dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Kaitseministeerium
Sissetulev kiriAvalik

Saksamaa meretuulepargialade arendamise kava muutmise piiriülene keskkonnamõju hindamine

Kaitseministeerium · 14. aprill 2022
Viit
12-4/22/1522
Registreeritud
14. aprill 2022
Dokumendi liik
Sissetulev kiri
Adressaat
Keskkonnaministeerium
Saabumis/saatmisviis
DHX
Funktsioon
- -
Sari
- -
Toimik
- -

Failid

  • 📎Saksamaa meretuulepargialade arendamise kava muutmise piiriülene keskkonnamõju hindamine.asice7309 KB

Sisu (failidest)

Vastavalt nimekirjale 13.04.2022 nr 7-12/22/1664-2 Saksamaa meretuulepargialade arendamise kava muutmise piiriülene keskkonnamõju hindamine Saksamaa on varakult teavitanud Eestit sellest, et Saksamaa Föderaalne Merendusamet on algatanud meretuulepargialade arendamise kava täiendamise ja ajakohastamise menetluse ning sellele korraldatakse ka keskkonnamõju strateegiline hindamine (KSH). Kõnealune menetlus puudutab kava, mida viimati täiendati 2020. aastal. Arvestades, et tegemist on menetluse varajase etapiga, on praeguseks koostatud kava esialgne eelnõu ning KSH aruande käsitlusala ja ulatuse eelnõu. Mõlemad ingliskeelsed dokumendid on kirjale lisatud. Meretuulepargialade arendamise kava põhineb mereala planeeringul ning sellega määratakse kindlaks avamere tuuleenergia alad ja nende võrguühendus, sealhulgas ajaline järgnevus. Tegemist on valdkondliku dokumendiga, mis käsitleb meretuuleparkide ja võrguühenduste arendamist (laiendamist) Saksamaa majandusvööndis Põhjameres ning Läänemeres, teatud tingimustel ka territoriaalvetes. Kokkuvõtlikult on kava eesmärgiks avamere tuuleenergia laiendamise eesmärkide saavutamine. Saksamaa küsib arvamust selle kohta, kas Eesti soovib osaleda edasises meretuulepargialade arendamise kava täiendamise ja ajakohastamise ning selle KSH menetluses. Lähtuvalt Saksamaa määratud vastamistähtajast ootame 2. maiks 2022 võimalikke arvamusi selle kohta, kas kava elluviimisega võib Eestile kaasneda oluline keskkonnamõju, mistõttu Eesti peaks osalema kõnealuses menetluses. Kui Te soovite esitada ettepanekuid lisatud materjalide kohta, palume need saata Keskkonnaministeeriumile samuti 2. maiks 2022. Lugupidamisega (allkirjastatud digitaalselt) Kaupo Heinma Asekantsler Lisad: 1. Lisa 1 – kava esialgne eelnõu 2. Lisa 2 – KSH aruande ulatuse eelnõu Rainer Persidski, 626 2973 [email protected] Paldiski mnt 96/ Tallinn 13522/ 626 2802/ [email protected]/ www.envir.ee/ Registrikood 70001231 Content I Content 1 Introduction 1 2 Framework conditions for designations 2 Areas in the Maritime Spatial Plan 2 Assumptions on decommissioning of facilities 3 Identification of the expected generation capacity 4 Availability of suitable grid connection points 6 Availability of cable routes in the territorial sea 6 3 Intended designations 7 Introduction 1 1 Introduction Spatial Plan 2021. A total of 43 GW of offshore wind capacity can probably be commissioned in The Offshore Wind Energy Act (WindSeeG)1 the sites shown in table 1. In addition, a further sets the target to increase the installed offshore 14.5 GW are expected to be in operation in wind capacity to 20 GW by 2030 and to a total of Zones 1 and 2 in 2030 in accordance with the 40 GW by 2040. specifications of the FEP 2020. These sites suf- With the Site Development Plan fice to achieve the targets set in the coalition (Flächenentwicklungsplan – FEP) 2020, pub- agreement of 30 GW by 2030 and 40 GW by lished on 18 December 2020, in a first step areas 2035. In order to achieve the expansion target of for achieving the expansion target of 20 GW by 70 GW by 2045 set out in the coalition agree- 2030 were determined. This preliminary draft in- ment, a considerable amount of additional areas itiates the process of updating the FEP. must be developed for the expansion of offshore wind energy. Now that the Maritime Spatial Plan (Raumord- nungsplan - ROP) 2021 for the German exclu- This preliminary draft is to be the basis for deter- sive economic zone (EEZ) of the North Sea and mining further tender quantities. For this pur- Baltic Sea2 has come into force on 1 September pose, the areas in zones 3 to 5 of the EEZ are 2021 following extensive participation of the au- divided into sites. Furthermore, it has been pos- thorities and the public, a spatial basis for the fur- sible to achieve an increase in capacity by ad- ther expansion of offshore wind energy in the justing the site layout. These measures contrib- EEZ has become available. On this basis, further ute to supporting the achievement of the in- areas for the expansion of offshore wind energy creased targets for the expansion of offshore can be defined within the framework of an up- wind energy. dated FEP. Following consultation on this preliminary draft, The coalition agreement concluded on 7 Decem- it is expected that a developed draft FEP will be ber 2021 between the SPD, BÜNDNIS 90/DIE put out for consultation in mid-2022. GRÜNEN and the FDP provides for an increase in the targets for the expansion of offshore wind energy to 30 GW by 2030, 40 GW by 2035 and 70 GW by 2045. To achieve these targets, the additional commissioning of offshore wind farms by 2030 is required. This preliminary draft does not yet contain any information on calendar years for tendering and commissioning of the sites and grid connection systems, because an acceleration of the currently planned commis- sioning years is to be expected. The preliminary draft of the FEP initially maps the areas and sites that were defined as priority and reservation ar- eas for offshore wind energy in the Maritime 1 Act of 13 October 2016, Federal Law Gazette I p. 2258, 2 Ordinance on Spatial Planning in the German Exclusive 2310, last amended by Article 1 Act Amending the Offshore Economic Zone in the North Sea and the Baltic Sea of 19 Wind Energy Act and Other Provisions of 03.12.2020, Fed- August 2021, BGBl. I p. 3886 eral Law Gazette 2682. 2 Framework conditions for designations 2 Framework conditions for (North Sea) as defined in the FEP 2020. In the Maritime Spatial Plan these areas were defined designations as priority areas EO1 to EO3 (Baltic Sea) and EN1 to EN3 and EN6 to EN13 (North Sea). Areas in the Maritime Spatial In addition, reservation areas for offshore wind Plan energy have been defined. These aim at secur- The Maritime Spatial Plan for the German EEZ, ing areas for the further expansion of offshore which came into force on 1 September 2021, is wind energy. an overall spatial plan that brings together the in- Individual areas are designated as conditional terests of various uses. It safeguards and devel- priority or conditional reservation areas. These ops the functions and uses of the sea, taking into are designated as areas for offshore wind energy account the ecosystem approach. The Maritime use unless, by a certain date, the competent fed- Spatial Plan regulates area categories (priority eral ministry provides compelling reasons that and reserved areas), as well as other objectives the respective area is required for other uses. and principles, for various uses at a strategic planning level. The Maritime Spatial Plan has de- The area designation in the Maritime Spatial fined new priority and reservation areas for off- Plan for the EEZ in the North Sea (Figure 1) and shore wind energy. in the Baltic Sea (Figure 2) form the basis for the amendment and updating of the sectoral plan- The starting point for defining priority areas for ning in the FEP. offshore wind energy were initially the areas O-1 and O-3 (Baltic Sea), N-1 to N-3 and N-6 to N-13 Figure 1: Designations of the 2021 Maritime Spatial Plan for offshore wind energy in the North Sea Framework conditions for designations 3 Figure 2: Designations of the 2021 Maritime Spatial Plan for offshore wind energy in the Baltic Sea Offshore wind farms that are commissioned by Assumptions on decommission- 2021 generally receive feed-in tariffs under the ing of facilities Renewable Energies Act (Erneuerbare-Ener- The first offshore wind farms in the German EEZ gien-Gesetz – EEG) for a period of 20 years. Af- were commissioned from 2009 onwards. By ter that, direct marketing of the electricity gener- 2040, a significant number of wind turbines are ated is possible. expected to have reached the end of their ser- According to the current state of knowledge, it vice life and to have been dismantled. In order to can be assumed that no electricity production reliably achieve the statutory expansion targets, can take place on the areas between decommis- reasonable assumptions must be made about sioning and subsequent use for a certain period the extent of the expected decommissioning. of time, so that the decommissioned capacity The permits or planning approval decisions for must be compensated for by the designation of the offshore wind farms currently in operation additional areas in order to achieve the statutory were generally granted for a limited period of targets. The amount of space required for this 25 years, with an extension of a further five years depends largely on how orderly and coordinated possible on application in accordance with § 48 decommissioning and subsequent use of the site para. 7 sentence 2 WindSeeG if the FEP does can be. This preliminary draft uses consultation not provide for any direct subsequent use of the questions to prepare for the establishment of site. provisions on the subject of decommissioning. 4 Framework conditions for designations Identification of the expected tion have turned out to be the most important fac- generation capacity tors. However, since the characteristics of the ar- eas to be considered vary greatly, it does not ap- The aim of identifying the expected generation pear to be expedient to determine the expected capacity is to ensure the expansion of offshore generation capacity solely on the basis of the wind energy and offshore connection systems in methodology introduced in the Site Development parallel and consequently to achieve the expan- Plan 2020. In order to determine the expected sion targets for offshore wind energy. On the ba- generation capacity of the respective site, an as- sis of this determination, the required capacity of sessment is therefore made on a case-by-case the offshore grid connection cable can be deter- basis, taking into account the increase in in- mined. This ensures the orderly and efficient use stalled capacity and the achievement of the set of offshore grid connection lines and an appro- expansion targets, the possibilities for grid con- priate designation for the cables required to con- nection with standard grid connection concepts, nect this area to the grid. and the expected annual energy generation, tak- Furthermore, the anticipated tender volume for ing into account losses due to wake effects. the respective area is predetermined by specify- The adjusted power density as a target value for ing the expected generation capacity. However, determining the expected generation capacity the actual share of the respective area in the ten- was increased as much as advisable within the der volume is determined later in the process on framework of an overall assessment in view of the basis of the offshore site investigation in the the increased expansion targets for offshore suitability assessment for the respective site, as wind energy, compared to the planning in the set out in the ordinance for the implementation Site Development Plan 2020. For this reason, of the Offshore Wind Energy Act (Windenergie- the division of areas N-9 and N-10 into sites and auf-See-Verordnung – WindSeeV) in accord- their expected generation capacity have been ance with § 12 para. 5 WindSeeG. Therefore, the adjusted compared to the Site Development generation capacity to be installed as deter- Plan 2020. mined in the offshore site investigation may de- viate from the specifications of the Site Develop- With this increase in power density, the genera- ment Plan. tion capacity on the sites can be increased over- all, but the utilisation of the wind farms will be The methodology for determining the expected significantly reduced due to the expected losses generation capacity for a site was consulted as from wake effects (see background information part of the Site Development Plan 2020. on the following page). To determine the expected annual electricity In order to outline the expansion path for the pe- production in various expansion scenarios, tak- riod after 2030, the expected generation capac- ing into account large scale wake effects, the ity in areas N-11 to N-13 was presented for infor- BSH has commissioned a scientific report. The mation purposes in the annex of the Site Devel- first interim report, which is being published to- opment Plan 2020. With reference to the need gether with this preliminary draft, already con- for further investigations into the extensive wake tains the results of initial modelling cases. It losses of the wind farms and the ongoing proce- shows that the efficiency of electricity generation dure for updating the maritime spatial plan in the depends on a large number of factors. The in- EEZ, the possible capacity was given with a stalled capacity per area of the wind farm, the range of 8 to 10 GW. As a result of the specifica- size of the continuous area and the inflow situa- tions in the Maritime Spatial Plan 2021, the size of areas N-11 to N-13 has increased compared Framework conditions for designations 5 to the specifications in the Site Development Plan 2020. Against this background, the desig- nation of 12 GW in areas N-11 to N-13 appears possible in an overall assessment. Background information: Development of full load hours When determining the expected generation capacity to be installed on a site, the increase in in- stalled capacity and its contribution to achieving the target, the cost efficiency of electricity generation and the efficient use and utilisation of grid connections must be weighed against each other. The annual energy yield corresponds to the amount of electricity that can be produced in the course of a year. If the installed generation capacity on a site is increased, the annual energy yield and thus the amount of electricity that can be produced on a site increases. Every wind turbine extracts kinetic energy from the air flow for electricity production and also causes turbulence in the air layers in the wake of the turbine. These so-called wake effects imply that less kinetic energy is available to a lee-side turbine - thus reducing the utilisation of this turbine. The full load hours are used as a measure for the utilisation of a wind turbine or wind farm. They represent the number of hours in a year during which the wind farm generates energy at full load. In order to improve the level of knowledge on the link between power density and full load hours, the long-term yield potential in various expansion scenarios is being modelled as part of a scientific report. It is shown that with increasing expansion of offshore wind energy and an increase in power density to the extent proposed in this preliminary draft, average full load hours of approx. 3,100 3h/a can be expected in zones 1 to 3. Despite a reduction of the cost efficiency of electricity generation and the utilisation of the grid connection systems, the annual energy yield can still be increased overall through the increased installed generation capacity. With regard to achieving the expansion targets for offshore wind energy, the reduction in the overall utilisation of the wind farms and grid connections must be weighed against achieving the expansion targets and increasing total electric- ity generation. 3 Compared to the first interim report of the accompanying scientific report (Baumgärtner et al. , 2021. Further development of the framework conditions for planning offshore wind turbines and grid connection systems, First interim report. Fraun- hofer IWES on behalf of the BSH), the modelled annual energy yield was additionally reduced by 9.5 percent to reflect losses due to technical unavailability, electrical and other losses (Falkenberg et al., 2020. Future framework conditions for the design of offshore wind farms and their grid connection systems, Final Report. Prognos AG on behalf of the BSH). 6 Framework conditions for designations Availability of suitable grid con- According to table 1, compared to the Site De- nection points velopment Plan 2020 there are one additional grid connection system in the Baltic Sea with a Ever since its 2019-2030 edition, the Network capacity of 1 GW and 18 additional grid connec- Development Plan (Netzentwicklungsplan – tion systems in the North Sea with a capacity of NEP) has also contained all effective measures 2 GW each. for the needs-based optimisation, reinforcement and expansion of the offshore grid connections The connection system in the Baltic Sea serves in the EEZ and in the territorial sea, including the to connect the additional sites in area O-2 and is grid connection points onshore which will be re- expected to be routed via gate O-I to the territo- quired by the end of the period under considera- rial sea of Mecklenburg-Western Pomerania. tion in accordance with section 12a (1) sentence The additional grid connection systems in the 2 of the EnWG. The specifications of the Net- North Sea are to be routed to gates N-II and N- work Development Plan and Site Development III in the direction of Lower Saxony and to gate Plan must be aligned. N-V in the direction of Schleswig-Holstein. Due to the uncertainty regarding the acceleration According to the current state of knowledge, it is potential of grid connections with regard to the possible to route two further systems via gate N- expansion targets outlined in the coalition agree- II. The total capacity of gate N-III has not been ment, this preliminary draft refrains from naming conclusively determined, but according to find- calendar years for the commissioning of grid ings from the "Seetrassen 2030" project, a po- connection systems. tential total of 13 systems could be conceivable. Availability of cable routes in the The state of Schleswig-Holstein does not specify a maximum number of connection systems for territorial sea gate N-V to Schleswig-Holstein. Pursuant to § 5 para. 1 no. 8 WindSeeG, the Site Development Plan specifies locations where the offshore grid connections cross the boundary between the EEZ and the territorial sea (so- called gates). The routes planned in the Site Development Plan must be able to be reasonably routed through the territorial sea to the grid connection point. For coordination with the coastal states, the gates serve as locations where the offshore grid connections cross the border between the EEZ and the territorial sea. In this way, the cable systems are to be concentrated as far as possi- ble at these points and bundled for further rout- ing towards the grid connection point. The rout- ing in the territorial sea is not determined in the Site Development Plan; this is the responsibility of other bodies in the procedures provided for this purpose. Intended designations 7 3 Intended designations available to contribute to the expansion target because of the time lag between decommission- This preliminary draft of the Site Development ing and subsequent use of the sites (cf. chapter Plan only presents the intended designations of 2.2). spatial capacity of areas and sites, the expected The basis for the intended designations of this generation capacity and the required capacity of preliminary draft are the priority and reservation the associated offshore grid connection sys- areas for offshore wind energy as shown in the tems. Due to the expected acceleration of devel- Maritime Spatial Plan 2021. opments, the calendar year in which areas will be put out to tender and the commissioning date Note: The size of a site is only of limited suitabil- for sites and grid connection systems will not be ity as