Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
EUROPEAN CLIMATE, INFRASTRUCTURE AND
ENVIRONMENT EXECUTIVE AGENCY (CINEA)
CINEA.D – Natural resources, climate, sustainable blue economy and clean energy
D.1 – LIFE Energy + LIFE Climate
GRANT AGREEMENT
Project 101102078 — LIFE21-CET-CA-CAEPBD6
PREAMBLE
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the European Climate, Infrastructure and Environment Executive Agency (CINEA) (‘EU
executive agency’ or ‘granting authority’), under the powers delegated by the European Commission
(‘European Commission’),
and
on the other part,
1. ‘the coordinator’:
ENERGISTYRELSEN (DEA), PIC 994605603, established in CARSTEN NIEBUHRS GADE 43,
KOBENHAVN V 1577, Denmark,
and the following other beneficiaries, if they sign their ‘accession form’ (see Annex 3 and Article 40):
2. OSTERREICHISCHES INSTITUT FUR BAUTECHNIK (OIB), PIC 933310333, established
in SCHENKENSTRASSE 4, WIEN 1010, Austria,
3. CENTRE SCIENTIFIQUE ET TECHNIQUE DE LA CONSTRUCTION (CSTC), PIC
999432129, established in Rue du Lombard 42, BRUXELLES 1000, Belgium,
4. SUSTAINABLE ENERGY DEVELOPMENT AGENCY (SEDA), PIC 939008695, established
in 37 EKZARH JOSSIF STR., SOFIA 1000, Bulgaria,
5. MINISTRY OF ENERGY, COMMERCE AND INDUSTRY (MECI), PIC 938650086,
established in 6, Andreas Araouzos str., Nicosia 1076, Cyprus,
6. MINISTRY OF INDUSTRY AND TRADE (MIT), PIC 999810332, established in Na Frantisku,
32, PRAHA 11015, Czechia,
7. BUNDESAMT FUR WIRTSCHAFT UND AUSFUHRKONTROLLE (BAFA), PIC
909836430, established in FRANKFURTERSTRASSE 29-35, ESCHBORN 65760, Germany,
8. MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM (MEC), PIC 963638450,
established in SUUR-AMEERIKA 1, TALLINN 10122, Estonia,
1
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
9. CENTRE FOR RENEWABLE ENERGY SOURCES AND SAVING FONDATION (CRES),
PIC 999646014, established in MARATHONOS 19TH KM, PIKERMI 19009, Greece,
10. INSTITUTO PARA LA DIVERSIFICACION Y AHORRO DE LA ENERGIA (IDAE), PIC
994622093, established in CALLE MADERA 8, MADRID 28004, Spain,
11. MOTIVA OY (MOTIVA), PIC 950479042, established in POHJOINEN RAUTATIEKATU 25,
HELSINKI 00100, Finland,
12. MINISTERE DE LA TRANSITION ECOLOGIQUE (MTE), PIC 996384874, established in
Grande Arche - Tour Sequoia, Paris - La Défense 92055, France,
13. MINISTARSTVO PROSTORNOGA UREDENJA, GRADITELJSTVA I DRZAVNE
IMOVINE (MPGI), PIC 953590123, established in REPUBLIKE AUSTRIJE 20, ZAGREB 10000,
Croatia,
14. EMI EPITESUGYI MINOSEGELLENORZO INNOVACIOS NONPROFIT KFT (EMI),
PIC 998707636, established in DOZSA GYORGY ST 26, SZENTENDRE 2000, Hungary,
15. THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND (SEAI), PIC 997611148,
established in WILTON PLACE WILTON PARK HOUSE, DUBLIN 2, Ireland,
16. AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE, L'ENERGIA E LO
SVILUPPO ECONOMICO SOSTENIBILE (ENEA), PIC 999988521, established in
LUNGOTEVERE GRANDE AMMIRAGLIO THAON DI REVEL 76, ROMA 00196, Italy,
17. LIETUVOS RESPUBLIKOS APLINKOS MINISTERIJA (LRAM), PIC 950938240,
established in A. JAKSTO 4/9, VILNIUS LT-01105, Lithuania,
18. MINISTERE DE L'ENERGIE ET DE L'AMENAGEMENT DU TERRITOIRE (MEAT),
PIC 898634676, established in 4 PLACE DE L'EUROPE, LUXEMBOURG 1499, Luxembourg,
19. EKONOMIKAS MINISTRIJA (EM), PIC 928511355, established in BRIVIBAS IELA 55,
RIGA LV 1519, Latvia,
20. MINISTRY FOR TRANSPORT, INFRASTRUCTURE AND CAPITAL PROJECTS
(MTIC), PIC 950554023, established in TRIQ FRANCESCO BUONAMICI, Floriana FRN 1700,
Malta,
21. MINISTERIE VAN ECONOMISCHE ZAKEN EN KLIMAAT (RVO), PIC 972778178,
established in BEZUIDENHOUTSEWEG 73, The Hague 2595 AC, Netherlands,
22. INSTYTUT TECHNIKI BUDOWLANEJ (ITB), PIC 955708409, established in UL
FILTROWA 1, WARSAW 00 611, Poland,
23. ADENE - AGENCIA PARA A ENERGIA (ADENE), PIC 950873638, established in
AVENIDA 5 DE OUTUBRO 208, LISBOA 1050 065, Portugal,
24. MINISTERUL DEZVOLTARII, LUCRARILOR PUBLICE SI ADMINISTRATIEI
(MLPDA), PIC 950502225, established in BDL LIBERTATII 16 BL LATURA NORD, BUCURESTI
010873, Romania,
2
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
25. BOVERKET (BOVERKET), PIC 933308587, established in DROTTNINGGATAN 18,
KARLSKRONA 37123, Sweden,
26. TECHNICKY A SKUSOBNY USTAV STAVEBNY n.o. (TSUS), PIC 957873934, established
in STUDENA 3, BRATISLAVA 821 04, Slovakia,
27. MINISTRSTVO ZA INFRASTRUKTURO (MZI), PIC 952242696, established in
LANGUSOVA ULICA 4, LJUBLJANA 1000, Slovenia,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator and
affiliated entities (if any).
If only one beneficiary signs the grant agreement (‘mono-beneficiary grant’), all provisions referring
to the ‘coordinator’ or the ‘beneficiaries’ will be considered — mutatis mutandis — as referring to
the beneficiary.
The parties referred to above have agreed to enter into the Agreement.
By signing the Agreement and the accession forms, the beneficiaries accept the grant and agree to
implement the action under their own responsibility and in accordance with the Agreement, with all
the obligations and terms and conditions it sets out.
The Agreement is composed of:
Preamble
Terms and Conditions (including Data Sheet)
Annex 1 Description of the action1
Annex 2 Estimated budget for the action
Annex 2a Additional information on unit costs and contributions (if applicable)
Annex 3 Accession forms (if applicable)2
Annex 3a Declaration on joint and several liability of affiliated entities (if applicable)3
Annex 4 Model for the financial statements
Annex 5 Specific rules (if applicable)
1 Template published on Portal Reference Documents.
2 Template published on Portal Reference Documents.
3 Template published on Portal Reference Documents.
3
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
TERMS AND CONDITIONS
TABLE OF CONTENTS
GRANT AGREEMENT.................................................................................................................................................... 1
PREAMBLE........................................................................................................................................................................1
TERMS AND CONDITIONS...........................................................................................................................................4
DATASHEET...................................................................................................................................................................... 9
CHAPTER 1 GENERAL..............................................................................................................................................16
ARTICLE 1 — SUBJECT OF THE AGREEMENT ..................................................................................... 16
ARTICLE 2 — DEFINITIONS........................................................................................................................16
CHAPTER 2 ACTION................................................................................................................................................. 17
ARTICLE 3 — ACTION................................................................................................................................. 17
ARTICLE 4 — DURATION AND STARTING DATE...................................................................................17
CHAPTER 3 GRANT...................................................................................................................................................17
ARTICLE 5 — GRANT...................................................................................................................................17
5.1 Form of grant......................................................................................................................................17
5.2 Maximum grant amount..................................................................................................................... 18
5.3 Funding rate........................................................................................................................................18
5.4 Estimated budget, budget categories and forms of funding.............................................................. 18
5.5 Budget flexibility................................................................................................................................18
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS......................................19
6.1 General eligibility conditions............................................................................................................. 19
6.2 Specific eligibility conditions for each budget category................................................................... 20
6.3 Ineligible costs and contributions...................................................................................................... 25
6.4 Consequences of non-compliance...................................................................................................... 26
CHAPTER 4 GRANT IMPLEMENTATION............................................................................................................ 26
SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER
PARTICIPANTS........................................................................................................................................ 26
ARTICLE 7 — BENEFICIARIES................................................................................................................... 26
ARTICLE 8 — AFFILIATED ENTITIES....................................................................................................... 28
ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION................................................... 29
9.1 Associated partners.............................................................................................................................29
9.2 Third parties giving in-kind contributions to the action.................................................................... 29
9.3 Subcontractors.....................................................................................................................................29
4
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
9.4 Recipients of financial support to third parties..................................................................................29
ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS....................................................................... 30
10.1 Non-EU participants......................................................................................................................... 30
10.2 Participants which are international organisations...........................................................................30
10.3 Pillar-assessed participants............................................................................................................... 31
SECTION 2 RULES FOR CARRYING OUT THE ACTION...........................................................................33
ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION............................................................ 33
11.1 Obligation to properly implement the action................................................................................... 33
11.2 Consequences of non-compliance.................................................................................................... 33
ARTICLE 12 — CONFLICT OF INTERESTS.............................................................................................. 33
12.1 Conflict of interests.......................................................................................................................... 33
12.2 Consequences of non-compliance.................................................................................................... 34
ARTICLE 13 — CONFIDENTIALITY AND SECURITY............................................................................ 34
13.1 Sensitive information........................................................................................................................34
13.2 Classified information...................................................................................................................... 34
13.3 Consequences of non-compliance.................................................................................................... 35
ARTICLE 14 — ETHICS AND VALUES...................................................................................................... 35
14.1 Ethics.................................................................................................................................................35
14.2 Values................................................................................................................................................ 35
14.3 Consequences of non-compliance.................................................................................................... 35
ARTICLE 15 — DATA PROTECTION.......................................................................................................... 35
15.1 Data processing by the granting authority....................................................................................... 35
15.2 Data processing by the beneficiaries............................................................................................... 36
15.3 Consequences of non-compliance.................................................................................................... 36
ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS —
ACCESS RIGHTS AND RIGHTS OF USE................................................................................ 36
16.1 Background and access rights to background..................................................................................37
16.2 Ownership of results.........................................................................................................................37
16.3 Rights of use of the granting authority on materials, documents and information received for
policy, information, communication, dissemination and publicity purposes...................................37
16.4 Specific rules on IPR, results and background................................................................................ 38
16.5 Consequences of non-compliance.................................................................................................... 38
ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY............................................ 38
17.1 Communication — Dissemination — Promoting the action........................................................... 38
17.2 Visibility — European flag and funding statement......................................................................... 38
17.3 Quality of information — Disclaimer..............................................................................................39
5
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
17.4 Specific communication, dissemination and visibility rules............................................................39
17.5 Consequences of non-compliance.................................................................................................... 40
ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION............................................... 40
18.1 Specific rules for carrying out the action........................................................................................ 40
18.2 Consequences of non-compliance.................................................................................................... 40
SECTION 3 GRANT ADMINISTRATION......................................................................................................... 40
ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS.................................................................... 40
19.1 Information requests......................................................................................................................... 40
19.2 Participant Register data updates..................................................................................................... 40
19.3 Information about events and circumstances which impact the action............................................40
19.4 Consequences of non-compliance.................................................................................................... 41
ARTICLE 20 — RECORD-KEEPING............................................................................................................ 41
20.1 Keeping records and supporting documents.................................................................................... 41
20.2 Consequences of non-compliance.................................................................................................... 42
ARTICLE 21 — REPORTING........................................................................................................................ 42
21.1 Continuous reporting........................................................................................................................ 42
21.2 Periodic reporting: Technical reports and financial statements....................................................... 42
21.3 Currency for financial statements and conversion into euros..........................................................43
21.4 Reporting language...........................................................................................................................44
21.5 Consequences of non-compliance.................................................................................................... 44
ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS DUE................. 44
22.1 Payments and payment arrangements.............................................................................................. 44
22.2 Recoveries.........................................................................................................................................44
22.3 Amounts due.....................................................................................................................................45
22.4 Enforced recovery.............................................................................................................................49
22.5 Consequences of non-compliance.................................................................................................... 50
ARTICLE 23 — GUARANTEES....................................................................................................................51
23.1 Prefinancing guarantee..................................................................................................................... 51
23.2 Consequences of non-compliance.................................................................................................... 51
ARTICLE 24 — CERTIFICATES................................................................................................................... 51
24.1 Operational verification report (OVR).............................................................................................51
24.2 Certificate on the financial statements (CFS).................................................................................. 51
24.3 Certificate on the compliance of usual cost accounting practices (CoMUC).................................. 52
24.4 Systems and process audit (SPA).....................................................................................................52
24.5 Consequences of non-compliance.................................................................................................... 52
6
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS..................................................................................................................................... 52
25.1 Granting authority checks, reviews and audits................................................................................ 52
25.2 European Commission checks, reviews and audits in grants of other granting authorities..............54
25.3 Access to records for assessing simplified forms of funding.......................................................... 54
25.4 OLAF, EPPO and ECA audits and investigations........................................................................... 54
25.5 Consequences of checks, reviews, audits and investigations — Extension of results of reviews,
audits or investigations.................................................................................................................... 55
25.6 Consequences of non-compliance.................................................................................................... 56
ARTICLE 26 — IMPACT EVALUATIONS................................................................................................... 56
26.1 Impact evaluation............................................................................................................................. 56
26.2 Consequences of non-compliance.................................................................................................... 56
CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE.................................................................................. 56
SECTION 1 REJECTIONS AND GRANT REDUCTION.................................................................................57
ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS...........................................................57
27.1 Conditions......................................................................................................................................... 57
27.2 Procedure.......................................................................................................................................... 57
27.3 Effects............................................................................................................................................... 57
ARTICLE 28 — GRANT REDUCTION........................................................................................................ 57
28.1 Conditions......................................................................................................................................... 57
28.2 Procedure.......................................................................................................................................... 58
28.3 Effects............................................................................................................................................... 58
SECTION 2 SUSPENSION AND TERMINATION............................................................................................58
ARTICLE 29 — PAYMENT DEADLINE SUSPENSION............................................................................. 58
29.1 Conditions......................................................................................................................................... 58
29.2 Procedure.......................................................................................................................................... 58
ARTICLE 30 — PAYMENT SUSPENSION...................................................................................................59
30.1 Conditions......................................................................................................................................... 59
30.2 Procedure.......................................................................................................................................... 59
ARTICLE 31 — GRANT AGREEMENT SUSPENSION..............................................................................60
31.1 Consortium-requested GA suspension............................................................................................. 60
31.2 EU-initiated GA suspension.............................................................................................................60
ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION......................................... 61
32.1 Consortium-requested GA termination............................................................................................ 61
32.2 Consortium-requested beneficiary termination................................................................................ 62
32.3 EU-initiated GA or beneficiary termination.................................................................................... 64
7
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE SANCTIONS............... 67
ARTICLE 33 — DAMAGES...........................................................................................................................67
33.1 Liability of the granting authority....................................................................................................67
33.2 Liability of the beneficiaries............................................................................................................ 67
ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES....................................... 67
SECTION 4 FORCE MAJEURE.......................................................................................................................... 68
ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 68
CHAPTER 6 FINAL PROVISIONS...........................................................................................................................68
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................68
36.1 Forms and means of communication — Electronic management................................................... 68
36.2 Date of communication.................................................................................................................... 68
36.3 Addresses for communication.......................................................................................................... 69
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................69
ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES..........................................................69
ARTICLE 39 — AMENDMENTS.................................................................................................................. 69
39.1 Conditions......................................................................................................................................... 69
39.2 Procedure.......................................................................................................................................... 70
ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES........................................... 70
40.1 Accession of the beneficiaries mentioned in the Preamble............................................................. 70
40.2 Addition of new beneficiaries.......................................................................................................... 70
ARTICLE 41 — TRANSFER OF THE AGREEMENT................................................................................. 71
ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE GRANTING
AUTHORITY.................................................................................................................................71
ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 71
43.1 Applicable law..................................................................................................................................71
43.2 Dispute settlement............................................................................................................................ 71
ARTICLE 44 — ENTRY INTO FORCE.........................................................................................................72
8
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
DATA SHEET
1. General data
Project summary:
Project summary
The overall objective of the Concerted Action EPBD is to foster exchange of information and experience among Member States and
other associated countries (Norway) with regards to the implementation of the specific European Union legislation and policy on the
energy performance of buildings, and in particular with regards to the transposition and implementation of the EPBD (DIRECTIVE
2018/844/EU) and the on-going revision of this directive. The specific objectives of the CA are to: 1. Enhance and structure sharing of
information and experience from national implementation and promote good practice in activities of Member States for implementation
of the Energy Performance of Buildings Directive (EPBD). 2. Create favourable conditions for faster convergence of national procedures
on EPBD-related matters. 3. Develop a direct collaboration with the other two buildings-related Concerted Actions that were established
within the IEE programme: the CA-RES, focussing on transposition and implementation of the Renewable Energy Systems Directive
(DIRECTIVE 2018/2001/EU); and the CA-EED, focusing on transposition and implementation of the Energy Efficiency Directive
(DIRECTIVE 2018/2002/EU), where National Energy Plans are expexted o include initiatives towards building energy efficiency. 4.
Supplement the work of the Article 26 Committee and establish a dialogue with the European Committee for Standardization (CEN) in
their work and implementation of standards to support the implementation of the zero carbon and life cycle calculations. 5. Support for
European Member States and Norway to use National Renovation Plans to support progress on the EPBD implementation and increased
renovation activities. As with previous instalments of the Concerted Action, CAV_EPBD will strive to result in a more harmonized
approach, improved implementation and actual application of the EPBD in all the countries involved, as well as helping to disseminate
best practices between the countries.
