IRCC8-06F
Baltic Sea Hydrographic Commission (BSHC)
BSHC Report to the IRCC 8 Meeting
29-31 May 2016, Abu Dhabi, UAE
The BSHC Chair
Sergey Travin
(May 2016)
1. General
BSHC Members are: Denmark, Estonia, Finland, Germany, Latvia, Poland,
Russian Federation and Sweden. Associate member is Lithuania. Information
on BSHC activities is available at www.bshc.pro.
The BSHC Chair since September 2015 is Captain Sergey Travin (Russian
Federation), replacing Mr. Jānis Krastiņš (Latvia).
Vice‐Chair is Mr. Viktoras Liulys (Lithuania).
The 20th BSHC Conference was held on 16-18 September 2015 in Saint
Petersburg, Russian Federation.
Altogether 30 participants from all Member States except Lithuania
participated to the Conference. In addition Admiral Mustafa Iptes from IHB
participated.
IRCC8-06F
The main issues of the 20th BSHC Conference were:
- outcome of IRCC 7 Meeting;
- National Reports;
- report of the IHO-EU Network Working Group;
- Baltic Sea Sub Navarea1b MSI Report;
- selection of BSHC representatives to the IHO Council;
- reports and further guidance for work of the BSHC Working Groups (see
Chapter 2);
- report on the harmonization of depth information in ENCs and paper
charts;
- customized ENC service for pilots and VTS applications;
- FAMOS project general report;
- FAMOS gravity measurements in 2015;
- new Danish national ENC service for leisure craft users;
- Smart Marine Fairway - information paper of studies implementing
services for e-Navigation in Finland;
- ENSI-project, test-bed for the exchange of Route plans in Gulf of Finland;
- WEND WG report;
- Baltic Sea International Charting Coordination Working Group
(BSICCWG) report;
- maintenance of the BSHC Internet domain;
- the status of Hydrographic Surveying and Nautical Charting (the status
of updating C‐55).
2. Status of work of the BSHC Working Groups
2.1. Working Group for Monitoring the Implementation of the Harmonized
Re‐survey Scheme (MWG).
The development and implementation of the Baltic Sea Harmonized
Re‐survey Scheme is monitored through the BSHC monitoring Working Group.
Overview of the Working Group was provided. The main tasks for the MWG are
to continue the development of the Re-Survey database and to encourage
the member states to continue the up-to-date surveys of their waters.
The Re‐Survey database is under renewal for more capabilities.
BSHC approved MWG work program for period 2015‐2016.
The re‐survey scheme can be browsed via
https://helcomresurvey.sjofartsverket.se/helcomresurveysite or data.bshc.pro.
IRCC8-06F
2.2. Chart Datum Working Group (CDWG).
The tasks for the Chart Datum Working Group are to prepare
the implementation of the harmonized European Vertical Reference System
(EVRS) in the Baltic Sea area, to study the validation, interpolation, prediction
and distribution of water level information and to cooperate with relevant other
international bodies.
Commission approved updated CDWG ToRs and CDWG Work Program
for 2015-2016 as a basis for Work Program for 2016-2017.
It was noted that item 1a has been done in WP 2015-, supported CDWG
proposal for displaying the name Baltic Sea Chart Datum 2000 in ENCs and paper
and gave further guidance to CDWG.
The 8-th CDWG Meeting took place in Helsinki, Finland on 23-24 February
2016. The CDWG 8 Meeting pointed out the importance of the CDWG work
on harmonizing the vertical reference systems in the Baltic Sea region and benefits
of harmonized vertical reference systems for many user groups in different
countries. Also the CDWG 8 Meeting noted that the harmonized vertical reference
will benefit the usage of digital services and upcoming IHO S-100 based standards.
The CDWG 8Meeting reviewed the draft definition for the Baltic Sea Chart
Datum 2000 and national implementation plans and status.
2.3. The Baltic Sea Bathymetric Database Working Group (BSBDWG).
Commission approved the need to develop the database of bathymetric data
for the Baltic Sea Area.
At the same time the Commission pointed out that the Baltic Sea
Bathymetric Database portal has been up and running without any downtime
on the viewing services and the bathymetric model at present time is the same
as the version published in December 2013 because of problem using the WCS
services via some GIS software.
The portal address is still data.bshc.pro.
The site is fairly widely used and the number of visits on the portal between
the first of July 2014 and the first of July 2015 is 12 546 visits made by 10 014
unique visitors.
Commission also endorsed the cooperation with GEBCO and EMODNET.
IRCC8-06F
2.4. The Baltic Sea Marine Spatial Data Infrastructure Working Group
(BSMSDIWG).
The BSMSDIWG is seen as an appropriate Working Group to deal
with the opportunities delivered by the MSDI from a regional approach.
The Commission reviewed the working group’s findings, status
and the planned next steps.
The implication of MSDI from a HO perspective and how MS can benefit
from a regional approach were discussed by the Commission.
The Draft BSMSDIWG work program was approved.
2.5. The Baltic Sea INT Chart Coordination Working Group (BSICCWG).
The tasks of the BSICCWG are to coordinate the publication of international
(INT) charts and the small and medium scale ENC scheme in the Baltic Sea
Region.
The Commission reviewed updated Regional INT Chart Catalogue
and updated ENC Catalogue relevant to the Region, changes made to the scheme
of INT Charts for the Region and changes made to the small/medium scale ENC
scheme for the Region, updated Work Plan.
The Baltic Sea (Region E) is one of the testing areas for S-11 Part B GIS
experimentation to move from the current S-11 Part B “paper-like” database,
to a GIS environment (“INToGIS” project).
The further guidance to the BSICCWG was given by the Commission.
2.6. The BSHC WEND WG representative.
WEND WG is a working group under the IRCC Committee. The purpose
of the WEND Working Group is to advise IRCC and to assist in facilitating
a world-wide consistent level of high-quality, updated official ENCs through
integrated services that support chart carriage requirements of SOLAS Chapter V,
and the requirements of the IMO Performance Standards for ECDIS.
The Commission noted the report and gave further guidance to the BSHC
WEND WG representative.
IRCC8-06F
3. Status of IRCC 7 actions.
In the table below is shown the status of IRCC 7 actions relevant to BSHC.
Action
No Resp. Deadline Status
(Agenda Item)
IRCC 7/01 Encourage the approval RHC Chairs Report According to
of pending applications to the IHO home
for IHO membership IRCC page BSHC
Chair MS have
Dec 2015 provided the
support
IRCC 7/02 Continue to engage RHC Chairs Report All IHO MS
pending applicants in to from BSHC
their region to encourage IRCC have ratified
the ratification of the Chair Amendments
IHO Convention Dec 2015 to the
convention
IRCC 7/03 Consider the RHC Chairs Report Each request
participation of to subject to
stakeholders at the RHC IRCC receive
conferences Chair the acceptance
Dec 2015 from MS
IRCC 7/05 Provide the IRCC Chair RHCs and Jan 2016 No action
with progress reports on IRCC taken
the relevant tasks in the subsidiary
IHO 2015 Work Program organs
IRCC 7/07 Provide to the IRCC RHC Chairs Jan 2016 No action
Chair the estimated taken
values of SPIs and
agreed WPIs as of 31
December 2015 and
target values for 31
December 2017,
complemented by the
comments on the
difficulties encountered
and suggestions for a
way forward
IRCC8-06F
Action
No Resp. Deadline Status
(Agenda Item)
IRCC 7/08 Invite GEBCO Guiding RHCs/ Report to GEBCO and
Committee / GEBCO IRCC Baltic Sea
Bathymetric Regional Chair Bathymetric
Project Chairs Dec 2015 Database
to attend corresponding Working
RHCs Group
meetings, aiming at (BSDBWG)
strengthening are tightly
collaboration with a collaborating
priority on on the item
improving high
resolution shallow
water bathymetry at the
regional level
IRCC 7/09 Encourage MSs and RHC Chairs Report to No action
representatives of IRCC taken
industry and academia to Chair
promote and to work Dec 2015
together to ensure that
the best possible use is
made of Satellite Derived
Bathymetry
IRCC 7/15 Provide material to the RHC Chairs Report to GEBCO
IHB to promote the and IRCC is promoted
achievements of IRCC subsidiary Chair by their logo
bodies bodies Dec 2015 under
“relations” on
http://www.bs
hc.pro
IRCC8-06F
Action
No Resp. Deadline Status
(Agenda Item)
IRCC 7/17 Encourage National RHC Chairs IRCC8 Permanent
Hydrographers to invest
in English language
training in order to
increase the chances of
their candidates being
selected to Cat A and
Cat B training courses
delivered in English
IRCC 7/18 Facilitate resolution of RHC Chairs IRCC8 Permanent
important nconsistencies
between paper charts
and ENCs and between
ENCs from different
producers as identified
by the RENCs or
otherwise
IRCC 7/19 Encourage MSs in their RHC Chairs IRCC8 Permanent
respective regions to use
the Risk Assessment
methodology to establish
Hydrographic Survey
priorities
IRCC 7/26 Report to IRCC on the RHC Chairs IRCC8 Input from
status of the RHC MS is
procedures for selecting expected to
their respective the BSHC 21
representatives to the Conference
Council (Sept. 2016)
IRCC8-06F
Action
No Resp. Deadline Status
(Agenda Item)
IRCC 7/27 To task: RHC Chairs October Permanent
a) New INT Chart 2015
Producer Nations to
provide first edition INT
chart to Regional INT
Chart Coordinator (or
ICCWG) for review as
soon as convenient
during the production
cycle;
b) INT Chart
Coordinators/ICCWGs to
manage the review of the
first edition INT charts
produced by new INT
Chart Producer Nations
to check their
compliance with IHO
standards, provide
feedback to the Producer
and to report progress to
the next RHC meeting;
c) All INT Chart
Producer Nations to
provide first edition and
new edition INT charts to
Regional INT Chart
Coordinator (or ICCWG)
3 months prior to every
RHC meeting to enable
Regional INT Chart
Coordinator (or
ICCWG) to validate
current INT chart
Scheme;
IRCC8-06F
Action
No Resp. Deadline Status
(Agenda Item)
d) All editions of INT
charts submitted under
action 27 a) and b) to be
subsequently transferred
to the IHB to
be included in the IHB
reference collection for
internal use;
e) Member States to
provide an update of the
list of on-line chart
catalogues,
either directly or
systematically when
updating the Yearbook
IRCC 7/28 Implement procedures RHCs IRCC8 On going
approved by Decision 3
and to report their
processes for the review
of first edition INT
Charts produced by
new Producer Nations to
IRCC
IRCC 7/33 Instruct the ICCWG RHC Chairs IRCC8 On going
Coordinators to
investigate ways to
improve communication
across the regions and
report back to IRCC
IRCC 7/41 Consider incorporating RHCs IRCC8 Permanent
hydrography in more
comprehensive maritime
projects as a way of
raising awareness and
funds from Donor
agencies and to report
progress to IRCC
IRCC8-06F
Action
No Resp. Deadline Status
(Agenda Item)
IRCC 7/42 Invite Member States to RHCs July 2015 Input from
update C-55 annually MS is
including reports of expected
“no changes”)
IRCC 7/43 Provide access to the RHCs August Input from
IHB to any of their 2015 MS is
relevant promotional expected
material
on CB and to consider
using the posters
displayed at the EIHC 5
CB exhibition
IRCC 7/44 Provide: RHC Chairs a) two Permanent
a) an initial summary and CB weeks
report on Technical Coordinators after
Visits (TV) within two the TV
weeks of the visit; b) three
b) full reports are months
expected within three after
months of completion of the TV
a TV
IRCC7/44bis Provide full reports for RHC Chairs July 2015 On going
those TVs undertaken in and CB
2014 that have not Coordinators
yet been submitted to the
IHB
IRCC 7/48 Consider nominating RHCs December Input from
regional representatives 2015 MS is
on the MSDIWG expected
IRCC 7/52 Continue supporting RHCs IRCC8 Permanent
GEBCO regional
projects and report back
to IRCC
IRCC8-06F
Action
No Resp. Deadline Status
(Agenda Item)
IRCC 7/53 Remind HOs of the RHCs IRCC8 Permanent
standing request to
provide GEBCO with
access to existing
shallow water
bathymetric data, at
whatever resolution is
permissible by the
country and to report
progress to IRCC
IRCC 7/56 provide comments on RHCs IRCC8 MS
doc. WENDWG5-04B comments are
(Relevance of expected via
information overlay Action
services and their status WEND WG
in the global IHO ENC 5/01
program) to IRCC
IRCC 7/62 Consider providing RHCs as soon as Input from
representatives volunteers MS is
of the IHO at the are expected
international meetings identified
listed in doc. IRCC-10B
on relations with
stakeholders and to
inform the IHB
4. The BSHC cooperation with other organizations.
The BSHC cooperates with at least the following organizations:
- Helsinki Commission (HELCOM) within the Baltic Sea Action Plan;
- The EU, in particular with the European Commission is working out
the EU Baltic Sea Strategy;
- BOOS and National Geodetic Institutes within the work of the Chart
Datum Working Group.
IRCC8-06F
5. Proposals.
No formal proposals have been made.
The IRCC 8 is invited to note this report.
_______________
Signe Paevere
From: Taivo Kivimäe
Sent: Tuesday, June 7, 2016 11:16 AM
To: Signe Paevere
Subject: FW: IRCC8-06F_BSHC Report
Attachments: IRCC8-06F_BSHC Report.docx
Palun PP‐sse ja teadmiseks Tõnis, Olavi ja Peeter Väling.
Edu!
Taivo
From: Шальнов Леонид [mailto:
[email protected]]
Sent: Sunday, May 29, 2016 6:28 AM
To: Mustafa Iptes <
[email protected]>; Alberto Neves <
[email protected]>; Aigars Gailis <
[email protected]>; Janis
Krastins <
[email protected]>; Jens Peter Weiss Hartmann <
[email protected]>; Lars Hansen <
[email protected]>; Marcin
Banaszak <
[email protected]>; Mathias Jonas <
[email protected]>; Patrik Wiberg
<
[email protected]>; Rainer Mustaniemi <
[email protected]>; Taivo Kivimäe
<
[email protected]>; Thomas Dehling <
[email protected]>; Tõnis Siilanarusk <
[email protected]>;
Viktoras Liulys <
[email protected]>
Cc:
[email protected]
Subject: IRCC8‐06F_BSHC Report
Dear colleagues,
please find attached the BSHC Report to the IRCC 8 Meeting (IRCC8-06F)
Best Regards,
Leonid Shalnov, DNO, on behalf of the BSHC Chair
1