LepingAvalik
Leping
Kaitsevägi · 20. oktoober 2025
- Viit
- 0.4-2.1/25/219
- Registreeritud
- 20. oktoober 2025
- Dokumendi liik
- Leping
- Adressaat
- Catalyst Business Development
- Saabumis/saatmisviis
- DHX
- Funktsioon
- - -
- Sari
- - -
- Toimik
- - -
Sisu (failidest)
gV
Y
V g
Vg
g
g
@
received inter alia if it has been sent by registered mail to the address specified in the
Agreement and 5 working days have passed since the notice was mailed. When sending the
notice via email, the notice is be deemed to have been received on the working day after the
notice was sent.
16.11. This Agreement and the documents have been created in both Estonian and English. In the
event of a contradiction between the Estonian and the English Agreement/documents, the
Estonian Agreement/documents will be the superior variant.
16.12. This Agreement has been made in one or two copies and signed by both Parties digitally / in
writing and issued to both Parties with signatures.
17. Annexes
17.1. Annex 1. Technical Description;
17.2. Annex 2. Codification criteria;
17.3. Annex 3. Security requirements with Annexes;
17.4. Annex 4. Smarten Logistics criteria;
17.5. Annex 5. The Seller's tender.
Buyer: Seller:
Signature/date
Katri Raudsepp Thomas Edward O'DEA
Deputy Director General CEO
acting as Director General
14/14