14.11.2023 No 11.1-13/23/1312
DECISION
FINANCIAL CORRECTION DECISION No 21
Project: Est-Lat 55, Improvement of sailing infrastructure and yacht harbours network building
in Estonia and Latvia (ESTLAT harbours)
Lead partner: Kurzeme planning region
Project partner: Saarte Liinid Ltd
According to the Guidelines to Financial Corrections for the Interreg V-A Estonia-Latvia
programme 2014-2020 Chapter 2 and based on the 2014-2020 Structural Assistance Act, adopted
by the Parliament of the Republic of Estonia on 13 June 2018, subsection 6 of the paragraph 54
the Managing Authority decides:
5% of the costs of the contract ”Ringsu sadama väikelaevasadama laiendus“ of the
project partner Saarte Liinid Ltd are ineligible;
and
5% of the costs of the contract “Munalaiu sadama väikelaevasadama laiendus II“ of the
project partner Saarte Liinid Ltd are ineligible.
1. Public procurement of the ”Ringsu sadama väikelaevasadama laiendus“
Circumstances
The project partner, AS Saarte Liinid (hereinafter the project partner or the Contracting Authority)
carried out public procurement No 199174. It was an open procedure through the public
procurement register “Ringsu sadama väikelaevasadama laiendus“ that was launched on
06.07.2018. As a result of the procurement, the project partner has concluded contract 2ERF/2018
(hereinafter the Procurement contract) with the provider Osaühing Kaurits (hereinafter the
Contractor) on 31.08.2018. The costs of the works were € 664 116.70 excluding VAT (includes
the Contracting Authority's reserve of 5%) and the implementation of the procurement contract
was 270 days from the conclusion of the contract. During the system audit on 26.04.2023 (Audit
No JKS-49/2022), the Audit Authority identified the following violation of the provisions of the
Public Procurement Act in the procurement:
referring to standards without the mark ‘or equivalent’.
Lõkke 4 / 10122 Tallinn / Estonia / + 372 663 8200 /
[email protected] / www.rtk.ee/ Reg. code: 70007340
Construction project explanatory notes contain various references to standards and guidelines that
do not have the indication ‘or equivalent’. For example:
In the document “RIN171_PP_VK-3-01_v02_seletuskiri_NP_1723810_2018-02-06”:
Hoone tehnosüsteemide RYL2002“ Ehitustööde üldised kvaliteedinõuded. Osa 1“
RIL 77-2013 “Pinnasesse ja vette paigaldatavad plasttorud. Paigaldusjuhend”, „Maa
sisse ja vette paigaldatavad plasttorud“;
RIL 194-1992 „ Putkikaivanto-ohje“;
MAARYL 2010 “Ehitustööde kvaliteedi üldnõuded . Hoone ehituse pinnasetööd“;
EVS-EN 1610:2015 „Äravoolu- ja kanalisatsioonitorustike ehitamine ja katsetamine“,
„Dreenide ja kanalisatsioonitorustike ehitamine ja katsetamine“;
EVS-EN 1610:2007;
EVS 921 „ Veevarustuse välisvõrk“;
EN12201;
EN1340;
EVS-EN 13598-2:2009;
EVS-EN-124;
EVS-EN 61386;
EVS-EN60423;
EVS-EN 1338;
InfraRYL 2006 „Infrarakentamisen yleiset laatuvaatimukset“;
In the document “RIN171_PP_EL-3-01_v02_Seletuskiri_2018-02-08”:
EE 10421629‐JV ST 5‐6:2001"0,4 kV kaabelliinid";
In the document: “RIN171_PP_EL-5-01_EL-10-JK-U3-U4-skeem_2017-10-16”:
EVS-EN 60439-1;
EVS-EN 60439-3;
In the document “RIN171_PP_VK-8-01_Toode-mahtude-loend-NP1723810_2017-11-
01”:
EVS-EN 12201;
EVS-EN 124;
In the document “RIN171_PP_TV-3-01_v02_Seletuskiri_2018-05-16“:
EVS 932-2017 Ehitusprojekt;
EVS 924-2015 Vesiehitised sisevetel.
This is not a final list, and references to various standards and guidelines are also included in the
construction project and its annexes.
2. The public procurement of the “Munalaiu sadama väikelaevasadama laiendus II”
Circumstances
The public procurement of the “Munalaiu sadama väikelaevasadama laiendus II” with reference
number 198843 was launched on 20.06.2018 with a deadline for submission of tenders on
20.07.2018. As a result of the procurement, on 24.08.2018, the Contracting Authority concluded
contract No. 1 ERF/2018 (hereinafter the Procurement contract) with the bidder OÜ BauEst
(hereinafter the successful bidder or contractor). The total cost of the works was 341,206 euros
excluding VAT (includes the customer's reserve of 5%) and the execution time of the contract was
270 days from the conclusion of the contract. During the system audit on 26.04.2023 (Audit No
JKS-49/2022), the Audit Authority identified the following violation of the provisions of the
Public Procurement Act in the procurement:
referring to standards without the mark ‘or equivalent’.
Construction project explanatory notes contain various references to standards and guidelines that
do not have the indication ‘or equivalent’.
For example in the document „B643_PP_EK_3-01_v02_Seletuskiri“:
EVS-EN 12350 - Vajalikud katsetused ja uuringud kasutatud betooni survetugevuse klassi
hindamiseks;
EVS-EN 12390 - Vajalikud katsetused ja uuringud kasutatud betooni survetugevuse klassi
hindamiseks;
EVS-EN 12504 - Vajalikud katsetused ja uuringud kasutatud betooni survetugevuse klassi
hindamiseks;
EVS-EN 206 “Betoon. Spetsifitseerimine, toimivus, tootmine ja vastavus”;
EVS-EN 206-1:2007;
EVS-ENV 13670-1:2010 Betoonkonstruktsioonide ehitamine. Osa 1: Üldsätted; 1. klassi
nõuded;
BY 47 Betonirakentamisen laatuohjeet.
TarindiRYL2010 p. 411 Raketisetööd;
TarindiRYL2010 p. 412 Sarrustamine;
TarindiRYL2010 p. 413 Betoonimine;
TarindiRYL2010 p. 421;
EVS-EN 12620:2005;
EVS-EN-ISO 5817:2004 - Betooniteraste keevitustööd tuleb teha vastavalt klassi WC
nõuetele;
EVS-EN 1504 - Tooted ja süsteemid betoonkonstruktsioonide kaitseks ja parandamiseks;
BLY 5 Betonilattioiden tuotantomenetelmät;
BÜ 4:2010 Betooni pinnad;
BY 41 Betonirakenteiden korjausohjeet;
BY 45/BLY 7 Betonilattiat 2000 (koos BY 48 ja BY 49);
EVS-ENV 13670-1:2010 Tolerantside arvväärtused;
DIN 53521;
DIN 30677;
Määratlused, nõuded, kvaliteedikontroll ja vastavuse hindamine;
EE 10421629-JV ST 5-6:2001"0,4 kV kaabelliinid" - Kaablite vahekaugused;
Kõik ehitustööd tuleb teha vastavuses allpool toodud dokumentidega:
EVS 921:1024 Veevarustuse välisvõrk;
EVS 848:2013 Väliskanalisatsioonivõrk;
EVS 812-6:2012 Ehitiste tuleohutus. Osa 6: Tuletõrje veevarustus;
LVI-RYL 2002; - RIL 77 Maa sisse ja vette paigaldatavad plasttorud. Paigaldusjuhend;
Maa RYL 2000 Ehitiste üldised kvaliteedinõuded. Pinnasetööd ja alustarindid, üldkehtivad
reeglid ja tavad;
IHO S-44.
This is not a final list, and references to various standards and guidelines are also included in the
construction project and its annexes.
The Managing Authority, before making financial correction decision, considered the
following circumstances:
According to the Estonia - Latvia programme 2014-2020 Manual point 5.3.4 each partner
organisation is responsible for ensuring that EU and national public procurement rules are
respected and that all contracts comply with the basic principles of transparency, non-
discrimination and equal treatment as defined in the EC Treaty and the Commission Interpretative
Communication on the Community law applicable to contract awards below the EU thresholds.