an indicator for the volume of the expected specified at this stage. Similarly, no statements generation capacity. In addition to size, site ge- are made on the spatial course of the connection ometry and the underlying turbine technology lines, the associated gates to the territorial sea are essential aspects in determining the poten- or possible grid connection points. Even though tial generation capacity on a site. For this reason, the intended timeframes are not yet presented in the Site Development Plan 2020 introduced the this preliminary draft, the order in which the sites corrected power density as a comparative value and grid connection systems are presented in (cf. chapter 4.7 of the FEP 2020). Here, the gen- Table 1 can be used as an indicator of the prob- eration capacity that is expected to be installed able order of implementation. is related to the corrected size of the site, which buffers the designated site with an additional Compared to the designations of the Site Devel- spacing of half the minimum distance between opment Plan 2020, the spatial designation and two turbines. This makes it possible to compare expected generation capacity in areas N-9 and sites of different sizes and geometries. To allow N-10 were adjusted to allow for an overall in- for a comparison of the sites, Table 1 also shows crease in the installed capacity. In table 1 the the corrected power density. For calculating the corresponding sites in areas N-9 and N-10 are corrected power density, a buffer distance of 600 therefore also shown. In total, 43 GW of wind en- m was selected for the sites in zone 3, and a ergy can probably be installed on the sites buffer distance of 700 m for the sites in zones 4 shown. A further 14.5 GW are expected to be in and 5 due to the expected development in tur- operation in Zones 1 and 2 in 2030 in accord- bine technology. ance with the determinations of the Site Devel- opment Plan 2020. Due to the significant decom- missioning of existing wind farms from 2035 on- wards, a certain share of the sites will not be 8 Intended designations Table 1: Intended designations for areas, sites, expected generation capacity and grid connection systems Area Site Grid connection system Name area Name site Size [km²] Expected ge- Corrected Name grid Capacity grid neration capa- power density connection connection city [MW] [MW/km²] system system [MW] N-9 N-9.1 76 1.000 10,5 NOR-9-1 2.000 N-9 N-9.2 76 1.000 10,9 N-9 N-9.3 76 1.000 10,5 NOR-9-2 2.000 N-9 N-9.4 77 1.000 10,6 N-9 N-9.5 106 1.500 11,2 NOR-9-3 2.000 N-10 N-10.3 31 500 10,7 N-10 N-10.1 75 1.000 10,6 NOR-10-1 2.000 N-10 N-10.2 73 1.000 10,3 O-2* O-2.2 93 1.000 7,3 OST-2-4 1.000 N-12 N-12.1 95 1.000 8,5 NOR-12-1 2.000 N-12 N-12.2 97 1.000 8,4 N-12 N-12.3 87 1.000 9,3 NOR-12-2 2.000 N-12 N-12.4 86 1.000 9,5 N-12 N-12.5 81 1.000 9,4 NOR-12.3 2.000 N-13 N-13.2 95 1.000 8,6 N-11 N-11.1 92 1.000 8,7 NOR-11-1 2.000 N-11 N-11.2 88 1.000 9,2 N-11 N-11.3 100 1.000 8,2 N-11 N-11.4 41 500 8,7 NOR-11-2 2.000 N-13 N-13.1 52 500 7,5 N-13 N-13.3 94 1.000 8,7 NOR-13-1 2.000 N-13 N-13.4 90 1.000 8,7 N-14 N-14.1 73 1.000 9,7 NOR-14-1 2.000 N-14 N-14.2 65 1.000 11,1 N-15 N-15.1 74 1.000 10,1 NOR-15-1 2.000 N-15 N-15.2 53 1.000 11,0 N-16 N-16.1 69 1.000 10,4 NOR-16-1 2.000 N-16 N-16.2 77 1.000 10,2 N-16 N-16.3 69 1.000 10,9 NOR-16-2 2.000 N-16 N-16.4 61 1.000 10,6 N-17 N-17.1 84 1.000 8,1 NOR-17-1 2.000 N-18 N-18.1 64 1.000 11,3 N-18 N-18.2 61 1.000 11,0 NOR-18-1 2.000 N-18 N-18.3 53 1.000 11,5 N-17 N-17.2 70 1.000 10,9 NOR-17-1 2.000 N-17 N-17.3 75 1.000 10,2 N-19 N-19.1 82 1.000 9,5 NOR-19-1 2.000 N-19 N-19.2 80 1.000 10,4 N-19 N-19.3 92 1.000 8,8 NOR-19-2 2.000 N-19 N-19.4 89 1.000 9,3 N-19 N-19.5 74 1.000 10,6 NOR-19-3 2.000 N-19 N-19.6 82 1.000 9,5 N-17 N-17.4 73 1.000 10,2 NOR-17-2 2.000 N-20** N-20.1 67 1.000 10,6 Total 43.000 * Area O-2 includes parts of both the priority area EO2 and the conditional reservation area EO2-West defined in the Maritime Spatial Plan 2021. However, the intended designation to the extent shown, as well as the expected capacity to be installed in area O-2.2, is dependent on the outcome of the spatial planning assessment, which results from Principle 2 of chapter 2.2.2 of the Maritime Spatial Plan 2021. Intended designations 9 ** The area N-20 corresponds to the conditional area EN20 of the Maritime Spatial Plan 2021. The intended designation is dependent on the result of the spatial planning assessment, which results from Principle 2 of chapter 2.2.2 of the Maritime Spatial Plan 2021. Figure 3 Intended designations of areas and sites in the EEZ of the North Sea 10 Intended designations Figure 4 Intended designations of areas and sites in the EEZ of the Baltic Sea Questions for consultation Assumptions on decomissioning F.1 What do you estimate is the expected operating time of existing offshore wind farms and grid connection systems? Do you consider it likely that the wind farms will be operated beyond the funding period of 20 years? What are your estimates regarding the maximum technical lifetime of wind turbines, platforms and cables? F.2 What framework conditions must be observed when dismantling individual components (in particular foundation structures, cabling within wind farms, cable crossings? What proce- dures will likely be available for decommissioning wind farms in the period up to 2040? F.3 What period of time is a reasonable assumption for the decommissioning and dismantling of a wind farm including all ancillary facilities? F.4 After dismantling, do you consider it sensible to use existing components (e.g. foundation structures, platforms) in the context of subsequent use or should the aim be to completely decommission the existing wind farm? How do you prove the stability of the components in question (e.g. foundation structures) in the event of subsequent use? Intended designations 11 Determination of expected generation capacity F.5 Against the background of the modelling results set out in the first scientific interim report (available in German language only on the BSH website), and taking into account the ex- pansion targets stated in the coalition agreement, how do you rate the intended designa- tions with regard to the expected generation capacity? Offshore grid connection systems F.6 In the case of the NOR-9-3 and NOR-17-1 grid connection systems listed above, and given the distance between the areas and the required crossings with existing lines, do you con- sider a direct connection feasible or are transformer platforms required for these areas? Assumptions on the model wind farm in the draft scope for the Strategic Environmental Assess- ment (separate document) F.7 In your opinion, how appropriate are the assumptions for the framework parameters of offshore wind farms and grid connection systems as well as platforms for the Strategic Environmental Assessment against the background of expected technological develop- ment? F.8 Given technological developments and increasing water depths, what are reasonable as- sumptions regarding the spatial requirements for foundations and scour protection? Is it reasonable to scale up the space required for monopile foundations? Which foundation variants seem realistic with increasing turbine size and water depth? Are there preferred foundations for the context of re-use? How should these foundations be assessed in terms of their spatial requirements compared to monopile foundations? ! "# $%$" Content I Content 1 Introduction 1 Legal basis and tasks of the environmental assessment 1 Definition of the scope of the investigation 2 Outline of the content and the main objectives of the site development plan 3 2 Relationship to other relevant plans, programmes and projects 4 Spatial development plans in adjacent areas 4 2.1.1 Mecklenburg-Western Pomerania 4 2.1.2 Lower Saxony 4 2.1.3 Schleswig-Holstein 5 MSFD Programme of Measures 5 Management plans for nature conservation areas in the EEZ 5 Staged planning procedure for offshore wind energy and power lines (central model) 6 2.4.1 Maritime Spatial Planning (EEZ) 7 2.4.2 Site development plan 8 2.4.3 Aptitude test as part the preliminary investigation 9 2.4.4 Approval procedure (planning approval and planning licensing procedure) for offshore wind turbines 10 2.4.5 Approval procedure for grid connections (converter platforms and submarine cable systems) 11 2.4.6 Cross-border submarine cable systems 11 3 Presentation and consideration of environmental protection objectives 14 International conventions on marine environmental protection 14 3.1.1 Globally applicable conventions that are wholly or partly aimed at protecting the marine environment 14 3.1.2 Regional agreements on marine environmental protection 14 3.1.3 Agreements specific to protected assets 14 Environmental and nature conservation requirements at EU level 15 Environmental and nature conservation requirements at national level 15 II Content 4 Strategic Environmental Assessment methodology 16 Examination room 17 Implementation of the environmental assessment 19 Criteria for the description and assessment of the condition 21 Consideration of climate change 24 Assumptions used to describe and assess the likely significant impacts 25 4.5.1 Cumulative consideration 26 4.5.2 Interrelationships 27 4.5.3 Specific assumptions for the assessment of the likely significant environmental effects 27 5 Data basis 29 Overview of data and knowledge base 30 Indications of difficulties in compiling the documents 30 6 Presentation of the individual assessment steps in the environmental report 31 Description and assessment of the state of the environment 32 Anticipated development if the plan is not implemented 32 Description and assessment of the likely significant effects of the implementation of the plan on the marine environment 33 Examination of reasonable alternatives 34 Measures to prevent, reduce and offset significant negative impacts of the site development plan on the marine environment 34 Measures planned to monitor the environmental impact of implementing the site development plan 35 7 References 36 8 Annex 37 Content III List of figures Figure 1 Overview of the staged planning and approval process in the EEZ. .................................. 7 Figure 2 Overview of the protected assets in the environmental assessments. ............................... 7 Figure 3 Overview of the focal points of environmental assessments in the planning and approval process. ........................................................................................................................................ 13 Figure 4 Overview of the normative levels of the relevant legal acts for SEA. ............................... 16 Figure 5 Delimitation of the investigation area for the SEA of the site development plan in the North Sea. .............................................................................................................................................. 18 Figure 6 Delimitation of the investigation area for the SEA of the site development plan in the Baltic Sea. .............................................................................................................................................. 18 Figure 7 General methodology for the assessment of likely significant environmental effects. ...... 21 Figure 8 Exemplary cumulative effect of similar uses. ................................................................... 27 Figure 9 Components of the environmental report. ....................................................................... 32 List of tables Table 1 Overview of potentially significant impacts if the FEP is implemented (t=temporary effects). ..................................................................................................................................................... 25 Table 2 Model parameters for the consideration of the areas and sites. ........................................ 28 Table 3 Parameters for the consideration of grid connections and platforms ................................. 28 Table 4 Parameters for the consideration of submarine cable systems ......................................... 29 IV Content List of abbreviations ASCOBANS Agreement on the Conservation of Small Cetaceans of the Baltic and North Seas EEZ Exclusive Economic Zone BBergG Federal Mining Act BfN Federal Agency for Nature Conservation BGBl Federal Law Gazette BMI Federal Ministry of the Interior, for Building and Homeland BMUB Federal Ministry for the Environment, Nature Conservation, Construction and Reactor Safety BNatSchG Law on nature conservation and landscape management (Federal Nature Conservation Act) BSH Federal Maritime and Hydrographic Agency CMS Convention on the Conservation of Migratory Species of Wild Animals EEG Law for the expansion of renewable energies (Renewable Energy Sources Act) EIA Environmental impact assessment EUROBATS Agreement on the conservation of European bat populations Federal Network Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Agency FEP Site development plan FFH Flora Fauna Habitat GW Gigawatt HELCOM Helsinki Commission MARPOL International Convention for the Prevention of Pollution from Ships MRO Maritime spatial planning MSRL Directive 2008/56/EC of the European Parliament and of the Council of 17 June 2008 establishing a Framework for Community Action in the field of Marine Environmental Pol- icy (Marine Strategy Framework Directive) NSG Nature reserve OSPAR Oslo-Paris-Übereinkommen (Convention for the Protection of the Marine Environment of the North-East Atlantic) ROG Spatial Planning Act ROP Spatial development plan SPEC Species of European Conservation Concern (Important species for bird conservation in Europe) StUK4 Standard "Investigation of the effects of offshore wind energy plants". SUP Strategic Environmental Assessment SUP-RL Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment (SEA Directive) UBA Federal Environment Agency UVPG Law on environmental impact assessment UVS Environmental impact study V-RL Directive 2009/147/EC of the European Parliament and of the Council of 30 November 2009 on the conservation of wild birds (Birds Directive) WindSeaG Act on the development and promotion of offshore wind energy (Wind Energy at Sea Act) Introduction 1 1 Introduction SEA was carried out and an environmental re- port was prepared for each of the German EEZs in the North Sea and Baltic Sea. The up- Legal basis and tasks of the date of the FEP will essentially build on the pro- environmental assessment visions of the maritime spatial planning for off- In accordance with Sections 4 et seq. of the shore wind energy and transmission lines and Wind Energy at Sea Act (WindSeeG), the BSH develop them in terms of sectoral planning. prepares a Site Development Plan (FEP) in Against this background, the SEA for the up- agreement with the Federal Network Agency date of the FEP will also be based essentially (BNetzA) and in coordination with the Federal on the results of the SEA carried out in the spa- Agency for Nature Conservation (BfN), the Di- tial planning update procedure: According to § rectorate-General for Waterways and Shipping 5 para. 3 sentence 4 WindSeeG in conjunction (GDWS) and the federal coastal states. The with. § Section 39 (3) sentence 3 UVPG, the FEP was last updated in 2020. A new update SEA to be carried out in the procedure for will be initiated on 17 December 2021. amending and updating the FEP is to be limited During the preparation of the FEP, a detailed to additional or other significant environmental environmental assessment within the meaning impacts compared to the SEA for the ROP, as of the Environmental Impact Assessment Act well as to necessary updates and deepening. (UVPG)1, the so-called Strategic Environmen- The SEA for the update of the FEP is also tal Assessment (SEA), was carried out. The en- based on the environmental reports on the vironmental reports were published together preparation and update of the FEP from the with the final plan on 28.06.2019. The imple- years 2019 and 2020. Insofar as new findings mentation of an SEA with the preparation of an on existing determinations should be available environmental report is based on § 35 para. 1 and are relevant, these are also taken into ac- no. 1 UVPG in connection with. No. 1.17 of An- count. nex 5, as site development plans are subject to the SEA obligation pursuant to Section 5 Wind- In the following, the scope of the assessment is SeeG. In principle, this also applies if the FEP therefore limited to additional or other signifi- is updated or amended. cant environmental impacts as well as to nec- essary updates and deepening. This follows for In the context of the update initiated on 17 De- the reference to the environmental reports of cember 2021, areas and sites will be identified the spatial development plan from Section 39 for the implementation of the energy policy ob- (3) sentence 3 UVPG. With regard to the refer- jectives that go beyond the FEP 2020 and are ence to environmental reports on the existing therefore also not covered by the SEA carried FEP, the aforementioned limitation of the out in this procedure. scope of the assessment is based on the fact In contrast to the last update of the FEP, with that in the absence of indications of actual the completion of the update procedure for changes in the circumstances, no new assess- maritime spatial planning, a spatial plan 2021 ment needs to take place. for the German EEZ of the North Sea and Baltic Sea (ROP)2 is now available, which came into force on 1 September 2021. As part of the spa- tial planning update process, a comprehensive 1 In the version published on 24 February 2010, Federal 2 Ordinance on Spatial Planning in the German Exclusive Law Gazette I p. 94, last amended by Article 2 of the Act Economic Zone in the North Sea and the Baltic Sea of 19 of 30 November 2016 (Federal Law Gazette I p. 2749). August 2021, BGBl. I p. 3886. 2 Introduction According to Art. 1 of the SEA Directive tion 39 (1) UVPG). The authorities whose envi- 2001/42/EC, the objective of strategic environ- ronmental and health-related area of responsi- mental assessment is to ensure a high level of bility is affected by the plan or programme are environmental protection in order to promote involved in determining the scope of the Stra- sustainable development and to contribute to tegic Environmental Assessment as well as the ensuring that environmental considerations are scope and level of detail of the information to adequately taken into account in the prepara- be included in the Environmental Report (cf. tion and adoption of plans well in advance of Section 39 para. 4 sentence 1 UVPG). Pursu- their actual planning. ant to Section 6 (4) sentence 1 WindSeeG, the scope of the assessment is determined on the The Strategic Environmental Assessment has basis of the results of the hearing. the task of identifying the likely significant envi- ronmental effects of implementing the plan, de- The scope of the investigation is determined, scribing them at an early stage in an environ- taking into account § 33 UVPG in conjunction mental report and evaluating them. It serves to with § 2 para. 1 UVPG, in accordance with the ensure effective environmental precaution in legal provisions governing the decision to pre- accordance with the applicable laws and is car- pare, adopt or amend the plan. This is limited ried out according to uniform principles and by the fact that the environmental report only with public participation. All protected assets contains information that can be determined pursuant to Article 2 (1) UVPG are to be con- with reasonable effort. In doing so, it takes into sidered: account the current state of knowledge and public statements known to the authority, gen-  people, especially human health, erally accepted auditing methods, the content  animals, plants and biodiversity, and level of detail of the plan and its position in  area, soil, water, air, climate and land- the decision-making process. The authorities scape, whose environmental and health-related tasks  cultural heritage and other tangible as- are affected by the plan or programme shall be sets, and involved in determining the scope of the Stra- tegic Environmental Assessment and the  the interactions between the above- scope and level of detail of the information to mentioned protected assets. be included in the environmental report (cf. Art. The main content document of the Strategic 39 para. 4 sentence 1 UVPG). According to § 6 Environmental Assessment will be the Environ- para. 4 sentence 1 WindSeeG, the scope of the mental Report to be prepared. This report shall investigation is determined on the basis of the identify, describe and assess the likely signifi- results of the hearing. cant environmental effects of the implementa- tion of the FEP and possible alternative plan- The present draft of the scope for the environ- ning options, taking into account the main pur- mental assessment applies both to the EEZs of poses of the plan. the North Sea and the Baltic Sea. Regionally different bases or methods of the SEA are Definition of the scope of marked accordingly. the investigation At the beginning of the Strategic Environmental Assessment, the scope for the environmental assessment, including the required scope and level of detail of the information to be included in the environmental report, is defined (cf. Sec- Introduction 3 Outline of the content and 3. the chronological order in which the the main objectives of the specified areas are to come up for ten- site development plan der under Part 3 Section 2, including the According to § 4 para. 1 WindSeeG, it is the designation of the respective calendar purpose of the FEP to draw up sectoral plan- years, ning specifications for the exclusive economic 4. the calendar years including the quarter zone (EEZ) of the Federal Republic of Ger- in the respective calendar year in which many. the surcharged offshore wind turbines § Section 4 (2) of the WindSeeG stipulates that, and the corresponding offshore con- for the expansion of offshore wind turbines and necting cables are to be commissioned offshore connecting lines required for this pur- on the specified sites, as well as the pose, the Site Development Plan shall draw up quarters in the respective calendar year rules with the aim of in which the cable installation of the in- ner park cabling of the surcharged off-  achieving the expansion targets pursu- shore wind turbines is to be carried out ant to § 1 para. 2 sentence 1 Wind- at the converter platform or the trans- SeeG, former platform,  expanding electricity generation from 5. the expected capacity of offshore wind offshore wind turbines in a spatially or- turbines to be installed in the designated dered and compact manner, and areas and on the designated sites,  ensuring an ordered and efficient utili- sation and loading of offshore connec- 6. Locations of converter platforms, collec- tion lines and planning, installation, tor platforms and, where possible, sub- commissioning and use of offshore stations, connection lines in parallel with the ex- 7. Routes or route corridors for offshore pansion of electricity generation from connecting cables, offshore wind turbines. 8. Locations where the offshore connect- According to the statutory mandate of section 5 ing cables cross the boundary between subsection 1 of the Offshore Wind Energy Act, the exclusive economic zone and the the Site Development Plan contains designa- territorial sea, tions for the period from 2026 to at least 2030 for the German EEZ and in accordance with the 9. Routes or route corridors for cross-bor- following provisions for coastal waters: der power cables, 10. routes or corridors for possible connec- 1. areas; in the territorial sea, areas can tions between the installations, routes or only be designated if the competent corridors mentioned in numbers 1, 2, 6, Land has identified the areas as a pos- 7 and 9; and sible subject of the Land development plan, 11. standardised technical principles and planning principles. 2. sites in the areas determined in accord- ance with number 1; in the territorial sea, sites may only be determined if the For the period from 2021 onwards, the FEP competent Land has designated the may designate available grid connection ca- sites as a possible subject of the land pacities on existing offshore connection lines or development plan, on offshore connecting cables to be completed in the following years for areas in the German 4 Relationship to other relevant plans, programmes and projects EEZ and in the territorial sea, these may be al- 2 Relationship to other rel- located to pilot offshore wind turbines in ac- cordance with section 70 (2) of the WindSeeG. evant plans, pro- The FEP may make spatial specifications for grammes and projects the construction of pilot offshore wind turbines in areas and designate the technical conditions The FEP relates to other plans and pro- of the offshore connecting cable and the result- grammes within the EEZ, in adjacent areas, ing technical requirements for the grid connec- particularly in the territorial sea, and to plans tion of pilot offshore wind turbines. and projects at upstream and downstream planning and approval levels. Pursuant to § 5 para. 2a WindSeeG, the FEP may designate other energy production areas Spatial development plans outside of areas. in adjacent areas In accordance with § 3 No. 8 WindSeeG, an In the interests of coherent planning, coordina- other energy production area is an area outside tion processes with the plans of the coastal fed- areas on which offshore wind turbines and eral states and neighbouring states are advisa- other energy production installations, each of ble and must be taken into account in the cu- which is not connected to the grid, can be - mulative and, where relevant, transboundary erected in spatial coherence and which is sub- assessment of the impacts on the marine envi- ject to the approval procedure according to § 2 ronment. In particular, close coordination with of the Marine Facilities Act. According to § 4 the coastal federal states is necessary with re- para. 3 WindSeeG, the objective of the desig- gard to the onshore connection of the offshore nation is to enable the practical testing and im- wind farms and the routing of the routes plementation of innovative concepts for energy through the coastal sea. At present, the re- generation not connected to the grid in a spa- gional planning for Lower Saxony is being up- tially ordered and land-saving manner. dated. Within the framework of the Strategic Environ- mental Assessment, a "conventional" offshore 2.1.1 Mecklenburg-Western Pomerania wind farm is assumed on the basis of the For the Land of Mecklenburg-Western Pomer- knowledge gained to date with regard to elec- ania, the highest state planning authority is the tricity generation. Environmental impacts going Ministry for Energy, Infrastructure and Digitali- beyond this are highly dependent on the re- sation of Mecklenburg-Western Pomerania. It spective type of use and should therefore be is responsible for regional planning at the state comprehensively examined at the approval level, including the coastal sea. level. In this respect, the SEA for other energy The current State Spatial Development Pro- production areas is carried out in the same way gramme of Mecklenburg-Western Pomerania as the assessment of sites for offshore wind (LEP M-V) came into force on 9 June 2016. energy. 2.1.2 Lower Saxony The spatial development plan for the Land of Lower Saxony, including the coastal sea of Lower Saxony, is the Land Regional Planning Programme (LROP). The Ministry of Food, Ag- riculture and Consumer Protection of Lower Saxony, as the highest state planning authority, is responsible for drawing up and amending it; Relationship to other relevant plans, programmes and projects 5 the final decision on the LROP is the responsi- the updating of the spatial development plans bility of the state government. The LROP is with regard to measures for the protection of based on an ordinance from 1994 and has migratory species in the marine area. Both the been updated several times since then, most environmental objectives of the MSFD and the recently in 2017. At the end of 2019, the proce- MSFD programme of measures are taken into dure for a new update was initiated. In Decem- account in the SEA. ber 2021, the second participation procedure for the draft amendment and update to the Management plans for na- LROP was initiated. ture conservation areas in the EEZ 2.1.3 Schleswig-Holstein On 17 November 2017, the Federal Agency for In Schleswig-Holstein, the Land Development Nature Conservation (BfN) initiated the partici- Plan (LEP S-H) is the basis for the spatial de- pation procedure under Article 7 (3) of the Reg- velopment of the state. The Ministry of the In- ulation on the Establishment of the "Borkum terior, Rural Areas, Integration and Equality of Riffgrund" Nature Conservation Area Schleswig-Holstein (MILIG) is responsible for (NSGBRgV)3, Article 7 (3) of the Regulation on its preparation and amendment. The recent the Establishment of the "Doggerbank" Nature Land Ordinance on the Land Development Conservation Area (NSGDgbV) 4and Article 9 Plan - Update 2021 (LEP-VO 2021) came into (3) of the Regulation on the Establishment of force on 16 December 2021 after an extensive the "Sylt Outer Reef - Eastern German Bight" participation process. Nature Conservation Area (NSGSylV)5 on the management plans for the nature conservation MSFD Programme of Mea- areas in the German North Sea EEZ. On 13 sures May 2020, the management plans "Borkum Each EU Member State must develop a Marine Riffgrund"6, "Doggerbank" 7and "Sylt Outer Strategy to achieve good status for its marine Reef - Eastern German Bight" were 8published waters, in Germany for the North Sea and the in the Federal Gazette. Baltic Sea. The key to this is the establishment For the Baltic Sea EEZ, the regulations on the of a programme of measures to achieve or designation of the nature reserves "Fehmarn- maintain good environmental status and the belt" (NSGFmbV), "Kadetrinne" (NSGKdrV) practical implementation of this programme of and "Pommersche Bucht - Rönnebank" measures. The establishment of the pro- (NSGPBRV) came into force in September gramme of measures (BMUB, 2016) is regu- 2017. According to the ordinances, the lated in Germany by Section 45h of the Federal measures necessary to achieve the conserva- Water Act (WHG). Under Objective 2.4 tion objectives established for the nature re- "Oceans with sustainably and carefully used serves are presented in management plans. resources", the current MSFD Programme of These plans are drawn up by the Federal Measures mentions maritime spatial planning Agency for Nature Conservation (BfN) in con- as a contribution of existing measures to sultation with the neighbouring Länder and the achieving the operational objectives of the technically affected public agencies, and with MSFD. In addition, the catalogue of measures the participation of the interested public and the also formulates a concrete review mandate for 3 6 Of 22 September 2017 (BGBl. I p. 3395). Published on 17 April 2020, BAnz AT 13.05.2020 B9. 4 Of 22 September 2017 (BGBl. I p. 3400). 7 Published on 13 May 2020, BAnz AT 13.05.2020 B10. 5 Of 22 September 2017 (BGBl. I p. 3423). 8 Published on 13 May 2020, BAnz AT 13.05.2020 B11. 6 Relationship to other relevant plans, programmes and projects nature conservation associations recognised is designed to plan the use of offshore wind en- by the Federation. ergy and power cables in a targeted manner and as optimally as possible under the given On 16 June 2020, BfN initiated the participation framework conditions - in particular the require- procedure under Article 7 (3) NSGFmbV, Arti- ments of regional planning - by defining areas cle 7 (3) NSGKdrV and Article 11 (3) and sites as well as locations, routes and corri- NSGPBRV on the management plans for the dors for grid connections and for cross-border nature conservation areas in the German Baltic submarine cable systems. As a matter of prin- Sea EEZ. As part of the participation proce- ciple, an SEA is carried out to accompany the dure, a hearing on the drafts was held on 17 preparation, updating and amendment of the August 2020. The management plans for the FEP. Baltic Sea EEZ have not yet been published. In the next step, the sites for offshore wind tur- Staged planning procedure bines identified in the FEP are pre-surveyed. for offshore wind energy The preliminary investigation is followed by the and power lines (central determination of the suitability of the area for the construction and operation of offshore wind model) turbines if the requirements of Section 12 (2) Within the framework of the central model, the WindSeeG are met. The determination of the FEP is the steering instrument for the orderly suitability of an area is also subject to the obli- expansion of offshore wind energy in a staged gation to carry out an SEA. planning process. The SEA for the FEP is linked to the respective upstream and down- If the suitability of an area for the use of off- stream environmental assessments. shore wind energy is determined, the area is put out to tender and the winning bidder or the Looking at the central model as a whole, the person entitled to do so is granted the right to planning process for the EEZ area is divided conduct a planning licensing procedure for the into several stages: construction and operation of wind turbines on At the highest and superordinate level is the in- the area specified in the FEP. If the require- strument of maritime spatial planning. The spa- ments are met, an environmental impact as- tial plan for the German EEZ in the North Sea sessment is carried out as part of the planning and the Baltic Sea is the forward-looking plan- licensing procedure. ning instrument that coordinates the most vari- While the sites defined in the FEP for the use ous interests of users in the areas of business, of offshore wind energy are pre-surveyed and science and research as well as protection put out to tender, this is not the case for defined claims. A Strategic Environmental Assessment sites, routes and corridors for grid connections (SEA) must be carried out when the spatial de- or cross-border submarine cable systems. velopment plan is drawn up. The SEA for the Upon application, a planning approval proce- ROP is related to various downstream environ- dure including environmental assessment is mental assessments, in particular the directly usually carried out for the construction and op- downstream SEA for the Site Development eration of grid connection cables. The same Plan (FEP). applies to cross-border submarine cable sys- The next step is the FEP. Within the framework tems. of the so-called central model, the FEP is the steering instrument for the orderly expansion of offshore wind energy and power cables in a staged planning process. The FEP has the character of a sectoral plan. The sectoral plan Relationship to other relevant plans, programmes and projects 7 According to Article 3 of the Environmental Im- pact Assessment Act, environmental assess- ments comprise the identification, description and assessment of the significant impacts of a project or a plan or programme on the pro- tected assets. They serve to ensure effective environmental protection in accordance with the applicable laws and are carried out accord- ing to uniform principles and with public partic- ipation. In the offshore sector, the special conservation goods avifauna have become established as sub-categories of the legally protection objec- Figure 1 Overview of the staged planning and ap- tives animals, plants and biological diversity: proval process in the EEZ. seabirds/resting and migratory birds, benthos, In the case of multi-stage planning and ap- biotope types, plankton, marine mammals, fish proval processes, it follows from the relevant and bats. legislation (e.g. Spatial Planning Act, Wind- SeeG and BBergG) or, more generally, from Article 39 (3) UVPG that, in the case of plans, it should be determined at the time of defining the scope of the investigation at which of the stages of the process certain environmental im- pacts are to be assessed. In this way, multiple assessments are to be avoided. The nature and extent of the environmental impacts, tech- nical requirements, and the content and subject matter of the plan must be taken into account. In the case of subsequent plans and subse- quent approvals of projects for which the plan sets a framework, the environmental assess- ment pursuant to Article 39 (3) sentence 3 UVPG shall be limited to additional or other sig- nificant environmental impacts as well as to Figure 2 Overview of the protected assets in the en- necessary updates and more detailed investi- vironmental assessments. gations. In detail, the staged planning process is as fol- As part of the staged planning and approval lows: process, all reviews have in common that envi- ronmental impacts on the protected assets 2.4.1 Maritime Spatial Planning (EEZ) specified in Article 2 (1) UVPG are considered, At the highest and superordinate level is the in- including their interactions. strument of maritime spatial planning. For sus- tainable spatial development in the EEZ, the According to the definition in Article 2 (2) of the BSH prepares a spatial development plan on UVPG, environmental impacts within the behalf of the responsible federal ministry, meaning of the UVPG are direct and indirect which comes into force in the form of statutory impacts of a project or the implementation of a orders. The ROP for the German EEZ in the plan or programme on the protected assets. 8 Relationship to other relevant plans, programmes and projects North Sea and the Baltic Sea came into force The focus is therefore on possible cumulative on 1 September 2021. effects, strategic and large-scale planning op- tions and possible transboundary impacts. The spatial development plans should define, taking into account possible interactions be- 2.4.2 Site development plan tween land and sea and safety aspects The next level is the FEP.  to ensure the safety and ease of navi- The specifications to be made by the FEP and gation, to be examined within the framework of the  to further economic uses, SEA result from § 5 para. 1 WindSeeG. The  on scientific uses and plan mainly specifies areas and sites for wind  to protect and improve the marine en- energy plants as well as the expected capacity vironment. to be installed on these sites. In addition, the In the context of spatial planning, definitions FEP also specifies routes, route corridors and are mainly made in the form of priority and re- sites. Planning and technical principles are also served areas and other objectives and princi- laid down. Although these also serve, among ples. According to Section 8 (1) ROG, when other things, to reduce environmental impacts, drawing up spatial development plans, the they may in turn lead to impacts, so that an as- body responsible for the spatial development sessment is required as part of the SEA. plan must carry out a strategic environmental In addition, the FEP specifies temporal as- assessment in which the probable significant pects, such as the chronological order in which impacts of the respective spatial development the sites for offshore wind energy are to be put plan on the objects to be protected, including out to tender and the calendar years for com- interactions, must be identified, described and missioning. These are not a focus of the SEA, evaluated. as they do not result in any further environmen- The aim of the instrument of spatial planning is tal impacts compared to the spatial specifica- to optimise overall planning solutions. A wider tions. spectrum of uses and functions is considered. The specifications of the FEP must be permis- Fundamental strategic questions should be sible in accordance with the requirements of § clarified at the beginning of a planning process. 5 WindSeeG. Pursuant to Section 5 para. 3 Thus the instrument primarily functions, and sentence 2 no. 2 WindSeeG, specifications are within the framework of the legal provisions, as inadmissible in particular if they conflict with a controlling planning instrument for the plan- overriding public or private interests. In the con- ning administrative bodies in order to create a text of the SEA, this means that the determina- framework for all uses which is compatible with tions to be examined are in particular inadmis- the spatial and natural environment as far as sible if they possible.  endanger the marine environment or In spatial planning, the depth of examination of the SEA is generally characterised by a  pursuant to § 5 para. 3 sentence 2 no. greater breadth of investigation, i.e. a funda- 5 WindSeeG, in the case of the desig- mentally greater number of planning options, nation of a site or area, it is located in a and a lesser depth of investigation in terms of protected area designated pursuant to detailed analyses. Above all, regional, national § 57 BNatSchG, or and global impacts as well as secondary, cu-  in the case of a designation under sec- mulative and synergetic effects are taken into tion 5(2a), the other energy production account. Relationship to other relevant plans, programmes and projects 9 area is located in a protected area des- der impacts. Against this background, the envi- ignated under section 57 of the Federal ronmental report of the FEP update that is now Nature Conservation Act. to be prepared should not repeat the assess- ments; instead, in accordance with Article 39 Pursuant to Section 40 (1) sentence 2 UVPG, (3) sentence 3 UVPG, the environmental as- the environmental report must identify, de- sessment should be limited to additional or scribe and assess the likely significant environ- other significant environmental impacts and to mental effects of implementing the plan as well necessary updates and deepenings. More in- as reasonable alternatives. Pursuant to Section depth assessments are carried out for the uses 40 (3) UVPG, the competent authority shall of wind energy and submarine cables, for ex- provisionally assess the environmental effects ample with regard to strategic, technical and of the plan on the protected assets in the envi- spatial alternatives. ronmental report in accordance with the princi- ples of environmental assessment. The as- 2.4.3 Aptitude test as part the prelimi- sessment standards of the sectoral legislation nary investigation and the UVPG are essentially congruent, as The next step in the staged planning process is the assessment of the environmental effects in the suitability testing of sites for the construc- the environmental assessments is carried out tion and operation of offshore wind turbines. In in accordance with the applicable legislation. addition, the power to be installed is deter- With regard to the FEP's objectives, it deals mined on the site in question. with the fundamental questions of the use of In the suitability test, it is examined in accord- offshore wind energy and grid connections on ance with section 10 subsection (2) WindSeeG the basis of the legal requirements, especially whether the construction and operation of off- with the need, purpose, technology and the shore wind energy installations on the site does identification of sites and routes or route corri- not conflict with the criteria for the inadmissibil- dors. The plan therefore primarily has the func- tion of a steering planning instrument in order ity of defining an area in the site development plan in accordance with section 5 subsection to create a spatially and, as far as possible, na- ture-compatible framework for the implementa- (3) WindSeeG or, insofar as they can be as- tion of individual projects, i.e. the construction sessed independently of the later design of the and operation of offshore wind energy plants, project, with the interests relevant for the plan their grid connections, cross-border submarine approval in accordance with section 48 subsec- tion (4) sentence 1 WindSeeG. cable systems and interconnections. The depth of the assessment of likely signifi- Both the criteria of § 5 (3) WindSeeG and the cant environmental effects is characterised by concerns of § 48 (4) sentence 1 WindSeeG re- a wider scope of investigation, i.e. a larger quire an examination of whether the marine en- vironment is endangered. With regard to the number of alternatives and, in principle, a lower latter concerns, it must be examined in particu- depth of investigation. At the level of sectoral planning, detailed analyses are generally not lar whether pollution of the marine environment yet performed. Above all, local, national and within the meaning of Article 1 (1) No. 4 of the global impacts as well as secondary, cumula- United Nations Convention on the Law of the Sea is not to be feared and whether bird migra- tive and synergistic impacts in the sense of an tion is not endangered. overall view are taken into account. The preliminary investigation with the suitability As with the instrument of maritime spatial plan- ning, the focus of the audit is on possible cu- test or determination is thus the instrument connected between the FEP and the individual mulative effects as well as possible cross-bor- approval procedure for offshore wind energy 10 Relationship to other relevant plans, programmes and projects plants. It refers to a concrete area designated In addition to the legal requirements of § 73 in the FEP and is thus much smaller than the para. 1 sentence 2 VwVfG, the plan must in- FEP. It is distinguished from the plan approval clude the information contained in § 47 para. 1 procedure by the fact that an inspection ap- WindSeeG. The plan may only be established proach is to be applied which is independent of under certain conditions listed in section 48(4) the later concrete type of installation and lay- WindSeeG, and only if, inter alia, the marine out. Thus, the impact prognosis is based on environment is not endangered, in particular if model parameters, e.g. in scenarios or ranges there is no cause for concern about pollution of of scenarios which are intended to represent the marine environment within the meaning of possible realistic developments. Article 1(1)(4) of the Convention on the Law of the Sea and if bird migration is not endangered. Compared to the FEP, the SEA of the profi- ciency test is thus characterised by a smaller Under § 24 UVPG, the competent authority examination area and a greater depth of ex- prepares a summary amination. In principle, fewer alternatives, lim-  the environmental impact of the pro- ited spatially to the site, are seriously consid- ject, ered. The two primary alternatives are the de-  the characteristics of the project and of termination of the suitability of an area on the the site, which are intended to prevent, one hand and the determination of its (possibly reduce or offset significant adverse en- partial) unsuitability (see section 12 para. 6 vironmental effects, WindSeeG) on the other. Restrictions on the  measures to prevent, reduce or offset type and extent of development, which are in- significant negative environmental im- cluded as specifications in the determination of pacts, and suitability, are not alternatives in this sense.  the replacement measures in case of The focus of the environmental assessment interventions in nature and landscape. within the framework of the suitability test is on the consideration of the local impacts of a de- Under Article 16 (1) of the UVPG, the project developer must submit a report to the compe- velopment with wind energy plants in relation to tent authority on the expected environmental the area and the location of the development impacts of the project (EIA report), which must on the area. contain at least the following information: 2.4.4 Approval procedure (planning ap-  a description of the project, including in- proval and planning licensing formation on the location, nature, scale procedure) for offshore wind tur- and design, size and other essential bines characteristics of the project, The next step after the preliminary investigation  a description of the environment and its is the approval procedure for the installation components within the project's sphere and operation of offshore wind turbines. After of influence, the area under investigation has been put out to tender by the BNetzA, the winning bidder  a description of the characteristics of can, with the acceptance of the bid by the the project and of the location of the BNetzA, submit an application for planning ap- project to exclude, reduce or offset the proval or - if the prerequisites are met - for plan- occurrence of significant adverse envi- ning permission for the construction and oper- ronmental effects of the project, ation of offshore wind energy plants including  a description of the measures planned the necessary ancillary plants on the area un- to prevent, reduce or offset any signifi- der investigation. cant adverse effects of the project on Relationship to other relevant plans, programmes and projects 11 the environment and a description of gered, in particular if there is no cause for con- planned replacement measures, cern about pollution of the marine environment within the meaning of Article 1(1)(4) of the Con-  a description of the expected significant vention on the Law of the Sea and no threat to environmental effects of the project, bird migration.  a description of the reasonable alterna- Moreover, according to Article 1 para 4 UVPG, tives, relevant to the project and its spe- the requirements for the environmental impact cific characteristics, that have been assessment of offshore wind energy installa- considered by the developer and the tions, including ancillary installations, apply ac- main reasons for the choice made, tak- cordingly to the performance of the environ- ing into account the specific environ- mental assessment. mental effects of the project; and  a generally understandable, non-tech- 2.4.6 Cross-border submarine cable nical summary of the EIA report. systems Pilot wind energy plants are only dealt with in According to § 133 (1) in conjunction with para. the context of the environmental assessment in 4 BBergG, the construction and operation of an the approval procedure and not already at up- underwater cable in or on the continental shelf stream stages. requires a permit  from a mining point of view (by the 2.4.5 Approval procedure for grid con- competent state mining authority) and nections (converter platforms  concerning the organisation of the use and submarine cable systems) and exploitation of waters above the In the staged planning process, the establish- continental shelf and the airspace ment and operation of grid connections for off- above these waters (by the BSH). shore wind energy plants (converter platform and submarine cable systems, if applicable) is Pursuant to § 133 (2) BBergG, the above-men- examined at the level of the approval proce- tioned permits may only be refused if there is a dures (planning approval and planning permis- risk to the life or health of persons or material sion procedures) in implementation of the re- goods or an impairment of overriding public in- gional planning requirements and the specifica- terests which cannot be prevented or compen- tions of the FEP at the request of the respective sated for by a time limit, conditions or require- project executing agency - the responsible ments. An impairment of overriding public inter- TSO. ests exists in particular in the cases specified in § 132 (2) No. 3 BBergG. Pursuant to Section According to § 44 (1) in conjunction with § 45 132 (2) No. 3 b) and d) BBergG, an impairment para 1 WindSeeG, the construction and opera- of overriding public interests with regard to the tion of facilities for the transmission of electric- marine environment exists in particular if the ity require planning approval. In addition to the flora and fauna would be impaired in an unac- legal requirements of § 73 para. 1 sentence 2 ceptable manner or if there is reason to believe VwVfG, the plan must include the information that the sea will be polluted. contained in § 47 para. 1 WindSeeG. The plan may only be approved under certain conditions According to § 1 (4) UVPG, the essential re- listed in section 48(4) WindSeeG and only if, quirements of the UVPG must be observed for inter alia, the marine environment is not endan- the construction and operation of transbound- ary submarine cable systems. 12 Relationship to other relevant plans, programmes and projects Relationship to other relevant plans, programmes and projects 13 Figure 3 Overview of the priorities of environmental assessments in the planning and approval process. 14 Presentation and consideration of environmental protection objectives 3 Presentation and con-  Convention on the prevention of marine pollution by dumping of waste and other sideration of environ- matter (London, 1972) and the 1996 mental protection objec- Protocol tives 3.1.2 Regional agreements on marine en- The preparation and updating of the FEP as vironmental protection well as the implementation of the SEA are car-  Trilateral Wadden Sea Cooperation ried out in consideration of environmental pro- (1978) and Trilateral Monitoring and As- tection objectives. These provide information sessment Programme of 1997 (TMAP) on the environmental status to be aimed for in  1983 Convention concerning Coopera- the future (environmental quality objectives). tion between the North Sea States to The environmental protection objectives can be combat pollution of the North Sea by oil derived from an overall view of the interna- and other harmful substances (Bonn tional, EU and national conventions and regu- Convention) lations that deal with marine environmental pro- tection and on the basis of which the Federal  1992 Convention for the Protection of Republic of Germany has committed itself to the Marine Environment of the North- certain principles and objectives. The environ- East Atlantic mental reports on the ROP 2021 contain a de- (OSPAR Convention) scription of how compliance with the aforemen-  1992 Convention on the Protection of tioned relevant international, EU and national the Marine Environment of the Baltic regulations and recommendations is examined Sea Area and implemented and what stipulations or (Helsinki Convention) measures are taken. Should there be a need for updates or changes in the context of the up- 3.1.3 Agreements specific to protected date of the FEP, a supplementary presentation assets will be made in the forthcoming environmental  1979 Convention on the Conservation report. of European Wildlife and Natural Habi- tats (Bern Convention) International conventions on marine environmental  1979 Convention on the conservation of migratory species of wild animals protection (Bonn Convention) The Federal Republic of Germany is a party to all relevant international conventions on marine Under the Bonn Convention, regional agree- environmental protection. ments for the conservation of the species listed in Appendix II were concluded in accordance 3.1.1 Globally applicable conventions with Article 4 No. 3 of the Bonn Convention: that are wholly or partly aimed at  1995 Agreement on the Conservation protecting the marine environment of African-Eurasian Migratory Water-  the 1973 Convention for the Prevention birds (AEWA) of Pollution from Ships, as amended by  1991 Agreement on the Conservation the 1978 Protocol (MARPOL 73/78) of Small Cetaceans of the Baltic and  1982 United Nations Convention on the North Seas (ASCOBANS) Law of the Sea  1991 Agreement on the Conservation of Seals in the Wadden Sea Presentation and consideration of environmental protection objectives 15  1991 Agreement on the Conservation Environmental and nature of European Bat Populations (EURO- conservation requirements BATS) at national level  1993 Convention on Biological Diversity There are also various legal provisions at na- tional level, the requirements of which must be Environmental and nature taken into account in the environmental report: conservation requirements  Law on nature conservation and land- at EU level scape management (Federal Nature As relevant EU legislation must be taken into Conservation Act - BNatSchG) account:  Water Resources Act (WHG)  Council Directive 337/85/EEC of 27  Law on Environmental Impact Assess- June 1985 on the assessment of the ef- ment (UVPG) fects of certain public and private pro- jects on the environment (Environmen-  Act on the Development and Promotion tal Impact Assessment Directive, EIA of Wind Energy at Sea (Wind Energy at Directive) Sea Act - WindSeeG)  Council Directive 92/43/EEC of 21 May  Regulation on the establishment of the 1992 on the conservation of natural nature reserve "Sylt Outer Reef - East- habitats and of wild fauna and flora ern German Bight", the Regulation on (Habitats Directive) the establishment of the nature reserve "Borkum Riffgrund", and the Regulation  Directive 2000/60/EC of the European on the establishment of the nature re- Parliament and of the Council of 23 Oc- serve "Doggerbank" in the North Sea tober 2000 establishing a framework for EEZ Community action in the field of water policy (Water Framework Directive,  Regulation on the designation of the WFD) "Fehmarnbelt" nature reserve, Regula- tion on the designation of the "Ka-  Directive 2001/42/EC of the European detrinne" nature reserve and Regula- Parliament and of the Council of 27 tion on the designation of the "Östliche June 2001 on the assessment of the ef- Deutsche Bucht - Rönnebank" nature fects of certain plans and programmes reserve in the Baltic Sea EEZ on the environment (Strategic Environ- mental Assessment Directive, SEA Di-  Management plans for nature conser- rective) vation areas in the German North Sea EEZ  Directive 2008/56/EC of the European Parliament and of the Council of 17  Management plans for the nature con- June 2008 establishing a framework for servation areas in the German Baltic Community action in the field of marine Sea EEZ (participation procedure not environmental policy (Marine Strategy yet completed) Framework Directive, MSFD),  Energy and climate protection targets of  Directive 2009/147/EC of the European the Federal Government Parliament and of the Council on the conservation of wild birds (Birds Di- rective). 16 Figure 4 Overview of the normative levels of the relevant legal acts for SEA. the environmental effects of the specifications 4 Strategic Environmental in the environmental report with a view to effec- tive environmental precautions in accordance Assessment methodology with the applicable legislation. According to the In principle, various methodological ap- special legal standard of § 5 para. 3 Wind- proaches can be considered when conducting SeeG, the specifications must not lead to a the SEA. This environmental report builds on hazard to the marine environment. In this con- the methodology already applied in the SEA of text, the requirements under nature conserva- the federal sectoral plans and the site develop- tion law (Federal Nature Conservation Act) ment plan, which was also used for the SEA of must also be examined. the ROP with regard to offshore wind energy The subject of the environmental report is the and transmission lines. description and assessment of the likely signif- The methodology depends primarily on the icant effects of the implementation of the FEP designations of the plan to be assessed. Within on the marine environment for the specifica- the framework of this SEA, it is determined, de- tions of the FEP as listed in Article 5 (1) of the scribed and assessed for each of the specifica- WindSeeG (see 1.3). tions whether the specifications are likely to However, the temporal specifications, such as have significant effects on the protected assets the order of tendering or calendar years of concerned. According to Section 1 (4) UVPG in commissioning, are less important here, as conjunction with Section 40 (3) UVPG, the they do not lead to any further environmental competent authority shall provisionally assess impacts compared to the spatial specifications. Strategic Environmental Assessment methodology 17 Although some planning and technical princi- Examination room ples also serve to reduce environmental im- The description and assessment of the envi- pacts, they can also lead to impacts, so that an ronmental status relates to the EEZs of the assessment is necessary. North Sea and the Baltic Sea, for which the The following specifications are examined in FEP essentially makes specifications. The SEA relation to their likely significant environmental investigation area covers the German EEZ of impacts: the North Sea and the Baltic Sea. It should be noted that the data situation within the North Sea EEZ is significantly better for the area up  Areas and sites for offshore wind en- to shipping route 10 than for the area northwest ergy, including the determination of of shipping route 10 due to the available pro- the expected capacity to be installed ject-related monitoring data.  Routes and corridors, including bor- For the area northwest of shipping route 10, the der corridors FEP makes statements on areas and sites, possible routes, route corridors or border corri-  Locations for platforms (converter dors for transboundary submarine cable sys- and collection platforms and substa- tems. Based on the available sediment data tions) and findings from the monitoring of the "Dogger  Designation of other energy produc- Bank" protected area, a description and as- tion areas sessment of the environmental status and an  Relevant planning and engineering evaluation of the potential environmental im- principles pacts is also possible for this area. The adjacent territorial sea and the adjacent ar- eas of the neighbouring states are not directly the subject of this plan, but they will be consid- ered as part of the cumulative and transbound- ary assessment in this SEA, where necessary. 18 Strategic Environmental Assessment methodology Figure 5 Delimitation of the investigation area for the SEA of the site development plan in the North Sea. Figure 6 Delimitation of the investigation area for the SEA of the site development plan in the Baltic Sea. Strategic Environmental Assessment methodology 19 Also relevant are the characteristics of the plan, Implementation of the en- in particular vironmental assessment  the extent to which the plan sets a frame- As with the SEA on maritime spatial planning, work for projects and other activities in terms the assessment of the likely significant environ- of location, type, size and operating condi- tions or through the use of resources mental effects of the implementation of the FEP includes secondary, cumulative, synergistic,  the extent to which the plan influences other short-, medium- and long-term, permanent and plans and programmes, including those in a temporary, positive and negative effects in planning hierarchy; terms of protected assets. Secondary or indi-  the importance of the plan for the integration rect effects are those which are not immediate of environmental considerations, in particu- and therefore may take effect after some time lar with a view to promoting sustainable de- and/or in other places. Occasionally we also velopment speak of consequential effects or interactions.  the environmental issues relevant to the plan; Possible impacts of the plan implementation are described and evaluated in relation to the  the relevance of the plan for the implemen- protected areas. A uniform definition of the tation of Community environmental legisla- tion (e.g. plans and programmes relating to term "significance" does not exist, since it is a waste management or water protection) "individually determined significance" which (Annex II SEA Directive) cannot be considered independently of the In some cases, further details on when an im- "specific characteristics of plans or pro- pact reaches the materiality threshold can be grammes" (SOMMER, 2005, 25f.). In general, derived from sectoral legislation. Threshold val- significant impacts can be understood to be ef- ues were developed under the law in order to fects that are serious and significant in the con- be able to make a distinction. text under consideration. According to the requirements of § 5 para. 3 According to the criteria of Annex 2 of the ROG, sentence 4 WindSeeG in conjunction with § 39 which are decisive for the assessment of the para. 3 sentence 3 UVPG. § Section 39 (3) sen- likely significant environmental impacts, signifi- tence 3 UVPG, it is first examined whether cance is determined by there are additional or other significant environ-  "the probability, duration, frequency and ir- mental impacts compared to the ROP and the reversibility of the effects SEA carried out in this procedure and whether  the cumulative nature of the effects; updates and deepening are required. It is also examined whether there is a need for adjust-  the cross-border nature of the effects; ments and amendments compared to the SEA  the risks to human health or the environment of the existing FEP. Assessments for which no (e.g. in the event of accidents); changes have arisen are not repeated; refer-  the scale and spatial extent of the impact; ence is made to the respective results in the  the importance and sensitivity of the area existing environmental reports in this respect. likely to be affected, due to its specific natu- For these two reasons, the scope of the as- ral characteristics or cultural heritage, the sessment is therefore limited to additional or exceeding of environmental quality stand- different significant environmental impacts as ards or limit values and intensive land use; well as to necessary updates and deepening.  the impact on sites or landscapes whose This assessment will be carried out separately status is recognised as protected at na- for areas and sites, platforms, submarine cable tional, Community or international level". systems and other energy generation areas, 20 Strategic Environmental Assessment methodology taking into account the assessment of the pro-  Biodiversity tected assets. Furthermore, if necessary, a dif-  Air ferentiation will be made according to different technical designs. All plan contents that can  Climate potentially have significant environmental im-  Landscape pacts are examined.  Cultural and material goods In this context, both the construction- and dis-  People, especially human health mantling-related impacts as well as the plant- and operation-related impacts are considered.  Interrelationships between protected assets In addition, impacts that may arise in the In general, the following methodological ap- course of maintenance and repair work are proaches find their way into the environmental taken into account. Possible interactions, cu- assessment: mulative effects and transboundary impacts  Qualitative descriptions and assessments are also considered.  Quantitative descriptions and assessments The result of the assessment as to whether ad- ditional or other significant environmental im-  Evaluation of studies and technical litera- ture, expert opinions pacts arise and whether updates and deepen- ing are required is documented in the environ-  Visualisations mental report in each case. Any assessments,  Worst-case assumptions updates or deepening required beyond the  Trend assessments (e.g. on the state of the SEA for the existing FEP or the SEA for the art of installations) ROP will be carried out as part of the upcoming SEA for the FEP and described in the environ-  Assessments by experts/ the professional public mental report. In general, the assessment of the impacts re- The following protected assets are considered sulting from the designations of the FEP con- with regard to the assessment of the state of tinues to be based on the status description the environment: and status assessment and the function and  Area significance of the individual areas, sites and  Soil routes for the individual protected assets on the one hand, and the impacts emanating from  Water these designations and the resulting potential  Plankton impacts on the other. A prognosis of the pro-  Biotope types ject-related impacts in the case of implementa- tion of the FEP is implemented based on the  Benthos criteria of intensity, range and duration or fre-  Fish quency of the effects (cf. figure 9).  Marine mammals  Avifauna  Bats Strategic Environmental Assessment methodology 21 Figure 7 General methodology for the assessment of likely significant environmental effects. tion status, assessment of occurrence, assess- Criteria for the description and ment of spatial units and prior contamination. assessment of the condition For migratory birds, the aspects of rarity, en- dangerment and existing pressures are taken The condition of the individual protected assets into account, as are the aspects of occurrence is assessed on the basis of various criteria. For assessment and the area's significance for bird the protected assets of area/soil, benthos and migration over a large area. There is currently fish, the assessment is based on the aspects of no reliable data basis for a criteria-based as- rarity and vulnerability, diversity and peculiarity, sessment of bats as a protected species. The and existing impacts. The description and as- biodiversity asset is evaluated in text form. sessment of marine mammals and marine and resting birds is based on the aspects listed in The following is a summary of the criteria that the figure. Since these are highly mobile spe- were used for the status assessment of the re- cies, an approach analogous to that for the pro- spective protected property. This overview tected assets area/soil, benthos and fish is not deals with the protected assets which can be appropriate. For seabirds, resting birds and meaningfully delimited on the basis of criteria marine mammals, the criteria used are protec- and which are considered in the focus area. 22 Strategic Environmental Assessment methodology Soil Aspect: Rarity and endangerment Criterion: Percentage of sediments on the seabed and distribution of the morphological inventory of forms. Aspect: Diversity and individuality Criterion: Heterogeneity of the sediments on the sea floor and formation of the morphological inventory of forms. Aspect: Preload Criterion: Extent of the anthropogenic preload of the sediments on the sea floor and the morphological inventory of forms. Benthos Aspect: Rarity and endangerment Criterion: Number of rare or endangered species based on the Red List species identified (Red List by RACHOR et al. 2013). Aspect: Diversity and individuality Criterion: Number of species and composition of the species communities. The extent to which species or communities characteristic of the habitat occur and how regularly they occur is assessed. Aspect: Preload For this criterion, the intensity of fishing exploitation, which is the most effective disturbance variable, will be used as a benchmark. Eutrophication can also affect benthic communities. For other disturbance variables, such as vessel traffic, pollutants, etc., there is currently a lack of suitable measurement and detection methods to be able to include them in the assessment. Biotope types Aspect: Rarity and endangerment Criterion: national conservation status and endangerment of biotope types according to the Red List of Endangered Biotope Types in Germany (FINCK et al., 2017) Aspect: Preload Criterion: Hazard due to anthropogenic influences. Strategic Environmental Assessment methodology 23 Fish Aspect: Rarity and endangerment Criterion: Proportion of species considered endangered according to the current Red List marine fish (THIEL et al. 2013) and for the diadromous species on the Red List freshwater fish (FREYHOF 2009) and assigned to Red List categories. Aspect: Diversity and individuality Criterion: The diversity of a fish community can be described by the number of species (α-Diversity, 'Species richness'). The species composition can be used to assess the specific nature of a fish com- munity, i.e. how regularly habitat-typical species occur. Diversity and specificity are compared and as- sessed between the North Sea or Baltic Sea as a whole and the German EEZ, as well as between the EEZ and individual areas. Aspect: Preload Criterion: Through the removal of target species and by-catch, and the impact on the seabed in the case of bottom-dwelling fishing methods, fisheries are considered to be the most effective disturbance to the fish community and therefore serve as a measure of the pressure on fish communities in the North Sea and Baltic Sea. There is no assessment of stocks on a smaller spatial scale such as the German Bight. The input of nutrients into natural waters is another path through which human activities can affect fish communities. For this reason, eutrophication is used to assess the existing pollution. Marine mammals Aspect: Protection status Criterion: Status under Annex II and Annex IV of the Habitats Directive and the following international protection agreements: Convention on the Conservation of Migratory Species of Wild Animals (Bonn Convention, CMS), ASCOBANS (Agreement on the Conservation of Small Cetaceans of the Baltic and North Seas), Convention on the Conservation of European Wildlife and Natural Habitats (Bern Con- vention) Aspect: Assessment of the occurrence criteria: Stock, stock changes/trends based on large-scale surveys, distribution patterns and density distributions Aspect: Evaluation of spatial units criteria: Function and importance of the German EEZ and the areas defined in the FEP for marine mammals as transit areas, feeding grounds or breeding grounds Aspect: Preload Criterion: Hazards due to anthropogenic influences and climate change. 24 Strategic Environmental Assessment methodology Seabirds and resting birds Aspect: Protection status Criterion: Annex I status Species of the Birds Directive, European Red List from BirdLife International Aspect: Assessment of the occurrence criteria: Stocks in the German North Sea and Baltic Sea and stocks in the German EEZ, large-scale distribution patterns, abundances, variability Aspect: Evaluation of spatial units criteria: Function of the areas defined in the FEP for relevant breeding birds, migrants, as resting areas, location of protected areas Aspect: Preload Criterion: Hazards due to anthropogenic influences and climate change. Migratory birds Aspect: The importance of bird migration over a large area Criterion: Guidelines and areas of concentration Aspect: Assessment of the occurrence Criterion: draught and its intensity Aspect: Rarity and endangerment Criterion: Number of species and endangered status of the species involved according to Annex I of the Birds Directive, Bern Convention of 1979 on the Conservation of European Wildlife and Natural Habitats, Bonn Convention of 1979 on the Conservation of Migratory Species of Wild Animals, AEWA (African-Eurasian Waterbird Agreement) and SPEC (Species of European Conservation Concern). Aspect: Preload Criterion: Prior pollution/hazards due to anthropogenic influences and climate change. Baltic Sea. This will inevitably have an impact Consideration of climate on marine ecosystems, their structure and change functions, which may also change ecosystem Anthropogenic climate change as one of the services. The changes may also have a direct biggest societal challenges is of particular im- impact on uses, e.g. for renewable energy portance for changes in the oceans and their (Frazão Santos, 2020). use. In changing seas, the consideration and The designations of the FEP have considerable integration of climate impacts into planning pro- CO2 reduction potential and contribute in par- cesses is of great importance in order to de- ticular to climate protection. The expansion and velop sustainable and future-oriented plans in use of climate-friendly technologies in the sea the long term. will support energy security and the achieve- Climate change will alter the physical, chemical ment of national and international climate pro- and biological conditions in the North Sea and tection objectives. Strategic Environmental Assessment methodology 25 Assumptions used to de- compared to the SEA for the existing FEP or scribe and assess the likely the SEA for the ROP and whether updates and deepening of the descriptions and assess- significant impacts ments are required. The following table lists, The description and assessment of the likely based on the main impact factors, the potential significant effects of the implementation of the environmental impacts that may arise from the FEP on the marine environment are carried out respective use and form the basis for the as- separately for areas and sites, platforms, sub- sessment of the likely significant environmental marine cable systems and other energy pro- impacts. For the assessment, the impacts are duction areas on the basis of the protected as- differentiated according to whether they are sets, including the status assessment de- due to construction/deconstruction or opera- scribed above. For each of these aspects, it is tion, or whether they are caused by the facility examined individually whether additional or dif- itself. ferent significant environmental impacts arise Table 1 Overview of potentially significant impacts if the FEP is implemented (t=temporary effects). Protected assets Marine mammals Cultural & mate- Potential im- Migratory birds Use Effect Biotope types pact Seabirds and resting birds Man/ Health Biodiversity Landscape rial goods Plankton Benthos Climate Water Area Bats Fish Soil Air Habitat modifica- x x x x x x x tion Habitat and land x x x x x x x x loss Attraction effects, Placement of increase in spe- hard substrate cies diversity, x x x x x x (foundations) change in species composition Change in hydro- x x x x x graphic conditions Scouring/sedi- Habitat modifica- x x x x x x ment shift tion Sediment resus- Impairment xt xt xt xt xt pension and tur- Areas, bidity plumes Physiological ef- sites and (construction fects and chilling xt x platform phase) effects locations Resuspension of sediment and sedimentation Impairment xt xt xt xt (construction phase) Noise emissions Impairment/ scare xt x during pile driving effect (construction Potential disrup- phase) xt x tion/damage Visual disturb- ance due to con- Local scouring xt xt struction opera- and barrier effects tions Scare effects, ha- x Obstacle in bitat loss airspace Barrier effect, col- x x x x lision 26 Strategic Environmental Assessment methodology Protected assets Marine mammals Cultural & mate- Potential im- Use Effect Migratory birds Biotope types pact Seabirds and resting birds Man/ Health Biodiversity Landscape rial goods Plankton Benthos Climate Water Area Bats Fish Soil Air Light emissions Attraction effects, (construction and x x x x collision operation) Wind farm-re- lated shipping Impairment/ scare traffic (mainte- effects x x x x x x x x x x xt x x x x x nance, construc- Collision tion traffic) Habitat modifica- Placement of x x x x x x tion hard substrate Habitat and land (riprap) x x x x x x loss Impairment/dis- placement of cold- Heat emissions x x x water-loving spe- cies Subma- rine Impairment x cable systems Impairment of the Magnetic fields orientation behav- x iour of individual migratory species Impairment xt xt xt xt xt Turbidity plumes (construction Physiological ef- phase) fects and chilling xt effects In addition to the effects on the individual pro- caused by temporal as well as spatial coinci- tected assets, cumulative effects and interac- dence of impacts. Effects of the construction tions between protected assets are also exam- phase are predominantly short-term and tem- ined. porary in nature, while plant-related and opera- tional effects can be permanent. The impact 4.5.1 Cumulative consideration can be intensified by similar uses or different According to Art. 5 para. 1 SEA Directive, the uses with the same effect, thus increasing the environmental report also includes the assess- impact on one or more protected assets. ment of cumulative effects. Cumulative impacts The focus of the environmental report on the result from the interaction of various independ- FEP is on the cumulative consideration of sim- ent individual effects that either add up through ilar uses, namely those for which the FEP their interaction (cumulative effects) or rein- makes specifications. A cumulative considera- force each other and thus produce more than tion of different uses, i.e. intersectoral, is car- the sum of their individual effects (synergetic ried out within the framework of the SEA at the effects) (e.g. SCHOMERUS et al., 2006). Cumu- higher level of the ROP for the EEZ. lative as well as synergetic effects can be Strategic Environmental Assessment methodology 27 Figure 8 Exemplary cumulative effect of similar uses. In order to examine the cumulative effects, it is offshore wind energy in the ROP will be identi- necessary to assess the extent to which the fied in the FEP. If additional areas are identi- designations of the plan, when taken together, fied, these will be included in the scope of the can be expected to have a significant adverse SEA. Within the areas, the FEP will define sites effect. An examination of the designations is and the expected capacity of offshore wind tur- performed on the basis of the current state of bines to be installed. knowledge within the meaning of Article 5 (2) of For the SEA, certain parameters are assumed the SEA Directive. The position paper on the for the development of the areas. In detail, cumulative assessment of diver habitat loss in these include the number of turbines, power the German North Sea (BMU, 2009) and the per turbine [MW], hub height [m], height of the BMUB's noise abatement concept (2013) form lower rotor tip [m], rotor diameter [m], total an important basis for assessing the impacts of height [m] of the turbines, diameter of founda- habitat loss and underwater noise. tion types [m] and diameter of the scour protec- tion [m]. 4.5.2 Interrelationships In general, impacts on a protected good lead to The input parameters considered in the upcom- various consequences and interactions be- ing SEA are, in particular: tween the protected assets. The main interde- - Plants already in operation or in the ap- pendence of the biotic protected assets exists proval procedure (as reference and ini- via the food chains. Due to the variability of the tial load) habitat, interactions can only be described very - Forecast of certain technical develop- imprecisely. ments and assumptions of bandwidths 4.5.3 Specific assumptions for the as- for various parameters for the consider- sessment of the likely significant ation of the defined areas and sites. environmental effects Table 2 provides an overview of the model pa- In detail, the following procedure is carried out rameters to be used with the respective band- for the analysis and assessment of the respec- widths. In order to reflect the range of possible tive designations: developments, the assessment is essentially based on two scenarios. In the first scenario, Areas and sites, including the expected power many small installations are assumed, while in to be installed: the second scenario, only a few large installa- With regard to the areas, it is currently as- tions are assumed. Due to the range of scenar- sumed that all priority and reservation areas for ios covered, a comprehensive description and 28 Strategic Environmental Assessment methodology assessment of the protected assets is made The parameters of the scenarios reflect the ex- possible. pected advancing state of the art and therefore differ for the different zones that are expected to be developed for offshore wind energy. Table 2 Model parameters for the consideration of the areas and sites. Parameter Zone 1/2 Zone 3 Zone 4/5 Scenario Scenario Scenario Scenario Scenario Scenario 1 2 1 2 1 2 Capacity per plant 5 15 15 20 20 30 [MW] Hub height [m] 100 150 150 165 165 210 Rotor diameter [m] 140 240 240 270 270 350 Total height [m] 170 270 270 300 300 385 Locations for platforms (transformer or residen- as a basis for the evaluation, such as the num- tial platforms) ber of platforms, length of the cabling within the park [km], diameter of one or several founda- For the assessment of platform locations tions [m] and area for foundations (incl. scour (transformer, converter and residential plat- protection) [m²]. forms), certain parameters are also assumed Table 3 Parameters for the consideration of grid connections and platforms Grid connection 320 kV 525 kV 220 kV Converter platforms, transformer/residen- 66 kV 155 kV 66 kV tial platforms* Spec. length park-internal ca- approx. 0.12 approx. 0.12 approx. 0.12 approx. 0.12 bling [km/MW] Number of converter platforms 1 1 1 0 Area of converter platform approx. 600 approx. 600 approx. 600 foundation [m²] Number of transformer plat- 0 2 0 1 forms Number of residential plat- 2 0 2 0 forms Diameter foundation [m]** approx. 2 x 10 approx. 2 x 10 approx. 2 x 10 approx. 10 Diameter scour protection [m] approx. 2 x 50 approx. 2 x 50 approx. 2 x 50 approx. 50 * The data on transformer/residential platforms refers to the number of transformer/residential platforms per grid connection (only for completions from 2026) for the different connection concepts. Only the length of the wind farm’s internal cabling is dependent on the anticipated capacity and was determined on the basis of existing plans. ** The calculation of the land use is based on the assumption of a monopile foundation. It is assumed that monopiles and jackets use approximately the same area on the seabed. Data basis 29 Routes and corridors for submarine cable sys- border submarine cable systems and intercon- tems nections), certain widths of the cable trench [m] and a certain area of the crossing structures [m When determining routes and corridors for sub- 2 ] are assumed. Mainly the construction-, oper- marine cable systems (connection lines, cross- ation- and repair-related environmental im- pacts are considered. Table 4 Parameters for the consideration of submarine cable systems Submarine cable sys- tems Cable trench width [m] approx. 1 Area of the crossing structures [m ]2 approx. 900 Other energy production areas was already specified as part of the BFO North Sea and was therefore also the subject of the For the definition of "other energy production environmental assessment of the BFO. areas", the SEA is based on the assumption of Changes to the standard transmission capac- a "classic" offshore wind farm on the basis of ity, for example, will be examined in the envi- previous knowledge of electricity production. ronmental report. Environmental impacts going beyond this are strongly dependent on the respective use vari- 5 Data basis ant and should therefore be comprehensively assessed at the approval level. In this respect, The basis for the SEA is a description and as- the SEA for other energy production areas is sessment of the state of the environment in the carried out in the same way as the assessment examination room. All protected assets are to of areas for offshore wind energy and is based be included. The data basis is the basis for the on the same model parameters. assessment of the likely significant environ- mental impacts, the site and species protection Relevant planning and technical principles assessment and the alternatives assessment. By regulating planning and technical principles Pursuant to Section 39 (2) sentence 2 UVPG, in the FEP, the required land use can be mini- the environmental report shall contain the infor- mised and the potential environmental impacts mation that can be ascertained with reasonable reduced to a low level. The majority of the plan- effort, taking into account the current state of ning principles serve to prevent or reduce envi- knowledge and public statements known to the ronmental impacts and are not expected to authority, generally accepted assessment lead to significant impacts. methods, the content and level of detail of the The FEP also contains some planning princi- plan and its position in the decision-making ples that are not related to the reduction of en- process. vironmental impacts. If these are based on spa- According to Section 40 (4) UVPG, information tial planning objectives, they must be complied available to the competent authority from other with due to the binding nature of the spatial procedures or activities may be included in the planning objectives. Remaining planning prin- environmental report if it is suitable for the in- ciples are examined for likely significant envi- tended purpose and sufficiently up-to-date. ronmental impacts on protected assets. The environmental report will again build on the With regard to the technical principles, a DC environmental assessments carried out as part system as a voltage-sourced high-voltage DC of the ROP and for the preparation and update transmission with a voltage level of +/- 320 kV of the FEP from 2019 and 2020. 30 Data basis The draft environmental report will, on the one  Data and findings from the operation of hand, update the description and assessment offshore wind farms of the current state of the environment as well  Data and findings from licensing proce- as the likely development in case of non-imple- dures for offshore wind farms, submarine mentation of the plan compared to the existing cable systems environmental reports on the FEP and the SEA  Results from the preliminary land use on the ROP. Secondly, it will forecast and as- study sess the likely significant additional or different  Results from the monitoring of Natura environmental effects resulting from the imple- 2000 sites mentation of the plan.  Mapping instructions for §30 biotope ty- The descriptions and assessments are carried pes out with regard to the following protected as-  Environmental Report on the 2021 Spatial sets: Development Plan for the German Exclu- sive Economic Zone in the North Sea  Area  Environmental Report on the Spatial De-  Soil velopment Plan 2021 for the German Ex-  Water clusive Economic Zone in the Baltic Sea  Plankton  BfN (2017): Die Meeresschutzgebiete in  Biotope types der deutschen ausschließlichen Wirt-  Benthos schaftszone der Nordsee - Beschreibung  Fish und Zustandsbewertung.  Marine mammals  BfN (2017): Methodik der Management-  Avifauna planung für die Schutzgebiete in der deut-  Bats schen ausschließlichen Wirtschaftszone  Biological diversity der Nord- und Ostsee  Air  MSFD Initial and Progress Assessment  Climate  OSPAR status reports  Landscape  Findings and results from R&D projects  Cultural and other material goods commissioned by BfN and/or BSH and  People, especially human health from accompanying ecological research  Interrelationships between protected as-  Results from EU cooperation projects, sets. such as Pan Baltic Scope and SEANSE  Studies/ Technical literature Overview of data and  Current red lists knowledge base  Comments from the technical authorities The data and knowledge situation has im-  Comments from the professional public proved significantly in recent years, in particu- A detailed overview of the individual data and lar due to the extensive data collection within findings bases is included in the annex (Chap. the framework of environmental impact studies 8) of the study framework. as well as the construction and operation mon- itoring for offshore wind farm projects and the Indications of difficulties in accompanying ecological research. compiling the documents In general terms, the following data and find- Pursuant to Article 40 (2) No. 7 UVPG, indica- ings are used as basis for the environmental tions of difficulties encountered in compiling the report: information, such as technical gaps or lack of knowledge, must be presented. There are still Presentation of the individual assessment steps in the environmental report 31 gaps in knowledge in places, particularly with marine environment, in order to fundamentally regard to the following points: consider cumulative effects over time and space.  Long-term effects from the operation of offshore wind farms and associated fa- Various R&D studies are currently being car- cilities, such as converter platforms ried out on behalf of the BSH on assessment approaches, including those for underwater  Data for assessing the environmental noise. The projects serve the continuous fur- status of the various protected assets ther development of a uniform, quality-assured for the area of the outer EEZ. basis of marine environmental information for In principle, forecasts on the development of assessing the potential impacts of offshore in- the living marine environment after implemen- stallations. tation of the FEP remain subject to a certain The environmental report will likely make sub- degree of uncertainty. There is often a lack of stantial reference to the environmental report long-term data series or analytical methods, on the ROP for the presentation of the specific e.g. for combining extensive information on bi- information gaps or difficulties in compiling the otic and abiotic factors, in order to better under- documents for the individual protected assets stand complex interactions of the marine eco- and update these, if necessary. system. In particular, there is a lack of detailed area- 6 Presentation of the indi- wide sediment and biotope mapping outside vidual assessment steps the nature conservation areas of the EEZ. As a result, there is a lack of a scientific basis for as- in the environmental re- sessing the impacts of the possible use of port strictly protected biotope structures. At present, a sediment and biotope mapping is being car- The description and assessment of the state of ried out on behalf of the BfN and in cooperation the environment, the presentation of the likely with the BSH, research and higher education development in the event of non-implementa- institutions and an environmental office, with a tion of the plan and the assessment of the likely spatial focus on the nature conservation areas. significant environmental effects are based on the designations of the FEP and compare In addition, for some protected assets there is these in each case with the assessments al- a lack of scientific assessment criteria, both ready carried out as part of the SEA for the ex- with regard to the assessment of their status isting FEP and the SEA for the ROP. and with regard to the impacts of anthropo- genic activities on the development of the living 32 Presentation of the individual assessment steps in the environmental report Figure 9 Components of the environmental report. greater impact. In spatial terms, the description Description and assessment of the environment is based on the respective of the state of the environ- environmental impacts of the plan. Depending ment on the type of impact and the protected object concerned, these impacts vary in extent and Pursuant to Section 40 (2) No. 3 UVPG, the en- may extend beyond the boundaries of the plan. vironmental report contains an inventory of the relevant aspects of the current state of the en- Anticipated development if vironment, including the environmental charac- the plan is not implemented teristics of the areas likely to be significantly af- For a comprehensive forecast of the environ- fected. Compared to the existing strategic en- mental impacts associated with the FEP, it vironmental assessments for the FEP and the must also be known how the environment ROP, this is to be limited to additional or other would likely develop if the plan were not imple- significant environmental impacts and to nec- mented. In the context of this consideration, it essary updates and deepening. is particularly relevant that offshore wind en- A description of the relevant aspects of the cur- ergy would be expanded within the EEZ even rent state of the environment is fundamentally without updating the plan. This is necessary to necessary in order to be able to forecast meet the climate protection and energy policy changes in it during implementation of the plan. objectives of the German government, for The subject of the inventory are the protected which the expansion of offshore wind energy assets listed in Article 2 (1), sentence 2, nos. 1 plays a key role. The anticipated development to 4 UVPG, as well as interactions between in the event of non-implementation of the plan them. The presentation is problem-oriented. thus includes a comparison with the environ- The focus is thus on possible existing impacts, mental impacts with an identical time horizon environmental elements requiring special pro- without an updated FEP, but not a comparison tection and on those protected assets on which of the environmental impacts of the plan with the implementation of the plan will have a the current environmental status. The starting point for the anticipated development in the Presentation of the individual assessment steps in the environmental report 33 event of non-implementation of the plan will es- section 44 subsection 1 no. 2 of the Federal sentially be the environmental assessment of Nature Conservation Act, wild animals of maritime spatial planning. strictly protected species and of European bird species may not be significantly disturbed dur- Description and assessment ing their breeding, rearing, moulting, of the likely significant ef- hibernation and migration periods. fects of the implementation Biotope protection assessment of the plan on the marine The specifications of the FEP must also comply environment with the requirements of biotope protection law. The description and assessment of the envi- According to § 30 para. 2 no. 6 BNatSchG, ac- ronmental impacts focuses on the assets for tions that lead to the destruction or other signif- which significant impacts cannot be excluded icant impairment of marine macrophyte popu- from the outset by the implementation of the lations, reefs, sublittoral sandbanks, mudflats FEP. Those protected assets are not consid- with burrowing bottom megafauna and spe- ered for which a significant impairment can al- cies-rich gravel, coarse sand and shingle beds ready be excluded during the description and in the marine and coastal areas are prohibited. assessment of the status quo. The description and assessment will be limited to additional or Impact assessment other significant environmental impacts as well As part of the SEA, the areas, sites, platforms as to necessary updates and deepening com- and planned submarine cable routes planned pared to the existing strategic environmental in the FEP will also be assessed separately for assessments for the FEP and the ROP. In ad- their compatibility with the conservation pur- dition to the significant negative impacts, pos- poses of the nature conservation areas. The sible positive effects on the marine environ- assessment will be limited to additional or other ment will also be assessed on the basis of the significant environmental impacts as well as to standards of the sectoral legislation, i.e. § 5 necessary updates and deepening compared para. 3 sentence 2 no. 2 WindSeeG and the to the existing environmental assessments of Federal Nature Conservation Act. Overall, the the FEP and the ROP. protected assets listed in Article 2 (1) UVPG are examined. The nature conservation areas "Sylter Außen- riff - Östliche Deutsche Bucht", "Borkum Species protection law examination Riffgrund" and "Doggerbank" are located in the The environmental report also presents the as- German EEZ of the North Sea and were estab- sessment of the species protection require- lished by ordinance of 22.09.2017. ments. The assessment will be limited to addi- In the German EEZ of the Baltic Sea, there are tional or other significant environmental im- the nature conservation areas "Pomeranian pacts as well as to necessary updates and Bay - Rönnebank", "Fehmarn Belt" and "Ka- deepening compared to the existing strategic detrinne", which were established by ordinance environmental assessments for the FEP and of 22.09.2017. the ROP. The specifications of the plan shall be exam- Special provisions with prohibitions are ined for their compatibility with the conservation applicable to fauna of specially or strictly pro- purpose of the respective ordinance. They are tected species. Wild animals of specially pro- admissible if, pursuant to section 36, sentence tected species may not be injured or killed ac- 1, no. 2 in conjunction with section 34, subsec- cording to section 44 subsection 1 of the tion 2 of the Federal Nature Conservation Act Federal Nature Conservation Act. Pursuant to 34 Presentation of the individual assessment steps in the environmental report (BNatSchG), they cannot lead to significant im- regard to their environmental impacts, so that pairments of the components of the nature con- the consideration of environmental concerns servation area relevant to the conservation pur- becomes comprehensible when deciding on pose, or if they meet the requirements under the alternative to be pursued further (Balla, S. section 34, subsections 3 to 5 of the et al, 2009, p.33). BNatSchG. At the same time, the effort required to identify The impact assessment also takes into account and examine the alternatives under considera- the long-distance effects of the designations tion must be reasonable. The following applies: adopted within the EEZ on the protected areas The greater the expected environmental im- in the adjacent territorial sea and in the adja- pacts and thus the need for conflict manage- cent waters of the neighbouring countries. This ment in planning, the more extensive or de- also applies to the assessment and considera- tailed investigations are required. tion of functional relationships between the in- In addition to the zero alternative, the environ- dividual protected areas and the coherence of mental report will examine spatial and technical the network of protected areas pursuant to Ar- alternatives in particular. Alternatives already ticle 56 (2) of the Federal Nature Conservation examined in the previous FEP procedures, for Act, since the habitat of some target species which no updating or deepening is required, will (e.g. avifauna, marine mammals) may extend not be repeated. across several protected areas due to their large radius of action. Measures to prevent, reduce Examination of reasonable and offset significant nega- alternatives tive impacts of the site de- velopment plan on the ma- Pursuant to Art. 5 para. 1 sentence 1 SEA Di- rective in conjunction with the criteria in Annex rine environment I SEA Directive and § 40 para. 2 No. 8 UVPG, Pursuant to Section 40 (2) UVPG, the environ- the environmental report contains a brief de- mental report shall contain a description of the scription of the reasons for the choice of the measures planned to prevent, reduce and, as reasonable alternatives examined. At the plan far as possible, offset significant adverse envi- level, the conceptual/strategic design, spatial ronmental effects resulting from the implemen- and technical alternatives play a role. The pre- tation of the plan. Avoidance and mitigation requisite is always that these are reasonable or measures form an essential basis for prevent- can be seriously considered. ing significant impacts on the marine environ- ment. Thus, not all conceivable alternatives have to be examined. However, it is no longer sufficient In addition, the designations of the FEP are to identify, describe and assess only those al- subject to a continuous optimisation process, ternatives that "seriously suggest themselves" as the insights gained on an ongoing basis dur- or "even impose themselves". The duty to in- ing the SEA and consultation process are taken vestigate thus extends to all alternatives that into account in the preparation of the plan. are "not obviously [...] remote" (Wulfhorst, While individual prevention, mitigation and NVwZ 2011, 1099 (1011) with further refer- compensation measures can already be ap- ences). The examination of reasonable alterna- plied at the planning level, others only come tives does not explicitly require the develop- into play during concrete implementation and ment and assessment of particularly environ- are regulated there in the individual approval mentally friendly alternatives. Rather, the alter- procedure on a project- and site-specific basis. natives that are "reasonable" in the above The best prevention and mitigation measure is sense are to be presented comparatively with Presentation of the individual assessment steps in the environmental report 35 an appropriate siting/selection of areas and Measures planned to moni- sites. With regard to planning prevention and tor the environmental im- mitigation measures, the FEP makes spatial pact of implementing the and, by means of planning principles, textual stipulations that serve to prevent or reduce sig- site development plan nificant negative impacts of the implementation Pursuant to Section 40 (2) No. 9 UVPG, the en- of the FEP on the marine environment in ac- vironmental report also contains a description cordance with the environmental protection ob- of the planned monitoring measures pursuant jectives set out. to Section 45 UVPG. Monitoring is necessary, in particular, to identify unforeseen significant These mitigation and prevention measures are impacts at an early stage and to be able to take specified and ordered by the competent licens- appropriate remedial measures. The monitor- ing authority at project level for the planning, ing measures shall be determined on the basis construction and operation phases and refer to of the information in the environmental report. the individual spatial determination types of § 5 para. 1 WindSeeG. 36 References 7 References Balla, S., Wulfert, K., Peters, H.-J. (2009) Leitfaden zur Strategischen Umweltprüfung (SUP). Texte 08/09. Dessau-Roßlau, Sachsen-Anhalt, Deutschland: Umweltbundesamt. BMUB (2016) MSRL-Maßnahmenprogramm zum Meereschutz der deutschen Nord- und Ostsee. Bonn. CBD (2000) Decision V/6, Ecosystem approach UN Doc UNEP/CBD/COP/5/23 (22 June 2000). EuGH, Kommission./.Vereingtes Königreich, C-6/04 (EuGH, Oktober 2005). Köppel, J, Geißler, G, Rehhausen, A, Wende, W, Albrecht, J, Syrbe, R, Magel, I, Scholles, F, Putschky, M, Hoppenstedt, A, Stemmer, B (2017) Strategische Umweltprüfung und (neuartige) Pläne und Programme auf Bundesebene – Methoden, Verfahren und Rechtsgrundlagen. Im Auf- trag des Umweltbundesamtes. Berlin. Landmann/Rohmer (2018) Umweltrecht Band I - Kommentar zum UVPG. München: C.H.Beck. Peters, W, Weingarten, E, Schicketanz, S, Balla, S (2017) Die Alternativenprüfung in der Strate- gischen Umweltprüfung und der Umweltverträglichkeitsprüfung. Im Auftrag des Umweltbundes- amtes. Berlin. Schomerus, T., Runge, K., Nehls, G., Busse, J., Nommel, J., & Poszig, D. (2006) Strategische Umweltprüfung für die Offshore Windenergienutzung. Grundlagen ökologischer Planung beim Ausbau der Offshore-Windenergie in der deutschen Ausschließlichen Wirtschaftszone. Schriften- reihe Umweltrecht in Forschung und Praxis, S. 551. UBA, Umweltbundesamt (Hrsg.) (2017) Umweltbelange der Meeresraumordnung in der deut- schen ausschließlichen Wirtschaftszone (AWZ) unter Berücksichtigung des Ökosystemansatzes. Dessau-Roßlau. Annex 37 8 Annex Data and knowledge bases  Environmental Report on the Spatial De- velopment Plan 2021 for the German Ex- In addition to the overview of the data basis in clusive Economic Zone in the Baltic Sea Chapter 5.1, the following is a compilation of  BfN (2017): Die Meeresschutzgebiete in relevant documents that are to be used as a der deutschen ausschließlichen Wirt- basis for the assessment of additional or other schaftszone der Nordsee - Beschreibung significant environmental effects as well as the und Zustandsbewertung necessary updates and deepening of the de- scription and assessment of the environmental  BfN (2017): Methodik der Management- status in the study area and for the assessment planung für die Schutzgebiete in der deut- of the likely significant environmental effects, schen ausschließlichen Wirtschaftszone the site and species protection assessment der Nord- und Ostsee and the alternatives assessment. This over-  Results from the monitoring of Natura view is a draft; it is explicitly not complete and 2000 sites not conclusive.  Mapping instructions for §30 biotope types  Status reports of the regional marine con-  Data, expert opinions and reports from vention OSPAR the operation of offshore wind farms  Findings and results from R&D projects  Data, expert opinions and reports from commissioned by BfN and/or BSH and approval procedures for offshore wind from accompanying ecological research farms, connection lines and interconnect-  Results from EU cooperation projects, ors such as Pan Baltic Scope and SEANSE  Results from the preliminary land use  Project results FABENA study  Studies/ technical literature, expert opin-  Environmental Report on the 2021 Spatial ions Development Plan for the German Exclu-  Current red lists sive Economic Zone in the North Sea  Comments of the technical authorities  Comments from the public In detail: BARZ K & ZIMMERMANN C (Hrsg.) Fischbestände online. Thünen-Institut für Ostseefischerei. Elekt- ronische Veröffentlichung auf www.fischbestaende-online.de, Zugriff am 12.03.2018. BEUSEKOM JEE VAN, THIEL R, BOBSIEN I. BOERSMA M, BUSCHBAUM C, DÄNHARDT A, DARR A, FRIED- LAND R, KLOPPMANN MHF, KRÖNCKE I, RICK J & WETZEL M (2018) Aquatische Ökosysteme: Nord- see, Wattenmeer, Elbeästuar und Ostsee. In: VON STORCH H, MEINKE I & CLAUßEN M (Hrsg.) Ham- burger Klimabericht – Wissen über Klima, Klimawandel und Auswirkungen in Hamburg und Nord- deutschland. Springer Spektrum, Berlin, Heidelberg. BFN, BUNDESAMT FÜR NATURSCHUTZ (2017). Die Meeresschutzgebiete in der deutschen aus- schließlichen Wirtschaftszone der Nordsee. Beschreibung und Zustandsbewertung. BIRDLIFE INTERNATIONAL (2015) European Red List of Birds. Luxembourg: Office for Official Pub- lication of the European Communities. 38 Annex BIOCONSULT SH, IBL UMWELTPLANUNG &IFAÖ (2020) Divers (Gavia spp.) in the German North Sea: Changes in Abundances and Effects of Offshore Wind Farms. Prepared for Bundesverband der Windparkbetreiber Offshore e.V. BMU, BUNDESMINISTERIUM FÜR UMWELT, NATURSCHUTZ UND REAKTORSICHERHEIT (2009) Positi- onspapier des Geschäftsbereichs des Bundesumweltministeriums zur kumulativen Bewertung des Seetaucherhabitatverlusts durch Offshore-Windparks in der deutschen AWZ der Nord- und Ostsee als Grundlage für eine Übereinkunft des BfN mit dem BSH, BMU 09.12.2009. BMU (HRSG.) (2012) Umsetzung der Meeresstrategie-Rahmenrichtlinie. RICHTLINIE 2008/56/EG zur Schaffung eines Ordnungsrahmens für Maßnahmen der Gemeinschaft im Be- reich der Meeresumwelt (Meeresstrategie-Rahmenrichtlinie). Festlegung von Umweltzielen für die deutsche Nordsee nach Artikel 10 Meeresstrategie-Rahmenrichtlinie, Bonn. BMU (2013) Konzept für den Schutz der Schweinswale vor Schallbelastungen bei der Errichtung von Offshore-Windparks in der deutschen Nordsee (Schallschutzkonzept). BMU (2018) Zustand der deutschen Nordseegewässer 2018. Aktualisierung der Anfangsbewer- tung nach § 45c, der Beschreibung des guten Zustands der Meeresgewässer nach § 45d und der Festlegung von Zielen nach § 45e des Wasserhaushaltsgesetzes zur Umsetzung der Meeresstra- tegie-Rahmenrichtlinie. BRABANT R, LAURENT Y & JONGE POERINK B (2018) First ever detections of bats made by an acoustic recorder installed on the nacelle of offshore wind turbines in the North Sea. In: DEGRAER S, BRABANT R, RUMES B & VIGIN L (Hrsg) Environmental Impacts of Offshore Wind Farms in the Belgian Part of the North Sea: Assessing and Managing Effect Spheres of Influence: 129 – 136. Royal Belgian Institute of Natural Sciences, OD Natural Environment, Marine Ecology and Man- agement, Brussels. 136 Seiten. BRANDT M, DRAGON AC, DIEDERICHS A, SCHUBERT A, KOSAREV V, NEHLS G, W AHL V, MICHALIK A, BRAASCH A, HINZ C, KETZER C, TODESKINO D, GAUGER M, LACZNY M & PIPER W (2016) Effects of offshore pile driving on harbour porpoise abundance in the German Bight. Study prepared for Offshore Forum Windenergie. Husum, June 2016, 246 Seiten. BRANDT MJ, DRAGON AC, DIEDERICHS A, BELLMANN M, W AHL V, PIPER W, NABE-NIELSEN J & NEHLS G (2018) Disturbance of harbour porpoises during construction of the first seven offshore wind farms in Germany. Marine Ecology Progress Series 596: 213−232. BROCKMANN U., TOPCU D., SCHÜTT M., LEUJAK W. (2017) Third assessment of the eutrophication status of German coastal and marine waters 2006–2014 in the North Sea according to the OSPAR Comprehensive Procedure. Universität Hamburg, Umweltbundesamt, 108 Seiten. https://www.meeresschutz.info/berichte-art-8-10.html?file=files/meeresschutz/be- richte/art8910/zyklus18/doks/HD_Nordsee_Dritte_Anwendung_COMP_DE_Gewaesser.pdf BSH, BUNDESAMT FÜR SEESCHIFFFAHRT UND HYDROGRAPHIE (2021a) Umweltbericht zum Raum- ordnungsplan für die deutsche ausschließliche Wirtschaftszone (AWZ) in der Nordsee. BSH (2021b) Umweltbericht zum Raumordnungsplan für die deutsche ausschließliche Wirt- schaftszone (AWZ) in der Ostsee. BSH (2019a) Flächenentwicklungsplan 2019 für die deutsche Nord- und Ostsee. Hamburg/ Rostock. BSH (2019b) Umweltbericht Nordsee zum Flächenentwicklungsplan. Hamburg/ Rostock. BSH (2019c) Umweltbericht Ostsee zum Flächenentwicklungsplan. Hamburg/ Rostock. Annex 39 BUREAU W AARDENBURG (1999) Falls of migrant birds − An analysis of current knowledge. Report prepared for the Directoraat-Generaal Rijksluchtvaartdienst, Postbus 90771, 2509 LT Den Haag, Programmadirectie Ontwikkeling Nationale Luchthaven, Ministerie van Verkeer en Waterstaat. BURGER C (2018) DIVER – Auswirkungen der Offshore-Windkraft auf Habitatnutzung und Bewe- gungsmuster überwinternder Seetaucher in der Deutschen Bucht. Vortrag auf dem 28. BSH-Mee- resumwelt-Symposium am 13. Juni 2018 in Hamburg. BURGER C, SCHUBER A, HEINÄNEN S. DORSCH M, KLEINSCHMIDT B, ZYDELIS R, MORKUNAS J, QUILL- FELDT P & NEHLS G (2019) A novel approach for assessing effects of ship on distributions and movements of seabirds. Journal of Environmental Management 251 (2019). CARR MH et al. (2017): The central importance of ecological spatial connectivity to effective coastal marine protected areas and to meeting the challenges of climate change in the marine environment. DAAN N, BROMLEY PJ, HISLOP JRG & NIELSEN NA (1990) Ecology of North Sea fish. Netherlands Journal of Sea Research 26 (2−4): 343–386. DÄHNE M, TOUGAARD J, CARSTENSEN J, ROSE A & NABE-NIELSEN J (2017) Bubble curtains attenu- ate noise levels from offshore wind farm construction and reduce temporary habitat loss for har- bour porpoises. Marine Ecology Progress Series 580: 221−237. DANNHEIM J, GUSKY M, & HOLSTEIN J (2014) Bewertungsansätze für Raumordnung und Geneh- migungsverfahren im Hinblick auf das benthische System und Habitatstrukturen. Statusbericht zum Projekt. Unveröffentliches Gutachten im Auftrag des Bundesamtes für Seeschifffahrt und Hydrographie, 113 Seiten. DANNHEIM J, GUTOW L, HOLSTEIN J, FIORENTINO D, BREY T (2016) Identifizierung und biologische Charakteristika bedrohter benthischer Arten in der Nordsee. Vortrag auf dem 26. BSH-Mee- resumwelt-Symposium am 31. Mai 2016 in Hamburg. DANNHEIM, J., BERGSTRÖM, L., BIRCHENOUGH, S.N.R., et al. (2019) Benthic effects of offshore re- newables: identification of knowledge gaps and urgently needed research. ICES Journal of Ma- rine Science (2019), doi:10.1093/icesjms/fsz018 DE BACKER A, DEBUSSCHERE E, RANSON J & HOSTENS K (2017) Swim bladder barotrauma in At- lantic cod when in situ exposed to pile driving. In: DEGRAER S, BRABANT R, RUMES B & VIGIN L (Hrsg.) (2017) Environmental impacts of offshore wind farms in the Belgian part of the North Sea: A continued move towards integration and quantification. Brussels: Royal Belgian Institute of Nat- ural Sciences, OD Natural Environment, Marine Ecology and Management Section. DIERSCHKE V, HÜPPOP O & GARTHE S (2003) Populationsbiologische Schwellen der Unzulässig- keit für Beeinträchtigungen der Meeresumwelt am Beispiel der in der deutschen Nord- und Ost- see vorkommenden Vogelarten. Seevögel 24: 61−72. DIERSCHKE J, DIERSCHKE V, HÜPPOP K, HÜPPOP O & JACHMANN KF (2011) Die Vogelwelt der Insel Helgoland. OAG Helgoland (Hrsg.). 1. Auflage. Druckwerkstatt Schmittstraße, 632 Seiten. DIERSCHKE V, FURNESS RW & GARTHE S (2016) Seabirds and offshore wind farms in European waters: Avoidance and attraction. Biological Conservation 202: 59−68. EHRICH S, KLOPPMANN MHF, SELL AF & BÖTTCHER U (2006) Distribution and Assemblages of Fish Species in the German Waters of North and Baltic Seas and Potential Impact of Wind Parks. In: KÖLLER W, KÖPPEL J & PETERS W (Hrsg.) Offshore Wind Energy. Research on Environmental Impacts. 372 Seiten. 40 Annex ESSINK K (1996) Die Auswirkung von Baggergutablagerungen auf das Makrozoobenthos: Eine Übersicht über niederländische Untersuchungen. – Mitteilung der Bundesanstalt für Gewässer- kunde Koblenz 11: S. 12−17. EUROPEAN ENVIRONMENT AGENCY (2015) State of the Europe’s seas. EEA Report No 2/2015. European Environment Agency. Publications Office of the European Union, Luxembourg (Web- seite der European Environment Agency). FINCK P, HEINZE S, RATHS U, RIECKEN U & SSYMANK A (2017) Rote Liste der gefährdeten Biotopty- pen Deutschlands: dritte fortgeschriebene Fassung 2017. Naturschutz und Biologische Vielfalt 156. FLIEßBACH KL, BORKENHAGEN K, GUSE N, MARKONES N, SCHWEMMER P & GARTHE S (2019) A Ship Traffic Disturbance Vulnerability Index for Northwest European Seabirds as a Tool for Marine Spatial Planning. Frontiers in Marine Science 6: 192. FREYHOF J (2009) Rote Liste der im Süßwasser reproduzierenden Neunaugen und Fische (Cyc- lostomata & Pisces). In: HAUPT H, LUDWIG G, GRUTTKE H, BINOT-HAFKE M, OTTO C & PAULY A (Red.) Rote Liste gefährdeter Tiere, Pflanzen und Pilze Deutschlands, Band 1: Wirbeltiere. Na- turschutz und Biologische Vielfalt 70 (1): 291–316. FRICKE R, BERGHAHN R & NEUDECKER T (1995) Rote Liste der Rundmäuler und Meeresfische des deutschen Wattenmeer- und Nordseebereichs (mit Anhängen: nicht gefährdete Arten). In: Nord- heim H von & Merck T (Hrsg.) Rote Listen der Biotoptypen, Tier- und Pflanzenarten des deut- schen Wattenmeer- und Nordseebe-reichs. Landwirtschaftsverlag Münster, Schriftenreihe für Landschaftspflege und Naturschutz 44: 101–113. GARTHE S (2000) Mögliche Auswirkungen von Offshore-Windenergieanlagen auf See- und Was- servögel der deutschen Nord- und Ostsee. In: MERCK T & VON NORDHEIM H (Hrsg) Technische Eingriffe in marine Lebensräume. Workshop des Bundesamtes für Naturschutz, Internationale Naturschutzakademie Insel Vilm, 27–29 Oktober 1999: BfN-Skripten 29: 113–119. Bonn/ Bad Godesberg. GARTHE S & HÜPPOP O (2004) Scaling possible adverse effects of marine wind farms on seabirds: developing and applying a vulnerability index, Journal of Applied Ecology, Vol. 41, S. 724-734. GARTHE S, SCHWEMMER H, MARKONES N, MÜLLER S & SCHWEMMER P (2015) Verbreitung, Jahres- dynamik und Bestandentwicklung der Seetaucher Gavia spec. in der Deutschen Bucht (Nordsee). Vogelwarte 53: 121 – 138. GARTHE S, SCHWEMMER H, MÜLLER S, PESCHKO V, MARKONES N & MERCKER M (2018) Seetaucher in der Deutschen Bucht: Verbreitung, Bestände und Effekte von Windparks. Bericht für das Bun- desamt für Seeschifffahrt und Hydrographie und das Bundesamt für Naturschutz. Veröffentlicht unter: http://www.ftz.uni-kiel.de/de/forschungsabteilungen/ecolab-oekologie-mariner-tiere/lau- fende-projekte/offshore-windenergie/Seetaucher_Windparkeffekte_Ergeb- nisse_FTZ_BIONUM.pdf GILL AB (2005) Offshore renewable energy: ecological implications of generating electricity in the coastal zone. Journal of Applied Ecology 42: 605−615. GILLES A, VIQUERAT S & SIEBERT U (2014) Monitoring von marinen Säugetieren 2013 in der deut- schen Nord- und Ostsee, itaw im Auftrag des Bundesamtes für Naturschutz. GILLES, A, DÄHNE M, RONNENBERG K, VIQUERAT S, ADLER S, MEYER-KLAEDEN O, PESCHKO V & SIEBERT U (2014) Ergänzende Untersuchungen zum Effekt der Bau- und Betriebsphase im Offs- Annex 41 hore-Testfeld „alpha ventus“ auf marine Säugetiere. Schlussbericht zum Projekt Ökologische Be- gleitforschung am Offshore-Testfeldvorhaben alpha ventus zur Evaluierung des Standardunter- suchungs-konzeptes des BSH StUKplus. GILLES A, VIQUERAT S, BECKER EA, FORNEY KA, GEELHOED SCV, HAELTERS J, NABENIELSEN J, SCHEIDAT M, SIEBERT U, SVEEGAARD S, VAN BEEST FM, VAN BEMMELEN R & AARTS G (2016) Sea- sonal habitat- based density models for a marine top predator, the harbor porpoise, in a dynamic environment. Ecosphere 7(6): e01367. 10.1002/ecs2.1367. HAMMER C (2000) Die Fischereiressourcen im Hinblick auf deutsche Interessen. Informationen für die Fischwirtschaft aus der Fischereiforschung, 47(1), pp. 3-18. HAMMOND PS & MACLEOD K (2006) Progress report on the SCANS-II project, Paper prepared for ASCOBANS Advisory Committee, Finland, April 2006. HAMMOND PS, BERGGREN P, BENKE H, BORCHERS DL, COLLET A, HEIDE-JORGENSEN MP, HEIM- LICH-BORAN, S, HIBY AR, LEOPOLD MF & OIEN N (2002) Abundance of harbour porpoise and other small cetaceans in the North Sea and adjacent waters. Journal of Applied Ecology 39: 361−376. HAMMOND PS, LACEY C, GILLES A, VIQUERAT S (2017) Estimates of cetacean abundance in Euro- pean Atlantic Waters in summer 2016 from the SCANS-III aerial and shipboard surveys. https://synergy.st-andrews.ac.uk/scans3/files/2017/04/SACANS-III-design-based-estimates- 2017-0428-final.pdf. HANSEN L (1954) Birds killed at lights in Denmark 1886–1939. Videnskabelige meddelelser, Dansk Naturhistorisk Forening I København, 116, 269−368. HEESSEN HJL (2015) 56. Goatfishes (Mullidae). In: HEESSEN H, DAAN N, ELLIS JR (Hrsg.) Fish atlas of the Celtic Sea, North Sea, and Baltic Sea: based on international research-vessel sur- veys. Academic Publishers, Wageningen, Seite 344–348. HEESSEN HJL, DAAN N & ELLIS JR (2015) Fish atlas of the Celtic Sea, North Sea, and Baltic Sea: based on international research-vessel surveys. Academic Publishers, Wageningen. HERRMANN C & KRAUSE JC (2000) Ökologische Auswirkungen der marinen Sand- und Kiesge- winnung. In: H. von Nordheim und D. Boedeker. Umweltvorsorge bei der marinen Sand- und Kiesgewinnung. BLANO-Workshop 1998. BfN-Skripten 23. Bundesamt für Naturschutz (Hrsg.). Bonn Bad Godesberg, 2000. 20−33. HILL K & HILL R (2010) Fachgutachten zum baubegleitenden Monitoring des Schutzgutes Zugvö- gel am Offshore-Testfeld „alpha ventus“ im Frühjahr und Herbst 2009. Stiftung Offshore-Winden- ergie. HOLLOWED AB, BARANGE M, BEAMISH RJ, BRANDER K, COCHRANE K, DRINKWATER K, FOREMAN MGG, HARE JA, HOLT J, ITO S, KIM S, KING JR, LOENG H, MACKENZIE BR, MUETER FJ, OKEY TA, PECK MA, RADCHENKO VI, RICE JC, SCHIRRIPA MJ, YATSU A & YAMANAKA Y (2013) Projected im- pacts of climate change on marine fish and fisheries. ICES Journal of Marine Science 70:1023– 1037. HORCH P & KELLER V (2005) Windkraftanlagen und Vögel − ein Konflikt? Eine Literaturrecherche. Schweizerische Vogelwarte, Sempach. HÜPPOP K & HÜPPOP O (2002) Atlas zur Vogelberingung auf Helgoland. Teil 1: Zeitliche und regi- onale Veränderungen der Wiederfundraten und Todesursachen auf Helgoland beringter Vögel (1909 bis 1998). Die Vogelwarte 41: 161−180. HÜPPOP K & HÜPPOP O (2004) Atlas zur Vogelberingung auf Helgoland. Teil 2: Phänologie im Fanggarten von 1961 bis 2000. Die Vogelwarte 42: 285−343. 42 Annex HÜPPOP O, DIERSCHKE J, EXO K-M, FREDRICH E. & HILL R (2005) AP1 Auswirkungen auf den Vo- gelzug. In: OREJAS C, JOSCHKO T, SCHRÖDER A, DIERSCHKE J, EXO K-M, FREDRICH E, HILL R, HÜPPOP O, POLLEHNE F, ZETTLER ML, BOCHERT R (Hrsg.) Ökologische Begleitforschung zur Wind- energienutzung im Offshore-Bereich auf Forschungsplattformen in der Nord- und Ostsee (Beo- FINO) - Endbericht Juni 2005, Bremerhaven: 7−160. HÜPPOP O, DIERSCHKE J, EXO K-M, FREDRICH E & HILL R (2006) Bird migration studies and poten- tial collision risk with offshore wind turbines. Ibis 148: 90−109. HÜPPOP O, HILL R, HÜPPOP K & JACHMANN F (2009) Auswirkungen auf den Vogelzug. Begleitfor- schung im Offshore-Bereich auf Forschungsplattformen in der Nordsee (FINOBIRD), Abschluss- bericht. HÜPPOP K, DIERSCHKE J, HILL R & HÜPPOP O (2012) Jahres- und tageszeitliche Phänologie der Vogelrufaktivität über der deutschen Bucht. Vogelwarte 50: 87−108. HUTTERER R, IVANOVA T, MEYER-CORDS C & RODRIGUES L (2005) Bat Migrations in Europe. - Na- turschutz und Biologische Vielfalt 28, 180 Seiten. ICES, INTERNATIONALER RAT FÜR MEERESFORSCHUNG (2018a) Fisheries overview - Greater North Sea Ecoregion. 31 Seiten, DOI: 10.17895/ices.pub.4647. ICES, INTERNATIONALER RAT FÜR MEERESFORSCHUNG (2018b) Report of the Working Group on Bycatch of Protected Species (WGBYC), 1-4 May 2018, Reykjavik, Iceland. ICES CM 2018/ACOM:25. 130 Seiten. ICES, INTERNATIONALER RAT FÜR MEERESFORSCHUNG Database of Trawl Surveys (DATRAS), Ex- traction date 12 March 2018. International Bottom Trawl Survey (IBTS) data 2016−2018; http://datras.ices.dk. ICES, Copenhagen. ILICEV VD & FLINT VE (1985) Handbuch der Vögel der Sowjetunion. Band 1 Erforschungsge- schichte, Gaviiformes, Podicipediformes, Procellariiformes. Wiesbaden: AULA-Verlag. JELLMANN J (1979) Flughöhen ziehender Vögel in Nordwestdeutschland nach Radarmessungen. Die Vogelwarte 30: 118−134. JELLMANN J (1989) Radarmessungen zur Höhe des nächtlichen Vogelzuges über Nordwest- deutschland im Frühjahr und im Hochsommer. Die Vogelwarte 35: 59−63. JOSCHKO T (2007) Influence of artificial hard substrates on recruitment success of the zoobenthos in the German Bight. Dissertation Universität Oldenburg, 210 Seiten. KLEIN B, KLEIN H, LOEW P, MÖLLER J, MÜLLER-NAVARRA S, HOLFORT J, GRÄWE U, SCHLAMKOW C & SEIFFERT R (2018) Deutsche Bucht mit Tideelbe und Lübecker Bucht. in: von Storch H, Meineke I & CLAUSSEN M (Hrsg.) (2018) Hamburger Klimabericht – Wissen über Klima, Klimawandel und Auswirkungen in Hamburg und Norddeutschland, Springer Verlag. KLOPPMANN MHF, BÖTTCHER, U, DAMM U, EHRICH S, MIESKE B, SCHULTZ N & ZUMHOLZ K (2003) Erfassung von FFH-Anhang-II-Fischarten in der deutschen AWZ der Nord- und Ostsee. Studie im Auftrag des BfN, Bundesforschungsanstalt für Fischerei. Endbericht, Hamburg, 82 Seiten. KNUST R, DALHOFF P, GABRIEL J, HEUERS J, HÜPPOP O & W ENDELN H (2003) Untersuchungen zur Vermeidung und Verminderung von Belastungen der Meeresumwelt durch Offshore-Windener- gieanlagen im küstenfernen Bereich der Nord- und Ostsee („offshore WEA“). Abschlussbericht des Forschungs- und Entwicklungsvorhabens Nr. 200 97 106 des Umweltbundesamts, 454 Sei- ten mit Anhängen. Annex 43 KRÖNCKE I, REISS H, EGGLETON JD, ALDRIDGE J, BERGMAN MJN, COCHRANE S, CRAEYMEERSCH JA, DEGRAER S, DESROY N, DEWARUMEZ J-M, DUINEVELD GCA, ESSINK K, HILLEWAERT H, LAVA- LEYE MSS, MOLL A, NEHRING S, NEWELL R, OUG E, POHLMANN T, RACHOR E, ROBERTSON M, RUMOHR H, SCHRATZBERGER M, SMITH R, VANDEN BERGHE E, VAN DALFSEN J, VAN HOEY G, VINCX M, W ILLEMS W & REES HI (2011) Changes in North Sea macrofauna communities and species distribution between 1986 and 2000. Estuarine, coastal and shelf science 94(1): 1−15. KRONE R, DEDERER G, KANSTINGER P, KRAMER P, SCHNEIDER C & SCHMALENBACH I (2017) Mobile demersal megafauna at common offshore wind turbine foundations in the German Bight (North Sea) two years after deployment − increased production rate of Cancer pagurus. Marine Environ- mental Research 123: 53−61. KULLINCK U & MARHOLD S (1999) Abschätzung direkter und indirekter biologischer Wirkungen der elektrischen und magnetischen Felder des Eurokabel/ Viking Cable HGÜ-Bipols auf Lebewesen der Nordsee und des Wattenmeeres. Studie im Auftrag von Eurokabel/Viking Cable: 99 Seiten. LAMBERS-HUESMANN M & ZEILER M (2011) Untersuchungen zur Kolkentwicklung und Kolkdyna- mik im Testfeld „alpha ventus“, Veröffentlichungen des Grundbauinstitutes der Technischen Uni- versität Berlin, Heft Nr. 56, Berlin 2011, Vortrag zum Workshop „Gründungen von Offshore-Wind- energieanlagen“ am 22. und 23. März 2011. LAURER W-U, NAUMANN M & ZEILER M (2013) Sedimentverteilung in der deutschen Nordsee nach der Klassifikation von Figge (1981). http://www.gpdn.de. LEONHARD SB, STENBERG C & STØTTRUP J (2011) Effect of the Horns Rev 1 Offshore Wind Farm on Fish Communities Follow-up Seven Years after Construction DTU Aqua Report No 246-2011 ISBN 978-87-7481-142-8 ISSN 1395−8216. LIVERSAGE, K. et al., 2019: Knowledge to decision in dynamic seas: Methods to incorporate non- indigenous species into cumulative impact assessments for maritime spatial planning. LOZAN JL, RACHOR E, W ATERMANN B & VON W ESTERNHAGEN H (1990) Warnsignale aus der Nord- see. Wissenschaftliche Fakten. Verlag Paul Parey, Berlin und Hamburg. 231–249. LOZAN, JL, ZIMMERMANN, C (2003) Zustand der Nutzfischbestände der Nordsee – insbesondere der demersalen Fischarten. In: Lozán, J. L. et al. Warnsignale aus Nordsee & Wattenmeer – Eine Umweltbilanz. Wissenschaftliche Auswertungen, Hamburg. 266-271. LUCKE K, LEPPER P, HOEVE B, EVERAARTS E, ELK N & SIEBERT U (2007) Perception of low-fre- quency acoustic signals by harbour porpoise Phocoena phocoena in the presence of simulated wind turbine noise. Aquatic mammals 33:55−68. LUCKE K, LEPPER PA, BLANCHET M-A & SIEBERT U (2009) Temporary shift in masked hearing thresholds in a harbor porpoise (Phocoena phocoena) after exposure to seismic airgun stimuli. Journal of the Acoustical Society of America 125(6): 4060−4070. MARKONES N & GARTHE, S (2011) Marine Säugetiere und Seevögel in der deutschen AWZ von Nord- und Ostsee. Teilbericht Seevögel. Monitoring 2010/2011 – Endbericht, FTZ Büsum. Im Auftrag des Bundesamts für Naturschutz (BfN). MARKONES N, GUSE N, BORKENHAGEN K, SCHWEMMER H & GARTHE S (2014) Seevogel-Monitoring 2012/2013 in der deutschen AWZ von Nord- und Ostsee. Im Auftrag des Bundesamts für Natur- schutz (BfN). MARKONES N, GUSE N, BORKENHAGEN K, SCHWEMMER H & GARTHE S (2015) Seevogel-Monitoring 2014 in der deutschen AWZ von Nord- und Ostsee. Im Auftrag des Bundesamts für Naturschutz (BfN). 44 Annex MEINIG H, BOYE P & HUTTERER R (2008) Rote Liste und Gesamtartenliste der Säugetiere (Mammalia) Deutschlands. In: Haupt H, Ludwig G, Gruttke H, Binot-Hafke M, Otto C & Pauly A (Red.) (2009) Rote Liste gefährdeter Tiere, Pflanzen und Pilze Deutschlands, Band 1: Wirbeltiere. Naturschutz und Biologische Vielfalt 70 (1): 115 – 153. MEISSNER K, BOCKHOLD J & SORDYL H (2007) Problem Kabelwärme? Vorstellung der Ergebnisse von Feldmessungen der Meeresbodentemperatur im Bereich der elektrischen Kabel im däni- schen Offshore-Windpark Nysted Havmøllepark. Vortrag auf dem Meeresumweltsymposium 2006, CHH Hamburg. MENDEL B, SCHWEMMER P, PESCHKO V, MÜLLER S, SCHWEMMER H, MERCKER M & GARTHE S (2019) Operational offshore wind farms and associated ship traffic cause profound changes in distribution patterns of Loons (Gavia spp.). Journal of environmental management 231: 429-438. MENDEL B, SONNTAG N, WAHL J, SCHWEMMER P, DRIES H, GUSE N, MÜLLER S & GARTHE S (2008) Artensteckbriefe von See- und Wasservögeln der deutschen Nord- und Ostsee. Verbreitung, Ökologie und Empfindlichkeiten gegenüber Eingriffen in ihren marinen Lebensraum. Naturschutz und Biologische Vielfalt, Heft 59, 437 Seiten. MENDEL B, SONNTAG N, SOMMERFELD J, KOTZERKA J, MÜLLER S, SCHWEMMER H, SCHWEMMER P & GARTHE S (2015) Untersuchungen zu möglichem Habitatverlust und möglichen Verhaltensän- derungen bei Seevögeln im Offshore-Windenergie-Testfeld (TESTBIRD). Schlussbericht zum Projekt Ökologische Begleitforschung am Offshore-Testfeldvorhaben alpha ventus zur Evaluie- rung des Standarduntersuchungskonzeptes des BSH (StUKplus). BMU Förderkennzeichen 0327689A/FTZ3. 166 Seiten. MENDEL B, SCHWEMMER P, PESCHKO V, MÜLLER S, SCHWEMMER H, MERCKER M & GARTHE S (2019) Operational offshore wind farms and associated ship traffic cause profound changes in distribution patterns of Loons (Gavie spp.). Journal of Environmental Management 231 (2019): 429 – 438. MERCKER M (2018) Influence of offshore wind farms on distribution and abundance of Gaviidae: Methodological overview. BIONUM. https://www.ftz.uni-kiel.de/de/forschungsabteilungen/ecolab-oekologie-mariner-tiere/laufende- projekte/offshore-windenergie. NORDHEIM H VON & MERCK T (1995) Rote Listen der Biotoptypen, Tier-und Pflanzenarten des deutschen Wattenmeer-und Nordseebereichs. Schriftenreihe für Landschaftspflege und Natur- schutz 44, 138 Seiten. NORDHEIM H VON, RITTERHOFF J & MERCK T (2003) Biodiversität in der Nordsee – Rote Listen als Warnsignal. In LOZÁN JL, RACHOR E, REISE K, SÜNDERMANN J & VON W ESTERNHAGEN H (Hrsg) Warnsignale aus Nordsee & Wattenmeer. Eine aktuelle Umweltbilanz. Wissenschaftliche Aus- wertungen, Hamburg 2003. 300−305. ÖHMAN MC, SIGRAY P & WESTERBERG H (2007) Offshore windmills and the effects of electromag- netic fields on fish. AMBIO: A Journal of the Human Environment 36(8): 630−633. OREJAS C, JOSCHKO T, SCHRÖDER A, DIERSCHKE J, EXO K-M, FREDRICH E, HILL R, HÜPPOP O, POLLEHNE F, ZETTLER M & BOCHERT R (2005) BeoFINO Endbericht: Ökologische Begleitfor- schung zur Windenergienutzung im Offshore-Bereich auf Forschungsplattformen in der Nord- und Ostsee (BeoFINO). 356 Seiten. PETERSEN I K, CHRISTENSEN T K, KAHLERT J, DESHOLM M & FOX A D (2006) Final results of bird studies at the offshore wind farms at Nysted and Horns Rev, Denmark. Report request. Commis- sioned by DONG energy and Vattenfall A/S). Annex 45 RACHOR E (1990) Veränderungen der Bodenfauna. In: Lozan JL, Lenz W, Rachor E, Watermann B & von Westernhagen H (Hrsg): Warnsignale aus der Nordsee. Paul Parey 432 Seiten. RACHOR E & NEHMER P (2003) Erfassung und Bewertung ökologisch wertvoller Lebensräume in der Nordsee. Schlussbericht für BfN. Bremerhaven, 175 S. und 57 S. Anlagen. RACHOR E, BÖNSCH R, BOOS K, GOSSELCK F, GROTJAHN M, GÜNTHER C-P, GUSKY M, GUTOW L, HEIBER W, JANTSCHIK P, KRIEG H-J, KRONE R, NEHMER P, REICHERT K, REISS H, SCHRÖDER A, WITT J & ZETTLER ML (2013) Rote Liste und Artenlisten der bodenlebenden wirbellosen Meeres- tiere. In: BfN (Hrsg.) (2013) Rote Liste gefährdeter Tiere, Pflanzen und Pilze Deutschlands. Band 2: Meeresorganismen, Bonn. READ AJ (1999) Handbook of marine mammals. Academic Press. READ AJ & W ESTGATE AJ (1997) Monitoring the movements of harbour porpoise with satellite telemetry. Marine Biology 130: 315−322. REID JB, EVANS PGH & NORTHRIDGE SP (2003) Atlas of the cetacean distribution in north-west European waters, Joint Nature Conservation Committee, Peterborough. ROSE A, DIEDERICHS A, NEHLS G, BRANDT MJ, W ITTE S, HÖSCHLE C, DORSCH M, LIESENJOHANN T, SCHUBERT A, KOSAREV V, LACZNY M, HILL A & PIPER W (2014) OffshoreTest Site Alpha Ventus; Expert Report: Marine Mammals. Final Report: From baseline to wind farm operation. Im Auftrag des Bundesamts für Seeschifffahrt und Hydrographie. ROSE A, BRANDT M J, VILELA R, DIEDERICHS A, SCHUBERT A, KOSAREV V, NEHLS G, VOLKENANDT M, W AHL V, MICHALIK A, WENDELN H, FREUND A, KETZER C, LIMMER B, LACZNY M, PIPER W (2019) Effects of noise-mitigated offshore pile driving on harbour porpoise abundance in the German Bight 2014-2016 (Gescha 2). Assessment of Noise Effects. Final Report. SALZWEDEL H, RACHOR E & GERDES D (1985) Benthic macrofauna communities in the German Bight. Veröffentlichungen des Instituts für Meeresforschung, Bremerhaven 20: 199−267. SCHOMERUS T, RUNGE K, NEHLS G, BUSSE J, NOMMEL J & POSZIG D (2006) Strategische Umwelt- prüfung für die Offshore-Windenergienutzung. Grundlagen ökologischer Planung beim Ausbau der Offshore-Windenergie in der deutschen Ausschließlichen Wirtschaftszone. Schriftenreihe Umweltrecht in Forschung und Praxis, Band 28, Verlag Dr. Kovac, Hamburg 2006. 551 Seiten. SCHRÖDER A, GUTOW L, JOSCHKO T, KRONE R, GUSKY M, PASTER M & POTTHOFF M (2013) Benthosökologische Auswirkungen von Offshore-Windenergieparks in der Nordsee (BeoFINO II). Abschlussbericht zum Teilprojekt B ‘‘Benthosökologische Auswirkungen von Offshore-Windener- gieparks in Nord- und Ostsee. Prozesse im Nahbereich der Piles”. BMU Förderkennzeichen 0329974B. hdl:10013/epic.40661.d001. SCHWEMMER P, MENDEL B, SONNTAG N, DIERSCHKE V & GARTHE S (2011) Effects of ship traffic on seabirds in offshore waters: Implications for marine conservation and spatial planning. Ecological Applications 21/5, S: 1851–1860. DOI: 10.2307/23023122. SCHWEMMER H, MARKONES N, MÜLLER S, BORKENHAGEN K, MERCKER M & GARTHE S (2019) Ak- tuelle Bestandsgröße und –entwicklung des Sterntauchers (Gavia stellata) in der deutschen Nordsee. Bericht für das Bundesamt für Seeschifffahrt und Hydrographie und das Bundesamt für Naturschutz. Veröffentlicht unter http://www.ftz.uni-kiel.de/de/forschungsabteilungen/ecolab-oe- kologie-mariner-tiere/laufende-projekte/offshore-windenergie/Seetaucher_Bestaende_Ergeb- nisse_FTZ_BIONUM.pdf. 46 Annex SKOV H, HEINÄNEN S, NORMAN T, W ARD RM, MÉNDEZ-ROLDÁN S & ELLIS I (2018) ORJIP Bird Col- lision and Avoidance Study. Final report – April 2018. The Carbon Trust. United Kingdom. 247 Seiten. SOUTHALL BL, BOWLES AE, ELLISON WT, FINNERAN JJ, GENTRY RL, GREENE CR JR, KASTAK D, KETTEN DR, MILLER JH, NACHTIGALL PE, RICHARDSON WJ, THOMAS JA & TYACK PL (2007) Marine mammal noise exposure criteria: Initial scientific recommendations. Aquatic Mammals 33: 411 – 521. TEMMING A & HUFNAGL M (2014) Decreasing predation levels and increasing landings challenge the paradigm of non-management of North Sea brown shrimp (Crangon crangon) ICES Journal of Marine Science 72(3): 804–823. THIEL R, WINKLER HM & URHO L (1996) Zur Veränderung der Fischfauna. In: LOZÁN JL, LAMPE R, MATTHÄUS W, RACHOR E, RUMOHR H & VON W ESTERNHAGEN H (Hrsg) Warnsignale aus der Ost- see, Verlag Paul Parey, Berlin: 181–188. THIEL R, W INKLER H, BÖTTCHER U, DÄNHARDT A, FRICKE R, GEORGE M, KLOPPMANN M, SCHAAR- SCHMIDT T, UBL C, & VORBERG, R (2013) Rote Liste und Gesamtartenliste der etablierten Fische und Neunaugen (Elasmobranchii, Actinopterygii & Petromyzontida) der marinen Gewässer Deutschlands. Naturschutz und Biologische Vielfalt 70 (2): 11–76. TODD VLG, PEARSE WD, TREGENZA NC, LEPPER PA & TODD IB (2009) Diel echolocation activity of harbour porpoises (Phocoena phocoena) around North Sea offshore gas installations. ICES Jour- nal of Marine Science 66: 734–745. TULP I, MCCHESNEY S & DEGOEIJ P (1994) Migratory departures of waders from north-western Australia-behavior, timing and possible migration routes. Ardea 82(2): 201−221. WASMUND N, POSTEL L & ZETTLER ML (2012) Biologische Bedingungen in der deutschen aus- schließlichen Wirtschaftszone der Nordsee im Jahre 2011. Leibniz-Institut für Ostseeforschung Warnemünde im Auftrag des Bundesamtes für Seeschifffahrt und Hydrographie. WEILGART, L (2018) The impact of ocean noise pollution on fish and invertebrates. Oceancare and Dalhousie University. WEINERT M, MATHIS M, KRÖNCKE I, NEUMANN H, POHLMANN T & REISS H (2016) Modelling climate change effects on benthos: Distributional shifts in the North Sea from 2001 to 2099. Estuarine, Coastal and Shelf Science 175: 157−168. WISNIEWSKA ET AL. (2018) High rates of vessel noise disrupt foraging in wild harbour porpoises (Phocoena phocoena). YANG, J (1982) The dominant fish fauna in the North Sea and its determination. Journal of Fish Biology 20: 635−643.
Allikas: Kaitseministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel