CLEAN ENERGY TRANSITION PARTNERSHIP
(CETPartnership)
Partnership Framework
Consortium Agreement
v3-31.01.2023/Finalised 25.05.2023
v3-31.01.2023/Finalised 25.05.2023
1
Content
Content ............................................................................................................................................................................ 2
HISTORY OF CHANGES ................................................................................................................................................ 5
Section 1: Definitions ................................................................................................................................................... 10
1.1 Definitions ................................................................................................................................................... 10
1.2 Additional Definitions................................................................................................................................... 10
Section 2: Purpose ....................................................................................................................................................... 15
Section 3: Entry into force, duration and termination .............................................................................................. 16
3.1 Entry into force ............................................................................................................................................ 16
3.2 Duration and termination ............................................................................................................................. 16
3.3 Survival of rights and obligations................................................................................................................. 17
Section 4: Responsibilities of Parties ........................................................................................................................ 17
4.1 General principles ....................................................................................................................................... 17
4.2 Breach ......................................................................................................................................................... 18
4.3 Involvement of third parties, procurement on behalf of the consortium ....................................................... 18
4.4 Specific responsibilities regarding data protection ...................................................................................... 19
Section 5: Liability towards each other...................................................................................................................... 19
5.1 No warranties .............................................................................................................................................. 19
5.2 Limitations of contractual liability ................................................................................................................. 19
5.3 Damage caused to third parties .................................................................................................................. 20
5.4 Force Majeure ............................................................................................................................................. 20
Section 6: Governance structure ................................................................................................................................ 20
6.1 General structure ........................................................................................................................................ 20
6.2 General operational procedures for all Consortium Bodies ......................................................................... 22
6.2.1 Representation in meetings ................................................................................................................. 22
6.2.2 Preparation and organisation of meetings ........................................................................................... 22
6.2.3 Decision making by the Governing Board ............................................................................................ 23
6.3 Specific operational procedures for the Consortium Bodies........................................................................ 26
6.3.1 Set of Core Management Documents .................................................................................................. 26
6.3.2 Specific operational procedures for the Governing Board ................................................................... 28
6.3.3 Specific operational procedures for the Budget Review Group (BRG) ................................................ 31
6.3.4 Specific operational procedures for the Transition Initiatives ............................................................... 31
6.3.5 Specific operational procedures for the General Assembly ................................................................. 31
6.3.6 Specific operational procedures for the Coordinator ............................................................................ 32
6.3.7 Specific operational procedures for the CETPartnership Management ............................................... 33
Section 7: Financial provisions................................................................................................................................... 34
7.1 General Principles ....................................................................................................................................... 34
7.1.1 The financial model (Overview) ........................................................................................................... 34
7.1.2 Distribution of the EU Financial Contribution ....................................................................................... 36
v3-31.01.2023/Finalised 25.05.2023
2
7.1.3 Justifying Costs towards the Granting Authority .................................................................................. 36
7.1.4 Financial Consequences of the termination of the participation of a Party .......................................... 36
7.2 Payments .................................................................................................................................................... 36
7.3 Withholding of Payments ............................................................................................................................ 36
7.4 Payment schedule....................................................................................................................................... 37
7.5 Justifying Coordination Cost and Parties’ Own Management Expenses ..................................................... 39
7.6 Budgeting .................................................................................................................................................... 39
7.6.1 Coordination Cost ................................................................................................................................ 41
7.6.2 Parties’ Own Management Expenses .................................................................................................. 44
7.6.3 National/Regional Financial Contributions from Funding Partners ...................................................... 45
7.7 Excess payments and revenues ................................................................................................................. 48
7.8 Cost of Certificates on the Financial Statement .......................................................................................... 49
7.9 Mitigation Scenarios and deduced obligations ............................................................................................ 49
7.9.1 Termination Scenario ........................................................................................................................... 49
7.9.2 Minimal Scenario – reduce to Capacities............................................................................................. 50
7.9.3 Reserve fund from the EU-Top-Up for Projects to mitigate risk of uncovered payments ..................... 51
Section 8: Implementation of Joint Calls ................................................................................................................... 52
8.1 Commitment of the Funding Partners ......................................................................................................... 52
8.2. Preparation of Joint Calls ........................................................................................................................... 52
8.3 Evaluation and Selection of Funded Projects.............................................................................................. 52
8.3.1 Pre-proposal stage............................................................................................................................... 53
8.3.2 Central scientific evaluation of pre-proposals ...................................................................................... 53
8.3.3 Limiting oversubscription ..................................................................................................................... 53
8.3.4 Selection of projects to be invited to submit a full proposal ................................................................. 53
8.3.5 Full-proposal stage .............................................................................................................................. 53
8.3.6 Selection of the projects to be funded.................................................................................................. 53
8.4 Use of EU-Top-Up for Funded Projects ...................................................................................................... 54
8.5 Conflicts of interests .................................................................................................................................... 55
8.6 Contractual obligations towards the Granting Authority on selection .......................................................... 55
8.7 Contractual obligations for projects funded in the Joint Calls ...................................................................... 55
Section 9: Results......................................................................................................................................................... 56
9.1 Ownership of Results .................................................................................................................................. 56
9.2 Dissemination of own Results ..................................................................................................................... 56
9.3 Dissemination of another Party’s unpublished Results or Background ....................................................... 56
9.4 Use of names, logos or trademarks ............................................................................................................ 57
Section 10: Access Rights........................................................................................................................................... 58
10.1 Background included................................................................................................................................. 58
10.2 General Principles ..................................................................................................................................... 58
10.3 Access Rights for implementation ............................................................................................................. 58
10.4 Access Rights for Exploitation ................................................................................................................... 58
v3-31.01.2023/Finalised 25.05.2023
3
10.5 Access Rights for Parties entering or leaving the consortium ................................................................... 58
Section 11: Non-disclosure of information ................................................................................................................ 59
11.1 Scope ........................................................................................................................................................ 59
11.2 Approach ................................................................................................................................................... 59
11.3 Range........................................................................................................................................................ 59
11.4 Exception .................................................................................................................................................. 59
11.5 Handling .................................................................................................................................................... 60
11.6 Unauthorised disclosure............................................................................................................................ 60
11.7 Disclosing Confidential Information in order to comply with applicable laws or regulations ...................... 60
11.8 Confidentiality for Proposals and Funded Projects ................................................................................... 60
Section 12: Data Management .................................................................................................................................... 60
Section 13: Miscellaneous ........................................................................................................................................... 60
13.1 Attachments, inconsistencies and severability .......................................................................................... 60
13.2 No representation or agency ..................................................................................................................... 61
13.3 Formal and written notices and other communication ............................................................................... 61
13.4 Assignment and amendments ................................................................................................................... 61
13.5 Mandatory national law ............................................................................................................................. 61
13.6 Language .................................................................................................................................................. 61
13.7 Applicable law ........................................................................................................................................... 61
13.8 Settlement of disputes ............................................................................................................................... 62
Section 14: Signatures ................................................................................................................................................. 63
Attachment 1: Background Included........................................................................................................................ 126
Attachment 2: Accession document ........................................................................................................................ 129
Attachment 3: Budget indications for the Joint Calls (at date of Initial GA) ........................................................ 130
v3-31.01.2023/Finalised 25.05.2023
4
HISTORY OF CHANGES
PUBLICATION
VERSION CHANGE
DATE
1.0 29.03.2022 -
2.0 25.04.2022 List of Parties included, including information on their role in the CETPartnership
Page numbers included in footer
„Steering Board“ all over replaced by „Governing Board“
“party” and “parties” all over replaced by “Party” and “Parties
“Parties’ Own Management Cost” all over replaced by “Parties’ Own Management Expenses”
“Management” (in the meaning of the Consortium Body) all over replaced by “CETPartnership Management”
“close” a contract all over replaced with “conclude” a contract
Preamble: paragraph E and F added
Section 1: Definitions „CETPartnership Management“, “Management Teams”, “TRI Leading Expert”, “TRI Office”, “EU-Top-Up
Balancing Pot”, “Call Module”, “External Expert”, “Glossary”, “Final List of Projects to be Funded”, “Capacities”, “Gap Filling” added
Section 2 / 3.2: Clause about adoption of Related Grant Agreements moved from Section 3.2 to Section 2
Section 4.1.: additional clause added to “Each Party shall promptly provide all information reasonably required by a Consortium
Body or by the Coordinator …”, regarding statutory law or regulations with a third party which existed prior to the start of the
CETPartnership
Section 4.3 Involvement of third parties:
o Reformulated in order to clarify, that if a partner should require to subcontract whether it will be the CA or GA Terms and
Conditions that would need to be incorporated in any subcontracting agreement.
o „as well as for ICT support below 20.000 € per year” added
o “contracts” replaced by “subcontracting and purchasing”
o Clause on procurement by Coordinator on behalf of the Consortium added
o Section 6.1: more explanation added for Coordination Bodies; Figure on management structure added from Part B of the
Initial Grant Agreement
Section 5.2: Liability limited to once the EU-Top-Up For Funded Projects the Party is entitled to receive; Limitation of Liability for
Supporting Partners removed.
Section 6.2.2.1: „Management Bodies“ changed to „Coordination Bodies or TRI Managements“
Section 6.2.3.3: Veto right written decison changed from 7 days to 15 calendar days
Section 6.3.1: Set of Core Management Documents: “for each joint call” added for the Programme Managers Handbook
Section 6.3.6: Coordinator: “Coordinate and carry out procurements on behalf of the Coordinator and sign contracts with third
parties on behalf of the Coordinator”, added to FFGs role as Consortium Agreement.
Section 7: Table 1: Global estimation for the use of the EC Financial Contribution received under the Initial Grant Agreement added;
Table 2: CET Partnership Payment schedule from the Coordinator to the Parties under the Initial Grant Agreement added.
Section 7.1: Payment schedule: Schedule adjusted for practical reasons (50%/30%/20%) to avoid high in advance funds by the
partners involved in Coordination, Management and Support Activities
Section 7.5: Clause on 100% remuneration of Coordination Cost reformulated; Cap for Parties’ Own Management Expenses
removed
Section 7.6.3: Indicated Budget for CDTI corrected
Section 7.9.3: Provisions on “Uncovered Payments” cancelled and replaced by concept of a 7.9.3. Reserve fund from the EU-Top-
Up for Projects to mitigate risk of uncovered payments
Section 11.2: Approach: typo corrected
Section 13.4: Clause “Core Management Documents listed in 6.3.1 as approved by the Governing Board are not considered to
amend or modify the text of this Consortium Agreement.” added.
Section 13.8: Option “ICC Arbitration” selected
3.0 Section 4.4: responsibilities for Associated Partners - added from updated DESCA
Section 6.2: put paragraph forward from end
Section 6.2.3.1 & 6.2.3.2: revised according to GOB decisions from the GOB meeting in Vienna in May 2022. Particularly two Tier
Model for Call Specific Configurations of the GOB
Section 6.2.3.2: corrected reference on voting right 6.2.3.4
Section 6.2.3.4: as above
Attachments updated, added Att 3;
01.07.2022 Section 1.1: according to legal/GA aligned and/or deleted not to double up
Section 7.5: hourly rate changed into daily rate according to GA
Final 23.10.2023 Section 9.2: AMGA ref.
v3-31.01.2023/Finalised 25.05.2023
5
‘Consortium Agreement’ changed into ‘Partnership Framework Consortium Agreement’ throughout
13.01.2023 Typos corrected throughout all sections, spacing, and bullet point order;
Tables 1-7: updated, corrected where applicable
23.01.2023 Section 4.4: responsibilities for Associated Partners moved in parts to Section 4.1 and therefore Section 4.4 changed to “Specific
responsibilities regarding data protection
Section 5.4: included reference to Art. 35 of GA
Section 6.3.2.3: corrected the reference …’selected based on Section 8.3.6’
Section 7.4: instead of ..’down’ used ‘part’ payment
Section 13.8: Option ‘ICC Arbitration’ deleted and reverted to previous content and aligned with DUT PS version
Initial Grant Agreement, Related Grant Agreement and Extension Amendment aligned throughout
13.02.2023 - List of Parties: corrected Beneficiary Numbers: ‘Parties’ FCT, DGEG, NCBR; changed PM to POM status ANR-FR, NCBR-PL &
23.05.2023 FCT-PT; names EUSKADI-ES NER-NO; address MoE-IL;
Section 2: purpose – ‘Affiliated and Associated Partners (not signatories of the Initial Grant Agreement’ included
Section 4.2: ‘The termination of participation in the action will be the consequence for a breach by an Associated Partner’
Section 5.2: corrected for better understanding …’A Beneficiary's aggregate liability towards the other Parties collectively shall be
limited to once the EU-Top-Up For Funded Projects the Beneficiary is entitled to receive, based on the Initial Grant Agreement
and/or any Related Grant Agreements, calculated on the basis of the version of the relevant grant agreement current at the date
at which the liability is incurred. Liability under this Agreement for each Associated Partner will be zero as Associated Partners
are not entitled to receive any of the EU Financial Contribution’.
Section 6.2.3.2: deleted paragraphs that appeared twice under call specific configuration ‘Tier 2 Decision Model’; corrected
majority 60% for call specific configuration;
Section 6.3.2: added Implementation Plan (including any relevant updates);
Section 7.6.1: (ii) changed contribution of the Granting Authority based on Table 4 to 80% and 86% respectively;
Table 6/p45: deleted SWEA-SE entry; Table 7: deleted entries Welsh Gov-UK and MCID-BG both left consortium in Grant
Agreement Preparation Phase; corrected respective Totals/Sub totals;
Section 8.7: added …projects ‘recommended’ to have signed CA prior to project start
Section 11.1: added at end of paragraph ‘notwithstanding other applicable laws and regulations on confidentiality’
Section 14: Signatures pages added for all Parties, p64-p125
Attachments 1-3 added.
v3-31.01.2023/Finalised 25.05.2023
6
BETWEEN the Parties:
(PO = ”Program Owner”, PM = “Program Manager”, POM = “Program Owner & Manager”; see Definitions Section
1.1)
Beneficiary No
Supporting
Funding
Country
Partner
Partner
Beneficiary Name
Federal Ministry for Climate Action, Environment, Energy, Mobility, Innovation and
1 PO
Technology (BMK)
AT
3 PO Climate and Energy Fund (KLIEN)
2 PM Austrian Research Promotion Agency (FFG)
50 POM Fonds Innoveren en Ondernemen (FIO)
BE
4 POM Public Service of Wallonia (SPW)
5 PM Technology Agency of the Czech Republic (TA CR)
CZ 6 PO Czech Ministry of Industry and Trade (MPO)
7 PO Czech Ministry of Environment (MZP)
8 PM Projektträger Jülich | Forschungszentrum Jülich GmbH (FZJ)
DE
48 POM Saxon State Ministry for Science, Culture and Tourism (SMWK)
9 POM Innovation Fund Denmark (INNOV.FUND DK)
DK
10 POM Danish Energy Authority (DEA)
11 PO Ministry of Economic Affairs and Communications (MKM)
EE
12 PM Estonian Research Council (ETAg)
Greek Ministry for Development and Investments,
EL 13 POM
General Secretariat for Research & Innovation (GSRI)
14 PM Agencia Estatal de investigacion (AEI)
15 POM Regional Development Agency of Cantabria (SODERCAN)
Departamento de Desarrollo Económico, Sostenibilidad y Medio Ambiente. Eusko
16 POM
Jaurlaritza-Gobierno Vasco (EUSKADI)
ES
17 PM Ente Vasco de la Energía (EVE)
Foundation for the Promotion of Applied Scientific Research and Technology in Asturias
18 PM
(FICYT)
19 PM CDTI E.P.E (SCTI E.P.E.)
FI 20 POM Innovaatiorahoituskeskus Business Finland (BF)
21 POM French National Research Agency (ANR)
22 PO French Ministry of Higher Education, Research and Innovation (MESRI)
FR
23 PM Agence De l'Environnement et de la Maitrise De L'energie (ADEME)
24 POM Région Pays de la Loire (RPL)
HR 25 POM Croatian Ministry of Economy and Sustainable Development (CMESD)
HU 26 PM National Research, Development and Innovation Office (NKFIH)
27 POM Sustainable Energy Authority of Ireland (SEAI)
IE
28 POM Department of the Environment, Climate & Communications/Geological Survey Ireland(GSI)
IL 29 POM Ministry of National Infrastructure, Energy and Water Resources (MoE)
IS 30 PM The Icelandic Centre for Research (Rannís)
IS 31 POM National Energy Authority of Iceland (Orkustofnun)
32 POM Ministero dell'Università e della Ricerca (MUR)
IT 51 POM Ministry of Economic Development (MISE/MIMIT)
49 X Ricerca sul Sistema Energetico (RSE SPA)
LT 33 POM ENMIN Lithuania
v3-31.01.2023/Finalised 25.05.2023
7
Beneficiary No
Supporting
Funding
Country
Partner
Partner
Beneficiary Name
LV 34 PM Latvian Council of Science (LZP)
MT 35 POM Ministry for Education, Sport, Youth, Research and Innovation (MEYR/MCST)
36 POM Dutch Ministry of Economic Affairs and Climate (MINEZK)
NL
37 PM Dutch Research Council (NWO)
- 38 X Nordic Energy Research (NER)
39 PM The Research Council of Norway (RCN)
NO
40 POM Gassnova
PL 41 POM National Centre for Research and Development (NCBR)
42 POM Portuguese Foundation for Science and Technology (FCT)
PT
43 X Portuguese Directorate General for Energy and Geology (DGEG)
Executive Agency for Higher Education, Research, Development and Innovation Funding
RO 44 PM
(UEFISCDI)
SE 45 POM Statens energimyndighet (SWEA-STEM)
TR 46 POM The Scientific and Technological Research Council of Turkey (TUBITAK)
CY 47 POM Research and Innovation Foundation Cyprus (RIFC)
Affiliated Entity
ES 14.1 X FUNDACION ESPANOLA PARA LA CIENCIAY LA TECNOLOGIA, F.S.P. (FECYT)
FI 20.1 (X) Business Finland OY (BF OY) [Program Management Support for Business Finland]
HU 26.1 (X) EXPRESS INNOVATION AGENCY (XIA) [Program Management Support for NKFIH]
IS 31.1 X GEORG-RANNSOKNARKLASI I JARDHITA (GEORG)
BE 50.1 (X) Vlaamse gewest (VLAIO) [Program Management Support for FIO]
Associated Partner
52 POM Federal Department of the Environment, Transport (DETEC)
CH
53 POM Swiss National Science Foundation (SNF)
MA 57 POM Institut de Recherche en Energie Solaire et Energies Nouvelles (IRESEN)
55 PO DEPARTMENT FOR BUSINESS ENERGY AND INDUSTRIAL STRATEGY UK (UKRI)
UK
56 PM THE ENERGY SAVING TRUST LIMITED UK (EST)
54 POM Scottish Enterprise (SCOTENT)
hereinafter, jointly or individually, referred to as ”Parties” or ”Party” relating to the Co-funded European Partnership
entitled
Clean Energy Transition Partnership
in short
CETPartnership
hereinafter referred to as “the CETPartnership”
v3-31.01.2023/Finalised 25.05.2023
8
WHEREAS:
The Parties, having considerable experience in the field concerned, have submitted a proposal for the
CETPartnership to the European Commission as part of Horizon Europe – the Framework Programme for Research
and Innovation (2021-2027).
The Parties wish to specify or supplement binding commitments among themselves in addition to the provisions of
the specific Initial Grant Agreement 101069750 – CETPartnership signed by the Beneficiaries and the European
Commission (hereinafter “Initial Grant Agreement”).
Preamble:
WHEREAS:
A. The Clean Energy Transition Partnership is a transnational joint programming initiative to boost and accelerate
the energy transition, building upon regional and national RDI funding programmes. It builds on established
trust and positive examples of collaboration which derive from the former ERA-Nets and Joint Programming
Platforms. All SET Plan priorities and Implementation work plans can be addressed in a well defined single
programme of activities to address the broad challenges for the clean energy transition for Europe to be
effective by 2050. The Clean Energy Transition Partnership will accelerate the progress of the European Union
as well as of participating Member States and/or Associated Countries and regions through a common
understanding of challenges, key areas to be addressed and activities to support energy research and
innovation. All Parties bring together their knowledge, priorities and resources based on their energy policies,
allowing the CETPartnership to act on joint priorities of all Parties involved and concerned.
B. The common vision of the CETPartnership is already manifested in its that has been co-created in a broad
engagement process during 2020, together with the involved countries, the EU SET-Plan Implementation
Working Groups and ETIPs, all energy relevant ERA-Nets as well as the EERA joint programmes (over 500
editors, co-authors, commenters and discussants). The Strategic Research and Innovation Agenda (SRIA)
was endorsed by the European Member States and the European Commission represented by Director
General Research, Technology and Development as well as Director General Energy in November 2020. This
articulates the common goal of (1) building a transnational transformative Joint Programming Platform, (2)
developing and demonstrating technology and solutions for the transition of energy systems, and finally (3)
building innovation ecosystems that support capacity building at all levels.
C. The ambition of the CETPartnership to address key challenges of energy transition with a clear output
orientation and measurable impacts, as well as a common vision and objectives have been initially laid down
in a draft partnership proposal1, that has been published by the European Commission on the CORDIS
Website on 8th June 2020. In this first proposal EU member states and the European Commission formulated
the intention that in total at least € 500 million of national contributions are expected (on average, at least € 70
million per year) together with at least € 250 million for the CETPartnership (on average, about € 35 million per
year) to implement the CETPartnership. In total, the partnership will invest at least € 750 million (2021-2030)
in funded and non funded Transnational Projects (spending about € 75 million per year until 2030).
D. In the initial proposal for a co-funded partnerhsip action, answering the Horizon Europe Call 2021
(HORIZON-CL5-2021-D3-01-04 — Clean Energy Transition, Project: 101069750 CETP), an initial
Consortium of 70 national and regional RTDI programme owners and managers from 32 countries (26 EU
member states and 5 associated countries) delivered a work plan and indicative financial contributions for the
implementation of the first two joint calls of the partnership in 2022 and 2023 as well as to build personnel
capacities to provide a basic coordination platform until 2027. This proposal has been positively evaluated and
the CETPartnership Beneficaries have been invited by the European Commission by end of 2021 to prepare
a Grant Agreement, which finally has been signed in June 2022. In the framework of the Cluster 5 configuration
of the Horizon Europe program, member states and the European Commission have agreed to plan for
additional co-fund Actions in the Horizon Europe work programs of the coming years in order to co-fund the
annual joint call planned for the years 2024 to 2027.
1
https://ec.europa.eu/info/research-and-innovation/funding/funding-opportunities/funding-programmes-and-open-calls/horizon-
europe/european-partnerships-horizon-europe/candidates-climate-energy-and-mobility_en
v3-31.01.2023/Finalised 25.05.2023
9
E. The CETPartnership aims to regulate in this Partnership Framework Consortium Agreement (PFCA) rights and
obligations of the Parties for the whole duration of the CETPartnership until 2032, which encompass the
duration for the financial management of the last Funded Projects for an additional one (1) year.
F. The funding and implementation for the co-fund Actions will be regulated in this PFCA covering Grant
Agreement No. 101069750 as Initial Grant Agreement and anticipated subsequent Grant Agreements as
Related Grant Agreements. Related Grant Agreements are anticipated as a possible option to co-fund activities
from 2024 to 2030 (particularly RTDI projects resulting from Joint Calls) not covered by the Initial Grant
Agreement2.
THIS PARTNERSHIP FRAMEWORK CONSORTIUM AGREEMENT is based upon Regulation (EU) 2021/695 of
the European Parliament and of the Council of 28 April 2021 establishing Horizon Europe – the Framework
Programme for Research and Innovation (2021-2027), laying down its rules for participation and dissemination
(hereinafter referred to as “Horizon Europe Regulation”), and the European Commissions’ Model Grant Agreement
for Horizon Europe and its Annexes3, and is made on [DATE], hereinafter referred to as the Effective Date
NOW, THEREFORE, IT IS HEREBY AGREED AS FOLLOWS:
Section 1: Definitions
1.1 Definitions
Words beginning with a capital letter shall have the meaning defined either herein or in the Horizon Europe
Regulation or in the Grant Agreement including its Annexes.
1.2 Additional Definitions
Affiliated Entity - refers to the meaning in Article 2 and 8 of the Grant Agreement. Can have the role of a Supporting
Partner or an entity providing national / regional program management support to a Program Owner or Program
Manager.
Annual Work Program - a detailed description of planned Coordination, Management and Support Activities and
related allocation of resources for a specific year, in accordance with the Implementation Plan, including specific
goals to be achieved in the respective year (see Section 6.3.1 “Core Management Documents”).
Associated Partner - refers to the meaning in Article 2 and 9 of the Grant Agreement. They are Funding Partners
and as such Parties to this Agreement, but no Beneficiaries.
Beneficiary - a Party that is a signatory of the Initial Grant Agreement or a Related Grant Agreement, concluded
to support the implementation of the CETPartnership, and is eligible to receive EU Financial Contribution.
Budget Review Group (BRG) - composed of Governing Board Members not CETPartnership Management
Members, appointed by the Governing Board to serve as an advisor to the Governing Board in financial matters
(see Section 6 and particularly Section 6.3.3).
Call Management (CAM) - the Coordination Body that has been established by the consortium to coordinate on
the development and implementation of Joint Calls. Parties that are Work Package and Task Leaders according to
Work Package 2 of the Implementation Plan. The CAM is collaborating with the responsible counterparts in the
Transition Initiative Managements, organised in the Call Management Team, lead by the CAM (see Section 6 and
particularly Section 6.3.7).
Call Modules - the building blocks of a Joint Call, as developed by different Transition Initiatives.
2
Another anticipated option to co-fund activities from 2024 to 2030, that are not covered by the Initial Grant Agreement, are Extension
Ammendments to the Initial Grant Agreement, to be proposed by the consortium by answering Calls in Horizon Europe.
3
HE MGA v1.1 15.04.2022
v3-31.01.2023/Finalised 25.05.2023
10
Call Partner - Funding Partner who collaborates in a specific Joint Call.
CETPartnership Management - a Consortium Body comprising the Transition Initiative Managements (Task and
Sub-Task Leaders according to Work Package 3 of the Implementation Plan) and the Coordination Bodies (see
Section 6).
Co-funded Joint Calls - are Joint Calls resulting in projects that are intended to be co-funded by the Granting
Authority (see also “EU-Top-Up for Funded Projects”) and thus are organised strictly according to the rules
determined by the respective Grant Agreement and/or Amendment covering the respective Joint Call.
Communication Office (COO) - the Coordination Body that has been established by the consortium to coordinate
on the external communication and to serve as the initial contact of the CETPartnership. Parties that are Work
Package and Task Leaders according to Work Package 4 of the Implementation Plan. The COO is collaborating
with the responsible counterparts in the Transition Initiative Managements, organised in the Communication
Management Team, lead by the COO (see Section 6, particularly 6.1 “CETPartnership Management”).
Consortium Body - any body described in the Governance Structure (Section 6.1) of this Partnership Framework
Consortium Agreement.
Coordination (COR) - the Coordination Body that has been established by the consortium to coordinate the
Transition Initiatives in strategic matters, to coordinate and support the CETPartnership Management in all
operational and internal communication matters (including financial and contract management, data management
and partnership monitoring), and to coordinate on European and international cooperation with other partnerships
and initiatives. Parties that are Work Package and Task Leaders according to Work Package 1 of the
Implementation Plan. The COR is collaborating with the responsible counterparts in the Transition Initiative
Managements, organised in Management Teams (see Section 6 and particularly Section 6.1 “CETPartnership
Management”).
Coordination Bodies - are part of the CETPartnership Management (see Section 6.1) and are described by related
Work Packages in the Implementation Plan. Coordination (COR, described in Work Package 1 of the
Implementation Plan), Call Management (CAM, described in Work Package 2 of the Implementation Plan),
Communication Office (COO, described in WP 4 of the Implementation Plan), Knowledge Community Management
(KCM described in Work Package 5 of the Implementation Plan) and Impact Network Management (INM described
in Work Package 6 of the Implementation Plan).
Coordination Body Lead - the Party that is the Work Package Leader of the respective work package in the
Implementation Plan, acting as responsible contact to the Coordinator for a Coordination Body.
Coordination Cost - cost for Coordination, Management and Support Activities. They are expressed in detail in
the Implementation Plan, the Annual Work Programs and the Annual Management Reports (see Section 6.3.1).
Coordination, Management and Support Activities - activities carried out by the CETPartnerhip Management
and contributing Parties for the benefit of the Parties and the whole network in order to enable the collaboration
according to the CETPartnership goals and to implement the CETPartnership concept as formulated in the
Implementation Plan (Sections “Excellence” and “Impact”). Such activities are explicitly expelled in the Work
Package and task descriptions in the Implementation Plan (Section “Quality and Efficiency of the Implementation”)
as well as in the Annual Work Programs.
Coordinator - the Party acting as the intermediary between the Parties and the Granting Authority as well as the
intermediary between the Governing Board and the CETPartnership Management, being responsible to organise
the efficient implementation of Governing Board decisions (see Section 6, “Governance Structure”).
Defaulting Party - a Party that the Governing Board has identified to be in breach of this Partnership Framework
Consortium Agreement and/or the Grant Agreement as specified in Section 4.2.
EU Financial Contribution - the financial contribution of the European Commission as Granting Authority to
implement the CETPartnership, comprising contributions according to funding provided from Funding Partners to
Project Participants, according to Coordination Cost and according to Parties’ Own Management Expenses (see
Section 7.1.1).
EU-Top-Up For Funded Projects - the remaining EU Financial Contribution from the Granting Authority, after
deduction of the Coordination Costs and EU Financial Contribution for Parties’ Own Management Expenses to be
distributed among the Parties as according to
v3-31.01.2023/Finalised 25.05.2023
11
- the financial contribution the Party provides to Project Participants, as claimed to the Initial Grant
Agreement or any of the Related Grant Agreements and approved by the Granting Authority
and
- the Mixed Mode Funding Model that applies according to Section 8 (see Section 7.1.1 and 7.5).
EU-Top-Up Balancing Pot - a fraction of the EU-Top-Up For Funded Projects that is used for Gap Filling according
to the Mixed Mode Funding Model (see also “Gap Filling” and “Mixed Mode Funding Model”; see Section 8).
Extension Amendment - is an amendment to the Grant Agreement No. 101069750, serving as a follow-up
agreement with the Granting Authority to co-fund activities that are not covered by the Initial Grant Agreement (in
particular additional Joint Calls).
External Experts - evaluators asked by the CETPartnership to assess the Funded Projects. They are expected to
be independent as they are not employees or under direct supervision of any of the Funding Partners.
Independent Expert Panel - the board of independent experts evaluating proposals of the Joint Calls.
Final List of Projects To Be Funded - the list of projects that the Governing Board finally decides to be funded,
based on the ranking list(s) as established by the External Experts. With this decision, the involved Funding
Partners guarantee the funding for these projects.
Funding Agency - a national or regional agency responsible for providing the national share of funding for the
Funded Projects.
Funding Partner - a national or regional body, which may be or may not be a Party to this Partnership Framework
Consortium Agreement and is responsible for providing the national/regional share of funding for the Funded
Projects.
Funded Project - a project selected for funding in the Joint Calls. This includes transnational projects Co-funded
by the Granting Authority as well as not co-funded projects.
Gap Filling - utilisation of a pre-defined portion of EU-Top-Up For Funded Projects as a EU-Top-Up Balancing Pot
in Co-funded Joint Calls, to fill funding gaps from Call Partners’ National/Regional Financial Contribution, so as to
follow the ranking list(s) provided by the Independent Expert Panel(s). Reason being, the consortium aiming to use
as much as possible of the National/ Regional Financial Contributions and the EU Financial Contribution to fund as
many projects as possible, following the ranking list(s) (see also “EU-Top-Up Balancing Pot” and “Mixed Mode
Funding Model”; see Section 8).
General Assembly (GEA) - a forum for all Parties that are collaborating in the CETPartnership and/or contributing
to the implementation of Coordination, Management and Support Activities. It is not a decision-making body, but a
forum for information and exchange, to help to ensure transparency of activities, progress and decisions, laying the
foundation to find consensus among all Parties. Meetings are organised back-to-back with Governing Board
meetings (see Section 6 and particularly Section 6.3.5).
Glossary - a section in the Implementation Plan that contains explanations with all relevant CETPartnership specific
terms, definitions and abbreviations.
Governing Board (GOB) - the ultimate decision-making Consortium Body (see Section 6.3.2).
Governing Board Configuration - a subset of Parties represented in the Governing Board according to 6.3.2.1,
corresponding to different categories of decisions to be taken (see Section 6.3.2.3).
Governing Board Plenary - all Governing Board Members represented according to 6.3.2.1
Grant Agreement - any Grant Agreement and its Annexes established between the Granting Authority and the
Beneficiaries. This includes the Initial Grant Agreement (Grant Agreement No. 101069750 – CETP) and any
subsequent Related Grant Agreement concluded to support the implementation of the CETPartnership.
It is expressly noted that Parties to this Partnership Framework Consortium Agreement will not necessarily be
signatories to all Grant Agreements that might be concluded with the Granting Authority to support the
implementation of the CETPartnership and that the adoption of a Related Grant Agreement including the accession
of new Beneficiaries of these Grant Agreements to this Partnership Framework Consortium Agreement needs the
active decision of the pre-existing consortium.
v3-31.01.2023/Finalised 25.05.2023
12
Granting Authority - the body awarding the grant to support the implementation of the CETPartnership, i.e. the
European Commission.
Highly Detrimental Situation - a situation that may arise if the funding decision agreed among Parties, and
occurring after the Ranking List is established by the Independent Expert Panel, leads to the loss of more than 20%
of the EU Financial Contribution.
Impact Network Management (INM) - the Coordination Body that has been established by the Consortium to
coordinate on activities related to maximising exploitation and impact. Parties that are Work Package Leaders and
Task leaders according to Work Package 6 of the Implementation Plan. The INM is collaborating with the
responsible counterparts in the Transition Initiative Managements, orgnaised in the Impact Management Team,
lead by INM (see Section 6.1 “CETPartnership Management”).
Implementation Plan - a Core Management Document (see Section 6.3.1). It shall describe the long term planning
of the CETPartnership beyond the Initial Grant Agreement. It shall be approved by the Governing Board and be
revised every two years or/and in accordance with the acknowledgement of Related Grant Agreements. In that
respect it is a concise documentation of decisions taken by the Governing Board in relation to the long term
planning, particularly including the budgeting (see Section 7.6). The Coordinator together witht the CETPartnership
Management will ensure compliance of the Implementation Plan with the Initial Grant Agreement and the Related
Grant Agreements. Furthermore the Coordinator together with the CETPartnership Management will ensure
consistency with all other Core Management Documents. In cases where updates in the Implementation Plan may
require updates of Grant Agreement data, in the course of the reporting to the Granting Authority, the Coordinator
will take action accordingly. In cases where changes in the Implementation Plan would trigger amendments to the
Initial Grant Agreement or a Related Grant Agreement, the Coordinator will take action to confirm these changes
with the involved Beneficiaries of the affected Grant Agreement as well as with the Granting Authority. Such
changes can by nature only become binding as accepted by the Parties and the Granting Authority (see also “Initial
Implementation Plan”; see Section 6.3.1).
Initial Grant Agreement - the specific Grant Agreement arising from the initial proposal for a co-funded partnership
action, answering the Horizon Europe Call 2021 (HORIZON-CL5-2021-D3-01-04 — Clean Energy Transition,
Project: 101069750 CETP) and its annexes, established between the EC as Granting Authority and Parties of the
CETPartnership Consortium (see also “Grant Agreement” and “Extension Amendment”).
Initial Implementation Plan (Implementation Plan v1.0) – consists of Annex 1 - Description of the Action (part A
and part B) and Annex 2 - Estimated budget for the action of the Initial Grant Agreement, supplemented by the
long-term budget calculations in Section 7.6.1 (i) „Typical Annual Coordination Cost“ and (ii) „Distribution of
Coordination Cost over years and Grant Agreements“ of this Partnership Framework Consortium Agreement (see
also “Implementation Plan”).
Institutional Couple - two Parties managing the same budget or programme to provide the National/Regional
Financial Contribution (usually Program Owner and Program Manager), sharing one vote.
Joint Call - the call in a specific year for collaborative proposals for Research, Development and Innovation (RDI)
projects, which are organised jointly by Parties (Call Partners) and represents the main objective of the
CETPartnership.
Knowledge Community Management (KCM) - the Coordination Body that has been established by the
Consortium to coordinate on activities related to knowledge creation, exchange and management. Parties that are
Work Package and Task Leaders according to Work Package 5 of the Implementation Plan. The KCM is
collaborating with the responsible counterparts in the Transition Initiative Managements, organised in the
Knowledge Community Management Team, lead by KCM.
Management Team - configuration of the CETPartnership Management to organise the interaction between the
Coordinator, the Coordination Bodies and the Transition Initiatives.
Mixed Mode Funding Model - a method applied for the distribution of the EU Top-Up For Funded Projects, which
will be used in the Co-Funded Joint Calls. It follows the principles set in Section 8 of this Partnership Framework
Consortium Agreement to fund as many projects as possible from the ranking list of projects, established by the
Independent Expert Panel(s), by utilising a part of the EU Financial Contribution as EU-Top-Up Balancing Pot for
Gap Filling (see also “EU –Top-Up-Balancing Pot” and “Gap Filling”; see Section 8).
v3-31.01.2023/Finalised 25.05.2023
13
National/Regional Financial Contribution - a Party’s financial support to transnational projects. For Beneficiaries
it is eligible to be co-funded by the Granting Authority. The Party in its role as a Program Manager provides these
funds to Funded Projects from their own funds or the funds of their Program Owners. Initial figures are shown in
section 7.6.3 of this Partnership Framework Consortium Agreement. At the beginning of the planning of a Joint
Call, actual figures shall be announced by the involved Funding Partners in the Annual Work Program for the year
the Joint Call is planned to be launched. Updated figures shall be included in the Joint Call text as information for
the applicants. Further updates of the figures will result from the Final Lists of Projects To Be Funded as well as
from the annual project monitoring.
Needed -
For the implementation of the CETPartnership:
Access Rights are Needed if, without the grant of such Access Rights, carrying out the tasks assigned to the
recipient Party would be technically or legally impossible, significantly delayed, or require significant additional
financial or human resources.
For exploitation of own Results:
Access Rights are Needed if, without the grant of such Access Rights, the Exploitation of own Results would be
technically or legally impossible.
For Parties’ Own Management Expenses
Remuneration is Needed if, without such remuneration representatives of the Party would not be able to fulfil their
obligations to participate in the meetings of the Governing Board, the meetings for Transition Initiatives Level 1
Project Participants according to the Implementation Plan or/and to contribute to “Standard Activities” as outlined
in the Implementation Plan to a minimum of 10 person months per Joint Call.
Party or Parties - the organisation(s) that join the consortium irrespective of the type of their participation in a Grant
Agreement. However, it is expressly noted that Subcontractors, Affiliated Entities or third parties on behalf of a
Beneficiary as laid down in the Grant Agreement(s) cannot join the CETPartnership consortium and are, therefore,
not considered a Party to this Partnership Framework Consortium Agreement.
Parties’ Own Management Expenses – are expenses of Funding Partners to participate in the CETPartnership
activities, decribed as “Standard Activities” in the Initial Grant Agreement and in the Implementation Plan. They are
expected to be in-kind contributions from the Party, but can be claimed for EU Financial Contribution, as needed
(see Section 7.1.1 and 7.5).
Program Manager (PM) - a Party managing a given program aimed at providing funding to different kind of
organisations (third parties) in order to support defined activities, especially Research and Development activities
in the frame of this Partnership Framework Consortium Agreement. A Program Manager is directly transferring the
National/Regional Financial Contribution to third parties that are participating in a Funded Project. A Program
Manager is managing a program on behalf of a Program Owner that may be or may not be a Party to this Partnership
Framework Consortium Agreement. Decisions of this Party relevant for the CETPartnership, particularly on
National/Regional Financial Contributions for a particular Joint Call, can only be taken in accordance with the
Program Owner.
Programme Managers Handbook - a handbook that describes milestones and guidance for Call Partners for a
specific Joint Call, for a coordinated approach to the preparation and implementation of the Joint Call.
Program Owner (PO) - a designated National/Regional Funding Partner fully responsible of a given program aimed
at providing funding, especially National/Regional Financial Contribution to Funded Projects in the frame of this
Partnership Framework Consortium Agreement. A Program Owner can manage itself the program or entrust a third
party to manage it but remains responsible for its funding.
Program Owner & Manager (POM) - a Program Owner that at least partly manages itself the program. Particularly
it can take its own decisions on the National/Regional Financial Contribution to a specific Joint Call while at the
same time is directly transferring the National/Regional Financial Contribution to third parties that are participating
in a Funded Project.
Project Participant - a third party participating in a Funded Project; refers to the meaning in Article 2 of the Grant
Agreement.
v3-31.01.2023/Finalised 25.05.2023
14
Related Grant Agreement - any other Grant Agreement than the Initial Grant Agreement that will be concluded
with the Granting Authority in order to co-fund and/or support the implementation of the CETP Partnership. Such
Grant Agreements become Related Grant Agreements if they are acknowledged by the pre-existing Parties by
decision of the pre-existing Governing Board; at the time of such Grant Agreements entry into force and all Parties
of the Grant Agreement enter into this Partnership Framework Consortium Agreement (see Section 3.2; see also
“Grant Agreement” and “Initial Grant Agreement”).
Result - all technical and/or scientific information and knowledge, whether or not protectable and/or protected by
an intellectual property right, including know-how, trade secrets, manufacturing secrets, data, databases, software,
files, materials, plans, diagrams, drawings, formulas or any other type of information, in any form whatsoever, and
all rights related thereto, developed by one or more Partners under the Project. Results may be Own Results or
Joint Results. New Software and joint new software are Results within the meaning of this definition.
Strategic Research and Innovation Agenda (SRIA) - describes the objectives and expected impacts of the
CETPartnership, as well as the Research Development and Innovation challenges to be addressed. It mirrors its
highly transformative ambition to foster challenge driven research, development and innovation that stimulate
transition and amplify the cooperation of research with “problem owners“ or “need owners” (potential buyers,
procurers and users of solutions), delivering to the EU climate ambition and the new European Research Area as
higher level policy goals and builds interfaces on European and international level (published and endorsed in
November ‘20 https://eranet-smartenergysystems.eu/global/images/cms/CETP/CETP_SRIA_v1.0_endorsed.pdf .
Supporting Partner - carries out Coordination, Management and Support Activities according to the
Implementation Plan but is not a Funding Partner. It can be a Beneficiary and signatory of the Grant Agreement, or
an Affiliated Entity.
Transition Initiative (TRI) - a topic specific configuration of the Parties, related to the challenges identified in the
Strategic Research and Innovation Agenda. The TRIs are responsible for development of respective Call Modules
for the annual Joint Calls, communication with stakeholders in their field on national level, and coordination with
stakeholder groups and other partnerships on European level (see Section 6.3.4).
Transition Initiative Management (TRI Management) - the Task and Sub-Task Leaders according to Work
Package 3 of the Implementation Plan, lead by the TRI Leading Expert and operatively supported by the TRI Office.
TRI Management Lead - the TRI Leading Expert together with the TRI Office.
TRI Leading Expert - a person that has expertise in the field, the Transition Initiative is working in and is taking
responsibility for the strategic lead of the Transition Initiative.
TRI Office - a Party, its Affiliated Entity or Subcontractor that provides operative support to the TRI Leading Expert
and the Parties participating in the Transition Initiative, e.g. in coordination, communication, organisation of
meetings, work- and resource planning.
Work Package - a defined set of activities, lead by a single Party (“Work Package Lead”), typically broken down in
tasks and sub-tasks, which might be shared with other Parties (“Task Leader”, “Sub-Task Leader”) and with one or
more associated Deliverables as defined in the Implementation Plan.
Section 2: Purpose
The purpose of this Partnership Framework Consortium Agreement is to specify with respect to the
implementation of the CETPartnership the relationship among the Parties, in particular concerning the
organisation of the work between the Parties, the CETPartnership Management and the rights and obligations of
the Parties concerning inter alia liability, Access Rights and dispute resolution, Financial Provisions and Call
Implementation. The Partnership Framework Consortium Agreement is concluded among the Parties signing the
Initial Grant Agreement with the Granting Authority, arising from the first proposal for a co-funded partnership
action, answering the Horizon Europe Call 2021 (HORIZON-CL5-2021-D3-01-04 — Clean Energy Transition,
Project: 101069750 CETP), Affiliated and Associated Partners (not signatories of the Initial Grant Agreement).
Furthermore, the pre-existing Parties may agree to include any other Grant Agreement that will be concluded with
the Granting Authority under the Horizon Europe programme in order to co-fund and support the implementation of
the CETPartnership. Such Grant Agreements become Related Grant Agreements and therefore, subject of this
v3-31.01.2023/Finalised 25.05.2023
15
Partnership Framework Consortium Agreement, if the pre-existing Parties acknowledge them by decision of the
pre-existing Governing Board, at the time of such Grant Agreements entering into force and all Parties of the Grant
Agreement enter into this Consortium Agreement. All signatories of any Related Grant Agreement will be expected
to enter this Partnership Framework Consortium Agreement.
It is expressly noted that Parties will not necessarily be signatories to all Grant Agreements that will be concluded
with the Granting Authority to support the implementation of the CETPartnership and that the adoption of a Related
Grant Agreement including the accession of new Beneficiaries of these Grant Agreements to this Partnership
Framework Consortium Agreement needs the active decision of the pre-existing consortium.
For the avoidance of doubt, this Partnership Framework Consortium Agreement is limited to the CETPartnership.
The consortia of the Funded Projects under the CETPartnership have to execute separate consortium agreements
in accordance with their specific needs and based under their national/regional provisions. The Knowledge
Community and the Impact Network to be organised by the CETPartnership (see Section 6.1) will include
collaboration partners of the CETPartnership that are also not covered by this Partnership Framework Consortium
Agreement.
Section 3: Entry into force, duration and termination
3.1 Entry into force
An entity becomes a Party to this Partnership Framework Consortium Agreement upon signature of this Consortium
Agreement by a duly authorised representative.
This Partnership Framework Consortium Agreement shall take effect from the Effective Date identified at the
beginning of this Partnership Framework Consortium Agreement.
An entity becomes a new Party to the Partnership Framework Consortium Agreement upon signature of the
accession document (Attachment 2) by the new Party and the Coordinator. Such accession shall have effect from
the date identified in the accession document.
A Partner who has not yet signed this Partnership Framwork Consortium Agreement shall neither be entitled to
vote nor to receive any EU Financial Contribution.
3.2 Duration and termination
This Partnership Framework Consortium Agreement shall continue in full force and effect until complete fulfilment
of all obligations undertaken by the Parties under the Initial Grant Agreement arising from the proposal for a co-
funded partnership action, responding to the Horizon Europe Call 2021 (HORIZON-CL5-2021-D3-01-04 — Clean
Energy Transition, Project: 101069750-CETP) as well as the subsequent anticipated Related Grant Agreements
(see Section 2) and under this Partnership Framework Consortium Agreement. Furthermore, it shall continue in full
force and effect until complete fulfilment of all obligations undertaken by the Parties under any other Related Grant
Agreement.
However, this Partnership Framework Consortium Agreement, or the participation of one or more Parties to it, may
be terminated in accordance with the terms of this Partnership Framework Consortium Agreement.
This Partnership Framework Consortium Agreement shall automatically terminate in respect of the affected
Party/ies, if
- the Initial Grant Agreement is not signed by the Granting Authority or a Beneficiary, or
- the Initial Grant Agreement or any of the Related Grant Agreements is terminated, the Party has been
Beneficiary to this Grant Agreement and the Party is not Beneficiary to any other of the relevant Grant
Agreements (i.e the Initial Grant Agreement or a Related Grant Agreement) in force, or
- if a Party’s participation in the Initial Grant Agreement or any of the Related Grant Agreements as a Beneficiary
is terminated, and the Party is not participating as a Beneficiary in any other of the relevant Grant Agreements
(i.e the Initial Grant Agreement or a Related Grant Agreement) in force,
subject to the provisions surviving the expiration or termination under Section 3.3.
v3-31.01.2023/Finalised 25.05.2023
16
For the avoidance of doubt - this means in detail:
• In the case that only the Initial Grant Agreement is concluded and no Related Grant Agreement is in force,
this Partnership Framework Consortium Agreement shall continue in full force and effect until complete
fulfilment of all obligations undertaken by the Parties under the Initial Grant Agreement.
• In case that a Related Grant Agreement has a later termination date than the Initial Grant Agreement, this
Partnership Framework Consortium Agreement shall continue in full force and effect until complete
fulfilment of all obligations undertaken by the Parties under this Related Grant Agreement.
• For Parties that are not a Beneficiary to a Related Grant Agreement this Partnership Framework
Consortium Agreement shall automatically terminate if the Beneficiary’s participation in the Initial Grant
Agreement is terminated or the Initial Grant Agreement is terminated, subject to the provisions surviving
the expiration or termination under Section 3.3.
• For Parties that are Beneficiary to a Related Grant Agreement, this Partnership Framework Consortium
Agreement shall automatically terminate if the Beneficiary’s participation in the Related Grant Agreementis
terminated or the Related Grant Agreement is terminated, as long as the Party is not Beneficiary of the
Initial Grant Agreement or another Related Grant Agreement still in force, subject to the provisions
surviving the expiration or termination under Section 3.3.
• There is no automatic termination for Associated Partners other than the termination of this Partnership
Framework Consortium Agreement.
If a Beneficiary’s participation in the Initial Grant Agreement or any of the Related Grant Agreements/ is terminated,
the leaving Beneficiary shall do its utmost to limit the consequences for the CETPartnership. Wherever possible, it
shall honour all its obligations to third parties in Transnational Projects, as well as financial commitments explicitly
made acoording to the Final List of Projects To Be Funded. The same shall apply for an Associated Partner if its
participation in the execution of the Implementation Plan is terminated.
3.3 Survival of rights and obligations
The provisions relating to Access Rights, Confidentiality, for the time period mentioned therein, as well as for
Liability, Applicable law and Settlement of disputes as well as financial rules agreed in Sections 7.7 and 7.9.3 shall
survive the expiration or termination of this Partnership Framework Consortium Agreement.
Termination shall not affect any rights or obligations of a Party leaving the Consortium incurred prior to the date of
termination, unless otherwise agreed between the Governing Board and the leaving Party. This includes the
obligation to provide all input, deliverables and documents for the period of the Party’s participation.
Section 4: Responsibilities of Parties
4.1 General principles
Each Party undertakes to take part in the efficient implementation of the CETPartnership, and to cooperate, perform
and fulfil, promptly and on time, all of its obligations under the Grant Agreement if applicable and this Partnership
Framework Consortium Agreement as may be reasonably required from it and in a manner of good faith as
prescribed by Belgian law.
Each Party undertakes to notify promptly the other Parties, in accordance with the Governance Structure in section
6, any significant information, fact, problem or delay likely to affect its role, tasks or duties in the CETPartnership.
Each Party shall promptly provide all information reasonably required by a Consortium Body or by the Coordinator
to carry out its tasks, provided that the respective Party is not prevented by statutory law or by regulations with a
third party, which existed prior to the start of the CETPartnership. It is expressly noted, that this Partnership
Framework Consortium Agreement has been closed under the assumption, that no such law or regulation is
contradicting the provision of information reasonably required by a Consortium Body or by the Coordinator to carry
out its tasks. In case that this would apply, each Party commits explicitely to inform the Coordinator without delay.
Each Party shall take reasonable measures to ensure the accuracy of any information or materials it supplies to
the other Parties.
v3-31.01.2023/Finalised 25.05.2023
17
The obligations under the following articles of the Grant Agreement will apply to the Associated Partners: Articles
9.1 (Associated Partners), 11 (proper implementation), 12 (conflict of interests), 13 (confidentiality and security), 14
(ethics and values), 17.2 (visibility), 18 (specific rules for carrying out the action), 19 (information obligations) and
20 (record-keeping), as well as related regulations of Annex 5 to the Grant Agreement.The Associated Partners will
also ensure that the bodies mentioned in Article 25 of the Grant Agreement (e.g. Granting Authority, OLAF, Court
of Auditors (ECA)) can exercise their rights also towards them. The Associated Partners support the Beneficiaries
regarding their exploitation, dissemination and Open Science obligations and commit to contribute to the technical
and continuous reporting during and after the implementation of the CETPartnership. Any Associated Partner from
a non EU-country undertakes to comply additionally with any other obligation arising from Article 10.1 of the Grant
Agreement. Should the Associated Partner(s) be obliged to sign a separate agreement concerning its funding for
the Project, it is the responsibility of the Associated Partner to ensure such agreement is not in conflict with this
Partnership Framework Consortium Agreement.
4.2 Breach
In the event that the Governing Board identifies a substantial breach by a Party, other that the Coordinator, of its
obligations under this Partnership Framework Consortium Agreement or the Initial Grant Agreement or any of the
Related Grant Agreements, if any of the named Grant Agreements is applicable to the Party (e.g. improper
implementation of the CETPartnership), the Coordinator will give formal notice to such Party requiring that such
breach will be remedied within 30 calendar days from the date of receipt of the written notice by the Party. If such
substantial breach is not remedied within that period or is not capable of remedy, the Governing Board may decide
to declare the Party to be a Defaulting Party and may decide on the consequences thereof, which may include
termination of its participation.
In the event that the Governing Board identifies a breach by the Coordinator of its obligations under this Partnership
Framework Consortium Agreement or the Initial Grant Agreement or any of the Related Grant Agreements and/or
(e.g. improper implementation of the CETPartnership), the Governing Board will appoint a Party that will give formal
notice to the Coordinator requiring that such breach will be remedied within 30 calendar days from the date of
receipt of the written notice by this Party. If such breach is substantial and is not remedied within that period or is
not capable of remedy, the Governing Board may decide to declare the nomination of a new Coordinator and to
decide on the consequences thereof, which may include termination of its tasks, duties and obligations.
All terminations are subject to and without prejudice to the necessary consent and rights of the Granting Authority
pursuant to the Initial Grant Agreement or any of the Related Grant Agreements. The termination of participation in
the action will be the consequence for a breach by an Associated Partner.
4.3 Involvement of third parties, procurement on behalf of the consortium
Any Party that involves third parties (including but not limited to Affiliated Entities, Subcontractors or other third
parties) in the CETPartnership remains responsible for carrying out its relevant part of the CETPartnership and for
such third party’s compliance with the provisions of this Partnership Framework Consortium Agreement and of the
Initial and Related Grant Agreements. Such Beneficiary has to ensure that the involvement of third parties does not
affect the rights and obligations of the other Parties and the Initial and Related Grant Agreements.
In order to comply with the regulations of the Granting Authority, Beneficiaries must base their subcontracts or
purchases according to the principles for best value for money and absence of any conflict of interest (according to
Article 6.2 and 9.3 of the European Commissions’ Model Grant Agreement for HORIZON Action Grant Budget-
Based and its Annexes). Beneficiaries that are ‘contracting authorities’ or ‘contracting entities’ (within the meaning
of the EU public procurement Directives 2004/18/EC and 2004/17/EC or any EU legislation that replaces these
Directives) must moreover comply with the applicable national law on public procurement.
If a Party that contributes to the CETPartnership Mangement (see Section 6) involves a third party as Subcontractor,
which is not an Affiliated Entity to the Party, to fulfil a task or part of a task to implement Coordination, Management
and Support Activities as described in the CETPartnership Implementation Plan (excluding limited purchasing of
e.g. logistics for meetings as well as for ICT support below 20,000 € per year), and expecting remuneration to the
full extent of these expenses as “Coordination Cost” (see Section 7.5), the following shall apply:
- the Party must notify such involvement to the other Parties. The notification shall contain at least the name,
the address and the activity of the third party.
v3-31.01.2023/Finalised 25.05.2023
18
- The Party shall conduct an appropriate market investigation and take advantage of all tariff-related
customer benefits (volume and time discounts, cash discounts, bonuses and the like) and credit these in
full to the cost settlement. The settlement shall be made at the net-net price, i.e. after deduction of all
discounts granted (rebates, bonuses, discounts) as well as the intermediary commission plus the
respective value-added tax.
- In case the Party is ‘contracting authority’ or ‘contracting entity’ (within the meaning of the EU public
procurement Directives 2004/18/EC and 2004/17/EC or any EU legislation that replaces these Directives)
must moreover comply with the applicable national law on public procurement.
If not otherwise agreed, procurement on behalf of the whole consortium shall be coordinated and carried out entirely
by the Coordinator under Austrian procurement law. The Coordinator will sign the resulting contracts on behalf of
the consortium.
4.4 Specific responsibilities regarding data protection
Where necessary, the Parties shall cooperate in order to enable one another to fulfil legal obligations arising under
applicable data protection laws (the Regulation (EU) 2016/679 of the European Parliament and of the Council of
27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free
movement of such data and relevant national data protection law applicable to said Party) within the scope of the
performance and administration of the CETPartnership and of this Partnership Framework Consortium Agreement.
In particular, the Parties shall, where necessary, conclude a separate data processing, data sharing and/or Joint
Controller Agreement before any data processing or data sharing takes place, in accordance with the Data
Management Plan as requested by the Granting Authority (see Section 6, “ Management Documents”).
Any transfer of data relevant to GDPR outside of the EU/EEA shall always take place in compliance with GDPR
and relevant data protection legislation. In which case, each Party shall implement appropriate measures that can
meet the EU’s data protection standards, such as adaequacy decisions, standard contractual clauses (SCCs),
binding corporate rules (BCRs), derogations (art. 49 GDPR), DPIAs certification mechanisms, codes of conduct,
etc.
Section 5: Liability towards each other
5.1 No warranties
In respect of any information or materials (incl. Results and Background) supplied by one Party to another under
the CETPartnership, no warranty or representation of any kind is made, given or implied as to the sufficiency or
fitness for purpose nor as to the absence of any infringement of any proprietary rights of third parties.
Therefore,
- the recipient Party shall in all cases be entirely and solely liable for the use to which it puts such information and
materials, and
- no Party granting Access Rights shall be liable in case of infringement of proprietary rights of a third party resulting
from any other Party (or its Affiliated Entities) exercising its Access Rights.
However, each Party shall promptly inform the other Parties of any claims of third parties that come to their
knowledge.
5.2 Limitations of contractual liability
All Parties are responsible for any damages or losses resulting from their own respective failure to comply with the
rules and commitments made under this agreement.
No Party shall be responsible to any other Party for any indirect or consequential loss or similar damage such as,
but not limited to, loss of profit, loss of revenue or loss of contracts, except in case of breach of confidentiality.
A Party’s aggregate liability towards the other Parties collectively shall be limited to once the Party’s share of the
total costs of the EC Financial Contribution received or to the amount of funds received by this Party for their work
under this agreement (e.g. their role according to the Implementation Plan) or the Grant Agreement. For Associated
v3-31.01.2023/Finalised 25.05.2023
19
Partners, due to the fact that they do not receive any funds under this agreement or the Grant Agreement, no
remaining liability would be expected from them.3
In order to limit the potential damage to any Party, the Coordinator, or FFG on behalf of the Coordinator, shall
create a Reserve Fund of 5% of all amounts of the EC Financial Contribution received, which shall be used to pay
for any damages not covered by the procedures mentioned in this Section 5.2. This Reserve Fund shall be treated
as part of the Juste Retour of the EC Financial Contribution and distributed together with the final payments to the
Partners in the Reporting Period 5 (see Table 2, Section 7.4). No contribution to this Reserve Fund shall be required
from the Associated Partners.
5.3 Damage caused to third parties
Each Party shall be solely liable for any loss, damage or injury to third parties resulting from the performance of the
said Party’s obligations by it or on its behalf under this Partnership Framework Consortium Agreement or from its
use of Results or Background.
5.4 Force Majeure
No Party shall be considered to be in breach of this Partnership Framework Consortium Agreement if it is prevented
from fulfilling its obligations under the Partnership Framework Consortium Agreement by Force Majeure as defined
in Art. 35 of the Grant Agreement.
Each Party shall notify the Chairperson of the Governing Board of any Force Majeure without undue delay. If the
consequences of Force Majeure for the CETPartnership are not overcome within six weeks after such notice, the
transfer of tasks - if any - shall be decided by the Governing Board.
Section 6: Governance structure
6.1 General structure
The organisational structure of the Consortium shall comprise the following Consortium Bodies (in coherence with
the Management Structure described in the Implementation Plan, Section 6):
v3-31.01.2023/Finalised 25.05.2023
20
• Governing Board (GOB) as the ultimate decision-making body of the consortium. The GOB meets and
takes decisions in plenary or in different Governing Board Configurations according to the different
categories of decisions to be taken, as described in Section 6.3.2.
All other Consortium Bodies act based on consensus. In case that consensus in another Consortium Body
cannot be reached, any member of this Consortium Body can call to escalate the issue to the GOB.
• Budget Review Group (BRG) appointed by the Governing Board, consisting of Governing Board
Members, shall serve as an advisory board to the GOB in financial matters (see also Section 6.3.3).
• Transition Initiatives (TRIs) as the thematic configurations of the Funding Partners. The TRIs shall be
composed of Funding Partners in any composition that reflects the interest of funding to work
collaboratively on particular Research Development and Innovation challenges as outlined in the SRIA
(see also Section 6.3.4).
• General Assembly (GEA) as a forum for all Parties that are collaborating in the CETPartnership (see also
Section 6.3.5) and/or contributing to the implementation of Coordination, Management and Support
Activities. It is not a decision-making body, but a forum for information and exchange, to foster
transparency of activities, progress and decisions, laying the foundation to find consensus among all
Parties. Meetings are organised back-to-back with GOB meetings.
• Coordinator as a Party being the legal entity acting as the intermediary between the Parties and the
Granting Authority as well as the intermediary between the GOB and the CETPartnership Management,
being responsible to organise the efficient implementation of GOB decisions. The Coordinator shall, in
addition to its responsibilities as a Party, perform the tasks assigned to it as prescribed in the Initial and
Related Grant Agreements and this Partnership Framework Consortium Agreement and described in
detail in the Implementation Plan (see also Section 6.3.6).
• Co-coordinator as a Party closely collaborating with the Coordinator, co-representing the
CETPartnership on European level (e.g. Horizon Europe Program Committee, SET-Plan Steering Group),
in the interaction with other partnerships, initiatives and organisations as well as in the chairing of meetings
(see Section 6.2.2). The Co-coordinator shall, in addition to its responsibilities as a Party, perform the
tasks assigned to it as prescribed in this Partnership Framework Consortium Agreement and described in
the Implementation Plan (Task 1.5: Coordination of European and international cooperation with other
partnerships and initiatives) and the related Annual Work Programs.
• CETPartnership Management comprising the
TRI Managements meaning Parties being Task and Sub-Task Leaders according to Work Package 3
(TRIs) of the Implementation Plan, organising and supporting the collaboration of the Parties participating
in a TRI.
and the
Coordination Bodies
- Coordination (COR) coordinates the TRIs in strategic matters, to coordinate and support the
CETPartnership Management in all operational and internal communication matters (including financial
and contract management, data management and partnership monitoring) and to coordinate on
European and international level with other partnerships and initiatives. Parties that are Work Package
and Task Leaders according to Work Package 1 of the Implementation Plan. The COR is collaborating
with the responsible counterparts in the TRI Managements, organised in Management Teams on
specific matters.
- Call Management (CAM) coordinates on the development and implementation of Joint Calls. Parties
that are Work Package and Task Leaders according to Work Package 2 of the Implementation Plan.
The CAM is collaborating with the responsible counterparts in the TRI Managements, organised in the
Call Management Team, lead by CAM.
- Communication Office (COO) coordinates on the external communication and serves as the initial
contact of the CETPartnership. Parties that are Work Package Leaders and Task Leaders according
to Work Package 4 of the Implementation Plan. The COO is collaborating with the responsible
v3-31.01.2023/Finalised 25.05.2023
21
counterparts in the TRI Managements, organised in the Communication Management Team, lead by
COO.
- Knowledge Community Management (KCM) coordinates on activities related to knowledge creation,
exchange and management, including the organisation of a Knowledge Community with the Funded
Projects. Parties that are Work Package Leaders and Task Leaders according to Work Package 5 of
the Implementation Plan. The KCM is collaborating with the responsible counterparts in the TRI
Managements, organised in the Knowledge Community Management Team, lead by KCM.
- Impact Network Management (INM) coordinates on activities related to maximising exploitation and
impact, including the organisation of an Impact Network. Parties that are Work Package and Task
Leaders according to Work Package 6 of the Implementation Plan. The INM is collaborating with the
responsible counterparts in the TRI Managements, orgnised in the Impact Management Team, lead
by INM.
The Coordinator shall interact with the CETPartnership Management in order to ensure the efficient
implementation of the decisions of the GOB and fulfilment of the obligations according to the Initial Grant
Agreement, the Related Grant Agreements and this Partnership Framework Consortium Agreement. In
that respect the TRI Leading Experts, TRI Offices and Coordination Body Leads shall act as the
Coordinator’s central counterparts. The responsible Parties, as well as the tasks shared with other Parties
within the Work Packages, are described in detail in the Implementation Plan and the Annual Work
Programs (see section 6.3.1). The CETPartnership Management shall report to and be accountable to the
GOB.
6.2 General operational procedures for all Consortium Bodies
6.2.1 Representation in meetings
Each member of a Consortium Body shall appoint a representative with a mandate of representation and decision-
making (where applicable) on behalf of the Party and if applicable its Program Owner it is representing.
Any Party which is a member of a Consortium Body (hereinafter referred to as "Member"):
is expected to be present or represented at any meeting of such Consortium Body as outlined in Section
6.2.2.1;
may appoint a substitute or a proxy to attend and vote (where applicable) at any meeting of such
Consortium Body;
and shall participate in a cooperative manner in the meetings of such Consortium Body;
6.2.2 Preparation and organisation of meetings
6.2.2.1 Convening meetings
The chairperson or lead of a Consortium Body (TRI Management Lead, Coordination Body Lead) shall convene
the meetings of that Consortium Body.
Consortium Body [Chair/Lead] Ordinary meeting Extraordinary meeting
Governing Board (including all At least twice a year in the At any time requested by the Coordinator or
configurations) course of the GEA upon written request of one of the
[Coordinator] Meetings Coordination Bodies or TRI Management
Leads or 1/3 of the Governing Board
Members
Budget Review Group Prior to the GOB meetings Prior to written decisions on financial matters
[Coordinator] where decisions on
financial matters are
expected to be taken
Transition Initiatives At least one meeting per Working meetings according to the timelines
[TRI Management Lead] quarter of the Core Processes, to be described in the
TRI Terms of Reference
General Assembly Twice a year, back-to-back None
[Chair & Co-Chairs] with GOB meetings
v3-31.01.2023/Finalised 25.05.2023
22
CETPartnership Management At least one jour fixe per Regular jour fixe meetings as well as specific
[Coordinator] month together with the working meetings according to the timelines
Coordinator and the of the Core Processes, to be described in the
Coordination Bodies; Management Manual (see section 6.3.1)
TRI Managements
At least one jour fixe per
[TRI Management Lead]
quarter together with the
Coordinator, the
Coordination Bodies
Coordination Body Leads
[Coordination Body Lead]
and the TRI Management
Leads
Meetings of each Consortium Body may be held by tele- or videoconference, or other telecommunication means
or be offered in hybrid format.
6.2.2.2 Notice of a meeting
The chairperson or lead of a Consortium Body shall give written notice of a meeting to each member of that
Consortium Body as soon as possible and no later than the minimum number of days preceding the meeting as
indicated below.
Consortium Body Ordinary meeting Extraordinary meeting
Governing Board 90 calendar days 21 calendar days
General Assembly 90 calendar days --
Transition Initiatives 30 calendar days 7 calendar days
CETPartnership Management 30 calendar days 7 calendar days
6.2.2.3 Sending the agenda
The chairperson of the GOB shall prepare and provide to each of the Governing Board Members an agenda no
later than 21 calendar days preceding the meeting and 14 calendar days for extraordinary meetings. Any other
Consortium Body shall prepare and provide to each member of that Consortium Body an agenda no later than 7
calendar days preceding the meeting and 1 calendar day for extraordinary meetings.
In case where the quorum is not reached and the chairperson of the GOB has to convene another meeting in 21
calendar days, he/she shall give written notice of the new meeting to each Governing Board Member as soon as
possible but no later than the minimum number of calendar days preceding the meeting as indicated above.
6.2.2.4 Agenda items
Any agenda item requiring a decision by the Governing Board Members must be identified as such on the agenda
for the Governing Board meeting. Any Governing Board Member may add an item to the original agenda by written
notice to all of the other Governing Board Members up to 7 calendar days preceding the meeting (can be done via
the Coordinator). Such agenda items need to be adopted at the beginning of the meeting by decision of the GOB.
For any other Consortium Body, a member may add an item to the original agenda by written notice to the
chairperson or lead of that Consortium Body up to 1 calendar day preceding the meeting.
During a meeting the members of a Consortium Body present or represented can unanimously agree to add a new
item to the original agenda.
6.2.3 Decision making by the Governing Board
6.2.3.1 Decisions without a meeting
Any decision may be taken without a meeting if
a) the chairperson of the GOB circulates by written procedure (including by e-mail or other electronic means) to
all Governing Board Members a suggested decision with the supporting documentation of reason for decision
making and the recommendation or alternatives and with a deadline for responses of at least 21 calendar days
starting after receipt by a Party and
v3-31.01.2023/Finalised 25.05.2023
23
b) the decision is agreed by the majority (> 50%) of all Parties that are entitled to vote for the specific decision
item (GOB Configurations and their responsibilities see Section 6.3.2.3). For decisions to be taken without a
meeting in a Call Specific Configuration of the GOB (see Section 6.3.2.3), the Tier 2 decision model as described
in Section 6.2.3.2 shall be used by default.
Decisions may also be taken via online voting tools, provided the online vote duly observes the principles of fairness,
transparency, proper documentation, and confidentiality as required to ensure the same degree of reliability
comparable to a vote held in a physical meeting. The chairperson of the Governing Board shall inform the Parties
of the tool to be used for online voting at least 15 calendar days prior to any vote for each Party to make sure they
have sufficient technical access and opportunity to cast their vote.
The chairperson of the GOB shall immediately inform all Governing Board Members of the vote outcome.
According to Section 6.2.3.3 a veto may be submitted up to 7 calendar days after receipt of the outcome of the
vote.
The decision will be binding after the chairperson of the GOB sends a notification to all Governing Board Members.
The chairperson of the Governing Board will keep records of the votes and make them available to the Parties upon
request.
6.2.3.2 Voting rules and quorum4 in meetings
The Governing Board shall not deliberate and decide validly in meetings unless more than half (> 50%) of the voting
rights for the specific item (means voting rights for the Governing Board configuration to decide on that item, in the
case of the Call Specific Configuration it isTier 2 Decision Model as described below) are present or represented
(quorum). Abstentions will be counted for the quorum.
If the quorum is not reached, the chairperson of the Governing Board shall convene another ordinary meeting within
21 calendar days. If in this meeting the quorum is not reached once more, the chairperson shall convene an
extraordinary meeting, which shall be entitled to decide even if less than the quorum of Governing Board Members
is present or represented.
Defaulting Parties may not vote.
The Governing Board shall strive to make decisions by consensus. If consensus cannot be achieved, decisions on
proposals shall be taken by voting according to the following voting rules:
The Governing Board Plenary, the Governing Board Strategic Configuration and the Governing Board Grant
Agreement Specific Configuration(s) (see Section 6.3.2.3) shall take decisions with a majority of two-thirds (equal
or more than 2/3) of the votes cast. The vote is void in case that less than 2/3 of present votes are cast.
The Governing Board Operative Configuration (see Section 6.3.2.3) shall take decisions with a majority of more
than 60% of the votes cast. The vote is void in case that less than 60% of present votes are cast.
The Governing Board Call Specific Configurations (see Section 6.3.2.3) shall take decisions by a two-tier approach:
Tier 1 Decision Model: Decisions shall be taken with a majority of more than 60% of the votes cast. The vote is
void in case that less than 60% of present votes are cast.
Tier 2 Decision Model: In the absence of an agreement in the Tier 1 Decision Model, or before the adoption of
the meeting agenda at the beginning of the meeting, any member of the Call Specific Configuration may request
that decisions are made by way of the Tier 2 Decision Model, which reflects the respective funding commitments
of the Governing Board Members as follows:
- for decisions taken before the approval of the Joint Call Text by the GOB, the votes of a Governing Board
Member shall be its regular votes according to Section 6.3.2, weighted with its National/Regional Financial
Contribution as announced in the Annual Work Program for the year in which the Joint Call is planned to be
launched;
4
Quorum-Wikipedia: https://en.wikipedia.org/wiki/Quorum%23:~:text=A quorum is the minimum,the business of that group
v3-31.01.2023/Finalised 25.05.2023
24
- for decisions taken before the approval of the Final List of Projects To Be Funded for the specific Joint Call,
the votes of a Governing Board Member shall be its regular votes according to Section 6.3.2, weighted with
its National/Regional Financial Contribution as announced in the Joint Call text;
- for decisions taken after the approval of the Final List of Projects To Be Funded for the specific Joint Call,
the votes of a Governing Board Member shall be its regular votes according to Section 6.3.2, weighted with
its National/Regional Financial Contribution according to the Final List of Projects To Be Funded.
The regular votes shall be weighted in quantification steps as follows:
With a National/Regional Financial Contribution of … … a Governing Board Member shall have …
below 1 Million Euro one vote
between 1 Million and ≤ 5 Million Euro two votes
Between 5 Million and ≤ 10 Million Euro three votes
more than 10 Million Euro four votes
Decisions will only be binding once the relevant part of the minutes has been accepted according to Section 6.2.3.4.
6.2.3.3 Veto rights
A Party which can show that its own work, time for performance, costs, liabilities, intellectual property rights or other
legitimate interests would be severely affected by a decision of the Governing Board or a conclusion made by any
other Consortium Body to propose a decision to the Governing Board, may exercise a veto with respect to the
corresponding decision or relevant part of the decision.
When the decision is foreseen on the original agenda, a Party may only veto such a decision during the meeting.
When a decision has been taken on a newly added item to the agenda before or during the meeting, a Party may
veto such decision during the meeting and within 15 calendar days after receipt of the draft minutes of the meeting.
When a decision has been taken without a meeting, a Party may veto such decision within 15 calendar days after
written notice by the chairperson of the outcome of the vote.
In case of exercise of veto, the Governing Board Members shall make every effort to resolve the matter, which
caused the veto to the general satisfaction of all Governing Board Members.
A Governing Board Member may neither veto decisions relating to its identification to be in breach of its obligations
nor to its identification as a Defaulting Party. The Defaulting Party may not veto decisions relating to its participation
and termination in the consortium or the consequences of them.
A Governing Board Member requesting to leave the consortium may not veto decisions relating thereto.
6.2.3.4 Minutes of meetings
The chairperson of a Consortium Body shall produce written minutes of each meeting, which shall be the formal
record of all decisions or conclusions taken. The chairperson shall send the draft minutes to all members of the
Consortium Body within 10 calendar days of the meeting.
The minutes of the Governing Board and the Transition Initiatives meetings shall be considered as accepted if,
within 15 calendar days from receipt, no member of the Consortium Body has sent an objection to the chairperson
with respect to the accuracy of the draft of the minutes or raised a veto within the meaning of Section 6.2.3.3 by
written notice (e.g. also email with acknowledgement of receipt possible). For all other Consortium Bodies within
7 calendar days.
The Consortium Management shall send the accepted minutes of Governing Board meetings to all the members
of the Consortium Body, who shall retain copies of them. Minutes of all other Consortium Bodies shall be made
available for information to all Parties.
v3-31.01.2023/Finalised 25.05.2023
25
6.3 Specific operational procedures for the Consortium Bodies
6.3.1 Set of Core Management Documents
The CETPartnership Management will interact internally and in its communication with the Governing Board using
a set of Core Management Documents. These documents are meant to describe operational procedures and plans
on different levels of detail, in order to appropriately support and simplify decision-making in the Governing Board
as well as to support a well coordinated interaction between the Parties.
1. Implementation Plan
The Initial Implementation Plan (Implementation Plan v1.0) is the Annex 1 - Description of the Action (part A
and part B) and Annex 2 - Estimated budget for the action of the Initial Grant Agreement, supplemented by the
long-term Budget Calculations in Section 7.6.1 (i) „Typical Envisaged Annual Coordination Cost“ and
(ii) „Envisaged Distribution of Coordination Cost over years and Grant Agreements“ of this Partnership
Framework Consortium Agreement.
Updated versions of the Implementation Plan shall describe the actual long term planning of the
CETPartnership beyond the Initial Grant Agreement. It shall particularly also include sound concepts how to
address the interdisciplinary approach and crosscutting topics. It shall be approved by the Governing Board
and be revised every two years or/and in accordance with the acknowledgement of Related Grant Agreements
or Amendments to any of the Grant Agreements. In that respect it is a concise documentation of decisions
taken by the GOB in relation to the long term planning, particularly including the Budgeting (see Section 7.6).
The Coordinator together witht the CETPartnership Management will ensure compliance of the Implementation
Plan with the Initial Grant Agreement and the Related Grant Agreements and/or any Amendments.
Furthermore, the Coordinator together with the CETPartnership Management will ensure consistency with all
other Core Management Documents. In cases where updates in the Implementation Plan may require updates
of Grant Agreement Data, in the course of the reporting to the Granting Authority, the Coordinator will take
action accordingly. In cases where changes in the Implementation Plan would trigger amendments to the Initial
Grant Agreement or a Related Grant Agreement, the Coordinator will take action to confirm these changes
with the involved Beneficiaries of the affected Grant Agreement as well as with the Granting Authority. Such
changes can by nature only become binding as accepted by the Parties and the Granting Authority.
The Implementation Plan shall comprise
• a Description of the Action (DoA) at least to the degree of detail as required for the Initial and Related
Grant Agreement(s) by the Granting Authority
• Concepts for each of the Transition Initiatives, describing the scope, core activities and roles
• a long term financial plan (2022-2032) including
- estimates for the planned Coordination Costs and the allocation of resources to Work
Packages and Tasks, respectively Sub Tasks in the Work Package “Thematic Management
- Transition Initiatives”, broken down to Capacities and Distributed Resources
- committed and indicated national/regional financial contributions
- planned Parties’ Own Management Cost to be claimed and eligible for EC Co-fund
- mapping of planned eligible costs to be claimed for EC Financial Contribution to the different
Grant Agreements - the Initial Grant Agreement and Related Grant Agreements (EC-Top-Up
for Funded Projects, Coordination Cost and Parties’ Own Management Expenses)
• a Glossary with explanations of all relevant specific terms, definitions and abbreviations.
2. Annual Work Programs and Management Reports
Annual Work Programs shall be prepared by the CETPartnership Management and approved by the Governing
Board in the second half of each preliminary calendar year. Based on this planning the Parties involved in
Coordination, Management and Support Activities are expected to implement the activities and claim related
cost for remuneration. For the avoidance of doubt, it shall be explicitly noted that the Annual Work Programs
are not related to a specific Grant Agreement, but comprise all activities to be implemented in a specific year.
The Annual Work Programs shall comprise
A description of the planned activities for the specific year for each TRI and each Coordination Body,
highlighting the specific goals to be achieved in the particular year and the related main activities;
v3-31.01.2023/Finalised 25.05.2023
26
The planned Coordination Costs for these activities per Task for the Coordination Bodies, respectively
per Sub Task for the TRI Managements (aggregation or diversification possible in accordance with
the GOB);
The planned Parties’ Own Management Expenses to be claimed and eligible for EU Financial
Contribution;
A management summary overview of budgets and planned costs for the specific year on the level of
TRIs and Coordination Bodies as well as the relation to the long-term planning;
A summary showing, which of the eligible costs will be claimed under which Grant Agreement (the
Initial Grant Agreement or one of the Related Grant Agreements);
Information on intended participation and level of engagement for Funding Partners in Transition
Initiatives for the particular year.
The Annual Work Program 2022 v1.0 has been delivered with the initial proposal for the Initial Grant
Agreement.
Management Reports shall be prepared by the CETPartnership Management and approved by the Governing
Board in the first half of each subsequent year. Based on the approved Management Report the cost of Parties
involved in Coordination, Management and Support Activities will be remunerated by the Coordinator. The
annual Management Reports shall comprise
A description of the implemented activities for the specific year for each TRI and each Coordination
Body, highlighting the specific achievements in the particular year as well as potential deviations from
the respective Annual Work Program;
The related expenses incurred with the same level of detail as outlined in the respective Annual Work
Program with explanation for potential deviations;
A management summary overview of expenses incurred for the specific year with the same level of
detail as outlined in the respective Annual Work Program with explanation for potential deviations.
3. Terms of Reference (TOR) for each of the Transition Initiatives
Terms of Reference for the cooperation of Parties participating in the Transition Initiatives shall be provided by
the TRI Managements for each TRI, based on a harmonised model for all TRIs but with specific information
for the particular TRI. The TOR shall be approved by the Governing Board. They shall be revised as needed-
e.g. when the composition of the main responsible Parties to implement the TRI Management (TRI Leading
Expert, TRI Office, Sub Task Leaders) are changing. They shall comprise
the organisation of the TRI, roles and responsibilities;
processes for thematic management and stakeholder management, development of Call Modules for
Joint Calls, communication and dissemination, contribution to project progress monitoring,
contribution to knowledge management, contribution to impact creation within the TRI;
procedures for finding consensus within the TRI and preparing for decisions to be taken by the GOB;
short description of the TRI mission, main processes and deliverables with reference to the
Implementation Plan;
annual deliverables and milestones.
4. Management Manual
A Management Manual shall be provided by the CETPartnership Management and approved by the Governing
Board. It shall describe procedures for the cooperation of the Parties involved in Coordination, Management
and Support Activities as well as provide guidance for all Parties. It shall comprise
A description of the Core Processes with milestones for a coordinated approach to the annual
implementation cycles according to the Implementation Plan (e.g. call preparation and
implementation, communication and dissemination, progress and project monitoring, outreach
activities, Knowledge Community Management, Impact Network Management, development of
Annual Work Programs and Management Reports, preparation of Governing Board meetings and
General Assembly meetings);
The interrelation and interfaces between the Core Processes;
Internal coordination and communication procedures (e.g. Coordination Bodies and TRI
Managements, standards for and classification of deliverables);
v3-31.01.2023/Finalised 25.05.2023
27
Corporate Identity and (external) communication plan, including guidance for TRIs and Parties;
A “Programme Managers Handbook” for each Joint Call, which describes milestones and guidance
for Funding Partners for a coordinated approach to the preparation and implementation of the Joint
Call;
A manual for the digital collaboration platform, including the file sharing system.
5. Deliverables
Specific documents (deliverables as outlined in the Implementation Plan) shall be prepared by the
CETPartnership Management to contribute to processes, documents and reports. They shall comprise
deliverables of the following categories
Deliverables to the Governing Board as a basis for monitoring, supervision and decision-making;
Deliverables to the Granting Authority to report according to the Initial and the Related Grant
Agreements and monitoring requirements of the Granting Authority;
Deliverables for dissemination resulting in CETPartnership publications, to be adopted by the GOB;
Internal deliverables that provide interfaces between different Consortium Bodies and processes (e.g.
contribution to planning and reporting from Coordination Bodies and TRIs).
6.3.2 Specific operational procedures for the Governing Board
In addition to the rules described in Section 6.2, the following rules apply:
6.3.2.1 Members
The Governing Board shall be composed of all Funding Partners (Beneficiaries and Associated Partners) of the
Initial and the Related Grant Agreements as well as the Supporting Partners that are Beneficiaries. They shall
nominate a representative to the Governing Board as well as a substitute in case of his/her absence.
Institutional Couples of Program Owner(s) and Program Manager, who are jointly providing financial resources from
the same national fund or budget shall together only nominate one representative and alternate.
In case that several Program Owners would form institutional couples with the same Program Manager, each of
these Institutional Couples shall nominate one representative and substitute, so a representation will apply per
Program Owner. For subject matters described in Section 6.3.2.3 (in particular i.e. Scheduling of Joint Call and
TRIs, Launch of a Joint Call, Approval of Terms of Referece for the TRIs) the representation therefore will apply
per Program Owner. This applies for the following Parties of the Initial Grant Agreement.
Country/Region Program Manager Program Owner
Germany- North- Rhine Westphalia PtJ [ETN] (MWIKE - not Party)
Germany PtJ [ESX] (BMWK- not Party)
Austria FFG BMK
Austria FFG Klima- und Energiefonds
The Coordinator or the Co-coordinator will chair the meetings of the Governing Board. In their absence, any of the
General Assembly vice chairs will chair the meetings.
Each Party shall formally nominate in written form the names of their representatives and alternates to the
Coordinator and keep him/her informed of any changes.
The Parties agree to abide by all decisions of the Governing Board. This does not prevent the Parties from
exercising their veto rights, according to 6.2.3.3 or from submitting a dispute to resolution in accordance with the
provisions of Settlement of disputes in 13.8.
6.3.2.2 Tasks and Decisions
The Governing Board is responsible for overseeing the overall direction and strategic development of the
CETPartnership as well as the fulfilment of the provisions of the Initial Grant Agreement and the subsequent Related
Grant Agreements. It shall take decisions in various Governing Board Configurations according to different
categories of decisions to be taken.
v3-31.01.2023/Finalised 25.05.2023
28
The following tasks shall be undertaken by the Governing Board and the Governing Board Members:
Strategic direction of the CETPartnership including orientation and decisions on the SRIA, the
Implementation Plan (including any relevant updates) and Annual Work Programs;
Mandating the CETPartnership Management with the development and implementation of the Annual
Work Plans;
Mandating the Coordinator to remunerate the Parties involved in Coordination, Management and Support
Activities for their activities by approval of the annual Management Reports;
Establishing national/regional coordination mechanisms, including connecting to national and regional
policies and programmes;
Communication and promotion as well as dissemination of the CETPartnership and its activities and
outcomes at national and/or regional level;
Arrangements among Parties to take coordinated action at national and regional levels e.g. related to the
alignment of national programmes, linking to national sector policies, mobilising and engaging
stakeholders - particularly relevant intermediaries for the Impact Network;
Arrangements among Parties to take coordinated action in their own area of influence, e.g. according to
provision of budgets for Joint Calls, project monitoring as well as monitoring related to the management
of grants and brief their respective country representative in the Horizon Europe program configuration.
6.3.2.3 Governing Board Configurations and related categories of decisions
The following voting rights apply to the different categories of decisions to be taken by the various Governing Board
Configurations.
The Governing Board Plenary for decisions concerning the CETPartnership as a whole. Each Member
represented according to Section 6.3.2.1 shall have one vote. The following decisions shall be taken by the
Governing Board Plenary:
Evolution of the CETPartnership
o Acknowledgement of a Grant Agreement as Related Grant Agreement;
o Entry of a new Party and approval of the settlement on the conditions of the accession of such a new
Party;
o Withdrawal of a Party and the approval of the settlement on the conditions of the withdrawal;
o Identification of a breach by a Party of its obligations under this Partnership Framework Consortium
Agreement or the Initial Grant Agreement or a Related Grant Agreement;
o Declaration of a Party to be a Defaulting Party;
o Remedies to be performed by a Defaulting Party;
o Termination of a Defaulting Party’s participation and measures relating thereto;
o Proposal to the Granting Authority for a change of the Coordinator;
o Proposal to the Granting Authority for suspension of all or part of the CETPartnership;
o Proposal to the Granting Authority for termination of the CETPartnership and the Partnership
Framework Consortium Agreement;
o Solving issues in the case of uncovered payments, utilising the Reserve Fund (see Section 7.9.3);
o Adopt agenda items that have been added to the original GOB meeting agenda by any Governing
Board according to Section 6.2.2.4.
Decision regarding the Joint Calls and Transition Initiatives
o Scheduling of Joint Calls
o Launch of a Joint Call
o Approval of Terms of Reference for the Transition Initiatives
Appointments
o Scheduling of the meetings of the Governing Board and the General Assembly
o Adoption of the agenda of Governing Board meetings
o Approval of the minutes of Governing Board meetings.
v3-31.01.2023/Finalised 25.05.2023
29
The Strategic Configuration for strategic decisions concerning the SRIA and the strategic role of the
CETPartnership in relation to European programs, particularly Horizon Europe, and other Horizon Europe
Partnerships. Each EU member country or associated country shall have one vote. Representatives from different
Parties from the same country have to coordinate and to cast one vote together. The following decisions shall be
taken by this configuration:
Approval of revisions to the SRIA;
Collaboration with other initiatives and partnerships.
The Operative Configuration for operative decisions, concerning the planning of activities as well as budget and
financing. Only members represented according to 6.3.2.1 that are Funding Partners and at the same time
Beneficiaries (i.e. excluding Supporting Partners and Associated Partners) shall have a vote. However, these
members shall only have a vote, if their financial contribution to Funded Projects
as announced in the Work Program for the year in which a specific Joint Call is planned to be launched,
for any Joint Call before the text of this Joint Call has been approved by the GOB;
or as announced in the approved text for any Joint Call, before the Final List of Projects To Be Funded for
this Joint Call has been approved by the GOB;
or accumulated over all Final List of Projects To Be Funded that have been approved by the GOB
is not zero.
For the avoidance of doubt, within the meaning of Section 6.3.2.1 of this Partnership Framework Consortium
Agreement if one of these Parties represent more than one Program Owner, then this Party is entitled to have as
many votes as Program Owners represented by this Party (for Tier 2 Decision Model: each weighted with the
budget of the respective Program Owner). For Institutional Couples only the Program Manager needs to be a
Beneficiary. The following decisions shall be taken by this configuration:
Approval of the Implementation Plan;
Approval of the Annual Work Programs;
Approval of the Annual Management Reports;
Approval of the Management Manual.
The Call Specific Configuration for decisions related to a specific Joint Call (e.g. timelines, call topics and
text, guidelines and rules for participation, Final List for Projects To Be Funded). Only Members represented
according to 6.3.2.1 that are Funding Partners (Beneficiary or Associated Partner) involved in the specific Joint Call
by providing funding for transnational projects shall have a vote. The following decisions shall be taken by this
configuration:
Approval of the call specific Programme Managers Handbook;
Approval of particular Call Modules including specific requirements for proposals, exclusively by the
Funding Partners dedicating budget to the specific Call Module;
Approval of the publishable text of the Joint Calls composed of the approved Call Modules and additional
general text parts;
Approval of general guidelines and rules for submitting proposals to the Joint Call;
Approval of the Final List of Projects To Be Funded, selection based on Section 8.3.6.
The Grant Agreement Specific Configuration for decisions related to the Grant Agreement affected (be it the
Initial Grant Agreement or one of the Related Grant Agreements). Only Members represented according to 6.3.2.1
that are Beneficiaries (Funding Partner or Supporting Partner) to the particular Initial Grant Agreement or Related
Grant Agreement shall have one vote. For Institutional Couples only the Program Manager needs to be a
Beneficiary to the Initial Grant Agreement or Related Grant Agreement(s).
Content, finances and intellectual property rights on Grant Agreement level;
Proposals for changes to Annexes 1 and 2 of the particular Initial Grant Agreement or Related Grant
Agreement(s) affected, to be agreed by the Granting Authority;
Changes to the Description of the Action (DoA) - Annex1 (Part B) of the Initial Grant Agreement or
the affected Related Grant Agreement.
v3-31.01.2023/Finalised 25.05.2023
30
6.3.3 Specific operational procedures for the Budget Review Group (BRG)
In order to achieve a flawless execution of the financial management and to reach a common understanding and
interpretation of all budget related figures in Annual Work Programs and Annual Management Reports, a Budget
Review Group, appointed by the Governing Board, shall serve as an advisor to the Governing Board in these
matters. BRG Members shall be volunteering Governing Board Members that are not involved in the implementation
of Coordination, Management and Support Activities. The CETPartnership Management will support the BRG by
preparing information, coordination and advice to the BRG. The BRG shall nominate a speaker among its BRG
Members in order to ensure a neutral and independent reporting to the Governing Board. Duties of BRG Members:
look over and cross-check the financial reporting of the Annual Management Reports;
look over and cross-check the financial planning of Annual Work Programs;
revise documents and files with financial information provided by the CETPartnership Management;
provide feedback to the CETPartnership Management;
report to the Governing Board via a short summary at the Governing Board meetings, where related
decisions are to be taken (in particular approval of Annual Work Programs and Management Reports)
about these checks and eventually formulate recommendations with regard to improving the financial
management;
eventually provide advice in budget related questions to reach a consensual and harmonized
execution of all financial procedures and processes.
There are no physical meetings foreseen. If there are financial related topics, which have to be prepared for the
Governing Board meeting, there will be a web-based meeting organised by the Coordinator at least 14 calendar
days ahead of the Governing Board meeting.
6.3.4 Specific operational procedures for the Transition Initiatives
The TRIs shall develop respective modules for the Joint Calls for projects as well as interact with stakeholder groups
on national and EU level, other initiatives and European partnerships under Horizon Europe, as well as Funded
Projects in the field as described in the Implementation Plan and the Annual Work Programs. Each of the TRIs shall
be led by a Leading Expert and supported by a TRI Office. The TRI Management may be supported by Supporting
Partners (can also provide the Leading Expert or be responsible for the TRI Office). The operational procedures of
the TRIs as well as the approach to reach consensus among the Parties participating in the TRIs shall be regulated
in Terms of Reference (see Section 6.3.1 on “Set of Core Management Documents”), to be approved by the
Governing Board.
6.3.5 Specific operational procedures for the General Assembly
In addition to the rules described in Section 6.2, the following rules apply:
6.3.5.1 Members
The General Assembly is a forum of all Parties, their Affiilated Entities, as well as their Subcontractors that are
actively collaborating in the CETPartnership and/or contributing to the implementation of Coordination,
Management and Support Activities. This includes all types of Partners as Funding Partners, Supporting Partners
and Associated Partners. In addition, representatives of the European Commission Directorate General for Energy
(DG ENER) and Directorate Research and Innovation (DG RTD) will be invited to participate in the General
Assembly.
Regular Governing Board meetings will be organised as an integral part of the bi-annual General Assembly
meetings. All Parties that do not have a seat in the Governing Board will, by that, become observers in those
meetings.
The General Assembly shall consist of at least one representative of each Party (hereinafter General Assembly
Member), which is the Governing Board Member of the Party. All Parties are invited to nominate more members
from their own staff, their Affiliated Entities or Subcontractors that are involved in the implementation of the
CETPartnership.
The Coordinator and/or the Co-coordinator shall (co-)chair the meetings of the General Assembly, supported by
elected vice chairs. The Governing Board shall specify number and duties of vice-chair positions as well as
nominate and elect vice-chairs.
v3-31.01.2023/Finalised 25.05.2023
31
6.3.5.2 Tasks
The following tasks are to be performed by the General Assembly:
Ensuring transparency of activities and decisions by providing presentations, reports and analyses on
outcomes and latest developments within the CETPartnership;
Striving for consensus amongst all Parties by providing opportunities for discussion and interpretation of
these inputs;
Hosting meetings of the Governing Board.
6.3.6 Specific operational procedures for the Coordinator
The Coordinator shall be the intermediary between the Parties and the Granting Authority and shall perform all
tasks assigned to the Coordination as described in the Implementation Plan, the Grant Agreement(s) and in this
Partnership Framework Consortium Agreement.
In particular, the Coordinator shall:
monitor the implementation and progress of the CETPartnership in collaboration with the CETPartnership
Management;
implement financial internal cost and budget controls to limit any kind of financial risks;
monitor compliance by the Parties with their obligations under this Partnership Framework Consortium
Agreement and the Grant Agreement(s);
convene and chair Governing Board, General Assembly and CETPartnership Management meetings;
keep the address list of members of all Consortium Bodies and other contact persons updated and
available;
collect, review relevant information & data to verify consistency; submit reports, other deliverables
(including financial statements and related certifications), milestones and Grant Agreement(s) specific
documents as requested to the Granting Authority and the Governing Board;
act as the intermediary for all communications between the Governing Board and the CETPartnership
Management, being responsible to organise the efficient implementation of GOB decisions;
act as the intermediary for all communications between the consortium and the Granting Authority, unless
the Grant Agreement(s) specifies otherwise, and in particular:
o submit the pre-financing guarantees to the Granting Authority (if any);
o request and review any documents or information required and verify their quality and
completeness before passing them on to the Granting Authority;
o submit the deliverables and reports to the Granting Authority;
o inform the Granting Authority about the payments made to all of the Beneficiaries of the Grant
Agreement(s) (report on the distribution of payments);
o distribute the payments received from the Granting Authority to all of the Beneficiaries without
unjustified delay;
o transmit documents and information connected with the CETPartnership to any other Parties
concerned;
o administer the Financial Contribution and fulfil the financial tasks described in Section 7.2.;
o provide, upon request to the Parties official copies or originals of documents that are in the sole
possession of the Coordinator when such copies or originals are necessary for the Parties to
present claims.
If one or more of the Parties is late in submission of any CETPartnership deliverable, the Coordinator may
nevertheless submit the other Parties’ deliverables and all other documents required by the Initial Grant Agreement
or any of the Related Grant Agreements to the Granting Authority in time.
If one or more of the Parties involved in the CETPartnership Management is late in contribution to any deliverable,
the Coordinator may nevertheless submit an incomplete version of the deliverable with the content provided by the
other Parties involved in Coordination, Management and Support Activities and all other documents required by the
Governing Board to the Governing Board in time.
If the Coordinator fails in its coordination tasks, the Governing Board may propose to the Granting Authority to
change the Coordinator.
v3-31.01.2023/Finalised 25.05.2023
32
The Coordinator shall not be entitled to act or to make legally binding declarations on behalf of any other Party or
of the consortium, unless explicitly stated otherwise in the Grant Agreement or this Partnership Framework
Consortium Agreement.
The Coordinator shall not enlarge its role beyond the tasks specified in this PFCA and in the Initial Grant Agreement
or any of the Related Grant Agreements.
The Coordinator Party No1 Austrian Ministry of Climate Action (BMK) delegates the following tasks to Party
No2 the Austrian Research Promotion Agency (FFG) with the authorisation to administer (FFG is controlled
by BMK) according to Article 7 in the Annotated Model Grant Agreement:
act as the intermediary for all communications between the consortium and the Granting Authority, unless the
Grant Agreement or Granting Authority specifies otherwise, and in particular:
- submit the pre-financing guarantees to the Granting Authority (if any);
- request and review any documents or information required and verify their quality and completeness
before passing them on to the Granting Authority - submit the deliverables and reports to the Granting
Authority;
- inform the Granting Authority about the payments made to the other beneficiaries (report on the distribution
of payments; if required, see Articles 22 and 32 of the Grant Agreement) under the Initial or Related Grant
Agreement.
distribute the payments received from the Granting Authority to the other Beneficiaries without unjustified delay
(see Article 22 of the Grant Agreement).
If requested by BMK: Coordinate and carry out procurements on behalf of the Coordinator and sign contracts
with third parties on behalf of the Coordinator.
The work of FFG is described in detail in Task 1.2: “Consortium Management of the Implementation Plan”.
6.3.7 Specific operational procedures for the CETPartnership Management
In addition to the rules described in Section 6.2 the following rules apply:
6.3.7.1 Members
Members of the CETPartnership Management are the Work Package Leaders, Task and Sub-Task Leaders
according to the Implementation Plan.
The interaction of the Coordinator, the Coordination Bodies and the TRIs will be organised in various Management
Teams to be described in detail in the Management Manual. These teams are different configurations of the
Management members according to the implementation of various Core Processes and coordination tasks,
following the management and Work Package structure with their interfaces as described in the Implementation
Plan, Section 3: Quality and Efficiency of the implementation.
The number and composition of the Management Teams may be adjusted according to actual needs and
experiences, to be described in the Management Manual, up for approval by the Governing Board.
These Management teams shall be organised and their meetings shall be chaired by the respective responsible
Lead of the Coordinating Body (Work Package Leader). The Parties involved in the CETPartnership Management
shall in addition to their responsibilities as a Party, perform the tasks assigned to them as described in the
Implementation Plan and the related Annual Work Programs.
6.3.7.2 Tasks
The general tasks of the CETPartnership Management include the following:
• Overall coordination and management of the CETPartnership in order to implement the Implementation
Plan and the Annual Work Programs effectively and efficiently, in close collaboration with the Coordinator
and in accordance with the decisions of the Governing Board;
• Ongoing monitoring of the successful leverage of EU Financial Contribution through the Joint Calls and
through the direct and indirect costs for implementation of the Implementation Plan and by the Parties;
• Monitoring of the effective and efficient implementation of the CETPartnership and input to the overall
monitoring process of Horizon Europe partnerships on a European level, as established by the Granting
Authority.
v3-31.01.2023/Finalised 25.05.2023
33
Leads of Coordinating Bodies (Work Package Leaders) are responsible
• To organise the task sharing within their Coordinating Body according to their Work Package Description
in the Implementation Plan;
• for the timely contribution of their Work Package to the Core Processes described in the Implementation
Plan including deliverables;
• to organise the coordination with and among the TRIs on the aspects relevant for their Work Package;
• to provide guidance enabling the TRIs to contribute to the Core Processes in a target oriented and timely
manner.
Section 7: Financial provisions
7.1 General Principles
7.1.1 The financial model (Overview)
Financial contributions to implement the CETPartnership are provided:
(A) by the Funding Partners in the form of support to Funded Projects from their own funds (National/Regional
Financial Contribution). Such contributions are transferred from the National/Regional Program Managers
directly to a third party that is participating in a Funded Project;
(B) by the Granting Authority (EU Financial Conribution) in the form of funding from the Horizon Europe
program. These contributions are transferred from the Granting Authority or its responsible agency to the
Coordinator. The EU Financial Contributions are provided according to
a. contributions to eligible Project Participants, by any of the Beneficiaries (calculated as 30% of eligible
[National/Regional Financial Contribution + EU Financial Contribution] transferred to Project
Participants);
b. expenses of any of the Beneficiaries for the implementation of Coordination, Management and Support
Activities (calculated as 30% of eligible Coordination Cost);
c. expenses of any of the Beneficiaries to collaborate, contribute to and participate in the CETPartnership
activities (calculated as 30% of eligible Parties’ Own Management Expenses);
according to the regulations determined in the Initial Grant Agreement, the Related Grant Agreements and
their annexes.
Expenses to be borne from the EU Financial Contribution are the following:
Coordination Cost shall be remunerated to the respective Parties to the full extent, including all arising direct and
indirect cost (see Section 7.5). These costs will be directly deducted from the received EU Financial Contribution.
The remuneration shall be transferred from the Coordinator to the respective Parties according to the cost reported
in the Annual Management Reports as approved by the Governing Board.
Parties’ Own Management Expenses are expected to be in-kind contributions from Funding Partners. In cases
where this is Needed to enable the Party to participate in the CETPartnership activities, such expenses can be
compensated to Beneficiaries to the extent of contribution actually received from the Granting Authority for these
cost (30% of eligible costs, see Section 7.5). These fundings (30% of eligible cost) will be directly deducted from
the received EU Financial Contribution. The EU Financial Contribution shall be transferred from the Coordinator to
the respective Beneficiaries accordingly.
EU-Top-Up for Funded Projects will be provided by distributing the remaining EU Financial Contribution from
the Granting Authority, after deduction of the Coordination Costs and EU Financial Contribution for Parties’ Own
Management Expenses (see also Section 7.5) among the Parties as according to
- the financial contribution the Party provides to Project Participants, as claimed in the Initial Grant
Agreement or any of the Related Grant Agreements and approved by the Granting Authority
and
- according to the Mixed Mode Funding Model that applies as described in Section 8 of this Partnership
Framework Consortium Agreement.
v3-31.01.2023/Finalised 25.05.2023
34
A Party’s share of the EU-Top-Up for Funded Projects will be transferred from the Coordinator to the Party. It then
has to be transferred to the Project Participant(s) by the respective Party (national/regional Program Manager). It
will remain upon the discretion of the Party at which point in time the EU-Top-Up For Funded Projects will be
transferred to the Project Participants. For the avoidance of doubt, it is not the obligation of the Coordinator to
transfer any funds directly to the Funded Projects.
The amounts listed below give an indication of the envisaged use of the EU Financial Contribution after deduction
of the Coordination Cost and Parties’ Own Management Expenses received under the Initial Grant Agreement,
according to Section 7.6.1 (i) and (ii):
Table 1: Global estimation for the use of the EU Financial Contribution received under the Initial Grant
Agreement
Estimate of the EU Financial Contribution
1) Coordination Cost eligible for EU Financial Contribution under the Initial Grant
Agreement) according to Section 7.6.1 (i) and (ii), see Table 4 (GA1) of this PFCA ~ 16.000.000 €
EU Financial Contribution for Coordination Cost (30%) ~ 4.800.000 €
Coordination Cost to be covered by the EU-Top-Up for Funded Projects ~ 11.200.000 €
2) national/regional funding commitments according to Section 7.6.3 ~ 200.000.000 €
Call Budget (nat.+ EU) = Max. theoretical contribution to third parties = ~ 270.000.000 €
(1+ 0,3 : 0,7) * (national/regional funding commitments minus Coordination Cost to be
covered by the EU-Top-Up for Funded Projects)
expected final contribution to third parties: ~80% of max. ~ 216.000.000 €
according to ERA-Net experience
expected requested EU-Top-Up For Funded Projects = 30% of ~ 64.800.000 €
expected contribution to third parties
3) Parties’ Own Management Expenses according to section 7.6.2, eligible for EU
~ 1.500.000 €
Financial Contribution
EU Financial Contribution for Parties’ Own Management Expenses (30%) ~ 450.000 €
Total EU Financial Contribution: ~ 70.000.000 €
Distribution of
EU Financial Contribution
Total available EU Financial Contribution (=maximum Grant Amount) 70.000.000 €
minus Coordination Cost ~ 16.000.000 €
minus 30% of Parties’ Own Management Expenses - ~ 450.000 €
Remaining EU-Top-Up For Funded Projects to be distributed to national/regional
~ 53.550.000 €
Program Managers for projects
Net EU Top-Up funding rate under Initial Grant Agreement
~25%
[EU-Top-Up For Funded Projects/expected contribution to third parties]
v3-31.01.2023/Finalised 25.05.2023
35
7.1.2 Distribution of the EU Financial Contribution
As described in Section 7.1.1 the Parties agree to use part of the EU Financial Contribution to co-fund the Funded
Projects selected through the Joint Calls. Part of the EU Financial Contribution will be used to cover the expenses
for Coordination, Management, and Support Activities and Parties’ Own Management Expenses. The Governing
Board will control these cost by revision and approval of the Implementation Plan, the Annual Work Programs and
the Annual Management Reports. These management documents together with the establishment of the Budget
Review Group will enable the Governing Board to steer and control the implementation as well as the use and
allocation of financial and personnel resources.
The EU Financial Contribution shall be distributed by the Coordinator according to:
- the expenses of a Party and its contribution to Project Participants, as described in Section 7.1.1,
- the approval of claimed cost and reports by the Granting Authority, and
- the provisions of payment in Section 7.2, 7.3 and 7.4, 7.5.
7.1.3 Justifying Costs towards the Granting Authority
In accordance with its own usual accounting and management principles and practices, each Party shall be solely
responsible for justifying its costs (and those of its Affiliated Entities, if any) with respect to the CETPartnership
towards the Granting Authority. Neither the Coordinator nor any of the other Parties shall be in any way liable or
responsible for such justification of costs towards the Granting Authority.
7.1.4 Financial Consequences of the termination of the participation of a Party
A Party leaving the consortium shall refund to the Coordinator any payments it has received except the amount of
contribution approved by the Governing Board and accepted by the Granting Authority.
In addition, a Defaulting Party shall, within the limits specified in Section 5.2 of this Partnership Framework
Consortium Agreement, bear any reasonable and justifiable additional costs occurring to the other Parties in order
to perform the Defaulting Party’s task and necessary additional efforts to fulfil them as a consequence of the Party
leaving the CETPartnership. The Governing Board should agree on a procedure regarding additional costs, which
are not covered by the Defaulting Party or the Mutual Insurance Mechanism.
7.2 Payments
Payments to Parties are the task of the Coordinator. FFG in its role as Consortium Management is acting with an
authorisation to administer (see Section 6.3.6) on behalf of the Coordinator in this regard. Related banking and
transaction costs are borne by the receiving Party. The Parties agree that any custody fees to be paid by the
Coordinator for the administration of the EU Financial Contribution administered on behalf of the CETPartnership
shall be borne by the Parties.
In particular, the Consortium Management shall:
- notify the Party concerned promptly of the date and composition of the amount transferred to its bank account,
giving the relevant references;
- perform diligently its tasks in the proper administration of any funds and in maintaining financial accounts;
- undertake to keep the EU Financial Contribution separated from its normal business accounts, its own assets
and property, except if it is a Public Body or is not entitled to do so due to statutory legislation.
With reference to Article 22.3.4 of the Grant Agreement, no Party shall before the transfer of the final payment for
a Grant Agreement from the Granting Authority to the Coordinator, receive more than its allocated share of the
maximum grant amount less the proportionate expenses for Coordination Cost, less the amounts retained by the
Granting Authority for the Mutual Insurance Mechanism as well as for the final payment.
The payment schedule will be handled in accordance with the provisions of this Partnership Framework Consortium
Agreement (see Section 7.4).
7.3 Withholding of Payments
The Coordinator is entitled to withhold any payments due to a Party identified by the Governing Board to be in
breach of its obligations under this Partnership Framework Consortium Agreement or the Initial Grant Agreement
or any of the Related Grant Agreements or to a Beneficiary that has not yet signed this Partnership Framework
Consortium Agreement.
v3-31.01.2023/Finalised 25.05.2023
36
The Coordinator is entitled to recover any payments already paid to a Defaulting Party except the costs already
claimed by the Defaulting Party and accepted by the Granting Authority. The Coordinator is equally entitled to
withhold payments to a Party, when this is suggested by or agreed with the Granting Authority.
7.4 Payment schedule
Reimbursement of Coordination Cost (as indicated in 7.1.1) shall be paid to the involved Parties upon approval
by the Governing Board in separate instalments as agreed below:
- 50 % first part payment of the planned Coordination Cost according to an approved Annual Work Program, no
later than 30 calendar days after its approval by the Governing Board, starting on receipt of the first pre-
financing payment by the Granting Authority to the Coordinator;
- 30% second part payment of the planned Coordination Cost according to the approved Annual Work Program,
no later than 31st January of the following year, starting on receipt of the first pre-financing payment by the
Granting Authority to the Coordinator. In case that the envisaged annual Coordination Cost would deviate more
than 20% from the planned Coordination Cost, the Party shall inform the Coordinator not later than 31st
December of that same year. In such case the Coordinator may adjust the part payment accordingly;
- balance of the reported cost according to the approved Annual Management Report, no later than 30 calendar
days after its approval by the Governing Board, starting on receipt of the first pre-financing payment by the
Granting Authority to the Coordinator;
- Limited to the extent of financial resources made available by instalments by the Granting Authority and in
accordance with the rules as determined in the Grant Agreement(s) regarding the Mutual Insurance
Mechanism and the final payment;
- For the avoidance of doubt, the provisions of Section 7.7 on excess payments and revenues apply.
Funding of Parties’ Own Management Expenses (as indicated in 7.1.1) shall be paid to the respective Parties
upon approval by the Granting Authority in separate instalments as agreed below:
- Amount of funding according to cost reported in the course of a periodic report as planned in any of the Grant
Agreements and as approved by the Granting Authority.
- No later than 30 calendar days after transfer of the interim payment according to the periodic report from the
Granting Authority to the Coordinator.
- Agreements limited to the Parties’ Own Management Expenses planned in the Implementation Plan and the
Annual Work Programs as approved by the Governing Board.
EU-Top-Up for Funded Projects shall be paid to Parties funding the Funded Projects. The amount to be
transferred to Parties shall be determined after deducting the planned Coordination Cost and EU Financial
Contribution for Parties’ Own Management Expenses as described in 7.1.1. The remainder shall be paid in separate
instalments as agreed below:
- 50 % of the funding for Funded Projects resulting from a Joint Call on receipt of the pre-financing payment by
the Granting Authority resulting from the Periodic Report to the Granting Authority in which the Final Selection
List of Projects from the respective Joint Call has been reported,
- 30% of the funding for Funded Projects resulting from a Joint Call on receipt of the pre-financing payment by
the Granting Authority resulting from the Periodic Report to the Granting Authority in which the updated
financial data of Projects from the respective Joint Call has been reported,
- 15 % of the funding for Funded Projects resulting from all Joint Calls covered by the relevant Initial or Related
Grant Agreement, on receipt of the payment of the balance for this Grant Agreement,
- 5 % of the funding for Funded Projects resulting from all Joint Calls covered by the relevant Initial or Related
Grant Agreement, on receipt of the payment of the Mutual Insurance Mechanism of the relevant Grant
Agreement.
The reporting periods to the Granting Authority are determined in the applying Initial or Related Grant Agreement.
v3-31.01.2023/Finalised 25.05.2023
37
Table 2: CET Partnership Payment schedule from the Coordinator to the Parties under the Initial Grant
Agreement
Cash flow
Cash flow from EU-Top-Up for Remuneration Parties’ Own
from
Year Granting Authority to Funded of Coordination Management
Coordinator
Coordinator Projects Cost Expenses
to Parties
[payments
based on the
[payments
initial List of [payments based [pro rata
[payments based on based on
Projects To Be on Annual distribution for
Periodic Reports to the Periodic Reports
Funded and Management each cost
Granting Authority] to the Granting
annual Reports] category]
Authority]
Monitoring
Reports]
in € in € in € in € in €
approx. 3.000.000 €
Pre-
2022 20.000.000 financing
- - 3.000.000 €
50% of 6.000.000 €
(30%)
RP 1 close 13.387.500 € 5.750.000 € ~ 112.500 €
at M14 * (50% of 26,775
2023 10.000.000 50% of 6.000.000 € 25% of ~ 450.000 € 19.250.000 €
(approx. Mio )
42%) + 50% of 5.500.000
€
RP 2 close 13.387.500 € 3.750.000 € ~ 112.500 €
at M24 ** (50% of 26,775
2024 20.000.000 50% of 5.500.000 € 25% of ~ 450.000 € 17.250.000 €
(approx. Mio )
71%) + 50% of 2.000.000
€
1.750.000 € ~ 67.500 €
2025 - 50% of 2.000.000 € 15% of ~ 450.000 € 1.975.000
+ 50% of 1.500.000
€
RP 3 close 16.065.000 1.250.000 € ~ 67.500 €
at M50 *** 30% of 53,550
2026 5.000.000 (approx. Mio €
50% of 1.500.000 € 15% of ~ 450.000 € 17.225.000 €
78%) + 50 % of 1.000.000
RP 4 close 500.000 € ~ 45.000 €
2027 5.000.000 at M 66 - 650.000
(85%) 50 % of 1.000.000 10% of ~ 450.000 €
RP 5 close 7.032.500 € ~ 45.000 €
10.000.000 at M 80 - 8.025.000
(100%) (15% of 53,550 Mio) 10% of ~ 450.000 €
2028
receipt of Mutual Insurance 2.677.500 €
Mechanism payment
- - 2.625.000
(5% of 53,550 Mio)
Total 70.000.000
- 53.550.000 € 16.000.000 € ~ 450.000 € 70.000.000 €
in € €
please note: all figures are preliminary and depend on the outcome of the Joint Calls 2022 & 2023
under the Intial Grant Agreement
* Call 2022: 50% of the expected from Call 2022
** Call 2023: 50% of the expected from Call 2023
*** 30% of total, in order to reduce admin = Coordination Cost
v3-31.01.2023/Finalised 25.05.2023
38
7.5 Justifying Coordination Cost and Parties’ Own Management Expenses
Coordination Cost
Only the Parties indicated in the Annual Work Programs may claim Coordination Cost to the extent reported in
the Annual Management Reports as approved by the Governing Board. These shall also comprise the break down
to each of the Parties involved in the implementation of Coordination, Management and Support Activities as well
as the break down to cost categories (see Section 6.3.1). Coordination costs are only eligible if they have incurred
between 1st November 2021 and the submission of the final report for the latest ending Related Grant Agreement
to the Granting Authority.
100 % of the personnel cost actually incurred by the Party during the Project duration and recorded in accordance
with the usual time recording, accounting and calculation rules will be reimbursed. The daily rates shall be used for
this purpose. The calculations shall be disclosed at the request of the Coordinator. The invoiced daily rates include
all services, assistance services, costs, charges and fees associated with the provision of the contractual service
and generally all services, assistance services, costs, charges and fees associated with the achievement of the
contractual objectives, even if they are not listed separately in this contract, but are necessary to achieve the
contractual performance. These include, for example, personnel, material and IT costs for office operations,
insurance, imputed costs (e.g. interest, risks), expenses for personnel management, work meetings and
corresponding presentations.
Directly attributable material costs (in particular travel costs and event costs) are reimbursed separately.
If the Party is liable to pay VAT - comply with the national applicable tax law - the reimbursement of costs shall be
increased by the VAT to be shown in the reporting by the Party and to be paid to the tax office. This shall also apply
to cash expenses, in each case less the items invoiced to the Party itself and therefore to be claimed by it as input
tax.
Parties’ Own Management Cost
In cases where this is Needed to enable the Party to participate in the CETPartnership activities, Parties’ Own
Management Expenses can be compensated in case the Party is a Beneficiary and only to the extent of the actually
received EU Financial Contribution for these cost claimed by the respective beneficiary in any of the Grant
Agreements and approved by the Granting Authority. Parties shall only claim such expenses for activities as
described under “Standard Activities” in the Implementation Plan. For general orientation, it is expected that Parties
would claim such expenses in any Grant Agreement in relation to the expected minimum of 10 person months per
Joint Call that is subject to the Grant Agreement. However, claimed expenses can be higher if needed, planned in
the Implementaton Plan and in the Annual Work Programs and approved by the Governing Board.
Only Parties’ Own Management Expenses planned in the Annual Work Programs may be claimed under the
Related Grant Agreements to the extent outlined in the Annual Management Reports as approved by the Governing
Board. Parties’ Own Management Expenses are eligible for funding from the Granting Authority if they have incurred
between the official start date of the respective Grant Agreement and the submission of the final report for this
same Grant Agreement.
Reporting
Coordination Cost and Parties’ Own Management Expenses shall be reported to the Governing Board on an
annual basis within the Annual Management Reports, using the following cost categories:
- Personnel costs
- Subcontracting costs (only applicable for Coordination Cost)
- Purchase costs
- Indirect costs as eligible to be claimed to the Granting Authority
- Additional overheads and taxes (only applicable for Coordination Cost)
7.6 Budgeting
The planning of activities and related resources shall be based on the following principles:
- The Core Processes as described in the Implementation Plan- “Initiate and Finance Funded Projects”, “Project
and Program Monitoring”, “Knowledge Creation”, “Maximising Exploitation and Impact”, “European and
International Cooperation”, “Communication and Dissemination” - are multi-annual processes, based on the
v3-31.01.2023/Finalised 25.05.2023
39
multiannual prospering of the Funded Projects resulting from a specific Joint Call, from their initiation,
submission, selection, and financing to knowledge creation and management, dissemination and exploitation.
Such a multiannual process starts every year, with the preparation and implementation of the Joint Call.
- The work planning is organising these overlapping multiannual processes in interlinked “Annual
Programming and Monitoring Cycles” as described in the Implementation Plan.
- The Implementation Plan comprises an overarching work plan, that is focusing on establishing the core
structures, processes and practises. It is following the original assumption, that the CETPartnership will
implement annual Joint Calls from 2022 to 2027. It will be refined and further developed during its
implementation, ensuring synergies and learning, resulting in elaborated key concepts and routines.
- Activities are planned in detail on a yearly basis in the Annual Work Programs, following these routines
while taking into account the actual portfolio of Funded Projects, strategic directions and decisions from the
Governing Board as well as the status of the initiative achieved and the available financial and personnel
resources provided by the Parties. The 1st Annual Work Program 2022 has been delivered as an annex to
the proposal, and became part of the Initial Grant Agreement. The preparation phase from November 2021
to the official start date of the Initial Grant Agreement was integrated in this first Annual Work Program. The
Parties have reached consensus to remunerate the related Coordination Cost based on the first Annual
Management Report.
- The Governing Board always remains responsible to adjust the work planning and the related resources
as proposed by the CETPartnership Management according to the actual situation. The Coordinator shall
design a financial reporting scheme that includes the data needed from each Party. It shall enable the
CETPartnership Management and the Governing Board to monitor the balance between the available EU
Financial Contribution on the one hand and the used and planned financial resources on the other hand. It
shall support the related decision making in the Governing Board, supported by its Budget Review Group. It
shall enable the Coordinator to trigger early warnings reported to the Governing Board and take actions
decided by the Governing Board to mitigate financial risks.
- Capacities are personnel resources for the CETPartnership Management, which are allocated to TRI
Management Leaders (particularly TRI Offices) and Coordination Body Leads (the Parties that are Work
Package Leaders according to the Implementation Plan). These Parties hold main responsibility to implement
the CETPartnership Management (see also Section 6.3.7). Capacities are meant to provide the basic
management backbone, facilitating the implementation of the planned annual Joint Calls from 2022 – 2027
and follow-up activities (incl. knowledge creation, sharing and management as well as maximising exploitation
and impact). They are planned to ensure a seamless, reliable, sustainable and highly efficient implementation
of the CETPartnership over the whole duration of the CETPartnership. The build-up of these Capacities is of
utmost importance in order to attract highly skilled and sustainable staff, co-developing the complex, highly
dynamic and interlinked core procedures from the very beginning and incorporating their design and the
learnings to be gained. Major efficiency gains will be made by that. Therefore, the budgeting shall give planning
security to the responsible Parties.
- Additional Distributed Resources shall be shared with other Parties that are also contributing to
Coordination, Management and Support Activities, planned to provide additional resources for the
CETPartnership Management, to reach the highly ambitious goals of the CETPartnership. The TRI
Management Leaders and Coordination Body Management Leaders are responsible for the detailed planning
of the task sharing in the Implementation Plan as well as on a yearly basis (Annual Work Programs), including
the allocation of the resources. The “Distributed Resources” are calculated based on the specific efforts related
to a specific Joint Call and its follow-up activities. They also include all Subcontracting, Travel and Purchase
Cost (e.g. for External Experts for project evaluation, meetings and events, ICT equipment and tools), part of
which are required to fulfil the obligations towards the Granting Authority to a reasonable extent. Part of the
“Distributed Resources” are expected to scale (up or down), according to the number of funded projects to be
served, number of Funding Partners in the particular Joint Calls to be served, number and size of Independent
Expert Panels, number and size of working groups in the Knowledge Community as well as quantity and
ambition of other accompanying activities planned.
v3-31.01.2023/Finalised 25.05.2023
40
7.6.1 Coordination Cost
Coordination Cost for the implementation of the CETPartnership have been calculated on the following
assumptions:
- The Parties intend to implement the CETPartnership and the planned annual Joint Calls from 2022 to
2027, as indicated in the first proposal, that has been published by the Granting Authority on the
CORDIS Website on 8th June 2020.
- The Parties intend to implement the CETPartnership according to the formulated goals and ambitions in
the Initial Implementation Plan (sections “Excellence” and “Impact”) and according to the extrapolation of
the Coordination, Management and Support Activities as outlined in the Implementation Plan (section
“Quality and Efficiency of Implementation”).
- European Member States and the Granting Authority are planning to co-fund the annual Joint Calls from
2023 to 2027 via the Related Grant Agreements and allocate sufficient budget in the Horizon Europe Work
Programmes for this purpose.
- The Parties intend to acknowledge additional Grant Agreements other than the Initial Grant Agreement as
Related Grant Agreements and all their Parties enter this Partnership Framework Consortium Agreement.
(i) Typical Envisaged Annual Coordination Cost
Coordination Cost in a year in which a Joint Call is organised and Funded Projects resulting from previous Joint
Calls are in execution, under the assumption that National/Regional Financial Contributions for Joint Calls would
be the same as for the Joint Calls 2022 and 2023 (see Section 7.6.3) are considered “Typical Coordination Cost”.
They are planned as shown in the table below. Annual Coordination Cost in the ramp-up and ramp-down phase of
the CETPartnership are expected to deviate from the envisaged annual 5.5M € Coordination Costs. Annual
Coordination Cost may also deviate by decisions of the GOB.
- according to actual national/regional Financial Contributions for the Joint Call in the respective year,
together with the actual requested funding in proposals for Funded Projects, resulting in a certain number
of Funded Projects to be evaluated;
- according to the number of Parties that participate in the Transition Initiatives and in the Joint Call in the
respective year, resulting in efforts to coordinate the development of Call Modules;
- according to active Funded Projects resulting from previous Joint Calls that are collaborating in the
Knowledge Community;
v3-31.01.2023/Finalised 25.05.2023
41
Table 3: Envisaged Annual Coordinaton Costs for the whole CETPartnership duration, broken down to Coordination
Bodies and TRI Managements
[Mio €] % of
Total
Capacity 0,40
Coordination Distributed 0,60
[COR] Resources
Total 1,00 18%
Capacity 0,22
Call Management
Distributed 0,43
[CAM]
Resources
Total 0,65 12%
Capacity 1,00
Transition Initiatives
Distributed 1,35
[TRIs]
Resources
Total 2,35 43%
Capacity 0,13
Communication Office
Distributed 0,37
[COO]
Resources
Total 0,50 9%
Knowledge Community Capacity 0,30
Management Distributed 0,20
[KCM] Resources
Total 0,50 9%
Impact Network Capacity 0,30
Management Distributed 0,20
[INM] Resources
Total 0,50 9%
Total 5,50 100%
(ii) Envisaged Distribution of Coordination Cost over years and Grant Agreements or extension
Periods resulting from Extension Amendments (“GA2”, “GA3”)
The distribution of Coordination Cost over years and Grant Agreements has been calculated based on typical
envisaged Coordination Cost, according to the following assumptions:
- First Joint Call implemented in 2022 after a ramp-up and preparation phase starting in November 2021.
- Annual Joint Calls implemented as planned with constant National/Regional Financial Contributions
according to section 7.4.3.
- Time from Joint Call publication to grant of Funded Projects is 1,5 years.
- Implementation time for Funded Projects is 3 years.
- The Initial Grant Agreement and each Related Grant Agreement comprises
o the preparation and implementation of two Co-funded Joint Calls;
o and the follow-up activities for the Funded Projects resulting from these two Co-funded Joint
Calls.
- In addition to the Initial Grant Agreement two Related Grant Agreements or Extension Amendments to co-
fund activities not covered by the Initial Grant Agreement, will be closed in 2024 and 2026 (indicated in
Tables as “GA2” and “GA3”).
- Each Grant Agreement or Extension Amendment comprises 6 months for final reporting from the
anticipated end of the last funded Transnational Project.
The contribution of the Granting Authority has been calculated on the following assumptions:
- Within the first two Joint Calls, 80% of the National/Regional Financial Contributions would be finally
granted to Funded Projects. With improvements based on learnings from the first calls, it would be 86%
in the following Joint Calls
- EU Top-Up For Funded Projects is 30% of total contribution to Project Participants (National/Regional
Financial Contribution plus EU Top-Up For Funded Projects)
- 30% EU Financial Contribution for Coordination Cost.
v3-31.01.2023/Finalised 25.05.2023
42
Table 4: Envisaged Coordination Cost for the whole CET Partnership duration and its distribution among Grant
Agreements, broken down to Coordination Bodies and TRI Managements
(iii) Budgeting for the Initial Grant Agreement
Resources in the Initial Grant Agreement are planned under the following assumptions to mitigate risks going
along with the uncertainties according to the closure of Related Grant Agreements:
- Capacities have been planned to enable the CETPartnership to implement annual Joint Calls from 2022 –
2027.
- Distributed resources are planned on the basis of the efforts to prepare and implement the Joint Calls 2022
and 2023 and related follow-up activities. They also include all Subcontracting, Travel and Purchase Cost (e.g.
for External Experts for project evaluation, meetings and events, ICT equipment and tools).
Table 5: Capacities and Distributed Resources as budgeted in the Initial Grant Agreement
Capacities CETPartnership Management Distributed Resources CETPartnership Management
(WP Leads, TRI Offices aggregated) (WPs all contributors, TRIs aggregated all contributors)
Capacities TRIs (TRI Offices) Distributed Resources TRIs (all contributors)
In total a maximum of 35.1M € of Coordination Cost is planned in the Initial Grant Agreement, providing the flexibility
to be claimed to the Granting Authority to also leverage the maximum grant amount of the Initial Grant Agreement
in case that the maximum grant amount of 70M € would not be leveraged and the closure of the Related Grant
Agreements or Extension Amendments would be delayed or even not realised. This planning will be subject to
request for change to the Granting Authority in the course of amendments to the Initial Grant Agreement, as soon
as Related Grant Agreements or Extension Amendments have been closed and Coordination Cost can be
v3-31.01.2023/Finalised 25.05.2023
43
distributed among the Grant Agreements or extension periods resulting from Extension Amendments as shown in
7.6.1 (ii), Table 4 (“GA2”, “GA3”).
7.6.2 Parties’ Own Management Expenses
Initial Parties’ Own Management Expenses are planned in the Initial Grant Agreement for activities according to the
preparation and implementation of the Joint Calls 2022 and 2023 and the related follow-up activities as shown in
Table 6. These figures are the basis for the calculations in Section 7 (Financial Provisions).
The Parties agree on the following allocation of budget for Parties’ Own Management Expenses.
Table 6: Planned Parties’ Own Management Cost, status as per date of signature of this Partnership Framework
Consortium Agreement
Country
Party Party Name Personnel Travel Party Total
Code
4 - SPW BE Public Service of Wallonia - 13.500 € 13.500 €
5 - TA CR Technology Agency of the Czech 38.400 € 4.000 € 42.400 €
CZ
Republic
11 - MKM Ministry of Economic Affairs and - 8.000 € 8.000 €
EE
Communications
12 - ETAg EE Estonian Research Council 21.000 € 20.000 € 41.000 €
13 - GSRI Greek Ministry for Development and 50.000 € 4.800 € 54.800 €
EL Investments, General Secretariat for
Research & Innovation
14 - AEI ES Agencia Estatal de Investigación 96.000 € 15.000 € 111.000 €
15 - SODERCAN Regional Development Agency of 30.000 € 4.000 € 34.000 €
ES
Cantabria
18 - FICYT Foundation for the Promotion of 49.000 € 4.800 € 53.800 €
ES Applied Scientific Research and
Technology in Asturias
19 - CDTI E.P.E. ES CDTI E.P.E 30.000 € 5.000 € 35.000 €
21 - ANR FR French National Research Agency 150.000 € 4.000 € 154.000 €
26 - NKFIH National Research, Development and 21.600 € 3.200 € 24.800 €
HU
Innovation Office
28 - GSI Department of the Environment, 40.000 € 5.000 € 45.000 €
IE Climate & Communications/ Geological
Survey Ireland
34 - LZP LV Latvian Council of Science 49.000 € 8.000 € 57.000 €
35 - MEYR Ministry for Equality, Research and 83.000 € 11.000 € 94.000 €
MT
Innovation
41 - NCBR National Centre for Research and 59.500 € 18.300 € 77.800 €
PL
Development
42 - FCT Portuguese Foundation for Science 47.500 € 3.000 € 50.500 €
PT
and Technology
43 - DGEG Portuguese Directorate General for 48.850 € 4.500 € 53.350 €
PT
Energy and Geology
46 - TUBITAK The Scientific and Technological 72.000 € 10.000 € 82.000 €
TR
Research Council of Turkey
47 - RIFC Reseach and Innovation Foundation 67.000 € 16.800 € 83.800 €
CY
Cyprus
48- SMWK Saxon State Ministry for Science, 53.000 € 6.000 € 59.000 €
DE
Culture and Tourism
50.1 - VLAIO BE Vlaamse gewest 20.000 € 6.000 € 26.000 €
Total 1.025.850 € 174.900 € 1.200.750 €
v3-31.01.2023/Finalised 25.05.2023
44
7.6.3 National/Regional Financial Contributions from Funding Partners
The following table indicates the initial financial commitments and indications of Funding Partners from their own
national/regional funds for the Joint Calls 2022 and 2023 as covered by the Initial Grant Agreement and the overall
commitment for all Joint Calls planned in the CETPartnership from 2022 - 2027.
In order to avoid doubt: Budgets in this table are included in good faith. Only financial figures in the Initial Grant
Agreement or the Related Grant Agreements are binding, apart from Force Majeure. Commitments for the planned
annual Joint Calls 2024 - 2027 will be specified on establishing the Related Grant Agreements and summarised in
the Implementation Plan.
The figures in Table 7 indicate the planned National/Regional Financial Contributions, meaning the financial
support, eligible to receive EU Financial Contribution, the Party in its role as a Program Manager or Program Owner
& Manager provides to Funded Projects from their own accounts. Institutional Couples are indicated by naming the
respective Program Manager or Program Owner under “Role” in parentheses. Updates of this table will be provided
in the actual version of the Implementation Plan as approved by the Governing Board.
v3-31.01.2023/Finalised 25.05.2023
45
Table 7: Planned National/Regional Financial Contributions
Committed
Role Indicated Total
National/ Regional
[PO Program National/Regional
Country Financial
Party Party Name Owner, Financial
Code Contributions for
PM Program Contributions for
Manager] Calls 2022 and
Calls 2022-2027
2023
Federal Ministry for Climate
Action, Environment, PO
BMK AT - -
Energy, Mobility, Innovation (PM: FFG)
and Technology
PM
Austrian Research
FFG AT for PO: BMK 4.000.000 €
Promotion Agency 40.000.000 €
for PO: KLIEN 7.000.000 €
PO
KLIEN AT Climate and Energy Fund - -
(PM FFG)
SPW BE Public Service of Wallonia PO&M 900.000 € 5.400.000 €
Technology Agency of the PM
TA CR CZ 2.600.000 € 8.200.000 €
Czech Republic (PO: MPO)
Czech Ministry of Industry PO
MPO CZ - -
and Trade (PM: TACR)
Czech Ministry of PO
MZP CZ - -
Environment (PM: TACR)
Projektträger Jülich | PM
FZJ DE Forschungszentrum Jülich [PO: MWIDE] 26.000.000 € 90.000.000 €
GmbH [PO: BMBWK]
INNOV. FUND
DK Innovation Fund Denmark PM 2.000.000 € 7.000.000 €
DK
DEA DK Danish Energy Authority PM 6.000.000 € 21.000.000 €
Ministry of Economic Affairs
MKM EE PO&M 420.000 € 1.500.000 €
and Communications
ETA EE Estonian Research Council PO&M 520.000 € 1.850.000 €
Greek Ministry for
Development and
GSRI EL Investments, General PO&M 1.000.000 € 7.000.000 €
Secretariat for Research &
Innovation
Agencia Estatal de
AEI ES PM 4.000.000 € 14.000.000 €
Investigación
Regional Development
SODERCAN ES PO&M 300.000 € 1.600.000 €
Agency of Cantabria
Departamento de Desarrollo
Económico, Sostenibilidad y
EUSKADI ES PO&M 2.000.000 € 7.000.000 €
Medio Ambiente. Eusko
Jaurlaritza-Gobierno Vasco
EVE ES Ente Vasco de la Energía PO&M 2.000.000 € 7.000.000 €
Foundation for the
Promotion of Applied
FICYT ES PM 600.000 € 2.400.000 €
Scientific Research and
Technology in Asturias
CDTI E.P.E. ES CDTI E.P.E PM 3.000.000 € 10.500.000 €
Innovaatiorahoituskeskus
BF FI PO&M 10.000.000 € 35.000.000 €
Business Finland
v3-31.01.2023/Finalised 25.05.2023
46
Committed
Role Indicated Total
National/ Regional
[PO Program National/Regional
Country Financial
Party Party Name Owner, Financial
Code Contributions for
PM Program Contributions for
Manager] Calls 2022 and
Calls 2022-2027
2023
French National Research PM
ANR FR 6.000.000 € 21.000.000 €
Agency (PO: MESRI)
French Ministry of Higher
PO
MESRI FR Education, Research and - -
(PM: ANR)
Innovation
Agence De l'Environnement
ADEME FR et de la Maitrise De PM 3.000.000 € 21.000.000 €
L'energie
RPL FR Région Pays de la Loire PO&M 1.720.000 € 6.000.000 €
Croatian Ministry of
CMESD HR Economy and Sustainable PO&M - 11.000 €
Development
National Research,
NKFIH HU Development and Innovation PM 2.000.000 € 7.000.000 €
Office
Sustainable Energy
SEAI IE PO&M 1.000.000 € 3.500.000 €
Authority of Ireland
Department of the
Environment, Climate &
GSI IE PO&M 200.000 € 500.000 €
Communications/Geological
Survey Ireland
Ministry of National
MoE IL Infrastructure, Energy and PO&M 2.400.000 € 8.400.000 €
Water Resources
PM
The Icelandic Centre for
Rannis IS (PO: 2.000.000 € 7.000.000 €
Research, rannís
Orkustofnun)
National Energy Authority of PO
Orkustofnun IS - -
Iceland/Orkustofnun (PM: Rannis)
Ministero dell'Università e
MUR IT PO&M 16.400.000 € 50.000.000 €
della Ricerca
Ministry of Economic
Development (intending to
MISE - MIMIT IT PO&M 32.000.000 € 32.000.000 €
become a party by
amendment of the GA)
ENMIN Ministry of Energy of the
LT PO&M 1.400.000 € 8.900.000 €
LITHUANIA Republic of Lithuania
LZP LV Latvian Council of Science PM 400.000 € 3.000.000 €
Institut de Recherche en
IRESEN MA Energie Solaire et Energies PO&M - -
Nouvelles
Ministry for Equality,
MFER MT PO&M 3.500.000 € 3.500.000 €
Research and Innovation
Dutch Ministry of Economic
MINEZK NL PO&M 16.000.000 € 56.000.000 €
Affairs and Climate
NWO NL Dutch Research Council PM 2.000.000 € 6.750.000 €
The Research Council of
RCN NO PM 16.660.000 € 50.000.000 €
Norway
GASSNOVA NO Gassnova PO&M 1.200.000 € 1.200.000 €
v3-31.01.2023/Finalised 25.05.2023
47
Committed
Role Indicated Total
National/ Regional
[PO Program National/Regional
Country Financial
Party Party Name Owner, Financial
Code Contributions for
PM Program Contributions for
Manager] Calls 2022 and
Calls 2022-2027
2023
National Centre for
NCBR PL PO&M 6.000.000 € 21.000.000 €
Research and Development
Portuguese Foundation for PO&M
FCT PT 1.000.000 € 1.000.000 €
Science and Technology (DGEG supp.)
Portuguese Directorate
Support:
DGEG PT General for Energy and - -
(PO&M FCT)
Geology
Executive Agency for Higher
Education, Research, PM
UEFISCDI RO 2.000.000 € 2.000.000 €
Development and Innovation (PO: MCID)
Funding
SWEA - STEM SE Statens energimyndighet PO&M 7.000.000 € 40.000.000 €
The Scientific and
TUBITAK TR Technological Research PM 4.000.000 € 12.000.000 €
Council of Turkey
SCOTENT UK Scottish Enterprise PM 8.600.000 € 30.000.000 €
Reseach and Innovation
RIFC CY PM 1.000.000 € 3.000.000 €
Foundation Cyprus
Saxon State Ministry for
SMWK DE Science, Culture and PO&M 4.000.000 € 15.000.000 €
Tourism
PO&M
Fonds Innoveren en
FIO BE (PM Support: 2.000.000 € 7.000.000 €
Ondernemen
VLAIO)
Total
consortium
215.820.000 € 669.211.000 €
without CH
Federal Department of the
Environment, Transport,
DETEC CH PO&M 4.000.000 € 10.000.000 €
Energy and
Communications
Swiss National Science
SNF CH PO&M 1.100.000 € 3.300.000 €
Foundation
Total
consortium
220.920.000 € 682.511.000 €
with CH
7.7 Excess payments and revenues
A Party has received excess payment if the payment received from the Coordinator exceeds the amount declared
and approved by the Granting Authority and/or the Governing Board where applicable.
In any case of a Party having received excess payments, the Party has to inform the Coordinator and return the
relevant amount to the Coordinator without undue delay. In case no refund takes place within 30 calendar days
upon request for return of excess payment from the Coordinator, the Party is in substantial breach of this
Partnership Framework Consortium Agreement and shall be reported to the Governing Board as a possible
Defaulting Party.
The Governing Board may declare the breaching Party as a Defaulting Party.
v3-31.01.2023/Finalised 25.05.2023
48
In case of a breach the Governing Board decides on legal action against the breaching Party. The Coordinator
engages to take the necessary and reasonable steps to recover the amount due from the breaching Party.
Amounts which are not refunded by a breaching Party and which are not due to the Granting Authority, shall be
apportioned by the Coordinator to the remaining Funding Partners that are Beneficiaries of the affected Grant
Agreement pro rata according to their share of total costs as identified in the latest Periodic Report within the Grant
Agreement to the Granting Authority, or in its absence, as identified in the initial data of the affected Grant
Agreement, until recovery from the breaching Party is possible.
7.8 Cost of Certificates on the Financial Statement
If a Party is eligible for requesting a total EU Financial Contribution of 430,000.00 € or more as reimbursement for
all costs (including indirect costs), a Certificate on the Financial Statement is required.
Each Party shall cover the costs for its own Certificate on the Financial Statement it has to provide according to
the respective Grant Agreement.
7.9 Mitigation Scenarios and deduced obligations
Budgets and payments are controlled by the Governing Board. The Coordinator shall facilitate this by designing a
financial reporting scheme that includes the data needed from each Party. This shall enable the CETPartnership
Management and the Governing Board to monitor the balance between the available EU Financial Contribution on
the one hand and the used and planned financial resources on the other hand. It shall support the related decision-
making in the Governing Board, supported by its Budget Review Group. It shall enable the Coordinator to trigger
early warnings to mitigate financial risks. Thus the Parties shall jointly guarantee to keep up Capacity to act
according to the obligations towards the Granting Authority as well as building a reserve fund from the EU Financial
Contribution to mitigate risk of uncovered payments.
The following Mitigation Scenarios have been calculated in order to exemplarily demonstrate possible
mitigation strategies for any - even substantial - deviations from the original budget plans and deduce
necessary commitments from the Parties to provide for risk mitigation or even emergency steps.
7.9.1 Termination Scenario
In the unlikely case, that the CETPartnership might need to be terminated at an early stage under the following
circumstances:
- The Joint Calls 2022 and 2023 would not be successful in a way that only an unexpected low number of
Funded Projects started, either through a lack of proposals with sufficient quality or due to/or in
combination with a failure in the selection process when applying the Mixed Mode Funding Model.
- Additionally, the planned Related Grant Agreements or Extension Amendments (outlined as ”GA 2” and
”GA 3” in Table 8) would not be realised.
- And also, no other Joint Calls could be launched with the remaining or new National/Regional Financial
Contributions or could not be credited under the Initial Grant Agreement.
As a consequence, a high share of the EU Financial Contribution would be used to cover Coordination Cost.
In the model calculation below it was assumed that only 27% of the National/Regional Financial Contributions
(resulting in 30M € total financial contributions to Funded Projects) would finally be granted to Funded Projects
within the Joint Call 2022 and only 44% (resulting in 50M € total financial contribution to Funded Projects) within
the Joint Call 2023. Under the assumption that the Governing Board would minimise the resources for Coordination,
Management and Support Activities to “Capacities”, to implement basic functions of the CETPartnership and to
enable the consortium to fulfil its obligations towards the Granting Authority, this might e.g. result in 70% of the
leveraged EU Financial Contribution to be used for Coordination Cost, which would increase to 21% of the total
cost (= total contribution to third parties + Coordination Cost).
v3-31.01.2023/Finalised 25.05.2023
49
Table 8: Model Calculation Termination Scenario
However, even in such scenario it would be possible to
- broadly fulfil the obligations towards the Granting Authority,
- mitigate risk for Parties impelementing Coordination, Mangement and Support Activities, particularly
Supporting Partners, and
- mitigate risk for Fuding Partners,
as the Parties shall be committed to the following:
- In case of unsuccessful first two Co-funded Joint Calls and non-realisation of the Related Grant
Agreements (depicted in Table 8 as “GA 2” and “GA 3”), the Parties of this Partnership Framework
Consortium Agreement guarantee the financing of the CETPartnership Management with priority to
„Capacities“ with the respective EU Financial Contribution to be received, until obligations towards the
Granting Authority under the Initial Grant Agreement are fulfilled.
- With the additional rule that no Funding Partner can be forced to contribute more to Coordination Cost
than the EU-Top-Up For Funded Projects the Party has received. For the avoidance of doubt: planned
Coordination Cost can never exceed the available EU Financial Contribution.
- Budgets shall be adjusted according to the following prioritisation:
o Keep-up Capacities to the extent ensuring in any case contract management and timely reporting
to the Granting Authority;
o Cover justified Coordination Cost incurred of Parties that are not a public entity;
o Provide EU Top-Up For Funded Projects;
o Cover Coordination Cost of Parties that are public bodies.
7.9.2 Minimal Scenario – reduce to Capacities
In a scenario considering political and economic uncertainties to commence, the CETPartnership might limit its
activities under the following assumptions:
- The Joint Calls 2022 and 2023 would be reasonably successful.
- The planned Related Grant Agreements or Extension Amendments (in Table 9 connotated as “GA 2” and
“GA 3”) would be realised.
- Annual Co-funded Joint Calls until 2027 would be implemented.
- But with a substantial decrease of National/Regional Financial Contributions.
v3-31.01.2023/Finalised 25.05.2023
50
In the model calculation the National/Regional Financial Contributions have been assumed to decrease drastically
to half the amount of the first two Joint Calls. Coordination Cost have been limited to „Capacities“ to the extent
planned according to the „Typical Annual Coordination Cost“ (Section 7.6.1).
The result is, that Coordination Cost limited to „Capacities“ would stay within a reasonable range of max. 7% of
total cost (=total contribution to third parties + Coordination Cost), even if the national/regional commitments would
be cut by half compared to the initial commitments (see Section 7.4.3 Financial Contributions from Funding
Partners- 2022-2027).
Table 9: Model calculation Minimal Scenario
Also in such scenario it would be possible to
- Successfully implement the CETPartnership Implementation Plan.
- Put into action the prospects given to the European Research, Development and Innovation communities.
- Ensure that the Parties are able to successfully fulfil their obligations towards the Granting Authority.
- Value the efforts of the Parties to establish the CETPartnership and keep a balance between the
commitment of Parties involved in the CETPartnership Management and all other partners.
- Limit the Coordination Cost to a reasonable fraction of the total budget.
as the Parties shall be committed to the following:
- As long as the planned Related Grant Agreements or Extension Amendments - ”GA 2” and ”GA 3” - are
going to be realised, the consortium guarantees the financing of the planned “Capacities“ according to the
„Typical Annual Coordination Cost“ as outlined in Section 7.6.1 until the planned end of the
CETPartnership.
- The Governing Board may decide to cut the “Capacities“ (as planned according to the “Typical Annual
Coordination Cost“ as outlined in Section 7.6.1), in case the Coordination Cost limited to “Capacities“
would exceed 7% of the annual total budget.
- With the additional rule that no Party can be forced to contribute more to Coordination Cost than the EU
Financial Contribution the Party has received. In other words: Coordination Cost can never exceed the
available EU Financial Contribution.
7.9.3 Reserve fund from the EU-Top-Up for Projects to mitigate risk of uncovered payments
With the implementation of the financial monitoring and warning system by the Coordinator, the in-depth checks of
budgets and financial planning by the Budget Review Group and the foresightful decision making in the GOB, a
situation of uncovered Coordination Cost will be broadly avoided. However, unforeseen events that cannot be taken
v3-31.01.2023/Finalised 25.05.2023
51
into account in the financial planning, e.g. failing of a big Funded Project very late in its implementation process,
could lead to a situation, where close to the end of a Grant Agreement the eligible costs to be clamied to the
Granting Authority would be less than planned and the available EU Financial Contribution will be less as well.
In such cases, costs may already have incurred, which cannot be averted any more
as they have been adopted by the GOB within an Annual Work Program and cannot be avoided, even by
trying to reduce the planned activities last minute during the execution of the Annual Work Program,
or even have already been adopted by the GOB within an Annual Management Report.
In order to keep the GOB capable of acting in such cases, making final adjustments to the financial planning and
reimburse incurred costs, the following shall be agreed:
The GOB will investigate, if coverage of the costs incurred is possible by other measures (e.g. Parties
would be able to cover the costs from their own part of the EU Financial Contribution or it would be possible
to shift the allocation of cost between different Grant Agreements) or if other options of compensation are
available.
If this is not possible, the GOB will be allowed to use the final two planned transfers of EU-Top-Up For
Funded Projects from the Initial Grant Agreement (see Table 2) or a Related Grant Agreement from the
Coordinator to the Parties (planned to be 25% + 5% of the EU-Top-Up For Funded Projects) as a reserve
fund to cover the incurred cost.
Section 8: Implementation of Joint Calls
8.1 Commitment of the Funding Partners
The Funding Partners will endeavour to make every effort, particularly through their financial commitments, the
Joint Call definition and their choices in terms of selection, so that the Partnership can (in no particular order of
importance)
maximise the amount of EU Top-Up For Funded Projects generated,
maximise the total output in terms of Funded Projects,
have a good balance between the Call Modules regarding the output in terms of Funded Projects,
maximise the number of countries/regions involved into the Funded Projects,
have similar success rates between the Call Modules.
8.2. Preparation of Joint Calls
The Transition Initiatives are responsible to coordinate the Parties, participating in the TRIs, to formulate Call
Module(s) for the Joint Call, comprising the objectives and challenges or topics addressed, requirements for
projects and information about the Funding Partners providing funding. The TRIs shall be coordinated and
supported by the Call Management in this task towards a harmonised approach. Joint Calls shall be composed of
the Call Modules from the different TRIs. Joint Calls shall be published on the CETPartnership website. The TRIs
together with the Communication Office will disseminate the information about Joint calls to the CETPartnership
and TRI specific stakeholder groups. Additionally, they will support the Funding Partners to convey the information
to the relevant national stakeholder groups. Proposals will be submitted to the CETPartnership via an electronic
submission tool provided via the CETPartnership website.
8.3 Evaluation and Selection of Funded Projects
The Sections 8.2 and 8.3 describe the process for the Co-funded Joint Calls.
The procedure for non-co-funded Joint Calls will be decided upon by the Governing Board Call Specific
Configuration by unanimity proposed in the Programme Managers Handbook (see Section 6.3.1).
Eligibility of pre-proposals and full proposals will be checked on national/regional level by the Programme Managers
as well as on a transnational level by the Call Management according to rules to be described in the Programme
Managers Handbook.
v3-31.01.2023/Finalised 25.05.2023
52
8.3.1 Pre-proposal stage
In order to establish a short-list of pre-proposals to be invited to submit a full proposal, two main aspects shall be
taken into account:
the quality of the pre-proposals as well as the
available National/Regional Financial Contributions per Call Module.
8.3.2 Central scientific evaluation of pre-proposals
A single international peer review shall be accomplished after the national/regional and transnational eligibility
checks to assess the submitted pre-proposals. At least three independent experts shall evaluate each pre-proposal
according to the Evaluation Criteria as described in the Programme Managers Handbook in full compliance with
the rules given by the Granting Authority. The result of the peer review shall be one ranking long-list of pre-proposals
for each call module consisting of projects having reached the evaluation threshold.
8.3.3 Limiting oversubscription
The Call Partners shall make their best efforts to match their national/regional funding budget with the expected
success of their respective research and innovation communities.
All Call Partners have the right to allocate their National/Regional Financial Contributions to specific call modules.
The oversubscription rate per Call Partner shall be limited to a maximum of four, unless otherwise decided by the
Governing Board Call Specific Configuration. The oversubscription rate shall be defined in the Programme
Managers Handbook, to be approved by the Governing Board Call Specific Configuration for each Joint Call. For
Call Partners that have allocated their contribution to specific call modules, the oversubscription rate shall be
calculated per call module, limiting requested funding to no more than four times the national/regional financial
commitment of each partner allocated/preliminary committed to the specific call module. Call Partners not having
dedicated funding to specific call modules up front, shall calculate their oversubscription in relation to their overall
funding/application ratio, considering all pre-proposals on the long-list with partners requesting their contribution
and their total financial contribution to the Joint Call. Call Partners with high oversubscription rates will be invited to
seek for an increase of their budget.
Additional measures to manage oversubscription may be implemented if necessary. These are to be decided upon
by the Governing Board Call Specific Configuration based on a proposal from the TRIs together with the Call
Management.
8.3.4 Selection of projects to be invited to submit a full proposal
On the basis of the long-lists, a short-list of pre-proposals to be invited to submit a full proposal shall be established
by the Call Management together with the TRI Leading Experts. This short-list will follow strictly the ranked long-
lists and skip the pre-proposals involving Call Partners that have already reached the oversubscription limit.
Call Partners with high oversubscription rates will be invited to seek for an increase of their budget. Taking into
account the new availability of funds and the discussion among Call Partners, the final group of pre-proposals will
be selected. The proposed short list shall be developed according to the core principles as listed in Section 8.1 in
no particular order of importance.
8.3.5 Full-proposal stage
A single international peer review shall be accomplished. The Expert Panel shall rank proposals according to the
evaluation criteria as will be described in the Programme Managers Handbook in full compliance with the rules
given by the Granting Authority. At least three independent experts shall evaluate each full proposal. The result of
the peer review shall be a ranking list of full proposals, suggested for funding.
8.3.6 Selection of the projects to be funded
Based on the rankings by the Expert Panel and considering the respective available budgets of the Call Partners
and the EU Financial Contribution, the Call Management Team together with the TRI Leading Experts will prepare
funding scenarios and recommendations to the Governing Board, taking into account that it is a requirement of the
CETPartnership to follow the ranking list as suggested.
v3-31.01.2023/Finalised 25.05.2023
53
The Governing Board Call Specific Configuration shall agree on the ranking list based on the suggestion by the
Call Management together with the TRI Leading Experts. Projects with scores below the thresholds given in the
call text will not be funded, even if there is national/regional funding available.
The selection lists will strictly follow the ranking of the projects starting from the highest ranked project. The selection
of the projects to be funded will proceed in two stages.
At the first stage, each Call Partner that has not yet allocated funding to a specific call module, provides a funding
allocation per call module-specific ranking list within the oversubscription limit per call module. Once all the Call
Partners have blocked the budget per module, the top-up available for project funding, is distributed according to
the individual Call Partners’ budget per module.
When all national/regional funding and EU-Top-Up is distributed among the call modules, the Call Management
together with the TRI Leading Experts will develop call module-specific selection lists following the ranking list in
each call module until national/regional budgets are exhausted.
Up to 80% of the EU-Top-Up balancing pot that is generated by national/regional funding within one specific call
module may be used for gap-filling within that specific call module. The remaining 20% or more of the EU-Top-Up
funding generated by each call module shall be reserved for the purpose of gap-filling at CETPartnership level.
At the second stage, the Call Management Team together with the TRI Leading Expert will develop a proposal on
how to use the available top-up funding and remaining available national/regional funding to fill gaps in the ranking
lists. Some Call Partners may be invited to seek for an increase of their budget.
The proposed selection list shall be developed according to the core principles as listed in Section 8.1 in no
particular order of importance.
The Call Partners may use their remaining national/regional funding freely to support projects across call modules.
8.4 Use of EU-Top-Up for Funded Projects
The Call Partners agree to fund as many Funded Projects as possible following the ranking lists per call module.
The EU-Top-Up for Funded Projects shall be used in the most efficient way possible. The Call Partners thus agree
that they will not insist on an equal share of the EU-Top-Up.
The EU-Top-Up for Funded Projects for each Call Partner shall be limited to its total respective financial contribution
to the Joint Calls.
The Governing Board can re-evaluate the rules for using the EU-Top-Up for Funded Projects if a Highly Detrimental
Situation occurs.
The Call Partners agree to use a Mixed Mode Funding Model to compensate cases where participating Funding
Agencies have exhausted their budget at different points in the ranking list. A minimum of 30% of the EU-Top-Up
for Funded Projects, after deduction of the contribution to Coordination Costs (see Section 7), will be reserved for
financial balancing purposes. If more than 30% of the EU-Top-Up for Funded Projects after reduction of the
contribution to Coordination Cost is needed for balancing purposes in order to maximise the number of Funded
Projects that can be funded, this percentage may be further increased by a decision of the Governing Board Call
Specific Configuration for this Joint Call. The EU-Top-Up for Funded Projects will be used for proportional topping-
up of the national/regional funding of the respective Call Partner.
All formal decisions regarding the final selection list of Funded Projects, including the gap filling on CETPartnership
level (meaning the 20% trans-TRI gap filling) shall be taken by the Governing Board Call Specific Configuration on
the basis of proposals from the Call Management together with the TRI Leading Experts. Consensus about call
module specific final lists of projects to be funded, including the call module specific gap filling (80%) shall be
reached within the TRIs according to the TRI Terms of Reference. In case that a call module is developed by
several TRIs, consensus has to be found within a process together with all involved TRIs, also to be described in
the TRI Terms of Reference.
v3-31.01.2023/Finalised 25.05.2023
54
8.5 Conflicts of interests
Each Party agrees that, in order to avoid any conflict of interest within the call for proposals developed in the
CETPartnership, it will not be involved in the evaluation process (including the appointment of the international
panel of independent experts).
In selecting the international independent experts for the Expert Panels, the TRIs, Call Management and the
Governing Board shall also endeavour to avoid any possible conflicts of interest. The Call Management Team shall
prepare a template concerning potential conflicts of interests and a declaration, which has to be signed by each
member of the Expert Panels.
8.6 Contractual obligations towards the Granting Authority on selection
The Funding Agencies shall provide to the Coordinator within 20 calendar days after the end of the selection
process a formal and duly signed commitment on availability of funds for their selected projects.
After the end of the selection process, the Coordinator shall submit including but not limited to the Granting
Authority:
(a) the ranking lists of the projects;
(b) the evaluation observers' report on the evaluation;
(c) the joint selection list of the projects to be funded, and
(d) a formal and duly signed commitment on availability of funds for the selected projects from each
Funding Agency participating in the Joint Calls.
The Coordinator will furthermore submit to the Granting Authority after the end of the selection process information
on each project selected for funding, including data on each Project Participant and abstracts of the project
proposals, in a format specified by the Granting Authority, for publication and evaluation purposes, based on
information delivered by the Projects during the submission of proposals.
This information will be updated at the end of the CETPartnership within the established Project Monitoring
(information on each Funded Project, including data on each Project Participant and overview of the results).
The Funding Agencies shall inform their national project applicants that the above mentioned data will be submitted
to the Granting Authority.
8.7 Contractual obligations for projects funded in the Joint Calls
The Call Partners acting as Program Managers for projects selected for funding in the Joint Calls agree to oblige
their Project Participants in funding contracts to the following:
to have a signed Consortium Agreement (recommended: prior to the start of the project) at least
addressing the following topics:
o Internal organisation and management of the consortium
o Intellectual Property arrangements
o Settlement of internal disputes
to prepare popular science summaries of the project contents for programme activities and publications
(e.g. for brochures, [digital] newsletters, the website) jointly with all Project Participants of the Funded
Project;
to participate in the Activities of the CETPartnership Knowledge Community, based on resources provided
in a relevant standard work package to each Funded Project;
to take part in, and contribute with project presentations and/or posters to the foreseen events of the
CETPartnership;
to prepare short annual joint reports together with all Project Participants of the funded Project according
to a standardised template and to respond to two in-depth monitoring surveys (mid-term and final) to
measure project progress and contribution to overall CETPartnership aims;
to provide the information on their projects, including data on each Project Participant and abstracts of the
project proposals, in a format specified by the Granting Authority, for publication and evaluation purposes.
v3-31.01.2023/Finalised 25.05.2023
55
Section 9: Results
9.1 Ownership of Results
For the avoidance of doubt, the term „Results“ in this section (as defined in Article 16.2 GA) refers to the Results
generated by the CETPartnership and does not include the results generated by the Funded Projects.
Results are owned by the Party that generates them.
Joint ownership is governed by Article 16.4 of the Annotated Model Grant Agreement and its Annex 5, Section
Ownership of results, with the following additions:
Unless otherwise agreed:
each of the joint owners shall be entitled to use their jointly owned Results for non-commercial activities
on a royalty-free basis, and without requiring the prior consent of the other joint owner(s), and
each of the joint owners shall be entitled to otherwise exploit the jointly owned Results and to grant non-
exclusive licenses to third parties (without any right to sub-license), if the other joint owners are given:
(a) at least 45 calendar days advance notice; and
(b) fair and reasonable compensation.
The joint owners shall agree on all protection measures and the division of related cost in advance.
9.2 Dissemination of own Results
For the avoidance of doubt, the confidentiality obligations set out in Section 11 apply to all dissemination activities
described in 9.2, 9.3 and 9.4.
During the CETPartnership and for a period of one year after the end of the CETPartnership, the dissemination of
own Results by one or several Parties, including but not restricted to publications and presentations, shall be
governed by the procedure of Article 17.4 of the Annotated Model Grant Agreement and its Annex 5, Section
Dissemination, subject to the following provisions.
Prior notice of any planned publication shall be given to the other Parties at least 45 calendar days before the
publication. Any objection to the planned publication shall be made in accordance with the Grant Agreement by
written notice to the Coordinator and to the Party or Parties proposing the dissemination within 30 calendar days
after receipt of the notice. If no objection is made within the time limit stated above, the publication is permitted.
An objection is justified if:
(a) the protection of the objecting Party's Results or Background would be adversely affected
(b) the objecting Party's legitimate interests in relation to its Results or Background would be significantly
harmed, or
(c) the proposed publication includes Confidential Information of the objecting Party.
The objection has to include a precise request for necessary modifications.
If an objection has been raised, the involved Parties shall discuss how to overcome the justified grounds for the
objection on a timely basis (for example by amendment to the planned publication and/or by protecting information
before publication) and the objecting Party shall not unreasonably continue the opposition if appropriate measures
are taken following the discussion.
The objecting Party can request a publication delay of not more than 90 calendar days from the time it raises such
an objection. After 90 calendar days the publication is permitted, provided that the objections of the objecting Party
have been addressed.
9.3 Dissemination of another Party’s unpublished Results or Background
A Party shall not include in any dissemination activity another Party's Results or Background without obtaining the
owning Party's prior written approval, unless they are already published.
v3-31.01.2023/Finalised 25.05.2023
56
9.4 Use of names, logos or trademarks
Nothing in this Partnership Framework Consortium Agreement shall be construed as conferring rights to use in
advertising, publicity or otherwise the name of the Parties or any of their logos or trademarks without their prior
written approval.
v3-31.01.2023/Finalised 25.05.2023
57
Section 10: Access Rights
For the avoidance of doubt, this section refers to the Access Rights of the CETPartnership and does not include
the Access Rights to Background/Results of the Funded Projects.
10.1 Background included
In Attachment 1, the Parties have identified and agreed on the Background for the CETPartnership and have also,
where relevant, informed each other that Access to specific Background is subject to legal restrictions or limits.
Anything not identified in Attachment 1 shall not be the object of Access Right obligations regarding Background.
Any Party may add additional Background to Attachment 1 during the CETPartnership provided they give written
notice to the other Parties. However, approval of the Governing Board is needed should a Party wish to add, modify
or withdraw its Background in Attachment 1.
10.2 General Principles
Each Party shall implement its tasks in accordance with the Implementation Plan and the Annual Work Program
and shall bear sole responsibility for ensuring that its acts within the CETPartnership do not knowingly infringe third
party property rights.
Any Access Rights granted exclude any rights to sublicense unless expressly stated otherwise.
Access Rights shall be free of any administrative transfer costs.
Access Rights are granted on a non-exclusive basis.
Results and Background shall be used only for the purposes for which Access Rights to it have been granted.
All requests for Access Rights shall be made in writing. The granting of Access Rights may be made conditional on
the acceptance of specific conditions aimed at ensuring that these rights will be used only for the intended purpose
and that appropriate confidentiality obligations are in place.
The requesting Party must show that the Access Rights are Needed.
10.3 Access Rights for implementation
Access Rights to Results and Background Needed for the performance of the own work of a Party under the
CETPartnership shall be granted on a royalty-free basis.
10.4 Access Rights for Exploitation
Access Rights to Results if Needed for Exploitation of a Party's own Results shall be granted on a royalty-free basis.
Access Rights to Background if Needed for Exploitation of a Party's own Results, including for research on behalf
of a third party, shall be granted on Fair and Reasonable conditions.
A request for Access Rights may be made up to twelve months after the end of the CETPartnership or, in the case
of a non-Defaulting Party leaving voluntarily and with the other Parties' consent, up to twelve months after the
termination of the requesting Party’s participation in the CETPartnership.
10.5 Access Rights for Parties entering or leaving the consortium
With regards to Results developed before the accession of the new Party, the new Party will be granted Access
Rights on the conditions applying for Access Rights to Background.
Access Rights granted to a Defaulting Party and such Party's right to request Access Rights shall cease immediately
upon receipt by the Defaulting Party of the formal notice of the decision of the Governing Board to terminate its
participation in the CETPartnership.
A non-Defaulting Party leaving voluntarily and with the other Parties' consent shall have Access Rights to the
Results developed until the date of the termination of its participation.
It may request Access Rights within the period of time specified in Section 10.4.
v3-31.01.2023/Finalised 25.05.2023
58
Any Party leaving the CETPartnership shall continue to grant Access Rights pursuant to the Grant Agreement and
this Partnership Framework Consortium Agreement as if it had remained a Party for the whole duration of the
CETPartnership.
Section 11: Non-disclosure of information
11.1 Scope
All information, especially the Ranking List to each Call Module or any information related to proposals or any
information about the outcome of the Joint Call prior to publication of the information on the Funded Projects, in
whatever form or mode of communication, which is disclosed by a Party (the “Disclosing Party”) to any other Party
(the “Recipient”) in connection with the CETPartnership during its implementation and which has been explicitly
marked as “confidential” or “personal distribution for named recipients only” or “limited distribution” at the time of
disclosure, or, when disclosed orally has been identified as confidential at the time of disclosure, and has been
confirmed and designated in writing within 15 calendar days from oral disclosure at the latest as confidential
information by the Disclosing Party, is “Confidential Information”, notwithstanding other applicable laws and
regulations on confidentiality.
11.2 Approach
The Recipients hereby undertake in addition and without prejudice to any commitment on non-disclosure under the
Grant Agreement, for a period of five years after the end of the CETPartnership:
not to use Confidential Information otherwise than for the purpose for which it was disclosed;
not to disclose Confidential Information without the prior written consent by the Disclosing Party;
to ensure that internal distribution of Confidential Information by a Recipient shall take place on a strict
need-to-know basis;
to return to the Disclosing Party, or destroy on request all Confidential Information that has been disclosed
by the Recipients including all copies thereof and to delete all information stored in a machine-readable
form to the extent practically possible. The Recipients may keep a copy to the extent it is required to keep,
archive or store such Confidential Information because of compliance with applicable laws and regulations
or for the proof of on-going obligations provided that the Recipient complies with the confidentiality
obligations herein contained with respect to such copy.
11.3 Range
The Recipients shall be responsible for the fulfilment of the above obligations on the part of their employees or third
parties involved in the CETPartnership and shall ensure that they remain so obliged, as far as legally possible,
during and after the end of the CETPartnership and/or after the termination of the contractual relationship with the
employee or third party.
11.4 Exception
The above shall not apply for disclosure or use of Confidential Information, if and in so far as the Recipient can
show that:
the Confidential Information has become or becomes publicly available by means other than a breach of
the Recipient’s confidentiality obligations;
the Disclosing Party subsequently informs the Recipient that the Confidential Information is no longer
confidential;
the Confidential Information is communicated to the Recipient without any obligation of confidence by a
third party, who is to the best knowledge of the Recipient in lawful possession thereof and under no
obligation of confidentiality to the Disclosing Party;
the disclosure or communication of the Confidential Information is foreseen by provisions of the Grant
Agreement;
the Confidential Information, at any time, was developed by the Recipient completely independently of any
such disclosure by the Disclosing Party;
the Confidential Information was already known to the Recipient prior to disclosure or
v3-31.01.2023/Finalised 25.05.2023
59
the Recipient is required to disclose the Confidential Information in order to comply with applicable national
laws and/or regulations or with a court or administrative order, subject to 11.7 hereunder.
11.5 Handling
The Recipient shall apply the same degree of care with regard to the Confidential Information disclosed within the
scope of the CETPartnership as with its own confidential and/or proprietary information, but in no case less than
reasonable care.
11.6 Unauthorised disclosure
Each Party shall promptly inform the relevant Disclosing Party by written notice of any unauthorised disclosure,
misappropriation or misuse of Confidential Information after it becomes aware of such unauthorised disclosure,
misappropriation or misuse.
11.7 Disclosing Confidential Information in order to comply with applicable laws or
regulations
If any Recipient becomes aware that it will be required, or is likely to be required, to disclose Confidential Information
in order to comply with applicable laws or regulations or with a court or administrative order, it shall, to the extent it
is lawfully able to do so, prior to any such disclosure
notify the Disclosing Party, and
comply with the Disclosing Party’s reasonable instructions to protect the confidentiality of the information.
The confidentiality obligations under this Partnership Framework Consortium Agreement shall not prevent the
obligations, arising from the Initial Grant Agreement or a Related Grant Agreement, concerning the communication
with the Granting Authority.
11.8 Confidentiality for Proposals and Funded Projects
The content of the proposals received under the Joint Calls is deemed to be confidential, except for the lists of
Funded Projects after the Publication by the CETPartnership Call Management (to be coordinated with all involved
Program Managers). This obligation shall survive the expiration or termination of this Partnership Framework
Consortium Agreement.
Section 12: Data Management
Appropriate and secure use of material and data of Funded Projects will be enabled according to the application of
common standards. Data management guidelines will be developed by the CETPartnership Management and
approved by the Governing Board (Deliverable “Data Management Plan” according to the Implementation Plan)
and will be applied in the implementation of the partnership. The collected data will be protected and secured, in
order to avoid a malevolent use of it.
Section 13: Miscellaneous
13.1 Attachments, inconsistencies and severability
This Partnership Framework Consortium Agreement consists of this core text and
Attachment 1 (Background included)
Attachment 2 (Accession document)
Attachment 3 (Budget Indications for the Joint Call/at the time of Initial GA)
In case the terms of this Partnership Framework Consortium Agreement are in conflict with the terms of the Initial
Grant Agreement or any of the Related Grant Agreements, the terms of the latter shall prevail. In case of conflicts
between the attachments and the core text of this Partnership Framework Consortium Agreement, the latter shall
prevail.
v3-31.01.2023/Finalised 25.05.2023
60
Should any provision of this Partnership Framework Consortium Agreement become invalid, illegal or
unenforceable, it shall not affect the validity of the remaining provisions of this Partnership Framework Consortium
Agreement. In such a case, the Parties concerned shall be entitled to request that a valid and practicable provision
be negotiated which fulfils the purpose of the original provision.
13.2 No representation or agency
Except if otherwise provided in Section 6.3.6, no Party shall be entitled to act or to make legally binding declarations
on behalf of any other Party or of the consortium. Nothing in this Partnership Framework Consortium Agreement
shall be deemed to constitute a joint venture, agency, legal entitiy, interest grouping or any other kind of formal
business grouping or entity between the Parties.
13.3 Formal and written notices and other communication
Any notice to be given under this Partnership Framework Consortium Agreement shall be addressed to the
recipients as listed as “Executive Contact” of a Party in the most current address list kept by the Coordinator.
Any change of persons or contact details shall be immediately communicated to the Coordinator by written notice.
The address list shall be accessible to all Parties.
Formal notices:
If it is required in this Partnership Framework Consortium Agreement (e.g. Sections 4.2, 13.4) that a formal
notice, consent or approval shall be given, such notice shall be signed by an authorised representative of
a Party and shall either be served personally or sent by mail with recorded delivery with acknowledgement
of receipt.
Written notice:
Where written notice is required by this Partnership Framework Consortium Agreement, this is fulfilled also
by other means of communication such as e-mail with acknowledgement of receipt.
Other communication between the Parties may also be effected by other means such as e-mail with
acknowledgement of receipt, which fulfils the conditions of written form.
13.4 Assignment and amendments
Unless otherwise agreed upon in this Partnership Framework Consortium Agreement, no rights or obligations of
the Parties arising from this Partnership Framework Consortium Agreement may be assigned or transferred, in
whole or in part, to any third party without the other Parties’ prior formal approval.
This does not apply for cases in which one of the Program Owners selects a new Program Manager to represent
the funding program under the CETPartnership.
Amendments and modifications to the text of this Partnership Framework Consortium Agreement not explicitly
described in Section 3.2 or listed in Sections 6.2.3, 6.3.2 require a separate written agreement to be signed between
all Parties. Core Management Documents listed in Section 6.3.1 as approved by the Governing Board are not
considered to amend or modify the text of this Partnership Framework Consortium Agreement.
13.5 Mandatory national law
Nothing in this Partnership Framework Consortium Agreement shall be deemed to require a Party to breach any
mandatory statutory or national law under which the Party is operating.
13.6 Language
This Partnership Framework Consortium Agreement is drawn up in English, which language shall govern all
documents, notices, meetings, arbitral proceedings and processes relative thereto.
13.7 Applicable law
This Partnership Framework Consortium Agreement shall be construed in accordance with and governed by the
laws of Belgium excluding its conflict of laws rules.
v3-31.01.2023/Finalised 25.05.2023
61
13.8 Settlement of disputes
The Parties shall endeavour to settle their disputes amicably among themselves including if necessary within the
Consortium governance or by any lawful alternative dispute resolution (ADR) method upon which they might agree
therefore (ie. Negotiation, conciliation, mediation, transaction or arbitration). The language to be used in such ADR
proceedings shall be in English unless otherwise agreed upon.
In case of a conflict of opinion which cannot be solved within the respective Consortium Body or between the
respective Consortium Bodies, the Coordinator shall be approached for advice. The Coordinator may decide to
seek a decision of the whole Governing Board in order to come to a solution. If the Coordinator is involved in the
conflict, the Co-Coordinator should take over this role.
Should the attempts to settle the dispute amicably fail to bring about a full agreement between the Parties, any
dispute, controversy or claim arising under, out of or relating to this Partnership Framework Consortium Agreement,
including, without limitation, its formation, validity, binding effect, interpretation, performance, breach or termination,
as well as non-contractual claims, shall be finally settled by the competent court of Brussels that shall have exclusive
jurisdiction.
Nothing in this Partnership Framework Consortium Agreement shall limit the Parties’ rights to seek injunctive relief
in any applicable competent court.
v3-31.01.2023/Finalised 25.05.2023
62
Section 14: Signatures
AS WITNESS:
The Parties have caused this Partnership Framework Consortium Agreement to be duly signed by the undersigned
authorised representatives in separate signature pages the day and year first above written.
The following Pages are reserved for Parties’ Signatures.
v3-31.01.2023/Finalised 25.05.2023
63
FEDERAL MINISTRY FOR CLIMATE ACTION, ENVIRONMENT, ENERGY, MOBILITY, INNOVATION AND
TECHNOLOGY (BMK), Austria
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
64
AUSTRIAN RESEARCH PROMOTION AGENCY (FFG), Austria
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
65
CLIMATE AND ENERGY FUND (KLIEN), Austria
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
66
PUBLIC SERVICE OF WALLONIA (SPW), Belgium
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
67
TECHNOLOGY AGENCY OF THE CZECH REPUBLIC (TA CR), Czech Republic
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
68
CZECH MINISTRY OF INDUSTRY AND TRADE (MPO), Czech Republic
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
69
CZECH MINISTRY OF ENVIRONMENT (MZP), Czech Republic
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
70
PROJEKTTRÄGER JÜLICH | FORSCHUNGSZENTRUM JÜLICH GMBH (PtJ), Germany
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
71
INNOVATION FUND DENMARK (INNOV. FUND DK), Denmark
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
72
DANISH ENERGY AUTHORITY (DEA), Denmark
Danish Energy Authority
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
73
MINISTRY OF ECONOMIC AFFAIRS AND COMMUNICATIONS (MKM), Estonia
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
74
ESTONIAN RESEARCH COUNCIL (ETA), Estonia
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
75
GREEK MINISTRY FOR DEVELOPMENT AND INVESTMENTS, GENERAL SECRETARIAT FOR RESEARCH
& INNOVATION (GSRI), Greece
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
76
AGENCIA ESTATAL DE INVESTIGACIÓN (AEI), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
77
REGIONAL DEVELOPMENT AGENCY OF CANTABRIA (SODERCAN), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
78
DEPARTAMENTO DE DESAROLLO ECONÓMICO, SOSTENIBILIDAD Y MEDIO AMBIENTE: EUSKO
JAURLARITZA-GOBIERNO VASCO (EUSKADI), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
79
ENTE VASCO DE LA ENERGÍA (EVE), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
80
FOUNDATION FOR THE PROMOTION OF APPIED SCIENTIFIC RESEATCH AND TECHNOLOGY IN
ASTURIAS (FICYT), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
81
CENTRO PARA EL DESARROLLO TECNOLOGICO INDUSTRIAL (CDTI E.P.E), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
82
INNOVAATIORAHOITUSKESKUS BUSINESS FINLAND (BF), Finland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
83
FRENCH NATIONAL RESEARCH AGENCY (ANR), France
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
84
FRENCH MINISTRY OF HIGHGER EDUCATION AND INNOVATION (MESRI), France
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
85
AGENCE DE L'ENVIRONNEMENT ET DE LAMAITRISE DE L'ENERGIE (ADEME), France
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
86
RÉGION DES PAYS DE LA LOIRE (RPL), France
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
87
MINISTARSTVO GOSPODARSTVA I ODRZIVOG RAZVOJA (CMESD), Croatia
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
88
NEMZETI KUTATASI FEJLESZTESI ES INNOVACIOS HIVATAL (NKFIH), Hungary
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
89
THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND (SEAI), Ireland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
90
DEPARTMENT OF ENVIRONMENT, CLIMATE AND COMMUNICATIONS (GSI), Ireland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
91
MINISTRY OF NATIONAL INFRASTRUCTURE, ENERGY AND WATER RESOURCES (MoE), Israel
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
92
RANNSOKNAMIDSTOD ISLANDS (Rannis), Iceland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
93
ORKUSTOFNUN (Orkustofnun), Iceland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
94
MINISTERO DELL'UNIVERSITÀ E DELLA RICERCA (MUR), Italy
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
95
LIETUVOS RESPUBLIKOS ENERGETIKOS MINISTERIJOS (ENMIN LITHUANIA), Lithuania
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
96
LATVIJAS ZINATNES PADOME (LZP), Latvia
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
97
MINISTRY FOR EDUCATION, SPORT, YOUTH, RESEARCH AND INNOVATION (MEYR), France
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
98
MINISTERIE VAN ECONOMISCHE ZAKEN EN KLIMAAT (RVO), Netherlands
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
99
NEDERLANDSE ORGANISATIE VOOR WETENSCHAPPELIJK ONDERZOEK (NWO), ZAKEN EN KLIMAAT,
Netherlands
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
100
NORDISK ENERGIFORSKNING NORDI ENERGY RESEARCH (NER), Norway
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
101
NORGES FORSKNINGSRAD (RCN), Norway
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
102
GASSNOVA SF (GASSNOVA), Norway
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
103
NARODOWE CENTRUM BADAN I ROZWOJU (NCBR), Poland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
104
FUNDACAO PARA A CIENCIA E A TECNOLOGIA (FCT), Portugal
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
105
DIRECAO-GERAL DE ENERGIA E GEOLOGIA (DGEG), Portugal
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
106
UNITATEA EXECUTIVA PENTRU FINANTAREA INVATAMANTULUI SUPERIOR A CERCETARII DEZVOLTARII
SI INOVARII (UEFISCDI), Romania
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
107
STATENS ENERGIMYNDIGHET (SWEA - STEM), Sweden
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
108
TURKIYE BILIMSEL VE TEKNOLOJIK ARASTIRMA KURUMU (TUBITAK), Turkey
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
109
IDRYMA EREVNAS KAI KAINOTOMIAS (RIFC), Cyprus
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
110
SAECHSISCHES STAATSMINISTERIUM FUR WISSENSCHAFT, KULTUR UND TOURISMUS (SMWK),
Germany
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
111
RICERCA SUL SISTEMA ENERGETICO - RSE SPA (RSE SPA), Italy
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
112
FONDS INNOVEREN EN ONDERNEMEN (FIO), Belgium
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
113
MINISTRY OF ENTERPRISES AND MADE IN ITALY (MIMIT), Italy
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
114
FUNDACION ESPANOLA PARA LA CIENCIAY LA TECNOLOGIA, F.S.P., FECYT (FECYT), Spain
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
115
BUSINESS FINLAND OY (BF OY), Finland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
116
EXPRESS INNOVATION AGENCY VMV NONPROFIT ZARTKORUEN MUKODO RESZVENYTARSASAG
(XIA), Hungary
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
117
GEORG-RANNSOKNARKLASI I JARDHITA (GEORG), Iceland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
118
VLAAMSE GEWEST (VLAIO), Belgium
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
119
FEDERAL DEPARTMENT FOR ENVIRONMENT, TRANSPORT, ENERGY AND COMMUNICATIONS (DETEC),
Switzerland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
120
SCHWEIZERISCHER NATIONALFONDS ZUR FORDERUNG DER WISSENSCHAFTLICHEN FORSCHUNG
(SNF), Switzerland
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
121
SCOTTISH ENTERPRISE (SCOTENT), United Kingdom
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
122
UNITED KINGDOM RESEARCH AND INNOVATION (UKRI), United Kingdom
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
123
THE ENERGY SAVING TRUST LIMITED (EST), United Kingdom
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
124
INSTITUT DE RECHERCHES EN ENERGIE SOLAIRE ET ENERGIES NOUVELLES (IRESEN), Morocco
___________________________________________________________________________________________________
Name(s)/Surname/Title(s) [in capital letters]
__________________________________________________________________________________________
Signature(s)
v3-31.01.2023/Finalised 25.05.2023
125
Attachment 1: Background Included
According to the Initial Grant Agreement No. 101069750 (Article 16.1) Background is defined as “data, know-how
or information (…) that is (...) needed to implement the action or exploit the results”.
Because of this need, Access Rights have to be granted in principle, but Parties must identify and agree amongst
them on the Background for the CETPartnership. This is the purpose of this attachment, to describe Background.
As to all Funding Parties, it is agreed between the Parties that, to the best of their knowledge, the following
Background is hereby identified and agreed upon for the CETPartnership. Specific limitations and/or conditions
shall be mentioned hereunder.
No data, know-how or information of a Party shall be Needed by another Party unless for the purposes of
CETPartnership, its implementation and project related work, as well as
No specific limitations and/or conditions for implementation (Article 16.1 Grant Agreement and its Annex 5,
section “Access rights to results and background”, sub-section “Access rights for implementing the action”) and no
specific limitations and/or conditions for Exploitation (Article 16.1 Grant Agreement and its Annex 5, section
“Access rights to results and background”, sub-section “Access rights for exploiting the results”) exist.
This represents the status at the time of signature of this Consortium Agreement.
In Order to facilitate the Governing Board in controlling and monitoring the balance between budgets and expenses,
the Funding Parties shall provide to the Management the best available information about the status of
implementation of Funded Projects as well as about the already transferred and finally expected financial
contributions to third parties involved in Funded Projects, according to annual reporting routines to be
established or on request within 30 calendar days.
Financial Contributions to individual third parties involved in Funded Projects shall be treated as confidential.
Financial Contributions to third parties involved in Funded Projects shall only be published on an aggregated level
per country or region.
To agree to the above Background Included, all Parties should be listed hereafter:
1. BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE, MOBILITAET, INNOVATION UND
TECHNOLOGIE (BMK), PIC 999633695
2. ÖSTERREICHISCHE FORSCHUNGSFORDERUNGSGESELLSCHAFT MBH (FFG), PIC 999507207
3. KLIMA- UND ENERGIEFONDS (KLIEN), PIC 953994031
4. SERVICE PUBLIC DE WALLONIE (SPW), PIC 999811884
5. TECHNOLOGICKA AGENTURA CESKE REPUBLIKY (TA CR), PIC 927033172
6. MINISTRY OF INDUSTRY AND TRADE (MPO), PIC 999810332
7. MINISTERSTVO ZIVOTNIHO PROSTREDI (MZP), PIC 890202757
8. FORSCHUNGSZENTRUM JULICH GMBH (FZJ), PIC 999980470
9. INNOVATION FUND DENMARK (INNOV. FUND DK), PIC 939076692
10. ENERGISTYRELSEN (DEA), PIC 994605603
11. MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM (MKM), PIC 963638450
12. SIHTASUTUS EESTI TEADUSAGENTUUR (ETAg), PIC 998483760
13. GENIKI GRAMMATIA EREVNAS KAI KAINOTOMIAS (GSRI), PIC 999827016
14. AGENCIA ESTATAL DE INVESTIGACION (AEI), PIC 911508128
15. SOCIEDAD PARA EL DESARROLLO REGIONAL DE CANTABRIA SA (SODERCAN), PIC 990269994
16. CONSEJERIA DE DESARROLLO ECONÓMICO, SOSTENIBILIDAD Y MEDIO AMBIENTE. EUSKO
JAURLARITZA-GOBIERNO VASCO (EUSKADI), PIC 999778225
17. ENTE VASCO DE LA ENERGIA (EVE), PIC 997911363
v3-31.01.2023/Finalised 25.05.2023
126
18. FUNDACION PARA EL FOMENTO EN ASTURIAS DE LA INVESTIGACION CIENTIFICA APLICADA Y
TECNOLOGIA (FICYT), PIC 999791514
19. CENTRO PARA EL DESARROLLO TECNOLOGICO INDUSTRIAL. (CDTI E.P.E.), PIC 999510020
20. INNOVAATIORAHOITUSKESKUS BUSINESS FINLAND (BF), PIC 999549111
21. AGENCE NATIONALE DE LA RECHERCHE (ANR), PIC 998711613
22. MINISTERE DE L'ENSEIGNEMENT SUPERIEUR, DE LA RECHERCHE ET DE L INNOVATION (MESRI),
PIC 999822263
23. AGENCE DE L'ENVIRONNEMENT ET DE LAMAITRISE DE L'ENERGIE (ADEME), PIC 999963301
24. Région des Pays de la Loire (RPL), PIC 984814132
25. MINISTARSTVO GOSPODARSTVA I ODRZIVOG RAZVOJA (CMESD), PIC 916533310,
26. NEMZETI KUTATASI FEJLESZTESI ES INNOVACIOS HIVATAL (NKFIH), PIC 999578696
27. THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND (SEAI), PIC 997611148
28. DEPARTMENT OF ENVIRONMENT, CLIMATE AND COMMUNICATIONS (GSI), PIC 996559280
29. Ministry of National Infrastructure, Energy and Water Resources (MoE), PIC 953232387
30. RANNSOKNAMIDSTOD ISLANDS (Rannis), PIC 999547268
31. ORKUSTOFNUN (Orkustofnun), PIC 969550406
32. MINISTERO DELL'UNIVERSITÀ E DELLA RICERCA (MUR), PIC 894763406
33. LIETUVOS RESPUBLIKOS ENERGETIKOS MINISTERIJOS (ENMIN LITHUANIA), PIC 923846916
34. LATVIJAS ZINATNES PADOME (LZP), PIC 999546589
35. MINISTRY FOR EDUCATION, SPORT, YOUTH, RESEARCH AND INNOVATION (MEYR), PIC 947567102
36. MINISTERIE VAN ECONOMISCHE ZAKEN EN KLIMAAT (RVO), PIC 972778178
37. NEDERLANDSE ORGANISATIE VOOR WETENSCHAPPELIJK ONDERZOEK (NWO), PIC 999663862
38. NORDISK ENERGIFORSKNING NORDIC ENERGY RESEARCH (NER), PIC 998859538
39. NORGES FORSKNINGSRAD (RCN), PIC 999460453
40. GASSNOVA SF (GASSNOVA), PIC 928434628
41. NARODOWE CENTRUM BADAN I ROZWOJU (NCBR), PIC 999519720
42. FUNDACAO PARA A CIENCIA E A TECNOLOGIA (FCT), PIC 999543970
43. DIRECAO-GERAL DE ENERGIA E GEOLOGIA (DGEG), PIC 951676022
44. UNITATEA EXECUTIVA PENTRU FINANTAREA INVATAMANTULUI SUPERIOR A CERCETARII
DEZVOLTARII SI INOVARII (UEFISCDI), PIC 972130024
45. STATENS ENERGIMYNDIGHET (SWEA - STEM), PIC 998687363
46. TURKIYE BILIMSEL VE TEKNOLOJIK ARASTIRMA KURUMU (TUBITAK), PIC 999587135
47. IDRYMA EREVNAS KAI KAINOTOMIAS (RIFC), PIC 999946035
48. SAECHSISCHES STAATSMINISTERIUM FUR WISSENSCHAFT, KULTUR UND TOURISMUS (SMWK),
PIC 998235634
49. RICERCA SUL SISTEMA ENERGETICO - RSE SPA (RSE SPA), PIC 999529420
50. FONDS INNOVEREN EN ONDERNEMEN (FIO), PIC 919917349
51. Ministry of Enterprises and Made in Italy (MIMIT), PIC 949756780
AFFILIATED PARTIES
14.1 FUNDACION ESPANOLA PARA LA CIENCIAY LA TECNOLOGIA, F.S.P., FECYT (FECYT), PIC
999421944, linked to AGENCIA ESTATAL DE INVESTIGACION (AEI)
20.1 BUSINESS FINLAND OY (BF OY), PIC 916229118, linked to INNOVAATIORAHOITUSKESKUS
BUSINESS FINLAND (BF)
26.1 EXPRESS INNOVATION AGENCY VMV NONPROFIT ZARTKORUEN MUKODO
RESZVENYTARSASAG (XIA), PIC 887408478, linked to NEMZETI KUTATASI FEJLESZTESI ES
INNOVACIOS HIVATAL (NKFIH)
v3-31.01.2023/Finalised 25.05.2023
127
31.1 GEORG-RANNSOKNARKLASI I JARDHITA (GEORG), PIC 952875524, linked to
ORKUSTOFNUN (Orkustofnun)
50.1 VLAAMSE GEWEST (VLAIO), PIC 999575107, linked to FONDS INNOVEREN EN
ONDERNEMEN (FIO)
ASSOCIATED PARTIES
52. FEDERAL DEPARTMENT FOR ENVIRONMENT, TRANSPORT, ENERGY AND COMMUNICATIONS
(DETEC), PIC 999439210
53. SCHWEIZERISCHER NATIONALFONDS ZUR FORDERUNG DER WISSENSCHAFTLICHEN
FORSCHUNG (SNF), PIC 999540575
54. SCOTTISH ENTERPRISE (SCOTENT), PIC 999763772
55. UNITED KINGDOM RESEARCH AND INNOVATION (UKRI), PIC 906446474
56. THE ENERGY SAVING TRUST LIMITED (EST), PIC 994186078
57. INSTITUT DE RECHERCHES EN ENERGIE SOLAIRE ET ENERGIES NOUVELLES (IRESEN), PIC
952594612
v3-31.01.2023/Finalised 25.05.2023
128
Attachment 2: Accession document
ACCESSION
of a new Party to
CETPartnership Partnership Framework Consortium Agreement, version xxx
[OFFICIAL NAME OF THE NEW PARTY AS IDENTIFIED IN THE RELATED GRANT AGREEMENT OR EXTENSION
AMENDMENT]
hereby consents to become a Party to the Partnership Framework Consortium Agreement identified above and accepts
all the rights and obligations of a Party starting [date].
[OFFICIAL NAME OF THE COORDINATOR AS IDENTIFIED IN THE PARTNERSHIP FRAMEWORK CONSORTIUM
AGREEMENT]
hereby certifies that the consortium has accepted in the meeting held on [date]
[if applicable] [ to acknowledge the Grant Agreement [Number and Short Name, starting date] as a Related
Grant Agreement starting [date]. ]
the accession of [the name of the new Party] to the Partnership Framework Consortium Agreement starting
[date].
This Accession document has been done in two originals to be duly signed by the undersigned authorised
representatives.
[Date and Place]
[INSERT NAME OF THE NEW PARTY]
Signature(s)
Name(s)
Title(s)
[Date and Place]
BUNDESMINISTERIUM FUER KLIMASCHUTZ, UMWELT, ENERGIE, MOBILITAET, INNOVATION UND
TECHNOLOGIE (BMK)
Signature(s)
Name(s)
Title(s)
v3-31.01.2023/Finalised 25.05.2023
129
Attachment 3: Budget indications for the Joint Calls (at date of Initial GA)
envisaged financial support to 3rd envisaged Financial Contributions
Short name Country
Parties (national/ regional)
BMK AT - -
FFG AT 12 886 538,12 11 000 000
KLIEN AT - -
SPW BE 2 108 706,24 1 800 000
TACR CZ 3 045 909,01 2 600 000
MPO CZ - -
MZP CZ - -
FZJ DE 30 459 090,09 26 000 000
INNOV. FUND DK DK 2 343 006,93 2 000 000
DEA DK 7 029 020,79 6 000 000
MKM EE 492 031,46 420 000
ETAg EE 609 181,80 520 000
GSRI EL 1 171 503,47 1 000 000
AEI ES 4 686 013,86 4 000 000
FECYT ES - -
SODERCAN ES 351 451,04 300 000
EUSKADI ES 2 343 006,93 2 000 000
EVE ES 2 343 006,93 2 000 000
FICYT ES 702 902,08 600 000
CDTI ES 3 514 510,40 3 000 000
BF FI 11 715 034,65 10 000 000
BF OY FI - -
ANR FR 7 029 020,79 6 000 000
MESRI FR - -
ADEME FR 3 514 510,40 3 000 000
RPL FR 2 014 985,96 1 720 000
CMESD HR - -
NKFIH HU 2 343 006,93 2 000 000
XIA HU - -
SEAI IE 1 171 503,47 1 000 000
GSI IE 234 300,69 200 000
MoE IL 2 811 608,32 2 400 000
Rannis IS 2 343 006,93 2 000 000
Orkustofnun IS - -
GEORG IS - -
MUR IT 19 212 656,83 16 400 000
ENMIN LT 1 640 104,85 1 400 000
LZP LV 937 202,77 800 000
MEYR MT 1 171 503,47 1 000 000
RVO NL 18 744 055 16 000 000
NWO NL 2 343 006,93 2 000 000
NER NO - -
RCN NO 19 517 247,73 16 660 000
GASSNOVA NO 1 405 804,16 1 200 000
NCBR PL 7 029 020,79 6 000 000
FCT PT 1 171 503,47 1 000 000
DGEG PT - -
UEFISCDI RO 2 343 006,93 2 000 000
SWEA SE 8 200 524,26 7 000 000
TUBITAK TR 4 686 013,86 4 000 000
RIFC CY 1 171 503,47 1 000 000
SMWK DE 4 686 013,86 4 000 000
RSE IT - -
v3-31.01.2023/Finalised 25.05.2023
130
FIO BE 2 343 006,93 2 000 000
VLAIO BE - -
MISE (MIMIT) IT 37 488 110,88 32 000 000
v3-31.01.2023/Finalised 25.05.2023
131