According to Annex 6, point 2.3.3 of the Guidelines to Financial Corrections, if there is an
irregularity related to non-compliance with the general procurement rules, specifically when the
Estonian partner, acting as a contracting authority, fails to adhere to the general principles of
procurement for a service, goods, or building works with an estimated value equal to or exceeding
the simple procurement threshold, a financial correction rate of 5, 10, 25, or 100 percent may be
applied. The correction rate depends on the severity of the violation in accordance with the
financial correction principles in the Guidelines to Financial Corrections for the Programme
Chapter 2 and European Commission Decision of 14.5.2019, C(2019) 3452, “Guidelines for
determining financial corrections to be made to expenditure financed by the Union under shared
management for non-compliance with the rules on public procurement” (hereinafter the EC
Guidelines).
In accordance with the provisions in subsection 1 of § 87 and § 88 of the Public Procurement Act,
when preparing the technical description, the Contracting Authority must, if possible, take as a
basis the norms in force in the relevant field. If there is no technical norm in the relevant field,
generally recognized standards and technical recognitions are taken as a basis for the preparation
of the technical description of the subject of the procurement contract in accordance with the order
presented in points 1-7 of subsection 2 of § 88 of the Public Procurement Act.
The Public Procurement Act makes no distinction regarding standards where it would be
acceptable to leave out the indication ‘or equivalent’. According to both the public procurement
directives and the Public Procurement Act, it is obligatory to indicate the reference ‘or equivalent’
when mentioning any standard. The third subsection of § 88 of the Public Procurement Act
stipulates that every reference that the Contracting Authority makes in the technical specifications
to any basis mentioned in subsection two of this section is accompanied by the words ‘or
equivalent.’ It is an explicit obligation; in which case the legislator has not provided for exceptions
to deviate from its compliance or to interpret the content of the obligation in an expansive manner.
This applies even if compliance with the standard is necessary for carrying out a specific task,
providing a service, or conducting construction work as required by another legal act regulating
the relevant field.
In addition to the Public Procurement Act, the obligation to add the ‘or equivalent’ remark is
stipulated in Article 42(3)(b) of the Directive 2014/24/EU of the European Parliament and of the
Council:
“by reference to technical specifications and, in order of preference, to national standards
transposing European standards, European Technical Assessments, common technical
specifications, international standards, other technical reference systems established by the
European standardisation bodies or - when any of those do not exist - national standards, national
technical approvals or national technical specifications relating to the design, calculation and
execution of the works and use of the supplies; each reference shall be accompanied by the words
‘or equivalent’;”.
The rules regarding the preparation of technical specifications, including standards, are also
explained in the European Commission's “Guidance for practitioners on the avoidance of the most
common errors in projects funded by the European Structural and Investment Funds”/
“Riigihanked. Praktilisi näpunäiteid kõige levinumate vigade vältimiseks Euroopa struktuuri- ja
investeerimisfondidest rahastavate projektide puhul“. By looking at the instructions on pages 34-
35, 64, 78-79 and 90, it can be concluded explicitly that the requirement of a standard without the
remark ‘or equivalent’ is not acceptable.
In Procurement No 199174 and 198843, the Contracting Authority has partially failed to fulfil the
condition stipulated in subsection 3 of § 88 of the Public Procurement Act to add the remark ‘or
equivalent’ to the standards listed in the base documents of the works referred to in the technical
description.
The Managing Authority states that in construction procurement with detailed documentation,
specific construction materials, production methods and instructions, it may not always be possible
to describe all requirements and conditions without referencing a specific standard or guide. In
such a situation, according to the subparagraph 3 of § 88 of the Public Procurement Act, the
Contracting Authority may also name specific standards in the technical description/specification
but is obliged to add the words “or equivalent”.
In this case, the Contracting Authority has not followed the aforementioned requirement and has
not added the required remark. The Managing Authority is of the opinion that the bidders were not
able to clearly understand the admissibility of bidding on the basis of equivalent standards for all
standards from the basic documents of the public procurement, as there was no corresponding
indication in these standards.
According to the subparagraph 7 of § 88 of the Public Procurement Act, the technical description
must ensure equal conditions for all companies to submit a tender and must not create objectively
unreasonable obstacles in the opening of public procurement to competition.
When preparing the technical description, the Contracting Authority has a broad discretion.
However, it must also follow certain rules and limits when using this discretion. In other words,
when making its decisions, in addition to the special regulation, the Contracting Authority must
also ground its choices on the general principles of organizing public procurement (Public
Procurement Act § 3).
According to § 2 of the Public Procurement Act the Contract Authority must ensure the
transparent, practical and economic use of the Contracting Authority’s funds, equal treatment of
persons and effective use of competition in public procurement. Based on § 3 of the Public
Procurement Act the Contracting Authority treats all persons equally and makes certain that all
restrictions and criteria imposed on the persons are proportional, relevant and reasoned in relation
to the purpose of the public procurement.
These principles are especially important in the preparation of technical description/specifications,
considering the risk of discrimination related to the selection and wording of technical
description/specifications (EC C-368/10, p. 62). Technical description/specifications must enable
public procurement to be open to competition and must be prepared in such a way that they do not
artificially reduce competition with requirements favouring a certain company (recital 74 and
subsection 1 of Article 18 of the Directive 2014/24/EU and recital 83 and subsection 1 second
paragraph of Article 36 of the Directive 20014/25/EU).
In public procurement, it must be possible to submit offers based on various technical solutions,
standards and technical specifications in use on the market. Thus, the technical
description/specifications must be prepared in such a way that they do not artificially reduce
competition with requirements favouring a certain company, by describing the main characteristics
of the goods, services or construction works normally offered by that company. When referring to
their national standard, Contracting Authorities should also consider tenders based on other
equivalent systems.
The purpose of allowing equivalent solutions and instructions is to make procurement more open
to competition. Thus, referring to the European standard or, in its absence, to the standard of its
own country, the Contracting Authority must consider and allow the submission of other offers
based on equivalent systems. As different organizations may do things differently and operate
according to different codes of conduct, naming specific standards and guidelines without ‘or
equivalent’ may limit the range of tenderers.
The Contracting Authority should not assume that in the absence of a proper reference, the persons
interested in participating in the tender themselves are aware of the option to propose equivalent
solutions and instructions in their offer. There is a possibility that the circle of persons participating
in the procurement could have been wider, if the procurer had enabled to offer equivalent solutions
aligning with the standards outlined in the detailed plan contained in the technical description of
the procurement.
In Regulation No 97 of the Minister of Economy and Infrastructure of July 17, 2015
“Requirements for construction projects¹”, standards are referred to in various sections (e.g., point
2 of subsection of § 4, point 1 of subsection 1 of § 18), but it is not added that these standards
should be EVS, EVS -EN, EE, RIL, MAARYL, RYL, InfraRYL 2006 or other specific standards.
Also, the Building Code does not contain references to EVS or other specific standards. The
Contracting Authority has not provided objective reasons for the need to demand the specific
standards mentioned in the basic documents of the works without adding the remark ‘or
equivalent’.
The Contracting Authority has stipulated in point 5 of the technical description that the delivered
products and materials must be at least equivalent to the products and materials described in the
project, which only covers the product standards. The Managing Authority is of the opinion that
this sentence does not apply to all other standards, instructions and norms contained in the
procurement's basic documents. It does not matter whether it is a procurement below the
international threshold or above the international threshold, the above-mentioned standards
without the marking “or equivalent” are restrictive of competition in both cases. From the point of
equivalence allowed in point 5.1 of the technical description, “The delivered products and
materials must be at least equivalent to the products and materials described in the project”, it only
covers the product standards.
As a result of the above, the requirements of subsections 3 and 7 of § 88 of the Public Procurement
Act have been violated. Taking into account the number of different standards and guidelines and
the volume of work covered by them, it cannot be assumed that they concern an insignificant part
of the contract or are only formal. The impact of this irregularity on the resources of European
Union cannot be excluded. Due to the nature of the irregularity, it is not possible to precisely
quantify the financial impact as it is not possible to ascertain what the price of potential tenderers’,
had these conditions been stated in the procurement documents.
According to the EC Guidelines Section 2 point 11 setting selection criteria not proportionate to
the subject-matter of the contract could result with financial correction in the amount of 5%, 10%
or 25% of the expenditure of the contract, depending on the seriousness of the violation.
The type of irregularity No 11 of the EC Guidelines describes situations where criteria or
conditions that, despite not being discriminatory on the basis of national/regional/local
preferences, still lead to restricting access for economic operators to specific public procurement
procedure. In addition, type of irregularity No 11 specifies the cases where specific
trademarks/brands/ standards are required, as it was in the current case, without allowing for an
equivalent trademark/brand by not using the compulsory quote ‘or equivalent’.
For the cases in which restrictive criteria/conditions/specifications were applied, but still a
minimum level of competition was ensured, i.e. a number of economic operators submitted tenders
that were accepted and fulfilled the selection criteria, the correction is 5%.
In the tender of “Ringsu sadama väikelaevasadama laiendus”, 3 offers were submitted, of which 2
were recognized as appropriate. Therefore 5% of financial correction applies.
The total ineligible costs (EUR):
Expenditure Total cost of Total cost ERDF Self- Total Ineligible Ineligible
budget line the contract certified support financing ineligible ERDF self-
excluding support financing
VAT
Infrastructure 664 116.70 555 042.75 471 786.34 83 256.41 27 752.15 23 589.27 4 162.88
and works
In the tender of “Munalaiu sadama väikelaevasadama laiendus II“, 3 offers were submitted, of
which 2 were recognized as appropriate. Therefore 5% of financial correction applies.
The total ineligible costs (EUR):
Expenditure Total cost of Total cost ERDF Self- Total Ineligible Ineligible
budget line the contract certified support financing ineligible ERDF self-
excluding support financing
VAT
Infrastructure 341 206.00 328 154.25 278 931.11 49 223.14 16 407.72 13 946.54 2 461.18
and works
Argumentations and statements
The Lead Partner does not agree with the financial correction decision and is of the opinion that
the project partner did not violate PPA § 88 subsection 7 with referring to standards and guidelines.
Project partner finds that standards provide relevant and sufficient information to interested and
diligent entrepreneurs for preparing and submitting tenders and ensuring that tenders are
comparable. The Project partner’s opinion that there are no reasonings and/or supporting proof,
from which it could be concluded, that cited standards and guidelines have objectively unjustified
restrictive effect to competition. This could only be said, if the purpose of the procurement
procedures could be achieved, following more lenient requirements.
The Management Authority is of the opinion that these standards cover a much wider area than
just "products and materials", with a large number of them also covering construction in general.
Nor can it be said that the required standards cover a small or insignificant part of the work in
comparison with the work carried out.
A general condition of the ETÜ may be relevant ex-post, for example in the case of practical
substitution of a single product or material. It is certainly not equivalent in terms of assurance to
using the words “or equivalent” for a significant list of standards in the tender documents, nor does
it allow the bidder to assume that he can use equivalent working procedures and solutions. We
consider that the case law cited does not tend to support the beneficiary's argument.
Finally, the Managing Authority took into account the number of tenderers when determining the
financial correction decision. Therefore, a correction rate of 5% applies.
Legal basis of the financial correction
1. Structural Assistance Act 2014-2020
According to the Article 54 subsection 6 of the Structural Assistance Act 2014-2020 a financial
correction decision shall be based on the procedure for making a financial correction decision
established in the ETC programme or in the procedure for making a financial correction decision,
established on the basis of subsection 7 of the same section, while pursuant to the ETC programme
the making of the financial correction decision is based on the procedure established nationally in
the states participating in the programme.
2. The Guidelines to Financial Corrections
The Guidelines to Financial Corrections for the Estonia – Latvia Programme 2014-2020
establishes a range of corrections of up to 5%, 10%, 25% and 100% that are applied to the
expenditure of a contract. They take into account the seriousness of the irregularity and the
principle of proportionality. These rates of corrections are applied when it is not possible to
quantify precisely the financial implications for the contract in question.
3. The Public Procurement Act of Estonia
The Public Procurement Act’s § 3 subsection 1 states that the Contracting Authority or the
contracting entity acts transparently, verifiably and proportionately, when carrying out public
procurement.
The subsection 2 of § 3 stipulates that, the contracting authority makes certain that all restrictions
and criteria imposed on the persons are proportional, relevant and reasoned in relation to the
purpose of the public procurement.
The subsection 1 of § 87 states that ‘technical specifications’ means the following, established by
the contracting authority or entity for the purpose of describing the subject matter of the public
contract using the terminology and the level of accuracy understandable to persons engaged in the
respective field:
1) list of the characteristics of and requirements applicable to the supplies or services that
constitute the subject matter of a public supply contract or a public service contract;
2) body of the characteristics of and requirements applicable to the works that constitute
the subject matter of a public works contract.
The subsection 2 of § 88, upon drawing up the technical specifications, the contracting authority
may rely on the following in the following order:
1) the European standard transposed as the Estonian standard;
2) the European standard;
3) a European technical approval, which has been granted by an approval body designated
by a Member State of the European Union and which certifies that, based on the technical
point of view, the product is suitable for the prescribed purpose in terms of its
characteristics, which correspond to the main requirements established for works, as well
as in terms of its features and the prescribed conditions of application or use;
4) a common technical specification, which has been established in accordance with the
rules recognised by a Member State of the European Union and published in the Official
Journal of the European Union;
5) an international standard;
6) a technical reference system established by a European standardisation body;
7) the original Estonian standard, Estonian technical approval or Estonian technical
specifications relating to the design, calculation, and execution of works or use of products.
Based on subsection 3 of § 88, every reference that the Contracting Authority makes in the
technical specifications to any ground specified in subsection 2 of this section as a criterion of the
conformity of a tender with the technical specifications is accompanied by the words ‘or
equivalent’.
According to the subsection 7 of § 88 technical specifications must ensure that the conditions for
the submission of a tender are equal for all tenderers and must not have the effect of creating
unjustified obstacles to the opening up of public procurement to competition.
4. The Common Provisions Regulation
According to Article 143(2) of the Regulation No 1303/2013 of the European Parliament and of
the Council of 17 December 2013, the Member States shall in the first instance be responsible for
investigating irregularities and for making the financial corrections required and pursuing
recoveries. In the case of a systemic irregularity, the Member State shall extend its investigation
to cover all operations potentially affected.
5. Protection of the European Communities financial interests
Article 4(1) of the European Union Council Regulation (EC, Euratom) No 2988/95 on of 18
December 1995 stipulates that any irregularity shall involve withdrawal of the wrongly obtained
advantage. Point d) of Article 5(1) of the same regulation stipulates that intentional irregularities
or those caused by negligence may lead to the following administrative penalties: total or partial
removal of an advantage granted by Community rules, even if the operator wrongly benefited from
only a part of that advantage.
According to Article 160(1) of the Regulation (EU) No 2018/1046 all contracts financed in whole
or in part by the budget shall respect the principles of transparency, proportionality, equal
treatment and non-discrimination and according to the point 2 of Article 160 all contracts shall be
put out to competition on the broadest possible basis.
6. Programme Manual for the Estonia - Latvia Programme 2014-2020
According to point 5.3.4 of the Programme Manual of the Estonia - Latvia programme 2014-2020
each partner organisation is responsible for ensuring that EU and national public procurement rules
are respected and that all contracts comply with the basic principles of transparency, non-
discrimination and equal treatment as defined in the EC Treaty and the Commission Interpretative
Communication on the Community law applicable to contract awards below the EU thresholds.
7. Programme Manual Annex 6. Guidelines to Financial Corrections
According to the Programme Manual Annex 6. Guidelines to Financial Corrections Chapter 2.3.3
Financial correction in case of irregularity related to non-compliance with the general rules on
procurement when the Estonian partner is a contracting authority for the purposes of the
procurement, when Estonian beneficiary or partner is a contracting authority for the purposes of
the public procurement, and the estimated value of a service, goods or building works is equal to
or in excess of simple procurement threshold has violated the obligation to comply with the general
principles of procurement, the financial correction rate of 5, 10, 25 or 100 percent may be applied
depending on the severity of the violation by using the financial correction principles according to
the EC Guidelines.
According to the Programme Manual Annex 6. Guidelines to Financial Corrections Chapter 2.5
Repayment to the Managing Authority, when MA, JS, FC detect an error in expenditure that has
already been paid out to the project, the programme can deduct the amount from the next project
progress report. In cases where the amount cannot be corrected by deducting it from the next
project progress report, LP is required to repay the amount to the programme, as specified in the
financial correction decision within 60 calendar days as of the date of entry into force of the
financial correction decision in the indicated amount and date.
8. Subsidy Contract
Article 1 of the Subsidy Contract stipulates that the partners should also follow the EU and national
principles on protection of environment, sustainable development, equal opportunities, non-
discrimination.
Point 2 of Article 3 of the Subsidy Contract regulates that the Lead Partner and Project Partner
shall implement the project with the requisite care, efficiency, transparency and diligence, in line
with best practice in the field concerned and in compliance with this Contract. For this purpose,
the Lead Partner and Project Partner shall mobilise all the financial, human and material resources
required for full implementation of the project as specified in the approved application.
DECISION
1. Based on the 2014-2020 Structural Assistance Act, adopted by the Parliament of the
Republic of Estonia on 13 June 2018, and Guidelines to Financial Corrections for the
Estonia - Latvia Programme 2014-2020, the Managing Authority decides to apply:
5% of the costs of the contract ”Ringsu sadama väikelaevasadama laiendus“ of the
project partner Saarte Liinid Ltd are ineligible
and
5% of the costs of the contract “Munalaiu sadama väikelaevasadama laiendus II“ of
the project partner Saarte Liinid Ltd are ineligible.
2. Financial correction to the Saarte Liinid Ltd is 5% of the contract of the Osaühing Kaurits.
Total certified costs were €555 042.75, out of which €471 786.34 is ERDF support and €83
256.41 is self-financing. Total certified ineligible amount is €27 752.15 out of which €23
589.27 is ERDF support and €4 162.88 is self-financing.
Financial correction to the Saarte Liinid Ltd is 5% of the contract of the OÜ BauEst. Total
certified costs were €328 154.25, out of which €278 931.11 is ERDF support and
€49 223.14 is self-financing. Total certified ineligible amount is €16 407.72, out of which
€13 946.54 is ERDF support and €2 461.18 is self-financing.
The ERDF support €37 535.81 must be repaid to the Programme.
3. The Lead Partner Kurzeme planning region is required to repay the ERDF support
within 60 calendar days from the receipt of this financial correction decision.
4. Repayment of the assistance has to be made as follows:
Beneficiary: Ministry of Finance of the Republic of Estonia
Bank information:
SEB Bank EE891010220034796011 (SWIFT: EEUHEE2X)
Swedbank EE932200221023778606 (SWIFT: HABAEE2X)
Luminor Bank EE701700017001577198 (SWIFT: NDEAEE2X)
Reference number: 2800045768
Please mark for payment for explanation “EE-LV Programme 2014-2020 FCD No 21”.
In case the Kurzeme planning region is not able to repay the assistance within the specified
period, the repayment may be postponed in compliance with chapter 2.6.1 of the Guidelines
to Financial Corrections. In this case a reasoned request has to be submitted to the
Managing Authority.
Fine for delay
Fine for delay, if necessary, will be applied in compliance with chapter 2.7 for the
Guidelines to Financial Corrections.
Appeal of the decision
The present Financial Correction Decision may be appealed in accordance with the Annex
4 to the Programme Manual, which is available on the web-site https://old.estlat.eu/.
(signed digitally)
Ege Ello
Head of the Managing Authority