the Decision on Special Plan came into force, the regulation owners of the land plots, which are to be expropriated, are prohibited to transfer, mortgage or by any other means restrict their property rights in land plots indicated in the Special Plan as well as the owners shall have no right to rearrange (separate, portion, divide or merge) these land plots. From the moment when the land owner and (or) other user of the land is informed about the initiation of procedure of expropriation, the land owner and (or) other user shall not interfere the implementation of the expropriation procedures. The Special Plan establishes railway protection zone along the Railway Line. Under the Land Law and Decision on Special Land Conditions the special land use condition comes into force once is registered in the Register of Real Estate. We have checked number of the land plots, which are under the process of expropriation, and determined that some of them already have this special condition registered, however, not all. We consulted with AB Lietuvos geležinkeliai and UAB Kelprojektas (company implementing the expropriation procedure) and they expect that the registration in the Register of Real Estate of the railway protection zones for all land plots established by the Special Plan should be finalised until the end of 2018. Once the railway protection zones are registered in the Register of Real Estate in respect of a land plot indicated in the Special Plan, the regime and the restrictions specified below shall apply in respect of the construction at this land plot. Under the Railway Transport Code, special protection zones are designated for railway tracks and their facilities. According to the Railway Transport Code and the Decision on Special Land Conditions, it is prohibited within the protection zone of railway tracks and their facilities: 49 SECTION 5: REGULATION IN LITHUANIA 1) to construct and reconstruct buildings not related to railway transport needs; 2) to use land not for its intended purpose. Also, it is prohibited within the railway and rail facilities protection zone without a written consent by the public railway infrastructure manager: 1) to excavate deeper than 0.3 m, mechanically level soil surfaces, conduct explosions and carry out land reclamation work; 2) to plant or cut trees and shrubs (exceptions apply); 3) to build crossings; 4) to construct and reconstruct buildings intended for railway transport needs and utilities. Under Article 23 of Railway Transport Code the public railway infrastructure manager is AB Lietuvos geležinkeliai, therefore, any allowed construction initiative in the railway protection zone shall be performed upon the written consent of AB Lietuvos geležinkeliai. Please note that written consent of AB Lietuvos geležinkeliai for construction initiatives in the railway protection zone is necessary irrespective of the ownership of the land plot. Please note that the legal acts do not set the term for issuance of such permit, however, considering other terms indicated in construction laws, it is our opinion that 10-20 working days should be considered as a reasonable term. Please note that AB Lietuvos geležinkeliai may have some internal procedure for issuance of the consents, including terms, however, we could not find it publicised. Additionally to the above, CTR Construction Works indicates that land works in the railway protection zone may be initiated only upon participation of the representative of public railway infrastructure manager and after the written consents for such works are received from the land owners (possessors) and from public railway infrastructure manager also upon signing the utilities installation, supervision, reconstruction and removal agreement. The written consents indicated above shall determine the following requirements: 1) until the beginning of works to ensure the continuance of the exploitation of railway (when the works are performed in the railway traffic place); 2) the terms of land works and obligation to notify the person issuing the consent; 3) obligation to reinstate the railway track parameters according to the requirements of technical design and construction technical documents until the indicated date using own funds; 4) upon necessity to repair, reconstruct or develop communications and railway infrastructure, the cables or other networks of the builder (client) within the protection zone shall be transformed under the order set in the agreement between the parties; 5) mechanisms, equipment and other means that are allowed to use while performing the works; 6) to inform the public infrastructure manager and the owner of the road about the works in protection zone three working days in advance; 7) confirmation that the works may be performed only by persons who have the permits to work in protection zones; 8) utilities may be built under the railway only by closed perforation method by having the ends of the utilities outside the protection zone. If the Builder does not comply with the requirements set in the written consents of the land owner or public railway infrastructure manager, does not comply with the railway safety requirements or does not have the consents specified above, the institution responsible for the state 50 SECTION 5: REGULATION IN LITHUANIA supervision of the constructions on its own initiative or on the initiative of the railway owner, police or other persons may suspend the constructions. Requirements Pursuant to Article 27 of the Construction Law, CTR Construction Permitting Documents and CTR Construction Works, the construction the set by the Builder intending to construct / install / repair any structure on the land plot / structure, which is not owned or otherwise legally possessed owner of land / by the Builder, has to obtain the respective consents of the land / structure (in case the construction works are intended in an existing structure structure) owner or possessor or conclude an agreement with the land / structure owner or possessor before applying for the construction permitting document. Additionally, CTR Construction Works indicates that land works in the railway protection zone may be initiated only upon written consents for such works are received from the land owners (possessors). It is the discretion of the land / structure owner or possessor to agree or not to agree to the intended construction (save for the cases when construction without prior obtaining of the discussed owner consents is permitted by the law, i.e. in case of construction of engineering networks, which corridor was formed under the spatial planning documents). According to the CTR Construction Works the owner / possessor of the land / structure shall be entitled to determine certain requirements for the intended construction by providing its consent. It is likely that the owner / possessor of the land / structure may also specify horizontal and vertical clearances between different objects constructed on the land. The clearances set by the land owner / manager may not be less than the minimal clearances defined by the Lithuanian legal acts. It shall be considered that the owner may determine stricter clearances than those established by the law. However, it shall be noted that the owner may not provide unreasonable and unjustified requirements concerning the mentioned clearances between the objects to be constructed on the land (please see Section 5.2. below). Supervision Pursuant to the Construction law and the CTR Construction Works, supervision of construction of Utilities is performed as follows: and completion - Supervision of execution of the Utilities design conducted by the designer of the Utilities, which inspects whether the Utilities are being of construction constructed in accordance with their design; of Utilities - technical supervision conducted by the technical supervisor appointed by the Builder, which controls whether the construction is carried out in accordance with the legal acts, normative technical documents, Utilities design and the Requirements, etc. - State supervision conducted by the State Spatial Planning and Construction Authority under the Ministry of Environment (the SSPCA). Under the Construction Law the design execution and technical supervision of the construction is mandatory in case of construction of special structures and certain simple structures in cases established by law. Depending on technical parameters and specifics of the Utilities (CTR Classification of Structures), the Utilities may be classified as special structures (e.g. trunk heat transfer networks with a pressure of more than 16 bar with an inside diameter greater than 100 mm, water pipes, collectors for sewage networks with an inside diameter greater than 500 mm, 110 kV and higher voltage transmission networks, etc.) or as simple structures. In most cases supervision of construction of simple structures is not mandatory and may be conducted on the initiative of the Builder. Under the Construction Law the above referred construction supervisors shall be entitled to demand the Builder / the contractor to remove / rectify any inconsistences with the design solutions and the applicable Requirements. In case the instructions and orders of the construction supervisors are not observed, they shall be entitled to suspend the construction of Utilities. 51 SECTION 5: REGULATION IN LITHUANIA According to the CTR Construction Works (Clause 40.5), land works within the railway protection zone can be performed only in the presence of the authorized representative of the public railway infrastructure manager (AB Lietuvos geležinkeliai). The land works are defined by the CTR Construction Works as excavation of the land / ground for construction purposes, filling of soil or underground works. Pursuant to the Construction Law completion of the construction of special structures shall be formalised by the construction completion deed issued by the construction completion commission (the Commission) formed by the SSPCA in accordance with the requirements of the CTR Construction Permitting Documents. Construction of simple structures and certain special structures (in cases established by law) may be completed by issuing the declaration on construction completion by the Builder, which in certain cases shall be approved by the SSPCA. Procedures for the approval of a declaration are not obligatory if the design expertise has been carried out in accordance with the procedure established by the STR Structure Design and the compliance of the structure with the essential requirements specified in the Construction Law was determined. Before issuing the construction completion deed the commission formed by the SSPCA, which is composed inter alia of the representatives of the respective municipality and of the owners of engineering networks and communications issued conditions on connection to respective networks / communications (including AB Lietuvos geležinkeliai, if certain conditions were issued) inspects if the constructed Utilities comply with the design solutions, requirements of the legal acts as well as the conditions / requirements set in the written approvals of the respective subjects (which approvals of the design were required under the legal acts) were fulfilled. In case violations in construction works were determined, the SSPCA decides on suspension of the construction completion procedures until the violations are duly rectified. In cases when according to the legal acts the completion of the construction may be formalised by the declaration on completion of construction, an authorised representative of the SSPCA inspects (in cases established by law) if the constructed Utilities comply with the design solutions, requirements of the legal acts as well as the conditions / requirements set in the written approvals of the respective subjects (whose approvals of the design were required under the legal acts) were fulfilled. Conclusion Our conclusion is that it may be possible to enforce the UR in a manner that is binding to third parties on a case-by-case basis while the Client, the Implementing Bodies and the Beneficiaries are not the owners of the land under the Railway Line in cooperation with AB Lietuvos geležinkeliai once the special land condition – railway protection zone - is registered with the Register of Real Estate. Each allowed construction initiative within railway protection zone shall be coordinated with AB Lietuvos geležinkeliai and AB Lietuvos geležinkeliai shall issue the written consent for the construction of Utilities in railway protection zone. If the UR requirements are incorporated in the requirements for construction issued by AB Lietuvos geležinkeliai for construction in the railway protection zone, the UR should become binding to the respective third party who intends to build Utilities in the railway protection zone. Please see the comments regarding the possibility to set stricter clearances in the UR than established in Lithuanian legal acts in 5.2. 52 SECTION 5: REGULATION IN LITHUANIA 5.2. Legal regulation for technical requirements of the UR Legal It is our understanding that the Client would like to regulate the horizontal and vertical clearances between the railway tracks and railway regulation infrastructure objects and different Utilities which may be placed near the Railway Line and related infrastructure objects or which may cross the Railway Line. The UR will comprise the technical requirements for the horizontal and vertical clearances when placing Utilities near or across the Railway Line. The intention of the Client is that the UR will be binding to the Clients contracting partners (used for designing the Utilities necessary for the operation of the Railway Line) and should become binding to the third parties who intend to construct the Utilities near or across the Railway Line. It shall be noted that there is no unified legal act concerning regulation of design and construction of Utilities and railway tracks / structures in Lithuania. The framework legal act establishing the basic and most essential regulation of construction process is the Lithuanian Construction Law. Certain requirements related to design and construction of the Railway Line and crossing of the Railway Line with engineering and communication networks are established in the Special Plan. Technical requirements concerning design and construction of railway and various types of Utilities, including minimal horizontal and vertical clearances between the railway tracks / structures and Utilities / other objects, are provided in a number of by-laws, construction rules, standards, depending on the type of the Utility. Generally, the mentioned requirements are provided in the mandatory legal acts, such as rules and technical construction regulations, approved by the Lithuanian Government, the Minister of Environment, the Minister of Energy, Communications Regulatory Authority and other competent authorities, as detailed in the List of legal acts provided in Section 6.3 below. These minimal requirements shall apply to all participants of design and construction process. Additionally, technical requirements for construction of Utilities, establishing minimal horizontal and vertical clearances, are provided in construction rules and European and Lithuanian standards. According to the Construction Law, the application of these documents is voluntary, unless it is indicated in the by-laws that application of construction rules and standards is mandatory. Please note that for the purposes of this Report, we have not reviewed the mentioned documents of non-binding nature. It shall be noted that the above-mentioned legal acts do not provide any specific / stricter requirements, including minimal clearances between structures / objects in respect of design and construction of the Railway Line. Therefore, the minimal clearances established in the currently valid legal acts applicable, basically, to any railway shall be used in order to determine the technical requirements for the clearances between the Utilities and the Railway Line. Possibility to As mentioned above, Lithuanian legal acts basically determine minimal clearances between the Utilities and other objects (including railway set stricter tracks / structures). This shall, generally, mean that it is possible to use greater distances between the Utilities and other objects while regulations preparing certain Utilities design. However, the applicable legal acts (Railway Transport Code, Construction Law, CTR Construction Works, etc.) do not provide for an explicit legal ground for establishing stricter requirements concerning minimal horizontal and vertical clearances between Utilities by the competent subjects (AB Lietuvos geležinkeliai / the Client owners of engineering networks and communications), while issuing their conditions / requirements towards third parties. Moreover, pursuant to the Construction Law, the authorities and subjects shall ensure that their issued technical requirements / conditions are compliant with the requirements of the applicable legal acts. 53 SECTION 5: REGULATION IN LITHUANIA AB Lietuvos geležinkeliai during the telephone conversation supported the position that only requirements provided in the currently valid legal acts should be issued to third parties, until stricter requirements are “legitimised” by the legal act(s). Notwithstanding the above, in our opinion, it may be considered that stricter requirements could be incorporated in the technical requirements issued for construction of Utilities in the railway protection zone of the Railway Line on case-by-case basis, given that reasonable technical justification for setting such stricter requirements is in place and can be provided to the Builder or other interested persons, if requested. Potential arguments that may be invoked for justification of setting stricter regulations could be the following: - with Articles 4 – 6 of the Construction Law and EU Regulation No. 305/2011 - mechanical strength and stability, fire safety, environmental protection and hygiene, including harmlessness, safety of use and accessibility of the environment, acoustics (noise protection), energy efficiency, sustainable use of natural resources, etc.; - “Rail Baltica” project has been declared as a project of national importance and current regulation is not sufficient for the European standard gauge railway with the speed of 240 km/h (higher safety, environment, operation and maintenance of the Railway Line standards shall apply); - essential requirements for a structure (in this case – the Railway Line) in accordance impacts of vibration, maintenance requirements, possible consequences of an accident (damage or collapse of the respective Utility); - quality of the environment, the rational use of the territory, energy and natural resources and the availability of the environment; - any available international practice for placement of the Utilities in the railway right of way of European gauge railway. - any available technical expertise and expert’s suggestions for the horizontal and vertical clearances of the Utilities to be placed within the railway protection zones of the Railway Line. Additionally, the requirements established in the Railway Transport Code applicable for the activity in railway protection zones (such as prohibition to construct and reconstruct buildings not related to railway transport needs, excavate deeper than 0.3 m, mechanically level soil surfaces, conduct explosions and carry out land reclamation work, build crossings within the Railway Protection Zone, etc.), also requirements concerning the railway protection zone of the Railway Line established in the Special Plan, may be invoked in finding justification for determining stricter requirements for the clearances in the designing stage of the Railway Line. However, neither the laws nor the available case-law contains any indication or guidance of whether and what kind of justification should be available to impose stricter requirements in respect of the clearances between the Utilities and between the Utilities and railway tracks / other railway infrastructure objects. In any case, it shall be considered that competent institutions / subjects may not set clearances between the Utilities and between the Utilities and other objects that are unreasonable and lacking proper and firm justification. Otherwise, there is a risk of disputing the issued stricter requirements by the Builder or other interested persons. In addition, it shall be noted that we did not succeed in finding any court judgements where a dispute over the clearances between the Utilities and between the Utilities and other structures would have been reviewed. Therefore, we conclude that there is currently no sustainable case- law in Lithuania on the issues concerned. Initiation of amendments to the current legislative regulation or adoption of the new legal act establishing requirements for implementation of the Project in cooperation with the Ministry of Transport and Communication and the Ministry of Environment could also be considered to 54 SECTION 5: REGULATION IN LITHUANIA implement the UR in the legislative acts as special requirements for the European gauge railway and thus avoid the potential disputes over the interpretation of the existing legal framework. Conclusion The Lithuanian legal acts determine only minimal clearances between the Utilities and between the Utilities and other objects (including railway tracks). The laws and case-law are silent as to whether the issuer of the technical conditions can determine stricter requirements by requesting greater clearances between the Utilities and other objects. However, it may be considered that stricter requirements could be determined in the technical conditions / requirements on case-by-case basis issued by competent subject for construction of Utilities in the railway protection zone, given that reasonable justification of the need for such stricter requirements is in place. 55 SECTION 5: REGULATION IN LITHUANIA 5.3. Interaction procedures and documents to be issued Role of AB As indicated above in the Report, any allowed construction initiative in the railway protection zone shall be performed upon the written Lietuvos consent of the public infrastructure manager AB Lietuvos geležinkeliai. geležinkeliai In Lithuania there is no separate regulation in respect of issuing consents/ technical conditions in the railway protection zone of the Railway Line, therefore, the general railway protection zone restrictions are applicable. Functions of AB Lietuvos geležinkeliai, as well as requirements and restrictions in relation to construction in railway protection zone are established in the Railway Transport Code (Article 19) and Decision on Special Land Conditions. Based on verbal discussion with the specialists of AB Lietuvos geležinkeliai, we understand that in practice the third parties apply to AB Lietuvos geležinkeliai with design proposals and request to issue the consent for construction in the railway protection zone. After such request, AB Lietuvos geležinkeliai issue technical conditions, however, these conditions are generally based on mandatory statutory requirements valid in Lithuania. Also, the third party and AB Lietuvos geležinkeliai sign the utilities installation, supervision, reconstruction and removal agreement under which third parties’ obligations in case the development of the railway, etc. are established (to remove / reconstruct Utilities if it is needed for further development of the railway, etc.). However, please note that the template of this agreement is not public, therefore, we could not evaluate its provisions and, therefore, the information provided above is based on verbal communication with the specialists of AB Lietuvos geležinkeliai only. Possible Since the Client is willing to participate in the process of establishing technical conditions and issuing consents for constructions in the involvement railway protection zone of the Railway Line, we have looked at different possibilities in this situation: forms of the 1) Amendments to legislation allowing the Client to issue the consent and technical requirements / conditions for third parties for the Client in issuing construction of the Utilities within the railway protection zone of the Railway Line; written 2) AB Lietuvos geležinkeliai issues the written consent itself based on the UR prepared by the Client or the response letter of AB Lietuvos consent for geležinkeliai to the respective third party includes a copy of the technical requirements prepared by the Client; construction 3) AB Lietuvos geležinkeliai forwards the request of the third party to the Client and the Client issues the technical requirements and the in the railway written consent directly to the third party on behalf of AB Lietuvos geležinkeliai. protection zone of the Railway Line Amendments As indicated above, in Lithuania there is no separate regulation in respect of issuing consents/ technical conditions in the railway protection to legislation zone of the Railway Line, therefore, the general railway protection zone requirements are applicable. (option 1) It would be possible to consider amendment of legislation / adoption of new legislation by establishing specific regulation for railway protection zone of the Railway Line and detailed specific requirements for implementation of the Project. However, this process can be rather complicated and lengthy, also, we understand that this option is not preferred by the Client, therefore, it will not be further elaborated. 56 SECTION 5: REGULATION IN LITHUANIA AB Lietuvos Following the discussion with the Client’s representative in Lithuania, we understand that currently AB Lietuvos geležinkeliai issue the geležinkeliai written consents and technical conditions to third parties in respect of the construction of the Utilities in the railway protection zone of the as the issuer Railway Line without consulting the Client. However, this is an issue for the Client, since, in the Client’s opinion, AB Lietuvos geležinkeliai of the UR does not have the particular knowledge required for issuance of technical conditions which would ensure effective implementation of the based on the Global Project and construction of the Railway Line. information Having analysed the Inter-Governmental Agreement and the CSA, we agree that it shall be interpreted in the way as described in Section provided by 4.3. of this Report, i.e. that the Client is actually authorised to determine the requirements for construction of the Utilities in the railway the Client protection zone of the Railway Line as this is a necessary part of the Client’s tasks in its role of “the project coordinator” and part of “the (option 2) preparatory activities” under the Inter-Governmental Agreement. In order to enable the Client to procure the Detailed Technical Design, all the Beneficiaries have authorized the Client to represent them in relations with any state or municipality institutions, natural persons or legal entities, with the right to sign, submit and receive all the documents and ensure all the activities necessary and related to the preparation of the Detailed Technical Design (Clause 3.2.3(a)), as well as to perform other activities related to the performance of the given task (Clause 3.1.2(b)). AB Lietuvos geležinkeliai as the Implementing Body by signing the CSA consented to the aforementioned authorization by the Beneficiary, as well as accepted the authorization given in its name by the Beneficiary for the Client to act in the name and on behalf of AB Lietuvos geležinkeliai as well. We also agree that there are no reasonable doubts that in order to prepare the Detailed Technical Design: (1) the necessary information regarding the existing and planned Utilities in the territory of railway protection zone of the Railway Line shall be collected and analysed; and (2) unified design guidelines for the Utilities servicing the Railway Line shall be in place to ensure its interoperability. Also we agree that it may be interpreted that “the preparatory activities” under the Inter-Governmental Agreement and the CSA should include also the right of the Client to provide guidance to third parties on construction in the railway protection zone of the Railway Line (although it is not directly (expressis verbis) indicated in the above documents), taking into account that the Client (and not AB Lietuvos geležinkeliai) is the entity who possesses all the technical information regarding the Railway Line. Therefore, based on the above, we agree that AB Lietuvos geležinkeliai should incorporate the UR drafted by the Client in the written consents issued to third parties in respect of construction of the Utilities in the railway protection zone of the Railway Line. However, neither the Inter-Governmental Agreement nor the CSA set a clear order how such cooperation should be implemented. Therefore, in order to set the mutual understanding of the competences under the Inter-Governmental Agreement and the CSA, as well to establish the clear and specific order how the Client would be involved in the procedure of issuing written consents for construction initiatives in railway protection zone of the Railway Line (by just providing the UR to AB Lietuvos geležinkeliai; by preparing individual technical conditions for each request, etc.), it would be advisable that a cooperation agreement is concluded between the Client and AB Lietuvos geležinkeliai. The agreement could establish the obligation of AB Lietuvos geležinkeliai to forward all respective requests of third parties in respect of construction of Utilities in the railway protection zone of the Railway Line to the Client and to incorporate all the requirements of the Client into the technical requirements and consents issued by AB Lietuvos geležinkeliai to third parties. 57 SECTION 5: REGULATION IN LITHUANIA However, this option shall not be considered to be the most optimal and reliable scenario as it involves a lengthy exchange of information and does not precisely foresee the role of the Client in the further process of the construction of the Utilities in the railway protection zone of the Railway Line. The Client as As indicated above in the Report, in Lithuania currently there is no separate regulation in respect of appointing an infrastructure manager the direct of the Railway Line and well as issuing consents / technical conditions in the railway protection zone of the Railway Line. According to the issuer of the information provided by the Client the decision regarding the infrastructure manager of the Railway Line should be made until 30 June UR based on 2019 (indicative date). According to general regulation of the railway protection zones provided in the Railway Transport Code (Article 19) the and the Decision on Special Land Conditions, AB Lietuvos geležinkeliai is currently the only public railway infrastructure manager, which is cooperation authorized to issue the written consent to construct Utilities in railway protection zones. agreement However, irrespective of the fact that the legislation currently in force does not contain any particular provisions with respect to issuance with AB of consents / technical conditions in the railway protection zone of the Railway Line, the following circumstances should be taken into Lietuvos consideration. gelezinkeliai (option 3) Firstly, the governments of Lithuania, Latvia and Estonia on 31 January 2017 signed Inter-Governmental Agreement and on a level of an international treaty confirmed the main functions of RB Rail: design, construction and marketing (including branding) of the Railway Line. Both the Inter-Governmental Agreement and the Shareholders’ Agreement define functions of RB Rail rather broadly, therefore, the authorizations granted to RB Rail in the CSA should be systematically interpreted in the same manner. Secondly, RB Rail being responsible for implementation of design phase and partly of construction phase of the Railway Line is the sole subject which has the required expertise and knowledge regarding the design of the Railway Line. Therefore, from practical perspective as well as in order to ensure safety, future interoperability of the Railway Line and effective usage of EU funds allocated for implementation of the Global Project, the Client shall be deemed an appropriate subject to communicate with third parties and determine technical requirements regarding construction initiatives in the railway protection zone of the Railway Line. Thirdly, under the current legislation it is not likely that AB Lietuvos geležinkeliai should be considered as the „infrastructure manager” in respect of the Railway Line infrastructure until the Railway Line is actually constructed. As mentioned above, the decision regarding the appointment of the infrastructure manager of the Railway Line shall be adopted only in middle of 2019. As explained in Section 4.3 of the of the Report, we believe that pursuant to the Inter-Governmental Agreement and the CSA, as well as taking into consideration the arguments above, the Ministry of Transport and AB Lietuvos geležinkeliai has actually authorized the Client to determine the requirements for construction of the Utilities in the railway protection zone of the Railway Line, since it is necessary for the Client to properly perform its functions designated to the Client by the Inter-Governmental Agreement. However, we are of opinion that the Client’s status versus third parties in respect of determining binding requirements towards third parties should be precisely stipulated in written (please see the potential alternatives for such stipulation described below in this section). It should, however, be considered that the CSA is not an international treaty ratified by the Parliament of the Republic of Lithuania and the Lithuanian law is currently silent about the Client’s authorisations to issue consents / technical conditions in the railway protection zone of 58 SECTION 5: REGULATION IN LITHUANIA the Railway Line. Therefore, there may be certain risks that the Client’s authorisations in respect of issuing consents / technical conditions in the railway protection zone of the Railway Line may be challenged in Lithuanian courts by third parties. In addition, certain practical issues may not be excluded, since the competent state institutions (e.g. municipality authorities issuing permits for construction), third parties requesting consents may question the authority of the Client as an issuer of the written consents in the Utilities construction process arising merely on the basis of the Inter-Governmental Agreement and the CSA and not directly established in the Lithuanian railway and construction legislation. In cases of dispute the Client could support its position in court or in front of other institutions with the arguments indicated above. In order to ensure smooth process of cooperation between all the parties concerned (the Client, Lietuvos geležinkeliai, Ministry of Transport, etc.), we recommend to conclude a cooperation agreement with AB Lietuvos geležinkeliai which would clearly stipulate the Client’s authorisations to perform the discussed actions in relation to construction initiatives in the railway protection zone of the Railway Line (i.e. issuing consent for construction, establishing technical conditions / requirements to third parties, verifying the Utilities design and issuing design approvals, visiting the site, participating in Utilities commissioning procedures, other related authorisations) on behalf of AB Lietuvos geležinkeliai and define the interaction process between the parties. The content of the agreement could be that AB Lietuvos geležinkeliai is obligated to send all requests to the Client immediately and the Client has the right to issue its consents / approvals / conditions directly to third parties on behalf of AB Lietuvos geležinkeliai. Alternatively, the Client may consider sending respective letter to AB Lietuvos geležinkeliai and the Ministry of Transport with the reminder of the authorisations granted to the Client under the signed Inter – Governmental Agreement and CSA and the request to forward all third parties applications in relation to Utilities construction initiatives in the railway protection zone of the Railway Line to the Client so that the consents to be issued directly by the Client to the third parties based on the authorisations granted under the Inter-Governmental Agreement and the CSA. Although certain legal risk remains, we consider that the solution discussed in this section would be the most efficient, as it would ensure the direct communication between the Client and third parties and the involvement (if necessary) of the Client in further stages of design and construction of the Utilities in the railway protection zone of the Railway Line. Documents to In order to implement the above alternative, the following documents shall be prepared and issued: be issued 1) Preparation step 1: an agreement between the Client and AB Lietuvos geležinkeliai which would clearly stipulate the Client’s authorisations to perform actions in relation to construction initiatives in the railway protection zone of the Railway Line (as well as to participate in further stages of implementation of Utilities construction – issue design approvals, visit the site, participate in Utilities commissioning procedures, etc.) and define the interaction process between the parties - without delay; 2) Preparation step 2: a letter to all municipal and other relevant authorities participating in approving / supervising design and construction of Utilities within the territories crossed by the Railway Line inviting them to take notice of the Inter – Governmental Agreement, CSA and the agreement between the Client and AB Lietuvos geležinkeliai (if concluded) and drawing attention to the necessity to coordinate any construction initiatives within the railway protection zones of the Railway Line – without delay. 3) Enforcement: issuance (on a case-by-case basis) of consents, including technical conditions / requirements, to the interested third parties by the Client in the name and on behalf of AB Lietuvos geležinkeliai. 59 SECTION 5: REGULATION IN LITHUANIA Utilities We note that the possibility to control the construction of the Utilities via the written consents relates only to railway protection zones of outside the the Railway Line. If any Utilities are constructed outside the railway protection zones of the Railway Line, no consent of AB Lietuvos railway geležinkeliai shall be needed. Thus, neither the Client nor AB Lietuvos geležinkeliai may directly determine requirements for the Utilities protection and other structures to be built outside the current railway protection zones of the Railway Line, even in case the changes in the alignment zone territory of the Railway Line are identified, unless railway protection zone is established in such territories. In addition, it shall be noted that in certain cases established in the CTR Construction Permitting Documents, approvals of the owners / managers of the adjacent land plots to construction initiatives have to be obtained. Therefore, once the land plots within the Railway Line corridor are expropriated, the respective consents of the trustee / manager of these land plots (potentially - the Ministry of Transport and Communication / AB Lietuvos geležinkeliai) may be required for certain construction initiatives in the adjacent land plots. 60 SECTION 6: MANUAL FOR APPLICATION OF UR Section 6. Manual for preparation and application of the UR 61 SECTION 6: MANUAL FOR APPLICATION OF UR 6.1. Estonia Regulations for horizontal and vertical clearances between the Utilities and other structures The table below reflects regulations and laws that contain regulation on horizontal and vertical clearances between Utilities and other structures. Please keep in mind that unlike laws, regulations aren’t usually translated to English in Estonia. Therefore, the English headlines for regulations aren’t official translations and we have added Estonian versions of these regulations. We note that no EVS and other non-published standards were verified for the purposes of this Report. If it is stipulated in the table below that it is possible to deviate and set greater clearances, the reasonable justification should be mentioned in the technical conditions given with the approval/conditional approval. As mentioned previously in section 3.1, if the Client does not give their approval to a project with the condition that certain aspects of the project must be changed (according to the Client’s higher demands), this non-approval or conditional approval has to be based on law, regulation or a spatial plan. This means that the building authority (TRA or local authority) is legally obligated to abide by the non-approval or conditional approval, only if it is based on law, regulation or a spatial plan. Law Date Number Content Possibility to deviate Water Act 11.05.1994 - The Water Act regulates the use and protection of Possibility to deviate from the minimal water, relations between landowners and water requirement but probably no higher than the users and the use of public water bodies and water maximum requirement. bodies designated for public use. For example: “A clearance of a storage facility Sets minimal and maximum clearances to ensure for oil products shall be at least 25 meters but water protection (§ 26). Specific requirements are not more than 150 meters depending on the set in regulations. capacity of the storage facility.” It is possible to deviate from the 25-meter rule but not the The Water Act and the regulations (171, 172, 23) 150-meter rule. regarding storage facilities might not be necessary for the UR, the technical team can assess if these are relevant. Regulations Date Number Content Possibility to deviate Regulation “Requirements for gas installations that 03.07.2015 87 As the headline says, Regulation 87 defines the As only minimal clearances are stipulated, use heating gas and its construction, installation of requirements for construction of gas installations, deviations are possible for setting greater gas appliances, storage of gas cylinders and filling of the installation of gas appliances, storage of gas clearances if the reasonable justification gas containers” cylinders and filling of gas containers. exists. Määrus “Küttegaasi kasutavale gaasipaigaldisele, It states the minimal horizontal clearances for selle ehitamisele ja gaasiseadme paigaldamisele mentioned Utilities set forth in the Regulation and ning gaasiballooni ladustamisele ja gaasianuma other objects. It also sets the minimal vertical täitmisele esitatavad nõuded” clearance for gas tanks and gas pipelines built underground. 62 SECTION 6: MANUAL FOR APPLICATION OF UR Regulation “Water protection requirements for 16.05.2001 171 Defines the planning, construction and operation Even though the regulation stipulates minimal sewerage facilities” requirements for sewerage facilities. requirements, the Water Act states that the maximum clearance is 500 meters. Therefore, Määrus “Kanalisatsiooniehitiste veekaitsenõuded” Sets minimal clearances between aforementioned it is possible to deviate but the clearance can’t facilities and other objects. be higher than 500 meters. Regulation “Water protection requirements for 16.05.2001 172 Defines the planning, construction and operation Even though the regulation stipulates minimal storage facilities for oil products” requirements for storage facilities for oil products. requirements, the Water Act states that the maximum clearance is 150 meters. Therefore, Määrus “Naftasaaduste hoidmisehitiste Sets minimal clearances between aforementioned it is possible to deviate but the clearance can’t veekaitsenõuded” storage facilities and other objects. be higher than 150 meters. Regulation “Water protection requirements for 15.06.2012 23 Defines the planning, construction and operation As only minimal clearances are stipulated, storage facilities for shale oil, its subproducts or requirements for storage facilities for shale oil, its deviations are possible for setting greater biofuels” subproducts or biofuels. clearances if the reasonable justification exists. Määrus “Põlevkiviõli, selle saaduste või biokütuste Sets minimal clearances between aforementioned hoidmisehitiste veekaitsenõuded” storage facilities and other objects. Regulation “Design standards for land improvement 17.02.2005 18 Sets design standards for different land As only minimal clearances are stipulated, systems” improvement systems (construction works needed deviations are possible for setting greater for drainage and irrigation). clearances if the reasonable justification Määrus “Maaparandussüsteemi exists. projekteerimisnormid” Sets minimal vertical and horizontal clearances for land improvement systems. Regulation “Requirements for the construction of 09.07.2015 43 Sets the minimal vertical clearances for certain As only minimal clearances are stipulated, dug wells, for the building design documentation, aspects of constructing drilled wells and dug wells. deviations are possible for setting greater the construction, demolition, rebuilding building clearances if the reasonable justification design documentation for dug wells and holes, for exists. the designing, establishing, deployment, upgrading, demolition and conservation of dug holes and wells and the forms to drill well or hole location approval, building permit and permit for use, construction or operation notice, drilling diary, cavity construction or operation notice drill well and for depositing data in the environmental register, and for demolishing drill wells, drill holes and dug wells” Määrus “Nõuded salvkaevu konstruktsiooni, puurkaevu või -augu ehitusprojekti ja konstruktsiooni ning lammutamise ja ümberehitamise ehitusprojekti kohta, puurkaevu või -augu projekteerimise, rajamise, kasutusele võtmise, ümberehitamise, lammutamise ja konserveerimise korra ning puurkaevu või -augu 63 SECTION 6: MANUAL FOR APPLICATION OF UR asukoha kooskõlastamise, ehitusloa ja kasutusloa taotluste, ehitus- või kasutusteatise, puurimispäeviku, salvkaevu ehitus- või kasutusteatise, puurkaevu või -augu ja salvkaevu andmete keskkonnaregistrisse kandmiseks esitamise ning puurkaevu või -augu ja salvkaevu lammutamise teatise vormid” Regulation “The extent of protection zones of 25.06.2015 73 Regulates protection zones of different Utilities and The extent of protection zones can’t be altered. construction works, procedures for operating in therefore indirectly sets clearances for certain protection zones and the requirements for marking objects and terms for construction in that area. As only minimal clearances have been protection zones” stipulated between district heating pipes and The protection zone of a construction work is the other Utilities (§ 11 subsection 4), deviations Määrus “Ehitise kaitsevööndi ulatus, kaitsevööndis land underneath and around the construction work are possible for setting greater clearances if tegutsemise kord ja kaitsevööndi tähistusele within which the owner of the registered the reasonable justification exists. esitatavad nõuded” immovable is obligated to tolerate the presence of a construction work belonging to another and within which the use of the registered immovable and operations on the registered immovable are restricted for the purposes of safety and of ensuring the functionality of the construction work (§ 70 subsection 1 of the Building Code). Also sets clearances between district heating pipes and other Utilities (§ 11 subsection 4). Regulation “Standards for the designing of roads” 05.08.2015 106 The Regulation states that the regulations and According to Section 8.1 of the Annex, the other guide materials from other countries with clearances for underground Utilities have not Määrus “Tee projekteerimise normid" similar climate can be used for the designing of been set but it is presumed that demands for roads in Estonia. clearances have been met, if they have been set according to standard EVS 843:2003. Since Annex of Regulation 106 sets the requirements for this is a non-mandatory standard, greater the designing of highways. Section 8 sets the clearances can be set. requirements for Utilities. Section 8.2 of the Annex sets minimal clearances for above-ground Utilities. Therefore, deviations are possible for setting greater clearances, if the reasonable justification exists. 64 SECTION 6: MANUAL FOR APPLICATION OF UR Examples of reasonable justification arguments for setting stricter clearances 1. General principle of safety as stipulated in Building Code § 8: Construction works, building work, the use of construction works and any other operations related to building work must be safe. Construction works, building work, the use of construction works and any other operations related to building work are safe if they do not pose a danger to humans, property or the environment. 2. General principle of environmental soundness as stipulated in Building Code § 9: Construction works, building work and the use of construction works must be as environmentally sound as possible; this principle also includes the requirement of sparing use of natural resources in the course of building work. 3. Requirements for construction works (the buildings) as stipulated in Building Code § 11 subsection 2: 1) mechanical durability and stability; 2) fire safety; 3) hygiene, health and the environment; 4) safety of use and access, including the needs of evacuation and rescue of people from the construction work and an operational map; 5) protection from noise; 6) energy conservation and energy efficiency; 7) sparing use of natural resources; 8) special needs of disabled people; 9) the functionality of a construction work, its functional coherence and compatibility; requirements arising from the purpose of use and from use of the construction work—i.e., requirements concerning the state of the construction work, including maintenance requirements. 4. Annex to the Regulation 106 “Standards for the designing of roads” point 8.1 (5) states that the clearances between Utilities and other buildings and trees must ensure the safety, maintenance of trees and allow the maintenance of Utilities in a manner that minimizes the impact to other buildings and trees. 5. The regulation regarding protection zones in Chapter 8 of the Building Code. In the protection zone, it is prohibited to endanger the construction work or any use of the construction work that follows established procedure (§ 70 subsection 2 point 1) and in the protection zone of a railway, it is prohibited to endanger rail traffic (§ 73 subsection 2). Even though the protection zone will be formed once the railway is built, these justifications could be used since the county-wide spatial plans have already marked the Railway Line Corridor. Also, Building Code § 12 subsection 2 states that building work must conform to the restrictions and spatial plans at the location of the construction work. Since the county-wide spatial plans explanatory statement point 3.3.1 states that the future building of the Railway Line must be taken into account, the regulation regarding protection zones may be used to justify stricter clearances. 6. Any available international practice for placement of the Utilities in the railway right of way of European gauge railway. 7. Any available technical expertise and expert’s suggestions for the horizontal and vertical clearances of the Utilities to be placed in the Railway Line Corridor. 65 SECTION 6: MANUAL FOR APPLICATION OF UR Steps to be taken in case the cooperation agreement is concluded with the Ministry The graph below reflects consecutive steps to be taken in case a co-operation agreement is concluded between the Client and the Ministry as described in Section 3.3 of this Report. •Building notice or request for building permit to begin construction work in the Railway Line Corridor by a third party to a competent authority •Request for approval to the Ministry by the competent authority (without delay) Step 1 •Receipt of the request for approval by the Ministry •Forwarding the above mentioned request to the Client by the Ministry in order to provide the technical requirements to be incorporated in the approval to the competent authority (without delay) Step 2 •Receipt of the above mentioned request by the Client •Preparation of the technical requirements with the approval or conditional approval by the Client (within 10 days, if the Client needs more time - an extentions shall be requested) •Forwarding the approval with the technical requirements to the competent authority (within 10 days after the Ministry has received the request or Step 3 within the extended time period) •Receipt of the approval/conditional approval and technical requirements by the competent authority •Issuance of the technical requirements to the third party by the competent authority •Receipt of the issued technical requirements by the third party Step 4 •Modification of the project by the third party if necessary •Submission of the modified project to the competent authority by the third party •Issuance of the building permit by the competent authority if the modified project meets the requirements set by the Client •Denial to issue the building permit/perform construction works if the modified project does not meet the requirements set by the Client Step 5 •The Client will visit the site (if it was stipulated in the technical requirements) in order to inspect whether the construction has been conducted according to the requirements 66 SECTION 6: MANUAL FOR APPLICATION OF UR 6.2. Latvia Regulations for horizontal and vertical clearances between the Utilities and other structures The table below reflects the identified legislation acts that contain regulation on horizontal and vertical clearances between the Utilities and other structures. We note that no LVS, EU standards and other non-published standards were verified for the purposes of this Report. Regulations Date Nr Content Possibility to deviate Regulations on the 30.09.2014 574 Regulations 574 define requirements for layout of engineering As only minimal horizontal and vertical clearances are stipulated, Latvian Construction networks for heating, water, sewers, drainage, electronic deviations are possible for setting greater clearances if the necessary Regulation LBN 008-14 communications, electricity supply, and gas supply substantiation exists (please see Section 4.2). “Layout of engineering engineering networks with pressure up to 1.6 MPa. networks” Where engineering networks cannot be placed according to the The horizontal clearances are defined in respect of the minimal clearances, derogations are permitted if the following distance of the engineering networks (underground and over conditions are met: ground) to other objects (such as foundations of buildings, 1) the safety of the technical solution may be ensured in accordance fences, estacades, railway catenary poles; outer railway track with the requirements of the Construction Law and other axes (1520 and 750 gauge), roads etc. Horizontal clearances regulatory enactments; between different engineering networks are defined as well. 2) the solution is coordinated with the owner (legal possessor) of the Vertical clearances (underground and over ground) are land and with the owner (legal possessor) of the engineering defined in respect of particular engineering networks. networks whose protection zones are affected or between which the specified distances are not possible, as well as with the It shall be noted that Article 12 of Regulations 574 prohibits to relevant state and municipal institutions, except in cases specified place all types of Utilities in the railway substructure in the Energy Law. (“dzelzceļa zemes klātnē”), except for technological communications of the railway. Particular regulations for placing the engineering networks in the railway right of way of a 1520 mm gauge railway are indicated in Article 21 including the minimal vertical distances for underground engineering networks under the railway in crossings with the railway (Article 21.6). Regulations on the 30.06.2015 328 Regulations 328 define requirements which shall be followed As only minimal horizontal and vertical clearances are stipulated, Latvian Construction when designing, constructing, reconstructing electronic deviations are possible for setting greater clearances if the necessary Regulation LBN 262-15 communication networks. substantiation exists (please see Section 4.2). “Electronic communication Annex 2 of the Regulations defines minimal vertical and Pursuant to Regulations 328 (Article 88 and 89), when installing or networks” horizontal clearances between external dimensions of building electronic communications networks, owners of engineering electronic communications network lines (underground and communications or objects shall comply with the minimum distances over ground) and other objects including different railway between the external dimensions of metallic cable lines and other infrastructure objects. objects of electronic communications networks and mutually 67 SECTION 6: MANUAL FOR APPLICATION OF UR coordinate the distances. The minimum distance between the external dimensions of the optical cable lines and other objects of electronic communications networks may be less than that set out in Annex 2 if the owners of the objects mutually agree on the distances. Where the placement of electronic communications network lines within the specified distances is not possible, the distance reduction shall be coordinated with the owners of the engineering networks or other objects. Regulations on the 30.06.2015 335 Regulations 335 establish technical requirements for the Please see the description of deviation possibilities for Regulations Latvian Construction design, construction works and commissioning of internal and 574 above. Regulation LBN 243-15 external liquefied petroleum gas pipeline systems with a “Internal and external maximum operating pressure of up to 1,6 MPa (16 bar). gas pipeline system for liquefied petroleum In respect of the clearances, a reference to Regulations 574 is gas” indicated. No other regulation for clearances is determined. Regulations on the 30.06.2015 341 Regulations 341 set technical requirements for the design, Please see the description of deviation possibilities for Regulations Latvian Construction construction works and commissioning of natural gas external 574 above. Regulation LBN 242-15 pipeline systems as well as natural gas pipelines located “Natural gas external outside buildings with a maximum operating pressure of up to Please note that we have not verified the content of LVS 417. gas pipeline system” 1,6 MPa (16 bar) for design, work and recruitment. Article 21 states that horizontal and vertical distances of the underground and surface gas pipelines to structures and engineering networks shall be determined in accordance with Regulations No 574. In addition, sub-section 3.3 sets additional requirements for the crossings with railways, roads and tram lines. It is stated in Article 38 that in areas where the pipeline crosses railways, tramway tracks and motorways, minimum distances to objects and other engineering structures shall be determined in accordance with the requirements of LBN 008 (Regulations 574) and LVS 417. Article 39 sets additional requirements for placement of the gas pipelines under railway. Regulations on the 30.06.2015 326 Regulations 326 set technical requirements for the design and Please see the description of deviation possibilities for Regulations Latvian Construction construction works of water supply structures. 574 above. Regulation LBN 222-15 “Water supply Article 165 states that the location of the pipelines shall be As only minimal vertical clearances are stipulated in Article 168, structures” determined in accordance with regulatory enactments in the deviations are possible for setting greater clearances if the necessary substantiation exists (please see Section 4.2). 68 SECTION 6: MANUAL FOR APPLICATION OF UR field of construction. Thus, an indirect reference to Regulations 574 is made. In addition, Article 168 sets particular requirements for vertical distances from the bottom of the rail track to the top of the pipes and tunnels stating that these distances shall be determined according to soil conditions and transport loads, but may not be: 1) less than 1 m for construction in an open trench; 2) less than 1,5 m for construction with a perforation (caurspiešanas) or tunnel method; 3) less than 2,5 m - using the punctuation method. Regulations on the 30.06.2015. 327 Regulations 327 set technical requirements for the design and Deviations are possible for setting greater clearances if the necessary Latvian Construction construction works of sewerage structures. substantiation exists (please see Section 4.2). Regulation LBN 223-15 “Sewerage structures” Article 63 states that pipeline crossings with road and railway track shall be designed in accordance with the regulatory enactments regarding the design of water supply structures and the instructions of the relevant supervisory services. Thus, a reference to Latvian Construction Regulation LBN 222- 15 “Water supply structures” is made regarding requirements for sewerage structures. Section 4.2 regulates the minimal installation depth of pipelines. “Railway technical 03.08.2010 724 Railway Technical Operations Regulations are regulations As only minimal horizontal and vertical clearances are stipulated, operations regulations” issued by the Cabinet and govern the basic railway technical deviations are possible for setting greater clearances if the necessary operations requirements. The Regulations mainly relate to the substantiation exists (please see Section 4.2). operation of a railway. However, they also contain some regulations for the Utilities servicing the railway itself. Therefore, a few requirements can be found regulating the clearances between the specific Utilities and the railway structures (Articles 284-286 regarding communication cable lines, Articles 295-300 regarding power supply Utilities). 69 SECTION 6: MANUAL FOR APPLICATION OF UR Examples of reasonable justification arguments for setting stricter clearances 1. Article 3 of Regulations 574 pursuant to which the location of engineering networks (the Utilities) in the territory shall be planned in such a way as to comply with the requirements of the Construction Law, as well as to ensure the quality of the environment, the rational use of the territory, energy and natural resources and the availability of the environment. 2. Article 12 of Regulations 574 pursuant to which it is prohibited to place all types of Utilities in the railway substructure (“dzelzceļa zemes klātnē”), except for technological communications of the railway. 3. Essential requirements for a structure (in this case – the Railway Line) in accordance with Article 9 of the Construction Law - mechanical strength and stability, fire safety, environmental protection and hygiene, including harmlessness, safety of use and accessibility of the environment, acoustics (noise protection), energy efficiency, sustainable use of natural resources. 4. Article 17(3) of the Railway Law pursuant to which any placement, relocation, and renovation of the Utilities in the railway right of way must not diminish the operational quality of the railway infrastructure facilities or traffic safety. 5. Impacts of vibration, maintenance requirements, possible consequences of an accident (damage or collapse of the respective Utility). 6. Any available international practice for placement of the Utilities in the railway right of way of European gauge railway. 7. Any available technical expertise and expert’s suggestions for the horizontal and vertical clearances of the Utilities to be placed in the ONI Territory. 8. The regulatory framework contained in the Protection Zone Law as a guideline, which, among others, states that it is prohibited in the protection zones along railroads: (1) to perform activities that will result in the visibility of the railroad being decreased or covering with snow being increased; (2) to perform activities as a result of which the hydrological conditions in the railroad protection zone may deteriorate or the functioning of the amelioration systems and structures of the protection zone and adjacent to it or crossing it may be disturbed; (3) to perform any building or ground digging and displacement works without co-ordination with the manager of the railway infrastructure; (4) to block service roads and accesses to the servicing objects of the railway. 70 SECTION 6: MANUAL FOR APPLICATION OF UR Steps to be taken in case the delegation agreement is concluded with the Ministry of Transport The graph below reflects consecutive steps to be taken in case a delegation agreement is concluded between the Client and the Ministry of Transport as described in Section 4.3 of this Report. •The third party - submission of the request for requirements (conditions) for the construction in the ONI Territory under Regulations 91 to the Ministry of Transport or directly to the Client if agreed so in the delegation agreement Step 1 •The Ministry of Transport - receipt of the request for requirements by the Ministry of Transport •The Ministry of Transport - forwarding the request for requirements for the construction in the ONI Territory under Regulations 91 to the Client (without delay) •The Client - the receipt of the request for requirements for the construction in the ONI Territory under Regulations 91 (from the Ministry of Step 2 Transport or directly from the third party) •The Client - preparation and issuance of the requirements within 20 days of the initial request of the third party •The third party - receipt of the requirements for the construction in the ONI Territory under Regulations 91 Step 3 •The third party - preparation of the technical design by the third party, submission to the Client for the approval (if requested) •The Client - review of the technical design, approval of the solutions or refusal to approve within 30 days Step 4 •The third party - request to the Client to issue the opinion on the readiness of the structure for the comissioning (depending on the regulations for the particular type of Utility) •The Client - visiting the object (if necessary or requested), issuing the opinion on the readiness of the structure for comissioning (within 10 Step 5 working days or within 14 days depending on the particular Utility) 71 SECTION 6: MANUAL FOR APPLICATION OF UR Steps to be taken to control territories potentially necessary for the Railway Line but not located within the current ONI Territory •Letter to the municipal and other construction authorities inviting to inform the Client and the Ministry of Transport about all significant construction initiatives in the land plots adjacent or located near the ONI Territory which could impact the implementation of the Project Step 1 •Receipt and evaluation of the information about significant construction initiatives in the land plots adjacent or located near the ONI Territory which could impact the implementation of the Project Step 2 •If necessary - addressing the Ministry of Transport with the request to exercise the rights of the Ministry stated in Article 5(5) of the Land Management Law (a reasoned decision which prohibits to continue the commenced use of a real estate object for the construction, if the real estate object in accordance with the construction project in a minimum composition or the technical design, or an administrative act issued by the Cabinet Step 3 or by a municipality will be expropriated for the needs of the society and the commenced use of the real estate burdens the implementation of the infrastructure project or substantially increases possible additional costs) •The Ministry issues the reasoned decision which prohibits to continue the commenced use of a real estate object for the construction. Step 4 72 SECTION 6: MANUAL FOR APPLICATION OF UR 6.3. Lithuania Regulations for horizontal and vertical clearances between the Utilities and other structures The table below reflects legislation containing regulation on horizontal and vertical clearances between the Utilities and other structures, including railway tracks and structures. We note that no voluntarily applicable documents, such as construction rules and standards, were verified for the purposes of this Report. Law Date Nr Content Possibility to deviate Comment Rules on 28-01-2014 1-12 The Rules defines requirements for design and As only minimal horizontal and The requirements of the rules are Establishment and construction of trunk gas pipelines with the working vertical clearances are obligatory for all participants in the Development of pressure range from 16 bar to 100 bar, which are stipulated, it shall be construction who performs design or Trunk Gas Pipelines used for transporting natural gas as well as considered that deviations are construction of HGP, HGP owners, approved by the distribution, gas compressors, record stations and possible for setting greater controllers as well as the owners, order of the Minister pressure limitation units (hereinafter – HGP). clearances if the reasonable controllers, users of the land-plots falling of Energy justification is in place. under the territory of HGP and other The Rules set minimal distances from trunk gas subjects participating in the planning of pipeline to the buildings / structures and other above-mentioned territories or objects, including railway and railway infrastructure performing design / construction of any objects as well as cases when prior written buildings or installations. approvals from the owner of the HGP are required within the limits of the lowest allowed distances. Rules on 17-05-2016 1-162 The Rules establish technical and organizational As only minimal horizontal The requirements of the rules are Establishing requirements of design and installation of steel gas clearances are stipulated, it obligatory for all participants of Distributive Gas pipelines with the maximum pressure no higher shall be considered that construction and establishment of the gas Pipelines approved than 16 bar and polyethylene gas pipelines with the deviations are possible for pipelines as well as persons who design, by the order of the maximum pressure no higher than 7 bar. The rules setting greater clearances if build, install, reconstruct or perform a Minister of Energy the reasonable justification is major repair of the gas pipelines. apply to the installation of natural gas systems for in place. the transport of natural gas, liquefied petroleum gas pipelines with a gas pressure of not more than 2 bar or consumer gas systems. The rules set minimal horizontal distances from the underground gas pipelines to buildings, utilities, other objects, including railways, electricity lines or support of the electrified railway contact points, also distances between gas pipelines. Rules on Installation 17-06-2011 1-160 The Rules apply to design and construction of heat As only minimal clearances are The requirements of the rules are of Heat Supply supply networks and heating points. The rules are stipulated, it shall be obligatory for any person installing, 73 SECTION 6: MANUAL FOR APPLICATION OF UR Networks and applicable for all trunk and underground distributive considered that deviations are reconstructing or performing major Heating Points heat supply networks. The rules set the minimum possible for setting greater repairs of heat supply networks and approved by the distances between heat supply networks and other clearances if the reasonable heating points. order of the Minister engineering networks, buildings, structures, justification is in place. of Energy including railway and its structure / objects. Rules on Installation 20-12-2011 1-309 The Rules establish the requirements on installation As only minimal clearances are The requirements of the rules are of Electricity Lines of air and cable electricity lines, electricity stipulated, it shall be obligatory for any person installing, and Equipment equipment and streamlines up to 400 kV inclusive. considered that deviations are reconstructing or performing major approved by the possible for setting greater repairs of electric lines and equipment. order of the Minister The Rules set the minimum distances between clearances if the reasonable of Energy electricity lines / cables and other engineering justification is in place. networks, buildings, structures, including railway and its structure / objects. General Rules on 03-02-2011 1-22 The Rules establish the general requirements for As only minimal horizontal The requirements of the rules are Establishing the construction of electricity networks, conductors, clearances are stipulated, it obligatory for producers of electricity, Electricity electricity equipment and related issues. shall be considered that operators of transmission and distributive Installations deviations are possible for networks, consumers of electric energy, approved by the The Rules sets the minimum horizontal distances setting greater clearances if energy companies and persons order of the Minister between the underground networks and buildings the reasonable justification is performing design, installation, of Energy structures and other objects. in place. reconstruction or major repair of the electrical devices with variable and constant current up to 400 kV as well as for persons, establishing vehicle recharge access points and devices of provision of electricity from the shore to the water vehicles. Rules on 14-10-2011 1V-978 The Rules set the basic requirements for design, As only minimal horizontal and The rules are mandatory for designers Installation, construction, laying, installing, reconstructing and vertical clearances are and builders of electronic Marking, marking electronic communication infrastructure or stipulated, it shall be communications infrastructure or current Supervision and current buildings as much as these works are considered that deviations are buildings as much as these works are Usage of Electronic related to equipping of electronic communications possible for setting greater related to the establishment of the Communications infrastructure in the buildings. clearances if the reasonable infrastructure of electronic Infrastructure justification is in place. communications in the buildings, for the approved by the The Rules sets the minimum distances between controllers or users of the infrastructure, Order of the pipes set up in horizontal and vertical plane, other persons. Communications distances between pipes and railway tracks, other Regulatory structures, buildings and other objects. Authority 74 SECTION 6: MANUAL FOR APPLICATION OF UR Rules on the 05-05-2004 3-25/D1- The Rules establishes requirements for design of As only minimal horizontal Railway Stations 249 new railway stations as well as reconstructing the clearances are stipulated, it Design approved by current railway stations with the track gauge of shall be considered that the Order of the 1520 mm in the territory of Lithuania in those deviations are possible for Communications railway lines in which the maximum speeds for the setting greater clearances if Regulatory train are: up to 160 km/h for commuter trains and the reasonable justification is Authority up to 120 km/h for commercial trains. in place. Section IV of the Rules sets minimal distances between axis of the railway track and adjacent buildings, structures and networks, as well as specifies in which cases the establishes distances can be lowered. Construction 17-06-2005 D1-309 The Regulation establishes general requirements for As only minimal horizontal and The Regulation is mandatory for all Technical Regulation construction, reconstruction and repair of vertical clearances are construction participants, owners or ‘Management of the manufacture, industrial and storage buildings, stipulated, it shall be users of engineering networks and Land of structures and engineering networks. considered that deviations are communications, subjects of public Manufacture, possible for setting greater administration as well as all persons Industry and Section 1 of the Regulation „Underground clearances if the reasonable related to design, construction, usage Storage Buildings’ engineering networks” sets minimal horizontal justification is in place. and supervision of buildings. approved by the distances between underground engineering order of the Minister networks and buildings, structures, engineering of Environment networks and communications, including railway and its structures. Construction 21-07-2003 390 The Regulation establishes essential requirements As only minimal horizontal and The Regulation is mandatory for all Technical Regulation for construction of inside and outdoor engineering vertical clearances are construction participants, owners or “Plumbing and networks - plumbing and sewage remover stipulated, it shall be users of engineering networks and sewage remover. considered that deviations are communications, subjects of public Building engineering The Rules sets the minimum horizontal and vertical possible for setting greater administration, other legal and natural systems. Outdoor distances between the networks and other clearances if the reasonable persons involved in this activity Engineering structures / objects. justification is in place. Networks”, approved by the order of the Minister of Environment 75 SECTION 6: MANUAL FOR APPLICATION OF UR Examples of reasonable justification arguments for setting stricter clearances 1. Essential requirements for a structure (in this case – the Railway Line) in accordance with Articles 4 – 6 of the Construction Law and EU Regulation No. 305/2011 - mechanical strength and stability, fire safety, environmental protection and hygiene, including harmlessness, safety of use and accessibility of the environment, acoustics (noise protection), energy efficiency, sustainable use of natural resources, etc. 2. The fact that “Rail Baltica” project has been declared as a project of national importance and current regulation is not sufficient for the European standard gauge railway with the speed of 240 km/h (higher safety, environment, operation and maintenance of the Railway Line standards shall apply). 3. Impacts of vibration, maintenance requirements, possible consequences of an accident (damage or collapse of the respective Utility). 4. Quality of the environment, the rational use of the territory, energy and natural resources and the availability of the environment. 5. Any available international practice for placement of the Utilities in the railway right of way of European gauge railway. 6. Any available technical expertise and expert’s suggestions for the horizontal and vertical clearances of the Utilities to be placed within the railway protection zones of the Railway Line. 76 SECTION 6: MANUAL FOR APPLICATION OF UR Steps to be taken in relation to construction initiatives in the railway protection zone of the Railway Line The proposal (graph) of the procedure below is based on the assumption that the Client and AB Lietuvos geležinkeliai sign the cooperation agreement which would clearly define Client’s authorisations to perform actions in relation to construction initiatives in the railway protection zone of the Railway Line. •Submission of the request for written consent for construction in the railway protection zone of the Railway Line by the third party to AB Lietuvos geležinkeliai Step 1 •Receipt of the request for written consent for construction in the railway protection zone of the Railway Line by AB Lietuvos geležinkeliai •Forwarding the above mentioned request to the Client by AB Lietuvos geležinkeliai (without delay) in order to provide the response / consent to the third party Step 2 •Receipt of the above mentioned request in the railway protection zone by the Client •Preparation of the technical requirements by the Client (within the agreed term (we consider 5-10 working days to be reasonable) Reasonable justification for setting stricter requirements shall be in place, however, not necesserily indicated in the technical conditions (i.e. protection of public interests - higher safety, environment protection requirements, technical, operational and maintenance of RL requirements, etc.) Step 3 •Issue of the written consent to the third party by the Client (no exact term established, however, we consider that 10-20 working days should be reasonable) •Signing of the Utilities installation, supervision, reconstruction and removal agreement between the Client and the third party •Receipt of the written consent and technical requirements by the third party •Preparation of the technical design by the third party, submission to the Client and LTSA for the approval of the design Step 4 •Verifying the compliance of the design with the technical requirements issued by the Client and approval of the design by the Client and LTSA •Visiting the site by the Client during the construction •Participation in the Utilities commissioning procedures by the Client as follows: • the builer’s requests the SSPCA to issue the construction completion deed (for certain type of Utilities which are special structures); •The Client – being a member of the completion commision inspects the compliance of the constructed Utility with the design solutions implementing Step 5 technical requirements issued by the Client and issues its approval or disapproval (within 10 working days after the completion commission had been formed) 77 SECTION 7: DISCLAIMER Section 7. Disclaimer 78 -degrees • • • Total Pressure (kPa) 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 0 0,5 1 1,5 Depth below interference plane (m) 2 2,5 3 3,5 4 4,5 5 5,5 6 Sum of total pressure Overburden pressure Imposed pressure GRAPH 1 TABLE A ° ° ° ° ° ° SCHEMATIC 1 Saatja: Liene Stiebre <[email protected]> Saadetud: 07.06.2019 09:56 Adressaat: Kristjan Kaunissaare <[email protected]>; Ahti Kuningas <[email protected]>; <[email protected]>; <[email protected]>; Olita Bērziņa <[email protected]>; <[email protected]>; Nerijus Kaučikas <[email protected]>; <[email protected]>; Heigo Saare <[email protected]>; TTJA <[email protected]>; Anvar Salomets <[email protected]>; Riia Sillave - External <[email protected]>; Info <[email protected]>; EDZL <[email protected]>; Kaspars Vingris <[email protected]>; <[email protected]>; <[email protected]>; 'Arenijus Jackus' <[email protected]> Koopia: Aivar Jaeski <[email protected]> Teema: RB Rail AS_Letter No. 6.1/107_Regarding the issuance of the Utility Requirements Manused: image004.png; image002.png; RBR Letter No 6.1.107_Regarding the izzuance of the Utility Requirements.edoc Dear Sir or Madam, On behalf of the Management Board of RB Rail AS, please find attached letter No 6.1/107 on “Regarding the issuance of the Utility Requirements”. Thank you in advance for confirming receipt of the letter. Sincerely, Liene Stiebre Mob.: +371 29937716 Administrative Assistant E-mail: [email protected] Skype: [email protected] K. Valdemāra 8-7, Rīga, LV-1010, Latvia RB Rail AS http://www.railbaltica.org This electronic communication, which includes any files or attachments thereto, contains proprietary or confidential information and may be privileged and otherwise protected under copyright or other applicable intellectual property laws. All information contained in this electronic communication is solely for the use of the individual(s) or entity to which it was addressed. If you are not the intended recipient(s), you are hereby notified that distributing, copying, or in any way disclosing any of the information in this e-mail is strictly prohibited. If you have received this e-mail in error, please notify the sender immediately, and destroy the communication and any files or attachments in their entirety, whether in electronic or hard copy format.
Allikas: Tarbijakaitse ja Tehnilise Järelevalve Amet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel