dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Veeteede Amet
Väljaminev kiriAvalik

S-65 - PRODUCTION, MAINTENANCE AND DISTRIBUTION GUIDANCE

Veeteede Amet · 25. juuli 2016
Viit
1-3.-9./16/2406-2
Registreeritud
25. juuli 2016
Dokumendi liik
Väljaminev kiri
Adressaat
International Hydrographic Bureau
Saabumis/saatmisviis
e-mail
Funktsioon
1-3. Avalikkussuhted (2003-2016)
Sari
1-3.-9. Kirjavahetus Rahvusvahelise hüdrograafia (IHO) kohta
Toimik
1-3.-9./16
Vastutaja
Dana Kuznetsova (HNT juhtkond)

Failid

  • 📎IHO.pdf88 KB
  • 📎S-65_Comments_Composite_EE.pdf150 KB

Sisu (failidest)

Signe Paevere Subject: FW: S-65 - PRODUCTION, MAINTENANCE AND DISTRIBUTION GUIDANCE Attachments: S-65_Comments_Composite_EE.DOC ‐‐‐‐‐Original Message‐‐‐‐‐ From: Dana Kuznetsova Sent: Monday, July 25, 2016 1:35 PM To: Signe Paevere <[email protected]> Subject: FW: S‐65 ‐ PRODUCTION, MAINTENANCE AND DISTRIBUTION GUIDANCE ‐‐‐‐‐Original Message‐‐‐‐‐ From: Dana Kuznetsova Sent: Monday, July 25, 2016 1:32 PM To: 'Tony Pharaoh' <[email protected]> Cc: Tõnis Siilanarusk <[email protected]>; Olavi Heinlo <[email protected]> Subject: RE: S‐65 ‐ PRODUCTION, MAINTENANCE AND DISTRIBUTION GUIDANCE Dear Tony, The Estonian Maritime Administration has reviewed the S‐65 Publication "ENCs: Production, Maintenance and Distribution Guidance" for alignment with the WEND Principles and Guidelines as amended (action item HSSC7/32) and the initial draft document sent. We agree with proposed changes in the draft, for other comments to the draft please see attached document S‐ 65_Comments_Composite_EE.doc Kind regards Dana Kuznetsova Senior Cartography Specialist Estonian Maritime Administration e‐mail: [email protected] Phone:+372 620 5623 ‐‐‐‐‐Original Message‐‐‐‐‐ From: Tony Pharaoh [mailto:[email protected]] Sent: Thursday, June 30, 2016 11:01 AM To: Argentina <[email protected]>; Australia <[email protected]>; Brazil <[email protected]>; Brazil <[email protected]>; Brazil <[email protected]>; Brazil <[email protected]>; Canada <patti.parkhouse@dfo‐mpo.gc.ca>; CARIS <[email protected]>; Chile <[email protected]>; Chile <[email protected]>; Ecuador <[email protected]>; Egypt <[email protected]>; ESRI <[email protected]>; Dana Kuznetsova <[email protected]>; Finland <[email protected]>; France <[email protected]>; Furuno <[email protected]>; Furuno <[email protected]>; Germany <[email protected]>; Germany <[email protected]>; IC‐ENC <liz.hahessy@ic‐enc.org>; IC‐ENC <richard.fowle@ic‐enc.org>; IEHG <[email protected]>; IHB <[email protected]>; IIC <[email protected]>; India <ia‐inho‐[email protected]>; Italy 1 <[email protected]>; Japan <[email protected]>; Jepessen <[email protected]>; Navtor <[email protected]>; Netherlands <[email protected]>; New Zealand <[email protected]>; Northrop Grumman <[email protected]>; Norway <odd‐[email protected]>; Ceri Carter <[email protected]>; Poland <[email protected]>; Portugal <[email protected]>; Primar <[email protected]>; Republic of Korea <[email protected]>; Russian Federation <[email protected]>; SevenCs <[email protected]>; Singapore <thai_low_ying‐[email protected]>; Slovinia <[email protected]>; Sweden <[email protected]>; Transas <[email protected]>; Ukraine <[email protected]>; UK <[email protected]>; USA ‐ NOAA <[email protected]>; USA ‐ NOAA Federal <[email protected]> Subject: S‐65 ‐ PRODUCTION, MAINTENANCE AND DISTRIBUTION GUIDANCE Dear ENCWG members, The 7th Hydrographic Services and Standards Committee (HSSC) meeting tasked the ENCWG "to review S‐65 for alignment with the WEND Principles and Guidelines as amended" (action item HSSC7/32). The vice Chair (Mikko Hovi) and I have have produced an initial review draft of the document in which the WEND principles have been updated. We have also made a few minor amendments to improve the text. I have attached clean and marked up (redline) version of the edited new document. You are kindly request to review the document and submit any corrections or clarifications to me (before the 28th of July) on the attached comment sheet. Regards, Tony 2 ENC WG comments and editorial observations Date: 25/07/16 Document: S-65 1 2 (3) 4 5 (6) (7) 3 CO1 Clause No./ Paragraph/ Type Comment (justification for change) by the CO Proposed change by the CO Secretariat observations Component Subclause Figure/Table/ of on each comment submitted No./ Note com- Annex (e.g. Table 1) ment2 (e.g. 3.1) 1. EE Title page ed Need to amend edition number to the next one. 2. EE STAGE 7 THE IHO ge Clause 3-6 repeat THE WEND principles in To leave the text in STAGE 2 and refer to it in WEND STAGE 7. – Edge principles STAGE 2 – Define ENC Production Requirement, Match Data STEP 2 – Produce Production Plan / clauses 7-9, 11 STEP 2 – Between Nations 3. EE Glossary of Transfer ge Need to update information regarding TSMAD and Terms Standard maybe to add explanation of ENCWG. Maintenanc e and Application Developme nt Working Group 1 CO = Contributing Organisation (HOs should use 2 character codes e.g. FR AU etc.) 2 Type of comment: ge = general te = technical ed = editorial 3 Whilst not compulsory, comments are more likely to be accepted if accompanied by a proposed change. NOTE Columns 1, 2, 4, 5 are compulsory. page 1 of 1
Allikas: Veeteede Amet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel