Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
EUROPEAN CLIMATE, INFRASTRUCTURE AND ENVIRONMENT
EXECUTIVE AGENCY (CINEA)
CINEA.B – Sustainable networks and investments
Head of Department
GRANT AGREEMENT
Project 101122891 — 22-EU-TG-eFTI4EU
PREAMBLE
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the European Climate, Infrastructure and Environment Executive Agency (CINEA) (‘EU
executive agency’ or ‘granting authority’), under the powers delegated by the European Commission
(‘European Commission’),
and
on the other part,
1. ‘the coordinator’:
KLIIMAMINISTEERIUM (MoClimate), PIC 941609750, established in SUUR-AMEERIKA 1,
TALLINN 10122, Estonia,
and the following other beneficiaries, if they sign their ‘accession form’ (see Annex 3 and Article 40):
2. DIGILOGISTIKA KESKUS (DLK), PIC 892290391, established in TEADUSPARGI 6/1,
TALLINN 12618, Estonia,
3. 51BIZ LUXEMBOURG SARL (51Biz LUXEMBURG), PIC 951890877, established in
MAISON 15, GREVENKNAPP 7433, Luxembourg,
4. CIRCLE SPA (CIRCLE SPA), PIC 946059916, established in VIA G. BATTISTA PERGOLESI
26, MILANO 20124, Italy,
5. BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR (BMDV), PIC 996530374,
established in Robert-Schuman-Platz 1, Bonn 53175, Germany,
6. BUNDESAMT FUR LOGISTIK UND MOBILITAT (BALM), PIC 884011344, established in
WERDERSTRASSE 34, KOLN 50672, Germany,
7. LIIKENNE- JA VIESTINTAVIRASTO (FI Transport&Co), PIC 900306956, established in
KUMPULANTIE 9, HELSINKI 00520, Finland,
1
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
8. SCHIENENINFRASTRUKTUR-DIENSTLEISTUNGS-GESELLSCHAFT MBH (SCHIG),
PIC 887660387, established in JAKOV-LIND-STRASSE 2 STG 2,4 OG AUSTRIA CAMPUS 2,
WIEN 1020, Austria,
9. PORTS AND TERMINALS CVBA (PORTEXPERTISE), PIC 933959457, established in DR
J GOOSSENAERTSSTRAAT AB 54, KALMTHOUT 2920, Belgium,
10. Ministero delle Infrastrutture e dei Trasporti (MIT), PIC 996445790, established in Via
Nomentana, 2, Roma 00161, Italy,
11. INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P (IMT, I. P.), PIC 966290430,
established in AVENIDA DAS FORCAS ARMADAS 40, LISBOA 1649 022, Portugal,
12. NORDIC INVESTMENT BANK (Nordic Invest), PIC 894031056, established in
FABIANINKATU 34, HELSINKI 00171, Finland,
13. UAB NORMALIS TECH (NORM), PIC 886548088, established in JAUNIMO G. 16,
INGALINA 30290, Lithuania,
14. TRANSPORTO INOVACIJU ASOCIACIJA (TIA), PIC 885458875, established in
GEDIMINO PR 9, VILNIUS LT01103, Lithuania,
15. IMPRIMERIE NATIONALE (Groupe IN), PIC 911407345, established in 38 AVENUE DE
NEW YORK, PARIS 75116, France,
16. VALSTYBES IMONE KLAIPEDOS VALSTYBINIO JURU UOSTO DIREKCIJA
(KLAIPEDA PORT), PIC 951975364, established in J JANONIO 24, KLAIPEDA 92251, Lithuania,
17. LIETUVOS RESPUBLIKOS SUSISIEKIMO MINISTERIJA (LT MIN.TRANSP.), PIC
888880550, established in GEDIMINO PR. 17, VILNIUS 01505, Lithuania,
18. SERVICE PUBLIC DE WALLONIE (SPW), PIC 999811884, established in Place de la
Wallonie 1, Namur 5100, Belgium,
19. LOGISTICS IN WALLONIA (LIW), PIC 963728466, established in RUE DE L'AEROPORT
52 / 10, GRACE-HOLLOGNE 4460, Belgium,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator and
affiliated entities (if any).
If only one beneficiary signs the grant agreement (‘mono-beneficiary grant’), all provisions referring
to the ‘coordinator’ or the ‘beneficiaries’ will be considered — mutatis mutandis — as referring to
the beneficiary.
The parties referred to above have agreed to enter into the Agreement.
By signing the Agreement and the accession forms, the beneficiaries accept the grant and agree to
implement the action under their own responsibility and in accordance with the Agreement, with all
the obligations and terms and conditions it sets out.
2
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
The Agreement is composed of:
Preamble
Terms and Conditions (including Data Sheet)
Annex 1 Description of the action1
Annex 2 Estimated budget for the action
Annex 2a Additional information on unit costs and contributions (if applicable)
Annex 3 Accession forms (if applicable)2
Annex 3a Declaration on joint and several liability of affiliated entities (if applicable)3
Annex 4 Model for the financial statements
Annex 5 Specific rules (if applicable)
1 Template published on Portal Reference Documents.
2 Template published on Portal Reference Documents.
3 Template published on Portal Reference Documents.
3
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
TERMS AND CONDITIONS
TABLE OF CONTENTS
GRANT AGREEMENT.................................................................................................................................................... 1
PREAMBLE........................................................................................................................................................................1
TERMS AND CONDITIONS...........................................................................................................................................4
DATASHEET...................................................................................................................................................................... 9
CHAPTER 1 GENERAL..............................................................................................................................................15
ARTICLE 1 — SUBJECT OF THE AGREEMENT ..................................................................................... 15
ARTICLE 2 — DEFINITIONS........................................................................................................................15
CHAPTER 2 ACTION................................................................................................................................................. 16
ARTICLE 3 — ACTION................................................................................................................................. 16
ARTICLE 4 — DURATION AND STARTING DATE...................................................................................16
CHAPTER 3 GRANT...................................................................................................................................................16
ARTICLE 5 — GRANT...................................................................................................................................16
5.1 Form of grant......................................................................................................................................16
5.2 Maximum grant amount..................................................................................................................... 17
5.3 Funding rate........................................................................................................................................17
5.4 Estimated budget, budget categories and forms of funding.............................................................. 17
5.5 Budget flexibility................................................................................................................................17
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS......................................18
6.1 General eligibility conditions............................................................................................................. 18
6.2 Specific eligibility conditions for each budget category................................................................... 19
6.3 Ineligible costs and contributions...................................................................................................... 24
6.4 Consequences of non-compliance...................................................................................................... 25
CHAPTER 4 GRANT IMPLEMENTATION............................................................................................................ 25
SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER
PARTICIPANTS........................................................................................................................................ 25
ARTICLE 7 — BENEFICIARIES................................................................................................................... 25
ARTICLE 8 — AFFILIATED ENTITIES....................................................................................................... 27
ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION................................................... 28
9.1 Associated partners.............................................................................................................................28
9.2 Third parties giving in-kind contributions to the action.................................................................... 28
9.3 Subcontractors.....................................................................................................................................28
4
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
9.4 Recipients of financial support to third parties..................................................................................28
ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS....................................................................... 29
10.1 Non-EU participants......................................................................................................................... 29
10.2 Participants which are international organisations...........................................................................29
10.3 Pillar-assessed participants............................................................................................................... 30
SECTION 2 RULES FOR CARRYING OUT THE ACTION...........................................................................32
ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION............................................................ 32
11.1 Obligation to properly implement the action................................................................................... 32
11.2 Consequences of non-compliance.................................................................................................... 32
ARTICLE 12 — CONFLICT OF INTERESTS.............................................................................................. 32
12.1 Conflict of interests.......................................................................................................................... 32
12.2 Consequences of non-compliance.................................................................................................... 32
ARTICLE 13 — CONFIDENTIALITY AND SECURITY............................................................................ 33
13.1 Sensitive information........................................................................................................................33
13.2 Classified information...................................................................................................................... 33
13.3 Consequences of non-compliance.................................................................................................... 34
ARTICLE 14 — ETHICS AND VALUES...................................................................................................... 34
14.1 Ethics.................................................................................................................................................34
14.2 Values................................................................................................................................................ 34
14.3 Consequences of non-compliance.................................................................................................... 34
ARTICLE 15 — DATA PROTECTION.......................................................................................................... 34
15.1 Data processing by the granting authority....................................................................................... 34
15.2 Data processing by the beneficiaries............................................................................................... 35
15.3 Consequences of non-compliance.................................................................................................... 35
ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS —
ACCESS RIGHTS AND RIGHTS OF USE................................................................................ 35
16.1 Background and access rights to background..................................................................................35
16.2 Ownership of results.........................................................................................................................36
16.3 Rights of use of the granting authority on materials, documents and information received for
policy, information, communication, dissemination and publicity purposes...................................36
16.4 Specific rules on IPR, results and background................................................................................ 37
16.5 Consequences of non-compliance.................................................................................................... 37
ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY............................................ 37
17.1 Communication — Dissemination — Promoting the action........................................................... 37
17.2 Visibility — European flag and funding statement......................................................................... 37
17.3 Quality of information — Disclaimer..............................................................................................38
5
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
17.4 Specific communication, dissemination and visibility rules............................................................38
17.5 Consequences of non-compliance.................................................................................................... 38
ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION............................................... 39
18.1 Specific rules for carrying out the action........................................................................................ 39
18.2 Consequences of non-compliance.................................................................................................... 39
SECTION 3 GRANT ADMINISTRATION......................................................................................................... 39
ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS.................................................................... 39
19.1 Information requests......................................................................................................................... 39
19.2 Participant Register data updates..................................................................................................... 39
19.3 Information about events and circumstances which impact the action............................................39
19.4 Consequences of non-compliance.................................................................................................... 40
ARTICLE 20 — RECORD-KEEPING............................................................................................................ 40
20.1 Keeping records and supporting documents.................................................................................... 40
20.2 Consequences of non-compliance.................................................................................................... 41
ARTICLE 21 — REPORTING........................................................................................................................ 41
21.1 Continuous reporting........................................................................................................................ 41
21.2 Periodic reporting: Technical reports and financial statements....................................................... 41
21.3 Currency for financial statements and conversion into euros..........................................................42
21.4 Reporting language...........................................................................................................................43
21.5 Consequences of non-compliance.................................................................................................... 43
ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS DUE................. 43
22.1 Payments and payment arrangements.............................................................................................. 43
22.2 Recoveries.........................................................................................................................................43
22.3 Amounts due.....................................................................................................................................44
22.4 Enforced recovery.............................................................................................................................48
22.5 Consequences of non-compliance.................................................................................................... 49
ARTICLE 23 — GUARANTEES....................................................................................................................50
23.1 Prefinancing guarantee..................................................................................................................... 50
23.2 Consequences of non-compliance.................................................................................................... 50
ARTICLE 24 — CERTIFICATES................................................................................................................... 50
24.1 Operational verification report (OVR).............................................................................................50
24.2 Certificate on the financial statements (CFS).................................................................................. 50
24.3 Certificate on the compliance of usual cost accounting practices (CoMUC).................................. 51
24.4 Systems and process audit (SPA).....................................................................................................51
24.5 Consequences of non-compliance.................................................................................................... 52
6
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS..................................................................................................................................... 52
25.1 Granting authority checks, reviews and audits................................................................................ 52
25.2 European Commission checks, reviews and audits in grants of other granting authorities..............53
25.3 Access to records for assessing simplified forms of funding.......................................................... 53
25.4 OLAF, EPPO and ECA audits and investigations........................................................................... 53
25.5 Consequences of checks, reviews, audits and investigations — Extension of results of reviews,
audits or investigations.................................................................................................................... 54
25.6 Consequences of non-compliance.................................................................................................... 55
ARTICLE 26 — IMPACT EVALUATIONS................................................................................................... 55
26.1 Impact evaluation............................................................................................................................. 55
26.2 Consequences of non-compliance.................................................................................................... 56
CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE.................................................................................. 56
SECTION 1 REJECTIONS AND GRANT REDUCTION.................................................................................56
ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS...........................................................56
27.1 Conditions......................................................................................................................................... 56
27.2 Procedure.......................................................................................................................................... 56
27.3 Effects............................................................................................................................................... 56
ARTICLE 28 — GRANT REDUCTION........................................................................................................ 56
28.1 Conditions......................................................................................................................................... 56
28.2 Procedure.......................................................................................................................................... 57
28.3 Effects............................................................................................................................................... 57
SECTION 2 SUSPENSION AND TERMINATION............................................................................................57
ARTICLE 29 — PAYMENT DEADLINE SUSPENSION............................................................................. 57
29.1 Conditions......................................................................................................................................... 57
29.2 Procedure.......................................................................................................................................... 58
ARTICLE 30 — PAYMENT SUSPENSION...................................................................................................58
30.1 Conditions......................................................................................................................................... 58
30.2 Procedure.......................................................................................................................................... 58
ARTICLE 31 — GRANT AGREEMENT SUSPENSION..............................................................................59
31.1 Consortium-requested GA suspension............................................................................................. 59
31.2 EU-initiated GA suspension.............................................................................................................60
ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION......................................... 61
32.1 Consortium-requested GA termination............................................................................................ 61
32.2 Consortium-requested beneficiary termination................................................................................ 62
32.3 EU-initiated GA or beneficiary termination.................................................................................... 63
7
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE SANCTIONS............... 66
ARTICLE 33 — DAMAGES...........................................................................................................................66
33.1 Liability of the granting authority....................................................................................................66
33.2 Liability of the beneficiaries............................................................................................................ 66
ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES....................................... 67
SECTION 4 FORCE MAJEURE.......................................................................................................................... 67
ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 67
CHAPTER 6 FINAL PROVISIONS...........................................................................................................................67
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................67
36.1 Forms and means of communication — Electronic management................................................... 67
36.2 Date of communication.................................................................................................................... 68
36.3 Addresses for communication.......................................................................................................... 68
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................68
ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES..........................................................68
ARTICLE 39 — AMENDMENTS.................................................................................................................. 69
39.1 Conditions......................................................................................................................................... 69
39.2 Procedure.......................................................................................................................................... 69
ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES........................................... 69
40.1 Accession of the beneficiaries mentioned in the Preamble............................................................. 70
40.2 Addition of new beneficiaries.......................................................................................................... 70
ARTICLE 41 — TRANSFER OF THE AGREEMENT................................................................................. 70
ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE GRANTING
AUTHORITY.................................................................................................................................70
ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 71
43.1 Applicable law..................................................................................................................................71
43.2 Dispute settlement............................................................................................................................ 71
ARTICLE 44 — ENTRY INTO FORCE.........................................................................................................71
8
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
DATA SHEET
1. General data
Project summary:
Project summary
The project eFTI4EU will encourage Member States to join forces, face the upcoming eFTI requirements, and work jointly on common
specifications and take advantage of a well harmonized European wide eFTI exchange environment according to the Regulation EU No
2020/1056 on electronic Freight Transport Information (eFTI Regulation). EFTI4EU project will support the process of implementation
of the eFTI Regulation in digitalizing freight transport and logistics by contributing to the implementation of a seamless paperless
information exchange between businesses and authorities and developing systems/IT platforms to be used by the competent authorities
to access and process information electronically on a non-discriminatory basis and in accordance with Regulation EU 2020/1056 on
electronic Freight Transport Information (eFTI). The overall objectives of the Project are fully aligned with the aim of eFTI Regulation
EU No 2020/1056, namely: - to encourage the digitalization of freight transport and logistics - to reduce administrative costs, improve
enforcement capabilities of competent authorities, and - to enhance the efficiency and sustainability of transport. In detail the project
comprises the following: Studies: ● Provision of national and regional eFTI roadmaps ● Participation in the horizontal alignment work
package to promote harmonization of eFTI development and interoperability between Member States. This also covers the specification
and the common co-development of eFTI reference implementations (eFTI platform and eFTI Gate) ● Communication and dissemination,
knowledge sharing activities in the MS to promote eFTI Pilots: ● Development and piloting of an eFTI gate aligned with the jointly
specified and developed reference implementation, which could lead to a system that becomes operational in 2025 ● eFTI gate pilots
cover the following communication paths: ○ eFTI gate to competent authorities ○ eFTI gate to eFTI platforms ○ eFTI gate to other eFTI
gates ○ eFTI gate to other linked systems
Keywords:
– eFTI, interoperability, DTLF, eFTI gates, trusted networks of platforms, National Access Points/ eFTI Gate,
building blocks, eFTI Network Corridors from North to South and across,
Project number: 101122891
Project name: electronic Freight Transport Information for Europe
Project acronym: 22-EU-TG-eFTI4EU
Call: CEF-T-2022-SIMOBGEN
Topic: CEF-T-2022-SIMOBGEN-eFTI-WORKS
Type of action: CEF Infrastructure Projects
Granting authority: European Climate, Infrastructure and Environment Executive Agency
Grant managed through EU Funding & Tenders Portal: Yes (eGrants)
Project starting date: fixed date: 1 April 2023
Project end date: 31 March 2026
Project duration: 36 months
Consortium agreement: Yes
2. Participants
List of participants:
Total
Max grant
N° Role Short name Legal name Ctry PIC eligible costs
amount
(BEN and AE)
1 COO MoClimate KLIIMAMINISTEERIUM EE 941609750 1 000 000.00 500 000.00
2 BEN DLK DIGILOGISTIKA KESKUS EE 892290391 710 000.00 355 000.00
9
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Total
Max grant
N° Role Short name Legal name Ctry PIC eligible costs
amount
(BEN and AE)
3 BEN 51Biz 51BIZ LUXEMBOURG SARL LU 951890877 590 280.00 295 140.00
LUXEMBURG
4 BEN CIRCLE SPA CIRCLE SPA IT 946059916 710 000.00 355 000.00
4.1 AE CCEU CIRCLE CONNECTING EU S.R.L. IT 889903609 415 000.00 207 500.00
5 BEN BMDV BUNDESMINISTERIUM FÜR DIGITALES UND DE 996530374 2 400 000.00 1 200 000.00
VERKEHR
6 BEN BALM BUNDESAMT FUR LOGISTIK UND MOBILITAT DE 884011344 3 000 000.00 1 500 000.00
7 BEN FI Transport&Co LIIKENNE- JA VIESTINTAVIRASTO FI 900306956 4 970 000.00 2 485 000.00
8 BEN SCHIG SCHIENENINFRASTRUKTUR-DIENSTLEISTUNGS- AT 887660387 800 000.00 400 000.00
GESELLSCHAFT MBH
8.1 AE BMK BUNDESMINISTERIUM FUER KLIMASCHUTZ, AT 999633695 0.00 0.00
UMWELT, ENERGIE, MOBILITAET, INNOVATION UND
TECHNOLOGIE
9 BEN PORTEXPERTISE PORTS AND TERMINALS CVBA BE 933959457 971 500.00 485 750.00
10 BEN MIT Ministero delle Infrastrutture e dei Trasporti IT 996445790 15 000.00 7 500.00
10.1 AE RAM SPA RETE AUTOSTRADE MEDITERRANEE PER LA IT 937468917 710 000.00 355 000.00
LOGISTICA LE INFRASTRUTTURE ED I TRASPORTI
SOCIETA PER AZIONI
11 BEN IMT, I. P. INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, PT 966290430 1 500 000.00 750 000.00
IP
12 BEN Nordic Invest NORDIC INVESTMENT BANK FI 894031056 285 000.00 142 500.00
(IO)
13 BEN NORM UAB NORMALIS TECH LT 886548088 200 000.00 100 000.00
14 BEN TIA TRANSPORTO INOVACIJU ASOCIACIJA LT 885458875 180 000.00 90 000.00
15 BEN Groupe IN IMPRIMERIE NATIONALE FR 911407345 5 495 844.00 2 747 922.00
15.1 AE French Ministry MINISTERE DE LA TRANSITION ECOLOGIQUE ET DE FR 996384874 1 000 000.00 500 000.00
LA COHESION DES TERRITOIRES
16 BEN KLAIPEDA PORT VALSTYBES IMONE KLAIPEDOS VALSTYBINIO JURU LT 951975364 1 500 000.00 750 000.00
UOSTO DIREKCIJA
17 BEN LT MIN.TRANSP. LIETUVOS RESPUBLIKOS SUSISIEKIMO LT 888880550 0.00 0.00
MINISTERIJA
18 BEN SPW SERVICE PUBLIC DE WALLONIE BE 999811884 1 850 000.00 925 000.00
19 BEN LIW LOGISTICS IN WALLONIA BE 963728466 50 000.00 25 000.00
Total 28 352 624.00 14 176 312.00
Coordinator:
– KLIIMAMINISTEERIUM (MoClimate)
3. Grant
Maximum grant amount, total estimated eligible costs and contributions and funding rate:
Total eligible costs Funding rate Maximum grant amount Maximum grant amount
(BEN and AE) (%) (Annex 2) (award decision)
28 352 624.00 70, 50, 50 14 176 312.00 14 176 312.00
Grant form: Budget-based
Grant mode: Action grant
Budget categories/activity types:
10
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
- A. Personnel costs
- A.1 Employees, A.2 Natural persons under direct contract, A.3 Seconded persons
- A.4 SME owners and natural person beneficiaries
- B. Subcontracting costs
- C. Purchase costs
- C.1 Travel and subsistence
- C.2 Equipment
- C.3 Other goods, works and services
- D. Other cost categories
- D.1 Financial support to third parties
- D.2 Studies
- D.3 Synergetic elements
- D.4 Works in outermost regions
- D.5 Land purchase
- E. Indirect costs
Cost eligibility options:
- Standard supplementary payments
- Average personnel costs (unit cost according to usual cost accounting practices)
- Country restrictions for subcontracting costs
- Travel and subsistence:
- Travel: Actual costs
- Accommodation: Actual costs
- Subsistence: Actual costs
- Equipment: full costs only
- Costs for providing financial support to third parties (actual cost; max amount for each recipient: EUR 60 000.00)
- Indirect cost flat-rate: 0% of the eligible direct costs (categories A-D, except volunteers costs and exempted
specific cost categories, if any)
- VAT: No
- Country restrictions for eligible costs
- Other ineligible costs
Budget flexibility: Yes (no flexibility cap)
4. Reporting, payments and recoveries
4.1 Continuous reporting (art 21)
Deliverables: see Funding & Tenders Portal Continuous Reporting tool
4.2 Periodic reporting and payments
11
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Reporting and payment schedule (art 21, 22):
Reporting Payments
Deadline
Reporting periods Type Deadline Type
(time to pay)
RP No Month from Month to
30 days from
entry into force/
financial guarantee
Initial prefinancing
(if required)
– whichever
is the latest
1 1 36 Periodic report 60 days after end Final payment 90 days from
of reporting period receiving
periodic report
Prefinancing payments and guarantees:
Prefinancing payment Prefinancing guarantee
Guarantee
Type Amount Division per participant
amount
Prefinancing 1 (initial) 7 088 156.00 n/a 1 - MoClimate n/a
2 - DLK n/a
3 - 51Biz LUXEMBURG n/a
4 - CIRCLE SPA n/a
4.1 - CCEU n/a
5 - BMDV n/a
6 - BALM n/a
7 - FI Transport&Co n/a
8 - SCHIG n/a
8.1 - BMK n/a
9 - PORTEXPERTISE n/a
10 - MIT n/a
10.1 - RAM SPA n/a
11 - IMT, I. P. n/a
12 - Nordic Invest n/a
13 - NORM n/a
14 - TIA n/a
15 - Groupe IN n/a
15.1 - French Ministry n/a
16 - KLAIPEDA PORT n/a
17 - LT MIN.TRANSP. n/a
18 - SPW n/a
19 - LIW n/a
Reporting and payment modalities (art 21, 22):
Mutual Insurance Mechanism (MIM): No
Restrictions on distribution of initial prefinancing: The prefinancing may be distributed only if the minimum number of
12
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
beneficiaries set out in the call condititions (if any) have acceded to the Agreement and only to beneficiaries that have
acceded.
Interim payment ceiling (if any): 90% of the maximum grant amount
No-profit rule: Yes
Late payment interest: ECB + 3.5%
Bank account for payments:
EE891010220034796011
Conversion into euros: Double conversion
Reporting language: Language of the Agreement
4.3 Certificates (art 24):
Certificates on the financial statements (CFS):
Conditions:
Schedule: interim/final payment, if threshold is reached
Standard threshold (beneficiary-level):
- financial statement: requested EU contribution to costs ≥ EUR 325 000.00
4.4 Recoveries (art 22)
First-line liability for recoveries:
Beneficiary termination: Beneficiary concerned
Final payment: Coordinator
After final payment: Beneficiary concerned
Joint and several liability for enforced recoveries (in case of non-payment):
Limited joint and several liability of other beneficiaries — up to the maximum grant amount of the beneficiary
Joint and several liability of affiliated entities — n/a
5. Consequences of non-compliance, applicable law & dispute settlement forum
Suspension and termination:
Additional suspension grounds (art 31)
Additional termination grounds (art 32)
Applicable law (art 43):
Standard applicable law regime: EU law + law of Belgium
Dispute settlement forum (art 43):
Standard dispute settlement forum:
13
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
EU beneficiaries: EU General Court + EU Court of Justice (on appeal)
Non-EU beneficiaries: Courts of Brussels, Belgium (unless an international agreement provides for the
enforceability of EU court judgements)
6. Other
Specific rules (Annex 5): Yes
Standard time-limits after project end:
Confidentiality (for X years after final payment): 5
Record-keeping (for X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Reviews (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Audits (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Extension of findings from other grants to this grant (no later than X years after final payment): 5 (or 3 for grants of
not more than EUR 60 000)
Impact evaluation (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
14
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and terms and conditions applicable to the grant
awarded for the implementation of the action set out in Chapter 2.
ARTICLE 2 — DEFINITIONS
For the purpose of this Agreement, the following definitions apply:
Actions — The project which is being funded in the context of this Agreement.
Grant — The grant awarded in the context of this Agreement.
EU grants — Grants awarded by EU institutions, bodies, offices or agencies (including EU executive
agencies, EU regulatory agencies, EDA, joint undertakings, etc.).
Participants — Entities participating in the action as beneficiaries, affiliated entities, associated
partners, third parties giving in-kind contributions, subcontractors or recipients of
financial support to third parties.
Beneficiaries (BEN) — The signatories of this Agreement (either directly or through an accession
form).
Affiliated entities (AE) — Entities affiliated to a beneficiary within the meaning of Article 187 of
EU Financial Regulation 2018/10464 which participate in the action with similar rights
and obligations as the beneficiaries (obligation to implement action tasks and right to
charge costs and claim contributions).
Associated partners (AP) — Entities which participate in the action, but without the right to charge
costs or claim contributions.
Purchases — Contracts for goods, works or services needed to carry out the action (e.g. equipment,
consumables and supplies) but which are not part of the action tasks (see Annex 1).
Subcontracting — Contracts for goods, works or services that are part of the action tasks (see Annex 1).
In-kind contributions — In-kind contributions within the meaning of Article 2(36) of EU Financial
4 For the definition, see Article 187 Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council
of 18 July 2018 on the financial rules applicable to the general budget of the Union, amending Regulations (EU)
No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013,
(EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom)
No 966/2012 (‘EU Financial Regulation’) (OJ L 193, 30.7.2018, p. 1): “affiliated entities [are]:
(a) entities that form a sole beneficiary [(i.e. where an entity is formed of several entities that satisfy the criteria for
being awarded a grant, including where the entity is specifically established for the purpose of implementing an
action to be financed by a grant)];
(b) entities that satisfy the eligibility criteria and that do not fall within one of the situations referred to in Article 136(1)
and 141(1) and that have a link with the beneficiary, in particular a legal or capital link, which is neither limited to
the action nor established for the sole purpose of its implementation”.
15
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Regulation 2018/1046, i.e. non-financial resources made available free of charge by
third parties.
Fraud — Fraud within the meaning of Article 3 of EU Directive 2017/13715 and Article 1 of the
Convention on the protection of the European Communities’ financial interests, drawn
up by the Council Act of 26 July 19956, as well as any other wrongful or criminal
deception intended to result in financial or personal gain.
Irregularities — Any type of breach (regulatory or contractual) which could impact the EU
financial interests, including irregularities within the meaning of Article 1(2) of EU
Regulation 2988/957.
Grave professional misconduct — Any type of unacceptable or improper behaviour in exercising one’s
profession, especially by employees, including grave professional misconduct within
the meaning of Article 136(1)(c) of EU Financial Regulation 2018/1046.
Applicable EU, international and national law — Any legal acts or other (binding or non-binding)
rules and guidance in the area concerned.
Portal — EU Funding & Tenders Portal; electronic portal and exchange system managed by the
European Commission and used by itself and other EU institutions, bodies, offices
or agencies for the management of their funding programmes (grants, procurements,
prizes, etc.).
CHAPTER 2 ACTION
ARTICLE 3 — ACTION
The grant is awarded for the action 101122891 — 22-EU-TG-eFTI4EU (‘action’), as described in
Annex 1.
ARTICLE 4 — DURATION AND STARTING DATE
The duration and the starting date of the action are set out in the Data Sheet (see Point 1).
CHAPTER 3 GRANT
ARTICLE 5 — GRANT
5.1 Form of grant
5 Directive (EU) 2017/1371 of the European Parliament and of the Council of 5 July 2017 on the fight against fraud to
the Union’s financial interests by means of criminal law (OJ L 198, 28.7.2017, p. 29).
6 OJ C 316, 27.11.1995, p. 48.
7 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities
financial interests (OJ L 312, 23.12.1995, p. 1).
16
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
The grant is an action grant8 which takes the form of a budget-based mixed actual cost grant (i.e. a
grant based on actual costs incurred, but which may also include other forms of funding, such as unit
costs or contributions, flat-rate costs or contributions, lump sum costs or contributions or financing
not linked to costs).
5.2 Maximum grant amount
The maximum grant amount is set out in the Data Sheet (see Point 3) and in the estimated budget
(Annex 2).
5.3 Funding rate
The funding rate for costs is 50% of the eligible costs for studies (if any), 70% of the eligible costs
for works in outermost regions (if any) and 50% of the eligible costs for the other cost categories.
Contributions are not subject to any funding rate.
5.4 Estimated budget, budget categories and forms of funding
The estimated budget for the action is set out in Annex 2.
It contains the estimated eligible costs and contributions for the action, broken down by participant
and budget category.
Annex 2 also shows the types of costs and contributions (forms of funding)9 to be used for each budget
category.
If unit costs or contributions are used, the details on the calculation will be explained in Annex 2a.
5.5 Budget flexibility
The budget breakdown may be adjusted — without an amendment (see Article 39) — by transfers
(between participants and budget categories), as long as this does not imply any substantive or
important change to the description of the action in Annex 1.
However:
- changes to the budget category for volunteers (if used) always require an amendment
- changes to budget categories with lump sums costs or contributions (if used; including
financing not linked to costs) always require an amendment
- changes to budget categories with higher funding rates or budget ceilings (if used) always
require an amendment
- addition of amounts for subcontracts not provided for in Annex 1 either require an amendment
or simplified approval in accordance with Article 6.2
8 For the definition, see Article 180(2)(a) EU Financial Regulation 2018/1046: ‘action grant’ means an EU grant to
finance “an action intended to help achieve a Union policy objective”.
9 See Article 125 EU Financial Regulation 2018/1046.
17
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
- other changes require an amendment or simplified approval, if specifically provided for in
Article 6.2
- flexibility caps: not applicable.
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS
In order to be eligible, costs and contributions must meet the eligibility conditions set out in this
Article.
6.1 General eligibility conditions
The general eligibility conditions are the following:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary
(ii) they must be incurred in the period set out in Article 4 (with the exception of costs relating
to the submission of the final periodic report, which may be incurred afterwards; see
Article 21)
(iii) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s
accounts in accordance with the accounting standards applicable in the country where
the beneficiary is established and with the beneficiary’s usual cost accounting practices
(vi) they must comply with the applicable national law on taxes, labour and social security
and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency
(b) for unit costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the units must:
- be actually used or produced by the beneficiary in the period set out in Article 4
(with the exception of units relating to the submission of the final periodic report,
which may be used or produced afterwards; see Article 21)
- be necessary for the implementation of the action and
(iii) the number of units must be identifiable and verifiable, in particular supported by records
and documentation (see Article 20)
18
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(c) for flat-rate costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the costs or contributions to which the flat-rate is applied must:
- be eligible
- relate to the period set out in Article 4 (with the exception of costs or contributions
relating to the submission of the final periodic report, which may be incurred
afterwards; see Article 21)
(d) for lump sum costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the work must be properly implemented by the beneficiary in accordance with Annex 1
(iii) the deliverables/outputs must be achieved in the period set out in Article 4 (with the
exception of deliverables/outputs relating to the submission of the final periodic report,
which may be achieved afterwards; see Article 21)
(e) for unit, flat-rate or lump sum costs or contributions according to usual cost accounting
practices (if any):
(i) they must fulfil the general eligibility conditions for the type of cost concerned
(ii) the cost accounting practices must be applied in a consistent manner, based on objective
criteria, regardless of the source of funding
(f) for financing not linked to costs (if any): the results must be achieved or the conditions must
be fulfilled as described in Annex 1.
In addition, for direct cost categories (e.g. personnel, travel & subsistence, subcontracting and other
direct costs) only costs that are directly linked to the action implementation and can therefore be
attributed to it directly are eligible. They must not include any indirect costs (i.e. costs that are only
indirectly linked to the action, e.g. via cost drivers).
6.2 Specific eligibility conditions for each budget category
For each budget category, the specific eligibility conditions are as follows:
Direct costs
A. Personnel costs
A.1 Costs for employees (or equivalent) are eligible as personnel costs if they fulfil the general
eligibility conditions and are related to personnel working for the beneficiary under an employment
contract (or equivalent appointing act) and assigned to the action.
They must be limited to salaries, social security contributions, taxes and other costs linked to the
19
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
remuneration, if they arise from national law or the employment contract (or equivalent appointing
act) and be calculated on the basis of the costs actually incurred, in accordance with the following
method:
{daily rate for the person
multiplied by
number of day-equivalents worked on the action (rounded up or down to the nearest half-day)}.
The daily rate must be calculated as:
{annual personnel costs for the person
divided by
215}.
The number of day-equivalents declared for a person must be identifiable and verifiable (see
Article 20).
The total number of day-equivalents declared in EU grants, for a person for a year, cannot be higher
than 215.
The personnel costs may also include supplementary payments for personnel assigned to the action
(including payments on the basis of supplementary contracts regardless of their nature), if:
- it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required
- the criteria used to calculate the supplementary payments are objective and generally applied
by the beneficiary, regardless of the source of funding used.
If the beneficiary uses average personnel costs (unit cost according to usual cost accounting practices),
the personnel costs must fulfil the general eligibility conditions for such unit costs and the daily rate
must be calculated:
- using the actual personnel costs recorded in the beneficiary’s accounts and excluding any
costs which are ineligible or already included in other budget categories; the actual personnel
costs may be adjusted on the basis of budgeted or estimated elements, if they are relevant
for calculating the personnel costs, reasonable and correspond to objective and verifiable
information
and
- according to usual cost accounting practices which are applied in a consistent manner, based
on objective criteria, regardless of the source of funding.
A.2 and A.3 Costs for natural persons working under a direct contract other than an employment
contract and costs for seconded persons by a third party against payment are also eligible as
personnel costs, if they are assigned to the action, fulfil the general eligibility conditions and:
(a) work under conditions similar to those of an employee (in particular regarding the way the
work is organised, the tasks that are performed and the premises where they are performed) and
20
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(b) the result of the work belongs to the beneficiary (unless agreed otherwise).
They must be calculated on the basis of a rate which corresponds to the costs actually incurred for
the direct contract or secondment and must not be significantly different from those for personnel
performing similar tasks under an employment contract with the beneficiary.
A.4 The work of SME owners for the action (i.e. owners of beneficiaries that are small and medium-
sized enterprises10 not receiving a salary) or natural person beneficiaries (i.e. beneficiaries that are
natural persons not receiving a salary) may be declared as personnel costs, if they fulfil the general
eligibility conditions and are calculated as unit costs in accordance with the method set out in Annex
2a.
B. Subcontracting costs
Subcontracting costs for the action (including related duties, taxes and charges) are eligible, if they
are calculated on the basis of the costs actually incurred, fulfil the general eligibility conditions and
are awarded using the beneficiary’s usual purchasing practices — provided these ensure subcontracts
with best value for money (or if appropriate the lowest price) and that there is no conflict of interests
(see Article 12).
Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on
public procurement must also comply with the applicable national law on public procurement.
The beneficiaries must ensure that the subcontracted work is performed in the eligible countries or
target countries set out in the call conditions — unless otherwise approved by the granting authority.
The tasks to be subcontracted and the estimated cost for each subcontract must be set out in Annex 1
and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2 (or may
be approved ex post in the periodic report, if the use of subcontracting does not entail changes to the
Agreement which would call into question the decision awarding the grant or breach the principle of
equal treatment of applicants; ‘simplified approval procedure’).
C. Purchase costs
Purchase costs for the action (including related duties, taxes and charges) are eligible if they fulfil
the general eligibility conditions and are bought using the beneficiary’s usual purchasing practices —
provided these ensure purchases with best value for money (or if appropriate the lowest price) and
that there is no conflict of interests (see Article 12).
Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on
public procurement must also comply with the applicable national law on public procurement.
10 For the definition, see Commission Recommendation 2003/361/EC: micro, small or medium-sized enterprise (SME)
are enterprises
- engaged in an economic activity, irrespective of their legal form (including, in particular, self- employed persons
and family businesses engaged in craft or other activities, and partnerships or associations regularly engaged
in an economic activity) and
- employing fewer than 250 persons (expressed in ‘annual working units’ as defined in Article 5 of the
Recommendation) and which have an annual turnover not exceeding EUR 50 million, and/or an annual balance
sheet total not exceeding EUR 43 million.
21
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
C.1 Travel and subsistence
Purchases for travel, accommodation and subsistence must be calculated as follows:
- travel: on the basis of the costs actually incurred and in line with the beneficiary’s usual
practices on travel
- accommodation: on the basis of the costs actually incurred and in line with the beneficiary’s
usual practices on travel
- subsistence: on the basis of the costs actually incurred and in line with the beneficiary’s usual
practices on travel .
C.2 Equipment
Purchases of equipment, infrastructure or other assets specifically for the action (or developed
as part of the action tasks) may be declared as full capitalised costs if they fulfil the cost eligibility
conditions applicable to their respective cost categories.
‘Capitalised costs’ means:
- costs incurred in the purchase or for the development of the equipment, infrastructure or other
assets and
- which are recorded under a fixed asset account of the beneficiary in compliance with
international accounting standards and the beneficiary’s usual cost accounting practices.
If such equipment, infrastructure or other assets are rented or leased, full costs for renting or leasing
are eligible, if they do not exceed the depreciation costs of similar equipment, infrastructure or assets
and do not include any financing fees.
C.3 Other goods, works and services
Purchases of other goods, works and services must be calculated on the basis of the costs actually
incurred.
Such goods, works and services include, for instance, consumables and supplies, promotion,
dissemination, protection of results, translations, publications, certificates and financial guarantees,
if required under the Agreement.
D. Other cost categories
D.1 Financial support to third parties
Costs for providing financial support to third parties (in the form of grants, prizes or similar
forms of support; if any) are eligible, if and as declared eligible in the call conditions, if they fulfil the
general eligibility conditions, are calculated on the basis of the costs actually incurred and the support
is implemented in accordance with the conditions set out in Annex 1.
These conditions must ensure objective and transparent selection procedures and include at least the
following:
(a) for grants (or similar):
22
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(i) the maximum amount of financial support for each third party (‘recipient’); this amount
may not exceed the amount set out in the Data Sheet (see Point 3) or otherwise agreed
with the granting authority
(ii) the criteria for calculating the exact amount of the financial support
(iii) the different types of activity that qualify for financial support, on the basis of a closed list
(iv) the persons or categories of persons that will be supported and
(v) the criteria and procedures for giving financial support
(b) for prizes (or similar):
(i) the eligibility and award criteria
(ii) the amount of the prize and
(iii) the payment arrangements.
D.2 Studies
Costs for studies are eligible, if and as declared eligible in the call conditions, if they fulfil the
general eligibility conditions, are calculated on the basis of the costs actually incurred and comply
with the conditions set out in Points A-C for the underlying types of costs (personnel, subcontracting,
purchase).
D.3 Synergetic elements
Costs for synergetic elements related to another sector of the CEF Programme (transport, energy or
digital) are eligible, if and as declared eligible in the call conditions, if they fulfil the general eligibility
conditions, are calculated on the basis of the costs actually incurred and allow to significantly improve
the socio-economic, climate or environmental benefits of the action.
Such costs are eligible only up to 20% of the beneficiaries’ total eligble costs.
D.4 Works in outermost regions
Costs for works in outermost regions are eligible, if and as declared eligible in the call conditions, if
they fulfil the general eligibility conditions, are calculated on the basis of the costs actually incurred,
comply with the conditions set out in Points A-C for the underlying types of costs (personnel,
subcontracting, purchase) and relate to works that are carried out in an outermost region within the
meaning of Article 349 of the Treaty on the Functioning of the EU (TFEU)).
D.5 Land purchase
Costs for land purchase are eligible, if and as declared eligible in the call conditions, if they fulfil
the general eligibility conditions and are calculated on the basis of the costs actually incurred.
Such costs are eligible only up to 10% of the beneficiaries’ total eligible costs.
Indirect costs
23
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
E. Indirect costs
Indirect costs will be reimbursed at the flat-rate of 0% of the eligible direct costs (categories A-D,
except volunteers costs and exempted specific cost categories, if any).
Contributions
Not applicable
6.3 Ineligible costs and contributions
The following costs or contributions are ineligible:
(a) costs or contributions that do not comply with the conditions set out above (Article 6.1 and
6.2), in particular:
(i) costs related to return on capital and dividends paid by a beneficiary
(ii) debt and debt service charges
(iii) provisions for future losses or debts
(iv) interest owed
(v) currency exchange losses
(vi) bank costs charged by the beneficiary’s bank for transfers from the granting authority
(vii) excessive or reckless expenditure
(viii) VAT (always ineligible)
(ix) costs incurred or contributions for activities implemented during grant agreement
suspension (see Article 31)
(x) in-kind contributions by third parties
(b) costs or contributions declared under other EU grants (or grants awarded by an EU Member
State, non-EU country or other body implementing the EU budget), except for the following
cases:
(i) Synergy actions: not applicable
(ii) if the action grant is combined with an operating grant11 running during the same period
and the beneficiary can demonstrate that the operating grant does not cover any (direct
or indirect) costs of the action grant
(c) costs or contributions for staff of a national (or regional/local) administration, for activities that
are part of the administration’s normal activities (i.e. not undertaken only because of the grant)
11 For the definition, see Article 180(2)(b) of EU Financial Regulation 2018/1046: ‘operating grant’ means an EU grant
to finance “the functioning of a body which has an objective forming part of and supporting an EU policy”.
24
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(d) costs or contributions (especially travel and subsistence) for staff or representatives of EU
institutions, bodies or agencies
(e) other :
(i) costs or contributions for activities that do not take place in one of the eligible countries or
target countries set out in the call conditions — unless approved by the granting authority
(ii) costs or contributions declared specifically ineligible in the call conditions.
6.4 Consequences of non-compliance
If a beneficiary declares costs or contributions that are ineligible, they will be rejected (see Article 27).
This may also lead to other measures described in Chapter 5.
CHAPTER 4 GRANT IMPLEMENTATION
SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER
PARTICIPANTS
ARTICLE 7 — BENEFICIARIES
The beneficiaries, as signatories of the Agreement, are fully responsible towards the granting authority
for implementing it and for complying with all its obligations.
They must implement the Agreement to their best abilities, in good faith and in accordance with all
the obligations and terms and conditions it sets out.
They must have the appropriate resources to implement the action and implement the action under
their own responsibility and in accordance with Article 11. If they rely on affiliated entities or other
participants (see Articles 8 and 9), they retain sole responsibility towards the granting authority and
the other beneficiaries.
They are jointly responsible for the technical implementation of the action. If one of the beneficiaries
fails to implement their part of the action, the other beneficiaries must ensure that this part is
implemented by someone else (without being entitled to an increase of the maximum grant amount
and subject to an amendment; see Article 39). The financial responsibility of each beneficiary in case
of recoveries is governed by Article 22.
The beneficiaries (and their action) must remain eligible under the EU programme funding the grant
for the entire duration of the action. Costs and contributions will be eligible only as long as the
beneficiary and the action are eligible.
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Portal Participant Register up to date (see Article 19)
25
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(ii) inform the granting authority (and the other beneficiaries) immediately of any events or
circumstances likely to affect significantly or delay the implementation of the action (see
Article 19)
(iii) submit to the coordinator in good time:
- the prefinancing guarantees (if required; see Article 23)
- the financial statements and certificates on the financial statements (CFS) (if
required; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
- the contribution to the deliverables and technical reports (see Article 21)
- any other documents or information required by the granting authority under the
Agreement
(iv) submit via the Portal data and information related to the participation of their affiliated
entities.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 11)
(ii) act as the intermediary for all communications between the consortium and the granting
authority, unless the Agreement or granting authority specifies otherwise, and in
particular:
- submit the prefinancing guarantees to the granting authority (if any)
- request and review any documents or information required and verify their quality
and completeness before passing them on to the granting authority
- submit the deliverables and reports to the granting authority
- inform the granting authority about the payments made to the other beneficiaries
(report on the distribution of payments; if required, see Articles 22 and 32)
(iii) distribute the payments received from the granting authority to the other beneficiaries
without unjustified delay (see Article 22).
The coordinator may not delegate or subcontract the above-mentioned tasks to any other beneficiary
or third party (including affiliated entities).
However, coordinators which are public bodies may delegate the tasks set out in Point (b)(ii) last
indent and (iii) above to entities with ‘authorisation to administer’ which they have created or which
are controlled by or affiliated to them. In this case, the coordinator retains sole responsibility for the
payments and for compliance with the obligations under the Agreement.
Moreover, coordinators which are ‘sole beneficiaries’12 (or similar, such as European research
12 For the definition, see Article 187(2) EU Financial Regulation 2018/1046: “Where several entities satisfy the criteria
26
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
infrastructure consortia (ERICs)) may delegate the tasks set out in Point (b)(i) to (iii) above to one of
their members. The coordinator retains sole responsibility for compliance with the obligations under
the Agreement.
The beneficiaries must have internal arrangements regarding their operation and co-ordination, to
ensure that the action is implemented properly.
If required by the granting authority (see Data Sheet, Point 1), these arrangements must be set out in
a written consortium agreement between the beneficiaries, covering for instance:
- the internal organisation of the consortium
- the management of access to the Portal
- different distribution keys for the payments and financial responsibilities in case of recoveries
(if any)
- additional rules on rights and obligations related to background and results (see Article 16)
- settlement of internal disputes
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The internal arrangements must not contain any provision contrary to this Agreement.
ARTICLE 8 — AFFILIATED ENTITIES
The following entities which are linked to a beneficiary will participate in the action as ‘affiliated
entities’:
- CIRCLE CONNECTING EU S.R.L. (CCEU), PIC 889903609, linked to CIRCLE SPA
(CIRCLE SPA)
- BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE,
MOBILITAET, INNOVATION UND TECHNOLOGIE (BMK), PIC 999633695, linked to
SCHIENENINFRASTRUKTUR-DIENSTLEISTUNGS-GESELLSCHAFT MBH (SCHIG)
- RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA LE
INFRASTRUTTURE ED I TRASPORTI SOCIETA PER AZIONI (RAM SPA), PIC
937468917, linked to Ministero delle Infrastrutture e dei Trasporti (MIT)
- MINISTERE DE LA TRANSITION ECOLOGIQUE ET DE LA COHESION DES
TERRITOIRES (French Ministry), PIC 996384874, linked to IMPRIMERIE NATIONALE
(Groupe IN)
Affiliated entities can charge costs and contributions to the action under the same conditions as the
beneficiaries and must implement the action tasks attributed to them in Annex 1 in accordance with
Article 11.
for being awarded a grant and together form one entity, that entity may be treated as the sole beneficiary, including
where it is specifically established for the purpose of implementing the action financed by the grant.”
27
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Their costs and contributions will be included in Annex 2 and will be taken into account for the
calculation of the grant.
The beneficiaries must ensure that all their obligations under this Agreement also apply to their
affiliated entities.
The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF,
Court of Auditors (ECA), etc.) can exercise their rights also towards the affiliated entities.
Breaches by affiliated entities will be handled in the same manner as breaches by beneficiaries.
Recovery of undue amounts will be handled through the beneficiaries.
If the granting authority requires joint and several liability of affiliated entities (see Data Sheet,
Point 4.4), they must sign the declaration set out in Annex 3a and may be held liable in case of enforced
recoveries against their beneficiaries (see Article 22.2 and 22.4).
ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION
9.1 Associated partners
Not applicable
9.2 Third parties giving in-kind contributions to the action
Other third parties may give in-kind contributions to the action (i.e. personnel, equipment, other goods,
works and services, etc. which are free-of-charge), if necessary for the implementation.
Third parties giving in-kind contributions do not implement any action tasks. They may not charge
costs or contributions to the action and the costs for the in-kind contributions are not eligible.
The third parties and their in-kind contributions should be set out in Annex 1.
9.3 Subcontractors
Subcontractors may participate in the action, if necessary for the implementation.
Subcontractors must implement their action tasks in accordance with Article 11. The costs for the
subcontracted tasks (invoiced price from the subcontractor) are eligible and may be charged by the
beneficiaries, under the conditions set out in Article 6. The costs will be included in Annex 2 as part
of the beneficiaries’ costs.
The beneficiaries must ensure that their contractual obligations under Articles 11 (proper
implementation), 12 (conflict of interest), 13 (confidentiality and security), 14 (ethics), 17.2
(visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping) also
apply to the subcontractors.
The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF,
Court of Auditors (ECA), etc.) can exercise their rights also towards the subcontractors.
9.4 Recipients of financial support to third parties
If the action includes providing financial support to third parties (e.g. grants, prizes or similar forms of
28
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
support), the beneficiaries must ensure that their contractual obligations under Articles 12 (conflict of
interest), 13 (confidentiality and security), 14 (ethics), 17.2 (visibility), 18 (specific rules for carrying
out action), 19 (information) and 20 (record-keeping)also apply to the third parties receiving the
support (recipients).
The beneficiaries must also ensure that the bodies mentioned in Article 25 (e.g. granting authority,
OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the recipients.
ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS
10.1 Non-EU participants
Participants which are established in a non-EU country (if any) undertake to comply with their
obligations under the Agreement and:
- to respect general principles (including fundamental rights, values and ethical principles,
environmental and labour standards, rules on classified information, intellectual property
rights, visibility of funding and protection of personal data)
- for the submission of certificates under Article 24: to use qualified external auditors which
are independent and comply with comparable standards as those set out in EU Directive
2006/43/EC13
- for the controls under Article 25: to allow for checks, reviews, audits and investigations
(including on-the-spot checks, visits and inspections) by the bodies mentioned in that Article
(e.g. granting authority, OLAF, Court of Auditors (ECA), etc.).
Special rules on dispute settlement apply (see Data Sheet, Point 5).
10.2 Participants which are international organisations
Participants which are international organisations (IOs; if any) undertake to comply with their
obligations under the Agreement and:
- to respect general principles (including fundamental rights, values and ethical principles,
environmental and labour standards, rules on classified information, intellectual property
rights, visibility of funding and protection of personal data)
- for the submission of certificates under Article 24: to use either independent public officers or
external auditors which comply with comparable standards as those set out in EU Directive
2006/43/EC
- for the controls under Article 25: to allow for the checks, reviews, audits and investigations
by the bodies mentioned in that Article, taking into account the specific agreements concluded
by them and the EU (if any).
For such participants, nothing in the Agreement will be interpreted as a waiver of their privileges or
immunities, as accorded by their constituent documents or international law.
13 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
29
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Special rules on applicable law and dispute settlement apply (see Article 43 and Data Sheet, Point 5).
10.3 Pillar-assessed participants
Pillar-assessed participants (if any) may rely on their own systems, rules and procedures, in so far as
they have been positively assessed and do not call into question the decision awarding the grant or
breach the principle of equal treatment of applicants or beneficiaries.
‘Pillar-assessment’ means a review by the European Commission on the systems, rules and procedures
which participants use for managing EU grants (in particular internal control system, accounting
system, external audits, financing of third parties, rules on recovery and exclusion, information on
recipients and protection of personal data; see Article 154 EU Financial Regulation 2018/1046).
Participants with a positive pillar assessment may rely on their own systems, rules and procedures,
in particular for:
- record-keeping (Article 20): may be done in accordance with internal standards, rules and
procedures
- currency conversion for financial statements (Article 21): may be done in accordance with
usual accounting practices
- guarantees (Article 23): for public law bodies, prefinancing guarantees are not needed
- certificates (Article 24):
- certificates on the financial statements (CFS): may be provided by their regular internal
or external auditors and in accordance with their internal financial regulations and
procedures
- certificates on usual accounting practices (CoMUC): are not needed if those practices
are covered by an ex-ante assessment
and use the following specific rules, for:
- recoveries (Article 22): in case of financial support to third parties, there will be no recovery if
the participant has done everything possible to retrieve the undue amounts from the third party
receiving the support (including legal proceedings) and non-recovery is not due to an error or
negligence on its part
- checks, reviews, audits and investigations by the EU (Article 25): will be conducted taking
into account the rules and procedures specifically agreed between them and the framework
agreement (if any)
- impact evaluation (Article 26): will be conducted in accordance with the participant’s internal
rules and procedures and the framework agreement (if any)
- grant agreement suspension (Article 31): certain costs incurred during grant suspension are
eligible (notably, minimum costs necessary for a possible resumption of the action and costs
relating to contracts which were entered into before the pre-information letter was received and
which could not reasonably be suspended, reallocated or terminated on legal grounds)
30
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
- grant agreement termination (Article 32): the final grant amount and final payment will be
calculated taking into account also costs relating to contracts due for execution only after
termination takes effect, if the contract was entered into before the pre-information letter was
received and could not reasonably be terminated on legal grounds
- liability for damages (Article 33.2): the granting authority must be compensated for damage
it sustains as a result of the implementation of the action or because the action was not
implemented in full compliance with the Agreement only if the damage is due to an
infringement of the participant’s internal rules and procedures or due to a violation of third
parties’ rights by the participant or one of its employees or individual for whom the employees
are responsible.
Participants whose pillar assessment covers procurement and granting procedures may also do
purchases, subcontracting and financial support to third parties (Article 6.2) in accordance with their
internal rules and procedures for purchases, subcontracting and financial support.
Participants whose pillar assessment covers data protection rules may rely on their internal standards,
rules and procedures for data protection (Article 15).
The participants may however not rely on provisions which would breach the principle of equal
treatment of applicants or beneficiaries or call into question the decision awarding the grant, such as
in particular:
- eligibility (Article 6)
- consortium roles and set-up (Articles 7-9)
- security and ethics (Articles 13, 14)
- IPR (including background and results, access rights and rights of use), communication,
dissemination and visibility (Articles 16 and 17)
- information obligation (Article 19)
- payment, reporting and amendments (Articles 21, 22 and 39)
- rejections, reductions, suspensions and terminations (Articles 27, 28, 29-32)
If the pillar assessment was subject to remedial measures, reliance on the internal systems, rules and
procedures is subject to compliance with those remedial measures.
Participants whose assessment has not yet been updated to cover (the new rules on) data protection
may rely on their internal systems, rules and procedures, provided that they ensure that personal data is:
- processed lawfully, fairly and in a transparent manner in relation to the data subject
- collected for specified, explicit and legitimate purposes and not further processed in a manner
that is incompatible with those purposes
- adequate, relevant and limited to what is necessary in relation to the purposes for which they
are processed
- accurate and, where necessary, kept up to date
31
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
- kept in a form which permits identification of data subjects for no longer than is necessary for
the purposes for which the data is processed and
- processed in a manner that ensures appropriate security of the personal data.
Participants must inform the coordinator without delay of any changes to the systems, rules and
procedures that were part of the pillar assessment. The coordinator must immediately inform the
granting authority.
Pillar-assessed participants that have also concluded a framework agreement with the EU, may
moreover — under the same conditions as those above (i.e. not call into question the decision awarding
the grant or breach the principle of equal treatment of applicants or beneficiaries) — rely on the
provisions set out in that framework agreement.
SECTION 2 RULES FOR CARRYING OUT THE ACTION
ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION
11.1 Obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement, the call conditions and all legal obligations under applicable EU,
international and national law.
11.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 12 — CONFLICT OF INTERESTS
12.1 Conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the Agreement could be compromised for reasons involving family, emotional life,
political or national affinity, economic interest or any other direct or indirect interest (‘conflict of
interests’).
They must formally notify the granting authority without delay of any situation constituting or likely
to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The granting authority may verify that the measures taken are appropriate and may require additional
measures to be taken by a specified deadline.
12.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28) and the grant or the beneficiary may be terminated (see Article 32).
32
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 13 — CONFIDENTIALITY AND SECURITY
13.1 Sensitive information
The parties must keep confidential any data, documents or other material (in any form) that is identified
as sensitive in writing (‘sensitive information’) — during the implementation of the action and for at
least until the time-limit set out in the Data Sheet (see Point 6).
If a beneficiary requests, the granting authority may agree to keep such information confidential for
a longer period.
Unless otherwise agreed between the parties, they may use sensitive information only to implement
the Agreement.
The beneficiaries may disclose sensitive information to their personnel or other participants involved
in the action only if they:
(a) need to know it in order to implement the Agreement and
(b) are bound by an obligation of confidentiality.
The granting authority may disclose sensitive information to its staff and to other EU institutions and
bodies.
It may moreover disclose sensitive information to third parties, if:
(a) this is necessary to implement the Agreement or safeguard the EU financial interests and
(b) the recipients of the information are bound by an obligation of confidentiality.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party
(b) the information becomes publicly available, without breaching any confidentiality obligation
(c) the disclosure of the sensitive information is required by EU, international or national law.
Specific confidentiality rules (if any) are set out in Annex 5.
13.2 Classified information
The parties must handle classified information in accordance with the applicable EU, international or
national law on classified information (in particular, Decision 2015/44414 and its implementing rules).
Deliverables which contain classified information must be submitted according to special procedures
agreed with the granting authority.
14 Commission Decision 2015/444/EC, Euratom of 13 March 2015 on the security rules for protecting EU classified
information (OJ L 72, 17.3.2015, p. 53).
33
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Action tasks involving classified information may be subcontracted only after explicit approval (in
writing) from the granting authority.
Classified information may not be disclosed to any third party (including participants involved in the
action implementation) without prior explicit written approval from the granting authority.
Specific security rules (if any) are set out in Annex 5.
13.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 14 — ETHICS AND VALUES
14.1 Ethics
The action must be carried out in line with the highest ethical standards and the applicable EU,
international and national law on ethical principles.
Specific ethics rules (if any) are set out in Annex 5.
14.2 Values
The beneficiaries must commit to and ensure the respect of basic EU values (such as respect for
human dignity, freedom, democracy, equality, the rule of law and human rights, including the rights
of minorities).
Specific rules on values (if any) are set out in Annex 5.
14.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 15 — DATA PROTECTION
15.1 Data processing by the granting authority
Any personal data under the Agreement will be processed under the responsibility of the data
controller of the granting authority in accordance with and for the purposes set out in the Portal Privacy
Statement.
For grants where the granting authority is the European Commission, an EU regulatory or executive
agency, joint undertaking or other EU body, the processing will be subject to Regulation 2018/172515.
15 Regulation (EU) 2018/1725 of the European Parliament and of the Council of 23 October 2018 on the protection of
natural persons with regard to the processing of personal data by the Union institutions, bodies, offices and agencies
34
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
15.2 Data processing by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with the applicable
EU, international and national law on data protection (in particular, Regulation 2016/67916).
They must ensure that personal data is:
- processed lawfully, fairly and in a transparent manner in relation to the data subjects
- collected for specified, explicit and legitimate purposes and not further processed in a manner
that is incompatible with those purposes
- adequate, relevant and limited to what is necessary in relation to the purposes for which they
are processed
- accurate and, where necessary, kept up to date
- kept in a form which permits identification of data subjects for no longer than is necessary for
the purposes for which the data is processed and
- processed in a manner that ensures appropriate security of the data.
The beneficiaries may grant their personnel access to personal data only if it is strictly necessary
for implementing, managing and monitoring the Agreement. The beneficiaries must ensure that the
personnel is under a confidentiality obligation.
The beneficiaries must inform the persons whose data are transferred to the granting authority and
provide them with the Portal Privacy Statement.
15.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND
RESULTS —ACCESS RIGHTS AND RIGHTS OF USE
16.1 Background and access rights to background
The beneficiaries must give each other and the other participants access to the background identified
as needed for implementing the action, subject to any specific rules in Annex 5.
‘Background’ means any data, know-how or information — whatever its form or nature (tangible or
intangible), including any rights such as intellectual property rights — that is:
and on the free movement of such data, and repealing Regulation (EC) No 45/2001 and Decision No 1247/2002/EC
(OJ L 295, 21.11.2018, p. 39).
16 Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural
persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive
95/46/EC (‘GDPR’) (OJ L 119, 4.5.2016, p. 1).
35
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(a) held by the beneficiaries before they acceded to the Agreement and
(b) needed to implement the action or exploit the results.
If background is subject to rights of a third party, the beneficiary concerned must ensure that it is able
to comply with its obligations under the Agreement.
16.2 Ownership of results
The granting authority does not obtain ownership of the results produced under the action.
‘Results’ means any tangible or intangible effect of the action, such as data, know-how or information,
whatever its form or nature, whether or not it can be protected, as well as any rights attached to it,
including intellectual property rights.
16.3 Rights of use of the granting authority on materials, documents and information
received for policy, information, communication, dissemination and publicity purposes
The granting authority has the right to use non-sensitive information relating to the action and
materials and documents received from the beneficiaries (notably summaries for publication,
deliverables, as well as any other material, such as pictures or audio-visual material, in paper or
electronic form) for policy, information, communication, dissemination and publicity purposes —
during the action or afterwards.
The right to use the beneficiaries’ materials, documents and information is granted in the form of a
royalty-free, non-exclusive and irrevocable licence, which includes the following rights:
(a) use for its own purposes (in particular, making them available to persons working for the
granting authority or any other EU service (including institutions, bodies, offices, agencies,
etc.) or EU Member State institution or body; copying or reproducing them in whole or in part,
in unlimited numbers; and communication through press information services)
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes)
(c) editing or redrafting (including shortening, summarising, inserting other elements (e.g.
meta-data, legends, other graphic, visual, audio or text elements), extracting parts (e.g. audio
or video files), dividing into parts, use in a compilation)
(d) translation
(e) storage in paper, electronic or other form
(f) archiving, in line with applicable document-management rules
(g) the right to authorise third parties to act on its behalf or sub-license to third parties the modes
of use set out in Points (b), (c), (d) and (f), if needed for the information, communication and
publicity activity of the granting authority
36
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(h) processing, analysing, aggregating the materials, documents and information received and
producing derivative works.
The rights of use are granted for the whole duration of the industrial or intellectual property rights
concerned.
If materials or documents are subject to moral rights or third party rights (including intellectual
property rights or rights of natural persons on their image and voice), the beneficiaries must ensure
that they comply with their obligations under this Agreement (in particular, by obtaining the necessary
licences and authorisations from the rights holders concerned).
Where applicable, the granting authority will insert the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the [name of granting authority]
under conditions.”
16.4 Specific rules on IPR, results and background
Specific rules regarding intellectual property rights, results and background (if any) are set out in
Annex 5.
16.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such a breach may also lead to other measures described in Chapter 5.
ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY
17.1 Communication — Dissemination — Promoting the action
Unless otherwise agreed with the granting authority, the beneficiaries must promote the action and its
results by providing targeted information to multiple audiences (including the media and the public),
in accordance with Annex 1 and in a strategic, coherent and effective manner.
Before engaging in a communication or dissemination activity expected to have a major media impact,
the beneficiaries must inform the granting authority.
17.2 Visibility — European flag and funding statement
Unless otherwise agreed with the granting authority, communication activities of the beneficiaries
related to the action (including media relations, conferences, seminars, information material, such as
brochures, leaflets, posters, presentations, etc., in electronic form, via traditional or social media, etc.),
dissemination activities and any infrastructure, equipment, vehicles, supplies or major result funded
by the grant must acknowledge EU support and display the European flag (emblem) and funding
statement (translated into local languages, where appropriate):
37
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
The emblem must remain distinct and separate and cannot be modified by adding other visual
marks, brands or text.
Apart from the emblem, no other visual identity or logo may be used to highlight the EU support.
When displayed in association with other logos (e.g. of beneficiaries or sponsors), the emblem must
be displayed at least as prominently and visibly as the other logos.
For the purposes of their obligations under this Article, the beneficiaries may use the emblem without
first obtaining approval from the granting authority. This does not, however, give them the right to
exclusive use. Moreover, they may not appropriate the emblem or any similar trademark or logo, either
by registration or by any other means.
17.3 Quality of information — Disclaimer
Any communication or dissemination activity related to the action must use factually accurate
information.
Moreover, it must indicate the following disclaimer (translated into local languages where
appropriate):
“Funded by the European Union. Views and opinions expressed are however those of the author(s) only
and do not necessarily reflect those of the European Union or [name of the granting authority]. Neither
the European Union nor the granting authority can be held responsible for them.”
17.4 Specific communication, dissemination and visibility rules
Specific communication, dissemination and visibility rules (if any) are set out in Annex 5.
17.5 Consequences of non-compliance
38
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION
18.1 Specific rules for carrying out the action
Specific rules for implementing the action (if any) are set out in Annex 5.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such a breach may also lead to other measures described in Chapter 5.
SECTION 3 GRANT ADMINISTRATION
ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS
19.1 Information requests
The beneficiaries must provide — during the action or afterwards and in accordance with Article 7 —
any information requested in order to verify eligibility of the costs or contributions declared, proper
implementation of the action and compliance with the other obligations under the Agreement.
The information provided must be accurate, precise and complete and in the format requested,
including electronic format.
19.2 Participant Register data updates
The beneficiaries must keep — at all times, during the action or afterwards — their information stored
in the Portal Participant Register up to date, in particular, their name, address, legal representatives,
legal form and organisation type.
19.3 Information about events and circumstances which impact the action
The beneficiaries must immediately inform the granting authority (and the other beneficiaries) of any
of the following:
(a) events which are likely to affect or delay the implementation of the action or affect the EU’s
financial interests, in particular:
(i) changes in their legal, financial, technical, organisational or ownership situation
(including changes linked to one of the exclusion grounds listed in the declaration of
honour signed before grant signature)
(ii) linked action information: not applicable
39
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
19.4 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 20 — RECORD-KEEPING
20.1 Keeping records and supporting documents
The beneficiaries must — at least until the time-limit set out in the Data Sheet (see Point 6) — keep
records and other supporting documents to prove the proper implementation of the action in line with
the accepted standards in the respective field (if any).
In addition, the beneficiaries must — for the same period — keep the following to justify the amounts
declared:
(a) for actual costs: adequate records and supporting documents to prove the costs declared (such
as contracts, subcontracts, invoices and accounting records); in addition, the beneficiaries’
usual accounting and internal control procedures must enable direct reconciliation between
the amounts declared, the amounts recorded in their accounts and the amounts stated in the
supporting documents
(b) for flat-rate costs and contributions (if any): adequate records and supporting documents to
prove the eligibility of the costs or contributions to which the flat-rate is applied
(c) for the following simplified costs and contributions: the beneficiaries do not need to keep
specific records on the actual costs incurred, but must keep:
(i) for unit costs and contributions (if any): adequate records and supporting documents to
prove the number of units declared
(ii) for lump sum costs and contributions (if any): adequate records and supporting
documents to prove proper implementation of the work as described in Annex 1
(iii) for financing not linked to costs (if any): adequate records and supporting documents
to prove the achievement of the results or the fulfilment of the conditions as described
in Annex 1
(d) for unit, flat-rate and lump sum costs and contributions according to usual cost accounting
practices (if any): the beneficiaries must keep any adequate records and supporting documents
to prove that their cost accounting practices have been applied in a consistent manner, based on
objective criteria, regardless of the source of funding, and that they comply with the eligibility
conditions set out in Articles 6.1 and 6.2.
40
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Moreover, the following is needed for specific budget categories:
(e) for personnel costs: time worked for the beneficiary under the action must be supported
by declarations signed monthly by the person and their supervisor, unless another reliable
time-record system is in place; the granting authority may accept alternative evidence
supporting the time worked for the action declared, if it considers that it offers an adequate
level of assurance
(f) additional record-keeping rules: not applicable
The records and supporting documents must be made available upon request (see Article 19) or in the
context of checks, reviews, audits or investigations (see Article 25).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Article 25), the beneficiaries must keep these
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The granting authority may accept
non-original documents if they offer a comparable level of assurance.
20.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently
substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may
be reduced (see Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 21 — REPORTING
21.1 Continuous reporting
The beneficiaries must continuously report on the progress of the action (e.g. deliverables,
milestones, outputs/outcomes, critical risks, indicators, etc; if any), in the Portal Continuous
Reporting tool and in accordance with the timing and conditions it sets out (as agreed with the granting
authority).
Standardised deliverables (e.g. progress reports not linked to payments, reports on cumulative
expenditure, special reports, etc; if any) must be submitted using the templates published on the Portal.
21.2 Periodic reporting: Technical reports and financial statements
In addition, the beneficiaries must provide reports to request payments, in accordance with the
schedule and modalities set out in the Data Sheet (see Point 4.2):
- for additional prefinancings (if any): an additional prefinancing report
- for interim payments (if any) and the final payment: a periodic report.
The prefinancing and periodic reports include a technical and financial part.
41
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
The technical part includes an overview of the action implementation. It must be prepared using the
template available in the Portal Periodic Reporting tool.
The financial part of the additional prefinancing report includes a statement on the use of the previous
prefinancing payment.
The financial part of the periodic report includes:
- the financial statements (individual and consolidated; for all beneficiaries/affiliated entities)
- the explanation on the use of resources (or detailed cost reporting table, if required)
- the certificates on the financial statements (CFS) (if required; see Article 24.2 and Data Sheet,
Point 4.3).
The financial statements must detail the eligible costs and contributions for each budget category
and, for the final payment, also the revenues for the action (see Articles 6 and 22).
All eligible costs and contributions incurred should be declared, even if they exceed the amounts
indicated in the estimated budget (see Annex 2). Amounts that are not declared in the individual
financial statements will not be taken into account by the granting authority.
By signing the financial statements (directly in the Portal Periodic Reporting tool), the beneficiaries
confirm that:
- the information provided is complete, reliable and true
- the costs and contributions declared are eligible (see Article 6)
- the costs and contributions can be substantiated by adequate records and supporting documents
(see Article 20) that will be produced upon request (see Article 19) or in the context of checks,
reviews, audits and investigations (see Article 25)
- for the final periodic report: all the revenues have been declared (if required; see Article 22).
Beneficiaries will have to submit also the financial statements of their affiliated entities (if any). In case
of recoveries (see Article 22), beneficiaries will be held responsible also for the financial statements
of their affiliated entities.
21.3 Currency for financial statements and conversion into euros
The financial statements must be drafted in euro.
Beneficiaries with general accounts established in a currency other than the euro must convert the
costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C
series of the Official Journal of the European Union (ECB website), calculated over the corresponding
reporting period.
If no daily euro exchange rate is published in the Official Journal for the currency in question, they
must be converted at the average of the monthly accounting exchange rates published on the European
Commission website (InforEuro), calculated over the corresponding reporting period.
42
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Beneficiaries with general accounts in euro must convert costs incurred in another currency into euro
according to their usual accounting practices.
21.4 Reporting language
The reporting must be in the language of the Agreement, unless otherwise agreed with the granting
authority (see Data Sheet, Point 4.2).
21.5 Consequences of non-compliance
If a report submitted does not comply with this Article, the granting authority may suspend the
payment deadline (see Article 29) and apply other measures described in Chapter 5.
If the coordinator breaches its reporting obligations, the granting authority may terminate the grant or
the coordinator’s participation (see Article 32) or apply other measures described in Chapter 5.
ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS
DUE
22.1 Payments and payment arrangements
Payments will be made in accordance with the schedule and modalities set out in the Data Sheet (see
Point 4.2).
They will be made in euro to the bank account indicated by the coordinator (see Data Sheet, Point 4.2)
and must be distributed without unjustified delay (restrictions may apply to distribution of the initial
prefinancing payment; see Data Sheet, Point 4.2).
Payments to this bank account will discharge the granting authority from its payment obligation.
The cost of payment transfers will be borne as follows:
- the granting authority bears the cost of transfers charged by its bank
- the beneficiary bears the cost of transfers charged by its bank
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
Payments by the granting authority will be considered to have been carried out on the date when they
are debited to its account.
22.2 Recoveries
Recoveries will be made, if — at beneficiary termination, final payment or afterwards — it turns out
that the granting authority has paid too much and needs to recover the amounts undue.
The general liability regime for recoveries (first-line liability) is as follows: At final payment, the
coordinator will be fully liable for recoveries, even if it has not been the final recipient of the undue
amounts. At beneficiary termination or after final payment, recoveries will be made directly against
the beneficiaries concerned.
Beneficiaries will be fully liable for repaying the debts of their affiliated entities.
43
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
In case of enforced recoveries (see Article 22.4):
- the beneficiaries will be jointly and severally liable for repaying debts of another beneficiary
under the Agreement (including late-payment interest), if required by the granting authority
(see Data Sheet, Point 4.4)
- affiliated entities will be held liable for repaying debts of their beneficiaries under the
Agreement (including late-payment interest), if required by the granting authority (see
Data Sheet, Point 4.4).
22.3 Amounts due
22.3.1 Prefinancing payments
The aim of the prefinancing is to provide the beneficiaries with a float.
It remains the property of the EU until the final payment.
For initial prefinancings (if any), the amount due, schedule and modalities are set out in the
Data Sheet (see Point 4.2).
For additional prefinancings (if any), the amount due, schedule and modalities are also set out in
the Data Sheet (see Point 4.2). However, if the statement on the use of the previous prefinancing
payment shows that less than 70% was used, the amount set out in the Data Sheet will be reduced by
the difference between the 70% threshold and the amount used.
Prefinancing payments (or parts of them) may be offset (without the beneficiaries’ consent) against
amounts owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
22.3.2 Amount due at beneficiary termination — Recovery
In case of beneficiary termination, the granting authority will determine the provisional amount due
for the beneficiary concerned. Payments (if any) will be made with the next interim or final payment.
The amount due will be calculated in the following step:
Step 1 — Calculation of the total accepted EU contribution
Step 1 — Calculation of the total accepted EU contribution
The granting authority will first calculate the ‘accepted EU contribution’ for the beneficiary for all
reporting periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate
to the accepted costs of the beneficiary), taking into account requests for a lower contribution to costs
and CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit,
flat-rate or lump sum contributions and financing not linked to costs, if any).
44
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
After that, the granting authority will take into account grant reductions (if any). The resulting amount
is the ‘total accepted EU contribution’ for the beneficiary.
The balance is then calculated by deducting the payments received (if any; see report on the
distribution of payments in Article 32), from the total accepted EU contribution:
{total accepted EU contribution for the beneficiary
minus
{prefinancing and interim payments received (if any)}}.
If the balance is positive, the amount will be included in the next interim or final payment to the
consortium.
If the balance is negative, it will be recovered in accordance with the following procedure:
The granting authority will send a pre-information letter to the beneficiary concerned:
- formally notifying the intention to recover, the amount due, the amount to be recovered and
the reasons why and
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered and ask this amount to be
paid to the coordinator (confirmation letter).
The amounts will later on also be taken into account for the next interim or final payment.
22.3.3 Interim payments
Interim payments reimburse the eligible costs and contributions claimed for the implementation of
the action during the reporting periods (if any).
Interim payments (if any) will be made in accordance with the schedule and modalities set out the
Data Sheet (see Point 4.2).
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The interim payment will be calculated by the granting authority in the following steps:
Step 1 — Calculation of the total accepted EU contribution
Step 2 — Limit to the interim payment ceiling
Step 1 — Calculation of the total accepted EU contribution
The granting authority will calculate the ‘accepted EU contribution’ for the action for the reporting
period, by first calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the
accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, and
CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate
or lump sum contributions and financing not linked to costs, if any).
45
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
After that, the granting authority will take into account grant reductions from beneficiary termination
(if any). The resulting amount is the ‘total accepted EU contribution’.
Step 2 — Limit to the interim payment ceiling
The resulting amount is then capped to ensure that the total amount of prefinancing and interim
payments (if any) does not exceed the interim payment ceiling set out in the Data Sheet (see Point 4.2).
Interim payments (or parts of them) may be offset (without the beneficiaries’ consent) against amounts
owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
22.3.4 Final payment — Final grant amount — Revenues and Profit — Recovery
The final payment (payment of the balance) reimburses the remaining part of the eligible costs and
contributions claimed for the implementation of the action (if any).
The final payment will be made in accordance with the schedule and modalities set out in the
Data Sheet (see Point 4.2).
Payment is subject to the approval of the final periodic report. Its approval does not imply recognition
of compliance, authenticity, completeness or correctness of its content.
The final grant amount for the action will be calculated in the following steps:
Step 1 — Calculation of the total accepted EU contribution
Step 2 — Limit to the maximum grant amount
Step 3 — Reduction due to the no-profit rule
Step 1 — Calculation of the total accepted EU contribution
The granting authority will first calculate the ‘accepted EU contribution’ for the action for all reporting
periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the total
accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, CFS
threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate or
lump sum contributions and financing not linked to costs, if any).
After that, the granting authority will take into account grant reductions (if any). The resulting amount
is the ‘total accepted EU contribution’.
Step 2 — Limit to the maximum grant amount
If the resulting amount is higher than the maximum grant amount set out in Article 5.2, it will be
limited to the latter.
46
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Step 3 — Reduction due to the no-profit rule
If the no-profit rule is provided for in the Data Sheet (see Point 4.2), the grant must not produce a
profit (i.e. surplus of the amount obtained following Step 2 plus the action’s revenues, over the eligible
costs and contributions approved by the granting authority).
‘Revenue’ is all income generated by the action, during its duration (see Article 4), for beneficiaries
that are profit legal entities.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible
costs approved by the granting authority (as compared to the amount calculated following Steps 1 and
2 minus the contributions).
The balance (final payment) is then calculated by deducting the total amount of prefinancing and
interim payments already made (if any), from the final grant amount:
{final grant amount
minus
{prefinancing and interim payments made (if any)}}.
If the balance is positive, it will be paid to the coordinator.
The final payment (or part of it) may be offset (without the beneficiaries’ consent) against amounts
owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
If the balance is negative, it will be recovered in accordance with the following procedure:
The granting authority will send a pre-information letter to the coordinator:
- formally notifying the intention to recover, the final grant amount, the amount to be recovered
and the reasons why
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered (confirmation letter),
together with a debit note with the terms and date for payment.
If payment is not made by the date specified in the debit note, the granting authority will enforce
recovery in accordance with Article 22.4.
22.3.5 Audit implementation after final payment — Revised final grant amount — Recovery
If — after the final payment (in particular, after checks, reviews, audits or investigations; see
47
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Article 25) — the granting authority rejects costs or contributions (see Article 27) or reduces the grant
(see Article 28), it will calculate the revised final grant amount for the beneficiary concerned.
The beneficiary revised final grant amount will be calculated in the following step:
Step 1 — Calculation of the revised total accepted EU contribution
Step 1 — Calculation of the revised total accepted EU contribution
The granting authority will first calculate the ‘revised accepted EU contribution’ for the beneficiary,
by calculating the ‘revised accepted costs’ and ‘revised accepted contributions’.
After that, it will take into account grant reductions (if any). The resulting ‘revised total accepted EU
contribution’ is the beneficiary revised final grant amount.
If the revised final grant amount is lower than the beneficiary’s final grant amount (i.e. its share in the
final grant amount for the action), it will be recovered in accordance with the following procedure:
The beneficiary final grant amount (i.e. share in the final grant amount for the action) is calculated
as follows:
{{total accepted EU contribution for the beneficiary
divided by
total accepted EU contribution for the action}
multiplied by
final grant amount for the action}.
The granting authority will send a pre-information letter to the beneficiary concerned:
- formally notifying the intention to recover, the amount to be recovered and the reasons why and
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered (confirmation letter),
together with a debit note with the terms and the date for payment.
Recoveries against affiliated entities (if any) will be handled through their beneficiaries.
If payment is not made by the date specified in the debit note, the granting authority will enforce
recovery in accordance with Article 22.4.
22.4 Enforced recovery
If payment is not made by the date specified in the debit note, the amount due will be recovered:
(a) by offsetting the amount — without the coordinator or beneficiary’s consent — against any
amounts owed to the coordinator or beneficiary by the granting authority.
In exceptional circumstances, to safeguard the EU financial interests, the amount may be offset
before the payment date specified in the debit note.
48
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
For grants where the granting authority is the European Commission or an EU executive
agency, debts may also be offset against amounts owed by other Commission services or
executive agencies.
(b) by drawing on the financial guarantee(s) (if any)
(c) by holding other beneficiaries jointly and severally liable (if any; see Data Sheet, Point 4.4)
(d) by holding affiliated entities jointly and severally liable (if any, see Data Sheet, Point 4.4)
(e) by taking legal action (see Article 43) or, provided that the granting authority is the European
Commission or an EU executive agency, by adopting an enforceable decision under Article 299
of the Treaty on the Functioning of the EU (TFEU) and Article 100(2) of EU Financial
Regulation 2018/1046.
The amount to be recovered will be increased by late-payment interest at the rate set out in
Article 22.5, from the day following the payment date in the debit note, up to and including the date
the full payment is received.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2015/236617 applies.
For grants where the granting authority is an EU executive agency, enforced recovery by offsetting or
enforceable decision will be done by the services of the European Commission (see also Article 43).
22.5 Consequences of non-compliance
22.5.1 If the granting authority does not pay within the payment deadlines (see above), the
beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank
(ECB) for its main refinancing operations in euros (‘reference rate’), plus the rate specified in the
Data Sheet (Point 4.2). The reference rate is the rate in force on the first day of the month in which the
payment deadline expires, as published in the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
on request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
If payments or the payment deadline are suspended (see Articles 29 and 30), payment will not be
considered as late.
17 Directive (EU) 2015/2366 of the European Parliament and of the Council of 25 November 2015 on payment
services in the internal market, amending Directives 2002/65/EC, 2009/110/EC and 2013/36/EU and Regulation (EU)
No 1093/2010, and repealing Directive 2007/64/EC (OJ L 337, 23.12.2015, p. 35).
49
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
22.5.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 28) and the grant or the coordinator may be terminated (see Article 32).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 23 — GUARANTEES
23.1 Prefinancing guarantee
If required by the granting authority (see Data Sheet, Point 4.2), the beneficiaries must provide (one
or more) prefinancing guarantee(s) in accordance with the timing and the amounts set out in the
Data Sheet.
The coordinator must submit them to the granting authority in due time before the prefinancing they
are linked to.
The guarantees must be drawn up using the template published on the Portal and fulfil the following
conditions:
(a) be provided by a bank or approved financial institution established in the EU or — if requested
by the coordinator and accepted by the granting authority — by a third party or a bank or
financial institution established outside the EU offering equivalent security
(b) the guarantor stands as first-call guarantor and does not require the granting authority to first
have recourse against the principal debtor (i.e. the beneficiary concerned) and
(c) remain explicitly in force until the final payment and, if the final payment takes the form of a
recovery, until five months after the debit note is notified to a beneficiary.
They will be released within the following month.
23.2 Consequences of non-compliance
If the beneficiaries breach their obligation to provide the prefinancing guarantee, the prefinancing
will not be paid.
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 24 — CERTIFICATES
24.1 Operational verification report (OVR)
Not applicable
24.2 Certificate on the financial statements (CFS)
If required by the granting authority (see Data Sheet, Point 4.3), the beneficiaries must provide
50
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
certificates on their financial statements (CFS), in accordance with the schedule, threshold and
conditions set out in the Data Sheet.
The coordinator must submit them as part of the periodic report (see Article 21).
The certificates must be drawn up using the template published on the Portal, cover the costs declared
on the basis of actual costs and costs according to usual cost accounting practices (if any), and fulfil
the following conditions:
(a) be provided by a qualified approved external auditor which is independent and complies with
Directive 2006/43/EC18 (or for public bodies: by a competent independent public officer)
(b) the verification must be carried out according to the highest professional standards to ensure
that the financial statements comply with the provisions under the Agreement and that the costs
declared are eligible.
The certificates will not affect the granting authority's right to carry out its own checks, reviews or
audits, nor preclude the European Court of Auditors (ECA), the European Public Prosecutor’s Office
(EPPO) or the European Anti-Fraud Office (OLAF) from using their prerogatives for audits and
investigations under the Agreement (see Article 25).
If the costs (or a part of them) were already audited by the granting authority, these costs do not need
to be covered by the certificate and will not be counted for calculating the threshold (if any).
24.3 Certificate on the compliance of usual cost accounting practices (CoMUC)
Beneficiaries which use unit, flat rate or lump sum costs or contributions according to usual costs
accounting practices (if any) may submit to the granting authority, for approval, a certificate on the
methodology stating that their usual cost accounting practices comply with the eligibility conditions
under the Agreement.
The certificate must be drawn up using the template published on the Portal and fulfil the following
conditions:
(a) be provided by a qualified approved external auditor which is independent and complies with
Directive 2006/43/EC19 (or for public bodies: by a competent independent public officer)
(b) the verification must be carried out according to the highest professional standards to ensure
that the methodology for declaring costs according to usual accounting practices complies with
the provisions under the Agreement.
If the certificate is approved, amounts declared in line with this methodology will not be challenged
subsequently, unless the beneficiary concealed information for the purpose of the approval.
24.4 Systems and process audit (SPA)
Not applicable
18 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
19 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
51
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
24.5 Consequences of non-compliance
If a beneficiary does not submit a certificate on the financial statements (CFS) or the certificate is
rejected, the accepted EU contribution to costs will be capped to reflect the CFS threshold.
If a beneficiary breaches any of its other obligations under this Article, the granting authority may
apply the measures described in Chapter 5.
ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
25.1 Granting authority checks, reviews and audits
25.1.1 Internal checks
The granting authority may — during the action or afterwards — check the proper implementation of
the action and compliance with the obligations under the Agreement, including assessing costs and
contributions, deliverables and reports.
25.1.2 Project reviews
The granting authority may carry out reviews on the proper implementation of the action and
compliance with the obligations under the Agreement (general project reviews or specific issues
reviews).
Such project reviews may be started during the implementation of the action and until the time-limit
set out in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiary
concerned and will be considered to start on the date of the notification.
If needed, the granting authority may be assisted by independent, outside experts. If it uses outside
experts, the coordinator or beneficiary concerned will be informed and have the right to object on
grounds of commercial confidentiality or conflict of interest.
The coordinator or beneficiary concerned must cooperate diligently and provide — within the deadline
requested — any information and data in addition to deliverables and reports already submitted
(including information on the use of resources). The granting authority may request beneficiaries
to provide such information to it directly. Sensitive information and documents will be treated in
accordance with Article 13.
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
the outside experts.
For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including
to the outside experts) and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a project review report will be drawn up.
The granting authority will formally notify the project review report to the coordinator or beneficiary
concerned, which has 30 days from receiving notification to make observations.
52
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Project reviews (including project review reports) will be in the language of the Agreement.
25.1.3 Audits
The granting authority may carry out audits on the proper implementation of the action and compliance
with the obligations under the Agreement.
Such audits may be started during the implementation of the action and until the time-limit set out in
the Data Sheet (see Point 6). They will be formally notified to the beneficiary concerned and will be
considered to start on the date of the notification.
The granting authority may use its own audit service, delegate audits to a centralised service or use
external audit firms. If it uses an external firm, the beneficiary concerned will be informed and have
the right to object on grounds of commercial confidentiality or conflict of interest.
The beneficiary concerned must cooperate diligently and provide — within the deadline requested —
any information (including complete accounts, individual salary statements or other personal data)
to verify compliance with the Agreement. Sensitive information and documents will be treated in
accordance with Article 13.
For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including
for the external audit firm) and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a draft audit report will be drawn up.
The auditors will formally notify the draft audit report to the beneficiary concerned, which has 30 days
from receiving notification to make observations (contradictory audit procedure).
The final audit report will take into account observations by the beneficiary concerned and will be
formally notified to them.
Audits (including audit reports) will be in the language of the Agreement.
25.2 European Commission checks, reviews and audits in grants of other granting
authorities
Where the granting authority is not the European Commission, the latter has the same rights of checks,
reviews and audits as the granting authority.
25.3 Access to records for assessing simplified forms of funding
The beneficiaries must give the European Commission access to their statutory records for the periodic
assessment of simplified forms of funding which are used in EU programmes.
25.4 OLAF, EPPO and ECA audits and investigations
The following bodies may also carry out checks, reviews, audits and investigations — during the
action or afterwards:
53
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
- the European Anti-Fraud Office (OLAF) under Regulations No 883/201320 and No 2185/9621
- the European Public Prosecutor’s Office (EPPO) under Regulation 2017/1939
- the European Court of Auditors (ECA) under Article 287 of the Treaty on the Functioning of
the EU (TFEU) and Article 257 of EU Financial Regulation 2018/1046.
If requested by these bodies, the beneficiary concerned must provide full, accurate and complete
information in the format requested (including complete accounts, individual salary statements or
other personal data, including in electronic format) and allow access to sites and premises for
on-the-spot visits or inspections — as provided for under these Regulations.
To this end, the beneficiary concerned must keep all relevant information relating to the action, at
least until the time-limit set out in the Data Sheet (Point 6) and, in any case, until any ongoing checks,
reviews, audits, investigations, litigation or other pursuits of claims have been concluded.
25.5 Consequences of checks, reviews, audits and investigations — Extension of results of
reviews, audits or investigations
25.5.1 Consequences of checks, reviews, audits and investigations in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to
rejections (see Article 27), grant reduction (see Article 28) or other measures described in Chapter 5.
Rejections or grant reductions after the final payment will lead to a revised final grant amount (see
Article 22).
Findings in checks, reviews, audits or investigations during the action implementation may lead to a
request for amendment (see Article 39), to change the description of the action set out in Annex 1.
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud
or breach of obligations in any EU grant may also lead to consequences in other EU grants awarded
under similar conditions (‘extension to other grants’).
Moreover, findings arising from an OLAF or EPPO investigation may lead to criminal prosecution
under national law.
25.5.2 Extension from other grants
Results of checks, reviews, audits or investigations in other grants may be extended to this grant, if:
(a) the beneficiary concerned is found, in other EU grants awarded under similar conditions, to
have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that
have a material impact on this grant and
20 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC)
No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ
L 248, 18/09/2013, p. 1).
21 Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15/11/1996, p. 2).
54
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — within the time-limit for audits set out in the Data Sheet (see
Point 6).
The granting authority will formally notify the beneficiary concerned of the intention to extend the
findings and the list of grants affected.
If the extension concerns rejections of costs or contributions: the notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings
(b) the request to submit revised financial statements for all grants affected
(c) the correction rate for extrapolation, established on the basis of the systemic or recurrent errors,
to calculate the amounts to be rejected, if the beneficiary concerned:
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
If the extension concerns grant reductions: the notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the correction rate for extrapolation, established on the basis of the systemic or recurrent
errors and the principle of proportionality.
The beneficiary concerned has 60 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method/rate.
On the basis of this, the granting authority will analyse the impact and decide on the implementation
(i.e. start rejection or grant reduction procedures, either on the basis of the revised financial statements
or the announced/alternative method/rate or a mix of those; see Articles 27 and 28).
25.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently
substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may
be reduced (see Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 26 — IMPACT EVALUATIONS
26.1 Impact evaluation
The granting authority may carry out impact evaluations of the action, measured against the objectives
and indicators of the EU programme funding the grant.
Such evaluations may be started during implementation of the action and until the time-limit set out
55
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiaries and
will be considered to start on the date of the notification.
If needed, the granting authority may be assisted by independent outside experts.
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
26.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the granting authority may apply
the measures described in Chapter 5.
CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE
SECTION 1 REJECTIONS AND GRANT REDUCTION
ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS
27.1 Conditions
The granting authority will — at beneficiary termination, interim payment, final payment or
afterwards — reject any costs or contributions which are ineligible (see Article 6), in particular
following checks, reviews, audits or investigations (see Article 25).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 25).
Ineligible costs or contributions will be rejected.
27.2 Procedure
If the rejection does not lead to a recovery, the granting authority will formally notify the coordinator
or beneficiary concerned of the rejection, the amounts and the reasons why. The coordinator or
beneficiary concerned may — within 30 days of receiving notification — submit observations if it
disagrees with the rejection (payment review procedure).
If the rejection leads to a recovery, the granting authority will follow the contradictory procedure with
pre-information letter set out in Article 22.
27.3 Effects
If the granting authority rejects costs or contributions, it will deduct them from the costs or
contributions declared and then calculate the amount due (and, if needed, make a recovery; see
Article 22).
ARTICLE 28 — GRANT REDUCTION
28.1 Conditions
56
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
The granting authority may — at beneficiary termination, final payment or afterwards — reduce the
grant for a beneficiary, if:
(a) the beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) the beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant (see Article 25).
The amount of the reduction will be calculated for each beneficiary concerned and proportionate to the
seriousness and the duration of the errors, irregularities or fraud or breach of obligations, by applying
an individual reduction rate to their accepted EU contribution.
28.2 Procedure
If the grant reduction does not lead to a recovery, the granting authority will formally notify the
coordinator or beneficiary concerned of the reduction, the amount to be reduced and the reasons why.
The coordinator or beneficiary concerned may — within 30 days of receiving notification — submit
observations if it disagrees with the reduction (payment review procedure).
If the grant reduction leads to a recovery, the granting authority will follow the contradictory procedure
with pre-information letter set out in Article 22.
28.3 Effects
If the granting authority reduces the grant, it will deduct the reduction and then calculate the amount
due (and, if needed, make a recovery; see Article 22).
SECTION 2 SUSPENSION AND TERMINATION
ARTICLE 29 — PAYMENT DEADLINE SUSPENSION
29.1 Conditions
The granting authority may — at any moment — suspend the payment deadline if a payment cannot
be processed because:
(a) the required report (see Article 21) has not been submitted or is not complete or additional
information is needed
(b) there are doubts about the amount to be paid (e.g. ongoing audit extension procedure, queries
57
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
about eligibility, need for a grant reduction, etc.) and additional checks, reviews, audits or
investigations are necessary, or
(c) there are other issues affecting the EU financial interests.
29.2 Procedure
The granting authority will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day the notification is sent.
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining time to pay (see Data Sheet, Point 4.2) will resume.
If the suspension exceeds two months, the coordinator may request the granting authority to confirm
if the suspension will continue.
If the payment deadline has been suspended due to the non-compliance of the report and the revised
report is not submitted (or was submitted but is also rejected), the granting authority may also terminate
the grant or the participation of the coordinator (see Article 32).
ARTICLE 30 — PAYMENT SUSPENSION
30.1 Conditions
The granting authority may — at any moment — suspend payments, in whole or in part for one or
more beneficiaries, if:
(a) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed or is suspected of
having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant.
If payments are suspended for one or more beneficiaries, the granting authority will make partial
payment(s) for the part(s) not suspended. If suspension concerns the final payment, the payment (or
recovery) of the remaining amount after suspension is lifted will be considered to be the payment that
closes the action.
30.2 Procedure
58
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Before suspending payments, the granting authority will send a pre-information letter to the
beneficiary concerned:
- formally notifying the intention to suspend payments and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite the
observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will
formally notify that the procedure is discontinued.
At the end of the suspension procedure, the granting authority will also inform the coordinator.
The suspension will take effect the day after the confirmation notification is sent.
If the conditions for resuming payments are met, the suspension will be lifted. The granting authority
will formally notify the beneficiary concerned (and the coordinator) and set the suspension end date.
During the suspension, no prefinancing will be paid to the beneficiaries concerned. For interim
payments, the periodic reports for all reporting periods except the last one (see Article 21) must
not contain any financial statements from the beneficiary concerned (or its affiliated entities). The
coordinator must include them in the next periodic report after the suspension is lifted or — if
suspension is not lifted before the end of the action — in the last periodic report.
ARTICLE 31 — GRANT AGREEMENT SUSPENSION
31.1 Consortium-requested GA suspension
31.1.1 Conditions and procedure
The beneficiaries may request the suspension of the grant or any part of it, if exceptional circumstances
— in particular force majeure (see Article 35) — make implementation impossible or excessively
difficult.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the date the suspension takes effect; this date may be before the date of the submission of the
amendment request and
- the expected date of resumption.
The suspension will take effect on the day specified in the amendment.
Once circumstances allow for implementation to resume, the coordinator must immediately request
another amendment of the Agreement to set the suspension end date, the resumption date (one day
after suspension end date), extend the duration and make other changes necessary to adapt the action
to the new situation (see Article 39) — unless the grant has been terminated (see Article 32). The
suspension will be lifted with effect from the suspension end date set out in the amendment. This date
may be before the date of the submission of the amendment request.
59
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities
implemented during grant suspension are not eligible (see Article 6.3).
31.2 EU-initiated GA suspension
31.2.1 Conditions
The granting authority may suspend the grant or any part of it, if:
(a) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed or is suspected of
having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant
(c) other:
(i) linked action issues: not applicable
(ii) due to major delays, the objectives of the action risk to no longer be achieved
31.2.2 Procedure
Before suspending the grant, the granting authority will send a pre-information letter to the
coordinator:
- formally notifying the intention to suspend the grant and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite the
observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will
formally notify that the procedure is discontinued.
The suspension will take effect the day after the confirmation notification is sent (or on a later date
specified in the notification).
Once the conditions for resuming implementation of the action are met, the granting authority will
formally notify the coordinator a lifting of suspension letter, in which it will set the suspension
end date and invite the coordinator to request an amendment of the Agreement to set the resumption
date (one day after suspension end date), extend the duration and make other changes necessary to
adapt the action to the new situation (see Article 39) — unless the grant has been terminated (see
60
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Article 32). The suspension will be lifted with effect from the suspension end date set out in the lifting
of suspension letter. This date may be before the date on which the letter is sent.
During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities
implemented during suspension are not eligible (see Article 6.3).
The beneficiaries may not claim damages due to suspension by the granting authority (see Article 33).
Grant suspension does not affect the granting authority’s right to terminate the grant or a beneficiary
(see Article 32) or reduce the grant (see Article 28).
ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION
32.1 Consortium-requested GA termination
32.1.1 Conditions and procedure
The beneficiaries may request the termination of the grant.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the date the consortium ends work on the action (‘end of work date’) and
- the date the termination takes effect (‘termination date’); this date must be after the date of the
submission of the amendment request.
The termination will take effect on the termination date specified in the amendment.
If no reasons are given or if the granting authority considers the reasons do not justify termination,
it may consider the grant terminated improperly.
32.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit a periodic
report (for the open reporting period until termination).
The granting authority will calculate the final grant amount and final payment on the basis of the report
submitted and taking into account the costs incurred and contributions for activities implemented
before the end of work date (see Article 22). Costs relating to contracts due for execution only after
the end of work are not eligible.
If the granting authority does not receive the report within the deadline, only costs and contributions
which are included in an approved periodic report will be taken into account (no costs/contributions
if no periodic report was ever approved).
Improper termination may lead to a grant reduction (see Article 28).
After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality and
security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks,
reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and
42 (assignment of claims)) continue to apply.
61
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
32.2 Consortium-requested beneficiary termination
32.2.1 Conditions and procedure
The coordinator may request the termination of the participation of one or more beneficiaries, on
request of the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing)
- the date the beneficiary ends work on the action (‘end of work date’)
- the date the termination takes effect (‘termination date’); this date must be after the date of the
submission of the amendment request.
If the termination concerns the coordinator and is done without its agreement, the amendment request
must be submitted by another beneficiary (acting on behalf of the consortium).
The termination will take effect on the termination date specified in the amendment.
If no information is given or if the granting authority considers that the reasons do not justify
termination, it may consider the beneficiary to have been terminated improperly.
32.2.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned
(ii) a termination report from the beneficiary concerned, for the open reporting period until
termination, containing an overview of the progress of the work, the financial statement,
the explanation on the use of resources, and, if applicable, the certificate on the financial
statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
(iii) a second request for amendment (see Article 39) with other amendments needed (e.g.
reallocation of the tasks and the estimated budget of the terminated beneficiary; addition of
a new beneficiary to replace the terminated beneficiary; change of coordinator, etc.).
The granting authority will calculate the amount due to the beneficiary on the basis of the report
submitted and taking into account the costs incurred and contributions for activities implemented
before the end of work date (see Article 22). Costs relating to contracts due for execution only after
the end of work are not eligible.
The information in the termination report must also be included in the periodic report for the next
reporting period (see Article 21).
If the granting authority does not receive the termination report within the deadline, only costs and
contributions which are included in an approved periodic report will be taken into account (no costs/
contributions if no periodic report was ever approved).
62
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
If the granting authority does not receive the report on the distribution of payments within the deadline,
it will consider that:
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
If the second request for amendment is accepted by the granting authority, the Agreement is amended
to introduce the necessary changes (see Article 39).
If the second request for amendment is rejected by the granting authority (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the grant
may be terminated (see Article 32).
Improper termination may lead to a reduction of the grant (see Article 31) or grant termination (see
Article 32).
After termination, the concerned beneficiary’s obligations (in particular Articles 13 (confidentiality
and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks,
reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and
42 (assignment of claims)) continue to apply.
32.3 EU-initiated GA or beneficiary termination
32.3.1 Conditions
The granting authority may terminate the grant or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 40)
(b) a change to the action or the legal, financial, technical, organisational or ownership situation
of a beneficiary is likely to substantially affect the implementation of the action or calls into
question the decision to award the grant (including changes linked to one of the exclusion
grounds listed in the declaration of honour)
(c) following termination of one or more beneficiaries, the necessary changes to the Agreement
(and their impact on the action) would call into question the decision awarding the grant or
breach the principle of equal treatment of applicants
(d) implementation of the action has become impossible or the changes necessary for its
continuation would call into question the decision awarding the grant or breach the principle
of equal treatment of applicants
(e) a beneficiary (or person with unlimited liability for its debts) is subject to bankruptcy
proceedings or similar (including insolvency, winding-up, administration by a liquidator or
court, arrangement with creditors, suspension of business activities, etc.)
(f) a beneficiary (or person with unlimited liability for its debts) is in breach of social security
or tax obligations
(g) a beneficiary (or person having powers of representation, decision-making or control, or person
63
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
essential for the award/implementation of the grant) has been found guilty of grave professional
misconduct
(h) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed fraud, corruption, or is
involved in a criminal organisation, money laundering, terrorism-related crimes (including
terrorism financing), child labour or human trafficking
(i) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) was created under a different jurisdiction
with the intent to circumvent fiscal, social or other legal obligations in the country of origin
(or created another entity with this purpose)
(j) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.)
(k) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant (extension of findings
from other grants to this grant; see Article 25)
(l) despite a specific request by the granting authority, a beneficiary does not request — through
the coordinator — an amendment to the Agreement to end the participation of one of its
affiliated entities or associated partners that is in one of the situations under points (d), (f), (e),
(g), (h), (i) or (j) and to reallocate its tasks, or
(m) other:
(i) linked action issues: not applicable
(ii) due to major delays, the objectives of the action can no longer be achieved
32.3.2 Procedure
Before terminating the grant or participation of one or more beneficiaries, the granting authority will
send a pre-information letter to the coordinator or beneficiary concerned:
- formally notifying the intention to terminate and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite
the observations it has received, it will confirm the termination and the date it will take effect
(confirmation letter). Otherwise, it will formally notify that the procedure is discontinued.
64
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
For beneficiary terminations, the granting authority will — at the end of the procedure — also inform
the coordinator.
The termination will take effect the day after the confirmation notification is sent (or on a later date
specified in the notification; ‘termination date’).
32.3.3 Effects
(a) for GA termination:
The coordinator must — within 60 days from when termination takes effect — submit a
periodic report (for the last open reporting period until termination).
The granting authority will calculate the final grant amount and final payment on the basis of
the report submitted and taking into account the costs incurred and contributions for activities
implemented before termination takes effect (see Article 22). Costs relating to contracts due
for execution only after termination are not eligible.
If the grant is terminated for breach of the obligation to submit reports, the coordinator may
not submit any report after termination.
If the granting authority does not receive the report within the deadline, only costs and
contributions which are included in an approved periodic report will be taken into account (no
costs/contributions if no periodic report was ever approved).
Termination does not affect the granting authority’s right to reduce the grant (see Article 28)
or to impose administrative sanctions (see Article 34).
The beneficiaries may not claim damages due to termination by the granting authority (see
Article 33).
After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality
and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25
(checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant
reduction) and 42 (assignment of claims)) continue to apply.
(b) for beneficiary termination:
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned
(ii) a termination report from the beneficiary concerned, for the open reporting period
until termination, containing an overview of the progress of the work, the financial
statement, the explanation on the use of resources, and, if applicable, the certificate
on the financial statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
(iii) a request for amendment (see Article 39) with any amendments needed (e.g.
reallocation of the tasks and the estimated budget of the terminated beneficiary;
addition of a new beneficiary to replace the terminated beneficiary; change of
coordinator, etc.).
The granting authority will calculate the amount due to the beneficiary on the basis of the
65
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
report submitted and taking into account the costs incurred and contributions for activities
implemented before termination takes effect (see Article 22). Costs relating to contracts due
for execution only after termination are not eligible.
The information in the termination report must also be included in the periodic report for the
next reporting period (see Article 21).
If the granting authority does not receive the termination report within the deadline, only costs
and contributions included in an approved periodic report will be taken into account (no costs/
contributions if no periodic report was ever approved).
If the granting authority does not receive the report on the distribution of payments within the
deadline, it will consider that:
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
If the request for amendment is accepted by the granting authority, the Agreement is amended
to introduce the necessary changes (see Article 39).
If the request for amendment is rejected by the granting authority (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the
grant may be terminated (see Article 32).
After termination, the concerned beneficiary’s obligations (in particular Articles 13
(confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility),
21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27
(rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply.
SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE
SANCTIONS
ARTICLE 33 — DAMAGES
33.1 Liability of the granting authority
The granting authority cannot be held liable for any damage caused to the beneficiaries or to third
parties as a consequence of the implementation of the Agreement, including for gross negligence.
The granting authority cannot be held liable for any damage caused by any of the beneficiaries or
other participants involved in the action, as a consequence of the implementation of the Agreement.
33.2 Liability of the beneficiaries
The beneficiaries must compensate the granting authority for any damage it sustains as a result of the
implementation of the action or because the action was not implemented in full compliance with the
Agreement, provided that it was caused by gross negligence or wilful act.
The liability does not extend to indirect or consequential losses or similar damage (such as loss of
66
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
profit, loss of revenue or loss of contracts), provided such damage was not caused by wilful act or
by a breach of confidentiality.
ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES
Nothing in this Agreement may be construed as preventing the adoption of administrative sanctions
(i.e. exclusion from EU award procedures and/or financial penalties) or other public law measures,
in addition or as an alternative to the contractual measures provided under this Agreement (see,
for instance, Articles 135 to 145 EU Financial Regulation 2018/1046 and Articles 4 and 7 of
Regulation 2988/9522).
SECTION 4 FORCE MAJEURE
ARTICLE 35 — FORCE MAJEURE
A party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of other participants involved
in the action), and
- proves to be inevitable in spite of exercising all due diligence.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
CHAPTER 6 FINAL PROVISIONS
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES
36.1 Forms and means of communication — Electronic management
EU grants are managed fully electronically through the EU Funding & Tenders Portal (‘Portal’).
All communications must be made electronically through the Portal, in accordance with the Portal
Terms and Conditions and using the forms and templates provided there (except if explicitly instructed
otherwise by the granting authority).
22 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities
financial interests (OJ L 312, 23.12.1995, p. 1).
67
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
Communications must be made in writing and clearly identify the grant agreement (project number
and acronym).
Communications must be made by persons authorised according to the Portal Terms and Conditions.
For naming the authorised persons, each beneficiary must have designated — before the signature of
this Agreement — a ‘legal entity appointed representative (LEAR)’. The role and tasks of the LEAR
are stipulated in their appointment letter (see Portal Terms and Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Portal.
36.2 Date of communication
The sending date for communications made through the Portal will be the date and time of sending,
as indicated by the time logs.
The receiving date for communications made through the Portal will be the date and time the
communication is accessed, as indicated by the time logs. Formal notifications that have not been
accessed within 10 days after sending, will be considered to have been accessed (see Portal Terms
and Conditions).
If a communication is exceptionally made on paper (by e-mail or postal service), general principles
apply (i.e. date of sending/receipt). Formal notifications by registered post with proof of delivery will
be considered to have been received either on the delivery date registered by the postal service or the
deadline for collection at the post office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
36.3 Addresses for communication
The Portal can be accessed via the Europa website.
The address for paper communications to the granting authority (if exceptionally allowed) is the
official mailing address indicated on its website.
For beneficiaries, it is the legal address specified in the Portal Participant Register.
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT
The provisions in the Data Sheet take precedence over the rest of the Terms and Conditions of the
Agreement.
Annex 5 takes precedence over the Terms and Conditions; the Terms and Conditions take precedence
over the Annexes other than Annex 5.
Annex 2 takes precedence over Annex 1.
ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES
68
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
In accordance with Regulation No 1182/7123, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
The day during which that event occurs is not considered as falling within the period.
‘Days’ means calendar days, not working days.
ARTICLE 39 — AMENDMENTS
39.1 Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
Amendments may be requested by any of the parties.
39.2 Procedure
The party requesting an amendment must submit a request for amendment signed directly in the Portal
Amendment tool.
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3). If a change of coordinator is requested without its agreement, the submission must be done
by another beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why
- the appropriate supporting documents and
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The granting authority may request additional information.
If the party receiving the request agrees, it must sign the amendment in the tool within 45 days of
receiving notification (or any additional information the granting authority has requested). If it does
not agree, it must formally notify its disagreement within the same deadline. The deadline may be
extended, if necessary for the assessment of the request. If no notification is received within the
deadline, the request is considered to have been rejected.
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date of entry into force or other date specified in the amendment.
ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES
23 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates
and time-limits (OJ L 124, 8/6/1971, p. 1).
69
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
40.1 Accession of the beneficiaries mentioned in the Preamble
The beneficiaries which are not coordinator must accede to the grant by signing the accession form
(see Annex 3) directly in the Portal Grant Preparation tool, within 30 days after the entry into force
of the Agreement (see Article 44).
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 44).
If a beneficiary does not accede to the grant within the above deadline, the coordinator must — within
30 days — request an amendment (see Article 39) to terminate the beneficiary and make any changes
necessary to ensure proper implementation of the action. This does not affect the granting authority’s
right to terminate the grant (see Article 32).
40.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
For this purpose, the coordinator must submit a request for amendment in accordance with Article 39.
It must include an accession form (see Annex 3) signed by the new beneficiary directly in the Portal
Amendment tool.
New beneficiaries will assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the accession form (see Annex 3).
Additions are also possible in mono-beneficiary grants.
ARTICLE 41 — TRANSFER OF THE AGREEMENT
In justified cases, the beneficiary of a mono-beneficiary grant may request the transfer of the grant to
a new beneficiary, provided that this would not call into question the decision awarding the grant or
breach the principle of equal treatment of applicants.
The beneficiary must submit a request for amendment (see Article 39), with
- the reasons why
- the accession form (see Annex 3) signed by the new beneficiary directly in the Portal
Amendment tool and
- additional supporting documents (if required by the granting authority).
The new beneficiary will assume the rights and obligations under the Agreement with effect from the
date of accession specified in the accession form (see Annex 3).
ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE
GRANTING AUTHORITY
The beneficiaries may not assign any of their claims for payment against the granting authority to
any third party, except if expressly approved in writing by the granting authority on the basis of a
reasoned, written request by the coordinator (on behalf of the beneficiary concerned).
70
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
If the granting authority has not accepted the assignment or if the terms of it are not observed, the
assignment will have no effect on it.
In no circumstances will an assignment release the beneficiaries from their obligations towards the
granting authority.
ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
43.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
Special rules may apply for beneficiaries which are international organisations (if any; see Data Sheet,
Point 5).
43.2 Dispute settlement
If a dispute concerns the interpretation, application or validity of the Agreement, the parties must bring
action before the EU General Court — or, on appeal, the EU Court of Justice — under Article 272
of the Treaty on the Functioning of the EU (TFEU).
For non-EU beneficiaries (if any), such disputes must be brought before the courts of Brussels,
Belgium — unless an international agreement provides for the enforceability of EU court judgements.
For beneficiaries with arbitration as special dispute settlement forum (if any; see Data Sheet, Point 5),
the dispute will — in the absence of an amicable settlement — be settled in accordance with the Rules
for Arbitration published on the Portal.
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299
TFEU (see Articles 22 and 34), the beneficiaries must bring action before the General Court — or, on
appeal, the Court of Justice — under Article 263 TFEU.
For grants where the granting authority is an EU executive agency (see Preamble), actions against
offsetting and enforceable decisions must be brought against the European Commission (not against
the granting authority; see also Article 22).
ARTICLE 44 — ENTRY INTO FORCE
The Agreement will enter into force on the day of signature by the granting authority or the
coordinator, depending on which is later.
71
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
SIGNATURES
For the coordinator For the granting authority
[--TGSMark#signature-941609750_75_210--] [--TGSMark#signature-service_75_210--]
72
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 1
Connecting Europe Facility (CEF)
Description of the action (DoA)
Part A
Part B
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
DESCRIPTION OF THE ACTION (PART A)
COVER PAGE
Part A of the Description of the Action (DoA) must be completed directly on the Portal Grant Preparation screens.
PROJECT
Grant Preparation (General Information screen) — Enter the info.
Project number: 101122891
Project name: electronic Freight Transport Information for Europe
Project acronym: 22-EU-TG-eFTI4EU
Call: CEF-T-2022-SIMOBGEN
Topic: CEF-T-2022-SIMOBGEN-eFTI-WORKS
Type of action: CEF-INFRA
Service: CINEA/B/02
Project starting date: fixed date: 1 April 2023
Project duration: 36 months
TABLE OF CONTENTS
Project summary ......................................................................................................................................................3
List of participants .................................................................................................................................................. 3
List of work packages .............................................................................................................................................5
Staff effort ............................................................................................................................................................. 13
List of deliverables ................................................................................................................................................14
List of milestones (outputs/outcomes) .................................................................................................................. 21
List of critical risks ............................................................................................................................................... 23
2
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
PROJECT SUMMARY
Project summary
Grant Preparation (General Information screen) — Provide an overall description of your project (including context and overall
objectives, planned activities and main achievements, and expected results and impacts (on target groups, change procedures,
capacities, innovation etc)). This summary should give readers a clear idea of what your project is about.
Use the project summary from your proposal.
The project eFTI4EU will encourage Member States to join forces, face the upcoming eFTI requirements, and work
jointly on common specifications and take advantage of a well harmonized European wide eFTI exchange environment
according to the Regulation EU No 2020/1056 on electronic Freight Transport Information (eFTI Regulation). EFTI4EU
project will support the process of implementation of the eFTI Regulation in digitalizing freight transport and logistics by
contributing to the implementation of a seamless paperless information exchange between businesses and authorities and
developing systems/IT platforms to be used by the competent authorities to access and process information electronically
on a non-discriminatory basis and in accordance with Regulation EU 2020/1056 on electronic Freight Transport
Information (eFTI).
The overall objectives of the Project are fully aligned with the aim of eFTI Regulation EU No 2020/1056, namely:
- to encourage the digitalization of freight transport and logistics
- to reduce administrative costs, improve enforcement capabilities of competent authorities, and
- to enhance the efficiency and sustainability of transport.
In detail the project comprises the following:
Studies:
● Provision of national and regional eFTI roadmaps
● Participation in the horizontal alignment work package to promote harmonization of eFTI development and
interoperability between Member States. This also covers the specification and the common co-development of eFTI
reference implementations (eFTI platform and eFTI Gate)
● Communication and dissemination, knowledge sharing activities in the MS to promote eFTI
Pilots:
● Development and piloting of an eFTI gate aligned with the jointly specified and developed reference implementation,
which could lead to a system that becomes operational in 2025
● eFTI gate pilots cover the following communication paths:
○ eFTI gate to competent authorities
○ eFTI gate to eFTI platforms
○ eFTI gate to other eFTI gates
○ eFTI gate to other linked systems
LIST OF PARTICIPANTS
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
1 COO MoClimate KLIIMAMINISTEERIUM EE 941609750
2 BEN DLK DIGILOGISTIKA KESKUS EE 892290391
3 BEN 51Biz 51BIZ LUXEMBOURG SARL LU 951890877
LUXEMBURG
4 BEN CIRCLE SPA CIRCLE SPA IT 946059916
4.1 AE CCEU CIRCLE CONNECTING EU S.R.L. IT 889903609
3
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
5 BEN BMDV BUNDESMINISTERIUM FÜR DIGITALES UND DE 996530374
VERKEHR
6 BEN BALM BUNDESAMT FUR LOGISTIK UND MOBILITAT DE 884011344
7 BEN FI Transport&Co LIIKENNE- JA VIESTINTAVIRASTO FI 900306956
8 BEN SCHIG SCHIENENINFRASTRUKTUR- AT 887660387
DIENSTLEISTUNGS-GESELLSCHAFT MBH
8.1 AE BMK BUNDESMINISTERIUM FUER KLIMASCHUTZ, AT 999633695
UMWELT, ENERGIE, MOBILITAET,
INNOVATION UND TECHNOLOGIE
9 BEN PORTEXPERTISE PORTS AND TERMINALS CVBA BE 933959457
10 BEN MIT Ministero delle Infrastrutture e dei Trasporti IT 996445790
10.1 AE RAM SPA RETE AUTOSTRADE MEDITERRANEE PER IT 937468917
LA LOGISTICA LE INFRASTRUTTURE ED I
TRASPORTI SOCIETA PER AZIONI
11 BEN IMT, I. P. INSTITUTO DA MOBILIDADE E DOS PT 966290430
TRANSPORTES, I P
12 BEN Nordic Invest NORDIC INVESTMENT BANK FI 894031056
13 BEN NORM UAB NORMALIS TECH LT 886548088
14 BEN TIA TRANSPORTO INOVACIJU ASOCIACIJA LT 885458875
15 BEN Groupe IN IMPRIMERIE NATIONALE FR 911407345
15.1 AE French Ministry MINISTERE DE LA TRANSITION ECOLOGIQUE FR 996384874
ET DE LA COHESION DES TERRITOIRES
16 BEN KLAIPEDA PORT VALSTYBES IMONE KLAIPEDOS LT 951975364
VALSTYBINIO JURU UOSTO DIREKCIJA
17 BEN LT MIN.TRANSP. LIETUVOS RESPUBLIKOS SUSISIEKIMO LT 888880550
MINISTERIJA
18 BEN SPW SERVICE PUBLIC DE WALLONIE BE 999811884
19 BEN LIW LOGISTICS IN WALLONIA BE 963728466
4
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
LIST OF WORK PACKAGES
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
WP1 WP 1: Horizontal Work 5 - BMDV 0.00 1 36 D1.1 – D1.1 Roadmap Workplan for MS
including templates
D1.2 – D1.2 eFTI System overview and
interface specification
D1.3 – D1.3 National eFTI Roadmaps
D1.4 – D1.4 eFTI System specifications
(preliminary Versions)
D1.5 – D 1.5 Reference implementation
development plan
D1.6 – D1.6 eFTI Gate service and content
specification
D1.7 – D1.7 Roadmap Status Report
D1.8 – D1.8 eFTI exchange environment
test plan
D1.9 – D1.9 Legal implementation and
certification strategy plan
D1.10 – D1.10 eFTI Gate Strategy and
Governance Model
D1.11 – D1.11 eFTI System specifications
(final Versions)
WP2 WP 2: National and Corridor Pilots 7 - FI Transport&Co 0.00 6 33 D2.1 – D2.1 eFTI4EU pilot plan
D2.2 – D2.2 Reference implementation
release nr. 05 description and system test
summary
D2.3 – D2.3 Reference implementation
release nr. 09 description and pilot result
summary
5
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
WP3 WP 3: Communication, Dissemination & Capacity 4 - CIRCLE SPA 0.00 1 36 D3.1 – D3.1 Detailed Communication Plan
Building D3.2 – D3.2 Mid-Term Communication
Report
D3.3 – D3.3 Final Communication Report
WP4 WP 4: Project management and coordination 1 - MoClimate 0.00 1 36 D4.1 – D4.1 Progress Report
D4.2 – D4.2 Progress Report
6
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Work package WP1 – WP 1: Horizontal Work
Work Package Number WP1 Lead Beneficiary 5. BMDV
Work Package Name WP 1: Horizontal Work
Start Month 1 End Month 36
Objectives
WP1 is the common harmonization work package for the participating Member States (MS) to identify, by means of
country’s specific roadmaps, inter alia, the inventory of requirements for national eFTI implementation, resource needs
(financial and technical) and requirements for the long-term operation of the eFTI exchange environment.;
WP1 will:
• analyze the Delegated Act (DA) and Implementing Act (IA) proposed by the European Commission (EC) and jointly
translate them into harmonized technical specifications, thus providing Member States with solid specifications, e.g.
for the development/tendering of an eFTI gate (the technical interfaces that enable the exchange of data between eFTI
platforms and user applications of competent authorities), as per Article 3(4) of Regulation (EU) 2020/1056 of the
European Parliament and of the Council of 15 July 2020 on electronic freight transport information;
• develop national and cross-border test strategies to test the eFTI exchange environment;
• develop a strategy for an open-source reference implementation of an eFTI gate;
• develop an agreed governance model that describes general rules for eFTI gates and the maintenance of the
specifications.
Description
WP1 consist of the following tasks:
Task 1.1 Authorities’ Road map (requirements and preparatory works)
Within the framework of Task 1.1, the participating Member States will first identify the existing systems, requirements
for national eFTI implementation, resource needs (financial and technical), pilots planned during the project and
requirements for the long-term operation of the eFTI exchange environment to document these in so-called national
roadmaps (D1.2). In eFTI4EU, the term roadmap is used as a synonym for a project plan for the introduction of eFTI
in the Member States. It is not necessarily a description of the implementation steps for eFTI, but rather an analysis
of the strategic, organizational, technical, legal and financial framework conditions in the MS, which serve to develop
eFTI gates specifically according to the requirements of the EU and the Member States. This should create a solid
information basis for eFTI4EU to analyze the starting point for the implementation of the eFTI exchange environment.
For this purpose, a work plan (D1.1) will be developed with support of the participating MS, in which the requirements
for the roadmaps will be documented. In addition, a corresponding roadmap structure will be developed in the form of
a template. This should help to collect the information in a harmonized way and facilitate an analysis afterwards. The
overall MS summary of the individual country-specific roadmaps will be made in a Roadmap Status Report (D1.3).
Here, an analysis of the commonalities and differences in the MS will be carried out, which represents a benchmark for
the harmonization range that will be available for the implementation of the eFTI exchange environment and thus for
the provision of interoperability.
Task 1.2 Interoperability of eFTI exchange environment (planning, reference specification, testing)
Task 1.2 will analyze the DA and IA introduced by the EU Commission and jointly translate them into harmonized
technical specifications. In addition, initial findings from the national roadmaps will be incorporated in parallel and the
use of e.g., EU Building Blocks will be discussed, such as eDelivery or similar existing, fully specified solutions. The
use of such solutions would indeed be a time saver for the project, as they could be implemented immediately in WP2.
The approach in Task 1.2 is to start with a systems overview and interface specification (D1.4). This includes a cross pilot
system architecture and an identification of interfaces to be considered (and harmonized) based on the architecture, which
will be specified in the first eFTI Implementing (IA). The next step is to evaluate if any of existing national systems can
take on the role of an eFTI gate (also making some adaptations, if needed), or if the eFTI gate should be built from scratch
(as a new component in the overall architecture). The resulting system dependencies (all IT applications in a specific
Member State that needs interface with eFTI gate) will be described in system specifications (D1.5). These also take into
account requirements of the eFTI stakeholders, including detailed application scenarios and usability requirements as
well as relevant service level and interoperability key performance indicators (KPI), which will be validated in the WP2
7
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
laboratory tests and pilot projects. According to the findings and experience gained from the implementation (WP2),
the specifications of the eFTI exchange environment, including the functional and technical interfaces between the eFTI
Gates, the national Authority Access Points (AAP) and the eFTI Platforms will be further improved and adapted until
the end of the project, so that a tested version of the specifications (D1.6) will be available at the end of the project.
The aim of this task is to provide member states with solid specifications, e.g., for the development/tendering of an
eFTI gate. On the other hand, the specifications as a whole will be used to produce a development plan for the reference
implementation (D1.7) (a common basis that will be adapted to the requirements that are specific for each Member
State). This plan involves the definition of development steps that must be carried out to reach the targeted eFTI
gate development, be it the adaptation of an existing system or the creation of a new one. The eFTI gate reference
implementation will be jointly developed (co-developed) and tested by the financially involved eFTI4EU partners in
WP2 and made available together with the data model and the requirement specifications to all Member States as
open-source code that can be modified, licensed, re-licensed or used without restrictions. Based on the above system
specifications, national and cross-border test strategies for testing the eFTI exchange environment will be developed,
which will be summarized in an eFTI exchange environment test plan (D1.8). Here, too, it would be possible to benefit
from existing test plans or test opportunities already developed for EU building blocks (e.g. eDelivery).
Task 1.3 eFTI Gate Strategy and Governance (Common Rule Set)
Task 1.3 aims to develop an agreed governance model (D.1.9) that describes common rules for eFTI gates (e.g., rules
for onboarding of eFTI platforms, rights and duties) and the maintenance of specifications. It should enable Member
States to monitor the technological-sociological system landscape and develop viable plans for the governance of the
reference implementation description, which can be made available to the market as open documentation. This includes
an identification of possible governance actors, their roles and relationships within the value chain structure.
The project partners will be responsible for jointly developing, testing and piloting the eFTI gate reference
implementation, which needs to meet the rules on harmonized data exchange and interoperability laid down in the first
eFTI DA and IA.
The reference implementation here is defined as a generic definition and pilot implementation of a generic solution
architecture. It is essential that the data sharing between the eFTI Gates is harmonized, that MS agree on a trust
architecture (identities, authentication and authorization), so that MS agree on a common process and service repository
and a common search and index mechanism. The reference architecture must comply with the EU implementing
regulations, but also be flexible enough so that each MS can keep on using their existing IT systems.
National pilots, which use the refence implementation as pattern for their national eFTI gate implementation, need
to perform tests following national and cross-border supply chain use cases where the exchange of data within an
eFTI exchange environment is required. Therefore, it is essential that the data sharing between the eFTI Gates is (a)
harmonized, that MS agree on (b) a trust architecture (identities, authentication and authorization), and (c) agree on a
common process and service repository and (d) a common search and index mechanism. The reference implementation
as pattern facilitates this by aiming at the same time in complying with the EU implementing regulations and allows
sufficient flexibility so that each Member State can use the eFTI gate reference implementation and adapt it to its existing
IT eco-system.
Task 1.4 eFTI Gate Content and Accessibility (e.g., Metadata, Access Management)
Task 1.4 is dedicated to the inside of the eFTI gate reference implementation, i.e. an eFTI Gate service and content
specification (D1.10) will functionally describe the relevant eFTI Gate services (e.g. internal/ external authentication,
eFTI platform-related services, eFTI Gate-to-eFTI Gate services, logging, search mechanism, etc.) and specify the
relevant registries (eFTI platform metadata, links, etc.).
Task 1.5 Legal implementation and Certification-related affairs and rules
Task 1.5 will address the legal implementation of eFTI components, taking into account the certification requirements
and rules that will be established for eFTI components. A strategy plan for legal implementation and certification (D1.11)
will therefore collect and document national strategies and processes for each MS regarding the legal implementation
of eFTI gates and the implementation of national certification processes for eFTI gates and platforms.
Work package WP2 – WP 2: National and Corridor Pilots
Work Package Number WP2 Lead Beneficiary 7. FI Transport&Co
8
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Work Package Name WP 2: National and Corridor Pilots
Start Month 6 End Month 33
Objectives
▪ Objective 1 is to test and pilot in real world conditions the main use cases of eFTI gates against the reference model
developed in WP1:
○ Test and pilot eFTI gate to competent authorities' data exchange
○ Test and pilot eFTI gate to eFTI platforms data exchange
○ Test and pilot eFTI gate to other eFTI gates data exchange
○ Test and pilot eFTI gate to other liked systems data exchange
▪ Objective 2 is to cover all main transport modes in pilots (maritime, air, rail and road) and with these study transport
mode specific eFTI data exchanges
▪ Objective 3 is to cover the whole eFTI architecture from Economic Operators to Competent Authorities in pilots
▪ Objective 4 is to pilot the above mentioned targeted pilots (i.e., objectives 1-3) in national and where applicable in
international/corridor context
Description
WP2 is based on the previous piloting experience derived from the CEF funded projects FENIX (2018-EU-TM-0077-
S) and FEDeRATED (2018-EU-TM-0119-S), where pre-eFTI piloting was already made. The purpose of the WP 2
pilots is to cover full eFTI architecture and its components. And hence, to provide concrete experience and lessons
learned from real life use cases and to adapt those into the WP2 eFTI Gate reference implementation solution. By
doing this co-developed open source eFTI Gate reference implementation, Member States will be able to implement
their interoperable operative eFTI Gates on time. Pilot results and findings will be disseminated both on national and
international level among eFTI stakeholders. WP2 target is to cover several eFTI Gate use cases and test these in different
MSs and international corridors, so that the eFTI4EU project covers main test use cases for eFTI Gates and complies
with the set KPIs defined for this.
WP2 consist of the following tasks:
Task 2.1 Pilot collaboration and knowledge sharing
The broad target of the Project Partners is to reach close working relationship with all engaged Member States to
better understand their needs, so that parallel national eFTI development projects can be supported with more accurate
definition, co-development and governance model. I.e., the eFTI4EU project will provide guidance and architecture
manual for MSs how to establish interoperable and a functioning system for eFTI implementation. This work will be
started already in WP1, and Task 2.1 will continue this and link it to the pilots and testing aspects. The WP2 will focus
on multi-country, multi-operator, cross-border eFTI use case scenarios and it will provide feedback and information for
reference model development. Due to the short time that the project and the Member States have for implementation of
eFTI, WP 2 will emphasize an agile co-development approach between Member States. In this incremental development
process, the Project Partners target to gain rapid progress and level ground for the eFTI gate reference implementation.
The development process is also linked to the general EU eFTI delegated acts development and potential CEF calls
(2023-2024), where eFTI4EU project could release nr. 05 version (intermediate version) of eFTI gate reference model for
those MSs, which were not ready to participate in 2022-2023 CEF funding. The system development start from release
number 0 and ready system equals to 1.0. Within this project produced release 0.5 can be seen as a mid-term solution and
0.9 is the solution, which covers all main features, ready to be transferred to the operative system if wanted. Hence, the
eFTI4EU will facilitate the eFTI entry for Member States in the project, including those that are not direct beneficiaries.
Task 2.2 Pilot planning
The co-development, planning and collaboration will be done with the lead of a few forerunning Partners (Task 2.2), who
will help to create the eFTI Gate reference technology and show its potential benefits in national and cross border pilots,
with respect to multimodal transportation. The lead partners for co-development are Estonia, Finland and Germany, with
support of other participant MSs.
Task 2.3 System development, testing and piloting
Testing will start under Task 2.3 with sample and simulation of data. Task 2.3 aims to get a functional solution as soon as
possible and then further develop and test it in real life pilots (Task 2.4), involving economic operators and authorities.
9
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Task 2.4 Cross-border testing and pilots
National and corridor pilots with various eFTI use cases will be made together with economic operators representing
different transport modes. For the corridor pilots, the TEN-T network is followed, and pilots should be designed to
verify real commercial transportation along the corridors. In the North, North Sea – Baltic corridor and stakeholders
along it will be engaged to pilots and the same will be done in the South on the Scandinavian Mediterranean corridor.
The corridor covers road, rail and maritime transportation and all these will be integrated to pilots. EFTI4EU will cover
all 9 Core Netwerk Corridors (CNCs). The corridor approach will be used to integrate both national and international
transportations and to tests the whole message channel from information enquiry of Competent Authority (CA) to the
data sharing of Economic Operator (EO) and how to enable information exchange between MS eFTI Gates. Target is to
pilot different real life use cases in close collaboration with EOs and potential existing eFTI platforms. If commercial
solutions are not available similar test solutions will be used to simulate the data exchange between EO and CA. With
these pilots eFTI4 EU project team wants to ensure the DTLF requirement compliance of the developed eFTI gate
reference model its capability in real world environment. At the same time pilots will enable opportunity to communicate
and collect feedback from EOs and other relevant stakeholders. The purpose of the pilots is to cover full eFTI architecture
and its components. And hence, to provide concrete experience and lessons learned from real world use cases and to
adapt those into the reference solution, so that Member States are able to implement their operative eFTI Gates on time.
Target is to cover several eFTI Gate use cases and test these in different MSs and international corridors, so that in total
the eFTI4EU project covers 4 main test use cases for eFTI GATES:
1. Test and pilot eFTI gate to competent authorities' data exchange (Pilot Group 1)
2. Test and pilot eFTI gate to eFTI platforms data exchange (Pilot Group 2)
3. Test and pilot eFTI gate to other eFTI gates data exchange (Pilot Group 3)
4. Test and pilot eFTI gate to other systems data exchange (Pilot Group 4)
1) Pilot Group 1 - eFTI Gate to CA will focus on pilots how to enable data and information exchange between the system
and CAs. It will cover identification, authentication and authorization testing for several CA profiles with respect to
their data enquiries. In addition, the pilots between eFTI-Gate and competent authorities holds the pilots and solutions
to manage and coordinate the competent authority platforms and the eFTI-Gates coordination.
2) Pilot Group 2 - The pilots between eFTI-Gates and eFTI platforms will entail the testing of eFTI-Gates connectivity
and data exchange, the metadata registries and search mechanism operations nationally and across borders. Some of
the testing entails testing the push of metadata and unique links to the eFTI Gate. Some of the testing is coordinated
highlighting border crossing use cases. In general, these tests highlight the data exchange between the EOs and eFTI
Gates.
3) Pilot Group 3 - Pilots of eFTI-Gate to eFTI-Gate holds the international corridor testing of the entire eFTI exchange
environment in exchanging and passing on the query between eFTI Gates and CAs. These pilots will emphasize the
interoperability between national systems.
4) Pilot Group 4 - Final use case category focuses on the interoperability and connection between eFTI Gates and other
linked systems, such as Information Management System for Official Controls (IMSOC) and European Maritime Single
Window (EMSW). Under this pilot the aim is to study and test how these systems together can help CAs and EOs to
digitalize their logistics processes and tasks.
For all the pilots, the aim in WP 1 with WP 2 support is to jointly develop a control and monitoring system with a set of
KPIs, which can be used to enable verification and evaluation of the pilot results and output. Co-development and piloting
will result in deliverables as set below. The scope of co-development and piloting is defined by the number of use cases
and budget of the participating MS. Based on these evaluations the Project Coordination Committee needs to approve
the eFTI gate reference model (I.e. release 0.5 and release 0.9), which can be further developed and finally presented as a
desired eFTI gate reference model of the eFTI4EU project. The eFTI gate reference model, should be easily adopted and
transferred to the operational eFTI systems of MSs. Each use case is associated with a specific set of requirements and
interoperability, technical-level and service-level KPIs, that cover all transport modes and focus on capability and usage
of eFTI Gates. However, pilots will cover the whole eFTI message channel from the Economic Operator to eFTI platform
and from there to eFTI Gate and further on to Competent Authorities, with respect to metadata, information enquiry and
data sharing identification-authentication-authorization aspects and linked systems when alternating between different
modes of transport and when crossing internal EU borders. In parallel with pilots, an important part of WP2 is also
a co-development of eFTI gate reference model between MSs. Co-development means actual shared architecture and
development actions. WP2’s aim is to develop simplified systems, which will succeed in all above mentioned eFTI Gate
use cases and can be approved by MSs, but without operative Generic User Interfaces (GUIs) and operation models.
10
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Iteration is necessary in co-development to ensure that potential improvements are applied to the components of the
reference implementation through feedback so that regression testing can be performed to ensure that the basic target
KPIs are achieved. It is also necessary to provide feedback to WP1 so that improvements can be incorporated into the
specifications or governance processes as appropriate.
Task 2.5 Pilot results and analysis
Pilot results and findings will be disseminated both on national and international level among eFTI stakeholders (Task
2.5).
Work package WP3 – WP 3: Communication, Dissemination & Capacity Building
Work Package Number WP3 Lead Beneficiary 4. CIRCLE SPA
Work Package Name WP 3: Communication, Dissemination & Capacity Building
Start Month 1 End Month 36
Objectives
The WP3 will create the project dissemination and communication activities aiming to implement the dissemination of
the project goals, eFTI gate reference implementation, test reports, pilot results, achievements, and other outputs and
establish also capacity building activities.
Description
WP3 is set in two layers:
1. Communication layer
• A set of communication / information / training tools (including an eFTI hub, where the specifications and reference
implementations on eFTI will be published on dedicated websites;
• A set of national events in which MSs will communicate eFTI to Economic Operators and to a broader public;
• A set of European workshops for very specific detailed issues;
• 3 eFTI conferences (one per year).
2. eFTI Capacity Building layer
• A series of workshops / on-site visits in which more advanced countries could transfer their knowledge and expertise to
less advanced ones. This should include lessons learnt including onboarding trainings (webinars) in collaboration with
the European Commission and the member states, associations and other projects;
• A set of training courses to be delivered (for example monthly for CAs and EOs, also open to MSs not involved in the
project), including knowledge sharing regarding implementation of open-source software and a learning material library
and video repository to support member state and regional dissemination.
Work package WP4 – WP 4: Project management and coordination
Work Package Number WP4 Lead Beneficiary 1. MoClimate
Work Package Name WP 4: Project management and coordination
Start Month 1 End Month 36
Objectives
WP 4 covers the management and coordination activities of eFTI4EU project required throughout its duration. Adequate
administrative and technical organization structures, control procedures, quality and risk management, monitoring and
auditing processes will be designed and followed as part of this activity. The results of this activity include the elaboration
of a Project Management Plan, the Periodic reports, Financial Statements and delivery of the Final Reports (both financial
and technical) for the Project.
11
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Description
The aim of this WP 4 is to cover the management tasks of the Project. These include adequate coordination actions,
control procedures, quality management, risk management, monitoring mechanisms and publicity actions.
WP4 objectives are:
• Efficient management of the project, fulfilment of all administrative and financial requirements in full compliance
with contractual requirements
• Communication with the Member States Ministries, CINEA, the EC and between local decision makers & stakeholders
(Port Authorities and logistic operators)
• Set-up of the kick-off and regular project meetings. Organising the different projects meetings at regular intervals
• Quality assurance of activities’ execution
• Technical control of all activities ensuring the quality of work and the timely production of the deliverables.
• Risk Management
In detail, the WP4 Project Management, will be responsible for the overall project coordination, management and
reporting. Additionally, the interface to the European Commission will be taken over by the Project Management.
Task 4.1 Project Management and Controlling is the main task of the Project management team being secretariat activities
to ensure that the project is managed and running according to the requirements of the Grant Agreement, Governance
Handbook and the Consortium Agreement between the consortium partners and the EU Commission. This task includes:
• preparation, consolidation, finalization and submission of the financial reports, monitoring the expenses versus the
budget;
• review and monitor the project status and milestones;
• consolidation of the project’s annual work program from all activities;
• plan, manage and monitor incoming and outgoing deliverables of the project;
• change management aspects: anticipate, evaluate, and manage changes in project structure, project participation by all
partners, budget allocation changes, leadership appointments;. appointments; etc.;
• escalation management, being the process of moving open issues of the project to a higher level for timely resolution
as per decision levels as set by the organization chart;
• risk management: create, monitor and update risk management plan + identify and mitigate project risks;
• quality management: set up and monitor quality assurance process regarding the project’s deliverables and reports;
• setup, generate and manage procedures, preparation of meeting minutes, templates and tools to support above tasks
(including the initial creation of an eFTI4EU “brand” with logo, design, color scheme etc.);
• setup, operation and management of a project management/document/collaboration platform;
• provision of a virtual meeting (and webinar) solution to enable planned and ad-hoc virtual meetings of project partners
(internally and with external partners).
All applicants will be active in this Work Package to fulfil their obligations related to their respective financial reporting
and general project management tasks.
Task 4.2 Project Coordination Committee Support. Project Management Office (PMO) will support the Project
Coordination Committee operationally and strategically in their tasks in cooperation with the European Commission
services. The task therefore takes over the secretariat function. This includes the coordination of the topics to be discussed
and the preparation of the meetings.
Task 4.3 Identification of actions needed. PMO will identify needs and future required actions for the progress of the
project. This will be done by collecting unprocessed requirements from the working groups. These can be new challenges
not yet foreseen or ideas for innovations that appear during the project’s implementation. On this basis, recommendations
can be made for future projects or necessary measures in the current project. In addition, in the case of serious unforeseen
issues that have a major impact on the project, this task will develop solution strategies that will be presented to the
Project Coordination Committee for decision. In this way, this task essentially contributes to risk management.
12
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
STAFF EFFORT
Staff effort per participant
Grant Preparation (Work packages - Effort screen) — Enter the info.
Participant WP1 WP2 WP3 WP4 Total Person-Months
Total Person-Months 0.00 0.00 0.00 0.00 0.00
13
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
LIST OF DELIVERABLES
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D1.1 D1.1 Roadmap Workplan for MS including WP1 5 - BMDV R — Document, report SEN - Sensitive 3
templates
D1.2 D1.2 eFTI System overview and interface WP1 5 - BMDV R — Document, report SEN - Sensitive 7
specification
D1.3 D1.3 National eFTI Roadmaps WP1 5 - BMDV R — Document, report SEN - Sensitive 11
D1.4 D1.4 eFTI System specifications WP1 5 - BMDV R — Document, report SEN - Sensitive 12
(preliminary Versions)
D1.5 D 1.5 Reference implementation WP1 5 - BMDV R — Document, report SEN - Sensitive 14
development plan
D1.6 D1.6 eFTI Gate service and content WP1 5 - BMDV R — Document, report SEN - Sensitive 14
specification
D1.7 D1.7 Roadmap Status Report WP1 5 - BMDV R — Document, report SEN - Sensitive 17
D1.8 D1.8 eFTI exchange environment test plan WP1 5 - BMDV R — Document, report SEN - Sensitive 20
D1.9 D1.9 Legal implementation and certification WP1 5 - BMDV R — Document, report SEN - Sensitive 26
strategy plan
D1.10 D1.10 eFTI Gate Strategy and Governance WP1 5 - BMDV R — Document, report SEN - Sensitive 29
Model
14
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D1.11 D1.11 eFTI System specifications (final WP1 5 - BMDV R — Document, report SEN - Sensitive 31
Versions)
D2.1 D2.1 eFTI4EU pilot plan WP2 7 - FI Transport&Co R — Document, report SEN - Sensitive 11
D2.2 D2.2 Reference implementation release nr. WP2 7 - FI Transport&Co R — Document, report SEN - Sensitive 21
05 description and system test summary
D2.3 D2.3 Reference implementation release nr. WP2 7 - FI Transport&Co DEM — Demonstrator, SEN - Sensitive 33
09 description and pilot result summary pilot, prototype
D3.1 D3.1 Detailed Communication Plan WP3 1 - CCEU R — Document, report SEN - Sensitive 3
D3.2 D3.2 Mid-Term Communication Report WP3 1 - CCEU R — Document, report SEN - Sensitive 15
D3.3 D3.3 Final Communication Report WP3 1 - CCEU R — Document, report SEN - Sensitive 30
D4.1 D4.1 Progress Report WP4 1 - MoClimate R — Document, report SEN - Sensitive 14
D4.2 D4.2 Progress Report WP4 1 - MoClimate R — Document, report SEN - Sensitive 26
15
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Deliverable D1.1 – D1.1 Roadmap Workplan for MS including templates
Deliverable Number D1.1 Lead Beneficiary 5. BMDV
Deliverable Name D1.1 Roadmap Workplan for MS including templates
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 3 Work Package No WP1
Description
Detailed workplan and template to provide a harmonized structure for the national roadmaps
Deliverable D1.2 – D1.2 eFTI System overview and interface specification
Deliverable Number D1.2 Lead Beneficiary 5. BMDV
Deliverable Name D1.2 eFTI System overview and interface specification
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 7 Work Package No WP1
Description
Architectural system overview on the eFTI exchange environment and identification of relevant interfaces
Deliverable D1.3 – D1.3 National eFTI Roadmaps
Deliverable Number D1.3 Lead Beneficiary 5. BMDV
Deliverable Name D1.3 National eFTI Roadmaps
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 11 Work Package No WP1
Description
National eFTI roadmap for each participating MS
Deliverable D1.4 – D1.4 eFTI System specifications (preliminary Versions)
Deliverable Number D1.4 Lead Beneficiary 5. BMDV
Deliverable Name D1.4 eFTI System specifications (preliminary Versions)
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 12 Work Package No WP1
Description
Functional description of all (standard) systems involved in the eFTI exchange environment and description of the
respective requirements according to provided eFTI DA and IA and relevant control use cases including appropriate
technical, service-level and interoperability KPI targets
Amended final versions of the eFTI System specifications after implementation and test experiences
16
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Deliverable D1.5 – D 1.5 Reference implementation development plan
Deliverable Number D1.5 Lead Beneficiary 5. BMDV
Deliverable Name D 1.5 Reference implementation development plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 14 Work Package No WP1
Description
Definition of development phases for the co-development of the reference implementation
Deliverable D1.6 – D1.6 eFTI Gate service and content specification
Deliverable Number D1.6 Lead Beneficiary 5. BMDV
Deliverable Name D1.6 eFTI Gate service and content specification
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 14 Work Package No WP1
Description
Functional description of relevant eFTI Gate services (e.g., internal/external authentication, eFTI platform related
services, eFTI Gate to eFTI Gate services, logging, search mechanism etc.) and specification of relevant registries (eFTI
Platforms Metadata, links, etc.)
Deliverable D1.7 – D1.7 Roadmap Status Report
Deliverable Number D1.7 Lead Beneficiary 5. BMDV
Deliverable Name D1.7 Roadmap Status Report
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 17 Work Package No WP1
Description
Summary on national roads maps: Analysis of commonalities and differences
Deliverable D1.8 – D1.8 eFTI exchange environment test plan
Deliverable Number D1.8 Lead Beneficiary 5. BMDV
Deliverable Name D1.8 eFTI exchange environment test plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 20 Work Package No WP1
Description
Definition of national and cross-border test cases for the eFTI exchange environment
17
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Deliverable D1.9 – D1.9 Legal implementation and certification strategy plan
Deliverable Number D1.9 Lead Beneficiary 5. BMDV
Deliverable Name D1.9 Legal implementation and certification strategy plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 26 Work Package No WP1
Description
Definition of national strategies and processes for each MS with regard to the legal introduction of eFTI Gates and the
introduction of national certification processes for eFTI Gates and platforms
Deliverable D1.10 – D1.10 eFTI Gate Strategy and Governance Model
Deliverable Number D1.10 Lead Beneficiary 5. BMDV
Deliverable Name D1.10 eFTI Gate Strategy and Governance Model
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 29 Work Package No WP1
Description
Common rules for eFTI Gates (e.g., rules for onboarding of eFTI platforms, rights and duties) and maintenance
Deliverable D1.11 – D1.11 eFTI System specifications (final Versions)
Deliverable Number D1.11 Lead Beneficiary 5. BMDV
Deliverable Name D1.11 eFTI System specifications (final Versions)
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 31 Work Package No WP1
Description
.
Deliverable D2.1 – D2.1 eFTI4EU pilot plan
Deliverable Number D2.1 Lead Beneficiary 7. FI Transport&Co
Deliverable Name D2.1 eFTI4EU pilot plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 11 Work Package No WP2
Description
Detailed description and work plan for all national and cross-border pilots and pre-testing.
18
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Deliverable D2.2 – D2.2 Reference implementation release nr. 05 description and system test
summary
Deliverable Number D2.2 Lead Beneficiary 7. FI Transport&Co
Deliverable Name D2.2 Reference implementation release nr. 05 description and system test summary
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 21 Work Package No WP2
Description
Documented description of reference implementation and test results including recommendations and updated test plan.
Deliverable D2.3 – D2.3 Reference implementation release nr. 09 description and pilot result
summary
Deliverable Number D2.3 Lead Beneficiary 7. FI Transport&Co
Deliverable Name D2.3 Reference implementation release nr. 09 description and pilot result summary
Type DEM — Demonstrator, Dissemination Level SEN - Sensitive
pilot, prototype
Due Date (month) 33 Work Package No WP2
Description
Documented description of reference implementation and pilot and test results including recommendations for MS eFTI
implementation.
Deliverable D3.1 – D3.1 Detailed Communication Plan
Deliverable Number D3.1 Lead Beneficiary 1. CCEU
Deliverable Name D3.1 Detailed Communication Plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 3 Work Package No WP3
Description
Description and detailed planning
Deliverable D3.2 – D3.2 Mid-Term Communication Report
Deliverable Number D3.2 Lead Beneficiary 1. CCEU
Deliverable Name D3.2 Mid-Term Communication Report
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 15 Work Package No WP3
Description
19
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Intermediate Report on Communication activities
Deliverable D3.3 – D3.3 Final Communication Report
Deliverable Number D3.3 Lead Beneficiary 1. CCEU
Deliverable Name D3.3 Final Communication Report
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 30 Work Package No WP3
Description
Final Report on Communication activities
Deliverable D4.1 – D4.1 Progress Report
Deliverable Number D4.1 Lead Beneficiary 1. MoClimate
Deliverable Name D4.1 Progress Report
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 14 Work Package No WP4
Description
The report will be prepared using the respective template provided in the portal. It will detail the actual progress of the
project, per WP, for the period from M1 until M12. It will also refer to the main implementation issues, milestones,
events or factors that affected the progress of the project. Finally, it will also include the planned progress per WP until
the end of the project.
Deliverable D4.2 – D4.2 Progress Report
Deliverable Number D4.2 Lead Beneficiary 1. MoClimate
Deliverable Name D4.2 Progress Report
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 26 Work Package No WP4
Description
The report will be prepared using the respective template provided in the portal. It will detail the actual progress of the
project, per WP, for the period from M13 until M24. It will also refer to the main implementation issues, milestones,
events or factors that affected the progress of the project. Finally, it will also include the planned progress per WP until
the end of the project.
20
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
LIST OF MILESTONES
Milestones
Grant Preparation (Milestones screen) — Enter the info.
Milestone Milestone Name Work Package No Lead Beneficiary Means of Verification Due Date
No (month)
1 Kick-Off meeting WP1 5-BMDV Kick-Off Meeting minutes with eFTI4EU 1
partners to initiate the work on WP1 and in
particular prepare the work in Task 1.1 and 1.2.
with validation by the Project Board
2 Roadmap Workplan templates WP1 5-BMDV National Roadmap for each participating MS, 3
including roadmap templates and the timeframe
with validation by the Project Board
3 Progress on technical specifications to comply WP1 5-BMDV Interim report on technical specifications needed 13
with eFTI requirements (at least for an eFTI Gate) to translate eFTI
Implementing Act and related technical annexes
into workable functional specifications that can
be used for public procurement. To comply to
eFTI requirements (=D1.5) with validation by the
Project Board
4 Roadmap report ready WP1 5-BMDV Roadmap Status Report (Summary on national 17
road maps: Analysis of commonalities and
differences) with validation by the Project Board
5 End of technical specifications to comply with WP1 5-BMDV Final report on technical specifications to 32
eFTI requirements comply with eFTI requirements (=D1.6) with its
validation by the Project Board
6 eFTI Gate reference implementation release WP2 7-FI Transport&Co eFTI Gate reference implementation model 21
nr. 05 release nr. 05 and its approval by the Project
Board
7 Demo-Day on end-of-testing and eFTI WP2 7-FI Transport&Co Minutes of the public meeting (also available 26
implementation online) to show the eFTI developments and
21
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Milestones
Grant Preparation (Milestones screen) — Enter the info.
Milestone Milestone Name Work Package No Lead Beneficiary Means of Verification Due Date
No (month)
integrations carried out by eFTI4EU partners on
production environment
8 End of the development and integration of the WP2 7-FI Transport&Co Final version on the eFTI gate components and its 31
eFTI components approval by the Project Board
9 eFTI Gate reference implementation release WP2 7-FI Transport&Co eFTI Gate reference model release nr. 09 33
nr. 09 documentation approved by the Project Board
10 Kick off of the digital communication WP3 1-CCEU Project publications on internet and social 6
campaigns network
11 WP 3 Intermediate Assessment WP3 1-CCEU Evaluation of the different tools and events 20
and corrective actions Publication of Mid-Term
Communication Report
12 WP 3 Final Assessment WP3 1-CCEU Evaluation of the different tools and events. 35
Publication Final Communication Report
13 Project status meeting WP4 1-MoClimate Project status meeting minutes 14
14 Progress status meeting WP4 1-MoClimate Project status meeting minutes 26
22
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
LIST OF CRITICAL RISKS
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
1 Partner/Member State (MS) leaves the eFTI4EU WP4, WP1, WP3, Participation in eFTI4EU is a high-level decision for all participants. As internal
project, political climate changes Impact = Medium, WP2 communication and coordination is organized properly and partners are actively involved
Chance = Low via WP4, problems can be detected, discussed and resolved within the project at a very early
stage.
2 Unforeseen difficulties for the eFTI4EU Partners/ WP4, WP1, WP3, The eFTI4EU Coordinator and the PCC are in contact with the Partner/MS on a regular basis
MS (political, economic, technical, financial, WP2 to inform each other about problems and progress where needed. In case of major difficulties,
organisational) Impact = Medium, Chance = the coordinator is therefore informed in due time to inform the related MS and to elaborate
Medium on alternative concepts to achieve the eFTI4EU objectives. In the case of new technical
challenges Task 4.3 will address those and prepare solution options to decide in the project
coordination committee.
3 Milestones are not met Impact = High, Chance = WP4, WP1, WP3, An appropriate project monitoring according to the project Handbook is set up to detect
Medium WP2 deviations from plans in a timely manner. Critical deviations will be limited, and alternatives
will be prepared and put in place. Official and formal risk management procedures will be
activated and performed by the coordinator until the risk is under control again. CINEA will
be continually informed about risks occurring to minimise the impact.
4 Delays with regard to the eFTI time plan of the WP4, WP1, WP3, Delays regarding the eFTI time plan, in particular about the provision of the planned DA and
European Commission, DA or IA not adopted WP2 IA will have a direct impact on specifications or the planning and development of reference
Impact = High, Chance = Medium implementations and pilots within the MS and last but not least to availability of operational
eFTI environment in August 2025. The project coordination committee will consult CINEA
and the European Commission to find a proper solution (e.g., project extension, specific
degree of implementation, etc.).
5 COVID pandemic extends for a longer period WP4, WP1, WP3, Stakeholder engagement and fall-back to digital/virtual way of project management risk
Impact = Medium, Chance = Low WP2 management will be put in place.
6 Not all stakeholders consulted - Not enough focus WP4, WP1, WP3, For all the business process, make a list of actor types involved in these processes such as
on the important stakeholders. Impact -medium, WP2 enforcing authorities, transport operators, IT developers, prof. organisations, make sure that
Chance = medium they or their interest groups are consulted and/or involved. Make a stakeholder analysis.
23
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
For each concept, topic or projects and for each actor type define their attitude against
these concept, topic or projects by making a power/ interest matrix. No effort goes to low
power - low interest stakeholders and the high interest - high power stakeholders are actively
managed.
7 Dissemination and communication not tailored to WP4 From previous stakeholder analysis target by topic the message to the audience. Define in a
the target audience Impact -medium, Chance = low stakeholder management plan or communication plan.
WP4
8 Availability of resources is limited, not sufficient WP4, WP1, WP3, The project team has a back-up of most important profiles, The direct/indirect (through
Impact -medium, Chance = medium WP2 subcontracting) involvement of renowned organizations includes back-up procedures as to
resources. Covid measures are common practice now.
9 Resistance regarding data sharing and nondisclosure WP2 Close stakeholder cooperation to create mutual trust and willingness to share data
of data formats Impact -high, Chance = medium
10 Conflicts in consortium Impact -medium, Chance = WP4, WP1, WP3, Experienced project coordination committee member and clearly defined project and
low WP2 organisation management structure; transparent project management & implementation;
open discussion with partners to address problem
11 Insufficient alignment between project scope and WP1, WP2 The consortium includes partners that actively participate in DTLF ever since its foundation
DTLF and DTLF’s subgroup, eFTI regulation (2014), having a profound understanding of existing Databases, IT architecture, applications,
Impact -medium, Chance = low it gaps and fits, and participates in discussions related to drafting DTLF III and eFTI II-
regulation.
The consortium includes also the leading consultant supporting DGMOVE for the IAs DAs
release
12 Insufficient testing and capacity (expertise, WP2 Besides the rich experience of consortium partners there is a testing environment available to
infrastructure) Impact -medium, Chance = medium allow extensive testing, valorisation. Testing is as much as possible part of training sessions,
but also a sufficient number of additional testers are available.
24
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 1
Connecting Europe Facility (CEF)
Description of the action (DoA)
Part B
Version 1.0
28 September, 2023
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
PROJECT
Grant Preparation (General Information screen) — Enter the info.
Project number: 101122891
Project name: electronic Freight Transport Information for Europe
Project acronym: 22-EU-TG-eFTI4EU
Call: CEF-T-2022-SIMOBGEN
Topic: CEF-T-2022-SIMOBGEN-eFTI-WORKS
Type of action: CEF-INFRA
Service: CINEA/B/02
Project starting date: fixed date: 1 April 2023
Project duration: 36 months
TABLE OF CONTENTS
TECHNICAL DESCRIPTION (PART B) ........................................................................ ERROR! BOOKMARK NOT DEFINED.
0. PROJECT DESCRIPTION ....................................................................................................................................................... 2
A. Global project and a wider context .............................................................................................................................. 2
B. General Description of the Project and Location ....................................................................................................... 3
C. Justification for the Project ......................................................................................................................................... 5
D. Overall objectives ......................................................................................................................................................... 6
E. Specific objectives and how they will be met .............................................................................................................. 6
ANNEXES ........................................................................................................................................................................................... 8
0. PROJECT DESCRIPTION
Project description, scope and objectives
A. Global Project and wider context
The efficiency of freight transport and logistics is vital for the growth and competitiveness of the Union’s economy, the
functioning of the internal market and the social and economic cohesion of all regions of the Union.
The overall aim of Regulation EU No 2020/1056 on electronic Freight Transport Information (in short “eFTI”) are:
● to encourage the digitalization of freight transport and logistics
● to reduce administrative costs, improve enforcement capabilities of competent authorities,
● and to enhance the efficiency and sustainability of transport.
The movement of goods, including waste and dangerous goods, is accompanied by a large amount of information which is
still exchanged mainly in paper format among businesses, and between businesses and competent authorities. The use of
paper documents represents a significant administrative burden for logistics operators and an additional cost for logistics
operators and related industries (such as trade and manufacturing), in particular for SMEs, and has a negative impact on the
environment.
The objective of the Global Project is the full adoption of eFTI Regulation by Member States in all modes of
transport.
The global and wider context is to be found in the implementation by Member States of the eFTI Regulation, the competent
authorities will be required to accept information made available electronically, that is whenever economic operators are
obliged to make information available as proof of compliance with requirements laid down in Union legal acts covered by
the Regulation.
Based on the work done so far, in 2023 the Delegated Act (DA) on eFTI Data Set and Subsets, the Implementing Act on
common rules for authorities and the Implementing Act (IA) on requirements for eFTI platforms and service providers will
be published by the European Commission. In 2024, the rules on certification of eFTI platforms and service providers will
be set upon a dedicated Delegated Act. By August 2025 all EU Member States need to have proper aligned systems in place,
2
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
which allow their competent authorities to accept electronic freight information presented by economic operators via
certified eFTI-platforms, e.g., when a transport is checked.
This project is the first action of the Global Project and will assist the Member States in preparing for the full implementation
of the eFTI regulation. by:
● supporting Member States, Competent Authorities and Economic Operators towards and harmonised eFTI
implementation
● translating Delegated Acts and Implementing Acts in a common reference implementation
● supporting the creation of and effective eFTI environment
● delivering robust pilots
The global project follows the timeline of eFTI implementation as set forward by the European Commission (EC), as
depicted below.
B. General Description of the Project and Location
The project eFTI4EU starts between the provision of the eFTI implementing and delegated acts and the final interoperable
implementation of the technical systems. It will encourage Member States to join forces, face the upcoming eFTI
requirements, work jointly on common specifications and take profit of a well harmonised European wide eFTI exchange
environment according to the regulation.
The project will support the process of implementation of the eFTI regulation in digitalizing freight transport and logistics.
It will contribute to the implementation of a seamless paperless information exchange between businesses and authorities.
The project will develop systems/IT platforms to be used by the competent authorities to access and process information
electronically on a non-discriminatory basis and in accordance with Regulation EU 2020/1056 on electronic Freight
Transport Information (eFTI).
Within this project and its WPs eFTI4EU Partners and associated partners will join forces to:
WP1 Horizontal Work:
● collect authorities’ road maps and support the exchange and common understanding of requirements; preparatory works
to implement eFTI
● cooperate with European or corridor-specific initiatives related to specific transport modes or goods. For example, Inland
Navigation
● analyse and implement B2A (national and cross-border) eFTI processes on functional level and in a harmonised way
● initiate a comprehensive cross-member state co-development of the eFTI exchange environment to ensure interoperability
● think beyond implementation and develop eFTI Gate strategy and governance (e.g., maintenance and service level
agreements)
● to enable day-to-day operations by addressing topics like legal implementation, certification, and accessibility
WP2 National and Corridor Pilots:
● focus on capability and usage of eFTI Gates
● integrate national and corridor B2A eFTI processes on functional level for all transport modes
● enable pilot planning, collaboration, testing (in particular with regards to interoperability) and knowledge sharing
WP3 Communication, Dissemination & Capacity Building:
● Building capacity and disseminate the result and accelerate the eFTI implementation effort for other member states that
are not joining this project
● involve external stakeholders to promote eFTI (in particular economic operators which should make use of the opportunity
of digitalised transport information)
3
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
WP4 Project Management and coordination:
● ensure the smooth (administrative) progress of the project and fulfil the planned activities with the possibility to meet
unforeseen challenges
As expected, outcomes and results of the Project, the participants will take profit of:
● pioneering information and knowledge about eFTI
● shared resources, co-creation and co-development for eFTI
● profound information and lessons learnt about eFTI architecture and pilots
● reference architecture to support eFTI implementation
In detail the project (that is a study including pilots) comprises the following:
Studies:
● Provision of national eFTI roadmaps
● Participation in the horizontal alignment work package to promote harmonisation of eFTI development and
interoperability between Member States. This also covers the specification and the common co-development of eFTI
reference implementations (eFTI platform and eFTI Gate)
● Communication and dissemination, knowledge sharing activities in the MSs to promote eFTI
Pilots:
● Development and piloting of an eFTI gate aligned with the jointly specified and developed reference implementation,
which could lead to a system that becomes operational in 2025
● eFTI gate pilots cover the following communication paths:
○ eFTI gate to competent authorities
○ eFTI gate to eFTI platforms
○ eFTI gate to other eFTI gates
○ eFTI gate to other linked systems
The project will be implemented by the following project partners:
• Nine (9) Member States as full beneficiaries (Estonia, Germany, Finland, France, Italy, Portugal, Austria, Lithuania,
Belgium); they are participating with their Ministry in charge of the eFTI implementation and / or with internal Agencies
acting on their behalf and /or in cooperation with selected IT companies for the pilot development. These partners are:
EE KLIIMAMINISTEERIUM
DE BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
DE BUNDESAMT LOGISTIK UND MOBILITÄT
FI LIIKENNE JA VIESTINTAVIRASTO
AT SCHIENENINFRASTRUKTUR-DIENSTLEISTUNGSGESELLSCHAFT MBH
AT BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE, MOBILITAET,
INNOVATION UND TECHNOLOGIE
IT MINISTERO DELLE INFRASTRUTTURE E DEI TRASPORTI IT RETE AUTOSTRADE
MEDITERRANEE PER LA LOGISTICA LE INFRASTRUTTURE ED I TRASPORTI
SOCIETA PER AZIONI
PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
FR MINISTERE DE LA TRANSITION ECOLOGIQUE ET DE LA COHESION DES
TERRITOIRES
LT LIETUVOS RESPUBLIKOS SUSISIEKIMO MINISTERIJA
LT VALSTYBES IMONE KLAIPEDOS VALSTYBINIO JURU UOSTO DIREKCIJA
BE SERVICE PUBLIC DE WALLONIE
BE LOGISTICS IN WALLONIA
• Three (3) Member States participating as observers (Ireland, Spain and the Netherlands). These partners are:
DEPARTMENT OF TRANSPORT (IRELAND)
MINISTERIO DE TRANSPORTES, MOVILIDAD (SPAIN)
MINISTRY OF INFRASTRUCTURE AND WATER MANAGEMENT (NETHERLANDS)
• Four (4) eFTI Consultant Companies with top level expertise in eFTI:
EE DIGILOGISTIKA KESKUS
LU 51BIZ LUXEMBOURG SARL
BE PORTS AND TERMINALS CVBA
IT CIRCLE CONNECTING EU
• Three (3) IT companies providing software development for the pilots in their countries:
IT CIRCLE SPA
4
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
FR IMPRIMERIE NATIONALE
LT UAB NORMALIS TECH
• Two (2) other beneficiaries for the specific eFTI implementation in Lithuania:
LT TRANSPORTO INOVACIJU ASOCIACIJA
LT VALSTYBES IMONE KLAIPEDOS
• One (1) international interministerial cooperation partnership (Northern Dimension Partnership for Transportation and
Logistics (NDPTL)) working under the international organisation Nordic Investment Bank (NIB). NDPTL is a
transboundary initiative and network of transport Ministries in northern Europe (in its current format consisting of the nine
partners: Estonia, Finland, Germany, Latvia, Lithuania, Norway, Poland, Sweden and the European Commission. The key
focus areas of recent NDPTL work include digitalization and green transition in transport. NDPTL has a secretariat, hosted
by the Nordic Investment Bank (NIB). As NDPTL Secretariat does not have legal identity, NIB acts on behalf of NDPTL
based on the NDPTL Secretariat Agreement -concluded between NIB and the participating countries. The role of NDPTL
in the EFTI4EU project includes engaging and involving relevant public bodies from those NDPTL countries, which are not
direct project partners in project activities (Latvia, Poland, Norway & Sweden). In addition, the NDPTL network, consisting
of regular meetings of representatives of Transport/Foreign Affairs Ministries & DGs - the nine partners mentioned above,
will facilitate intergovernmental dialogue on, and
dissemination of, project activities and results.
Location
The scope of the eFTI4EU project includes all 27 Member States, different modes of transports (road, rail, inland navigation,
air and maritime) and administrations that are impacted by the EU 2020/1056 regulation. This will be achieved by a
European eFTI reference architecture and its cross-border pilots. Ultimately, the project will support the vision of generating
digital and vibrant eFTI Core Network Corridors across the EU.
The project will be executed in 9 EU Member States (Estonia, Germany, Finland, France, Italy, Portugal, Austria,
Lithuania, Belgium) with cross border pilots that will also be exploited in all the 9 Core Network Corridors.
eFTI4EU Project Partners
5
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
TEN T Corridors
C. Justification for the Project
Through the eFTI Regulation EU 2020/1056, the EU wants to boost and harmonise the digitalization of logistics and
transport. For companies eFTI provides a good opportunity to move from paper documents to digital data exchange and
hence streamline their own processes. Based on industry comments the savings can be above EUR 10 per digital cargo
document from the process point of view.
While the deadline to implement eFTI is getting closer (operational in August 2025) all authorities in the EU Member States
need to speed up and prepare to meet the upcoming requirements in a rather quick manner - e.g., they need to join together
and agree on rules to manage cross-border eFTI dataset requests, set up their data exchange readiness and instruct
local/international eFTI platforms on the connectivity.
In other words, based upon the regional differences, existing or new platforms and ecosystems have to be integrated or made
interoperable across the EU in such a way that all competent authorities could equally well exchange the required data - a
task that a single Member States (MS) cannot solve alone.
The questions of Member States currently are:
● On which (certified) eFTI Platform can an authority find the appropriate eFTI Data Set in case of a check?
● How can an authority trust and verify transport information that is presented in an electronic format?
● How can an economic operator trust and verify that a public officer has the mandate to request transport
information?
● How to define the rules and set up national query systems to fit all international destinations for queries?
● How (if) should a MS set up an eFTI Gate without “discovering” its rules on its own?
● How to set up a well-functioning eFTI architecture and eFTI Gate?
● How can economic operators be encouraged to accept and use the implementation of eFTI?
● How does the budget and funding calculation timeline for MS look like (individual implementation roadmaps)?
To face this challenge Digital Transport and Logistic Forum Experts join together with various national and regional
authorities they already cooperate with.
The foundation of the project will be based on the eFTI Regulation and the related IAs and Das that will serve as starting
points for all the project activities.
The project follows the vision of eFTI that this task can be efficiently managed by an architecture comprising a federated,
coordinated (harmonised) and trusted eFTI network. Therefore, e.g., existing systems (UNECE eDGTI dangerous goods
system), EU building blocks and proven practices of previous CEF and Horizon projects (e.g., FENIX, FEDeRATED,
6
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
DIGINNO Proto, etc.) could be reused and, if necessary, adapted to fulfil the eFTI requirements (Delegated Acts - DAs-
and Implementing Acts - IAs).
In order to get an overview of the current state of eFTI development in the Member States, the project supports the creation
of individual roadmaps for all participating Member States, which serve for further cooperation and as a foundation for joint
specifications.
Following the project vision, a trusted network of eFTI Gates or similar services have to be developed. For that, the project
envisages support in planning, organising and coordinating harmonised rules for platforms and components. The national
ecosystems which manage the data exchange between eFTI Gate and eFTI Platforms can be different and to some extent
the functional and technical national or regional eFTI Gate structure could be different. Yet, they all have to communicate
with each other in cases of authority queries on eFTI datasets. Eventually new mechanisms could be built on jointly evolved
building blocks. Jointly developed and used building blocks will be tested and piloted to ensure interoperability.
Frontrunner MS will do first developments / implementations and perform (cross-border) interoperability pilots and checks.
For the harmonised eFTI data exchange common open-source solutions or modules will be specified and used. This requires
a common understanding of rules and specifications to be followed.
The project will be carried out in compliance with relevant Union and national laws, in particular with Union legal acts on
the environment, climate protection, safety, security, competition, state aid, public procurement, public health and
accessibility.
eFTI4EU project aims at development of all the components of the systems/IT platforms to be used by the competent
authorities to access and process information electronically in accordance with the provisions of the eFTI Regulation and
its implementing and delegated acts, including:
● Pilot testing of exchanges with IT platforms of the economic operators (when adapted to meet the specifications
for eFTI platforms in line with eFTI implementing and delegated acts)
● Knowledge and good practice sharing with other Member States, including technical implementation guides
● Communication measures aimed at awareness raising and training of responsible officials in the competent
authorities concerned
Digital platforms developed under eFTI4EU aim to be accessible for use by all operators on a non-discriminatory basis.
The studies conducted will be an effort to fill the gaps and align specifications across borders, while the pilots serve as
contact points and possible testbeds for the Members States and European Commission, the businesses and platforms that
are to be developed within and aside the project. Both the organisations in Member States of the project implementation and
in the Member States outside this project are welcome to reap the practical benefits of the pilots while they are being
developed and while these are being implemented.
The output of the project and its deliverables are direct tools and input for policy making, development and pooling of best
practices on eFTI and digitalisation of transport and trade data through the application date of eFTI on August 2025,
including the period after reflecting the assessment of the Regulation and the identified needs for amendments or further
specifications for the next stages of decision-making related to the full FTI implementation in segments that might – for
example - need a longer transition period.
D. Overall objective
The Project's overall objectives are in line with the overall aim of the Regulation EU No 2020/1056, commonly known as
"eFTI electronic Freight Transport Information."
These objectives include:
- Promoting the digitalization of freight transport and logistics.
Decreasing administrative expenses and strengthening the enforcement capabilities of competent authorities. - Enhancing
the efficiency and sustainability of transportation.
E. Specific objectives and how they will be met
The specific objectives are:
- to identify, by means of country-specific roadmaps, inter alia, the inventory of existing reusable systems,
requirements for national eFTI implementation, resource needs (financial and technical) and requirements for the
long-term operation of the eFTI exchange environment
- to analyse the DA and IA proposed by the EU Commission and jointly translate them into harmonised technical
specifications, thus providing Member States with solid specifications, e.g., for the development/tendering of an
eFTI gate
- to develop national and cross-border test strategies to test the eFTI exchange environment
7
Project: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
- to develop a strategy for an open-source reference implementation of an eFTI gate
- to develop an agreed governance model that describes general rules for eFTI gates and the maintenance of the
specifications
- to test and pilot
o eFTI gate to competent authorities' data exchange,
o eFTI gate to eFTI platforms data exchange,
o eFTI gate to other eFTI gates data exchange,
o eFTI gate to other liked systems data exchange.
- to support a wide communication, awareness raising, and cross fertilisation and capacity building activities
supporting a harmonised eFTI development including;
o a set of communication /information / training tools,
o a set of national events in which MSs will communicate eFTI to EOs and to a broader public,
o a set of European workshops for very specific detailed issues,
o 3 yearly eFTI conferences,
o a series of workshops / on-site visits,
o onboarding trainings (webinars) and a set of training courses.
This will be organised in 4 Work Packages (listed below) with specific outcomes as described in the DoA Part A:
➢ WP1 Horizontal Work
➢ WP2 National and Corridor Pilots
➢ WP3 Communication, Dissemination & Capacity Building
➢ WP4 Project Management and coordination
8
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEXES
LIST OF ANNEXES
1. Subcontracting table
ANNEX 1 - SUBCONTRACTING TABLE
Subcontracting
Give details on subcontracted action tasks (if any).
Subcontracts must be awarded using your usual purchasing practices – provided that they ensure best value for money and no conflict of interests. If you are a ‘contracting authority/entity’ within the meaning of the EU
Directives on public procurement, you must also comply with the applicable national law on public procurement.
Note: The coordinator remains fully responsible for the coordination tasks, even if they are delegated to someone else. Coordinator tasks cannot be subcontracted.
Task number to be Name of task to be subcontracted Description Estimated Costs
subcontracted (Describe briefly the part of the task to be subcontracted and indicate the BEN/AE (affiliated entity) (EUR)
(follow the numbering in the responsible)
grant agreement)
WP 1 Overall package lead The collection and evaluation of information, participation in EU IT-technical working 400,000
groups, analysis and evaluation of EU working papers and proposals regarding German
implementation conditions, impact assessments, preparation of the situation in Germany
about the state of preparation of the authorities, estimation of the costs for the BMDV and the
German authorities.
BEN: 06. DE BLM Bundesamt Logistik und Mobilität
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
Task 1.1, Task 1.2, Task Task 1.1 Authorities’ Road map Subcontracting costs for development of IT applications related to the pilots in WP 2. The 3,153,083
1.3, Task 1.4 (WP 1) (requirements and preparatory works) amount is for development of Functional and Technical design of reference architecture.
Task 1.2 Interoperability of eFTI
exchange environment (planning,
reference specification, testing) BEN:
Task 1.3 eFTI Gate Strategy and 01. EE MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
Governance (Common Rule Set) 02. EE Digilogistika Keskus
Task 1.4 eFTI Gate Content and 03. LU 51biz Luxembourg
Accessibility (e.g., Metadata, Access
Management) 04. IT Circle Spa
04.1. IT Circle Connecting EU
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BLM Bundesamt Logistik und Mobilität
07. FI Transport & CO LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIG Schieneninfrastruktur-Dienstleistungsgesellschaft MBH
09. BE Ports and Terminals (PortExpertise)
11. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
12. FI Nordic Investment Bank
14. LT TIA Transport Innovation Association
15. FR Groupe IN Imprimerie Nationale SA
16 LT Valstybes Imone Klaipedos State Enterprise Klaipeda
18. BE SPW Service Public de Wallonie
AE:
15.1. FR Ministère de la transition écologique
10.1 IT RAM RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
Task 1.1, task 1.5 (WP 1) Task 1.1 Authorities roadmap Subcontracting cost for Legal expert on Member States’ legislation 20,000
Task 1.5 Legal implementation and BEN:
Certification-related affairs and rules
01. EE MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BLM Bundesamt Logistik und Mobilität
07. FI Transport & CO LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIG Schieneninfrastruktur-Dienstleistungsgesellschaft MBH
11. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
14. LT TIA Transport Innovation Association
15. FR Groupe IN Imprimerie Nationale SA
16 LT Valstybes Imone Klaipedos State Enterprise Klaipeda
18. BE SPW Service Public de Wallonie
9
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
AE:
15.1. FR Ministère de la transition écologique
10.1 IT RAM RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
Task 1.1 (WP 1), Task Task 1.1 Authorities roadmap Subcontracting cost for Cyber security expert(s) 30,000
2.3 (WP 2)
Task 2.3 System development BEN:
01. EE MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
02. EE Digilogistika Keskus
03. LU 51biz Luxembourg
04. IT Circle Spa
04.1. IT Circle Connecting EU
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BLM Bundesamt Logistik und Mobilität
07. FI Transport & CO LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIG Schieneninfrastruktur-Dienstleistungsgesellschaft MBH
09. BE Ports and Terminals (PortExpertise)
11. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
12. FI Nordic Investment Bank
14. LT TIA Transport Innovation Association
15. FR Groupe IN Imprimerie Nationale SA
16 LT Valstybes Imone Klaipedos State Enterprise Klaipeda
18. BE SPW Service Public de Wallonie
AE:
15.1. FR Ministère de la transition écologique
10.1 IT RAM RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
Task 1.4 (WP 1), Task Task 1.4 eFTI Gate Content and Data management services, supplier assistance for use of online tool for metadata 30,000
2.3 (WP2) Accessibility (e.g., Metadata, Access management
Management)
BEN:
Task 2.3 System development, testing
and piloting 01. EE MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
02. EE Digilogistika Keskus
03. LU 51biz Luxembourg
04. IT Circle Spa
04.1. IT Circle Connecting EU
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BLM Bundesamt Logistik und Mobilität
07. FI Transport & CO LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIG Schieneninfrastruktur-Dienstleistungsgesellschaft MBH
09. BE Ports and Terminals (PortExpertise)
11. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
12. FI Nordic Investment Bank
14. LT TIA Transport Innovation Association
15. FR Groupe IN Imprimerie Nationale SA
16 LT Valstybes Imone Klaipedos State Enterprise Klaipeda
18. BE SPW Service Public de Wallonie
AE:
15.1. FR Ministère de la transition écologique
10.1 IT RAM RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
Task 2.3, Task 2.4 (WP Task 2.3 System development, testing Specific IT and logistic expertise for the definition of the technical and functional
2) and piloting. specifications of the solutions, for the implementations of the pilots and for the evaluation of
the results 12,614,766
Task 2.4 Cross-border testing and
pilots
BEN:
01. EE MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
02. EE Digilogistika Keskus
03. LU 51biz Luxembourg
04. IT Circle Spa
04.1. IT Circle Connecting EU
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BLM Bundesamt Logistik und Mobilität
10
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
07. FI Transport & CO LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIG Schieneninfrastruktur-Dienstleistungsgesellschaft MBH
09. BE Ports and Terminals (PortExpertise)
11. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
12. FI Nordic Investment Bank
14. LT TIA Transport Innovation Association
15. FR Groupe IN Imprimerie Nationale SA
16 LT Valstybes Imone Klaipedos State Enterprise Klaipeda
18. BE SPW Service Public de Wallonie
AE:
15.1. FR Ministère de la transition écologique
10.1 IT RAM RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
WP 4 Final reporting: Certificate of the Costs of auditing and administrative support(s) for the following project partners 180,000
financial statements (CFS)
BEN:
01. EE MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
02. EE Digilogistika Keskus
03. LU 51biz Luxembourg
04. IT Circle Spa
05. DE BMDV BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BLM Bundesamt Logistik und Mobilität
07. FI Transport & CO LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIG Schieneninfrastruktur-Dienstleistungsgesellschaft MBH
09. BE Ports and Terminals (PortExpertise)
10. IT MIT Ministero delle infrastrutture e della mobilità sostenibili
12. IT RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
13. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
15. FR Groupe IN Imprimerie Nationale SA
16 LT Valstybes Imone Klaipedos State Enterprise Klaipeda
18. BE SPW Service Public de Wallonie
AE:
15.1. FR Ministère de la transition écologique
Task 4.1 (WP 4) Task 4.1 Project management and Subcontracting of a Lead technical workgroup 150,000
controlling
BEN:
09. BE Ports and Terminals (PortExpertise)
Task 4.1 (WP 4) Task 4.1 Project management and Subcontracting of assistants project management team (3 - 4 Full time Equivalent) 90,000
controlling
BEN:
09. BE Ports and Terminals (PortExpertise)
Task 4.1 (WP 4) Task 4.1 Project management and Quality control (quality management expert, writing quality guidelines, review work of 72,000
controlling deliverables, language checks)
BEN:
09. BE Ports and Terminals (PortExpertise)
Task 4.1 (WP 4) Task 4.1 Project management and Graphics, and video’s support to create media to facilitate workshops, capacity building and 20,000
controlling other dissemination levels on related to the project
BEN:
09. BE Ports and Terminals (PortExpertise)
Total 16,759,849
HISTORY OF CHANGES
PUBLICATION
VERSION CHANGE
DATE
1.0 28.09.2023 Initial version
11
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
ANNEX 1
DETAILED BUDGET BREAKDOWN PER REPORTING PERIOD
Estimated eligible costs (per budget category) Estimated EU contribution
Indirect
Direct costs EU contribution to eligible costs Total
costs
requested
B. Total costs Maximum Requested
E. Indirect Funding EU
A. Personnel costs Subcontracting C. Purchase costs D. Other cost categories EU EU contribution
costs rate %
costs contribution contribution
A.1 Employees (or A.4 SME C.2 C.3 Other D.1 Financial D.2 Studies D.3 D.4 Works D.5 Land
equivalent) owners C.1 Travel and subsistence Equipment goods, works support to Synergetic in outermost purchases
and natural and services third parties elements regions
A.2 Natural persons under person
direct contract beneficiaries
Travel Accommodation Subsistence
A.3 Seconded persons
Unit costs
(usual Flat-
Forms of funding Actual costs Unit costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs
accounting rate costs
practices)
a1 a2 a3 b c1a c1b c1c c2 c3 d1a d2 d3 d4 d5 e1 f = a+b+c+d V, W, X g2 h m
Reporting period 1
1 - MoClimate 300 000.00 0.00 0.00 650 000.00 50 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 000 000.00 50, 50, 70 500 000.00 500 000.00 500 000.00
2 - DLK 355 000.00 0.00 0.00 284 000.00 35 500.00 0.00 0.00 0.00 35 500.00 0.00 0.00 0.00 0.00 0.00 0.00 710 000.00 50, 50, 70 355 000.00 355 000.00 355 000.00
3 - 51Biz LUXEMBURG 320 000.00 0.00 0.00 141 280.00 21 000.00 0.00 0.00 0.00 108 000.00 0.00 0.00 0.00 0.00 0.00 0.00 590 280.00 50, 50, 70 295 140.00 295 140.00 295 140.00
4 - CIRCLE SPA 648 000.00 0.00 0.00 30 000.00 12 000.00 0.00 0.00 0.00 20 000.00 0.00 0.00 0.00 0.00 0.00 0.00 710 000.00 50, 50, 70 355 000.00 355 000.00 355 000.00
4.1 - CCEU 383 000.00 0.00 0.00 0.00 12 000.00 0.00 0.00 0.00 20 000.00 0.00 0.00 0.00 0.00 0.00 0.00 415 000.00 50, 50, 70 207 500.00 207 500.00 207 500.00
5 - BMDV 72 000.00 0.00 0.00 2 292 000.00 36 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 400 000.00 50, 50, 70 1 200 000.00 1 200 000.00 1 200 000.00
6 - BALM 390 000.00 0.00 0.00 2 400 000.00 30 000.00 0.00 0.00 150 000.00 30 000.00 0.00 0.00 0.00 0.00 0.00 0.00 3 000 000.00 50, 50, 70 1 500 000.00 1 500 000.00 1 500 000.00
7 - FI Transport&Co 1 170 000.00 0.00 0.00 3 680 000.00 60 000.00 0.00 0.00 0.00 60 000.00 0.00 0.00 0.00 0.00 0.00 0.00 4 970 000.00 50, 50, 70 2 485 000.00 2 485 000.00 2 485 000.00
8 - SCHIG 240 000.00 0.00 0.00 480 000.00 40 000.00 0.00 0.00 40 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 800 000.00 50, 50, 70 400 000.00 400 000.00 400 000.00
8.1 - BMK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50, 50, 70 0.00 0.00 0.00
9 - PORTEXPERTISE 560 425.00 0.00 0.00 350 000.00 31 075.00 0.00 0.00 30 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 971 500.00 50, 50, 70 485 750.00 485 750.00 485 750.00
10 - MIT 15 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15 000.00 50, 50, 70 7 500.00 7 500.00 7 500.00
10.1 - RAM SPA 355 000.00 0.00 0.00 330 000.00 25 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 710 000.00 50, 50, 70 355 000.00 355 000.00 355 000.00
11 - IMT, I. P. 1 345 000.00 0.00 0.00 130 000.00 25 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 500 000.00 50, 50, 70 750 000.00 750 000.00 750 000.00
12 - Nordic Invest 276 000.00 0.00 0.00 5 000.00 4 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 285 000.00 50, 50, 70 142 500.00 142 500.00 142 500.00
13 - NORM 190 000.00 0.00 0.00 0.00 10 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200 000.00 50, 50, 70 100 000.00 100 000.00 100 000.00
14 - TIA 90 000.00 0.00 0.00 81 000.00 9 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180 000.00 50, 50, 70 90 000.00 90 000.00 90 000.00
15 - Groupe IN 2 599 275.00 0.00 0.00 2 516 569.00 100 000.00 0.00 0.00 130 000.00 150 000.00 0.00 0.00 0.00 0.00 0.00 0.00 5 495 844.00 50, 50, 70 2 747 922.00 2 747 922.00 2 747 922.00
15.1 - French Ministry 50 000.00 0.00 0.00 900 000.00 50 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 000 000.00 50, 50, 70 500 000.00 500 000.00 500 000.00
16 - KLAIPEDA PORT 375 000.00 0.00 0.00 1 050 000.00 75 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 500 000.00 50, 50, 70 750 000.00 750 000.00 750 000.00
17 - LT MIN.TRANSP. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50, 50, 70 0.00 0.00 0.00
18 - SPW 360 000.00 0.00 0.00 1 440 000.00 50 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 850 000.00 50, 50, 70 925 000.00 925 000.00 925 000.00
19 - LIW 40 000.00 0.00 0.00 0.00 10 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 000.00 50, 50, 70 25 000.00 25 000.00 25 000.00
Total 10 133 700.00 0.00 0.00 16 759 849.00 685 575.00 0.00 0.00 350 000.00 423 500.00 0.00 0.00 0.00 0.00 0.00 0.00 28 352 624.00 14 176 312.00 14 176 312.00 14 176 312.00
1 e = flat-rate * (a1 + a2 + a3 + b + c1a + c1b + c1c + c2 + c3 + d1a + d2 + d3 + d4 + d5)
2 g = (a1 + a2 + a3) * V% + b * V% + (c1a + c1b + c1c + c2 + c3) * V% + (d1a + d3 + d5) * V% + d2 * W% + d4 * X% + e * V%
Page 1 of 1
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
INSTRUCTIONS (DETAILED BUDGET TABLE PER WP)
General
The file is composed of 7 sheets (1- Start, 2 - Work packages, 3 - Participants, 4 - DB table, 5 - DB
table_Summary_WP, 6 - DB table_Summary_Participants, 7 - DB table_Consistency check).
This table complements the budget information you encode directly in the Funding & Tenders Portal. Make sure that
the information provided in the DB table is consistent with the information provided in the Funding & Tenders
Portal.
You should submit the DB table as part of your proposal and grant preparation:
- for proposal: the table will be an Annex to your Application Form Part B. Complete and upload the table as an
Excel file in the Funding & Tenders Portal Submission System.
- for grant preparation: the table will become part of the Grant Agreement Annex 1 Description of the Action (DoA).
Complete and upload the table as an Excel File in the Funding & Tenders Portal Grant Preparation tool.
Getting started
Please complete the sheets in their order (Start - Work packages- Participants- DB table).
ATTENTION! White cells mean that you are required to enter data. Grey cells are calculated automatically.
1- Start sheet
Use this sheet to insert the generic data (project name and acronym). This information will be automatically copied
into the other sheets.
2 - Work packages sheet
Use this sheet to enter the names of work packages and the corresponding funding rates. The information provided
here needs to be consistent with the information provided in the Funding & Tenders Portal (Submission System for
the application & Grant Preparation Tool for grant preparation).
3 - Participants sheet
Use this sheet to enter the names of the applicants (for the proposal) or beneficiaries (for the grant preparation).
4 - Detailed budget table per WP
Encode the costs per beneficiary, work package and reporting periods:
- For proposal/grant preparation: encode the estimated costs (budget). These amounts should be based on
detailed, reasonable and accurate estimates. Keep sufficient documentation to be able to explain them if requested.
Please ensure to insert only costs that are eligible under the EU grant agreement (see eligibility article on eligible
and ineligible costs of the Model Grant Agreement). All estimated costs must be entered in EUR.
Names of work packages and the participants need to be chosen from the drop down menu. Sub-totals and totals
are calculated automatically (only white cells need to be filled in).
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Work package name Funding Rate
WP 1 Horizontal Work 50%
WP 2 National and Corridor Pilots 50%
WP 3 Communication, Dissemination & Capacity Building50%
WP 4 Project Management and coordination 50%
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Participant name
01. EE KLIIMAMINISTEERIUM
02. EE DIGILOGISTIKA KESKUS
03. LU 51BIZ LUXEMBOURG SARL
04. IT CIRCLE SPA
05. DE BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR
06. DE BUNDESAMT FUR LOGISTIK UND MOBILITAT
07. FI LIIKENNE JA VIESTINTAVIRASTO
08. AT SCHIENENINFRASTRUKTUR¬DIENSTLEISTUNGS-GESELLSCHAFT MBH
09. AT BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE, MOBILITAET, INNOVATION UND TECHNOLO
10. BE PORTS AND TERMINALS CVBA
11. IT Ministero delle Infrastrutture e dei Trasporti
12. IT RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA
13. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P
14. FI NORDIC INVESTMENT BANK
15. LT UAB Normalis TECH
16. LT TRANSPORTO INOVACIJU ASOCIACIJA
17. FR IMPRIMERIE NATIONALE
18. FR MINISTERE DE LA TRANSITION ECOLOGIQUE ET DE LA COHESION DES TERRITOIRES
19. LT VALSTYBES IMONE KLAIPEDOS VALSTYBINIO JURU UOSTO DIREKCIJA
20. LT LIETUVOS RESPUBLIKOS SUSISIEKIMO MINISTERIJA
21. BE SERVICE PUBLIC DE WALLONIE
22. BE LOGISTICS IN WALLONIA
23. IT CIRCLE CONNECTING EU
DETAILED BUDGET TABLE PER WP
PROJECT DATA
Project number: SEP-210903819
Project acronym: eFTI4EU
BUDGET BREAKDOWN PER WORK PACKAGE AND PARTICIPANT
Reporting period can be added/deleted as needed
Participant Reporting period Total Funding rate
Work Package EU contribution
1 costs (for work package)
01. EE
WP 1 Horizontal KLIIMAMINISTEERIU
249.500,00 249.500,00 50% 124.750,00
Work M
01. EE
WP 2 National and KLIIMAMINISTEERIU
615.500,00 615.500,00 50% 307.750,00
Corridor Pilots M
WP 3 01. EE
Communication, KLIIMAMINISTEERIU
83.000,00 83.000,00 50% 41.500,00
Dissemination & M
Capacity Building
01. EE
WP 4 Project
KLIIMAMINISTEERIU
Management and 52.000,00 52.000,00 50% 26.000,00
M
coordination
02. EE
WP 1 Horizontal DIGILOGISTIKA
285.420,00 285.420,00 50% 142.710,00
Work KESKUS
02. EE
WP 2 National and DIGILOGISTIKA
307.430,00 307.430,00 50% 153.715,00
Corridor Pilots KESKUS
WP 3 02. EE
Communication, DIGILOGISTIKA
69.580,00 69.580,00 50% 34.790,00
Dissemination & KESKUS
Capacity Building
02. EE
WP 4 Project
DIGILOGISTIKA
Management and 47.570,00 47.570,00 50% 23.785,00
KESKUS
coordination
03. LU 51BIZ
WP 1 Horizontal LUXEMBOURG SARL
200.695,00 200.695,00 50% 100.347,50
Work
03. LU 51BIZ
WP 2 National and LUXEMBOURG SARL
306.945,00 306.945,00 50% 153.472,50
Corridor Pilots
WP 3 03. LU 51BIZ
Communication, LUXEMBOURG SARL
47.223,00 47.223,00 50% 23.611,50
Dissemination &
Capacity Building
WP 3 03. LU 51BIZ
Communication, LUXEMBOURG SARL
35.417,00 35.417,00 50% 17.708,50
Dissemination &
Capacity Building
04. IT CIRCLE SPA
WP 1 Horizontal
0,00 0,00 50% 0,00
Work
04. IT CIRCLE SPA
WP 2 National and
695.000,00 695.000,00 50% 347.500,00
Corridor Pilots
WP 3 04. IT CIRCLE SPA
Communication,
5.000,00 5.000,00 50% 2.500,00
Dissemination &
Capacity Building
04. IT CIRCLE SPA
WP 4 Project
Management and 10.000,00 10.000,00 50% 5.000,00
coordination
05. DE
WP 1 Horizontal BUNDESMINISTERIU
680.040,00 680.040,00 50% 340.020,00
Work M FÜR DIGITALES
UND VERKEHR
05. DE
WP 2 National and BUNDESMINISTERIU
1.458.360,00 1.458.360,00 50% 729.180,00
Corridor Pilots M FÜR DIGITALES
UND VERKEHR
WP 3 05. DE
Communication, BUNDESMINISTERIU
138.000,00 138.000,00 50% 69.000,00
Dissemination & M FÜR DIGITALES
Capacity Building UND VERKEHR
05. DE
WP 4 Project
BUNDESMINISTERIU
Management and 123.600,00 123.600,00 50% 61.800,00
M FÜR DIGITALES
coordination
UND VERKEHR
06. DE BUNDESAMT
WP 1 Horizontal FUR LOGISTIK UND
666.000,00 666.000,00 50% 333.000,00
Work MOBILITAT
06. DE BUNDESAMT
WP 2 National and FUR LOGISTIK UND
2.133.000,00 2.133.000,00 50% 1.066.500,00
Corridor Pilots MOBILITAT
WP 3 06. DE BUNDESAMT
Communication, FUR LOGISTIK UND
135.000,00 135.000,00 50% 67.500,00
Dissemination & MOBILITAT
Capacity Building
06. DE BUNDESAMT
WP 4 Project
FUR LOGISTIK UND
Management and 66.000,00 66.000,00 50% 33.000,00
MOBILITAT
coordination
07. FI LIIKENNE JA
WP 1 Horizontal VIESTINTAVIRASTO
1.152.790,00 1.152.790,00 50% 576.395,00
Work
07. FI LIIKENNE JA
WP 2 National and VIESTINTAVIRASTO
2.560.260,00 2.560.260,00 50% 1.280.130,00
Corridor Pilots
WP 3 07. FI LIIKENNE JA
Communication, VIESTINTAVIRASTO
350.160,00 350.160,00 50% 175.080,00
Dissemination &
Capacity Building
07. FI LIIKENNE JA
WP 4 Project
VIESTINTAVIRASTO
Management and 906.790,00 906.790,00 50% 453.395,00
coordination
08. AT
WP 1 Horizontal SCHIENENINFRASTR
140.000,00 140.000,00 50% 70.000,00
Work UKTUR¬DIENSTLEIS
TUNGS-
08. AT
WP 2 National and SCHIENENINFRASTR
568.000,00 568.000,00 50% 284.000,00
Corridor Pilots UKTUR¬DIENSTLEIS
TUNGS-
WP 3 08. AT
Communication, SCHIENENINFRASTR
42.000,00 42.000,00 50% 21.000,00
Dissemination & UKTUR¬DIENSTLEIS
Capacity Building TUNGS-
08. AT
WP 4 Project
SCHIENENINFRASTR
Management and 50.000,00 50.000,00 50% 25.000,00
UKTUR¬DIENSTLEIS
coordination
TUNGS-
09. AT
WP 1 Horizontal BUNDESMINISTERIU
0,00 0,00 50% 0,00
Work M FUER
KLIMASCHUTZ,
09. AT
WP 2 National and BUNDESMINISTERIU
0,00 0,00 50% 0,00
Corridor Pilots M FUER
KLIMASCHUTZ,
WP 3 09. AT
Communication, BUNDESMINISTERIU
0,00 0,00 50% 0,00
Dissemination & M FUER
Capacity Building KLIMASCHUTZ,
09. AT
WP 4 Project
BUNDESMINISTERIU
Management and 0,00 0,00 50% 0,00
M FUER
coordination
KLIMASCHUTZ,
10. BE PORTS AND
WP 1 Horizontal TERMINALS CVBA
37.500,00 37.500,00 50% 18.750,00
Work
10. BE PORTS AND
WP 2 National and TERMINALS CVBA
140.000,00 140.000,00 50% 70.000,00
Corridor Pilots
WP 3 10. BE PORTS AND
Communication, TERMINALS CVBA
60.000,00 60.000,00 50% 30.000,00
Dissemination &
Capacity Building
10. BE PORTS AND
WP 4 Project
TERMINALS CVBA
Management and 734.000,00 734.000,00 50% 367.000,00
coordination
11. IT Ministero delle
WP 1 Horizontal Infrastrutture e dei
5.000,00 5.000,00 50% 2.500,00
Work Trasporti
11. IT Ministero delle
WP 2 National and Infrastrutture e dei
5.000,00 5.000,00 50% 2.500,00
Corridor Pilots Trasporti
WP 3 11. IT Ministero delle
Communication, Infrastrutture e dei
5.000,00 5.000,00 50% 2.500,00
Dissemination & Trasporti
Capacity Building
11. IT Ministero delle
WP 4 Project
Infrastrutture e dei
Management and 0,00 0,00 50% 0,00
Trasporti
coordination
12. IT RETE
WP 1 Horizontal AUTOSTRADE
90.000,00 90.000,00 50% 45.000,00
Work MEDITERRANEE PER
LA LOGISTICA
12. IT RETE
WP 2 National and AUTOSTRADE
370.000,00 370.000,00 50% 185.000,00
Corridor Pilots MEDITERRANEE PER
LA LOGISTICA
WP 3 12. IT RETE
Communication, AUTOSTRADE
150.000,00 150.000,00 50% 75.000,00
Dissemination & MEDITERRANEE PER
Capacity Building LA LOGISTICA
12. IT RETE
WP 4 Project
AUTOSTRADE
Management and 100.000,00 100.000,00 50% 50.000,00
MEDITERRANEE PER
coordination
LA LOGISTICA
13. PT INSTITUTO
WP 1 Horizontal DA MOBILIDADE E
80.000,00 80.000,00 50% 40.000,00
Work DOS TRANSPORTES,
IP
13. PT INSTITUTO
WP 2 National and DA MOBILIDADE E
1.190.000,00 1.190.000,00 50% 595.000,00
Corridor Pilots DOS TRANSPORTES,
IP
WP 3 13. PT INSTITUTO
Communication, DA MOBILIDADE E
80.000,00 80.000,00 50% 40.000,00
Dissemination & DOS TRANSPORTES,
Capacity Building IP
13. PT INSTITUTO
WP 4 Project
DA MOBILIDADE E
Management and 150.000,00 150.000,00 50% 75.000,00
DOS TRANSPORTES,
coordination
IP
14. FI NORDIC
WP 1 Horizontal INVESTMENT BANK
225.000 225.000,00 50% 112.500,00
Work
14. FI NORDIC
WP 2 National and INVESTMENT BANK
0,00 0,00 50% 0,00
Corridor Pilots
WP 3 14. FI NORDIC
Communication, INVESTMENT BANK
30.000 30.000,00 50% 15.000,00
Dissemination &
Capacity Building
14. FI NORDIC
WP 4 Project
INVESTMENT BANK
Management and 30.000 30.000,00 50% 15.000,00
coordination
15. LT UAB Normalis
WP 1 Horizontal TECH
99.000,00 99.000,00 50% 49.500,00
Work
15. LT UAB Normalis
WP 2 National and TECH
52.000,00 52.000,00 50% 26.000,00
Corridor Pilots
WP 3 15. LT UAB Normalis
Communication, TECH
29.500,00 29.500,00 50% 14.750,00
Dissemination &
Capacity Building
15. LT UAB Normalis
WP 4 Project
TECH
Management and 19.500,00 19.500,00 50% 9.750,00
coordination
16. LT TRANSPORTO
WP 1 Horizontal INOVACIJU
48.600,00 48.600,00 50% 24.300,00
Work ASOCIACIJA
16. LT TRANSPORTO
WP 2 National and INOVACIJU
25.200,00 25.200,00 50% 12.600,00
Corridor Pilots ASOCIACIJA
WP 3 16. LT TRANSPORTO
Communication, INOVACIJU
93.150,00 93.150,00 50% 46.575,00
Dissemination & ASOCIACIJA
Capacity Building
16. LT TRANSPORTO
WP 4 Project
INOVACIJU
Management and 13.050,00 13.050,00 50% 6.525,00
ASOCIACIJA
coordination
17. FR IMPRIMERIE
WP 1 Horizontal NATIONALE
747.759,00 747.759,00 50% 373.879,50
Work
17. FR IMPRIMERIE
WP 2 National and NATIONALE
4.080.473,00 4.080.473,00 50% 2.040.236,50
Corridor Pilots
WP 3 17. FR IMPRIMERIE
Communication, NATIONALE
218.227,50 218.227,50 50% 109.113,75
Dissemination &
Capacity Building
17. FR IMPRIMERIE
WP 4 Project
NATIONALE
Management and 449.384,50 449.384,50 50% 224.692,25
coordination
18. FR MINISTERE DE
WP 1 Horizontal LA TRANSITION
170.000,00 170.000,00 50% 85.000,00
Work ECOLOGIQUE ET DE
LA COHESION DES
18. FR MINISTERE DE
WP 2 National and LA TRANSITION
700.000,00 700.000,00 50% 350.000,00
Corridor Pilots ECOLOGIQUE ET DE
LA COHESION DES
WP 3 18. FR MINISTERE DE
Communication, LA TRANSITION
72.500,00 72.500,00 50% 36.250,00
Dissemination & ECOLOGIQUE ET DE
Capacity Building LA COHESION DES
18. FR MINISTERE DE
WP 4 Project
LA TRANSITION
Management and 57.500,00 57.500,00 50% 28.750,00
ECOLOGIQUE ET DE
coordination
LA COHESION DES
19. LT VALSTYBES
WP 1 Horizontal IMONE KLAIPEDOS
324.000 324.000,00 50% 162.000,00
Work VALSTYBINIO JURU
UOSTO DIREKCIJA
19. LT VALSTYBES
WP 2 National and IMONE KLAIPEDOS
977.250 977.250,00 50% 488.625,00
Corridor Pilots VALSTYBINIO JURU
UOSTO DIREKCIJA
WP 3 19. LT VALSTYBES
Communication, IMONE KLAIPEDOS
126.000 126.000,00 50% 63.000,00
Dissemination & VALSTYBINIO JURU
Capacity Building UOSTO DIREKCIJA
19. LT VALSTYBES
WP 4 Project
IMONE KLAIPEDOS
Management and 72.750 72.750,00 50% 36.375,00
VALSTYBINIO JURU
coordination
UOSTO DIREKCIJA
20. LT LIETUVOS
WP 1 Horizontal RESPUBLIKOS
0 0,00 50% 0,00
Work SUSISIEKIMO
MINISTERIJA
20. LT LIETUVOS
WP 2 National and RESPUBLIKOS
0 0,00 50% 0,00
Corridor Pilots SUSISIEKIMO
MINISTERIJA
WP 3 20. LT LIETUVOS
Communication, RESPUBLIKOS
0 0,00 50% 0,00
Dissemination & SUSISIEKIMO
Capacity Building MINISTERIJA
20. LT LIETUVOS
WP 4 Project
RESPUBLIKOS
Management and 0 0,00 50% 0,00
SUSISIEKIMO
coordination
MINISTERIJA
21. BE SERVICE
WP 1 Horizontal PUBLIC DE
290.000 290.000,00 50% 145.000,00
Work WALLONIE
21. BE SERVICE
WP 2 National and PUBLIC DE
1.120.000 1.120.000,00 50% 560.000,00
Corridor Pilots WALLONIE
WP 3 21. BE SERVICE
Communication, PUBLIC DE
0 0,00 50% 0,00
Dissemination & WALLONIE
Capacity Building
21. BE SERVICE
WP 4 Project
PUBLIC DE
Management and 440.000 440.000,00 50% 220.000,00
WALLONIE
coordination
22. BE LOGISTICS IN
WP 1 Horizontal WALLONIA 0 0,00 50% 0,00
Work
22. BE LOGISTICS IN
WP 2 National and
WALLONIA 42.000 42.000,00 50% 21.000,00
Corridor Pilots
WP 3
22. BE LOGISTICS IN
Communication,
WALLONIA 8.000 8.000,00 50% 4.000,00
Dissemination &
Capacity Building
WP 4 Project 22. BE LOGISTICS IN
Management and WALLONIA 0,00 50% 0,00
coordination
WP 1 Horizontal 23. IT CIRCLE 80.000 80.000,00 50% 40.000,00
Work CONNECTING EU
WP 2 National and 23. IT CIRCLE 160.000 160.000,00 50% 80.000,00
Corridor Pilots CONNECTING EU
WP 3
23. IT CIRCLE
Communication,
CONNECTING EU 35.000 35.000,00 50% 17.500,00
Dissemination &
Capacity Building
WP 4 Project 23. IT CIRCLE
Management and CONNECTING EU 140.000 140.000,00 50% 70.000,00
coordination
Total 28.352.624,00 28.352.624,00 14.176.312,00
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
# EU CONTRIBUTION TOTAL COSTS
ENCODE VALUE FROM EGRANTS 14.176.312,00 28.352.624,00
DIFFERENCE 0,00 0 NO CHANGES ALLOWED - TABLE IS AUTOMATICALLY FILLED - DO NOT INSERT/DELETE ROWS
Summary per work package
Reporting FP Sum of Total Sum of EU
Row Labels period_1 RP_1 costs contribution
WP 1 Horizontal Work 5.571.304 100% 5.571.304 2.785.652
WP 2 National and Corridor Pilots 17.506.418 100% 17.506.418 8.753.209
WP 3 Communication, Dissemination & Capacity Building 1.812.758 100% 1.812.758 906.379
WP 4 Project Management and coordination 3.462.145 100% 3.462.145 1.731.072
Grand Total 28.352.624 100% 28.352.624 14.176.312,00
Summary per Participant
Reporting Sum of Total Sum of EU
Row Labels period_1 costs contribution
.
..
01. EE KLIIMAMINISTEERIUM2 1.000.000 1.000.000 500.000
02. EE DIGILOGISTIKA KESKUS 710.000 710.000 355.000
03. LU 51BIZ LUXEMBOURG SARL2 590.280 590.280 295.140
04. IT CIRCLE SPA 710.000 710.000 355.000
05. DE BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR 2.400.000 2.400.000 1.200.000
06. DE BUNDESAMT FUR LOGISTIK UND MOBILITAT 3.000.000 3.000.000 1.500.000
07. FI LIIKENNE JA VIESTINTAVIRASTO 4.970.000 4.970.000 2.485.000
08. AT SCHIENENINFRASTRUKTUR¬DIENSTLEISTUNGS-GESELLSCHAFT MBH 800.000 800.000 400.000
09. AT BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE, MOBILITAET, INNOVATION UND TECHNOLOGIE2 - - -
10. BE PORTS AND TERMINALS CVBA2 971.500 971.500 485.750
11. IT Ministero delle Infrastrutture e dei Trasporti2 15.000 15.000 7.500
12. IT RETE AUTOSTRADE MEDITERRANEE PER LA LOGISTICA 710.000 710.000 355.000
13. PT INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P 1.500.000 1.500.000 750.000
14. FI NORDIC INVESTMENT BANK 285.000 285.000 142.500
15. LT UAB Normalis TECH2 200.000 200.000 100.000
16. LT TRANSPORTO INOVACIJU ASOCIACIJA2 180.000 180.000 90.000
17. FR IMPRIMERIE NATIONALE 5.495.844 5.495.844 2.747.922
18. FR MINISTERE DE LA TRANSITION ECOLOGIQUE ET DE LA COHESION DES TERRITOIRES 1.000.000 1.000.000 500.000
19. LT VALSTYBES IMONE KLAIPEDOS VALSTYBINIO JURU UOSTO DIREKCIJA 1.500.000 1.500.000 750.000
20. LT LIETUVOS RESPUBLIKOS SUSISIEKIMO MINISTERIJA - - -
21. BE SERVICE PUBLIC DE WALLONIE 1.850.000 1.850.000 925.000
22. BE LOGISTICS IN WALLONIA 50.000 50.000 25.000
23. IT CIRCLE CONNECTING EU 415.000 415.000 207.500
Grand Total 28.352.624 28.352.624 14.176.312,00
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
5 & 6- DB summary sheets (for work packages and participants)
This sheet summarises the information of the DB table sheet. Do not modify the data here.
7 - DB consistency check sheet
This sheet allows you to perform a quick check on the final data (total costs and EU contribution) that you have
encoded in the DB table sheet and in Funding & Tenders Portal (Submission System for the application and Grant
Preparation Tool for grant preparation). Please encode the values from the Funding & Tenders Portal. In case a
difference is detected, please review your application/grant agreement to align the amounts.
Warning
Do NOT delete formulas or change the configuration of the file.
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
START (DETAILED BUDGET TABLE PER WP)
PROJECT DATA
Project number: SEP-210903819
Project acronym: eFTI4EU
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
ANNEX 2
ESTIMATED BUDGET FOR THE ACTION
Estimated eligible1 costs (per budget category) Estimated EU contribution2
Indirect
Direct costs EU contribution to eligible costs
costs Maximum
Total costs Maximum grant
B. E. Indirect Funding Requested
A. Personnel costs Subcontracting C. Purchase costs D. Other cost categories EU EU amount6
costs costs3 rate %4
contribution5 contribution
A.1 Employees (or A.4 SME B. C.2 C.3 Other D.1 Financial D.2 Studies D.3 D.4 Works D.5 Land E. Indirect
equivalent) owners Subcontracting C.1 Travel and subsistence Equipment goods, works support to Synergetic in outermost purchases costs
and natural and services third parties elements regions
A.2 Natural persons under person
direct contract beneficiaries
Travel Accommodation Subsistence
A.3 Seconded persons
Unit costs
(usual Flat-rate
Forms of funding Actual costs Unit costs7 Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs
accounting costs8
practices)
a1 a2 a3 b c1a c1b c1c c2 c3 d1a d2 d3 d4 d5 e9 f = a+b+c+d V, W, X g10 h m
1 - MoClimate 300 000.00 0.00 0.00 650 000.00 50 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 000 000.00 50, 50, 70 500 000.00 500 000.00 500 000.00
2 - DLK 355 000.00 0.00 0.00 284 000.00 35 500.00 0.00 0.00 0.00 35 500.00 0.00 0.00 0.00 0.00 0.00 0.00 710 000.00 50, 50, 70 355 000.00 355 000.00 355 000.00
3 - 51Biz LUXEMBURG 320 000.00 0.00 0.00 141 280.00 21 000.00 0.00 0.00 0.00 108 000.00 0.00 0.00 0.00 0.00 0.00 0.00 590 280.00 50, 50, 70 295 140.00 295 140.00 295 140.00
4 - CIRCLE SPA 648 000.00 0.00 0.00 30 000.00 12 000.00 0.00 0.00 0.00 20 000.00 0.00 0.00 0.00 0.00 0.00 0.00 710 000.00 50, 50, 70 355 000.00 355 000.00 355 000.00
4.1 - CCEU 383 000.00 0.00 0.00 0.00 12 000.00 0.00 0.00 0.00 20 000.00 0.00 0.00 0.00 0.00 0.00 0.00 415 000.00 50, 50, 70 207 500.00 207 500.00 207 500.00
5 - BMDV 72 000.00 0.00 0.00 2 292 000.00 36 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 400 000.00 50, 50, 70 1 200 000.00 1 200 000.00 1 200 000.00
6 - BALM 390 000.00 0.00 0.00 2 400 000.00 30 000.00 0.00 0.00 150 000.00 30 000.00 0.00 0.00 0.00 0.00 0.00 0.00 3 000 000.00 50, 50, 70 1 500 000.00 1 500 000.00 1 500 000.00
7 - FI Transport&Co 1 170 000.00 0.00 0.00 3 680 000.00 60 000.00 0.00 0.00 0.00 60 000.00 0.00 0.00 0.00 0.00 0.00 0.00 4 970 000.00 50, 50, 70 2 485 000.00 2 485 000.00 2 485 000.00
8 - SCHIG 240 000.00 0.00 0.00 480 000.00 40 000.00 0.00 0.00 40 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 800 000.00 50, 50, 70 400 000.00 400 000.00 400 000.00
8.1 - BMK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50, 50, 70 0.00 0.00 0.00
9 - PORTEXPERTISE 560 425.00 0.00 0.00 350 000.00 31 075.00 0.00 0.00 30 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 971 500.00 50, 50, 70 485 750.00 485 750.00 485 750.00
10 - MIT 15 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15 000.00 50, 50, 70 7 500.00 7 500.00 7 500.00
10.1 - RAM SPA 355 000.00 0.00 0.00 330 000.00 25 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 710 000.00 50, 50, 70 355 000.00 355 000.00 355 000.00
11 - IMT, I. P. 1 345 000.00 0.00 0.00 130 000.00 25 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 500 000.00 50, 50, 70 750 000.00 750 000.00 750 000.00
12 - Nordic Invest 276 000.00 0.00 0.00 5 000.00 4 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 285 000.00 50, 50, 70 142 500.00 142 500.00 142 500.00
13 - NORM 190 000.00 0.00 0.00 0.00 10 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200 000.00 50, 50, 70 100 000.00 100 000.00 100 000.00
14 - TIA 90 000.00 0.00 0.00 81 000.00 9 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 180 000.00 50, 50, 70 90 000.00 90 000.00 90 000.00
15 - Groupe IN 2 599 275.00 0.00 0.00 2 516 569.00 100 000.00 0.00 0.00 130 000.00 150 000.00 0.00 0.00 0.00 0.00 0.00 0.00 5 495 844.00 50, 50, 70 2 747 922.00 2 747 922.00 2 747 922.00
15.1 - French Ministry 50 000.00 0.00 0.00 900 000.00 50 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 000 000.00 50, 50, 70 500 000.00 500 000.00 500 000.00
16 - KLAIPEDA PORT 375 000.00 0.00 0.00 1 050 000.00 75 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 500 000.00 50, 50, 70 750 000.00 750 000.00 750 000.00
17 - LT MIN.TRANSP. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50, 50, 70 0.00 0.00 0.00
18 - SPW 360 000.00 0.00 0.00 1 440 000.00 50 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 850 000.00 50, 50, 70 925 000.00 925 000.00 925 000.00
19 - LIW 40 000.00 0.00 0.00 0.00 10 000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50 000.00 50, 50, 70 25 000.00 25 000.00 25 000.00
Σ consortium 10 133 700.00 0.00 0.00 16 759 849.00 685 575.00 0.00 0.00 350 000.00 423 500.00 0.00 0.00 0.00 0.00 0.00 0.00 28 352 624.00 14 176 312.00 14 176 312.00 14 176 312.00
1 See Article 6 for the eligibility conditions. All amounts must be expressed in EUR (see Article 21 for the conversion rules).
2 The consortium remains free to decide on a different internal distribution of the EU funding (via the consortium agreement; see Article 7).
3 Indirect costs already covered by an operating grant (received under any EU funding programme) are ineligible (see Article 6.3). Therefore, a beneficiary/affiliated entity that receives an operating grant during the action duration cannot declare indirect costs for the year(s)/reporting period(s) covered by the operating grant, unless they can
demonstrate that the operating grant does not cover any costs of the action. This requires specific accounting tools. Please immediately contact us via the EU Funding & Tenders Portal for details.
4 See Data Sheet for the funding rate(s).
Page 1 of 2
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
CEF Ref.
Associated with document MGAAres(2023)6850115
— Multi & Mono:-v1.0
09/10/2023
5 This is the theoretical amount of the EU contribution to costs, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is then capped by the 'maximum grant amount'.
6 The 'maximum grant amount' is the maximum grant amount decided by the EU. It normally corresponds to the requested grant, but may be lower.
7 See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit).
8 See Data Sheet for the flat-rate.
9 e = flat-rate * (a1 + a2 + a3 + b + c1a + c1b + c1c + c2 + c3 + d1a + d2 + d3 + d4 + d5)
10 g = (a1 + a2 + a3) * V% + b * V% + (c1a + c1b + c1c + c2 + c3) * V% + (d1a + d3 + d5) * V% + d2 * W% + d4 * X% + e * V%
Page 2 of 2
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 2a
ADDITIONAL INFORMATION ON UNIT COSTS AND CONTRIBUTIONS
SME owners/natural person beneficiaries without salary
See Additional information on unit costs and contributions (Annex 2a and 2b)
1
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
DIGILOGISTIKA KESKUS (DLK), PIC 892290391, established in TEADUSPARGI 6/1,
TALLINN 12618, Estonia,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-892290391_75_210--]
1
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
51BIZ LUXEMBOURG SARL (51Biz LUXEMBURG), PIC 951890877, established in MAISON
15, GREVENKNAPP 7433, Luxembourg,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-951890877_75_210--]
2
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
CIRCLE SPA (CIRCLE SPA), PIC 946059916, established in VIA G. BATTISTA PERGOLESI
26, MILANO 20124, Italy,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-946059916_75_210--]
3
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR (BMDV), PIC 996530374,
established in Robert-Schuman-Platz 1, Bonn 53175, Germany,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-996530374_75_210--]
4
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESAMT FUR LOGISTIK UND MOBILITAT (BALM), PIC 884011344, established in
WERDERSTRASSE 34, KOLN 50672, Germany,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-884011344_75_210--]
5
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
LIIKENNE- JA VIESTINTAVIRASTO (FI Transport&Co), PIC 900306956, established in
KUMPULANTIE 9, HELSINKI 00520, Finland,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-900306956_75_210--]
6
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SCHIENENINFRASTRUKTUR-DIENSTLEISTUNGS-GESELLSCHAFT MBH (SCHIG),
PIC 887660387, established in JAKOV-LIND-STRASSE 2 STG 2,4 OG AUSTRIA CAMPUS 2,
WIEN 1020, Austria,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-887660387_75_210--]
7
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
PORTS AND TERMINALS CVBA (PORTEXPERTISE), PIC 933959457, established in DR J
GOOSSENAERTSSTRAAT AB 54, KALMTHOUT 2920, Belgium,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-933959457_75_210--]
8
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Ministero delle Infrastrutture e dei Trasporti (MIT), PIC 996445790, established in Via
Nomentana, 2, Roma 00161, Italy,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-996445790_75_210--]
9
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P (IMT, I. P.), PIC 966290430,
established in AVENIDA DAS FORCAS ARMADAS 40, LISBOA 1649 022, Portugal,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-966290430_75_210--]
10
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NORDIC INVESTMENT BANK (Nordic Invest), PIC 894031056, established in
FABIANINKATU 34, HELSINKI 00171, Finland,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-894031056_75_210--]
11
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
UAB NORMALIS TECH (NORM), PIC 886548088, established in JAUNIMO G. 16, INGALINA
30290, Lithuania,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-886548088_75_210--]
12
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
TRANSPORTO INOVACIJU ASOCIACIJA (TIA), PIC 885458875, established in GEDIMINO
PR 9, VILNIUS LT01103, Lithuania,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-885458875_75_210--]
13
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
IMPRIMERIE NATIONALE (Groupe IN), PIC 911407345, established in 38 AVENUE DE NEW
YORK, PARIS 75116, France,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-911407345_75_210--]
14
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
VALSTYBES IMONE KLAIPEDOS VALSTYBINIO JURU UOSTO DIREKCIJA
(KLAIPEDA PORT), PIC 951975364, established in J JANONIO 24, KLAIPEDA 92251, Lithuania,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-951975364_75_210--]
15
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
LIETUVOS RESPUBLIKOS SUSISIEKIMO MINISTERIJA (LT MIN.TRANSP.), PIC
888880550, established in GEDIMINO PR. 17, VILNIUS 01505, Lithuania,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-888880550_75_210--]
16
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SERVICE PUBLIC DE WALLONIE (SPW), PIC 999811884, established in Place de la Wallonie
1, Namur 5100, Belgium,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999811884_75_210--]
17
Grant Agreement number: 101122891 — 22-EU-TG-eFTI4EU — CEF-T-2022-SIMOBGEN
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
LOGISTICS IN WALLONIA (LIW), PIC 963728466, established in RUE DE L'AEROPORT 52 /
10, GRACE-HOLLOGNE 4460, Belgium,
hereby agrees
to become beneficiary
in Agreement No 101122891 — 22-EU-TG-eFTI4EU (‘the Agreement’)
between KLIIMAMINISTEERIUM (MoClimate) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-963728466_75_210--]
18
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 4 CEF MGA — MULTI + MONO
FINANCIAL STATEMENT FOR [PARTICIPANT NAME] FOR REPORTING PERIOD [NUMBER]
1 2
Eligible costs (per budget category) EU contribution Revenues
Direct costs Indirect costs EU contribution to eligible costs
Total requested EU Income generated by the
Total costs
Requested EU contribution action
A. Personnel costs C. Purchase costs D. Other cost categories 2 3 4
B. Subcontracting costs E. Indirect costs Funding rate % Maximum EU contribution contribution
[OPTION for
[OPTION for
[OPTION for Infrastructure [OPTION for
A.4 SME owners and Infrastructure
C.3 Other goods, works and D.X Financial support to third Infrastructure Projects: D.4 Infrastructure
A.1 Employees (or equivalent) natural person B. Subcontracting C.1 Travel and subsistence C.2 Equipment Projects: D.3 E. Indirect costs
services parties Projects: D.2 Works in Projects: D.5 Land
beneficiaries Synergetic
Studies] outermost purchases]
elements]
regions]
A.2 Natural persons under direct contract
Travel Accommodation Subsistence
A.3 Seconded persons
Unit costs (usual 5 6
Forms of funding Actual costs Unit costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs [ Actual costs] [ Actual costs] [ Actual costs] [ Actual costs] Flat-rate costs
accounting practices)
[ g = f*U%] [ g = (a1 + a2 + a3)
e=
* V% + b *V% + ( +c1a + c1b +
flat-rate * (a1 + a2 + a3 + b f=
a1 a2 a3 b c1a c1b c1c c2 c3 d1a [ d2] [ d3] [ d4] [ d5] [ U] c1c + c2 + c3) *V% + (d1a + d3 h m (i) n
+c1a + c1b + c1c + c2 + c3 + d1a a+b+c+d+e
[ V, W, X] + d5)*V% + d2*W% + d4*X% +
[ + d2][ + d3][ + d4][ + d5] )
e*V%]
XX – [short name beneficiary/affiliated entity]
The beneficiary/affiliated entity hereby confirms that:
The information provided is complete, reliable and true.
The costs and contributions declared are eligible (see Article 6).
The costs and contributions can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 19, 20 and 25).
For the last reporting period: that all the revenues have been declared (see Article 22).
i Please declare all eligible costs and contributions, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial statements can be taken into account lateron, in order to replace costs/contributions that are found to be ineligible.
1
See Article 6 for the eligibility conditions. All amounts must be expressed in EUR (see Article 21 for the conversion rules).
2
If you have also received an EU operating grant during this reporting period, you cannot claim indirect costs - unless you can demonstrate that the operating grant does not cover any costs of the action. This requires specific accounting tools. Please contact us immediately via the Funding & Tenders Portal for details.
3
See Data Sheet for the reimbursement rate(s).
4
This is the theoretical amount of EU contribution to costs that the system calculates automatically (by multiplying the reimbursement rates by the costs declared). The amount you request (in the column 'requested EU contribution') may be less.
5
See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit).
6
See Data Sheet for the flat-rate.
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
ANNEX 5
SPECIFIC RULES
CONFIDENTIALITY AND SECURITY (— ARTICLE 13)
Sensitive information with security recommendation
Sensitive information with a security recommendation must comply with the additional
requirements imposed by the granting authority.
Before starting the action tasks concerned, the beneficiaries must have obtained all approvals
or other mandatory documents needed for implementing the task. The documents must be
kept on file and be submitted upon request by the coordinator to the granting authority. If they
are not in English, they must be submitted together with an English summary.
For requirements restricting disclosure or dissemination, the information must be handled in
accordance with the recommendation and may be disclosed or disseminated only after written
approval from the granting authority.
EU classified information
If EU classified information is used or generated by the action, it must be treated in
accordance with the security classification guide (SCG) and security aspect letter (SAL) set
out in Annex 1 and Decision 2015/4441 and its implementing rules — until it is declassified.
Deliverables which contain EU classified information must be submitted according to special
procedures agreed with the granting authority.
Action tasks involving EU classified information may be subcontracted only with prior
explicit written approval from the granting authority and only to entities established in an EU
Member State or in a non-EU country with a security of information agreement with the EU
(or an administrative arrangement with the Commission).
EU classified information may not be disclosed to any third party (including participants
involved in the action implementation) without prior explicit written approval from the
granting authority.
INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS —
ACCESS RIGHTS AND RIGHTS OF USE (— ARTICLE 16)
1
Commission Decision 2015/444/EC, Euratom of 13 March 2015 on the security rules for protecting EU
classified information (OJ L 72, 17.3.2015, p. 53).
1
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
Rights of use of the granting authority on results for information, communication,
dissemination and publicity purposes
The granting authority also has the right to exploit non-sensitive results of the action for
information, communication, dissemination and publicity purposes, using any of the
following modes:
- use for its own purposes (in particular, making them available to persons working for
the granting authority or any other EU service (including institutions, bodies, offices,
agencies, etc.) or EU Member State institution or body; copying or reproducing them
in whole or in part, in unlimited numbers; and communication through press
information services)
- distribution to the public in hard copies, in electronic or digital format, on the
internet including social networks, as a downloadable or non-downloadable file
- editing or redrafting (including shortening, summarising, changing, correcting,
cutting, inserting elements (e.g. meta-data, legends or other graphic, visual, audio or
text elements) extracting parts (e.g. audio or video files), dividing into parts or use in a
compilation
- translation (including inserting subtitles/dubbing) in all official languages of EU
- storage in paper, electronic or other form
- archiving in line with applicable document-management rules
- the right to authorise third parties to act on its behalf or sub-license to third parties,
including if there is licensed background, any of the rights or modes of exploitation set
out in this provision
- processing, analysing, aggregating the results and producing derivative works
- disseminating the results in widely accessible databases or indexes (such as through
‘open access’ or ‘open data’ portals or similar repositories, whether free of charge or
not.
The beneficiaries must ensure these rights of use for the whole duration they are protected by
industrial or intellectual property rights.
If results are subject to moral rights or third party rights (including intellectual property rights
or rights of natural persons on their image and voice), the beneficiaries must ensure that they
comply with their obligations under this Agreement (in particular, by obtaining the necessary
licences and authorisations from the rights holders concerned).
COMMUNICATION, DISSEMINATION AND VISIBILITY (— ARTICLE 17)
Communication and dissemination plan
Where imposed by the call conditions, the beneficiaries must provide a detailed
communication and dissemination plan, setting out the objectives, key messaging, target
audiences, communication channels, social media plan, planned budget and relevant
2
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
indicators for monitoring and evaluation.Additional communication and dissemination
activities
The beneficiaries must engage in the following additional communication and dissemination
activities:
- present the project (including project summary, coordinator contact details, list of
participants, European flag and funding statement and project results) on the
beneficiaries’ websites or social media accounts
- for actions involving equipment, infrastructure or works, display public plaques or
billboards as soon as the work on the action starts and a permanent commemorative
plaque once it is finished, with the European flag and funding statement
- upload the public project results to the CEF Project Results platform, available through
the Funding & Tenders Portal.
SPECIFIC RULES FOR CARRYING OUT THE ACTION (— ARTICLE 18)
Member State information
The beneficiaries must keep the Member States that support the action informed about its
progress.
To this effect, the coordinator must provide the reports submitted in accordance with Article
21 to the concerned the Member States representatives (listed on the granting authority’s
website). This can be done either by email or by giving them access to the reports in the
Funding & Tenders Portal.
Implementation in case of restrictions due to security
Where the call conditions restrict participation or control due to security reasons, the
beneficiaries must ensure that none of the entities that participate as affiliated entities,
associated partners, subcontractors or recipients of financial support to third parties are
established in countries which are not eligible countries or target countries set out in the call
conditions (or are controlled by such countries or entities from such countries).
The beneficiaries must moreover ensure that any cooperation with entities established in
countries which are not eligible countries or target countries set out in the call conditions (or
are controlled by such countries or entities from such countries) does not affect the security
interests and avoids potential negative effects over security of supply of inputs critical to the
action.
Specific rules for digital infrastructure projects
When implementing digital infrastructure projects, the beneficiaries must ensure that the
network technologies and equipment (including software and services) funded by the action
comply with the security requirements and assessments as reflected in the applicable EU,
international and national law on cybersecurity and on data protection.
Moreover, where the call conditions impose wholesale access obligations, the beneficiaries
must provide wholesale access to the digital infrastructure funded by the action, under fair and
3
Associated with document Ref. Ares(2023)6850115 - 09/10/2023
reasonable conditions, in a non-discriminatory manner and in accordance with the call
conditions.
Specific rules for ATM common projects
When implementing actions for the implementation of common projects established under
Regulation (EU) No 409/20132, the beneficiaries must ensure that their actions comply with
the deployment programme referred to in Article 11 of that Regulation (as published on the
Europa website).
Durability
Unless exempted by the granting authority, the beneficiaries must commit to continue to use
and maintain after the end of the action equipment bought and fully reimbursed by the action,
for activities pursuing the action’s objectives. Such equipment must be used for these
purposes — for at least five years after the end of the action (see Data Sheet, Point 1) or until
the end of its economic lifespan (i.e. until it has been fully depreciated) — whichever is
earlier.
Specific rules for blending operations
When implementing blending operations, the beneficiaries acknowledge and accept that:
- the grant depends on the approved financing from the Implementing Partner and/or
public or private investors for the project
- they must inform the granting authority both about the approval for financing and the
financial close — within 15 days
- both actions will be managed and monitored in parallel and in close coordination with
the Implementing Partner, in particular:
- all information, data and documents (including the due diligence by the
Implementing Partner and the signed agreement) may be exchanged and may
be relied on for the management of the other action (if needed)
- issues in one action may impact the other (e.g. suspension or termination in
one action may lead to suspension also of the other action; termination of the
grant will normally suspend and exit from further financing and vice versa,
etc.)
- the granting authority may disclose confidential information also to the Implementing
Partner.
2
Commission Implementing Regulation (EU) No 409/2013 of 3 May 2013 on the definition of common
projects, the establishment of governance and the identification of incentives supporting the implementation
of the European Air Traffic Management Master Plan (OJ L 123, 4.5.2013, p. 1).
4
Digitally sealed by the European Commission
Date: 2023.10.09 18:05:17 CEST
This electronic receipt is a digitally signed version of the document submitted by your
organisation. Both the content of the document and a set of metadata have been digitally
sealed.
This digital signature mechanism, using a public-private key pair mechanism, uniquely
binds this eReceipt to the modules of the Funding & Tenders Portal of the European
Commission, to the transaction for which it was generated and ensures its full integrity.
Therefore a complete digitally signed trail of the transaction is available both for your
organisation and for the issuer of the eReceipt.
Any attempt to modify the content will lead to a break of the integrity of the electronic
signature, which can be verified at any time by clicking on the eReceipt validation
symbol.
More info about eReceipts can be found in the FAQ page of the Funding & Tenders
Portal.
(https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/support/faq)
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
TECHNICAL DESCRIPTION (PART B)
COVER PAGE
Part B of the Application Form must be downloaded from the Portal Submission System, completed and then assembled and
re-uploaded as PDF in the system. Page 1 with the grey IMPORTANT NOTICE box should be deleted before uploading.
Note:
Please read carefully the conditions set out in the Call document (for open calls: published on the Portal). Pay particular
attention to the award criteria; they explain how the application will be evaluated.
The term ‘project’ used in this application form and other documents is synonymous to the term ‘action’ used in the CEF
Regulation 2021/1153.
PROJECT
Project name: eFTI for Europe
Project acronym: 22-EU-TG-eFTI4EU
Coordinator contact: MS Estonia
EVA KILLAR,
[email protected]
Starting date 01/04/2023
Duration 36 months
TABLE OF CONTENTS
TECHNICAL DESCRIPTION (PART B) .......................................................................................................................... 1
COVER PAGE ............................................................................................................................................................. 1
PROJECT SUMMARY ................................................................................................................................................. 2
0. PROJECT DESCRIPTION ....................................................................................................................................... 3
1. PRIORITY AND URGENCY ..................................................................................................................................... 8
1.1 TEN-T network — Project of common interest (PCI) ........................................................................................... 8
1.2 Call objectives and priorities................................................................................................................................ 9
1.3 EU added value ................................................................................................................................................ 10
1.4 Cross-border link............................................................................................................................................... 10
1.5 Integrated management .................................................................................................................................... 12
1.6 Synergies.......................................................................................................................................................... 12
1.7 Dual-use potential (civilian-defence) ................................................................................................................. 14
2. MATURITY............................................................................................................................................................. 14
2.1 Readiness and technical maturity...................................................................................................................... 14
2.2 Status of contracting procedures and authorisations, approvals and permits ..................................................... 22
2.3 Financial maturity .............................................................................................................................................. 24
3. QUALITY ............................................................................................................................................................... 24
3.1 Cost effectiveness and financial management .................................................................................................. 24
3.2 Consortium set-up, governance and organisational structure ............................................................................ 26
3.3 Project management, quality assurance and control procedures ....................................................................... 28
3.4 Risk management ............................................................................................................................................. 30
3.5 Communication and visibility ............................................................................................................................. 33
3.6 Sustainability and maintenance strategy ........................................................................................................... 34
4. IMPACT — COST-BENEFIT ANALYSIS ............................................................................................................... 34
4.1 Demand analysis .............................................................................................................................................. 34
1
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
4.2 Economic and financial analysis........................................................................................................................ 34
4.3 Social, environmental and other impacts ........................................................................................................... 36
5. CATALYTIC EFFECT ............................................................................................................................................ 41
5.1 Financial gap .................................................................................................................................................... 41
5.2 Public and private investment and financial leverage ........................................................................................ 42
5.3 Stakeholder commitment .................................................................................................................................. 42
6. WORK PLAN, WORK PACKAGES, ACTIVITIES, RESOURCES AND TIMING .................................................... 43
6.1 Work plan ......................................................................................................................................................... 43
6.2 Work packages, activities, resources and timing ............................................................................................... 47
Work Package 1 ............................................................................................................................................... 49
Work Package 2 ............................................................................................................................................... 55
Work Package 3 ............................................................................................................................................... 60
Work Package 4 ............................................................................................................................................... 63
Timetable ......................................................................................................................................................... 66
7. OTHER .................................................................................................................................................................. 67
7.1 Ethics ................................................................................................................................................................ 67
7.2 Security............................................................................................................................................................. 67
8. DECLARATIONS ................................................................................................................................................... 67
ANNEXES ..................................................................................................................................................................... 69
#@APP-FORM-CEFT@#
#@PRJ-SUM-PS@# [This document is tagged. Do not delete the tags; they are needed for the processing.]
PROJECT SUMMARY
Project summary
The efficiency of freight transport and logistics is vital for the growth and competitiveness of the
Union economy, the functioning of the internal market and the social and economic cohesion of all regions
of the Union. Digitalisation of transport documents and implementing a seamless paperless information
exchange between businesses and authorities has been a major challenge.
The aim of Regulation EU No 2020/1056 on electronic Freight Transport Information (in short “eFTI
Regulation”)1 is to foster an apply the digitalization of freight transport and logistics to reduce
administrative costs, improve enforcement capabilities of competent authorities, and enhance the
efficiency and sustainability of transport. Aim is to also support the shift from paper based supply chains
towards digital processes.
By the eFTI Regulation, the competent authorities will be required to accept information made
available electronically, that is whenever economic operators are obliged to make information available
as proof of compliance with requirements laid down in Union legal acts covered by the Regulation.
Based on the work so far, in 2023 the Delegated Act on eFTI Data Set and Subsets, the Implementing
Act on common rules for authorities and the Implementing Act on requirements for eFTI platforms and
service providers will be published by the European Commission. In 2024, the rules on certification of
eFTI platforms and service providers will be set upon a dedicated Delegated Act. By August 2025 all EU
Member States need to have proper aligned systems in place, which allow their competent authorities to
accept electronic freight information presented by economic operators, e.g., when a transport is checked.
eFTI4EU starts exactly there - between the implementing and delegated acts texts and the final
interoperable implementation of the technical systems.
1
eFTI Regulation 2020/1956, https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32020R1056
2
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
The project encourages Member States to join forces, face the upcoming eFTI requirements, work jointly
on common specifications and take profit of a well harmonized European wide eFTI exchange
environment according to the regulation.
The consortium is led by the most committed EU Member States that are willing to quickly kick off and
start up the eFTI operations in their country supported by some selected consultant companies with the
most experienced EU eFTI experts already cooperating with DG MOVE for the implementation of
Regulation 1056. Namely:
• Nine (9) Member States as full beneficiaries (Estonia, Germany, Finland, France, Italy, Portugal,
Austria, Lithuania, Belgium); they are participating with their Ministry in charge of the eFTI
implementation and / or with internal Agencies acting on their behalf and /or in cooperation with
selected IT companies for the pilot development
• Three (3) Member States participating as observers (Ireland, Spain and the Netherlands)
• Four (4) eFTI Consultant Companies with top level expertise in eFTI (PortExpertise, 51Biz
Luxembourg Digilogistika Keskus, Circle)
• Three (3) IT companies providing software development for the pilots in their countries (Circle
IT, Imprimerie Nationale FR, LT Normalis Tech LT)
• One (1) international interministerial cooperation partnership in the Baltic area working under the
Nordic Investment Bank
• Two (2) other beneficiaries for the specific eFTI implementation in Lithuania (Transport
Innovation Association and State Enterprise Klaipeda)
The project will be complemented by specific companies that will be subcontracted both for the eFTI
expertise and to develop the eFTI pilots for the countries that decided to outsource this activity.
eFTI4EU has a total eligible costs of 28.352.625 EUR and a duration of 36 months with a work plan that
has been carefully identified in order to match with the overall eFTI implementation process led by the
European Commission DG MOVE.
Due to the tight timing planned for the eFTI implementation (see eFTI time plan in the next section) the
participating Member States and the other beneficiaries agreed to start preparations as early as possible.
Therefore eFTI4EU is planned to start in April 2023 at latest.
A first eFTI4EU meeting is already planned in Germany at the end of April.
#§PRJ-SUM-PS§# #@REL-EVA-RE@# #@PRJ-OBJ-PO@#
0. PROJECT DESCRIPTION
Project description, scope and objectives
Describe the project scope, main goals and objectives, as well as the technical data.
Please use the following structure:
− Overall objective
− General description and context — describe the context, including political priorities and if the project is part
of a bigger project (‘global project’, including projects of common interest)
− Location — mention where on the network/corridors the project will be implemented
− Justification — describe the current situation and needs analysis
− Specific objectives — list and link them to the work packages used in section 6
− Expected outcomes and results — include facts and statistics (for instance, quantitative information expressed
in km, MVA, Bcm/y, kV, bar, etc.).
3
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Overall objective
The overall objectives of the Project are fully aligned with the overall aim of Regulation EU No 2020/1056
on electronic Freight Transport Information (in short “eFTI”):
- to encourage the digitalisation of freight transport and logistics
- to reduce administrative costs, improve enforcement capabilities of competent authorities,
- and to enhance the efficiency and sustainability of transport.
The specific objectives that are then translated in the work plan are:
- to identify, by means of country-specific roadmaps, inter alia, the inventory of existing reusable
systems, requirements for national eFTI implementation, resource needs (financial and
technical) and requirements for the long-term operation of the eFTI exchange environment;
- to analyse the DA and IA introduced by the EU Commission and jointly translate them into
harmonised technical specifications, thus providing member states with solid specifications, e.g.
for the development/tendering of an eFTI gate;
- to develop national and cross-border test strategies to test the eFTI exchange environment;
- to develop a strategy for an open source reference implementation of an eFTI gate on top;
- to develop an agreed governance model that describes general rules for eFTI gates and the
maintenance of the specifications
- to test and pilot
o eFTI gate to competent authorities data exchange,
o eFTI gate to eFTI platforms data exchange
o eFTI gate to other eFTI gates data exchange
o eFTI gate to other liked systems data exchange
- to support a wide communication, awareness raising, and cross fertilisation and capacity building
activities supporting an harmonised eFTI development including;
o a set of communication /information / training tools
o a set of national events in which MSs will communicate eFTI to EOs and to a broader
public.
o a set of European workshops for very specific detailed issues.
o 3 yearly eFTI conferences
o a series of workshops / on site visits
o onboarding trainings (webinars) and a set of training courses
This will be organised in 4 Work Packages with specific outcomes as described in the workplan.
The work plan has been carefully identified in order to match with the overall eFTI implementation
process led by DG MOVE.
General description and context
By the eFTI Regulation, the competent authorities will be required to accept information made available
electronically, that is whenever economic operators are obliged to make information available as proof of
compliance with requirements laid down in Union legal acts covered by the Regulation.
Based on the work so far, in 2023 the Delegated Act on eFTI Data Set and Subsets, the Implementing
Act on common rules for authorities and the Implementing Act on requirements for eFTI platforms and
service providers will be published by the European Commission. In 2024, the rules on certification of
eFTI platforms and service providers will be set upon a dedicated Delegated Act. By August 2025 all EU
Member States need to have proper aligned systems in place, which allow their competent authorities to
4
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
accept electronic freight information presented by economic operators via certified eFTI-platforms, e.g.
when a transport is checked.
Location
The scope of the eFTI4EU project includes all 27 Member States, modes of transports (road, rail, inland
navigation, air and maritime) and administrations that are impacted by the EU 2020/1056 regulation. This
will be achieved by a European eFTI reference architecture and its cross-border pilots. Ultimately, the
project will support the vision of generating digital and vibrant eFTI Core Network Corridors from North to
South and across the EU.
The project will be executed in 9 EU Member States (Estonia, Germany, Finland, France, Italy,
Portugal, Austria, Lithuania, Belgium) with cross border pilots that will also be exploited in all the
9 Core Network Corridors.
eFTI4EU Project Partners
TEN T Corridors
5
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Justification
The project eFTI4EU starts exactly between the provision of the eFTI implementing and delegated acts
and the final interoperable implementation of the technical systems. The project encourages Member
States to join forces, face the upcoming eFTI requirements, work jointly on common specifications and
take profit of a well harmonised European wide eFTI exchange environment according to the regulation.
Through the eFTI regulation, the EU wants to boost and harmonise the digitalization of logistics and
transport. For companies eFTI provides a good opportunity to move from paper documents to digital data
exchange and hence streamline their own processes. Based on industry comments the savings can be
above 10€ per digital cargo document from the process point of view.
While the deadline to implement eFTI is getting closer (operational in August 2025) all authorities in the
EU Member States need to speed up and prepare to meet the upcoming requirements in a rather quick
manner - e.g. they need to join together and agree on rules to manage cross-border eFTI dataset requests,
set up their data exchange readiness and instruct local/international eFTI platforms on the connectivity.
In other words, based upon the regional differences, existing or new platforms and ecosystems have to
be integrated or made interoperable across the EU in a way that all competent authorities could equally
well exchange the required data - a task that a single Member States (MS) cannot solve alone.
The questions of MS currently in air:
● On which (certified) eFTI Platform can an authority find the appropriate eFTI Data Set in case of
a check?
● How can an authority trust and verify transport information that is presented in an electronic
format?
● How can an economic operator trust and verify that a public officer has the mandate to request
transport information
● How to define the rules and set up national query systems to fit all international destinations for
queries?
● How (if) should a MS set up an eFTI Gate without “discovering” its rules on its own?
● How to set up a well-functioning eFTI architecture and eFTI Gate?
● How can economic operators be encouraged to accept and use the implementation of eFTI?
● How does the budget and funding calculation timeline for MS look like (individual implementation
roadmaps)?
To face this challenge Digital Transport and Logistic Forum Experts join together with various national
and regional authorities they already cooperate with.
The foundation of the project will be based on the eFTI Regulation and the related IAs and Das that will
serve as starting points for all the project activities.
The project follows the vision of eFTI that this task can be efficiently managed by an architecture
comprising a federated, coordinated (harmonised) and trusted eFTI network. Therefore, e.g. existing
systems (UNECE eDGTI dangerous goods system), EU building blocks and proven practices of previous
CEF and Horizon projects (e.g. FENIX FEDeRATED, DIGINNO Proto, etc.) could be reused and, if
necessary, adapted to fulfil the eFTI requirements (Delegated Acts - DAs- and Implementing Acts - IAs).
In order to get an overview of the current state of eFTI development in the Member States, the project
supports the creation of individual roadmaps for all participating Member States, which serves for further
cooperation and as a foundation for joint specifications.
Following the project vision, a trusted network of eFTI Gates or similar services have to be developed.
For that, the project envisages support in planning, organising and coordinating harmonised rules for
platforms and components. The national ecosystems which manage the data exchange between eFTI
Gate and eFTI Platforms can be different and to some extent the functional and technical national or
regional eFTI Gate structure could be different. Yet, they all have to communicate with each other in cases
of authority queries on eFTI datasets. Eventually new mechanisms could be built on jointly evolved
building blocks. Jointly developed and used building blocks will be tested and piloted to ensure
interoperability.
Frontrunner MS will do first developments / implementations and perform (cross-border) interoperability
pilots and checks. For the harmonised eFTI data exchange common open-source solutions or modules
will be specified and used. This requires a common understanding of rules and specifications to be
followed
6
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Work Plan
eFTI4EU Partners and associated partners join forces to:
WP1 Horizontal Alignment collect authorities’ road maps and support an exchange and common
understanding of requirements and preparatory works to implement eFTI
● cooperate with European or corridor-specific initiatives related to specific transport modes or
goods. For example, Inland Navigation
● analyse and implement B2A (national and cross-border) eFTI processes on functional level and
in a harmonised way
● initiate a comprehensive cross-member state co-development of the eFTI exchange
environment to ensure interoperability
● think beyond implementation and develop eFTI Gate strategy and governance (e.g.
maintenance and service level agreements)
● to enable day-2-day operation by addressing topics like legal implementation, certification and
accessibility
WP2 National and Corridor Pilots
● focus on capability and usage of eFTI Gates
● integrate national and corridor B2A eFTI processes on functional level for all transport modes
● enable pilot planning, collaboration, testing (in particular with regard to interoperability) and
knowledge sharing
WP3 Communication, Dissemination & Capacity Building disseminate the result and accelerate the
eFTI implementation for other member states that do not join the project
● involve external stakeholders to promote eFTI (in particular economic operators which should
make use of the opportunity of digitalised transport information).
WP4 Project Management
● ensure the smooth (administrative) progress of the project and fulfil the planned activities with
the possibility to meet unforeseen challenges
Expected outcomes and results
Project participants will take profit of:
● pioneering information and knowledge about eFTI;
● shared resources, co-creation and co-development for eFTI;
● profound information and lessons learnt about eFTI architecture and pilots;
● reference architecture to support eFTI implementation;
In detail the project (that is a study including pilots) comprises the following:
Studies:
● Provision of national and regional eFTI roadmaps
● Participation in the horizontal alignment work package to promote harmonisation of eFTI
development and interoperability between Member States. This also covers the specification and
the common co-development of eFTI reference implementations (eFTI platform and eFTI Gate)
● Communication and dissemination, knowledge sharing activities in the MS to promote eFTI
Pilots:
● Development and piloting of an eFTI gate aligned with the jointly specified and developed
reference implementation, which could lead to a system that becomes operational in 2025
● eFTI gate pilots cover the following communication paths:
○ eFTI gate to competent authorities
○ eFTI gate to eFTI platforms
○ eFTI gate to other eFTI gates
○ eFTI gate to other liked systems
7
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Global projects
If the project is part of a global project (including projects of common interest (PCI), if applicable), provide the following
information:
− Objectives of the global project
− General description and context — specify how the project fits into the global project
− Justification — problems, needs and issues addressed by the global project
− State of play, results and objectives achieved by the global project so far
− Parallel projects — describe which other parts of the global project are to be implemented in parallel and their
links to the project
− Timetable — describe the timetable of the global project and the interdependence with the timetable of the
project; explain how the project will impact the progress of other activities which are part of the global project.
The efficiency of freight transport and logistics is vital for the growth and competitiveness of the Union
economy, the functioning of the internal market and the social and economic cohesion of all regions of the
Union.
The overall aim of Regulation EU No 2020/1056 on electronic Freight Transport Information (in short
“eFTI”) are
● to encourage the digitalisation of freight transport and logistics
● to reduce administrative costs, improve enforcement capabilities of competent authorities,
● and to enhance the efficiency and sustainability of transport.
The movement of goods, including waste and dangerous goods, is accompanied by a large amount of
information which is still exchanged mainly in paper format among businesses, and between businesses
and competent authorities. The use of paper documents represents a significant administrative burden for
logistics operators and an additional cost for logistics operators and related industries (such as trade and
manufacturing), in particular for SMEs, and has a negative impact on the environment.
The Global Project is the full adoption of eFTI by Member States in all modes and different cases
including waste shipment and dangerous goods.
The project is the first action of the Global Project and includes the activities described in the previous
paragraph.
It contributes to the Global Project through:
● support Member States, Competent Authority and Economic Operators towards and
harmonised eFTI implementation
● translating Delegated Acts and Implementing Acts in a common reference implementation
● supporting the creation of and effective eFTI environment
● delivering robust pilots
1. PRIORITY AND URGENCY
1.1 TEN-T network — Project of common interest (PCI)
TEN-T network — Project of common interest (PCI)
Explain why the project is considered a project of common interest (PCI) within the meaning of Article 7 of the TEN-T
Guidelines and how it contributes or links to the core and/or comprehensive network.
Does it contribute to realising corridor work plans and implementing acts pursuant to Article 47 of the TEN-T
Guidelines?
Does the project (or global project) produce a network effect by linking with or complementing other TEN-T/CEF
actions?.
Don’t forget to also encode this information in the Application Form Part A in the General information section.
eFTI4EU is in line with Art.7 contributing to the development of the trans-European transport
network through the measures promoting the resource-efficient use of the network.
The Project will generate significant European value added as it contributes to all four categories of
objectives set out in Article 4 of the TEN-T Guidelines:
8
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
a) Cohesion through defining measures and recommendations to improve accessibility and
connectivity to all regions of the Union, reducing the IT infrastructure quality gaps between Member
States; improving the interconnection between long-distance international transport and regional and
local traffic.
b) Efficiency through improving interoperability in national /international multimodal transport networks;
different transport modes will be better integrated and interconnected thanks to the results of
initiatives; economically efficient and high-quality TEN-T transport chains will be promoted
contributing to further economic growth and competitiveness; efficient use of existing infrastructure
will be fostered; pilots will demonstrate that innovative technological and operational concepts can
be applied in a cost-efficient way.
c) Sustainability through contributing to the objectives of low greenhouse gas emissions, low-carbon
and clean transport, reducing external costs and increasing environmental protection as EFTI4EU
will favour a more efficient use of the different transport modes.
d) Increasing the benefits for its users through meeting the mobility and transport needs of its users
within the Union; increasing interoperability, which will ensure quality, efficiency and sustainability of
transport services, particularly for rail and inland waterways transport.
In line with art. 47, the Project will also contribute to efficient use of infrastructure, safe and
environmentally friendly intermodal connections in the all the 9 Core Network Corridors (CNC).
Stakeholders of these CNCs participate in eFTI4EU stakeholder’s platform and results of this project will
be presented periodically in CNCs meetings and stakeholders fora.
The project will be carried out in compliance with relevant Union and national law, in particular with Union
legal acts on the environment, climate protection, safety, security, competition, state aid, public
procurement, public health and accessibility.
1.2 Call objectives and priorities
Call objectives and priorities
Explain how the project contributes to the objectives, priorities and expected results of the topic under which it is
submitted.
The general objective of the call CEF-T-2022-SIMOBGEN-eFTI-WORKS is to modernise transport
infrastructure on the Core and Comprehensive Networks of the TEN-T.
Specifically, in accordance with the Article 9(2)(b)(ii) of the CEF Regulation, studies and / or works, will
be supported, which support Member States to develop and implement IT platforms and processes in
accordance with the eFTI Regulation (Regulation (EU) 2020/1056 of the European Parliament and of the
Council of 15 July 2020 on electronic freight transport information (OJ L 249, 31.7.2020, p. 33)).
eFTI4EU fulfils exactly the call objectives and priorities, since it considers the development of all of the
components of the systems/IT platforms to be used by the competent authorities to access and process
information electronically in accordance with the provisions of the eFTI Regulation and its implementing
and delegated acts, including:
● Pilot testing of exchanges with IT platforms of the economic operators (when adapted to meet
the specifications for eFTI platforms in line with eFTI implementing and delegated acts*)
● Knowledge and good practice sharing with other Member States, including technical
implementation guides
● Communication measures aimed at awareness raising and training of responsible officials in
the competent authorities concerned
Digital platforms developed under eFTI4EU aim to be accessible for use by all operators on a non-
discriminatory basis.
The project contributes strongly and has a supporting impact on the European Commission
documentation and decision-making in member states on the practical and legislative implementation of
eFTI. The project contributes to the works and specifications of the same eFTI Regulation that it is aimed
to implement and seek solutions for.
9
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
The studies conducted will be an effort to fill in gaps and align specifications across borders and the
pilots serve as contact points and possible testbeds for the members states and European Commission,
the businesses and platforms that are to be developed within and aside the project. Both the
organisations in member states of the project implementation and in the member states beyond are
welcome to reap the practical benefits of the pilots while they are being developed and also while those
are being implemented.
The output of the project and its deliverables are direct tools and input for policy making and development
and pooling of best practices on eFTI and digitalisation of transport and trade data through the application
date of eFTI on August 2025 trhough the period after reflecting also towards the assessment of the
Regulation and needs for the amendments or further specifications for the next stages of decision-making
for the full eFTI implementation in segments that might need a longer transition period.
1.3 EU added value
EU added value
Explain the effects of the project from the perspective of the EU interest and how it contributes to the objectives set at
European level.
The Project will support the implementation of a key EU Regulation in terms of the effective digitalisation
in the transport sector and that this is the highest EU added value that the project can bring,
Moreover, there are some other relevant added values in other areas,
Climate change and digitalisation are two global megatrends that will continue to shape EU policy for
decades. The European Green Deal introduced policy shifts in the EU in these areas with the two being
linked more explicitly at a political level. The synthesis of these policy areas has also been accelerated
by the EU recovery package (RRF), which requires EU Member States receiving coronavirus-recovery
funds to make significant investments in both areas.
Furthermore, the European Commission’s (EC) Communication “Shaping Europe's digital future”/ Digital
Europe Programme2 provides some details about its vision for the role of digitalisation in achieving
climate ambitions and the Sustainable Development Goals (SDGs).
Additionally, the EC Sustainable and Smart Mobility Strategy’ lays the foundation for how the EU
transport system can achieve its green and digital transformation and become more resilient to future
crises. Namely in terms of innovation and digitalisation the strategy foresees to make connected
multimodal mobility a reality and to boost innovation and the use of data and artificial
intelligence (AI) for smarter mobility.
In this respect, eFTI4EU supports investment in Europe's transport digital infrastructure with beneficial
consequences on the environment, thus supporting the twin green and digital transition, and contributing
to the ambitious targets for the European Green Deal3 and the Digital Decade4.
It will support the goals of the Smart and Sustainable Mobility Strategy laying the foundation for how
the EU transport system can achieve its digital transformation and become more resilient to future crises.
1.4 Cross-border link
Cross-border link
Is the project related to one of the cross-border links listed in Part III of the Annex to the CEF Regulation read in
conjunction with Article 2(h) of the CEF Regulation and Article 3(m) and 3(p) of the TEN-T Guidelines?
Note:
2
Digital Europe Programme, Digital Europe Programme | European Commission (europa.eu)
3
European Green Deal - https://ec.europa.eu/info/strategy/priorities-2019-2024/european-green-deal_en
4
Digital Decade, https://ec.europa.eu/commission/presscorner/detail/en/ip_21_983
10
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Grants for works addressing a cross-border section may benefit from a higher funding rate (Article 15(2)(a)(i)) of the
CEF Regulation). A joint application is strongly recommended, as a demonstration of the good coordination between
the partners. Single applicant proposals can be considered as addressing a cross-border section, but need to
demonstrate the commitment of all the countries involved.
Continuity of PCI or core network corridor
Is the project located on a section which ensures the continuity of a project of common
interest between the nearest urban nodes, on each side of the border of two Member States
or between a Member State and a neighbouring country?
NO
or
Does the project ensure, via a neighbouring country, continuity of a core network corridor
between two Member States?
If YES, explain how the project (or part of it) fulfills these conditions. Indicate which Member States/neighbouring
countries are concerned and which activities each of them will be carrying out in the framework of the project. Please
indicate which core network corridors are addressed (if applicable).
Insert text
High degree of integration in the planning and implementation
Does your project involve a high degree of integration in the planning and
implementation, in accordance with Article 15(2)(e) of the CEF Regulation (for
instance through the establishment of a single project company, a joint governance NO
structure, a bilateral legal framework or an implementing act pursuant to Article 47
of the TEN-T Guidelines)?
If YES, describe the main elements of this integration and attach appropriate evidence in annex.
Insert text
Written agreement between the States concerned
Actions involving a cross-border link are eligible only if there is a written agreement between the States concerned.
Agreement of the proposal by the Member States does NOT substitute the written agreement.
Have the Member States/neighbouring countries concluded a written agreement at
appropriate level relating to the completion of the cross border link (in accordance NO
with Article 7(1) of the CEF Regulation)?
Put N/A if the answer to the first question above is NO.
If YES, describe the main elements of this agreement and attach a copy of it in annex.
Insert text
Other joint commitments
Such commitments could relate, for example, to a common financial plan or coordinated financial plans, a common
timetable for the works, including a coordinated date of opening of service, agreement on coordinated procedures for
assessing environmental effects and other similar arrangements.
Have the Member States/neighbouring countries made other joint commitments NO
regarding the project?
11
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
If YES, clarify and give details. Attach copies of the related documents (in particular legally binding agreements, if
any).
1.5 Integrated management
Integrated management structure
Is your project a cross-border link project (see section 1.4) which will be carried out
NO
by an integrated management structure (including joint ventures, etc), in accordance
with Article 15(2)(e) of the CEF Regulation ?
If YES, describe the main elements of this agreement and attach a copy of it in annex.
#@COM-PLE-CP@#
1.6 Synergies
Synergies
Describe possible synergies with other CEF sectors (Energy and Digital) or other EU programmes (Resilience and
Recovery Facility (RRF), Digital Europe, Horizon Europe, Structural Funds, etc.).
Indicate if the project includes synergetic elements eligible under another CEF sector within the meaning of Article
10(2) of the CEF Regulation (and, if yes, describe the sector and the elements).
Indicate if the project will benefit from funding from another programme (and, if yes, explain which part of the project,
which EU programme and provide the project reference of the other programme).
Overall synergies
For the project, significant preceding work has been done in previous projects within most of the
beneficiaries both within the previous European and regional projects, both EU and other funding-based.
For the key synergies, the learnings from the European Commission stakeholder, expert group Digital
Transport and Logistics Forum (DTLF) consultation expertise and documentation will be onboarded and
extended. Based on the already mapped alternatives and preferences, the evolution of the eFTI4EU will
be extending the already existing knowledge, developments and networks.
From projects, most valuable for the eFTI4EU and most related to the eFTI-Gates are the exchange and
search mechanisms for Dangerous Goods (UNECE) and for the electronic road transport consignment
note eCMR (UNECE).
For using the search mechanism and data at source principle (of access point and now eFTI Gates),
DIGINNO, DIGINNO Proto and DINNOCAp projects in the Nordic-Baltic area have proven the concept
via a dedicated pilot prototype, both as IT solution and testing platform between several access points.
Specific synergies within CEF
FEDeRATED
The FEDeRATED project is an EU Member State driven initiative to contribute to the establishment of a
viable federated network of platforms for data sharing in the freight transport and logistics domain at EU
level (and beyond). The main objective of the project is to enable a smooth and effective public
involvement with logistic chains for the execution of public duties, such as eFTI. The project builds upon
the work and recommendation of the Digital Transport and Logistic Forum (DTLF) to create such a viable
and valid federative network of platforms as an enabler for Business to Administration (B2A) and
Business to Business (B2B) data exchange and sharing. During the project beneficiaries have done
12
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
some pre-eFTI piloting actions that have been used to design the eFTI4EU project also. In 2023,
according to its planning, the FEDeRATED Action will ultimately deliver the building blocks
(templates/Master Plan) for developing an EU future proof data sharing infrastructure for freight transport
and logistics established through testing sites with participation of various supply chain operators.
The Leading Principles of the FEDeRATED project shall be the functional requirements and technical
specifications, resulting as a validated Master Plan, including a Toolbox and “How To” guidebook, in
2023. The various aspects laying down the foundations of a federated infrastructure provision shall cover
the following functionalities (global features – the FEDeRATED stack), closely related to DTLF Subgroup
II recommendations and FEDeRATED Activity 2 work, i.e.
a) Semantics with (open) standards
b) Identity and Authentication - Determining the identity of a person/organization/’thing’ from a recognised
provider
c) Access points and control - determine what data a person has access to and to identify the points for
integrating organizations with or unlocking IT services (GUI) of the infrastructure
d) Findability - Search systems with metadata - findability of all kinds of data (cargo, qualifications,
certificates, electronic documents) for supervisors and enforcers
e) Governance principles
For practical purposes the FEDeRATED Activity has identified the federated network of platforms as “an
infrastructure provision containing a set of arrangements and technical applications to enable data in
existing IT systems (platforms) of companies and public administrations to become available to
authorized users through a publish and subscribe approach”. The feasibility of the infrastructure provision
will be concretely identified through a multitude of Living Labs.
eFTI will be integrated into several FEDeRATED Living Labs, which along with the FEDeRATED Leading
Principles will be utilized for the planning of the eFTI4EU project and its pilots as of 2023. Thus most of
the work done in the project can be used as foundation and building blocks for eFTI implementation and
eFTI4EU project. more info: http://www.federatedplatforms.eu/
FENIX
While FEDeRATED Activity focused on more fundamental data sharing issues, the FENIX project
focused on way more scalable piloting of platform federations. Fenix was also initiated by the work and
recommendations of the European Commission’s Digital Transport and Logistic Forum (DTLF) to create
a viable and valid federative network of platforms as enabler for Business to Administration (B2A) and
Business to Business (B2B) data exchange and sharing by transport and logistics operators.
The FENIX objectives were to:
• overcome fragmentation and lack of connectivity around ICT-based systems for logistics
decision making
• interconnect the different digital platforms and harmonize the services they offer
• ensure interoperability and common protocols for supporting data sharing services
• facilitate horizontal collaboration within the Logistics Solution Companies and act as a
technology neutral open-solution
• enable data sharing in the form of digital corridor information systems serving the European
logistics community
A key result of the FENIX project at its closing in 2022 was the well tested FENIX connector, which
provides an interface for federation of platforms. These learnings will also be utilized in the eFTI4EU
project and its pilots as of 2023.
RISCOMEX and RISCOMEX II (Inland Navigation)
RIS COMEX is a CEF funded multi-Beneficiary project aiming at the definition, specification,
implementation, and sustainable operation of Corridor RIS Services following the results of the CoRISMa
study. RIS COMEX started in the course of 2016 and is operational since June 2023. The project area
covered altogether 13 different European countries.
The EuRIS and the CEERIS portals are the main deliverables of the RISCOMEX CEF project.
EuRIS provides skippers an access to all information required by skippers, vessel owners or logistic
operators on the main European waterways. Barge operators can register their vessels and follow their
13
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
route, receive a message when one of your vessels passes a certain point on the network. As the owner
of the information, the barge operator is always in charge of who is allowed to see which information.
The EuRIS and CEERIS information platforms will be extended during the CEF RISCOMEX II follow-up
project to provide an integration of the movement of the vessel with the movement of the cargo. As such
RISCOMEX II will provide the information that is necessary for the implementation of the EU 2020/1056
eFTI regulation.
The participation of INE (Inland Navigation Europe) as an observer of the eFTI4EU project will ensure a
periodic alignment role between MS implementing their national eFTI roadmap and the eFTI roadmap
for inland navigation at a corridor level.
Synergies with other funding and RRF
Some Member States may use RRF funds to support the overall eFTI implementation.
#§COM-PLE-CP§#
1.7 Dual-use potential (civilian-defence)
Dual-use potential (civilian-defence) (for Military mobility topics)
Describe the potential of dual-use (civilian-defence).
Not applicable
#§PRJ-OBJ-PO§# #§REL-EVA-RE§# #@MAT-URI-MU@#
2. MATURITY
2.1 Readiness and technical maturity
Readiness and technical maturity
Provide information about the readiness and technical maturity of the project.
For every work package, describe the precise state of preparation (e.g. terms of reference ready, tendered, contract
signed, started, etc. If any activities of the project have already started, indicate more precisely their current status of
implementation.
Describe how the implementation of the project (and, if applicable, of the global project it is part of) depends on the
results of past or on-going feasibility or technical studies. For projects with high technological value (such as
infrastructure crossing natural barriers, intelligent traffic management systems, cooperative ITS, or airspace initiatives),
provide additional information on the foreseen technology, type of communication, and materials.
Explain if there are any further dependencies that are critical to the start and completion of the project such as
connection to grid or other utilities, access to and use of land, etc. Indicate if such authorisations have been obtained
already or when they are planned for.
The eFTI regulation and the preparation work on EU level is still ongoing and during the 2023 most of the
regulative actions needs to be decided. However, at the same time the main conceptual framework for
eFTI is understood and the implementation deadline is getting closer. Thus, it must be stated that all eFTI
development actions and works need to follow an agile development cycle, where parallel EU regulation
work must be monitored continuously.
The project eFTI4EU is designed so that it will provide maximal support for member states and thus it
starts exactly where eFTI development is meant to be in summer 2023 - between the implementing and
delegated acts texts and the final interoperable implementation of the technical systems.
It is important to stress again that the foundation of the project will be based on the eFTI Regulation and
the related IAs and Das that will serve as starting points for all the project activities.
Namely in 2023 the first DA (on data model) and IA (on the technical specification of the eFTI gate) will
be released. Ongoing works are in execution with all the 27 MSs that are regularly aligned on the
progresses. This will assure a robust readiness and maturity level although there are still some open
questions regarding the technical solutions for interoperability, data exchange, identification-
authentication-authorization for example. However, the aim of the project is to produce reference
14
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
architecture, which will tackle all of these issues also and provide that for the MS, so that they can utilize
it effectively in their national implementations.
The composition of the consortium support the readiness of the proposal and the technical robustness
of the team.
9 Member States as full beneficiary
Estonia
• MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM (ministry in charge)
• Digilogistika Keskus (supporting consultant and IT specialist)
Germany
• BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR (ministry in charge)
• Bundesamt Logistik und Mobilität (supporting Agency)
Finland
• LIIKENNE JA VIESTINTAVIRASTO (supporting Agency acting on behalf of the ministry in
charge)
Austria
• BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE, MOBILIÄT,
INNOVATION und TECHNOLOGIE (ministry in charge)
• Schieneninfrastruktur-Dienstleistungsgesellschaft MBH (supporting Agency)
Italy
• MINISTERO DELLE INFRASTRUTTURE E DEI TRASPORTI (ministry in charge)
• RAM (supporting Agency)
• Circle (supporting eFTI consultant and IT specialist for pilot implementation)
France
• MINISTERE DE LA TRANSITION ECOLOGIQUE (ministry in charge)
• IN Continue et Services (supporting consultant and IT specialist for pilot implementation)
Portugal
• INSTITUTO DA MOBILIDADE E DOS TRANSPORTES, I P (supporting Agency acting on behalf
of the ministry in charge)
Lithuania
• LIETUVOS RESPUBLIKOS SUSISIEKIMO MINISTERIJA (ministry in charge)
• Transporti Innovation Association (supporting consultant)
• Normalis Tech (supporting consultant and IT specialist for pilot implementation)
• Klaipeda Port (supporting for pilot implementation for the connection between the port and the
hinterland; the pilot won’t be dealing with the maritime side that is covered by the EMSWe
Regulation)
Belgium
• SERVICE PUBLIC DE WALLONIE (ministry in charge)
• Logistics in Wallonia (supporting non-profit community)
4 top level eFTI consulting companies
• PortExpertise and 51Biz Luxembourg, heavily involved in supporting the EC in the eFTI
implementation through the Digital Transport and Logistics Forum (DTLF). Digilogistika Keskus
consolidating both the expertise on DTLF consultations and team co-leading and on analysis
and suggestions on eFTI Platforms and eFTI Gates requirements.
Circle has been supporting the EC in the eFTI implementation of eFTI trough specific contracts,
the latest ongoing contract with Circle and Digilogistika Keskus together supporting the DG
15
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
MOVE will l guarantee the alignment of the eFTI4EU development with the delivery of the
Delegated and Implementing Acts
1 Intergovernmental initiative
• The Secretariat of the Northern Dimension Partnership for Transportation and Logistics (NDPTL
www.ndptl.org), represented by the Nordic Investment Bank, is an intergovernmental initiative
established by the Ministries of Transport of the participating countries and the EU in October
2009 by the Memorandum of Understanding setting out the modalities of establishing the
Northern Dimension Partnership on Transport and Logistics - The currently active members of
the NDPTL are Estonia, Finland, Germany, Latvia, Lithuania, Norway, Denmark, Poland,
Sweden and the European Union. Geographically the Northern Dimension focuses on Northern
Europe, including Baltic, Northern Atlantic, Arctic and Sub-Arctic areas. The overall goal of the
partnership is to improve, in compliance with the ecological needs of the region, transport
connections and logistics in the Northern Dimension region. Digitalization of transportation is,
together with decarbonization, a currently highlighted NDPTL strategic priority topic. The
Secretariat of the Northern Dimension Partnership for Transportation and Logistics (NDPTL),
hosted by the Nordic Investment Bank (NIB). NDPTL has allocated its work for the first two years
of the project because its agreed work program is set for 2020-2024.
The consortium is complemented by other experienced top consultants subcontracted by Members
States such as AlbrechtConsult in Germany (Expert for data exchange, developer of the Dangerous
Goods system architecture of the UNECE and DTLF Subgroup 1 Team 3 co-lead) and by Member States
participating as observers with whom a regular interaction will be established during the project.
The composition of the consortium also shows that the eFTI4EU project connects leading eFTI MSs and
experts together, which gives an extremely good starting point for the project. Most of the project
participants have actively participated in the project preparations and eFTI development. Some actors
have taken more concrete and pioneering roles and some have been active followers. Aim is to utilize this
same division between actors during the project and hence improve the general readiness and maturity
level of MSs on eFTI implementation.
WP1 – Will be built on know-how of the eFTI Expert team, that prepared this proposal, that will form the
Project Coordination Committee; the relevant work undertaken by the PCC in eFTI matters will be
reflected towards the MS requirements while creating the eFTI roadmaps, reference implementation
architecture and the subsequent governance model.
The PCC members are:
• Peter Bresseleers, PortExpertise
• Alexio Picco, Circle
• Marco Gorini, Circle
• Ulrika Hurt, Digilogistika Keskus
• Heiti Mering, Digilogistika Keskus
• Matti Lankinen, Vediafi
• Lasse Nykänen, Vediafi
• Rudy Hemeleers, 51Biz Luxembourg
• Christian Lüpges, AlbrechtConsult
WP2 – Is based on the PCC team piloting experience derived e.g. from the FENIX and FEDeRATED
projects, where pre-eFTI piloting is already being made. MSs will enrich this piloting with valuable real
system cross-border implementation experience e.g. for Dangerous Goods in Germany and France (see
political statements below) or eCMR pilots in the Nordic-Baltic region. This will be complemented through
inclusion of counter parting eFTI test platforms, which will be available as a result of MS initiated projects
e.g. in Estonia and Germany.
WP3 – Circle has a relevant experience in Communication and Dissemination activities in a vast range of
projects across Europe (DocksTheFuture, Pioneers, 5G Loginnov, Moses, E-Bridge, Seanergy, Renew).
This assures a very mature knowledge base and a quite large stakeholders database (nearly 3.500
profiled and GDPR compliant addresses in their own mailing lists).
WP4 – The Coordinator (Estonia) will be supported by PortExpertise and specifically by Peter Bresseleers
that is an experienced project manager of the eFTI4EU-project. In addition to Peter´s own experience
e.g. in the FENIX project the PortExpertise has more than 20 years of experience in maritime/port issues.
PortExpertise has international focus on financing, legal matters, market research/audits, insurance and
claims, ICT, customs, training, and market communication. It has made research assignments and project
management for more than 300 port and terminal projects worldwide with agents in Europe, Middle-East
and Asia. It has also been active in Worldbank and EU projects worldwide, as external advisor to EU
logistics and - digitalisation projects, and assisting the big five consultancy firms in port related projects.
16
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Together with the coordinator, and the PCC, he will have full control of the project and its reporting to
CINEA.
The eFTI4EU Activities are technically mature, the beneficiaries integrate a consortium ready to develop
entirely these activities, the necessary budget has been agreed and self-financing has been secured.
Complementary considerations about readiness / technical maturity which reinforce the maturity of the
Project are provided below.
eFTI4EU is not an isolated project, but it is built on the results of different projects and regulatory activities
conducted at national and international level.
In technical terms, as already anticipated, the work of DTLF and the outcomes of the FENIX and
FEDERATED project are the foundation of the eFTI4EU.
A list of previous projects is provided as annex.
eFTI4EU goes several steps further on the way initiated by these projects in order to effectively deploy
reference implementations and potential solutions with high positive impact on the multimodal transport
sector. In fact, the lessons learned from those projects allowed the identification of the proposed
technological solutions as the most suitable options to be implemented in a short period of time and with
a high degree of impact on increasing door-to-door TEN-T efficiency and competitiveness and raising
perceived quality by TEN-T operators.
The pilots in eFTI4EU constitute market sided innovation and will bridge the gap between the existing
state of the art and the eFTI implementation, validating the technologies in real scenarios in real TEN-T
sections. These technologies that have already been thoroughly researched but never tested in real eFTI
solution will be analysed and piloted, with the objective of testing them and providing results by beginning
2024. The partners involved in the piloting activities agree that this deadline already incorporates a 15%
extra margin of time just in case minor unforeseen tasks arise during the piloting activities. The
commitment of the partners to the project and to the dates fixed in these activities is total and they agree
that the time plan has been designed following conservative criteria.
Ex ante evaluations and feasibility studies
Provide information on ex-ante evaluations and feasibility studies (if any) and summarise the main results (and attach
them as annexes).
In particular, describe the objectives, activities and policy options considered. Describe the main indicators used in
the ex-ante evaluation and make reference to the appropriate statistical base. Outline the strategic and technical
alternative options considered in the option analysis. Summarise the multi-criteria analysis or any other method used
to shortlist the alternatives and what have been the arguments used to exclude cheaper but still relevant solutions.
Summarise the shortlisted options or any other method used that led to the final selection.
If the ex-ante evaluation was carried out on a global project going beyond the scope of the project, give an overview
and explain how it is linked to the project.
Clarify if TEN-T/CEF or other EU programmes have provided financial support for the ex-ante evaluations.
eFTI4EU is a study conducted through pilots that will be assessed prior to their future implementation
after the project has been completed. As such, it does not need to provide a full ex-ante evaluation as
the validation of the feasibility of those solutions is one of the tasks to be carried out in the Project.
However, since the start of Digital Transport and Logistics Forum (2015) a substantial list of studies lead
to the current regulation on eFTI platforms. We mention a few of them:
● The Digital Transport and Logistics Forum Second Mandate (DTLF II) Subgroup 2: corridor
information systems Interim report: defines the challenges as having a too high Total Cost of
Ownership due to the wide range of different interfaces deployed in B2B and B2G/G2B data
sharing interfaces; this current approach lacks inclusiveness, as SMEs have insufficient
knowledge and financial means to invest in current methods of data sharing; the lack of
harmonized interfaces leads to a variety of platform solutions focused on particular markets. In
short, the current data sharing solutions hinder the creation of an open and neutral data space.
● Digitalisation of transport data is considered a digital Pillar of the Sustainable and Smart Mobility
Strategy, as per Principal Adviser for Digitalisation – Smart Mobility, European Commission
address to the DTLF Plenary meeting of December 2021, stating that ‘ The main objective of
the Strategy and its digital pillar is to create an irreversible shift to zero-emission mobility while
making the EU’s transport more efficient and resilient, which corresponds to the three pillars of
the Strategy (Sustainability, Smart Mobility, Resilience of the Transport System). The Strategy
is translated into 82 policy actions, structured around 10 flagship areas relevant flagships for
17
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
the DTLF are “Making connected and automated multimodal mobility a reality” and “Innovation,
data, and artificial intelligence for smarter mobility”
● European Data Strategy - Mobility Data Space and Digital Europe Programme-, is to ‘create the
right conditions for people, companies and authorities to share data in a secure, trust creating
manner’. This is to be done by 4 key instruments, the Data Act (2022) - ensuring fairness in the
allocation of data value among the actors of data economy; Implementing Act High Value Data
Sets (2021) (unleashing the socio-economic potential of data as a public good; Digital Market
Act (2021) - regulating market power based on data, and Data Governance Act (2020) -
ensuring trust in transactions.
● The European data strategy of February 2020 announced the creation of data spaces in 10
strategic fields among which logistics. To this point the creation of eFTI platforms and national
nodes is indispensable.
● DG MOVE’s ‘State of play and barriers to the use of electronic transport documents for freight
transport: options for EU level policy interventions5 addressed the Member States in a detailed
study on ‘the high use of paper documentation in freight transport’, causing a high administrative
burden for public and private sector, blocking the full benefit of digital solutions and the
elimination of paper copies of carriage contracts, consignment notes, CMR, lading way bill,
Dangerous goods formalities, … .the survey also identifies problems in national authorities
having nearly 30 times different requirements, transport is often cross-border and only a small
number of cross border initiatives exist in digitalisation, .. Furthermore there are numerous legal
and regulatory barriers ( lack of appropriate legislative frameworks in the EU MS on acceptance
by authorities of electronic Freight Transport Documents (e-fTD), a too large diversification of
national regulations on data, acceptance, and use of e-fTD; procedural and organisational
barriers ( the fact that authorities still demand paper copies; The suggested policy measures
that resulted from the survey are a) acceptance by MS b)Interoperability of solutions/systems
(i.e. automatic reuse of data) in business-to administration communication
● a 2017 study by SAMSKIP revealed that Samskip a pPotential cost saving for the supply chain
partners of at least EUR 3.2 million per year when - only - digitising the CMR (assuming 350.000
shipments in total @ lowest average of 9.26 euro per shipment)
● the World Economic Forum6 estimates the benefits of a Reduced administrative cost of
compliance to $ 12 billion per year, in the air sector alone : Stakeholders would be able to handle
all administrative tasks online instead of filling in paper documents. For example in the air sector,
the World Economic Forum (WEF) estimates benefits of moving from paper to electronic
documents up to $12 billion per year. In addition, transport players could introduce their
information only once, and the data could then be made automatically available to all
stakeholders that they choose. Furthermore, controls as well as tolling of trucks thanks a remote
access to trucks on-board systems while these are moving could reduce unnecessary stop
times.
● Currently, only 1%-3% of all cross-border shipments carry electronic freight information
documents on average, ranging from 0-1% in road and inland waterways, 5% in rail, up to 40%
in air transport. There are substantial inefficiencies in the handling of paper-based freight
documents: incorrect completed documentation, human mistakes, poor writing and loss of
documents result in poor data quality. This, in turn, leads to losses in terms of efficiency,
simplification, transparency and competitiveness. Nominally, the industry spends yearly
approximately 387 million hours on processing paper-based documents with an estimated cost
of about EUR 7 890 million.7
● Further on we identify the alignment of this project with EU policy and ambitions for digitalisation
of transport and logistics:
○ the European Interoperability Framework (EIF), promoted and maintained by the ISA²
programme, aims at developing, maintaining and promoting interoperable systems that
can act as enablers of smooth electronic data sharing.
○ A decade ago, the White Paper on Transport (COM/2011/0144)[1] acknowledged the
need to improve the use of digital technologies in the freight transport sector.
○ The European Strategy for Low-Emission Mobility (COM/2016/501)
5
https://op.europa.eu/en/publication-detail/-/publication/b187493e-0349-11e9-adde-01aa75ed71a1
6
http://reports.weforum.org/global-enabling-trade-2013/iata/
7
European Commission. (2018). State of play and barriers to the use of electronic transport documents for freight transport
Options for EU level policy interventions : final report - Study, pp. 41, 47. and European Commission. (2018). State of play
and barriers to the use of electronic transport documents for freight transport Options for EU level policy interventions : final
report - Study, pp. 41, 47.
18
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
○ the Digital Single Market Policy (COM/2015/192)[1] has introduced a detailed
digitisation action plan, including the ICT Standardisation Priorities for the Digital
Single Market
○ the EU intends to develop several common European data spaces, which will allow a
single market for data, as stipulated in the European Strategy for Data
○ Smart and Sustainable Transport Strategy
○ the European Green Deal (EGD): in which digitalisation of the transport and freight
sector is key for the successful implementation of the EGD. Among others,
transportation networks should become completely digital in order to benefit from the
Green Deal. Moreover, electronic data should flow across supply chains seamlessly,
which includes data-sharing between public administrations and businesses, and
between firms themselves
This project also addresses the objectives of EU legislative framework for digitalisation of
transport and logistics:
● 2017, the Commission introduced two mobility packages and the subsequent EU
Member State ministers signed policy statement reiterating the need to invest in
accelerating digital transformation of the public sector through the Tallinn Ministerial
Resolution on e-Government
● Third Mobility Package is the Electronic Freight Transport Information (eFTI)
Regulation
● INSPIRE Directive (2007/2/EC)[1] aiming to create a European-wide ‘Infrastructure for
Spatial Information’. It outlines 34 spatial data themes to be made available by public
sector organisations for environmental utilisation, of which transport networks is
defined as one of these themes.
● In addition, the intelligent Transport Systems (ITS) Directive (2010/40/EU)[2] aims at
facilitating the deployment of innovative transport solutions by creating favourable
conditions through the adoption of technological, functional and organisational
specifications
Ex-ante preliminary identified benefits
The benefits of the eFTI Regulation are to be important to both economic operators and competent
authorities. If one accounts for the time-savings, the industry would save up to 75-102 million hours saved
yearly, which is the equivalent of EUR 20-27 billion over a period of 22 years (2018-2040). Specifically,
the majority of the administrative cost savings would take place in the road transport sector (60%) – an
industry composed of 99 percent SMEs, who will be directly impacted.[1] The eFTI Regulation will also
have beneficial consequences in terms of sustainability, in addition to economic benefits. The sum of
CO² emissions reductions are estimated to amount to a cumulative external cost saving of EUR 74
million. In addition, less congestion and waiting times are estimated so save almost EUR 300 million. On
the other hand, the eFTI Regulation will ensure the availability of standardised, high quality data for
monitoring and statistical purposes. This, in turn, will lead to more efficient and consistent enforcement
of EU freight transport regulations and enable risk-based controls by competent authorities.[3]
Overall, the eFTI Regulation represents a significant step towards strengthening the goals of efficiency
of the logistics chain, administrative simplification, and competitiveness of the sector.8
8
European Commission. (2018). Impact Assessment Accompanying the Document Proposal for a Regulation of the
European Parliament and of the Council on Electronic Freight Transport Information, pp. 42-50.
European Commission. (2018). Impact Assessment Accompanying the Document Proposal for a Regulation of the
European Parliament and of the Council on Electronic Freight Transport Information, p. 52.
European Commission. (2018). Impact Assessment Accompanying the Document Proposal for a Regulation of the
European Parliament and of the Council on Electronic Freight Transport Information, p. 49.
19
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Political commitment
Provide information on the political commitments regarding the implementation of the project and, if relevant, on the
global project, including cross-border commitments where relevant.
List and briefly describe the (formal and informal) documents demonstrating these commitments (decisions of national
and regional authorities, memoranda of understanding, written agreements, national transport master plans or in
sectorial strategies, etc).
At EU level, the DTLF and the European Commission emphasise the relevance of corridor information
system aspects in a future pan-European architecture together with the advanced interoperable transport
and logistics solutions.
Nationally, the project is a direct extension of existing political commitment in all the MSs towards
furthering digitalisation in the fields of transport and logistics. The activities are formulated to ensure
existing initiatives can be further upheld and developed, specifically in relation to the already mentioned
Resilience and Recovery Fund in different MSs.
The political commitment is clearly shown by the nine (9) ministries and agencies directly participating in
the proposal or through their own agencies plus three (3) participating as observers.All the committed
MSs have secured their own budget for the eFTI4EU implementation and are ready to co-fund this
project. Moreover, many MSs are already cooperating between them in order to execute specific
agreement that are indirectly supporting the eFTI implementation.
In the following paragraphs two examples are presented.
Guidelines for the use of RID/ADR/ADN 5.4.0.2 (use of electronic data exchange) - The regulations on
the carriage of dangerous goods require a transport document to be provided with standardised
information on the goods being carried. Up to now, this has usually been done in paper form. The
provisions of ADR (Agreement concerning the International Carriage of Dangerous Goods by Road), RID
(Regulations concerning the International Carriage of Dangerous Goods by Rail) and ADN (European
Agreement concerning the International Carriage of Dangerous Goods by Inland Waterways) only permit
the electronic exchange of data if the procedures used meet the legal requirements with regard to
evidential value and availability during carriage at least equivalent to the procedures with written
documents.The competent international dangerous goods body, the UNECE RID/ADR/ADN Joint
Meeting, has developed a guideline for this purpose which describes the necessary elements of data
communication in order to achieve the required equivalence.
On 30 March 2021, as the first country of the UNECE contracting parties, Germany notified the
Guidelines had been legally adopted and designated a TP1 entity (similar to an eFTI Gate) in accordance
with Appendix A of the guidelines. The notification is available in the Verkehrsblatt in 2021 and thus made
it applicable in Germany. France planned the notification after successful field tests of proper authority
applications at the end of 2022 or the beginning of 2023.
The electronic dangerous goods transport document as part of eFTI not only serves to make things easier
for transport companies, but also in particular to increase the safety of dangerous goods transport. In the
event of accidents, data communication makes it possible for authorities and emergency services to
reliably obtain information that is important for emergency measures without endangering themselves.
Further increases in efficiency can also be expected in the further processing of the data by the
authorities. Therefore, eFTI plans to incorporate these benefits and the processes required to apply them
to the transport of dangerous goods. This in turn will be properly implemented by eFTI4EU.
Memorandum of Understanding between the Finnish and Estonian ministries - On 15 November 2022,
Finland's Minister of Transport and Communications Timo Harakka and Estonia's Minister of
Entrepreneurship and Information Technology Kristjan Järvan signed a Memorandum of Understanding
between the Finnish and Estonian ministries on advancing the digital transformation in the field of
logistics.
The Memorandum of Understanding enables cooperation and exchange of information between the
ministries in logistics digitalisation. This agreement between the two countries will facilitate cross-border
transport and promote the digitalisation of transport and logistics, which directly contributes to the efficient
functioning of logistics helping with green transition and sustainability. Cooperation between Finland and
Estonia plays an important role in promoting the digitalisation of logistics. In Finland, cross-border
cooperation is included in the government resolution on the digitalisation of logistics, published in 2021.
Cooperation is expected to increase efficiency in international transport, create new business
opportunities and promote the achievement of emission reduction targets. Both countries are also
currently preparing for the Connecting Europe Facility (CEF)-eFTI call for proposals in line with the MoU
targets.
20
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Public consultations
Describe the public consultations carried out and the feedback received (or consultations foreseen and their timing).
Provide information on the plans to involve stakeholders during the implementation.
With regards to the preparation of the Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT
AND OF THE COUNCIL on electronic freight transport information the Commission actively engaged
with stakeholders and conducted comprehensive consultations throughout the impact assessment
process. The consultation activities included: an open public consultation (OPC) organised by the
Commission, running from 25 October 2017 to 18 January 2018; an SME panel survey organised by the
Commission, running from 24 November 2017 to 22 January 2018; a legal survey of private and public
stakeholders organised by the consultant responsible for the impact assessment support study, running
from 23 October 2017 to 1 January 2018; a targeted survey of private and public stakeholders organised
by the consultant responsible for the impact assessment support study, running from 27 October 2017
to 7 January 2018; 50 interviews with stakeholders, including industry representatives and national
authorities, conducted by the consultant responsible for the impact assessment support study and its
partners between 20 October 2017 and 15 January 2018; stakeholder meetings and workshops at
several different events; five case studies examined by the consultant responsible for the impact
assessment support study between 6 November 2017 and 15 January 2018.
The result was that a large majority of the stakeholder consulted — i.e. more than 90 % of the 265 SME
respondents to the SME panel survey, and 88 of the 100 respondents to the OPC survey, indicated
significant or at least some expected benefits from adopting electronic information exchange. Moreover,
90 % of the private companies and associations responding to the OPC indicated the non-acceptance
of electronic transport documents/information by Member State authorities as a significant driver of the
problem. For the smaller companies, the SME panel survey found that the main reason for not using
electronic transport documents was that their clients and business partners do not use transport
documents in an electronic format. The next most widely cited reason for this group (following closely
behind) was non-acceptance by the authorities.
More importantly, around 90 % of the respondents of the OPC considered ensuring acceptance by
Member State authorities, while 88% found a legally binding approach to ensuring such acceptance
more effective than a non-binding one. 90% of all OPC respondents also indicated as important the
interoperability of B2A and B2B communications. Similarly, 75% of the SME panel respondents
indicated ensuring acceptance by authorities as a very important policy objectives, and another 13% as
moderately important.
More than 70 % of both the OPC and SME panel respondents would also welcome standardised
technical specifications for sharing data between logistics operators and the public administration, with
88 % of OPC respondents considering a legally binding approach more effective.
As part of the service contract MOVE/2020/OP/0015 ‘Support for development of implementations
specifications for the EU Regulation 2020/1056 on electronic freight transport information (eFTI)’, project
partner Circle performed detailed discussions with EU Member States representatives by means of
surveys and virtual workshops in order to identify the possible technical scenarios which resulted in a
report called ‘Draft sets of alternative architectural options & comparative assessment’. The document
aims at describing several architectural options for the eFTI exchange environment. The document is
built on the top of the eFTI regulation and of the Architecture principles for the eFTI reference
architecture.
The project preparation and the application coordination team has interviewed several actors around EU
from public and private sectors and at the same time the team has participated actively in DTLF work.
All these discussions and knowledge has been used for preparation works and the team has tried to
gather together the most relevant challenges and open questions that have been pointed out from the
stakeholders. Target is that the eFTI4EU project will tackle these issues and provide profound and useful
information and practices for EU MS so that they are well prepared to implement their operative eFTI
systems.
eFTI4EU will involve as stakeholders several authorities, port and inland terminals, railway undertakings,
railway infrastructure managers, road transport companies and IT experts that are not direct beneficiaries
of this Project. As many stakeholders interested in this Project as possible will be involved in this group
that will have access to the results of the activities, will be able to provide technical input and give
information for the impact assessment and cost-benefit analyses on the benefits that launching for real
the sFTI4EU initiatives would have on the European digital transport and logistics sector.
21
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
2.2 Status of contracting procedures and authorisations, approvals and permits
Authorisations, approvals and permits
Indicate the general project maturity in terms of authorisations, approvals and permits needed.
Not applicable being eFTI4EU a study.
Authorisations, approvals and permits (including environmental)
For each work package/task, list the authorisations or approvals needed (at governmental, regional, local level,
including environmental approvals, right-of-way, state aid notification/decision, etc.) and their status and expected
timeline.
Risk factors and mitigating measures (alternative solutions) if the authorisations are not obtained in time should be
described in section 3.4.
Date of award
Task Type and Description Status
No
Building permits
For each work package/task, provide information on the building permits which must be obtained.
Describe what the permit is for, the authority concerned, the size (land surface) and the kind of works concerned.
Indicate their status timeline.
Risk factors and mitigating measures (alternative solutions) if the permits are not obtained in time should be described
in section 3.4.
Date of award
Task Type and Description Status
No
Contracting procedures
Procurement in general
Indicate the project maturity in terms of procurements needed.
In order to carry out the eFTI4EU project, both public and private beneficiaries will require external
procurement of services and/or materials for their solutions. The partners of EFTI4EU will carefully respect
legal procurement procedures. All beneficiaries will abide by the rules on procurement contained in the
respective Union and specific country legislation on public procurement. Relevant public procurement
procedures will be applied to contracts signed during the reporting period of the Project by public partners.
In any case, the best value for money criteria will be followed.
Contracts awarded before submission of the proposal
For each work package/task, explain the contracts already awarded, their typology and status. For public procurers,
please specify which procurement method has been selected (e.g. EU-wide or national; open, restricted or negotiated,
etc). For private companies, please specify best value for money. Where applicable, indicate the starting dates of the
awarded contracts.
22
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Please note that we do not check or validate the procurement method you chose. The procurement must be in
compliance with the provisions set out in the Grant Agreement and compliance may be checked later on (in checks,
reviews, audits or investigations).
The German Ministry of Transport has already awarded a 400.000 € contract to AlbrechtConsult. The
following text describes the content of this contract.
The Regulation 2020/1056 on electronic freight transport information obliges the control authorities to
accept freight information electronically in the event of a control. For this purpose, information on the
implementation situation in the authorities concerned must be collected and processed, and the costs of
setting up and operating the system must be estimated. In addition, all implementation-relevant working
documents discussed within the Digital Transport and Logistics Forum driven by the EU Commission, e.g.
on technical specifications for the development of the platforms, are to be analysed and evaluated. For
the regulation, Delegated (DA) and Implementing Acts (IA) being developed, which are also to be
analysed and evaluated. The first DA on data (others will follow) is to enter into force as early as February
2023. In addition, working group meetings and communication tasks are to be carried out. Therefore, a
public procurement has been started already in 2022.
In summary the contract comprises for Germany, the collection and evaluation of information, participation
in EU IT-technical working groups, analysis and evaluation of EU working papers and proposals with
regard to German implementation conditions, impact assessments, preparation of the situation in
Germany with regard to the state of preparation of the authorities, estimation of the costs for the BMDV
and the German authorities.
Contracts planned during implementation
For each work package/task, explain the contracts planned, their typologies and status. For public procurers, please
specify which procurement method will be selected (open, restricted, negotiated, EU wide or national). For private
companies, please specify how you will ensure best value for money. Where applicable, please indicate the start dates
of the awarded contracts.
Please note that we do not check or validate the procurement method you chose. The procurement must be in
compliance with the provisions set out in the Grant Agreement and compliance may be checked later on (in checks,
reviews, audits or investigations).
The partners that require relevant external contracts in the Project have already asked for preliminary
budgets from different suppliers in order to estimate the costs executing their activities and be able to
produce an adjusted budget. If the Project is selected for EU co-funding, all beneficiaries will abide by the
rules on public procurement contained in their respective country and Union legislation.
Any outsourcing will be awarded in accordance with the applicable rules on public tendering of their
respective countries and in conformity with European Union Directives on public tendering procedures.
eFTI4EU partners will invite competitive tenders from potential subcontractors and award the contract to
the bid offering the best value for money; in doing so, they will observe the principles of transparency and
equal treatment and will take care to avoid any conflicts of interest. Contracts may be awarded only on
the following basis:
• Recourse to the award of contracts must be justified having regard to the nature of the Project
and what is necessary for its implementation.
• The Beneficiary will undertake to make the necessary arrangements to ensure that the
contractor(s) waive(s) all rights in respect of the Commission.
The Beneficiary will undertake to ensure that the conditions applicable to them concerning conflict of
interests, ownership/use of the results, confidentiality, publicity, evaluation, suspension, assignment,
checks and audits are also applicable to the contractor(s).
The main costs that will be outsourced are:
• Specific IT and logistic expertise for the definition of the technical and functional specifications
of the solutions, for the implementations of the pilots and for the evaluation of the results
• Software development works for some beneficiaries
• Some countries (e.g. Italy) will reserve a portion of the pilot budget to publicly select and engage
a set of economic operators / eFTI potential service providers to test the eFTI gate
Travel and subsistence costs have been budgeted considering a limited amount of physical consortium
meetings,
Costs of auditing and administrative support(s) have been also budgeted.
23
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
2.3 Financial maturity
Financial maturity
Describe the availability of funds for the project over its lifecycle (budget in balance; use of funds vs sources of funds)
demonstrating that the sources of funds cover the project costs. Distinguish between the applicant’s own resources,
third party resources, grants and other forms of funding of the project and list for each source the fund providers,
recipients and use of funds. Provide a diagram of entities participating in the financing structure, either as a receiving
party or as provider of funding or financing, or of other support (e.g. guarantee).
Provide details on revenues and other sources of financing needed to complement the CEF support and the degree
of confidence in those financial commitments.
For own resources, indicate whether these are already approved internally and put aside for the project, or what
conditions need to be lifted to reach approval. Explain the degree of confidence (and why) that these conditions will
be lifted. Give details on the planning/timing for the final investment decision.
For resources contributed by third parties, describe the amounts expected, their nature (external equity, debt or other
grants). Indicate when approval is expected and explain the degree of confidence (and why) of getting such approval.
Indicate if the approval necessitates a due-diligence process and, if yes, describe its scope.
For debt instruments, explain if you (or your partners or associated companies) provide guarantees of repayment,
irrespective of the financial performance of the project. Explain the debt structure (layers and their respective seniority)
as necessary.
Explain what the alternatives are, if a specific source of financing turns out to be not available.
83.63 % of the projects budget (eligible costs) is secured by the participating Member States, or
their appointed public agencies. These budgets are secured in their respective national budget for the
next three years. The remaining 16.37 % is allocated by private partners annual investment budgets.
In terms of funding, all partners have allocated budgets up to 50% of total costs. 50% of the project
budget is expected to be covered with CEF funding which was approved internally and put aside for the
project.
The co-financing is secured as the commitment of the partners to the Project is total.
All MSs allocated national budgets to cover the full eFTI implementation and the eFTI4EU project is part
of the overall implementation.
#§MAT-URI-MU§# #@QUA-LIT-QL@# #@FIN-MGT-FM@#
3. QUALITY
3.1 Cost effectiveness and financial management
Cost effectiveness (n/a for prefixed Lump Sum Grants)
For each work package of the project, explain and justify the level of resources needed for implementing the proposed
tasks. These may relate to human resources, financial resources, buying equipment, etc.
Note: It is important to demonstrate the appropriateness of the estimated costs (in terms of both type and level of
costs) needed for the implementation of the proposed tasks.
The overall costs for each WP have been calculated considering the estimated eligible costs for the
different main categories:
- Personnel costs (based on actual personnel costs practice): 10.210.248 EUR
- Subcontracting (based on market values): 16.897.414 EUR
- Purchase costs (travel and subsistence, equipment and other goods, works and services) in
total: 1.244.963 EUR
- The share of the budget between the Work Packages over the years can be seen below (details
in Annex I to Part B – Detailed Budget)
Summary per work package Reporti
ng
Reporting FP Reporting FP Reporting FP Reporting FP period_ FP Sum of Total Sum of EU
Row Labels period_1 RP_1 period_2 RP_2 period_3 RP_3 period_4 RP_4 5 RP_5 costs contribution
WP 1 Horizontal Alignment 865.376 16% 2.012.035 38% 1.958.709 37% 445.184 8% - 0% 5.281.304 2.640.652
WP 2 National and Corridor Pilots 2.074.089 13% 6.353.044 39% 6.229.748 38% 1.687.537 10% - 0% 16.344.418 8.172.209
WP 3 Communication, Dissemination & Capacity Building 264.393 15% 648.278 37% 663.522 38% 193.149 11% - 0% 1.769.342 884.671
WP 4 Project Management 541.932 18% 1.029.816 34% 1.069.641 35% 416.173 14% - 0% 3.057.561 1.528.781
Grand Total 3.745.790 14% 10.043.173 38% 9.921.620 38% 2.742.042 10% - 0% 26.452.625 13.226.313
24
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
The EU member states are obliged to implement Regulation 2020/1056 on electronic freight transport
information from 2024. The regulation obliges competent authorities to accept electronically information
in case of control. The member states are responding to this fact with varying degrees of commitment in
the project. Basically, they are all analysing their eFTI readiness and joining forces to actively create a
harmonised cross-border eFTI exchange environment based on the eFTI Regulation and related
delegated and implementing acts and to promote eFTI in their countries. This requires a similar
commitment in WP 1, 3 and 4. Some countries also want to go a step further and test the specifications
in (WP2). This ranges from small pilots that essentially look at single use cases to wide-ranging pilots
that come close to an operational eFTI system. All pilots are to realise cross-border exchange of eFTI
data sets. This leads to varying levels of commitment and financial investment.
Therefore, the following table explains the main differences in the budget for each Member State by using
3 different levels of engagement.
Level Description Member State
1 - Advanced MSs with a higher budget, providing a software development DE, FI, FR, EE
level close to full operational system, co-develop also an
open- source reference implementation, provide a higher
level of integration with existing national systems (e.g.,
eCMR, Dangerous Goods) and covering most of the eFTI use
cases (road, rail, aviation, inland waterways, combined
transport, cabotage waste and dangerous goods)
2 – Basic MSs with an intermediate budget to cover a smaller number IT, PT, AT, LT, BE
of eFTI use cases and the cross-border pilots
3 - Observer MSs acting as observer (no budget and no active participation IR, ES, NL, INE*
in the Project) will be engaged at least twice a year in specific
meetings dedicated to inform them on the progress of the
project and to ask for their feedback in order to guarantee a
more effective and harmonised eFTI implementation at EU
level + Inland Navigation Europe (INE) a platform of national
& regional waterway authorities and bodies promoting
waterways transport
PortExpertise.
PortExpertise: PortExpertise will support the coordinating MS (Estonia) and lead the overall project
coordination team from daily operational aspect of the project. PortExpertise will facilitate the overall
project governance (with “political” alignment with the member states). In practice these concerns mainly
WP 4 Project Management, that consist of daily management, controlling, coordination of Coordination
Committee Support and Identification of the action required, and support and secretariat activities. All
reporting formalities of both the MS and the private partners
Circle
Circle: supporting Italy in the horizontal tasks, leading WP3 on communication / dissemination, and
working in WP 1 to guarantee the compliance with the eFTI IAs and DAs (being the leading consultant
for DG MOVE); Circle will also develop the national eFTI gate pilot.
51Biz Luxembourg
51Biz Luxembourg will adapt the FEDeRATED EU-Gate e-CMR/eFTI access point and OneAPP for
Authorities to the eFTI4EU reference architecture (WP1). During the first year, particular attention will be
also given to hands-on training sessions (WP3). 51Biz will participate in the setup and implementation
and quality assurance of cross-border pilot use cases. 51Biz will participate in the coordination with
external stakeholders in the domain of inland navigation (INE, RISCOMEX II project), the DTLF SG1
Data Model and eFTI architecture teams and DTLF SG2/FEDeRATED pilot implementations (WP3).
Digilogistika Keskus (Digital Logistcs Centre of Excellence)
Digilogistika Keskus and its experts and partners come into the project with a strong expertise on eCMR
and eFTI architecture and application, research and stakeholder engagement experience. The company
is both holding competence in how to set up an access point and consolidates delivering the analysis
reports and architecture proposals for the eFTI platforms and eFTI gates (National Access Points).
25
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
DLK has the respective international expertise via its projects, DIGINNO, DIGINNO-Proto and
DINNOCAP as well as NDPTL eCMR.
DLK also consolidates Estonian and regional experts who have been members of DTLF and its partner
Ulrika Hurt has long been the co-lead of DTLF eFTI Technical Requirements/Architecture team and
consolidator of the DLTF content work on eFTI Architecture, Building Blocks, Scenario and General
Business Process. Currently, DLK is in the consultation team for the European Commission on preparing
the regulatory proposal content on requirements for eFTI and for the German ministry BMDV on reflection
and requirements on eFTI.
DLK also leads and consolidates the experts who consult the Estonian Innovation and Entrepreneurship
Agency on consulting the eFTI platforms development as per national grants.
The Project Coordination Committee (PCC), (description in the project management structure
section) will be also adding additional eFTI consultants that are already or will be contracted by MSs
for specific national support alongside with the abovementioned teams (mainly from also DTLF-
experienced. AlbrechtConsult).
Financial management
Describe in detail the arrangements for the financial management of the project and the monitoring, internal and
external audit and evaluation processes, put in place to ensure the eligibility of the expenditure.
The overall eligible cost of the Project is a bit more than 28 million euro.
The main categories of costs will be personnel costs and subcontractors (rules of engagement already
described in the paragraph on procurement).
Outsourced external costs (services, equipment, travels) accounts for about 1,25 million euro.
The financial management of the eFTI4EU will be primarily the responsibility of the Project Coordinator,
who will put in place the following arrangements:
• appointment of an administrative and financial manager: All Project partners have extensive
experience in the management of TEN-T/CEF projects and also in the use of the EU CEF
/Horizon web portal. Each MS will allocate an administrative and financial contact point to align
with the project administrative and financial manager
• drafting, finalizing the Consortium Agreement, including covering i) consortium organization ii)
payments procedures: iii) participants admin in web-Portal; iv); dispute settlement rules; vii)
liability, indemnification and confidentiality arrangements. Signing of consortium will be
mandatory
• special workshops, and online tutorials/guides on projects administration procedures, eligibility
of costs, will be organized
• project accounting is used by participants allowing to track the specific costs of each project
activity/cost. This is done by using a sub-account for this project, where activity specific costs
are accumulated
• inserted in the document), reporting obligations (i.e. timesheets, justification of the best value
for money in subcontracting) and how to prepare the periodic reports.
• availability of financial reporting template, assistance and monitoring of project partners financial
reporting
#§FIN-MGT-FM§# #@CON-SOR-CS@#
3.2 Consortium set-up, governance and organisational structure
Consortium cooperation and division of roles and organisational structure
Describe the organisational structure set up to implement the project.
In particular, explain the distribution of roles and responsibilities between the different partners (Beneficiaries, Affiliated
Entities and Associated Partners, if any).
Describe the main contractual arrangements, the governance structure, the lines of communication and decision-
making processes. Describe if the governance bodies have already been established; if members have been
nominated and the status of approval of the governance rules. List any pending decisions on the organisational
structure.
If a special purpose company/vehicle (SPC/SPV) is envisaged, indicate whether a shareholder agreement has already
been prepared. If not yet, the case, indicate where you are with the finalisation of the agreement.
26
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
This section describes how the project will be managed, the distribution of roles and responsibilities, the
decision-making structures to be applied and the communication flows within the consortium. The
management procedures will be based on international recognised methodologies for project
management, already successfully proven in several EU TEN-T projects. The eFTI4EU consortium
involves experienced partners in the management of large projects. In addition, the proposed
management structure ensures effective collaboration among partners and activities for the duration of
the project.
The roles and responsibilities of the different partners and boards will be as follows.
The Project Coordinator (Estonian Ministry of Economics and Communications (MKM)) will ensure
effective and comprehensive project coordination and management. Tasks include administrative tasks,
contract management, financial monitoring, preparation and submission of deliverables, preparation of
periodic and final reports, organisation of project meetings and the management of any contingencies.
The responsibilities of the Coordinator will cover the technical management of the project in general and
chair the Project Board and General Assembly meetings, it will manage the administrative and financial
perspectives of the project and lead WP4.
The Project Coordinator will be supported by a Technical Manager (PortExpertise) and (as described
above) by an administrative and financial manager.
The Partners’ General Assembly is the body where all partners are represented. It is composed of one
duly authorised representative of each of the Parties. The Partners’ General Assembly will be led by the
Project Coordinator (supported by the Project Coordinating team) and it will decide on access rights
matters and results communication during the project duration. Meetings of the General Assembly will
help to communicate important decisions made by the Project Board to all partners.
The Project Coordination Committee (PCC) is composed by the specific beneficiaries DTLF and eFTI
consultancy related (PortExpertise, AlbrechtConsult, Digitlogistika Keskus, 51Biz Luxembourg, Circle
and some others that will be contracted by MSs.
As explained in the previous paragraph they will mainly act in the horizontal activities guaranteeing an
harmonised development of the eFTI gates and an adequate link with the eFTI Regulation and with
DTLF. It will be led by the Technical Manager (Peter Bresseleers) and will be the central technical
governing body of the Project (by weekly meetings). The Project Coordination Committee will be in
permanent contact with the partners and stakeholders participating in field operational tests in order to
ensure that the activities to be carried are performed in due time, with no significant delays. With regard
to the provision of the deliverables under the specific work packages, the PCC will technically support
the partners that committed already for a leading or co-leading role to ensure the technical correctness,
the alignment with DTLF and delivery in time. Additionally, after analysing the contributions received from
partners participating in each initiative, the Project Coordination Committee will give them feedback on
synergies that could be exploited and will ensure that cross-fertilisation from one field operational tests
and group of partners to another takes place.
The Project Board will be formed by the Project Coordination Committee plus Workpackage Leaders
and the MSs Leaders (appointed by each MS). The responsibilities of the Board (meeting monthly) will
be to guarantee the technical execution of the Project, ensuring that the work executed by each party
proceeds at all levels and particularly that the necessary technical links between partners are established
and maintained.
The Project Coordinating Committee acts also as a support body for the General Assembly and the
Project Board and carries out an important role in the communication of the Project and in the quality
control as it will carry out the first verification of all the information dossiers to be sent to the EC. The
Project Coordinating Team is also the body in charge of producing the first draft of the specific
deliverables requested by the EC and compiling the contributions from the Parties before submitting them
to the EC.
The key responsibilities of the project Work Packages and underlying tasks are shared between the
beneficiaries and/or their subcontractors in accordance with the Project WP structure. The WP 1. will be
led by Germany as MS. WP 2. will be led by Finland as MS. WP 3. will be led by Circle . WP4. will be led
by Estonia as MS supported by the Technical Manager.
The MS leaders, following the advice and recommendations issued by the Work Package leaders, will
provide the general specifications of the work to be done within their specific initiative to all partners
participating in it and will ensure the coordination of the engineering, prototyping and field operational
testing phases for their specific initiative throughout the project.
The Observers Group formed by the Member States and Associations that signed a specific letter of
support and that are not directly engaged in the project but intend to have a close link to it. They will be
invited 2 times per year in a specific digital working group in order to share the advancement of the project
27
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
and to share best and worst practices in the eFTI implementation. The Observer Group can be extended
later during the project.
The overall Stakeholders Group will include mainly Economic Operators (railway undertakings, railway
infrastructure managers, inland terminals, multimodal transport operators, barge operators, road
transport companies, road hauliers, freight forwarders, Competent Authorities) and IT experts that are
not direct beneficiaries of this Project but are interested in having access to the results obtained in it. As
many stakeholders interested in this Project as possible will be involved in this group that will have access
to the results of the activities, will be able to provide technical input and give information for the impact
assessment and analysis on the benefits that launching for real the EFTI4EU initiatives would have on
the European transports and logistics sectors.
#§CON-SOR-CS§# #@PRJ-MGT-PM@#
3.3 Project management, quality assurance and control procedures
Project management, quality assurance and control procedures
Describe the methods to ensure good quality, monitoring, planning and control for the implementation of the project.
Explain the main features of the quality assurance plan and quality control system that will be used.
Implementation of quality assurance procedures with particular focus on monitoring review activities built
into the studies programme and submitting quality review reports. A quality plan within the Project Quality
Handbook will specify the quality procedures, internal and external peer reviews, control, monitoring and
reporting activities to be implemented in the project to ensure that satisfactory quality standards are met.
Task 4.1. is responsible for project Management, quality assurance and control procedures.
Project Management Tasks (Project Coordination Committee reporting to the Project Coordinator)
● Identification and prioritisation of key elements of the work packages with each WP team to
ensure tasks are conveyed/delegated appropriately and clearly.
● Establish a modus operandi for the work packages that conveys a logical breakdown to the
team e.g., phases, blocks etc.
● Establish drawing and data registers
● Ensure that design criteria and risk mitigations are clearly understood by each team.
● Ensure that that the design and assessment outputs produced address agreed requirements.
● Ensure that the WPS are carried out utilising relevant and current editions of standards,
regulations and guidelines.
● Verifies key elements of the work programme for submission to the Project Board.
● Liaise with EC/ CINEA /Consultants / Contractors / Local Authorities etc. and maintains
adequate records e.g., minutes, telecoms etc.
● Ensure all contract amendments are noted and keeps records of authorisations, scope
changes agreed etc.
● Ensures that communications systems properly update the Project Coordinator on status
and/or particular aspects of the project
● Ensure that peer reviews take place to ensure delivery of project Deliverables.
● Ensure that Standardised Documentation is used across the work packages.
● Ensure that a comprehensive project risk register is maintained across the work packages with
regular reviews with the Project Coordinator, work package and MS leaders.
Project Handbook
In order to help each project actor, at the kick‐off meeting each person involved in the project will receive
the management and project rules document, informing on the rules to be followed in the project,
particularly scheduled dates of meetings, contacts names, document numbering and handling rules. The
management document will recall the financial issues of the project rules and content of the internal
reports. This will help in the timely generation of reporting and cost claims documents.
28
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
The project document numbering will be also defined, whether it will be an official document (like a
Deliverable) or a project’s internal reporting. The formats to be used for the document will be also
distributed. In order to perform the above-mentioned tasks, a configuration management tool will assure
that all project documents including shared documents are properly tracked. A specific Project Repository
will be established; rules will be set by and circulated.
Different broadcasting email lists will be set up to be used for different purposes
Quality management
Next to the risk management, the quality assurance is essential for reaching the overall project targets.
The main target is to monitor the achievements of the Project, i.e., the deliverables and milestones, and
to establish adequate processes within the project to get the optimum high-quality results. The Project
refers to the ISO norm and contains the description of all relevant organisational elements, processes,
methods and tools. It aims at effectively steering and controlling the project and complying with
contractual regulations.
Deliverable’s handling
Deliverables will be a joint effort between the persons involved in the related Work Package. Their
completion will be the responsibility of the Project Coordination Committee who will ask for assistance to
the Work Package Leaders. Their content in a draft version has to be approved by all the persons
involved in the related Work Package and by the Technical Manager. Moreover, the quality of technical
results will be based on the instrument of peer reviews. All deliverables will be evaluated by at least two
experts, always including one Partner’s General Assembly member and one expert coming from the
Project Board. If needed, the Project Board can allocate a third reviewer. The quality management is
organised by the Project Coordination Committee which is also in charge of the tracking and assurance
of formal standards.
Conflict settlement mechanism
Consensus as the general principle will also be pursued in the decision-making processes of the project.
In general, project-related decisions will be taken at the lowest organisational level possible.
Furthermore, it is expected that the instructions of overall coordinating tasks (such as management tasks
within specific WP) will be followed by the concerned WPL, or that conflicting views will be solved
bilaterally. In the exceptional case that conflicts cannot be solved at Work Package level, the respective
Work Package Leader will bring the problem to the Technical Manager that is expected to consult the
concerned WP before making any decision and especially ensure that no heavyweight is generated. The
goal of the coordinating tasks is always to enhance the overall functioning of the project as a joint
undertaking and improve the quality, consistency, and impact of the project results. In case conflicts
cannot be solved at the operational level, the Project Coordinator passes them to the Project Board that
can be also urgently called via remote conference call. If no acceptable solution can be achieved within
it, the case must be brought to the Partner’s General Assembly that will take the final decision. This
decision is then binding on all management bodies.
Control Procedures established within the Project Board
Most of the beneficiaries have significant experience in managing complex projects and will apply this
discipline to the proposed project.
Standard operating procedures will be used to monitor the effectiveness of internal controls covering
financial, operational, compliance and risk management, encompassing policies, processes, tasks,
behaviours and other issues that:
• Facilitate effective and efficient operations;
• Help ensure the quality of internal and external reporting; and
• Help ensure compliance with applicable laws (health and safety for example), regulations and
internal policies (audit for instance).
The procedures include:
• A clearly defined organisational structure, with defined authority, spending approval and
reporting procedures;
• A cost-based budgeting dashboard;
• A comprehensive system of financial reporting and review;
• The submission of monthly reports comparing actual results against budget;
• The capture of all project data into a defined repository.
29
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
• Cyber security protective measures;
• Measures to identify possible fraud;
Official Reporting
The beneficiary will continuously report on the progress of the action (e.g. deliverables, milestones,
outputs/outcomes, critical risks, indicators, etc; if any), in the Portal Continuous Reporting tool and in
accordance with the timing and conditions it sets out (as agreed with CINEA). Standardised deliverables
(e.g. progress reports not linked to payments, reports on cumulative expenditure, special reports, etc; if
any) will be submitted using the templates published on the Portal.
The beneficiary will provide reports to request payments, in accordance with the schedule and modalities
set out in Grant Agreement:
- an additional prefinancing report for additional prefinancing (if any)
- a periodic report for interim payments (if any) and the final payment
The prefinancing and periodic reports will include a technical and financial part. The technical part will
include an overview of the action implementation. It will be prepared using the template available in the
Portal Periodic Reporting tool. The financial part of the additional prefinancing report will include a
statement on the use of the previous prefinancing payment.
The financial part of the periodic report will include:
- the financial statements (individual and consolidated; for all beneficiaries/affiliated entities)
- the explanation on the use of resources (or detailed cost reporting table, if required)
- the certificates on the financial statements (CFS) (if required)
The financial statements will detail the eligible costs and contributions for each budget category and, for
the final payment. All the eligible costs and contributions incurred will be declared, even if they exceed
the amounts indicated in the estimated budget.
#§PRJ-MGT-PM§# #@RSK-MGT-RM@#
3.4 Risk management
Risk management methods and procedures
Explain how risk management is part of your project management approach and how you address risk management
in general. Mention only methods and major elements (details are to be provided in the risk assessment grid below).
Indicate whether a risk management plan is in place and explain its main features.
Risk management methods and procedures will be further defined in the eFTI4EU Project Handbook.
eFTI4EU risk management integrates recognition of risk, risk assessment, developing strategies to
manage it, and mitigation of risk using managerial resources. It is therefore linked very closely to
eFTI4EU’s quality management and an appropriate eFTI4EU project management, which is monitoring
all plans and processes. In eFTI4EU, organisational, technical and financial risks are considered.
The objective of eFTI4EU risk management is to reduce different risks for different, pre-selected domains
to an acceptable level. It refers to various types of threats caused by technology, humans, organisations
and politics. The eFTI4EU coordinator has identified risks and has drafted a risk table based on risk
management (see section 6.9). The eFTI4EU partners have endorsed the risk table and the PCC will
start the risk management process according to the Project Handbook when and where needed. The risk
process will be closed when a problem has been resolved. The eFTI4EU risk management steps are:
Establishing eFTI4EU goals and context (i.e. the risk environment) ⇨ Identifying risks to reach these
goals ⇨ Analysing the identified risks ⇨ Assessing the risks⇨ Treating or managing the risks ⇨
Monitoring and reviewing risks and the whole risk environment regularly ⇨ Continuously communicating
with eFTI4EU partners, CINEA, stakeholders and reporting.
Risk assessment grid
Describe critical risks, uncertainties or difficulties related to the implementation of your project, and your
measures/strategy for addressing them. Include significant risks, factors of uncertainty and major elements of
complexity that may affect the project implementation, whether of political, institutional, financial, organisational, social
and/or technical nature.
30
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Indicate for each risk (in the description) the impact and the likelihood that the risk will materialise (high, medium, low),
even after taking into account the mitigating measures.
Note: Uncertainties and unexpected events may occur in all organisations, even if very well-run. The risk analysis will
help you to predict issues that could delay or hinder project activities. A good risk management strategy is essential
for good project management.
Risk No Description Work Proposed Risk Mitigation Measures
Package No
1 Partner/Member State all Participation in eFTI4EU is a high-level
(MS) leaves the decision for all applicants. As internal
eFTI4EU project, communication and coordination is
political climate organised properly and partners are actively
changes involved via WP4, problems can be
detected, discussed and resolved within the
Impact = Medium, project at a very early stage.
Chance = Low
2 Unforeseen difficulties all The eFTI4EU Coordinator and the PCC are
for the eFTI4EU in contact with the Partner/MS on a regular
Partners/MS (political, basis to inform each other about problems
economic, technical, and progress where needed. In case of
financial, major difficulties, the coordinator is
organisational) therefore informed in due time to inform the
related MS and to elaborate on alternative
Impact = Medium, concepts to achieve the eFTI4EU
Chance = Medium objectives. In the case of new technical
challenges Task 4.3 will address those and
prepare solution options to decide in the
project coordination committee.
3 Milestones are not met all An appropriate project monitoring according
to the project Handbook is set up to detect
Impact = High, Chance deviations from plans in a timely manner.
= Medium Critical deviations will be limited, and
alternatives will be prepared and put in
place. Official and formal risk management
procedures will be activated and performed
by the coordinator until the risk is under
control again. CINEA will be continually
informed about risks occurring in order to
minimise the impact.
4 Delays with regard to all Delays with regard to the eFTI time plan, in
the eFTI time plan of particular with regard to the provision of the
the European planned DA and IA will have a direct impact
Commission, DA or IA on specifications or the planning and
not adopted development of reference implementations
and pilots within the MS and last but not
Impact = High, Chance least to availability of operational eFTI
= Medium environment in August 2025. The project
coordination committee will consult CINEA
and the European Commission to find a
proper solution (e.g. project extension,
specific degree of implementation, etc.).
5 COVID pandemic all Stakeholder engagement and fall-back to
extends for a longer digital/virtual way of project management
period risk management will be put in place.
Impact = Medium,
Chance = Low
31
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
6 Not all stakeholders all For all the business process, make a list of
consulted - Not enough actor types involved in these processes
focus on the important such as enforcing authorities, transport
stakeholders. operators, IT developers, prof.
organisations, make sure that they or their
interest groups are consulted and/or
Impact -medium, involved. Make a stakeholder analysis. For
Chance = medium each concept, topic or projects and for each
actor type define their attitude against these
concept, topic or projects by making a
power/ interest matrix. No effort goes to low
power - low interest stakeholders and the
high interest - high power stakeholders are
actively managed.
7 Dissemination and WP4 From previous stakeholder analysis target
communication not by topic the message to the audience.
tailored to the target Define in a stakeholder management plan
audience or communication plan.
Impact -medium,
Chance = low
8 Availability of resources all The project team has a back-up of most
is limited, not sufficient important profiles, The direct/indirect
(through subcontracting) involvement of
Impact -medium, renowned organizations includes back-up
Chance = medium procedures as to resources. Covid
measures are common practice now.
Resistance regarding
9 data sharing and non- WP2 Close stakeholder cooperation to create
disclosure of data mutual trust and willingness to share data
formats
Impact -high, Chance
= medium
10 Conflicts in consortium All Experienced project coordination committee
member and clearly defined project and
Impact -medium, organisation management structure;
Chance = low transparent project management &
implementation; open discussion with
partners to address problem
The consortium includes partners that
11 Insufficient alignment WP1 and 2 actively participate in DTLF ever since its
between project scope foundation (2014), having a profound
and DTLF an DTLF’s understanding of existing Databases, IT
subgroup, eFTI architecture, applications, it gaps and fits,
regulation and participates in discussions related to
drafting DTLF III and eFTI II-regulation.
Impact -medium, The consortium includes also the leading
Chance = low consultant supporting DGMOVE for the IAs
DAs release
12 Insufficient testing and WP2 Besides the rich experience of consortium
capacity (expertise, partners there is an testing environment
infrastructure) available to allow extensive testing,
valorisation. Testing is as much as possible
part of training sessions, but also a
Impact -medium, sufficient number of additional testers are
Chance = medium available.
#§RSK-MGT-RM§# #@COM-DIS-VIS-CDV@#
32
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
3.5 Communication and visibility
Communication and visibility
Describe the communication plan and strategy to provide visibility to the EU funding (e.g. billboards, reports, websites,
brochures, information leaflets, reports, factsheets, newsletters, press articles, presentations).
Provide the websites being used for this purpose, the Social Media accounts and the communications’ contact person.
Note: Please note that we will no longer pay for project websites which are not hosted on participants’ websites; costs
for separate project websites are no longer eligible.
Communication, cross-fertilisation and dissemination represent crucial activities involving the whole
consortium. The objective will be to ensure that the aims of SMILE, its ongoing prosecution, and its results
as they emerge throughout the lifetime of the project are publicised among all the actors and stakeholders
involved in the field under consideration and more widely in the European regions and transport and
logistic operators, counting also on the European and global networks in which the partners are involved.
The project will be of little value if the dissemination and capacity building activities are not successful
and the enhancement of capabilities, positive socio-economic impact and increased business profitability
are not tangible outcomes of the project.
Communication will be developed within Work Package 4 of the Project. This activity will provide support
to any communication and visibility action carried out in eFTI4EUROPE and will provide proper publicity
to inform the public of European Union’s financial support and the progress of the project.
Communication and visibility will be materialised through different press statements released in each of
the Member States involved in the project during its execution. The project is expected to attract strong
interest on behalf of the specialised media, due to the relevance of the topic and the Trans-European
Transport Network, as well as institutional significance of many of the members of the consortium in
their respective countries.
The ultimate objective of the communication efforts to be carried out is to enable TEN-T business
stakeholders, transport and logistic operators, transport policy-makers and EU citizens to understand
and decide which technologies and potential solutions generate the best socio-economic value, help to
increase TEN-T competitiveness to the largest extent, support the most the integration of TEN-T, core
ports, CNCs and RFCs and have the highest potential for rapid deployment across the EU.
The eFTI4EUROPE Communication Plan will outline the communication strategy of the project. This
document will define the objectives of the communication strategy, provide the key communication
messages to be used by all partners, analyse the main target groups and communication channels, set
up the timeframe for the different communication activities to be carried out, describe the communication
tools that will be defined and used throughout the duration of the project and designate a communication
core group that will be in charge of carrying out the communication activities defined.
All project’s materials will follow the EC rules on Communication and Visibility.
The anticipated communication plan includes two main streams.
Communicating and Disseminating eFTI
• A set of communication /information / training tools (including the MSs web sites)
• A set of national events in which MSs will communicate eFTI to EOs and to a broader public.
• A set of European workshops for very specific detailed issues.
• 3 eFTI conferences (once a year)
eFTI Capacity Building
• A series of workshops / on-site visits in which more advanced countries could transfer their
knowledge and expertise to less advanced ones this should include lessons learnt including
onboarding trainings (webinars) in collaboration with the European Commission and the
member states, associations and other projects
A set of training courses to be delivered monthly for CAs and EOs, also open to MSs not involved in the
project (to complement the ones planned in the eFTI second tender), including knowledge sharing.
#§COM-DIS-VIS-CDV§# #@SUS-CON-SC@#
33
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
3.6 Sustainability and maintenance strategy
Sustainability and maintenance (for Works topics)
Describe the follow-up of the project after the EU funding ends. How will you guarantee the proper maintenance and
continued operation of the investments made?
Describe in detail the strategy (periodicity, components, financing, actors) and practical measures that will be put in
place.
Not applicable
#§SUS-CON-SC§# #§QUA-LIT-QL§# #@IMP-ACT-IA@#
4. IMPACT — COST-BENEFIT ANALYSIS
4.1 Demand analysis
Demand/traffic forecast study
Provide the results of the demand/traffic forecast study (if any). Give an outline of the overall context (including date
of completion) and scope of the study, explain the methodology chosen and the assumptions made regarding the
demand growth rate and the utilisation rate on completion of the project. Provide the list of indicators and their sources
of verification (e.g. institution or organisation collecting statistical information, website, database, etc.). If the study
carried out goes beyond the scope of the project, give an overview of the demand analysis of the global project and
explain how it is related to the project. Clarify if TEN-T/CEF or other EU programmes have provided financial support
for the study.
Not applicable
4.2 Economic and financial analysis
Socio-economic impact analysis
Describe the general socio-economic impact of the project.
Describe whether the project (or the wider global project) has the potential to generate cash revenues, and what are
the limitations (legal, regulatory, or commercial, if any), that constrain the revenues generation to the levels you have
estimated.
Provide details on the expected revenues and their timeline (e.g. number and diversity of users). Describe if the users
are sensitive to prices and if they are captive. Provide indications concerning the degree of certainty of your
assumptions and estimations. Explain whether the project will operate in an autonomous manner or whether the
expected level of revenues depends on the completion of additional investments or processes.
For Works proposals required to submit a full CBA, describe the main results of the economic analysis of the cost
benefit analysis (Economic Rate of Return (ERR) and Economic Net Present Value (ENPV). If the scope of the
economic analysis addressed by the CBA is wider than the scope of the project, explain the difference in scope
between the CBA and the project and to what extent findings of the CBA are relevant to the project. Please upload
the CBA report and the CBA cash flow template filled in.
For Works proposals required to submit a simplified CBA, provide information under this section and submit the
simplified CBA calculator filled in. No need for a separate CBA report.
For the CBA report, please use the unitary values referred to in the Handbook on External Costs of Transport.
Note:
For more guidance on CBA, see CINEA Guide on economic appraisal for CEF Transport Projects, DG REGIO Guide
to Cost-Benefit Analysis of Investment Projects and DG REGIO CBA Economic Appraisal Vademecum.
The project will not generate cash revenues for the participating authorities. Facilitating the
implementation of eFTI-services, is a service offered by the governments. The main goal is not to
generate revenues, but to increase the safety and to improve the efficiency of logistics in Europe. This
project will have a direct economic impact for the users of logistics services. Improved safety means that
34
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
there will be less costs associated with incidents and improved efficiency means a reduction of costs
related to time loss. The project is also expected to generate economic growth, by creation of additional
jobs both in logistics sector and IT-sector, alongside a positive environmental impact.
As per the COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT Accompanying the
document Proposal for a Regulation of the European Parliament and of the Council on electronic freight
transport information {COM(2018) 279 final} - {SEC(2018) 231 final} - {SWD(2018) 184 final}, a full socio-
economic impact analysis was made that covered economic impacts(administrative and compliance
costs for businesses and authorities, modal shift and congestions costs, transport costs for operates,
internal market impacts and innovation impacts. In addition, the social impacts (employment) and
environmental impacts (emissions, and use of natural resources and energy use efficiency) were
valuated.
The document distinguishes between 4 policy options (PO1 to PO4), in which the scope of policy
intervention is limited in PO1 and PO2 to those transport documents which serve as (international)
contracts of carriage. In PO3 and PO4, this scope is enlarged to include any document which, due to its
information content, may serve as evidence of compliance of a determined transport operation with the
applicable regulatory conditions on the EU Member States' territory.
The main expected potential negative social impact is linked to changes in the employment structure
and possible impacts on the related levels of employment. Full implementation of the electronic
documentation is expected to make redundant over time a large number of jobs that today are linked to
processing of paper documents. However, according to stakeholders' feedback, these employees will be
more efficiently redeployed in higher-value tasks. Nevertheless, the exact mechanism for this remains
unclear and it will largely differ depending on the organisational structure and internal processes of each
company.
This negative impact is expected to be offset to a large extent by the overall sector growth that is
expected under all policy options for all transport modes. Greater demand for IT solutions and systems
is likely to bring more opportunities for the IT providers, leading to an increase in high-skilled employment.
The employment in public administrations is unlikely to change significantly since authorities do not
expect to significantly reduce the absolute number of inspections, but rather improve their effectiveness.
One can note the reduction in workload expected will lead to improvements in working conditions via the
reduction of workload equal to around 75-102 million hours yearly (equivalent to around 36-49 thousand
full time equivalents per year) on average in PO3 and PO4 over the full deployment horizon of electronic
transport documents (2018-2040) across the whole sector.
The impact would be the lowest in PO1 (6-9 million hours saved per year; equivalent to around 3-4
thousand full time equivalents per year). Also, it is expected that there will be the possibility to focus on
more creative and added-value tasks and reduce the overtime work.
More argument on the positive side, that the concerned studies identify
- reduction in workload for both public and private entities, reduction of administrative burden.
- The European Commission estimates that the reduced administrative burden of using digital
forms will save operators up to EUR 27 billion over the next 20 years (source European
Commission Staff Working Document: Executive Summary of the Impact Assessment
(SWD(2018) 184 final).
- Shipping goods across EU borders and between transport modes is expected to become easier
and cheaper. This could translate into faster delivery times and lower prices for consumers. For
road and other route transport operators, operational cost savings would amount to about €12
billion over the period 2018-20402.
- A growth in the ITC sector to help businesses and public administration to modify their IT
applications
Source: European Commission Staff Working Document: Executive Summary of the Impact Assessment
(SWD(2018) 184 final)
35
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Financial analysis
Describe the financial viability/sustainability of the project over its lifecycle (budget in balance; use of funds vs sources
of funds).
For works proposals submitting a CBA, mention the value of the financial indicators after CEF funding (i.e. assuming
that CEF support is granted for the amount requested (Financial Rate of Return FRR (C after CEF) and Financial Net
Present Value FNPV(C after CEF)). Compare the profitability achieved after CEF funding with national and
international benchmarks for the sector.
For projects with negative FNPV and with FRR smaller than the discount rate, explain why or under which conditions
(e.g. other grants, reduction of costs) you would still proceed with the project despite its insufficient financial viability
and illustrate how the project would be at least financially sustainable (i.e. not likely to default and therefore not putting
at risk the commitment from the EU budget) by showing that the cumulated cash flows are always positive.
Unprofitable/nonviable projects need to demonstrate their sustainability, for example by benefitting from other sources
of support (such as national/local grants or operational subsidies) or revenues that can compensate negative cash
flows or by the applicant’s commitment and financial capacity to cover the remaining gap or absorb potential losses
or accept deferral of profits.
Describe any financial risks associated with the implementation of the project.
The EFTI is a regulation measure, which is imposed on MS’s Competent authorities to be able to accept
information made available electronically whenever economic operators are obliged to make information
available as proof of compliance with requirements laid in the Regulation.
Consequently, the objective of the investments made by the Member States in this eFTI4EU project is to
accelerate the digitalisation of freight transport and logistics as stipulated by the eFTI regulation
REGULATION (EU) 2020/1056 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 15 July
2020 on electronic freight transport information.
As such this project is an enabler to comply with the eFTI requirements and is not to achieve a
positive Financial Rate of Return (FRR) and Financial Net Present Value (FNPV) but to accelerate
the digitalisation of freight transport and logistics.
All participants, public and private allocated dedicated budgets to this eFTI4EU project for the complete
duration of the project. During the project, WP 1 is to assist MS in further detailing each MS’ roadmap,
as the technical architecture choices get finalized. These roadmaps will include budget estimates for
further eFTI maintenance and implementation in the years after the pilot implementation.
All budgets are found to be in balance by the respective Member States, and private partners.
As such, also no revenues will be generated directly from this Project. For certain, the use of electronic
means to exchange regulatory information will reduce administrative costs for economic operators and
enhance the efficiency of competent authorities. This results in minimising costs for both competent
authorities and economic operators.
The burden and costs on Member States is minimised by this eFTI4EU initiative by offering a common
software developed at EU level, available to all MS and private sector. This minimises the risks related
to the creation of an additional layer of architecture (including by ensuring proportionality of the proposal)
and reduces the risks deriving form single point of failure.
4.3 Social, environmental and other impacts
Impact on congestion, modal split, safety and security, service quality, noise air pollutants
Describe the expected positive and/or negative impacts of the project on time savings, optimisation of existing capacity
and service quality. If quantified in the CBA, mention the total monetary value of such impacts (€ Net Present Value
(NPV)) and the main assumptions in terms of quantities (e.g. change in number of hours or vehicles) and unit values
(e.g. €/hour or €/vehicle/km).
Describe the expected positive and/or negative impacts on modal split.
Describe the expected positive and/or negative impacts on safety and security. If quantified in the CBA, mention the
monetary value of such impacts (€ NPV) and the main assumptions in terms of quantities (e.g. change in number of
accidents, injuries and fatalities) and unit values (€/accident).
Describe the expected positive and/or negative impacts of the project on noise emissions. If quantified in the CBA,
mention the total monetary value of such impacts (€ NPV) and the main assumptions in terms of quantities (e.g.
change in number of trains) and unit values (e.g. €/train).
36
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
With the removal of paper processes and resulting improvement on logistics efficiency, the supply chains
are expected to get a positive - double digit percentage - impact on supply chain congestion, modal split,
safety and security, service quality as well as noise air pollutants.
The project, once eFTI is fully deployed is also to bring about net positive environmental impacts.
In cumulative terms, CO2 emission savings are estimated to amount to more than 1,300 thousand
tons over the 2018-2040 period, equivalent to 74 million euros in external cost savings.
Congestion costs are expected to be reduced by nearly 300 million euros over the same period. In
addition, no longer printing an average of 1-5 copies of each document per shipment would save about
2-8 billion sheets of paper, or the equivalent of 180-900 thousand trees per year.
Businesses, including SMEs, will opt between the speed of their digital transformation, in this case
digitalise their paper-based processes. The assurance that e-documents/information will be accepted will
encourage digitalisation. One-off investments are expected to bring savings already within the first year,
because of reduced time spent on regulatory compliance reporting activities and improved overall
business efficiency. Road transport operators, about 99% of which are SMEs, are expected to benefit of
about 60% of all industry administrative costs savings.
The European Roads Policing Network reported already in 2021 that the number of drivers’ hours
offences has “never been higher,” showing that of the 197,274 Heavy Good Vehicles (HGV) and 111,545
buses checked overall, 77,386 violations were found. The HGV violation rate was 35,21% higher
compared to May 2020. The main violations were tachographs not properly managed, manipulated, drug-
driving, serious technical defects, overweight, over-dimensioned, load insecurity, speeding, use of
DVD/TV/mobile phones while driving, etc.
When considering the low number of controls versus the effectuated number of transports, law
enforcement authorities clearly lack capacity to have a permanent positive impact on road safety.
Initiatives by European Commission to facilitate this structural change in transport policy are ongoing in
large numbers covering all transport modes (RIS, DTLF, EUCARIS, ERTMS, ...).
A major contribution into the implementation of this transport policy is expected from the broad
digitalisation of the transport sector. The more data becomes available, the more finetuning will be
possible within MS authorities and between multi-MS authorities. The use of eFTI will therefore certainly
increase the need for applications to facilitate the controlling capacity of law enforcement authorities. Not
only in the number of controlled vehicles, but also in the deployment of human resources.
The Modal shift to cleaner transport fails to materialise as per conclusion of Global transport data from
2010 to 2021 collected by the International Transport Forum: The increasing use of road transport over
the railway in most countries translates into more carbon dioxide (CO2) emissions, hindering global
climate efforts. The internalisation of external costs will contribute to making such effects part of the
decision-making process of transport users. To this means data needs to be digitised, to which eFTI and
this project contributes significantly.
Source: EU COMMISSION STAFF WORKING DOCUMENT EXECUTIVE SUMMARY OF THE IMPACT
ASSESSMENT: Proposal for a Regulation of the European Parliament and of the Council on electronic
freight transport information {COM(2018) 279 final} - {SEC(2018) 231 final} - {SWD(2018) 183 final}
The EU 2020/1056 eFTI regulation introduces a common data model that will harmonize the
implementation of the eFTI regulation across EU MS and across modes of transport. The eFTI4EU
project will allow individual MS to coordinate their national implementation roadmap with transport mode
roadmaps for inland navigation, rail and air that are coordinated by corridor or by mode of transport.
The portfolio of pilot projects of the eFTI4EU project includes the integration of a port community system
as an eFTI Gate and/or eFTI Roadmap.
Several members of the PCC have been participating since several years in eFTI expert groups that are
transport mode specific.
37
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Environmental and climate impact
Describe the expected positive and/or negative impacts of the project on the climate change targets (such as the Paris
Agreement and the 2030 Climate and energy framework).
Describe the expected positive and/or negative impacts of the project on the emission of air pollutants such as
Particulate Matter - PM2.5, Nitrogen oxides - NOX, Sulphur Dioxides – SO2, etc. If quantified in the CBA, mention the
total monetary value of such impacts (€ NPV) and the main assumptions in terms of quantities (change in tonnes or
vehicle*km) and unit values (e.g. €/tonnes or €/vkm).
Specify if the project helps to reduce greenhouse gas emissions (GHG) and limit global warming. Explain how it
impacts upstream and downstream emissions (e.g. emissions from purchased electricity as well as full life cycle). For
works proposals submitting a CBA, also include the total monetary value of such impacts (€ NPV) and the main
assumptions in terms of quantities (avoided tonnes of GHG) and unit values (e.g. €/tCO2equivalent).
Describe how climate change has been taken or will be taken into consideration when designing the project and its
components.
Describe in detail the measures that are foreseen to monitor, prevent and mitigate a negative impact on the
environment, and provide an estimation of the associated costs.
Freight transportation and logistics sector, i.e. the movement of goods, including waste, dangerous
goods, cabotage, is accompanied by a large amount of information which is still exchanged in paper
format among businesses, and between businesses and competent authorities. Cargo transports are
still characterized by large number of paper-based documents set, which move together with shipment.
in worst case the same information is copied several times as the shipment moves along the supply
chain. eFTI is promoting fully digital operation mode and works as enabler for private sector in the
digitalization transition. For public organisations it means that the same information is available for
stakeholders without the dependency on paper documents. In addition, the use of paper documents
represents a significant administrative burden for logistics operators and an additional cost for logistics
operators and related industries (such as trade and manufacturing), in particular for SMEs. Another
aspect of this positive impact is the availability of data, which can be used to digitally track and trace
supply chains in a more detailed level and even generating digital twins of transportations. Such a data
and information can easily be used to track and analyse carbon footprint of supply chains and even
parcels, which enables actors' opportunity to react and mitigate their emissions based on actual data.
In addition to direct reduce the usage of paper, eFTI regulation has indirect impact to supply chain
emission mitigation via enhanced situational awareness and transparency. I.e., when data and
information are not tied to any specific location, through the eFTI gates stakeholders will have more
efficient access to necessary data without physical interaction between authorities and economic
operators. Hence unnecessary field inspections (law enforcement) and auditions can be avoided. At the
same time, the technical implementation of eFTI regulation removes the well-known bottleneck from
private sector process digitalization development, being the acceptance by public organisations of a
digital format instead of a paper-based form. Thus it can be stated that eFTI regulation will enable fully
digital supply chain processes and hence it has great positive impact on supply chain sustainability.
The European Commission estimates the benefits of eFTI to be around €1.3 billion per year due to the
reduction of administrative burdens and foreshadows both economic and environmental benefits due to
the large paper savings resulting from the digitization process of transport documents. EC estimates
point to economic benefits of up to €27 billion over the next 20 years, thanks to the reduction in
administrative burdens made possible by setting up widespread digital logistics, resulting in savings of
between 75 and 102 million man-hours per year9. Shipping goods across EU borders and between
transport modes is expected to become easier and cheaper as to its administrative costs and faster
delivery times. For road and other route transport operators, operational cost savings would amount to
about €12 billion over the period 2018-204010.
However, Europe’s Policy on Green digital sector describes that Europe faces two important challenges:
the green transition and the digital transition. These might seem like two distinct issues, but really, they
are twin challenges: neither can succeed without the other. Indeed, whereas the digital transformation
may help in reducing our carbon footprint in our lives, there is also a potential downside.
Digital technologies should not consume more energy than they save. At present, digital technologies
9
European Commission Staff Working Document: Executive Summary of the Impact Assessment (SWD(2018) 184 final)
Savings are calculated against a scenario in which no policy action is taken at the EU level.
10
Savings are calculated against a scenario in which no policy action is taken at the EU level.
38
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
account for between 8-10% of our energy consumption, and 2-4% of our greenhouse gas emissions –
small percentages but big numbers.
All technical solutions in eFTI4EU are to be validated against the EU’s most relevant voluntary and
binding measures on this topic. To this respect the European Green Deal Coalition will be involved in
peer reviewing of the retained technologies. This coalition (EGDC) was formed by 26 CEOs of ICT
companies who signed a Declaration to support the Green and Digital Transformation of the EU on Digital
Day 2021. The Declaration builds on the EU Council conclusions of December 2020 on Digitalisation for
the benefit of the environment and recognises the ICT sector as a key player in the fight against climate
change11.
The outcomes of this project will be used by not only the MS participating, but through communication
and dissemination be shared with the other MS. These best practices will assist in the update of existing
laws and introduce new measures to achieve EU’s green and digital goals for the next decade. This
project is to create awareness among all stakeholders to this aspect. Examples are measures for the MS
to ensure data centres are climate neutral, energy-efficient and sustainable.
Climate resilience (for Works topics)
Describe the climate proofing exercise and how it was taken into consideration when designing the project and its
components (see Technical guidance on the climate proofing of infrastructure). Summarise the findings of the
vulnerability assessment to identify the climate hazards to which the project is more sensitive (because of the its type
or location).
If significant risks are identified, explain how the vulnerabilities were embedded in the decision-making process so
that they can be addressed and mitigated and what relevant measures were taken to ensure the resilience of the
project to climate change.
Not applicable
Decision-making tool, input for policy making or development of best practices (for Studies topics)
Show how the project will have an impact as decision-making tool or input for policy making or development of best
practices.
Who will use the output of the project and for how long? Describe the extent to which the output will be relied on for
decision-making, possibly in relation to other studies and future projects, and at what level, (e.g. a future CEF
Transport action, national project, global project, etc.). Describe the relevance and economic value of those future
projects in terms of costs and benefits. Explain the degree to which elements of the project could be used to develop
best practices.
The eFTI4EU project addresses the coordination and collaboration in and between the relevant national
authorities, other governmental agencies and private stakeholders in the 9 participating Member States,
including several observers being MS (IRL, NL, ES) and private organisations (such as Inland Navigation
Europe).
But the real impact of eFTI4EU extends to all 27 MS as decision making tool. Indeed, it will not only pave
the way for a really harmonised eFTI development across the EU, which is very unlikely to happen without
such multi–Member State initiatives such as this project. The eFTI4EU project will define the MSs
roadmaps, strategy and long-term governance model for eFTI and facilitate the co-development of the
eFTI reference open architecture that will be validated in cross border and national pilots. This will provide
a strong foundation of best practices for the full MSs implementation of eFTI implementing acts. The MSs
time and cost benefits thus created will be multiplied way beyond the project cost when eFTI
interoperability is established between the MS competent authorities in the 27 MSs and with countless
Economic Operator eFTI platforms that are to report to it.
The outcomes of this project will be used by not only the MS participating, but through communication
and dissemination be shared with the other MS. These best practices will assist in estimating national
11
https://www.greendigitalcoalition.eu/coalition/
39
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
budgets for eFTI implementations in the coming years, in identifying MS’s IT capacity shortages, in
contributing to the digital transformation strategies of national authorities, in contributing to the MS’s
strategies on Smart Enforcement in transport and logistics, in providing arguments and insights to the
update of existing laws and in introducing new measures to achieve EU’s green and digital goals for the
next decade.
The participating private project partners will disseminate the material into their eco-systems. This will
allow their public and private clients to have detailed insights in the upcoming changes impacting their
company or public service department. As such providing feedback will be done towards the near future
regulations of eFTI II (through among others DTLF), by means of dissemination to national ministries of
transport (BE, DE, Luxemburg, Baltic States, ...), making sandbox (testing environments) available for all
stakeholders, providing training courses. More details on this in the communication and dissemination
section.
Task 1.3- eFTI Gate Strategy and Governance will set the common rule set for the best practices.
Interoperability and accessibility
Describe if and how the project contributes to increased interoperability of transport systems and/or modes in the
TEN-T network.
Describe if and how the proposal enhances the accessibility for passengers and/or goods to the TEN-T network (e.g.
cross-border dimension, effect/contribution to territorial accessibility, including for outermost regions and islands).
The national and cross border corridor pilots are performed in the eFTI4EU test environment according
to eFTI specification and adherent reference implementation is created to build interoperability between
different MSs. This will result in more fluent transit of goods within and in-between the MSs.
Interoperability and accessibility will be under Task 1.2.
Innovation and digitalisation
Describe if and how innovative technologies are being used to reach the project’s objectives.
Describe if and how the digitalisation forms part of the project (or its use).
In case the project is making use of results from EU-supported research projects, please give the reference of the EU
research project.
eFTI4EU is a digitalisation project that will use the input taken form the Regulations and the related IAs
and DAs (e.g., the specifications of the eFTI architecture) to pilot eFTI gates in a harmonised way across
Europe using robust and mature proven technologies.
The overall project structure ensures that each partner organisation is engaged in the development of
the technological enablers for the reference implementation and the pilots (see Task 4.3)
Competition
Describe the expected positive and/or negative impacts of the project on regional and national competition.
With introduction of paperless logistics over multimodal supply chains the EU region is expected to get
a competitive edge over other global regions. The pioneering MSs will have the edge over other MSs
and the pioneering actors within MSs will have the edge over other actors. However, a critical mass of
stakeholders is required to make these benefits come through. Therefore, it is essential to create EU-
level commitment to the eFTI implementation.
The approach of open software architecture is taken to minimize the risk of having transport and logistics
SMEs ‘barred’ from technical solutions that go beyond their knowledge and financial means.
40
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Regional and local development and land use
Describe the expected positive and/or negative impacts of the project on regional and/or local development, and land
use. Assess the impacts on the neighbouring regions.
Indicate if the project is linked to urban development plans, or if it will contribute to increasing the land value.
There are no major regional effects due to the project.
Outermost regions (if applicable)
Describe which outermost regions are impacted by the project.
Indicate how the regions and project promoters cooperate. If relevant, specify which countries are impacted and
explain how the cooperation with them is ensured.
Other considerations
Please describe any other relevant considerations.
Not applicable
#§IMP-ACT-IA§# #@CAT-EFF-CE@#
5. CATALYTIC EFFECT
5.1 Financial gap
Financial gap
Explain how the EU grant will facilitate or accelerate the project, in comparison to a situation without the EU funding.
Describe the financial gap, which the EU funding is supposed to cover. Specify and justify the amount.
Describe the financial obstacles and how public funding would help to overcome them.
Indicate whether you expect any EU support under the Recovery and Resilience Facility (RRF) (with an approximate
amount).
To reach the ambitious goal to have eFTI fully in place in 2025, the project is essential to accelerate a
common harmonised development that will be much further delayed without it. Considering that eFTI
must be implemented in all MS by 2025 and considering that the first of CEF2 Transport call in 2021 (on
this topic), did not generate a project, the urgency to finally start acting has only grown bigger for the
Member States.
In some cases, the national RFF will support the full implementation of the national eFTI architecture, but
the early piloting stage will not be covered. Therefore, once again eFTI4EU is an essential tool to cover
the early-stage financial gap.
Without eFTI4EU there is the serious risk of delays in the national implementation of the eFTI Regulation.
Despite the many efforts from EC (DTLF forum, information sessions, Research Funding Programs, CEF
Funding, IT building blocks, organisation of Member State workgroups) the uptake by the Member States
of eFTI preparations remains far below the expected level. The Council stresses that it is urgent for its
Member States to take action towards achieving the eFTI implementation.
EU support is needed for this Project to bridge a financial gap. The eFTI implementation cannot be
approached from an individual country viewpoint but is to build on the joined efforts of as many MS as
possible. The leveraging effect will also help to minimize the current different ‘eFTI’ maturity stages
between the MS. This is the added value that CEF financing and support to this Project offers. The CEF
financing will facilitate and promote the creation of a consortium of Member States that will bring together
work from other private and public entities to address these issues together, joining different stakeholders
to improve the efficiency of reporting operations in Europe and ultimately contribute to a harmonized eFTI
41
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
implementation. Should the co-funding not be available MS indicated that these initiatives would be
delayed for another 2 years., given the budgetary constraints all MS are confronted with.
No support under the Recovery and Resilience Facility is expected for this Project in any of the involved
MS.
5.2 Public and private investment and financial leverage
Public and private investment and financial leverage
Provide information on the capacity of the grant to trigger a bigger investment or to allow other investments.
Will the EU grant help mobilising additional public and private funding? Will different sources of funding or higher
amounts become available? Has the financial leverage been optimised in terms of amounts and duration?
eFTI4EU will be a great investment trigger.
National budget will be mobilised to move from the pilot stage to the full eFTI implementation including
specific budget of the national Competent Authorities.
Private funding will be mobilised for 2 different strands:
- Economic Operators that will invest in developing and certifying their platforms
- Software service providers that will invest in their products to be ready to provide to the
market the new eFTI services
5.3 Stakeholder commitment
Stakeholder commitment
Explain how the EU funding would reinforce the commitment of different partners and stakeholders (public and
private).
What would be the effects, in terms of commitment of stakeholders, if the project would not receive the grant?
EU funding of the eFTI4EU project will be a crucial catalyst for eFTI take off initially for the Competent
Authorities in the MSs and indirectly also to the Economic Operators who will be the long-term real
beneficiaries of this project. Moreover, is an indispensable and accelerating means to enable the rapid
roll-out of the eFTI exchange environment and thus to meet the ambitious timetable of the EU
Commission for eFTI, as this requires considerable investment costs.
If the grant is not received, severe consequences on the eFTI harmonisation and implementation
schedules will be expected. On the contrary, this could be counterproductive about the ambitious
timetable of the EU Commission. Many MSs are not aware of the scope of regulation and the necessary
cross-border harmonisation and are still waiting for the DA and IA. This will significantly delay the
timetable for eFTI readiness.
#§CAT-EFF-CE§#
42
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
#@WRK-PLA-WP@#
6. WORK PLAN, WORK PACKAGES, ACTIVITIES, RESOURCES AND TIMING
6.1 Work plan
Work plan
Provide a brief description of the overall structure of the work plan (list of work packages or graphical presentation (Pert chart or similar)).
Overall Structure of the Work Plan
The project is organised in four (4) Work Packages (WPs) that correspond to the project’s objectives, coordinated by the Project Coordination Committee. Each WP is led by a
project partner particularly experienced in the corresponding area, so as to ensure the best practice and work efficiency.
Work Packages Timing and Key Dependencies
The Member State activities will be coordinated within WP1 and supported by other WPs to provide detailed analysis of the requirements and analysis of the required WP
contribution. After the initial Studies and project starting phase the project focus will move towards creation of reference implementation related pilots and communication led
by WP2 and WP3. Information and results from WP2 and WP3 will provide constant input for WP1 and Member States as authority support actions. This iteration loop between
the WPs will be repeated constantly, so that all required project goals and aims will be covered. In parallel WP4 project management will take care of project process,
coordination and novelty. Below WPs and subtasks are listed.
WP1: Horizontal Alignment
● Task 1.1 Authorities’ road map (requirements and preparatory works)
● Task 1.2 Interoperability of eFTI exchange environment (planning, reference specification, testing)
● Task 1.3 eFTI Gate Strategy and Governance (Common Rule Set)
● Task 1.4 eFTI Gate Content and Accessibility (e.g. Metadata, Access Management)
● Task 1.5 Legal implementation and Certification-related affairs and rules
WP2: National and Corridor Pilots
● Task 2.1 Pilot collaboration and knowledge sharing
43
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
● Task 2.2 Pilot planning
● Task 2.3 System development, testing and piloting
● Task 2.4 Cross-border testing and pilots
● Task 2.5 Pilot results and analysis
WP3: Communication, Dissemination & Capacity Building
● Task 3.1 Communication / information
● Task 3.2 National events
● Task 3.3 EU workshops
● Task 3.4 eFTI yearly conferences
● Task 3.5 Cross fertilisation events
● Task 3.6 Training Courses
WP4: Project Management
● Task 4.1 Project Management and Controlling
● Task 4.2 Project Coordination Committee Support
● Task 4.3 Identification of actions needed
The Figure below summarises the project structure, illustrating the relationships between WPs and the Project Coordination Committee that, as explained in the previous
paragraph will heavily support all the eFTI4EU activities.
All the Deliverables will be in English (pdf format).
44
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Project WP structure
45
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
The project follows agile development cycles, where project coordination, strategy, governance, reference model and piloting will be executed partly in parallel. The project
scheduling is also synchronised with the EU eFTI roadmap. The Figure Below displays the time dimension of the project and its WPs, which will be implemented in total in 36
months.
April 2023 Sep 2023 Jan 2024 Dec 2024 Dec 2025
Early studies Project Kick Off Implementation and project Reference Reference
Own risk work Grant Agreement coordination committee start implementation 0.5 implementation 0.9
Task 1.1. Authorities’ road map (requirements & preparatory works) Task 1.3 eFTI Gate Strategy & Governance
Task 1.2 Interoperability of eFTI exchange environment (planning, reference specification, testing)
Task 2.1 Pilot collaboration, knowledge sharing and codeveloping reference architecture
Task 2.2 Pilot planning Task 2.5 Pilot results and analysis
Task 2.3 System development, testing and piloting
Task 2.4 Cross-border testing &
pilots
WP 4 Project management
Task 1.4 eFTI Gate Content and
Task 1.5 Legal implementation and
Accessibility (e.g., Metadata, Access
Certification-related affairs and rules
Management)
WP 3 Horizontal communication and dissemination activities
Grant Decision Subcontractor agreements First review Mid term review Final review
June 2023 Dec 2023 June 2024 June 2025 Mar 2026
Project Gantt chart
46
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
6.2 Work packages, activities, resources and timing
WORK PACKAGES
Work packages
This section concerns a detailed description of the project activities.
Group your activities into work packages. A work package means a major sub-division of the project. For each work package, enter an objective (expected outcome) and list the activities,
milestones and deliverables that belong to it. The grouping should be logical and guided by identifiable outputs.
Projects should normally have a minimum of 2 work packages. WP1 should cover the management and coordination activities (meetings, coordination, project monitoring and evaluation, financial
management, progress reports, etc) and all the activities which are cross-cutting and therefore difficult to assign to another specific work package (do not try splitting these activities across different
work packages). WP2 and further WPs should be used for the other project activities. You can create as many work packages as needed by copying WP1.
For very simple projects, it is possible to use a single work package for the entire project (WP1 with the project acronym as WP name).
For works proposals, please make sure to use separate work packages for activities that are linked to the following specific budget categories (D.2 Studies, D.3 Synergetic elements, D.4 Works in
outermost regions and D.5 Land purchase, if applicable).
Work packages covering financial support to third parties ( only allowed if authorised in the Call document) must describe the conditions for implementing the support (for grants: max amounts
per third party; criteria for calculating the exact amounts, types of activity that qualify (closed list), persons/categories of persons to be supported and criteria and procedures for giving support; for
prizes: eligibility and award criteria, amount of the prize and payment arrangements).
Enter each activity/milestone/output/outcome/deliverable only once (under one work package).
Ensure consistency with the detailed budget table per WP/calculator (if applicable) (n/a for prefixed Lump Sum Grants)
Objectives
. Describe the objective of the work package and how it contributes/relates to the overall and specific objectives of the project.
State if there are links to other work packages (or conversely that there are no links to any other work package).
Activities (WP description)
Provide a concise overview of the work (planned tasks). Be specific and give a short name and number for each task. Provide quantitative information (dimensions, capacity of infrastructure, etc).
Mention for each task links with tasks planned under other work packages. Flag tasks which are on the critical path.
Show who is participating in each task: Coordinator (COO), Beneficiaries (BEN), Affiliated Entities (AE), Associated Partners (AP), indicating in bold the task leader.
Add information on other participants’ involvement in the project e.g. subcontractors.
Complete the column on subcontracting. Subcontracts must be awarded using your usual purchasing practices – provided that they ensure best value for money and no conflict of interests. If you
are a public procurer (‘contracting authority/entity’ within the meaning of the EU Directives on public procurement), you must also comply with the applicable national law on public procurement.”
Note:
The Coordinator remains fully responsible for the coordination tasks, even if they are delegated to someone else. Coordinator tasks cannot be subcontracted.
47
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Milestones and deliverables (outputs/outcomes)
Milestones are control points in the project that help to chart progress.
The milestones must be SMART: specific, measureable, achievable, relevant and time-related and must have clearly identified means of verification. The number of milestones per work package
will depend on the complexity of each work package. Each work package should have at least two milestones related to it, ideally, one milestone per activity and per year. If needed, one or more
intermediate milestones can be added, particularly for long or very complex and costly work packages. Examples of milestones include publication of a tender, signature of contract, starting of
study/works, technical progress as certified by the works/studies subcontractors, etc.
Means of verification are how you intend to prove that a milestone has been reached. If appropriate, you can also refer to indicators. They should be easy and concrete. Examples of means of
verification include: publication of the tender notice, signature of a contract by the last party, acceptance/approval of final report/outcome, etc. A deliverable can be also used as a mean of verification
for a milestone.
Deliverables are project outputs which are submitted to show project progress (any format) and achievement of the technical work. Refer only to major outputs. Do not include minor sub-items,
internal working papers, meeting minutes, etc.
Examples of deliverables for works projects include: constructed rail section, built bridge, deployed charging stations, concluded contract, published manuals, construction of the transmission line
[name of the line], commissioning of the transmission line [name of the line], constructed transmission tower, deployed submarine cable, etc. For deliverables which are physical investments, provide
in the ‘Description’ field the type of document you will use to prove the completion of the deliverable (e.g. acceptance note, test protocol, certificate of completion, handover certificate, etc).
Examples of deliverables for studies include: a technical design, an engineering design, a completed analysis, an environmental report, data collection, creation of a model and description of
scenarios, etc. For such deliverables, provide in the ‘Description’ field: confirmation of completion and/or approval of technical design, copy of environmental report, etc.
For deliverables such as meetings, events, seminars, trainings, workshops, webinars, conferences, etc., enter each deliverable separately and provide the following in the 'Description' field: invitation,
agenda, signed presence list,report of the event, presentations.
For deliverables such as manuals, toolkits, guides, reports, leaflets, brochures, training materials etc., add in the ‘Description’ field: format (electronic or printed), language(s), approximate number
of pages and estimated number of copies of publications (if any).
For each deliverable you will have to indicate a due month by when you commit to upload it in the Portal. The due month of the deliverable cannot be outside the duration of the work package and
must be in line with the timeline provided below. Month 1 marks the start of the project and all deadlines should be related to this starting date.
The labels used mean:
Public — fully open ( automatically posted online on the Project Results platforms)
Sensitive — limited under the conditions of the Grant Agreement
EU classified — RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444. For items classified under other rules
(e.g. national or international organisation), please select the equivalent EU classification level.
Please note that milestones/deliverables should relate to the project work. Periodic reports or final reports linked to payments should NOT be included.
48
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Work Package 1
Work Package 1: Horizontal Work
Duration: M1 – M36 Lead Beneficiary: BUNDESMINISTERIUM FÜR DIGITALES UND VERKEHR (BMDV)
Co-leader MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM
(MKM)
Objectives
Objectives
WP 1 is the common harmonisation work package for the participating Member States to identify, by means of country-specific roadmaps, inter alia, the inventory of existing
reusable systems, requirements for national eFTI implementation, resource needs (financial and technical) and requirements for the long-term operation of the eFTI exchange
environment;
• analyse the DA and IA introduced by the EU Commission and jointly translate them into harmonised technical specifications, thus providing member states with
solid specifications, e.g. for the development/tendering of an eFTI gate;
• develop national and cross-border test strategies to test the eFTI exchange environment;
• develop a strategy for an open-source reference implementation of an eFTI gate on top;
• develop an agreed governance model that describes general rules for eFTI gates and the maintenance of the specifications.
Within the framework of Task 1.1, the participating MS will first identify the existing systems, requirements for national eFTI implementation, resource needs (financial and
technical), pilots planned during the project and requirements for the long-term operation of the eFTI exchange environment in order to document these in so-called national
roadmaps (D1.2). This should create a solid information basis for eFTI4EU to analyse the starting point for the implementation of the eFTI exchange environment. For this
purpose, a work plan (D1.1) will be developed together with the MS, in which the requirements for the roadmaps will be documented. In addition, a corresponding roadmap
structure will be developed in the form of a template. Both should help to collect the information in a harmonised way and facilitate an analysis afterwards. The overall MS
summary of the individual country-specific roadmaps will be made in a Roadmap Status Report (D1.3). Here, an analysis of the commonalities and differences in the MS is
carried out, which represents a benchmark for the harmonisation range that is available for the implementation of the eFTI exchange environment and thus for the provision
of interoperability.
Task 1.2 (Interoperability of the eFTI exchange environment for planning, reference specification, testing) will analyse the DA and IA introduced by the EU Commission and
jointly translate them into harmonised technical specifications. In addition, initial findings from the national roadmaps will be incorporated in parallel and the use of e.g. EU
49
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Building Blocks will be discussed, such as eDelivery or similar existing, fully specified solutions. The use of such solutions would indeed be a time saver for the project, as
they could be implemented immediately in WP2.
The approach in Task 1.2 is to start with a system overview and interface specification (D1.4). This includes a cross-pilot system architecture and an identification of interfaces
to be considered (and harmonised) based on the architecture favoured in DTLF SG1 (Scenario 7). The next step is to analyse how which existing systems can take on the
role of an eFTI gate (if necessary, by modification), or where a “new” eFTI gate can be used in general. The resulting system dependencies are described in system
specifications (D1.5). These also take into account requirements of the eFTI stakeholders, including detailed application scenarios and usability requirements as well as
relevant service level and interoperability key performance indicators (KPI), which will be validated in the WP2 laboratory tests and pilot projects. According to the findings
and experience gained from the implementation (WP2), the specifications will be further improved and adapted until the end of the project, so that a tested version of the
specifications (D1.6) will be available at the end.
The aim is to provide member states with solid specifications, e.g. for the development/tendering of an eFTI gate. On the other hand, the specifications as a whole will be
used to derive a development plan for reference development (D1.7) for the co-development of the reference implementation. The reference development will be jointly
developed and tested by the financially involved eFTI4EU partners in WP2 and made available together with the data model and the requirement specifications to all Member
States as open-source code that can be modified, licensed, re-licensed or used without restrictions. Based on the above system specifications, national and cross-border
test strategies for testing the eFTI exchange environment will be developed, which will be summarised in an eFTI exchange environment test plan (D1.8). Here, too, it would
be possible to benefit from ready-made EU building blocks that provide test plans or test opportunities where appropriate.
Task 1.3 eFTI gate strategy and governance (Common Rule Set) aims to develop an agreed governance model (D.1.9) that describes common rules for eFTI gates (e.g.
rules for onboarding of eFTI platforms, rights and duties) and the maintenance of specifications. It should enable member states to monitor the technological-sociological
system landscape and develop viable plans for the governance of the reference implementation description, which can be made available to the market as open
documentation. This includes an identification of possible governance actors, their roles and relationships within the value chain structure.
The project partners will be responsible for jointly developing, testing and piloting the eFTI reference implementation in national and cross-border, transnational supply chain
use cases where the exchange of data within a cross-border eFTI exchange environment is required. Task 1.4 is dedicated to the inside of the eFTI reference implementation,
i.e. an eFTI Gate service and content specification (D1.10) will functionally describe the relevant eFTI Gate services (e.g. internal/external authentication, eFTI platform-
related services, eFTI Gate-to-eFTI Gate services, logging, search mechanism, etc.) and specify the relevant registries (eFTI platform metadata, links, etc.).
Task 1.5 will address the legal implementation of eFTI components, taking into account the certification requirements and rules that will be established for eFTI components.
A strategy plan for legal implementation and certification (D1.11) will therefore collect and document national strategies and processes for each MS with regard to the legal
implementation of eFTI gates and the implementation of national certification processes for eFTI gates and platforms.
Important note on timing: The EU Commission's ambitious eFTI timetable foresees that by August 2025, public authorities will have operational systems in place for the
exchange of eFTI datasets, enabling economic operators to provide their transport information in the form of eFTI datasets and sub-sets. Therefore, many of the tasks need
to start very early, before the grant agreement is signed and only slightly staggered, as well as working in parallel in an agile process. To this end, it is planned that the
individual tasks in WP1 closely coordinate with each other, but also with the activities for prototypical eFTI Gate development in WP2. This ensures continuous development
and improvement of the specifications but also of the prototypical development. A sequential approach would significantly delay the project duration under the circumstances
mentioned. The goal of eFTI4EU pilots that are as close as possible to operational use would otherwise not be possible.
50
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Activities (WP description)
Task No Task Name Description Participants Subcontracting
(continuous (Yes/No and Percentage of the task
numbering that will be subcontracted).
linked to Name Role
WP) (COO,
BEN, AE,
AP,
OTHER)
T1.1 Task 1.1 Authorities’ Road map Identify, by means of country-specific ALL BEN YES (up to 25%)
(requirements and preparatory works) roadmaps, inter alia, the inventory of
existing reusable systems,
requirements for national eFTI
implementation, resource needs
(financial and technical) and
requirements for the long-term
operation of the eFTI exchange
environment
T1.2 Task 1.2 Interoperability of eFTI Analyse the DA and IA introduced by ALL BEN YES (up to 25%)
exchange environment (planning, the EU Commission and jointly
reference specification, testing) translate them into harmonised
technical specifications, thus
providing member states with solid
specifications, e.g. for the
development/tendering of an eFTI
gate
T1.3 Task 1.3 eFTI Gate Strategy and Develop an agreed governance ALL BEN YES (up to 25%)
Governance (Common Rule Set) model that describes general rules
for eFTI gates and the maintenance
of the specifications (based on
approved IAs and DAs)
T1.4 Task 1.4 eFTI Gate Content and Specify relevant eFTI Gate services ALL BEN YES (up to 25%)
Accessibility (e.g. Metadata, Access (e.g., internal/external authentication,
Management) eFTI platform-related services, eFTI
Gate-to-eFTI Gate services, logging,
51
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
search mechanism, etc.) and the
relevant registries (eFTI platform
metadata, links, etc.
T1.5 WP1.5 Legal implementation and Collect and document national ALL BEN YES (up to 25%)
Certification-related affairs and rules strategies and processes for each
MS with regard to the legal
implementation of eFTI gates and the
implementation of national
certification processes for eFTI gates
and platforms
Milestones and deliverables (outputs/outcomes)
Milestone No Milestone Name Work Package Lead Beneficiary Description Due Date Means of Verification
(continuous numbering No (month number)
not linked to WP)
MS 1 WP1 Kick-Off 1 BMDV (MKM) Kick-Off Meeting with eFTI4EU M1 Validation from the
partners to initiate the work on WP1 Project Board
and in particular prepare the work in
Task 1.1 and 1.2.
MS 2 Roadmap 1 BMDV (MKM) Definition of the timeframe and M3 Validation from the
Workplan for MS content of national roads maps to Project Board
including be provided by the MS. Appropriate
templates ready templates are be delivered.
MS 3 Roadmap Status 1 BMDV (MKM) Summary on national roads maps: M17 Validation from the
Report ready Analysis of commonalities and Project Board
differences
MS 4 Progress on 1 BMDV (MKM) Interim report on technical M13 Validation from the
technical specifications to comply with eFTI Project Board
specifications to requirements =D1.5
comply with eFTI
requirements
52
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
MS 5 End of technical 1 BMDV (MKM) Final report on technical M32 Validation from the
specifications to specifications to comply with eFTI Project Board
comply with eFTI requirements =D1.6
requirements
Deliverable No Deliverable Name Work Package Lead Beneficiary Type Dissemination Due Date Description
(continuous numbering No Level (Month number) (including format and
linked to WP) language)
D1.1 Roadmap Task1.1 BMDV (MKM) [R — Document, [PU — Public] M3 Detailed workplan and
Workplan for MS report] template to provide a
including harmonised structure for
templates the national roadmaps
D1.2 National eFTI Task1.1 BMDV (MKM) [R — Document, [PU — Public] M11 National eFTI roadmap
Roadmaps report] for each MS
D1.3 Roadmap Status Task1.1 BMDV (MKM) [R — Document, [PU — Public] M17 Summary on national
Report report] roads maps: Analysis of
commonalities and
differences
D1.4 eFTI System Task1.2 BMDV (MKM) [R — Document, [PU — Public] M7 Architectural system
overview and report] overview on the eFTI
interface exchange environment
specification and identification of
relevant interfaces
D1.5 eFTI System Task1.2 BMDV (MKM) [R — Document, [PU — Public] M12 Functional description of
specifications report] all (standard) systems
(preliminary involved in the eFTI
Versions) exchange environment
and description of the
respective requirements
according to provided
eFTI DA and IA and
relevant control use
cases including
appropriate technical,
53
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
service-level and
interoperability KPI
targets
D1.6 eFTI System Task1.2 BMDV (MKM) [R — Document, [PU — Public] M31 Amended final versions
specifications report] of the eFTI System
(final Versions) specifications after
implementation and test
experiences
D1.7 Reference Task1.2 BMDV (MKM) [R — Document, [PU — Public] M14 Definition of
implementation report] development phases for
development plan the co-development of
the reference
implementation
D1.8 eFTI exchange Task1.2 BALM (MKM) [R — Document, [PU — Public] M20 Definition of national and
environment test report] cross-border test cases
plan for the eFTI exchange
environment
D1.9 eFTI Gate Task1.3 BMDV (MKM) [R — Document, [PU — Public] M29 Common rules for eFTI
Strategy and report] Gates (e.g. rules for
Governance onboarding of eFTI
Model platforms, rights and
duties) and maintenance
D1.10 eFTI Gate service Task1.4 BMDV (MKM) [R — Document, [PU — Public] M14 Functional description of
and content report] relevant eFTI Gate
specification services (e.g.
internal/external
authentication, eFTI
platform related services,
eFTI Gate to eFTI Gate
services, logging, search
mechanism etc) and
specification of relevant
54
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
registries (eFTI Platforms
Metadata, links, etc)
D1.11 Legal Task 1.5 BMDV (MKM) [R — Document, [PU — Public] M26 Definition of national
implementation report] strategies and processes
and certification for each MS with regard
strategy plan to the legal introduction
of eFTI Gates and the
introduction of national
certification processes
for eFTI Gates and
platforms
Estimated budget — Resources (n/a for prefixed Lump Sum Grants)
See detailed budget table per WP/calculator (annex 1 to Part B)
Work Package 2
Work Package 2: National and Corridor Pilots
Duration: M6 – M33 Lead Beneficiary: LIIKENNE JA VIESTINTAVIRASTO (LJV)
Co-Leader IN Continue et Services
Objectives
▪ Objective 1 is to test and pilot in real world conditions the main use cases of eFTI gates against the reference model developed in WP1:
○ Test and pilot eFTI gate to competent authorities data exchange
○ Test and pilot eFTI gate to eFTI platforms data exchange
○ Test and pilot eFTI gate to other eFTI gates data exchange
○ Test and pilot eFTI gate to other liked systems data exchange
▪ Objective 2 is to cover all main transport modes in pilots (maritime, air, rail and road) and with these test objective 1 eFTI Gate use cases
▪ Objective 3 is to cover the whole eFTI architecture from Economic Operators to Competent Authorities in pilots
55
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
▪ Objective 4 is to pilot above mentioned issues in national and international/corridor context
The broad target of the Project Partners is to reach close working relationship with all engaged Member States to better understand their needs, so that parallel national
eFTI development projects can be supported with more accurate definition, co-development and governance model. I.e. the eFTI4EU project will provide guidance and
architecture manual for MSs how to establish interoperable and a functioning system for eFTI implementation. This work will be started already in WP1, but Task 2.1 will
continue it and link that to the pilots and testing aspects. The WP2 will focus on multi-country, multi-operator, cross-border eFTI use case scenarios and it will provide
feedback and information for reference model development. Due to the short time that the project – and the Member States – have for implementation of eFTI, WP 2 will
emphasise agile co-development approach between member states. In this incremental development process, the Project Partners target to gain rapid progress and level
ground for the eFTI reference implementation. The development process is also linked to the general EU eFTI delegated acts development and potential CEF calls (2023-
2024), where eFTI4EU project could provide 0.5 version of reference model for those MSs, which were not ready to participate 2022-2023 CEF round. Hence, the eFTI4EU
will facilitate the eFTI entry for other Member States in the project but also for those which are not direct beneficiaries. The co-development, planning and collaboration will
be done with the lead of a few forerunning Partners (Task 2.2), who will help to create the eFTI Gate reference technology and show its potential benefits in national and
cross border pilots, with respect to multimodal transportation. The lead partners for co-development are Estonia, Finland and Germany, with support of other participant
MSs.
Testing will be started with sample and simulation data under Task 2.3. Aim is to get a functional solution as soon as possible and then further develop and test it in real
world pilots (Task 2.4). National and corridor pilots with various eFTI use cases will be made together with economic operators representing different transport modes. For
the corridor pilots the TEN-T network is followed and pilots should be designed to verify real commercial transportations along the corridors. In the North, North Sea – Baltic
corridor and stakeholders along it will be engaged to pilots and the same will be done in the South on the Scandinavian Mediterranean corridor. The corridor covers road,
rail and maritime transportation and all these will be integrated to pilots. As reported in the previous sections, eFTI4EU will cover all the 9 CNCs. The corridor approach
will be used to integrate both national and international transportations and to tests the whole message channel from information enquiry of Competent Authority (CA) to the
data sharing of Economic Operator (EO) and how to enable information exchange between MS eFTI Gates. Target is to pilot different real world use cases in close
collaboration with EOs and potential existing eFTI platforms. If commercial solutions are not available similar test solutions will be used to simulate the data exchange
between EO and CA. With these pilots eFTI4 EU project team wants to ensure the DTLF requirement compliance of the developed reference model its capability in real
world environment. At the same time pilots will enable opportunity to communicate and collect feedback from EOs and other relevant stakeholders.
The purpose of the pilots is to cover full eFTI architecture and its components. And hence, to provide concrete experience and lessons learned from real world use cases
and to adapt those into the reference solution, so that Member States are able to implement their operative eFTI Gates on time. Pilot results and findings will be disseminated
both on national and international level among eFTI stakeholders (Task 2.5). Target is to cover several eFTI Gate use cases and test these in different MSs and international
corridors, so that in total the eFTI4EU project covers 4 main test use cases for eFTI GATES:
1. Test and pilot eFTI gate to competent authorities data exchange
2. Test and pilot eFTI gate to eFTI platforms data exchange
3. Test and pilot eFTI gate to other eFTI gates data exchange
4. Test and pilot eFTI gate to other liked systems data exchange
56
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
1) eFTI Gate to CA will focus on pilots how to enable data and information exchange between the system and CAs. It will cover identification, authentication and
authorization testing for several CA profiles with respect of their data enquiries. In addition, the pilots between eFTI-Gate and competent authorities holds the pilots
and solutions to manage and coordinate the competent authority platforms and the eFTI-Gates coordination.
2) The pilots between eFTI-Gates and eFTI platforms will entail the testing of eFTI-Gates connectivity and data exchange, the metadata registries and search
mechanism operations nationally and across borders. Some of the testing entails to test the push of metadata and unique links to the eFTI Gate. Some of the
testing is coordinated highlighting border crossing use cases. In general these test highlight the data exchange between the EOs and eFTI Gates
3) Pilots of eFTI-Gate to eFTI-Gate holds the international corridor testing of the entire eFTI exchange environment in exchanging and passing on the query between
eFTI Gates and CAs. These pilots will emphasise the interoperability between national systems.
4) Final use case category focuses on the interoperability and connection between eFTI Gates and other linked systems, such as IMSOC and EMSW. Under these
pilot the aim is to study and test how these systems together can help CAs and EOs to digitalize their logistics processes and tasks
For all the pilots, the aim in WP 1 with WP 2 support is to jointly develop control and monitoring system with a set of KPIs, which can be used to enable verification and
evaluation of the pilot results and output. Co-development and piloting will result into deliverables as set below. The scope of co-development and piloting is defined by the
number of use cases and budget of the participating MS. Based on these evaluations the Project Coordination Committee needs in two milestones approve the reference
model, which can be further developed and finally presented as a desired reference model of the eFTI4EU project. The consortium has set high ambitious level for the
reference model, which could be easily adopted and transferred to the operational eFTI systems of MSs. Each use case is associated with a specific set of requirements
and interoperability, technical-level and service-level KPIs, that cover all transport modes and focus on capability and usage of eFTI Gates. However, pilots will cover the
whole eFTI message channel from the Economic Operator to eFTI platform and from there to eFTI Gate and further on to Competent Authorities, with respect to metadata,
information enquiry and data sharing identification-authentication-authorization aspects and linked systems when alternating between different modes of transport and
when crossing internal EU borders. In parallel with pilots, an important part of WP2 is also co-development between MSs. Co-development means actual shared
architecture and development actions, which target to the reference model of the project. Aim is to develop simplified system, which will succeed in all above mentioned
eFTI Gate use cases and can be approved by MSs, but without operative GUIs and operation models. Iteration is necessary in co-development to ensure that potential
improvements are applied to the components of the reference implementation through feedback so that regression testing can be performed to ensure that the basic target
KPIs are achieved. It is also necessary to provide feedback to WP1 so that improvements can be incorporated into the specifications or governance processes as
appropriate.
Activities (WP description)
Task No Task Name Description Participants Subcontracting
(continuous (Yes/No and Percentage of the task
numbering that will be subcontracted).
linked to Name Role
WP) (COO,
BEN, AE,
AP,
OTHER)
Task 2.1 Pilot collaboration and knowledge WP 2 horizontal collaboration YES (up to 75%)
sharing between project partners and other ALL BEN
WPs in order to harmonize and share
actions and knowledge.
57
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Task 2.2 Pilot planning Detailed pilot plans for each MS. ALL YES (up to 75%)
Plans will cover: general description, BEN
roles and responsibilities, schedule
and covered functionalities and use
cases.
Task 2.3 System development, testing and Preparation testing and simulation ALL YES (up to 75%)
piloting pilots for reference model. BEN
Task 2.4 Cross-border testing and pilots Actual reference model testing with ALL YES (up to 75%)
full eFTI architecture and engaged BEN
stakeholders. Pilots will follow a
corridor approach, where real world
use cases are used for piloting.
Task 2.5 Pilot results and analysis integration of national and ALL YES (up to 75%)
international pilot results. Pilot BEN
analysis and reporting to other WP.
Milestones and deliverables (outputs/outcomes)
Milestone No Milestone Name Work Package Lead Beneficiary Description Due Means of Verification
(continuous numbering No Date
not linked to WP) (month
number)
MS 6 Reference WP2 LJV Reference implementation model M21 Reference model 0.5
implementation 0.5 available, tested and documentation is approved by the
0.5 documented Project Board
MS 7 Reference WP2 LJV Reference implementation model M33 Reference model 0.9
implementation 0.9 available, tested, piloted and documentation is approved by the
0.9 documented Project Board
58
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
MS 8 End of the WP2 LJV Final version on the eFTI M31 Final version of the eFTI
development and components developed and components approved by the
integration of the integrated Project Board
eFTI components
MS 9 Demo-Day on WP2 LJV (BALM) Public meeting to show the eFTI M26 Minutes of the meeting available
end-of-testing and developments and integrations online
eFTI carried out by eFTI4EU partners on
implementation production environment – This is a
preparatory meeting for the WP3
final national event
Deliverable No Deliverable Name Work Package Lead Beneficiary Type Dissemination Due Description
(continuous numbering No Level Date (including format and language)
linked to WP) (month
number)
D2.1 eFTI4EU pilot Task 2.2 LJV [R — Document, [PU — Public] M11 Detailed description and workplan
plan report] for all national and cross-border
pilots and pre-testing.
D2.2 Reference Task 2.1, Task LJV (BALM) [R — Document, [PU — Public] M21 Documented description of
implementation 2.3, Task 2.5 report] reference implementation and test
0.5 description results including recommendations
and system test and updated test plan.
summary
D2.3 Reference Task 2.1, Task LJV (BALM) [R — Document, [PU — Public] M33 Documented description of
implementation 2.4, Task 2.5 report] reference implementation and pilot
0.9 description and test results including
and pilot result recommendations for MS eFTI
summary implementations.
Estimated budget — Resources (n/a for prefixed Lump Sum Grants)
See detailed budget table per WP/calculator (annex 1 to Part B)
59
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Work Package 3
Work Package 3: Communication, Dissemination & Capacity Building
Duration: M1 – M36 Lead Beneficiary: CIRCLE
Objectives
The WP3 (Dissemination, Communication and scale-up) will create the project dissemination and communication activities aiming to implement the dissemination of the
project goals, reference implementation, test reports, pilot results, achievements, and other outputs and establish also capacity building activities.
Communicating and disseminating eFTI and the project activities and results:
• A set of communication /information / training tools (including an eFTI hub, were the specifications and reference implementations on eFTI will be published; an
example could be the OOTS Hub. https://ec.europa.eu/digital-building-blocks/wikis/display/OOTS/OOTSHUB+Home
• A set of national events in which MSs will communicate eFTI to EOs and to a broader public.
• A set of European workshops for very specific detailed issues.
• 3 eFTI conferences (one per year)
eFTI Capacity Building
• A series of workshops / on site visits in which more advanced countries could transfer their knowledge and expertise to less advanced ones this should include
lessons learnt including onboarding trainings (webinars) in collaboration with the European Commission and the member states, associations and other projects
• A set of training courses to be delivered monthly for CAs and EOs, also open to MSs not involved in the project (to complement the ones planned in the eFTI
second tender), including knowledge sharing regarding implementation of open-source software and a learning material library and video repository to support
member state and regional dissemination.
Activities (WP description)
Task No Task Name Description Participants Subcontracting
(continuous (Yes/No and Percentage of the task
numbering that will be subcontracted).
linked to Name Role
WP) (COO,
BEN, AE,
60
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
AP,
OTHER)
T3.1 Communication / information eFTI4EU LinkedIn account ALL BEN YES up to 20%
eFTI4EU 3 monthly European
newsletter and national newsletters
in national language
eFTI4EU brochure
eFTI pilot fact-sheets
eFTI general video
T3.2 National events 2 national events per year ALL BEN YES up to 60%
T3.3 EU workshops 2 specific technical online webinars ALL BEN NO
per year on very specific technical
issues
T3.4 eFTI yearly conferences 1 yearly event (kick off conference, ALL BEN YES up to 50%
mid term conference, final
conference)
T3.5 Cross fertilisation events 1 specific on line webinar per year + ALL BEN NO
3 on site visits
T3.6 Training Courses Set of training tutorial and training ALL BEN YES up to 30%
library available in a specific
repository
Milestones and deliverables (outputs/outcomes)
Milestone No Milestone Name Work Package Lead Beneficiary Description Due Date Means of Verification
(continuous numbering No (month number)
not linked to WP)
61
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
MS 5 Kick off of the 4 CIRCLE Starting point of the use of internet 3 Post and news
digital and social nets to communicate published
communication about the project
campaigns
MS 6 WP 4 4 CIRCLE Evaluation of the different tools and 20 Publication of Mid-Term
Intermediate events and corrective actions Communication Report
Assessment
MS 7 WP 4 Final 4 CIRCLE Evaluation of the different tools and 35 Publication Final
Assessment events Communication Report
Deliverable No Deliverable Name Work Package Lead Beneficiary Type Dissemination Due Date Description
(continuous numbering No Level (month number) (including format and
linked to WP) language)
D3.1 Detailed 4 CIRCLE R PU 3 Descripton and detailed
Communication planning
Plan
D3.2 Mid-Term 4 CIRCLE R PU 15 Intermediate Report on
Communication Communication activities
Report
D3.3 Final 4 CIRCLE R PU 30 Final Report on
Communication Communication activities
Report
Estimated budget — Resources (n/a for prefixed Lump Sum Grants)
See detailed budget table per WP/calculator (annex 1 to Part B)
62
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Work Package 4
Work Package 4: Project management and coordination
Duration: M1 – M36 Lead Beneficiary: MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM (MKM) –
Estonian Ministry of Economics and Communication,
supported by PortExpertise
Objectives
It covers the management and coordination activities of EFTI4EU that will be required throughout its duration. Adequate administrative and technical organisation structures,
control procedures, quality and risk management, monitoring and auditing processes will be designed and followed as part of this activity. The results of this activity include
the elaboration of a Project Management Plan, the Project Status Reports, Financial Statements and delivery of the Final Reports (both financial and technical) for the
Project.
The aim of this activity is to cover the management tasks of the Project. These include adequate coordination actions, control procedures, quality management, risk
management, monitoring mechanisms and publicity actions.
WP objectives are:
• Efficient management of the project, fulfilment of all administrative and financial requirements in full compliance with contractual requirements
• Communication with the Member States Ministries, CINEA, the EC and between local decision makers & stakeholders (Port Authority and logistic operators)
• Set-up of the kick-off and regular project meetings
• Organizing the different projects meetings at regular intervals
• Quality assurance of activities’ execution
• Technical control of all activities ensuring the quality of work and the timely production of the deliverables.
• Risk Management
The management structure and procedures are described in detail in the specific paragraph.
The WP4 Project Management, will be responsible for the overall project coordination, management and reporting. Additionally, the interface to the European Commission
will be taken over by the Project Management.
Task 4.1. is the main task of the secretariat making sure that the project is managed and running according to the requirements of the Grant Agreement, Governance
Handbook and the Consortium Agreement between the consortium partners and the EU Commission. This task includes:
• preparation, consolidation, finalisation and submission of the financial reports
63
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
• monitoring the expenses versus the budget
• review and monitor the project status and milestone monitoring
• consolidation of the project’s annual work programme from all activities
• plan, manage and monitor incoming and outgoing deliveries
• change management: anticipate, evaluate and manage changes in project structure, project participation, budget allocation changes, leadership appointments etc.
• escalation management: resolve escalated issues
• risk management: Create, monitor and update risk management plan + identify and mitigate project risks
• quality management: set up and monitor quality assurance guidelines
• setup, generate and manage procedures, minute taking, templates and tools to support above tasks (including the initial creation of a NAPCORE “brand” with logo,
design, colour scheme etc.)
• setup, operation and management of a project management/document/collaboration platform
• provision of a virtual meeting (and webinar) solution to enable planned and ad-hoc virtual meetings of project partners (internally and with external partners)
All applicants will be active in this task to fulfil their obligations relating to their respective financial reporting and general project management tasks.
Task 4.2 will support the Project Coordination Committee operationally and strategically in their tasks in cooperation with the European Commission services. The task
therefore takes over the secretariat function. This includes the coordination of the topics to be discussed and the preparation of the meetings.
Tasks 4.3 and 4.4 will generally take over the collection of identified needs and future required actions. This will be done by collecting all gaps and unprocessed requirements
from the working groups. These can be new challenges not yet foreseen or ideas for innovations that appear during the course of the project. On this basis, recommendations
can be made for future projects or necessary measures in the project. In addition, in the case of serious unforeseen circumstances that have a major impact on the project,
this task will develop solution strategies that will be presented to the Project Coordination Committee for decision. In this way, this task essentially contributes to risk
management.
Activities (WP description)
Task No Task Name Description Participants Subcontracting
(continuous (Yes/No and Percentage of the task
numbering that will be subcontracted).
linked to Name Role
WP) (COO,
BEN, AE,
AP,
OTHER)
T4.1 Project Management See specific paragraph ALL BEN
64
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
T4.2 Technical Management See specific paragraph ALL BEN
T4.3 Quality control See specific paragraph ALL BEN
T4.4 Risk Management See specific paragraph ALL BEN
Milestones and deliverables (outputs/outcomes)
Milestone No Milestone Name Work Package Lead Beneficiary Description Due Date Means of Verification
(continuous numbering No (month number)
not linked to WP)
MS 8 Annual status 4 MKM Finalisation of the first-year M7 Validation by the MS and
report 2023 reporting submission to CINEA
MS 9 Annual status 4 MKM Finalisation of the second-year M19 Validation by the MS and
report 2024 reporting submission to CINEA
Deliverable No Deliverable Name Work Package Lead Beneficiary Type Dissemination Due Date Description
(continuous numbering No Level (month number) (including format and
linked to WP) language)
D4.1 Annual Status 1 MKM R PU M7 Progress report on 2023
Report 2023 management activities
D4.2 Annual Status 1 MKM R PU M19 Progress report on 2024
Report 2024 management activities
D4.3 Final Report 1 MKM R PU M27+6 Final reporting
Estimated budget — Resources (n/a for prefixed Lump Sum Grants)
See detailed budget table per WP/calculator (annex 1 to Part B)
65
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Timetable
Timetable
Fill in the timetable for the project (using either the template available on Portal Reference Documents or a Gantt chart which respects the minimum requirements set out in the template)
and attach it to your Application Form (annex X to Part B).
Due to the tight timing planned for eFTI the participating member states and partners agreed to start preparations as early as possible. Therefore eFTI4EU
is planned to start in April 2023 latest.
#§WRK-PLA-WP§#
2023 2024 2025 2026
eFTI4EU Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
WP1 Horizontal Alignment
T1.1 Authorities’ road map (requirements and preparatory works) D D M/D
Interoperability of eFTI exchange environment (planning, reference
T1.2 M D D M D D D
specification, testing)
T1.3 eFTI Gate Strategy and Governance (Common Rule Set) M D
eFTI Gate Content and Accessibility (e.g. Metadata, Access
T1.4 M D
Management)
T1.5 Legal implementation and Certification-related affairs and rules M D
WP2 National and Corridor Pilots
T2.1 Pilot collaboration and knowledge sharing
T2.2 Pilot planning D
T2.3 System development, testing and piloting M
T2.4 Cross-border testing and pilots M
T2.5 Pilot results and analysis M/D M/D
WP3
T3.1 Communication / information D M D M D
T3.2 National events
T3.3 EU workshops
T3.4 eFTI yearly conferences
T3.5 Cross fertilisation events
T3.6 Training Courses
WP4
T4.1 Project Management M M M
T4.2 Technical Management D D D
T4.3 Quality control
T4.4 Risk Management
66
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
#@ETH-ICS-EI@#
7. OTHER
7.1 Ethics
Ethics
Not applicable.
#§ETH-ICS-EI§# #@SEC-URI-SU@#
7.2 Security
Security
Not applicable.
#§SEC-URI-SU§# #@DEC-LAR-DL@#
8. DECLARATIONS
Higher funding rate (if applicable) YES/NO
Do you fulfil the conditions set out in the Call document for a higher funding rate?
NO
If YES, explain and provide details.
Insert text
Twinned projects (if applicable) YES/NO
Is the project twinned to another project which is funded under another CEF call and part of
the same global project?
If YES, give details on the twin-project (name, number, etc). NO
Note: Twinned projects will be evaluated together and afterwards managed as linked actions
(for the purposes of the Grant Agreement).
Insert text
Double funding
Information concerning other EU grants for this project
Please note that there is a strict prohibition of double funding from the EU budget (except YES/NO
under EU Synergies actions).
We confirm that to our best knowledge neither the project as a whole nor any parts of it have
benefitted from any other EU grant (including EU funding managed by authorities in EU
Member States or other funding bodies, e.g. EU Regional Funds, EU Agricultural Funds, etc).
YES
If NO, explain and provide details.
We confirm that to our best knowledge neither the project as a whole nor any parts of it are YES
(nor will be) submitted for any other EU grant (including EU funding managed by authorities in
67
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
EU Member States or other funding bodies, e.g. EU Regional Funds, EU Agricultural Funds,
etc). If NO, explain and provide details.
Financial support to third parties (if applicable)
If your project requires a higher maximum amount per third party than the threshold amount set in the Call document,
justify and explain why this is necessary in order to fulfil your project’s objectives.
Not applicable
#§DEC-LAR-DL§#
68
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
ANNEXES
LIST OF ANNEXES
Standard
Detailed budget table per WP/Calculator (annex 1 to Part B) — uploaded
CVs (annex 2 to Part B) — uploaded for private beneficiaries
Annual activity reports (annex 3 to Part B) — uploaded for private beneficiaries
List of previous projects (annex 4 to Part B) — see next section
Special
Timetable/Gantt chart — uploaded
Other annexes — Letters of support - uploaded
69
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
LIST OF PREVIOUS PROJECTS
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No and Period Role (COO, Amount Website (if any)
Title, Funding programme (start and BEN, AE, (EUR)
end date) OTHER)
Total
EE, LV, LT, DIGINNO, (2017- MKM Lead budget https://www.diginn
PL 2020) partner, obsr.eu
Interreg Baltic Sea Region others EUR 3,5
BEN million,
incl.
ERDF
(EUR 2,8
million,
partners
EUR 0,7
million)
DIGINNO-Proto EUR
EE 2020 MKM lead https://www.diginn
134,000
Nordic Council of Ministers partner, obsr.eu/diginno-
others 100% proto
BEN funded
DINNOCAP
EE, LV, LT, 2021 MKM lead EUR https://www.dinno
PL, FI Interreg Baltic Sea Region partner, 880,000 capbsr.eu/
others
BEN
NDPTL-eCMR project:
EE, LV, LT, July 2022 MKM; DLK EUR https://realtimeeco
PL, FI NDPTL goes real-time until 30 as BEN 400,000 nomy-bsr.eu/ecmr
economy June , https://ndptl-
2023 project.ready4efti.
eu/
Analysis of the operational
EE model of the Estonian Sept MKM as EUR https://realtimeeco
national access point for 2021- tenderer, 100,000 nomy-bsr.eu/ecmr
electronic road transport March DLK as
consignment notes,' 2022 delivery
partner
Public Tender of 239359 as
of July 2022 of Estonian
Ministry of Economic Affairs
and Communications
DLK as
EE Initial analysis of the April- 4 900 https://realtimeeco
LEAD
implementing of e-waybills, June EUR nomy-bsr.eu/ecmr
reviewing of requirements 2021 Smartup
and planning of the support Studies as
measure for development key
and onboarding of e-waybill
platforms meeting the
70
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
upcoming eFTI contributor
requirements, contracted by s
Estonian Ministry of
Economic Affairs and
Communications
Analysis of the eFTI February DLK, as
EE Regulation 2020/1056 -April LEAD 7 200 https://realtimeeco
requirements for eFTI EUR nomy-bsr.eu/ecmr
2022
platforms, service providers SmartUp
and data exchange with a Studies
focus on requirements on and
eFTI platform on electronic AlbrechtCo
road transport waybills as of nsult as
April 2022, key
contributor
contracted by Estonian s
Ministry of Economic Affairs
and Communications
Training and onboarding for
EE eFTI platform developers Since DLK as 7 000 https://realtimeeco
RRF funding for Estonian May LEAD and EUR nomy-bsr.eu/ecmr
Entrepreneurship and 2022 - SmartUp
Innovation Agency ongoing Studies
partner
EE ProtoTesting – eCMR August SmartUp 10 000 https://realtimeeco
indexing prototype testing 2020 and Studies/ EUR nomy-bsr.eu/ecmr
planning, technical testing October- DLK as
and stakeholder Decembe lead
engagement, assessment r 2021
and reporting in DIGINNO-
Proto and DINNOCAP
projects
FI, LU, CEF-T-2018 FEDeRATED Jan-2019 BEN, COO 2530220 http://www.federat
ES,IT,NL,SE – March 4 edplatforms.eu/
2024
651K €
INRIA TousAntiCovid (TAC) app June IN Groupe https://bonjour.tou
was part of the global 2021-Mar develops santicovid.gouv.fr/
LUNABEE strategy for tackling the 2022 the
IN GROUPE COVID-19 epidemic and TousAntiC
helping people to emerge ovid Verif
from lockdown. The app is application
part of an overall contact for Android
tracing strategy, the goal of and IOS.
which is to break the chain
of transmission. It provides a
quicker way of notifying
contacts, particularly in
cases involving individuals
who have been infected by
people they do not know,
such as on public transport
or in shops. The use of this
app is voluntary.
IN Groupe Carte Famille Nombreuse- June IN Groupe XX https://www.carte-
CFN. 2022-Jan develops familles-
2023 the whole nombreuses.gouv.
platform. fr/home
71
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Circle Support for Development of June Circle as 250 000
Implementations 2022- lead EUR max
Specifications for the EU Dec 2023 contractor award
Regulation 2020/1056 on
Electronic Freight Transport
Information (eFTI) As per
tender: eFTI -
MOVE/2020/OP/0015
Circle, DLK Support for Development of Novembe Circle as 450 000
Implementations r 2022- lead EUR max
Specifications for the EU contractor award
Regulation 2020/1056 on DLK
Electronic Freight Transport partner
Information (eFTI), MOVE-
2022-OP-0009
Circle Docks The Future, Grant 1 Jan COO 464131 https://www.docks
Agreement number 770064, 2018-30 EUR thefuture.eu/
Horizon 2020 Oct 2020
Circle Synchronet, Grant 1. May BEN 430312 https://www.synch
Agreement number 636354, 2015- EUR ronet.eu/
Horizon 2020 31.Oct.2
018
Circle 5G-LOGINNOV 1 Sept BEN 296625 https://5g-
2020-31 EUR loginnov.eu/
Aug 2023
Circle E-Bridge October BEN 12.185.0 E-Bridge | TRIMIS
2018- 50 EUR (europa.eu)
Decembe
r 2022
Docks The Future, Grant Steering
1/1/2018- board https://www.docks
PortExpertise Agreement number thefuture.eu/
member, -
30/11/20
770064, Horizon 2020 20 WP lead
PortExpertise National Ministry of 2016- Project - n.a.
Transport (Belgium) – 2023 Lead
Federale Overheidsdienst assistance to
Transport en Mobiliteit national
department on
data sharing
platforms
PortExpertise Global Gateway Workshops 10/2022- Digitalisati - n.a.
for Latin America-Caribbean 05/2023 on Subject
and Asia Pacific (233) > Matter
Request for Services SIEA- Expert on
2018-12860 Client: trade data
European External Action exchange
Service (EEAS) is the
European Union's diplomatic
service
PortExpertise Port Community System 03/2018- Project - Assistance to
(PCS) Pakistan Trade 09/2019 lead Pakistan
Facilitation Project/National government
72
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
Single Window, data Inland Revenue
exchange platform: client Board on National
World bank Group, 2018- Single window
2019 Platform on
reporting
obligations for
logistics, trade.
PortExpertise FENIX 2019-2023 04/2019- Activity - https://fenix-
Federated Network of 03/2023 Lead network.eu/
Information eXchange in digital and
Logistics, location: various operational
EU locations including business,
Brussels. Fenix2.0
(INEA/CEF/TRAN/M2018/17
93401 – Action No:2018-EU-
TM-0077-S)
PortExpertise River Information Services 2014- CoRISMa : - https://www.risco
project, RISCOMEX and 2023 pilot co- mex.eu/
CoRISMa lead for
Luxembour Sharing of data
g between MS on
Inland Waterway
RISCOME transport, traffic,
X: infrastructure, …
observator
y
PortExpertise Digital Transport and 2015 Member of - https://transport.e
Logistics Forum 2015- both c.europa.eu/trans
ongoing (2023) 2023 groups port-
Paperless, themes/digital-
Location: Brussels, and other and transport-and-
EU member states corridor logistics-forum-
freight dtlf_en
information
systems
PortExpertise EU DG 2018- Project - n.a.
MOVE/DDG2.D1/2018-FV- lead
377 2019
Support action for
contributing to the
establishment of a
European Maritime Single
Window environment data
set
PortExpertise Maiden project: 2016 Subject - n.a. assistance on
Implementation of the CISE Matter project
(Common Information 2017 Expert organisation, set
Sharing Environment) for the up of governance
EU maritime domain structure,
consortium
agreement
between MS’’
authorities
73
Call: [CEF-T-2022-SIMOBGEN-eFTI-WORKS]
EU Grants: Application form (CEF-T): V2.0 – 01.06.2022
PortExpertise DG MOVE/A3/119-2013 06/2018- Subject - Defining
REVISION OF THE 05/2019 Matter harmonised data
REPORTING FORMALITIES Expert set for all EU MS
DIRECTIVE WITH THE AIM on Maritime
TO ESTABLISH Single Window
EUROPEAN MARITIME
SINGLE WINDOW
ENVIRONMENT Year:
December 2017-February
2018
51Biz FEDeRATED CEF January BEN and 300K of FEDeRATED
Luxembourg Consortium 2019- Living Lab 25 M€ Living Labs
Decembe Lead
r 2023
51Biz RISCOMEX CEF January 51Biz as 135K of RISCOMEX
Luxembourg Consortium 2018- national 31 M€
June coordinator
2022 for
Luxembour
g
74
KOOSTÖÖKOKKULEPE nr 1-7/24-0061
Majandus- ja Kommunikatsiooniministeerium (edaspidi MKM), registrikood 70003158,
asukoht Suur-Ameerika 1, 10122 Tallinn, mida esindab põhimääruse alusel majandus- ja
infotehnoloogiaminister Tiit Riisalo
ja
Kliimaministeerium (edaspidi asutus), registrikood 70001231, asukoht Suur-Ameerika 1, 10122
Tallinn, mida esindab põhimääruse alusel kliimaminister Kristen Michal, edaspidi koos nimetatud
pooled ja eraldi pool,
LÄHTUDES poolte ühisest huvist rakendada Euroopa Parlamendi ja nõukogu määruses (EL)
2020/1056 elektroonilise kaubaveoteabe kohta (eFTI) toodud nõudeid turvaliseks ja täielikult
koostalitlusvõimeliseks elektrooniliseks andmevahetuseks ettevõtete ja ametiasutuste vahel
kaupade liikumisel Euroopa Liidus, milleks taotleti rahastust Euroopa Ühendamise Rahastust
(CEF) projektile eFTI4EU (edaspidi projekt) (lisa 3)
on sõlminud käesoleva koostöökokkuleppe (edaspidi koostöölepe) järgnevas:
1. Koostööleppe eesmärk ja objekt
1.1. Koostööleppe eesmärgiks on toetada majandus-ja taristuministri ning väliskaubandus- ja
infotehnoloogiaministri 30.09.2020.a käskkirjaga nr 200 kinnitatud „Reaalajamajanduse
visioon 2020–2027“ lisa 1 „Reaalajamajanduse tööplaan 2020–2027“ lisa 1.1
„Reaalajamajanduse tehniliste võimaluste loomine“ alameesmärgi 4 „E-veoselehtede
laialdane kasutuselevõtt (2025)“ saavutamist aastaks 2025 (lisa 1).
1.2. Koostööleppe objektiks on 2023–2026. aastateks planeeritud projekti elluviimisega seotud
asutuse tegevustega kaasneva omafinantseeringu katmine MKM-i teadus- ja
arendustegevuseks ette nähtud riigieelarveliste vahendite sihtotstarbelisel kasutamisel punktis
1.1 nimetatud alameesmärgi täitmiseks toetavateks tegevusteks (lisa 2 ja lisa 4) summas
kokku 500 000 eurot käibemaksuta (lisa 2). Summa eraldatakse aastate lõikes järgnevalt:
1.2.1. 2023. aastal 7500 EUR;
1.2.2. 2024. aastal 210 063 EUR;
1.2.3. 2025. aastal 198 250 EUR;
1.2.4. 2026. aastal 84 187 EUR.
1.3. Tegevused on abikõlblikud alates 01.07.2023. Juhul, kui tegevused lükkuvad edasi
järgmisesse aastasse, on konkreetseks aastaks plaanitud tegevusi koostööleppe raames
võimalik ellu viia järgmise aasta lõpuni.
1.4. Juhul, kui projekti elluviimise jooksul toimuvad muudatused projektis, lepivad pooled selles
koostöölepingus eraldi kokku.
2. MKMi õigused ja kohustused
2.1. MKMil on õigus küsida asutuselt teavet ja dokumente tehtud kulude tõendamiseks.
2.2. MKM kohustub jagama koostööleppe täitmiseks asutusele vajalikku informatsiooni.
3. Asutuse kohustused:
3.1. Asutus kohustub:
3.1.1. viima tähtajaliselt ellu koostööleppega võetud kohustused;
3.1.2. lähtuma koostööleppe täitmisel parimast oskusteabest, sh Euroopa Komisjoni poolt
tulevatest juhistest ning tehnilistest eFTI määruse alusel välja antavatest rakendusaktidest
ning delegeeritud aktidest ning nende alusel loodavatest spetsifikatsioonidest ja reeglitest
kaubaveoteabe andmevahetuse kohta, teadus- ja arendustegevuse korralduse seadusest ning
teadus- ja arendustegevuse juhendmaterjalist Frascati käsiraamatust1, dokumendist
„Tehnoloogilise valmiduse tasemed, TVT (Technology Readiness Levels, TRL)“2 ja lisades
1–4 märgitud dokumentidest;
3.1.3. esitama projekti kohustusliku aruandluse käigus enda tegevuste kohta sisu- ja
finantsaruande rahastajale vastavalt CEFi reeglistikule ning European Climate, Infrastructure
and Environment Executive Agency (CINEA) määratud tähtaegadele (lisa 4) ning edastama
rahastaja poolt kinnitatud aruandluse koopia MKMi volitatud esindajale.
3.1.4. MKMi järelepärimisel andma lisainformatsiooni (sh teavet ja dokumente tehtud kulude
tõendamiseks) punktis 1.2 teostatud ja planeeritud tegevuste kohta ning arvestama MKMi
volitatud esindaja poolt punktis 6.4 nimetatud vormis tehtud ettepanekuid;
3.1.5. eristama punktis 1.2 toodud tegevuste elluviimiseks tehtud kulud wbs, projekti või muu
eristatava koodi alusel;
3.1.6. mitte edasi delegeerima MKMi eelneva kirjaliku nõusolekuta koostööleppega sätestatud
kohustusi;
3.1.7. viima koostööleppe alusel tegevused ellu vastavalt lisas 4 määratud projekti lõpptähtajaks;
3.1.8. katma tehtud kulud asutuse eelarvest juhul, kui asutus ei kasuta talle eraldatud vahendeid
sihtotstarbeliselt;
3.1.9. kaasama MKMi esindaja hankemenetluste läbiviimiseks hankekomisjoni juhul, kui
teenuseid või asju tellitakse hankemenetluse raames alates lihthanke piirmäärast.
4. Koostööleppe tegevuste rahastamine
4.1. Asutus viib ellu lisas 4 toodud tegevused punkti 1.2. alusel 2023. aasta riigieelarve seadusega
2023. aasta eelarvesse ja 2024. aasta riigieelarve seadusega 2024. aasta eelarvesse eraldatud
ning RES2025–2028 koostamise raames (esitatakse 01.06.2024) 2025. ja 2026. aasta
eelarvetesse eraldatavatest teadus- ja arendustegevuse vahenditest.
4.2. Koostööleppe alusel ellu viidavate tegevuste rahalise kulu kogumaksumus ei ole suurem kui
500 000 eurot käibemaksuta. Vahendite kasutamisel lähtuvad asutused lisas 2 esitatud
eelarvest.
5. Koostööleppe kehtivus
5.1. Koostöölepe jõustub tagasiulatuvalt alates 01.07.2023 ja kehtib kuni koostööleppes toodud
kohustuste nõuetekohase täitmiseni.
5.2. Pool võib koostööleppe ennetähtaegselt lõpetada, teatades sellest teisele poolele ette vähemalt
60 päeva.
6. Volitatud esindajad ja teadete edastamine
6.1. MKMi volitatud esindajaks koostööleppe täitmisega seotud küsimustes on Sirli Heinsoo,
tel 639 7604, e-post
[email protected], või teda asendav isik.
6.2. Asutuse volitatud esindajaks koostööleppe täitmisega seotud küsimustes on Eva Killar,
tel +372 5885 1083 , e-post
[email protected], või teda asendav isik.
6.3. Poole volitatud esindajal on õigus esindada poolt kõikides koostööleppe täitmisega seotud
küsimustes, v.a koostööleppe muutmine ja koostööleppe ennetähtaegne ühepoolne
lõpetamine.
6.4. Informatiivsete teadete edastamine toimub üldjuhul telefoni või e-posti teel. Juhul kui teate
edastamisel on õiguslikud tagajärjed, peavad teisele poolele edastatavad teated olema
edastatud kirjalikus vormis.
1
https://read.oecd-ilibrary.org/science-and-technology/frascati-manual-2015_9789264239012-en#page1,
FrascatiManual2015_2ptk.pdf (etag.ee)
2
Technology-readiness-levels.pdf (etag.ee) , Tehnoloogilise-valmiduse-tasemed.pdf (etag.ee)
6.5. Koostööleppe pool kohustub teist poolt informeerima kõikidest olulistest asjaoludest, mis
võivad mõjutada või takistada kokkuleppes sätestatud kohustuste täitmist või õiguste
realiseerimist.
7. Koostööleppe lisad
Koostööleppe juurde kuuluvad allkirjastamise hetkel lisadena alljärgnevad dokumendid:
7.1. Lisa 1 – Reaalajamajanduse visioon 2020–20273;
7.2. Lisa 2 – Projekti eFTI4EU eelarve 2023–2026;
7.3. Lisa 3 – Projekti eFTI4EU taotlusdokument;
7.4. Lisa 4 – Grant Agreement – GAP-101122891.
Majandus- ja Kommunikatsiooniministeerium Kliimaministeerium
(allkirjastatud digitaalselt) (allkirjastatud digitaalselt)
3
Kättesaadav: https://realtimeeconomy.ee/sites/default/files/2022-04/Reaalajamajanduse%20visioon%202020-
2027%20%28eesti%20keeles%29.pdf
Tööpakett 2023
WP1: Horisontaalsed tegevused, teekaardid ja uuringud
3 000
WP2: Liikmesriikide piloodid (tarkvara valideerimine läbi piloteerimise)
0
WP3: Kommunikatsiooni ja tegevused teadlikkuse tõstmiseks
11 000
WP4: Projekti koordineerimine
1 000
Kokku 15 000
Tegevused: 2023
Personalikulu 3 000
Tellitavad teenused (piloteerimisega seotud tegevused) 0
Tellitavad teenused (kohtumiste korraldamisega seotud tegevused) 5 000
Tellitavad teenused (uuringud, teekaardid) 0
Reisikulud 6 000
Projektijuhtimisega seotud tegevused (sh auditi tellimine) 1 000
Kokku 15 000
2024 2025 2026 2023-2026 kokku
76 750 76 750 21 000 177 500
293 625 261 000 97 875 652 500
25 000 35 000 44 000 115 000
24 750 23 750 5 500 55 000
420 125 396 500 168 375 1 000 000
2024 2025 2026 2023-2026 KOKKU
38 000 38 000 21 000 100 000
293 625 261 000 97 875 652 500
10 000 20 000 30 000 65 000
38 750 38 750 0 77 500
15 000 15 000 14 000 50 000
24 750 23 750 5 500 55 000
420 125 396 500 168 375 1 000 000
Koostööleppe Lisa 2 – Projekti eFTI4EU eelarve 2023–2026
Tööpakett 2023 2024 2025 2026 2023-2026 kokku
WP1: Horisontaalsed tegevused, teekaardid ja uuringud
1 500 38 375 38 375 10 500 88 750
WP2: Liikmesriikide piloodid (tarkvara valideerimine läbi piloteerimise)
0 146 813 130 500 48 938 326 250
WP3: Kommunikatsiooni ja tegevused teadlikkuse tõstmiseks
5 500 12 500 17 500 22 000 57 500
WP4: Projekti koordineerimine
500 12 375 11 875 2 750 27 500
Kokku 7 500 210 063 198 250 84 188 500 000
Tegevused: 2023 2024 2025 2026 2023-2026 KOKKU
Personalikulu 1 500,0 19 000,0 19 000,0 10 500,0 50 000
Tellitavad teenused (piloteerimisega seotud tegevused) 0,0 146 812,5 130 500,0 48 937,5 326 250
Tellitavad teenused (kohtumiste korraldamisega seotud tegevused) 2 500,0 5 000,0 10 000,0 15 000,0 32 500
Tellitavad teenused (uuringud, teekaardid) 0,0 19 375,0 19 375,0 0,0 38 750
Reisikulud 3 000,0 7 500,0 7 500,0 7 000,0 25 000
Projektijuhtimisega seotud tegevused (sh auditi tellimine) 500,0 12 375,0 11 875,0 2 750,0 27 500
Kokku 7 500,0 210 062,5 198 250,0 84 187,5 500 000