Keywords: not defined
Project number: 101102078
Project name: 6th Concerted Action supporting Member States and participating countries in implementing the Energy
Performance of Buildings Directive
Project acronym: LIFE21-CET-CA-CAEPBD6
Call: LIFE-CET-2021-CAEPBD6-IBA
Topic: LIFE-CET-2021-CAEPBD6-IBA
Type of action: LIFE Project Grants
Granting authority: European Climate, Infrastructure and Environment Executive Agency
Grant managed through EU Funding & Tenders Portal: Yes (eGrants)
Project starting date: fixed date: 1 November 2022
Project end date: 31 October 2027
Project duration: 60 months
Consortium agreement: Yes
2. Participants
List of participants:
Short Total eligible costs Max grant
N° Role Legal name Ctry PIC
name (BEN and AE) amount
1 COO DEA ENERGISTYRELSEN DK 994605603 2 397 083.55 2 277 229.00
2 BEN OIB OSTERREICHISCHES INSTITUT FUR BAUTECHNIK AT 933310333 325 986.20 309 686.00
3 BEN CSTC CENTRE SCIENTIFIQUE ET TECHNIQUE DE LA BE 999432129 253 632.80 240 951.00
CONSTRUCTION
4 BEN SEDA SUSTAINABLE ENERGY DEVELOPMENT AGENCY BG 939008695 38 711.53 36 775.00
9
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Short Total eligible costs Max grant
N° Role Legal name Ctry PIC
name (BEN and AE) amount
5 BEN MECI MINISTRY OF ENERGY, COMMERCE AND INDUSTRY CY 938650086 41 995.36 39 895.00
6 BEN MIT MINISTRY OF INDUSTRY AND TRADE CZ 999810332 38 691.20 36 756.00
7 BEN BAFA BUNDESAMT FUR WIRTSCHAFT UND DE 909836430 402 213.00 382 102.00
AUSFUHRKONTROLLE
8 BEN MEC MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM EE 963638450 191 821.04 182 229.00
9 BEN CRES CENTRE FOR RENEWABLE ENERGY SOURCES AND EL 999646014 36 688.16 34 853.00
SAVING FONDATION
10 BEN IDAE INSTITUTO PARA LA DIVERSIFICACION Y AHORRO DE ES 994622093 49 665.12 47 181.00
LA ENERGIA
11 BEN MOTIVA MOTIVA OY FI 950479042 288 827.24 274 385.00
12 BEN MTE MINISTERE DE LA TRANSITION ECOLOGIQUE FR 996384874 54 689.84 51 955.00
13 BEN MPGI MINISTARSTVO PROSTORNOGA UREDENJA, HR 953590123 38 554.24 36 626.00
GRADITELJSTVA I DRZAVNE IMOVINE
14 BEN EMI EMI EPITESUGYI MINOSEGELLENORZO INNOVACIOS HU 998707636 39 797.58 37 807.00
NONPROFIT KFT
15 BEN SEAI THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND IE 997611148 225 397.64 214 127.00
16 BEN ENEA AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE, IT 999988521 149 436.20 141 964.00
L'ENERGIA E LO SVILUPPO ECONOMICO SOSTENIBILE
17 BEN LRAM LIETUVOS RESPUBLIKOS APLINKOS MINISTERIJA LT 950938240 37 792.40 35 902.00
18 BEN MEAT MINISTERE DE L'ENERGIE ET DE L'AMENAGEMENT LU 898634676 46 360.96 44 042.00
DU TERRITOIRE
19 BEN EM EKONOMIKAS MINISTRIJA LV 928511355 38 691.20 36 756.00
20 BEN MTIC MINISTRY FOR TRANSPORT, INFRASTRUCTURE AND MT 950554023 51 087.15 48 532.00
CAPITAL PROJECTS
21 BEN RVO MINISTERIE VAN ECONOMISCHE ZAKEN EN KLIMAAT NL 972778178 113 762.40 108 074.00
22 BEN ITB INSTYTUT TECHNIKI BUDOWLANEJ PL 955708409 45 573.44 43 294.00
23 BEN ADENE ADENE - AGENCIA PARA A ENERGIA PT 950873638 176 648.44 167 816.00
24 BEN MLPDA MINISTERUL DEZVOLTARII, LUCRARILOR PUBLICE SI RO 950502225 24 610.00 23 379.00
ADMINISTRATIEI
25 BEN BOVERKETBOVERKET SE 933308587 66 879.28 63 535.00
26 BEN TSUS TECHNICKY A SKUSOBNY USTAV STAVEBNY n.o. SK 957873934 40 232.00 38 220.00
27 BEN MZI MINISTRSTVO ZA INFRASTRUKTURO SI 952242696 48 346.88 45 929.00
28 AP NVE NORGES VASSDRAGS- OG ENERGIDIREKTORAT NO 933343992 0.00 0.00
Total 5 263 174.85 5 000 000.00
Coordinator:
– ENERGISTYRELSEN (DEA)
3. Grant
Maximum grant amount, total estimated eligible costs and contributions and funding rate:
Total eligible costs Funding rate Maximum grant amount Maximum grant amount
(BEN and AE) (%) (Annex 2) (award decision)
5 263 174.85 95 5 000 000.00 5 000 000.00
Grant form: Budget-based
Grant mode: Action grant
10
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Budget categories/activity types:
- A. Personnel costs
- A.1 Employees, A.2 Natural persons under direct contract, A.3 Seconded persons
- A.4 SME owners and natural person beneficiaries
- A.5 Volunteers
- B. Subcontracting costs
- C. Purchase costs
- C.1 Travel and subsistence
- C.2 Equipment
- C.3 Other goods, works and services
- D. Other cost categories
- D.1 Financial support to third parties
- D.2 Land purchase
- E. Indirect costs
Cost eligibility options:
- Standard supplementary payments
- Limitation for subcontracting
- Travel and subsistence:
- Travel: Actual costs
- Accommodation: Actual costs
- Subsistence: Actual costs
- Equipment: depreciation only
- Costs for providing financial support to third parties (actual cost; max amount for each recipient: EUR 0.00)
- Indirect cost flat-rate: 7% of the eligible direct costs (categories A-D, except volunteers costs and exempted
specific cost categories, if any)
- VAT: Yes
- Other ineligible costs
Budget flexibility: Yes (no flexibility cap)
4. Reporting, payments and recoveries
4.1 Continuous reporting (art 21)
Deliverables: see Funding & Tenders Portal Continuous Reporting tool
4.2 Periodic reporting and payments
Reporting and payment schedule (art 21, 22):
11
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Reporting Payments
Deadline
Reporting periods Type Deadline Type
(time to pay)
RP No Month from Month to
30 days from
entry into force/
financial guarantee
Initial prefinancing
(if required)
– whichever
is the latest
1 1 30 Additional 60 days after end Additional 60 days from
prefinancing report of reporting period prefinancing receiving additional
prefinancing report/
financial guarantee
(if required)
– whichever
is the latest
2 31 60 Periodic report 60 days after end Final payment 90 days from
of reporting period receiving
periodic report
Prefinancing payments and guarantees:
Prefinancing payment Prefinancing guarantee
Guarantee
Type Amount Division per participant
amount
Prefinancing 1 (initial) 1 500 000.00 n/a 1 - DEA n/a
2 - OIB n/a
3 - CSTC n/a
4 - SEDA n/a
5 - MECI n/a
6 - MIT n/a
7 - BAFA n/a
8 - MEC n/a
9 - CRES n/a
10 - IDAE n/a
11 - MOTIVA n/a
12 - MTE n/a
13 - MPGI n/a
14 - EMI n/a
15 - SEAI n/a
16 - ENEA n/a
17 - LRAM n/a
18 - MEAT n/a
19 - EM n/a
20 - MTIC n/a
21 - RVO n/a
22 - ITB n/a
23 - ADENE n/a
24 - MLPDA n/a
25 - BOVERKET n/a
12
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Prefinancing payment Prefinancing guarantee
Guarantee
Type Amount Division per participant
amount
26 - TSUS n/a
27 - MZI n/a
Prefinancing 2 (additional) 2 500 000.00 n/a 1 - DEA n/a
2 - OIB n/a
3 - CSTC n/a
4 - SEDA n/a
5 - MECI n/a
6 - MIT n/a
7 - BAFA n/a
8 - MEC n/a
9 - CRES n/a
10 - IDAE n/a
11 - MOTIVA n/a
12 - MTE n/a
13 - MPGI n/a
14 - EMI n/a
15 - SEAI n/a
16 - ENEA n/a
17 - LRAM n/a
18 - MEAT n/a
19 - EM n/a
20 - MTIC n/a
21 - RVO n/a
22 - ITB n/a
23 - ADENE n/a
24 - MLPDA n/a
25 - BOVERKET n/a
26 - TSUS n/a
27 - MZI n/a
Reporting and payment modalities (art 21, 22):
Mutual Insurance Mechanism (MIM): No
Restrictions on distribution of initial prefinancing: The prefinancing may be distributed only if the minimum number of
beneficiaries set out in the call condititions (if any) have acceded to the Agreement and only to beneficiaries that have
acceded.
Interim payment ceiling (if any): 90% of the maximum grant amount
No-profit rule: Yes
Late payment interest: ECB + 3.5%
Bank account for payments:
DK4630003237073266
13
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Conversion into euros: Double conversion
Reporting language: Language of the Agreement
4.3 Certificates (art 24):
Certificates on the financial statements (CFS):
Conditions:
Schedule: interim/final payment, if threshold is reached
Standard threshold (beneficiary-level):
- financial statement: requested EU contribution to costs ≥ EUR 500 000.00
4.4 Recoveries (art 22)
First-line liability for recoveries:
Beneficiary termination: Beneficiary concerned
Final payment: Coordinator
After final payment: Beneficiary concerned
Joint and several liability for enforced recoveries (in case of non-payment):
Limited joint and several liability of other beneficiaries — up to the maximum grant amount of the beneficiary
Joint and several liability of affiliated entities — n/a
5. Consequences of non-compliance, applicable law & dispute settlement forum
Applicable law (art 43):
Standard applicable law regime: EU law + law of Belgium
Dispute settlement forum (art 43):
Standard dispute settlement forum:
EU beneficiaries: EU General Court + EU Court of Justice (on appeal)
Non-EU beneficiaries: Courts of Brussels, Belgium (unless an international agreement provides for the
enforceability of EU court judgements)
6. Other
Specific rules (Annex 5): Yes
Standard time-limits after project end:
Confidentiality (for X years after final payment): 5
Record-keeping (for X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Reviews (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Audits (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
14
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Extension of findings from other grants to this grant (no later than X years after final payment): 5 (or 3 for grants of
not more than EUR 60 000)
Impact evaluation (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
15
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and terms and conditions applicable to the grant
awarded for the implementation of the action set out in Chapter 2.
ARTICLE 2 — DEFINITIONS
For the purpose of this Agreement, the following definitions apply:
Actions — The project which is being funded in the context of this Agreement.
Grant — The grant awarded in the context of this Agreement.
EU grants — Grants awarded by EU institutions, bodies, offices or agencies (including EU executive
agencies, EU regulatory agencies, EDA, joint undertakings, etc.).
Participants — Entities participating in the action as beneficiaries, affiliated entities, associated
partners, third parties giving in-kind contributions, subcontractors or recipients of
financial support to third parties.
Beneficiaries (BEN) — The signatories of this Agreement (either directly or through an accession
form).
Affiliated entities (AE) — Entities affiliated to a beneficiary within the meaning of Article 187 of
EU Financial Regulation 2018/10464 which participate in the action with similar rights
and obligations as the beneficiaries (obligation to implement action tasks and right to
charge costs and claim contributions).
Associated partners (AP) — Entities which participate in the action, but without the right to charge
costs or claim contributions.
Purchases — Contracts for goods, works or services needed to carry out the action (e.g. equipment,
consumables and supplies) but which are not part of the action tasks (see Annex 1).
Subcontracting — Contracts for goods, works or services that are part of the action tasks (see Annex 1).
In-kind contributions — In-kind contributions within the meaning of Article 2(36) of EU Financial
4 For the definition, see Article 187 Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council
of 18 July 2018 on the financial rules applicable to the general budget of the Union, amending Regulations (EU)
No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013,
(EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom)
No 966/2012 (‘EU Financial Regulation’) (OJ L 193, 30.7.2018, p. 1): “affiliated entities [are]:
(a) entities that form a sole beneficiary [(i.e. where an entity is formed of several entities that satisfy the criteria for
being awarded a grant, including where the entity is specifically established for the purpose of implementing an
action to be financed by a grant)];
(b) entities that satisfy the eligibility criteria and that do not fall within one of the situations referred to in Article 136(1)
and 141(1) and that have a link with the beneficiary, in particular a legal or capital link, which is neither limited to
the action nor established for the sole purpose of its implementation”.
16
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Regulation 2018/1046, i.e. non-financial resources made available free of charge by
third parties.
Fraud — Fraud within the meaning of Article 3 of EU Directive 2017/13715 and Article 1 of the
Convention on the protection of the European Communities’ financial interests, drawn
up by the Council Act of 26 July 19956, as well as any other wrongful or criminal
deception intended to result in financial or personal gain.
Irregularities — Any type of breach (regulatory or contractual) which could impact the EU
financial interests, including irregularities within the meaning of Article 1(2) of EU
Regulation 2988/957.
Grave professional misconduct — Any type of unacceptable or improper behaviour in exercising one’s
profession, especially by employees, including grave professional misconduct within
the meaning of Article 136(1)(c) of EU Financial Regulation 2018/1046.
Applicable EU, international and national law — Any legal acts or other (binding or non-binding)
rules and guidance in the area concerned.
Portal — EU Funding & Tenders Portal; electronic portal and exchange system managed by the
European Commission and used by itself and other EU institutions, bodies, offices
or agencies for the management of their funding programmes (grants, procurements,
prizes, etc.).
CHAPTER 2 ACTION
ARTICLE 3 — ACTION
The grant is awarded for the action 101102078 — LIFE21-CET-CA-CAEPBD6 (‘action’), as
described in Annex 1.
ARTICLE 4 — DURATION AND STARTING DATE
The duration and the starting date of the action are set out in the Data Sheet (see Point 1).
CHAPTER 3 GRANT
ARTICLE 5 — GRANT
5.1 Form of grant
5 Directive (EU) 2017/1371 of the European Parliament and of the Council of 5 July 2017 on the fight against fraud to
the Union’s financial interests by means of criminal law (OJ L 198, 28.7.2017, p. 29).
6 OJ C 316, 27.11.1995, p. 48.
7 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities
financial interests (OJ L 312, 23.12.1995, p. 1).
17
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
The grant is an action grant8 which takes the form of a budget-based mixed actual cost grant (i.e. a
grant based on actual costs incurred, but which may also include other forms of funding, such as unit
costs or contributions, flat-rate costs or contributions, lump sum costs or contributions or financing
not linked to costs).
5.2 Maximum grant amount
The maximum grant amount is set out in the Data Sheet (see Point 3) and in the estimated budget
(Annex 2).
5.3 Funding rate
The funding rate for costs is 95% of the action’s eligible costs.
Contributions are not subject to any funding rate.
5.4 Estimated budget, budget categories and forms of funding
The estimated budget for the action is set out in Annex 2.
It contains the estimated eligible costs and contributions for the action, broken down by participant
and budget category.
Annex 2 also shows the types of costs and contributions (forms of funding)9 to be used for each budget
category.
If unit costs or contributions are used, the details on the calculation will be explained in Annex 2a.
5.5 Budget flexibility
The budget breakdown may be adjusted — without an amendment (see Article 39) — by transfers
(between participants and budget categories), as long as this does not imply any substantive or
important change to the description of the action in Annex 1.
However:
- changes to the budget category for volunteers (if used) always require an amendment
- changes to budget categories with lump sums costs or contributions (if used; including
financing not linked to costs) always require an amendment
- changes to budget categories with higher funding rates or budget ceilings (if used) always
require an amendment
- addition of amounts for subcontracts not provided for in Annex 1 either require an amendment
or simplified approval in accordance with Article 6.2
8 For the definition, see Article 180(2)(a) EU Financial Regulation 2018/1046: ‘action grant’ means an EU grant to
finance “an action intended to help achieve a Union policy objective”.
9 See Article 125 EU Financial Regulation 2018/1046.
18
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
- other changes require an amendment or simplified approval, if specifically provided for in
Article 6.2
- flexibility caps: not applicable.
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS
In order to be eligible, costs and contributions must meet the eligibility conditions set out in this
Article.
6.1 General eligibility conditions
The general eligibility conditions are the following:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary
(ii) they must be incurred in the period set out in Article 4 (with the exception of costs relating
to the submission of the final periodic report, which may be incurred afterwards; see
Article 21)
(iii) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s
accounts in accordance with the accounting standards applicable in the country where
the beneficiary is established and with the beneficiary’s usual cost accounting practices
(vi) they must comply with the applicable national law on taxes, labour and social security
and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency
(b) for unit costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the units must:
- be actually used or produced by the beneficiary in the period set out in Article 4
(with the exception of units relating to the submission of the final periodic report,
which may be used or produced afterwards; see Article 21)
- be necessary for the implementation of the action and
(iii) the number of units must be identifiable and verifiable, in particular supported by records
and documentation (see Article 20)
19
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(c) for flat-rate costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the costs or contributions to which the flat-rate is applied must:
- be eligible
- relate to the period set out in Article 4 (with the exception of costs or contributions
relating to the submission of the final periodic report, which may be incurred
afterwards; see Article 21)
(d) for lump sum costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the work must be properly implemented by the beneficiary in accordance with Annex 1
(iii) the deliverables/outputs must be achieved in the period set out in Article 4 (with the
exception of deliverables/outputs relating to the submission of the final periodic report,
which may be achieved afterwards; see Article 21)
(e) for unit, flat-rate or lump sum costs or contributions according to usual cost accounting
practices (if any):
(i) they must fulfil the general eligibility conditions for the type of cost concerned
(ii) the cost accounting practices must be applied in a consistent manner, based on objective
criteria, regardless of the source of funding
(f) for financing not linked to costs (if any): the results must be achieved or the conditions must
be fulfilled as described in Annex 1.
In addition, for direct cost categories (e.g. personnel, travel & subsistence, subcontracting and other
direct costs) only costs that are directly linked to the action implementation and can therefore be
attributed to it directly are eligible. They must not include any indirect costs (i.e. costs that are only
indirectly linked to the action, e.g. via cost drivers).
6.2 Specific eligibility conditions for each budget category
For each budget category, the specific eligibility conditions are as follows:
Direct costs
A. Personnel costs
A.1 Costs for employees (or equivalent) are eligible as personnel costs if they fulfil the general
eligibility conditions and are related to personnel working for the beneficiary under an employment
contract (or equivalent appointing act) and assigned to the action.
They must be limited to salaries, social security contributions, taxes and other costs linked to the
20
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
remuneration, if they arise from national law or the employment contract (or equivalent appointing
act) and be calculated on the basis of the costs actually incurred, in accordance with the following
method:
{daily rate for the person
multiplied by
number of day-equivalents worked on the action (rounded up or down to the nearest half-day)}.
The daily rate must be calculated as:
{annual personnel costs for the person
divided by
215}.
The number of day-equivalents declared for a person must be identifiable and verifiable (see
Article 20).
The total number of day-equivalents declared in EU grants, for a person for a year, cannot be higher
than 215.
The personnel costs may also include supplementary payments for personnel assigned to the action
(including payments on the basis of supplementary contracts regardless of their nature), if:
- it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required
- the criteria used to calculate the supplementary payments are objective and generally applied
by the beneficiary, regardless of the source of funding used.
A.2 and A.3 Costs for natural persons working under a direct contract other than an employment
contract and costs for seconded persons by a third party against payment are also eligible as
personnel costs, if they are assigned to the action, fulfil the general eligibility conditions and:
(a) work under conditions similar to those of an employee (in particular regarding the way the
work is organised, the tasks that are performed and the premises where they are performed) and
(b) the result of the work belongs to the beneficiary (unless agreed otherwise).
They must be calculated on the basis of a rate which corresponds to the costs actually incurred for
the direct contract or secondment and must not be significantly different from those for personnel
performing similar tasks under an employment contract with the beneficiary.
A.4 The work of SME owners for the action (i.e. owners of beneficiaries that are small and medium-
sized enterprises10 not receiving a salary) or natural person beneficiaries (i.e. beneficiaries that are
10 For the definition, see Commission Recommendation 2003/361/EC: micro, small or medium-sized enterprise (SME)
are enterprises
- engaged in an economic activity, irrespective of their legal form (including, in particular, self- employed persons
and family businesses engaged in craft or other activities, and partnerships or associations regularly engaged
in an economic activity) and
21
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
natural persons not receiving a salary) may be declared as personnel costs, if they fulfil the general
eligibility conditions and are calculated as unit costs in accordance with the method set out in Annex
2a.
A.5 The work of volunteers for the action (i.e. persons who freely work for an organisation, on a
non-compulsory basis and without being paid) may be declared as personnel costs, if and as declared
eligible in the call conditions, if they fulfil the general eligibility conditions and are calculated as unit
costs in accordance with the method set out in Annex 2a.
They:
- may not exceed the maximum amount for volunteers for the action (which corresponds to 50%
of the total (ineligible and eligible) project costs and contributions estimated in the proposal)
- may not exceed the maximum amount for volunteers for each beneficiary set out in Annex 2
- may not make the maximum EU contribution to costs higher than the total eligible costs without
volunteers.
If also indirect costs for volunteers are declared eligible in the call conditions, the amount of indirect
costs may be added to the volunteers costs category in Annex 2, at the flat-rate set out in Point E.
B. Subcontracting costs
Subcontracting costs for the action (including related duties, taxes and charges, such as non-
deductible or non-refundable value added tax (VAT)) are eligible, if they are calculated on the basis
of the costs actually incurred, fulfil the general eligibility conditions and are awarded using the
beneficiary’s usual purchasing practices — provided these ensure subcontracts with best value for
money (or if appropriate the lowest price) and that there is no conflict of interests (see Article 12).
Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on
public procurement must also comply with the applicable national law on public procurement.
Subcontracting may cover only a limited part of the action.
The tasks to be subcontracted and the estimated cost for each subcontract must be set out in Annex 1
and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2 (or may
be approved ex post in the periodic report, if the use of subcontracting does not entail changes to the
Agreement which would call into question the decision awarding the grant or breach the principle of
equal treatment of applicants; ‘simplified approval procedure’).
C. Purchase costs
Purchase costs for the action (including related duties, taxes and charges, such as non-deductible or
non-refundable value added tax (VAT)) are eligible if they fulfil the general eligibility conditions and
are bought using the beneficiary’s usual purchasing practices — provided these ensure purchases with
- employing fewer than 250 persons (expressed in ‘annual working units’ as defined in Article 5 of the
Recommendation) and which have an annual turnover not exceeding EUR 50 million, and/or an annual balance
sheet total not exceeding EUR 43 million.
22
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
best value for money (or if appropriate the lowest price) and that there is no conflict of interests (see
Article 12).
Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on
public procurement must also comply with the applicable national law on public procurement.
C.1 Travel and subsistence
Purchases for travel, accommodation and subsistence must be calculated as follows:
- travel: on the basis of the costs actually incurred and in line with the beneficiary’s usual
practices on travel
- accommodation: on the basis of the costs actually incurred and in line with the beneficiary’s
usual practices on travel
- subsistence: on the basis of the costs actually incurred and in line with the beneficiary’s usual
practices on travel .
C.2 Equipment
Purchases of equipment, infrastructure or other assets used for the action must be declared as
depreciation costs, calculated on the basis of the costs actually incurred and written off in accordance
with international accounting standards and the beneficiary’s usual accounting practices.
Only the portion of the costs that corresponds to the rate of actual use for the action during the action
duration can be taken into account.
Costs for renting or leasing equipment, infrastructure or other assets are also eligible, if they do not
exceed the depreciation costs of similar equipment, infrastructure or assets and do not include any
financing fees.
C.3 Other goods, works and services
Purchases of other goods, works and services must be calculated on the basis of the costs actually
incurred.
Such goods, works and services include, for instance, consumables and supplies, promotion,
dissemination, protection of results, translations, publications, certificates and financial guarantees,
if required under the Agreement.
D. Other cost categories
D.1 Financial support to third parties
Costs for providing financial support to third parties (in the form of grants, prizes or similar
forms of support; if any) are eligible, if and as declared eligible in the call conditions, if they fulfil the
general eligibility conditions, are calculated on the basis of the costs actually incurred and the support
is implemented in accordance with the conditions set out in Annex 1.
These conditions must ensure objective and transparent selection procedures and include at least the
following:
23
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(a) for grants (or similar):
(i) the maximum amount of financial support for each third party (‘recipient’); this amount
may not exceed the amount set out in the Data Sheet (see Point 3) or otherwise agreed
with the granting authority
(ii) the criteria for calculating the exact amount of the financial support
(iii) the different types of activity that qualify for financial support, on the basis of a closed list
(iv) the persons or categories of persons that will be supported and
(v) the criteria and procedures for giving financial support
(b) for prizes (or similar):
(i) the eligibility and award criteria
(ii) the amount of the prize and
(iii) the payment arrangements.
D.2 Land purchase
Costs for land purchase from private entities (or long-term lease of land or one-off compensations for
land use rights) are eligible, if and as declared eligible in the call conditions, if they fulfil the general
eligibility conditions, are calculated on the basis of the costs actually incurred and:
(a) the purchase will contribute to improving, maintaining and restoring the integrity of the
Natura 2000 network set up pursuant to Article 3 of Directive 92/43/EEC, including through
improving connectivity by the creation of corridors, stepping stones, or other elements of green
infrastructure
(b) land purchase is the only or most cost-effective way of achieving the desired conservation
outcome
(c) the land purchased is reserved in the long term for uses consistent with the specific objectives
of the LIFE Programme
(d) the Member State concerned ensures, by way of transfer or otherwise, the long-term assignment
of such land to nature conservation purposes and the beneficiary documents this by ensuring
that:
(i) the entry into the land register includes a condition that the land will be assigned
definitively to nature conservation
(ii) or, if there is no land register or such a condition is not possible under national law, that
such a condition is either included in the land sale contract or guaranteed by equivalent
means
(e) for land purchases by private entity beneficiaries: the beneficiaries ensure the long-term
conservation by ensuring that:
24
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(i) the entry into the land register includes a condition that, in case of their dissolution
or incapacity to manage the land according to nature conservation requirements, the
property will be transferred to an entity primarily active in the field of nature protection
(ii) or, if there is no land register or such a condition is not possible under national law, that
such a condition is either included in the land sale contract or guaranteed by equivalent
means
(f) for purchases of partial rights: the entry into the land register duly reflects the long-term nature
conservation objectives and the requirements set out in this Article
(g) for land purchased to be exchanged at a later date for another parcel on which the action will
be undertaken: the exchange is carried out before the end of the action and the land exchanged
complies with the requirements set out in this Article
(h) for long-term leases: the lease is of at least 20 years and includes provisions and commitments
that ensure the achievement of its objectives in terms of habitat and species protection.
This cost will not be taken into account for the indirect cost flat-rate.
Indirect costs
E. Indirect costs
Indirect costs will be reimbursed at the flat-rate of 7% of the eligible direct costs (categories A-D,
except volunteers costs and exempted specific cost categories, if any).
Contributions
Not applicable
6.3 Ineligible costs and contributions
The following costs or contributions are ineligible:
(a) costs or contributions that do not comply with the conditions set out above (Article 6.1 and
6.2), in particular:
(i) costs related to return on capital and dividends paid by a beneficiary
(ii) debt and debt service charges
(iii) provisions for future losses or debts
(iv) interest owed
(v) currency exchange losses
(vi) bank costs charged by the beneficiary’s bank for transfers from the granting authority
(vii) excessive or reckless expenditure
25
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(viii) deductible or refundable VAT (including VAT paid by public bodies acting as public
authority)
(ix) costs incurred or contributions for activities implemented during grant agreement
suspension (see Article 31)
(x) in-kind contributions by third parties
(b) costs or contributions declared under other EU grants (or grants awarded by an EU Member
State, non-EU country or other body implementing the EU budget), except for the following
cases:
(i) Synergy actions: not applicable
(ii) if the action grant is combined with an operating grant11 running during the same period
and the beneficiary can demonstrate that the operating grant does not cover any (direct
or indirect) costs of the action grant
(c) costs or contributions for staff of a national (or regional/local) administration, for activities that
are part of the administration’s normal activities (i.e. not undertaken only because of the grant)
(d) costs or contributions (especially travel and subsistence) for staff or representatives of EU
institutions, bodies or agencies
(e) other :
(i) country restrictions for eligible costs: not applicable
(ii) costs or contributions declared specifically ineligible in the call conditions.
6.4 Consequences of non-compliance
If a beneficiary declares costs or contributions that are ineligible, they will be rejected (see Article 27).
This may also lead to other measures described in Chapter 5.
CHAPTER 4 GRANT IMPLEMENTATION
SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER
PARTICIPANTS
ARTICLE 7 — BENEFICIARIES
The beneficiaries, as signatories of the Agreement, are fully responsible towards the granting authority
for implementing it and for complying with all its obligations.
11 For the definition, see Article 180(2)(b) of EU Financial Regulation 2018/1046: ‘operating grant’ means an EU grant
to finance “the functioning of a body which has an objective forming part of and supporting an EU policy”.
26
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
They must implement the Agreement to their best abilities, in good faith and in accordance with all
the obligations and terms and conditions it sets out.
They must have the appropriate resources to implement the action and implement the action under
their own responsibility and in accordance with Article 11. If they rely on affiliated entities or other
participants (see Articles 8 and 9), they retain sole responsibility towards the granting authority and
the other beneficiaries.
They are jointly responsible for the technical implementation of the action. If one of the beneficiaries
fails to implement their part of the action, the other beneficiaries must ensure that this part is
implemented by someone else (without being entitled to an increase of the maximum grant amount
and subject to an amendment; see Article 39). The financial responsibility of each beneficiary in case
of recoveries is governed by Article 22.
The beneficiaries (and their action) must remain eligible under the EU programme funding the grant
for the entire duration of the action. Costs and contributions will be eligible only as long as the
beneficiary and the action are eligible.
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Portal Participant Register up to date (see Article 19)
(ii) inform the granting authority (and the other beneficiaries) immediately of any events or
circumstances likely to affect significantly or delay the implementation of the action (see
Article 19)
(iii) submit to the coordinator in good time:
- the prefinancing guarantees (if required; see Article 23)
- the financial statements and certificates on the financial statements (CFS) (if
required; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
- the contribution to the deliverables and technical reports (see Article 21)
- any other documents or information required by the granting authority under the
Agreement
(iv) submit via the Portal data and information related to the participation of their affiliated
entities.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 11)
(ii) act as the intermediary for all communications between the consortium and the granting
authority, unless the Agreement or granting authority specifies otherwise, and in
particular:
- submit the prefinancing guarantees to the granting authority (if any)
27
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
- request and review any documents or information required and verify their quality
and completeness before passing them on to the granting authority
- submit the deliverables and reports to the granting authority
- inform the granting authority about the payments made to the other beneficiaries
(report on the distribution of payments; if required, see Articles 22 and 32)
(iii) distribute the payments received from the granting authority to the other beneficiaries
without unjustified delay (see Article 22).
The coordinator may not delegate or subcontract the above-mentioned tasks to any other beneficiary
or third party (including affiliated entities).
However, coordinators which are public bodies may delegate the tasks set out in Point (b)(ii) last
indent and (iii) above to entities with ‘authorisation to administer’ which they have created or which
are controlled by or affiliated to them. In this case, the coordinator retains sole responsibility for the
payments and for compliance with the obligations under the Agreement.
Moreover, coordinators which are ‘sole beneficiaries’12 (or similar, such as European research
infrastructure consortia (ERICs)) may delegate the tasks set out in Point (b)(i) to (iii) above to one of
their members. The coordinator retains sole responsibility for compliance with the obligations under
the Agreement.
The beneficiaries must have internal arrangements regarding their operation and co-ordination, to
ensure that the action is implemented properly.
If required by the granting authority (see Data Sheet, Point 1), these arrangements must be set out in
a written consortium agreement between the beneficiaries, covering for instance:
- the internal organisation of the consortium
- the management of access to the Portal
- different distribution keys for the payments and financial responsibilities in case of recoveries
(if any)
- additional rules on rights and obligations related to background and results (see Article 16)
- settlement of internal disputes
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The internal arrangements must not contain any provision contrary to this Agreement.
ARTICLE 8 — AFFILIATED ENTITIES
Not applicable
12 For the definition, see Article 187(2) EU Financial Regulation 2018/1046: “Where several entities satisfy the criteria
for being awarded a grant and together form one entity, that entity may be treated as the sole beneficiary, including
where it is specifically established for the purpose of implementing the action financed by the grant.”
28
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION
9.1 Associated partners
The following entities which cooperate with a beneficiary will participate in the action as ‘associated
partners’:
- NORGES VASSDRAGS- OG ENERGIDIREKTORAT (NVE), PIC 933343992
Associated partners must implement the action tasks attributed to them in Annex 1 in accordance with
Article 11. They may not charge costs or contributions to the action and the costs for their tasks are
not eligible.
The tasks must be set out in Annex 1.
The beneficiaries must ensure that their contractual obligations under Articles 11 (proper
implementation), 12 (conflict of interests), 13 (confidentiality and security), 14 (ethics), 17.2
(visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping) also
apply to the associated partners.
The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF,
Court of Auditors (ECA), etc.) can exercise their rights also towards the associated partners.
9.2 Third parties giving in-kind contributions to the action
Other third parties may give in-kind contributions to the action (i.e. personnel, equipment, other goods,
works and services, etc. which are free-of-charge), if necessary for the implementation.
Third parties giving in-kind contributions do not implement any action tasks. They may not charge
costs or contributions to the action and the costs for the in-kind contributions are not eligible.
The third parties and their in-kind contributions should be set out in Annex 1.
9.3 Subcontractors
Subcontractors may participate in the action, if necessary for the implementation.
Subcontractors must implement their action tasks in accordance with Article 11. The costs for the
subcontracted tasks (invoiced price from the subcontractor) are eligible and may be charged by the
beneficiaries, under the conditions set out in Article 6. The costs will be included in Annex 2 as part
of the beneficiaries’ costs.
The beneficiaries must ensure that their contractual obligations under Articles 11 (proper
implementation), 12 (conflict of interest), 13 (confidentiality and security), 14 (ethics), 17.2
(visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping) also
apply to the subcontractors.
The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF,
Court of Auditors (ECA), etc.) can exercise their rights also towards the subcontractors.
9.4 Recipients of financial support to third parties
29
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
If the action includes providing financial support to third parties (e.g. grants, prizes or similar forms of
support), the beneficiaries must ensure that their contractual obligations under Articles 12 (conflict of
interest), 13 (confidentiality and security), 14 (ethics), 17.2 (visibility), 18 (specific rules for carrying
out action), 19 (information) and 20 (record-keeping)also apply to the third parties receiving the
support (recipients).
The beneficiaries must also ensure that the bodies mentioned in Article 25 (e.g. granting authority,
OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the recipients.
ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS
10.1 Non-EU participants
Participants which are established in a non-EU country (if any) undertake to comply with their
obligations under the Agreement and:
- to respect general principles (including fundamental rights, values and ethical principles,
environmental and labour standards, rules on classified information, intellectual property
rights, visibility of funding and protection of personal data)
- for the submission of certificates under Article 24: to use qualified external auditors which
are independent and comply with comparable standards as those set out in EU Directive
2006/43/EC13
- for the controls under Article 25: to allow for checks, reviews, audits and investigations
(including on-the-spot checks, visits and inspections) by the bodies mentioned in that Article
(e.g. granting authority, OLAF, Court of Auditors (ECA), etc.).
Special rules on dispute settlement apply (see Data Sheet, Point 5).
10.2 Participants which are international organisations
Participants which are international organisations (IOs; if any) undertake to comply with their
obligations under the Agreement and:
- to respect general principles (including fundamental rights, values and ethical principles,
environmental and labour standards, rules on classified information, intellectual property
rights, visibility of funding and protection of personal data)
- for the submission of certificates under Article 24: to use either independent public officers or
external auditors which comply with comparable standards as those set out in EU Directive
2006/43/EC
- for the controls under Article 25: to allow for the checks, reviews, audits and investigations
by the bodies mentioned in that Article, taking into account the specific agreements concluded
by them and the EU (if any).
13 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
30
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
For such participants, nothing in the Agreement will be interpreted as a waiver of their privileges or
immunities, as accorded by their constituent documents or international law.
Special rules on applicable law and dispute settlement apply (see Article 43 and Data Sheet, Point 5).
10.3 Pillar-assessed participants
Pillar-assessed participants (if any) may rely on their own systems, rules and procedures, in so far as
they have been positively assessed and do not call into question the decision awarding the grant or
breach the principle of equal treatment of applicants or beneficiaries.
‘Pillar-assessment’ means a review by the European Commission on the systems, rules and procedures
which participants use for managing EU grants (in particular internal control system, accounting
system, external audits, financing of third parties, rules on recovery and exclusion, information on
recipients and protection of personal data; see Article 154 EU Financial Regulation 2018/1046).
Participants with a positive pillar assessment may rely on their own systems, rules and procedures,
in particular for:
- record-keeping (Article 20): may be done in accordance with internal standards, rules and
procedures
- currency conversion for financial statements (Article 21): may be done in accordance with
usual accounting practices
- guarantees (Article 23): for public law bodies, prefinancing guarantees are not needed
- certificates (Article 24):
- certificates on the financial statements (CFS): may be provided by their regular internal
or external auditors and in accordance with their internal financial regulations and
procedures
- certificates on usual accounting practices (CoMUC): are not needed if those practices
are covered by an ex-ante assessment
and use the following specific rules, for:
- recoveries (Article 22): in case of financial support to third parties, there will be no recovery if
the participant has done everything possible to retrieve the undue amounts from the third party
receiving the support (including legal proceedings) and non-recovery is not due to an error or
negligence on its part
- checks, reviews, audits and investigations by the EU (Article 25): will be conducted taking
into account the rules and procedures specifically agreed between them and the framework
agreement (if any)
- impact evaluation (Article 26): will be conducted in accordance with the participant’s internal
rules and procedures and the framework agreement (if any)
- grant agreement suspension (Article 31): certain costs incurred during grant suspension are
eligible (notably, minimum costs necessary for a possible resumption of the action and costs
31
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
relating to contracts which were entered into before the pre-information letter was received and
which could not reasonably be suspended, reallocated or terminated on legal grounds)
- grant agreement termination (Article 32): the final grant amount and final payment will be
calculated taking into account also costs relating to contracts due for execution only after
termination takes effect, if the contract was entered into before the pre-information letter was
received and could not reasonably be terminated on legal grounds
- liability for damages (Article 33.2): the granting authority must be compensated for damage
it sustains as a result of the implementation of the action or because the action was not
implemented in full compliance with the Agreement only if the damage is due to an
infringement of the participant’s internal rules and procedures or due to a violation of third
parties’ rights by the participant or one of its employees or individual for whom the employees
are responsible.
Participants whose pillar assessment covers procurement and granting procedures may also do
purchases, subcontracting and financial support to third parties (Article 6.2) in accordance with their
internal rules and procedures for purchases, subcontracting and financial support.
Participants whose pillar assessment covers data protection rules may rely on their internal standards,
rules and procedures for data protection (Article 15).
The participants may however not rely on provisions which would breach the principle of equal
treatment of applicants or beneficiaries or call into question the decision awarding the grant, such as
in particular:
- eligibility (Article 6)
- consortium roles and set-up (Articles 7-9)
- security and ethics (Articles 13, 14)
- IPR (including background and results, access rights and rights of use), communication,
dissemination and visibility (Articles 16 and 17)
- information obligation (Article 19)
- payment, reporting and amendments (Articles 21, 22 and 39)
- rejections, reductions, suspensions and terminations (Articles 27, 28, 29-32)
If the pillar assessment was subject to remedial measures, reliance on the internal systems, rules and
procedures is subject to compliance with those remedial measures.
Participants whose assessment has not yet been updated to cover (the new rules on) data protection
may rely on their internal systems, rules and procedures, provided that they ensure that personal data is:
- processed lawfully, fairly and in a transparent manner in relation to the data subject
- collected for specified, explicit and legitimate purposes and not further processed in a manner
that is incompatible with those purposes
32
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
- adequate, relevant and limited to what is necessary in relation to the purposes for which they
are processed
- accurate and, where necessary, kept up to date
- kept in a form which permits identification of data subjects for no longer than is necessary for
the purposes for which the data is processed and
- processed in a manner that ensures appropriate security of the personal data.
Participants must inform the coordinator without delay of any changes to the systems, rules and
procedures that were part of the pillar assessment. The coordinator must immediately inform the
granting authority.
Pillar-assessed participants that have also concluded a framework agreement with the EU, may
moreover — under the same conditions as those above (i.e. not call into question the decision awarding
the grant or breach the principle of equal treatment of applicants or beneficiaries) — rely on the
provisions set out in that framework agreement.
SECTION 2 RULES FOR CARRYING OUT THE ACTION
ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION
11.1 Obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement, the call conditions and all legal obligations under applicable EU,
international and national law.
11.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 12 — CONFLICT OF INTERESTS
12.1 Conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the Agreement could be compromised for reasons involving family, emotional life,
political or national affinity, economic interest or any other direct or indirect interest (‘conflict of
interests’).
They must formally notify the granting authority without delay of any situation constituting or likely
to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The granting authority may verify that the measures taken are appropriate and may require additional
measures to be taken by a specified deadline.
33
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
12.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28) and the grant or the beneficiary may be terminated (see Article 32).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 13 — CONFIDENTIALITY AND SECURITY
13.1 Sensitive information
The parties must keep confidential any data, documents or other material (in any form) that is identified
as sensitive in writing (‘sensitive information’) — during the implementation of the action and for at
least until the time-limit set out in the Data Sheet (see Point 6).
If a beneficiary requests, the granting authority may agree to keep such information confidential for
a longer period.
Unless otherwise agreed between the parties, they may use sensitive information only to implement
the Agreement.
The beneficiaries may disclose sensitive information to their personnel or other participants involved
in the action only if they:
(a) need to know it in order to implement the Agreement and
(b) are bound by an obligation of confidentiality.
The granting authority may disclose sensitive information to its staff and to other EU institutions and
bodies.
It may moreover disclose sensitive information to third parties, if:
(a) this is necessary to implement the Agreement or safeguard the EU financial interests and
(b) the recipients of the information are bound by an obligation of confidentiality.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party
(b) the information becomes publicly available, without breaching any confidentiality obligation
(c) the disclosure of the sensitive information is required by EU, international or national law.
Specific confidentiality rules (if any) are set out in Annex 5.
13.2 Classified information
34
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
The parties must handle classified information in accordance with the applicable EU, international or
national law on classified information (in particular, Decision 2015/44414 and its implementing rules).
Deliverables which contain classified information must be submitted according to special procedures
agreed with the granting authority.
Action tasks involving classified information may be subcontracted only after explicit approval (in
writing) from the granting authority.
Classified information may not be disclosed to any third party (including participants involved in the
action implementation) without prior explicit written approval from the granting authority.
Specific security rules (if any) are set out in Annex 5.
13.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 14 — ETHICS AND VALUES
14.1 Ethics
The action must be carried out in line with the highest ethical standards and the applicable EU,
international and national law on ethical principles.
Specific ethics rules (if any) are set out in Annex 5.
14.2 Values
The beneficiaries must commit to and ensure the respect of basic EU values (such as respect for
human dignity, freedom, democracy, equality, the rule of law and human rights, including the rights
of minorities).
Specific rules on values (if any) are set out in Annex 5.
14.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 15 — DATA PROTECTION
15.1 Data processing by the granting authority
14 Commission Decision 2015/444/EC, Euratom of 13 March 2015 on the security rules for protecting EU classified
information (OJ L 72, 17.3.2015, p. 53).
35
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Any personal data under the Agreement will be processed under the responsibility of the data
controller of the granting authority in accordance with and for the purposes set out in the Portal Privacy
Statement.
For grants where the granting authority is the European Commission, an EU regulatory or executive
agency, joint undertaking or other EU body, the processing will be subject to Regulation 2018/172515.
15.2 Data processing by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with the applicable
EU, international and national law on data protection (in particular, Regulation 2016/67916).
They must ensure that personal data is:
- processed lawfully, fairly and in a transparent manner in relation to the data subjects
- collected for specified, explicit and legitimate purposes and not further processed in a manner
that is incompatible with those purposes
- adequate, relevant and limited to what is necessary in relation to the purposes for which they
are processed
- accurate and, where necessary, kept up to date
- kept in a form which permits identification of data subjects for no longer than is necessary for
the purposes for which the data is processed and
- processed in a manner that ensures appropriate security of the data.
The beneficiaries may grant their personnel access to personal data only if it is strictly necessary
for implementing, managing and monitoring the Agreement. The beneficiaries must ensure that the
personnel is under a confidentiality obligation.
The beneficiaries must inform the persons whose data are transferred to the granting authority and
provide them with the Portal Privacy Statement.
15.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND
RESULTS —ACCESS RIGHTS AND RIGHTS OF USE
15 Regulation (EU) 2018/1725 of the European Parliament and of the Council of 23 October 2018 on the protection of
natural persons with regard to the processing of personal data by the Union institutions, bodies, offices and agencies
and on the free movement of such data, and repealing Regulation (EC) No 45/2001 and Decision No 1247/2002/EC
(OJ L 295, 21.11.2018, p. 39).
16 Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural
persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive
95/46/EC (‘GDPR’) (OJ L 119, 4.5.2016, p. 1).
36
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
16.1 Background and access rights to background
The beneficiaries must give each other and the other participants access to the background identified
as needed for implementing the action, subject to any specific rules in Annex 5.
‘Background’ means any data, know-how or information — whatever its form or nature (tangible or
intangible), including any rights such as intellectual property rights — that is:
(a) held by the beneficiaries before they acceded to the Agreement and
(b) needed to implement the action or exploit the results.
If background is subject to rights of a third party, the beneficiary concerned must ensure that it is able
to comply with its obligations under the Agreement.
16.2 Ownership of results
The granting authority does not obtain ownership of the results produced under the action.
‘Results’ means any tangible or intangible effect of the action, such as data, know-how or information,
whatever its form or nature, whether or not it can be protected, as well as any rights attached to it,
including intellectual property rights.
16.3 Rights of use of the granting authority on materials, documents and information
received for policy, information, communication, dissemination and publicity purposes
The granting authority has the right to use non-sensitive information relating to the action and
materials and documents received from the beneficiaries (notably summaries for publication,
deliverables, as well as any other material, such as pictures or audio-visual material, in paper or
electronic form) for policy, information, communication, dissemination and publicity purposes —
during the action or afterwards.
The right to use the beneficiaries’ materials, documents and information is granted in the form of a
royalty-free, non-exclusive and irrevocable licence, which includes the following rights:
(a) use for its own purposes (in particular, making them available to persons working for the
granting authority or any other EU service (including institutions, bodies, offices, agencies,
etc.) or EU Member State institution or body; copying or reproducing them in whole or in part,
in unlimited numbers; and communication through press information services)
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes)
(c) editing or redrafting (including shortening, summarising, inserting other elements (e.g.
meta-data, legends, other graphic, visual, audio or text elements), extracting parts (e.g. audio
or video files), dividing into parts, use in a compilation)
(d) translation
(e) storage in paper, electronic or other form
37
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(f) archiving, in line with applicable document-management rules
(g) the right to authorise third parties to act on its behalf or sub-license to third parties the modes
of use set out in Points (b), (c), (d) and (f), if needed for the information, communication and
publicity activity of the granting authority
(h) processing, analysing, aggregating the materials, documents and information received and
producing derivative works.
The rights of use are granted for the whole duration of the industrial or intellectual property rights
concerned.
If materials or documents are subject to moral rights or third party rights (including intellectual
property rights or rights of natural persons on their image and voice), the beneficiaries must ensure
that they comply with their obligations under this Agreement (in particular, by obtaining the necessary
licences and authorisations from the rights holders concerned).
Where applicable, the granting authority will insert the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the [name of granting authority]
under conditions.”
16.4 Specific rules on IPR, results and background
Specific rules regarding intellectual property rights, results and background (if any) are set out in
Annex 5.
16.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such a breach may also lead to other measures described in Chapter 5.
ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY
17.1 Communication — Dissemination — Promoting the action
Unless otherwise agreed with the granting authority, the beneficiaries must promote the action and its
results by providing targeted information to multiple audiences (including the media and the public),
in accordance with Annex 1 and in a strategic, coherent and effective manner.
Before engaging in a communication or dissemination activity expected to have a major media impact,
the beneficiaries must inform the granting authority.
17.2 Visibility — European flag and funding statement
Unless otherwise agreed with the granting authority, communication activities of the beneficiaries
related to the action (including media relations, conferences, seminars, information material, such as
brochures, leaflets, posters, presentations, etc., in electronic form, via traditional or social media, etc.),
dissemination activities and any infrastructure, equipment, vehicles, supplies or major result funded
38
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
by the grant must acknowledge EU support and display the European flag (emblem) and funding
statement (translated into local languages, where appropriate):
The emblem must remain distinct and separate and cannot be modified by adding other visual
marks, brands or text.
Apart from the emblem, no other visual identity or logo may be used to highlight the EU support.
When displayed in association with other logos (e.g. of beneficiaries or sponsors), the emblem must
be displayed at least as prominently and visibly as the other logos.
For the purposes of their obligations under this Article, the beneficiaries may use the emblem without
first obtaining approval from the granting authority. This does not, however, give them the right to
exclusive use. Moreover, they may not appropriate the emblem or any similar trademark or logo, either
by registration or by any other means.
17.3 Quality of information — Disclaimer
Any communication or dissemination activity related to the action must use factually accurate
information.
Moreover, it must indicate the following disclaimer (translated into local languages where
appropriate):
“Funded by the European Union. Views and opinions expressed are however those of the author(s) only
and do not necessarily reflect those of the European Union or [name of the granting authority]. Neither
the European Union nor the granting authority can be held responsible for them.”
17.4 Specific communication, dissemination and visibility rules
Specific communication, dissemination and visibility rules (if any) are set out in Annex 5.
39
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
17.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION
18.1 Specific rules for carrying out the action
Specific rules for implementing the action (if any) are set out in Annex 5.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such a breach may also lead to other measures described in Chapter 5.
SECTION 3 GRANT ADMINISTRATION
ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS
19.1 Information requests
The beneficiaries must provide — during the action or afterwards and in accordance with Article 7 —
any information requested in order to verify eligibility of the costs or contributions declared, proper
implementation of the action and compliance with the other obligations under the Agreement.
The information provided must be accurate, precise and complete and in the format requested,
including electronic format.
19.2 Participant Register data updates
The beneficiaries must keep — at all times, during the action or afterwards — their information stored
in the Portal Participant Register up to date, in particular, their name, address, legal representatives,
legal form and organisation type.
19.3 Information about events and circumstances which impact the action
The beneficiaries must immediately inform the granting authority (and the other beneficiaries) of any
of the following:
(a) events which are likely to affect or delay the implementation of the action or affect the EU’s
financial interests, in particular:
(i) changes in their legal, financial, technical, organisational or ownership situation
(including changes linked to one of the exclusion grounds listed in the declaration of
honour signed before grant signature)
40
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(ii) linked action information: not applicable
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
19.4 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 20 — RECORD-KEEPING
20.1 Keeping records and supporting documents
The beneficiaries must — at least until the time-limit set out in the Data Sheet (see Point 6) — keep
records and other supporting documents to prove the proper implementation of the action in line with
the accepted standards in the respective field (if any).
In addition, the beneficiaries must — for the same period — keep the following to justify the amounts
declared:
(a) for actual costs: adequate records and supporting documents to prove the costs declared (such
as contracts, subcontracts, invoices and accounting records); in addition, the beneficiaries’
usual accounting and internal control procedures must enable direct reconciliation between
the amounts declared, the amounts recorded in their accounts and the amounts stated in the
supporting documents
(b) for flat-rate costs and contributions (if any): adequate records and supporting documents to
prove the eligibility of the costs or contributions to which the flat-rate is applied
(c) for the following simplified costs and contributions: the beneficiaries do not need to keep
specific records on the actual costs incurred, but must keep:
(i) for unit costs and contributions (if any): adequate records and supporting documents to
prove the number of units declared
(ii) for lump sum costs and contributions (if any): adequate records and supporting
documents to prove proper implementation of the work as described in Annex 1
(iii) for financing not linked to costs (if any): adequate records and supporting documents
to prove the achievement of the results or the fulfilment of the conditions as described
in Annex 1
(d) for unit, flat-rate and lump sum costs and contributions according to usual cost accounting
practices (if any): the beneficiaries must keep any adequate records and supporting documents
to prove that their cost accounting practices have been applied in a consistent manner, based on
41
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
objective criteria, regardless of the source of funding, and that they comply with the eligibility
conditions set out in Articles 6.1 and 6.2.
Moreover, the following is needed for specific budget categories:
(e) for personnel costs: time worked for the beneficiary under the action must be supported
by declarations signed monthly by the person and their supervisor, unless another reliable
time-record system is in place; the granting authority may accept alternative evidence
supporting the time worked for the action declared, if it considers that it offers an adequate
level of assurance
(f) additional record-keeping rules: not applicable
The records and supporting documents must be made available upon request (see Article 19) or in the
context of checks, reviews, audits or investigations (see Article 25).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Article 25), the beneficiaries must keep these
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The granting authority may accept
non-original documents if they offer a comparable level of assurance.
20.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently
substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may
be reduced (see Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 21 — REPORTING
21.1 Continuous reporting
The beneficiaries must continuously report on the progress of the action (e.g. deliverables,
milestones, outputs/outcomes, critical risks, indicators, etc; if any), in the Portal Continuous
Reporting tool and in accordance with the timing and conditions it sets out (as agreed with the granting
authority).
Standardised deliverables (e.g. progress reports not linked to payments, reports on cumulative
expenditure, special reports, etc; if any) must be submitted using the templates published on the Portal.
21.2 Periodic reporting: Technical reports and financial statements
In addition, the beneficiaries must provide reports to request payments, in accordance with the
schedule and modalities set out in the Data Sheet (see Point 4.2):
- for additional prefinancings (if any): an additional prefinancing report
- for interim payments (if any) and the final payment: a periodic report.
42
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
The prefinancing and periodic reports include a technical and financial part.
The technical part includes an overview of the action implementation. It must be prepared using the
template available in the Portal Periodic Reporting tool.
The financial part of the additional prefinancing report includes a statement on the use of the previous
prefinancing payment.
The financial part of the periodic report includes:
- the financial statements (individual and consolidated; for all beneficiaries/affiliated entities)
- the explanation on the use of resources (or detailed cost reporting table, if required)
- the certificates on the financial statements (CFS) (if required; see Article 24.2 and Data Sheet,
Point 4.3).
The financial statements must detail the eligible costs and contributions for each budget category
and, for the final payment, also the revenues for the action (see Articles 6 and 22).
All eligible costs and contributions incurred should be declared, even if they exceed the amounts
indicated in the estimated budget (see Annex 2). Amounts that are not declared in the individual
financial statements will not be taken into account by the granting authority.
By signing the financial statements (directly in the Portal Periodic Reporting tool), the beneficiaries
confirm that:
- the information provided is complete, reliable and true
- the costs and contributions declared are eligible (see Article 6)
- the costs and contributions can be substantiated by adequate records and supporting documents
(see Article 20) that will be produced upon request (see Article 19) or in the context of checks,
reviews, audits and investigations (see Article 25)
- for the final periodic report: all the revenues have been declared (if required; see Article 22).
Beneficiaries will have to submit also the financial statements of their affiliated entities (if any). In case
of recoveries (see Article 22), beneficiaries will be held responsible also for the financial statements
of their affiliated entities.
21.3 Currency for financial statements and conversion into euros
The financial statements must be drafted in euro.
Beneficiaries with general accounts established in a currency other than the euro must convert the
costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C
series of the Official Journal of the European Union (ECB website), calculated over the corresponding
reporting period.
If no daily euro exchange rate is published in the Official Journal for the currency in question, they
must be converted at the average of the monthly accounting exchange rates published on the European
Commission website (InforEuro), calculated over the corresponding reporting period.
43
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Beneficiaries with general accounts in euro must convert costs incurred in another currency into euro
according to their usual accounting practices.
21.4 Reporting language
The reporting must be in the language of the Agreement, unless otherwise agreed with the granting
authority (see Data Sheet, Point 4.2).
21.5 Consequences of non-compliance
If a report submitted does not comply with this Article, the granting authority may suspend the
payment deadline (see Article 29) and apply other measures described in Chapter 5.
If the coordinator breaches its reporting obligations, the granting authority may terminate the grant or
the coordinator’s participation (see Article 32) or apply other measures described in Chapter 5.
ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS
DUE
22.1 Payments and payment arrangements
Payments will be made in accordance with the schedule and modalities set out in the Data Sheet (see
Point 4.2).
They will be made in euro to the bank account indicated by the coordinator (see Data Sheet, Point 4.2)
and must be distributed without unjustified delay (restrictions may apply to distribution of the initial
prefinancing payment; see Data Sheet, Point 4.2).
Payments to this bank account will discharge the granting authority from its payment obligation.
The cost of payment transfers will be borne as follows:
- the granting authority bears the cost of transfers charged by its bank
- the beneficiary bears the cost of transfers charged by its bank
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
Payments by the granting authority will be considered to have been carried out on the date when they
are debited to its account.
22.2 Recoveries
Recoveries will be made, if — at beneficiary termination, final payment or afterwards — it turns out
that the granting authority has paid too much and needs to recover the amounts undue.
The general liability regime for recoveries (first-line liability) is as follows: At final payment, the
coordinator will be fully liable for recoveries, even if it has not been the final recipient of the undue
amounts. At beneficiary termination or after final payment, recoveries will be made directly against
the beneficiaries concerned.
Beneficiaries will be fully liable for repaying the debts of their affiliated entities.
44
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
In case of enforced recoveries (see Article 22.4):
- the beneficiaries will be jointly and severally liable for repaying debts of another beneficiary
under the Agreement (including late-payment interest), if required by the granting authority
(see Data Sheet, Point 4.4)
- affiliated entities will be held liable for repaying debts of their beneficiaries under the
Agreement (including late-payment interest), if required by the granting authority (see
Data Sheet, Point 4.4).
22.3 Amounts due
22.3.1 Prefinancing payments
The aim of the prefinancing is to provide the beneficiaries with a float.
It remains the property of the EU until the final payment.
For initial prefinancings (if any), the amount due, schedule and modalities are set out in the
Data Sheet (see Point 4.2).
For additional prefinancings (if any), the amount due, schedule and modalities are also set out in
the Data Sheet (see Point 4.2). However, if the statement on the use of the previous prefinancing
payment shows that less than 70% was used, the amount set out in the Data Sheet will be reduced by
the difference between the 70% threshold and the amount used.
Prefinancing payments (or parts of them) may be offset (without the beneficiaries’ consent) against
amounts owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
22.3.2 Amount due at beneficiary termination — Recovery
In case of beneficiary termination, the granting authority will determine the provisional amount due
for the beneficiary concerned. Payments (if any) will be made with the next interim or final payment.
The amount due will be calculated in the following step:
Step 1 — Calculation of the total accepted EU contribution
Step 1 — Calculation of the total accepted EU contribution
The granting authority will first calculate the ‘accepted EU contribution’ for the beneficiary for all
reporting periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate
to the accepted costs of the beneficiary), taking into account requests for a lower contribution to costs
and CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit,
flat-rate or lump sum contributions and financing not linked to costs, if any).
45
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
After that, the granting authority will take into account grant reductions (if any). The resulting amount
is the ‘total accepted EU contribution’ for the beneficiary.
The balance is then calculated by deducting the payments received (if any; see report on the
distribution of payments in Article 32), from the total accepted EU contribution:
{total accepted EU contribution for the beneficiary
minus
{prefinancing and interim payments received (if any)}}.
If the balance is positive, the amount will be included in the next interim or final payment to the
consortium.
If the balance is negative, it will be recovered in accordance with the following procedure:
The granting authority will send a pre-information letter to the beneficiary concerned:
- formally notifying the intention to recover, the amount due, the amount to be recovered and
the reasons why and
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered and ask this amount to be
paid to the coordinator (confirmation letter).
The amounts will later on also be taken into account for the next interim or final payment.
22.3.3 Interim payments
Interim payments reimburse the eligible costs and contributions claimed for the implementation of
the action during the reporting periods (if any).
Interim payments (if any) will be made in accordance with the schedule and modalities set out the
Data Sheet (see Point 4.2).
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The interim payment will be calculated by the granting authority in the following steps:
Step 1 — Calculation of the total accepted EU contribution
Step 2 — Limit to the interim payment ceiling
Step 1 — Calculation of the total accepted EU contribution
The granting authority will calculate the ‘accepted EU contribution’ for the action for the reporting
period, by first calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the
accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, and
CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate
or lump sum contributions and financing not linked to costs, if any).
46
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
After that, the granting authority will take into account grant reductions from beneficiary termination
(if any). The resulting amount is the ‘total accepted EU contribution’.
Step 2 — Limit to the interim payment ceiling
The resulting amount is then capped to ensure that the total amount of prefinancing and interim
payments (if any) does not exceed the interim payment ceiling set out in the Data Sheet (see Point 4.2).
Interim payments (or parts of them) may be offset (without the beneficiaries’ consent) against amounts
owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
22.3.4 Final payment — Final grant amount — Revenues and Profit — Recovery
The final payment (payment of the balance) reimburses the remaining part of the eligible costs and
contributions claimed for the implementation of the action (if any).
The final payment will be made in accordance with the schedule and modalities set out in the
Data Sheet (see Point 4.2).
Payment is subject to the approval of the final periodic report. Its approval does not imply recognition
of compliance, authenticity, completeness or correctness of its content.
The final grant amount for the action will be calculated in the following steps:
Step 1 — Calculation of the total accepted EU contribution
Step 2 — Limit to the maximum grant amount
Step 3 — Reduction due to the no-profit rule
Step 1 — Calculation of the total accepted EU contribution
The granting authority will first calculate the ‘accepted EU contribution’ for the action for all reporting
periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the total
accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, CFS
threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate or
lump sum contributions and financing not linked to costs, if any).
After that, the granting authority will take into account grant reductions (if any). The resulting amount
is the ‘total accepted EU contribution’.
Step 2 — Limit to the maximum grant amount
If the resulting amount is higher than the maximum grant amount set out in Article 5.2, it will be
limited to the latter.
47
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Step 3 — Reduction due to the no-profit rule
If the no-profit rule is provided for in the Data Sheet (see Point 4.2), the grant must not produce a
profit (i.e. surplus of the amount obtained following Step 2 plus the action’s revenues, over the eligible
costs and contributions approved by the granting authority).
‘Revenue’ is all income generated by the action, during its duration (see Article 4), for beneficiaries
that are profit legal entities.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible
costs approved by the granting authority (as compared to the amount calculated following Steps 1 and
2 minus the contributions).
The balance (final payment) is then calculated by deducting the total amount of prefinancing and
interim payments already made (if any), from the final grant amount:
{final grant amount
minus
{prefinancing and interim payments made (if any)}}.
If the balance is positive, it will be paid to the coordinator.
The final payment (or part of it) may be offset (without the beneficiaries’ consent) against amounts
owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
If the balance is negative, it will be recovered in accordance with the following procedure:
The granting authority will send a pre-information letter to the coordinator:
- formally notifying the intention to recover, the final grant amount, the amount to be recovered
and the reasons why
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered (confirmation letter),
together with a debit note with the terms and date for payment.
If payment is not made by the date specified in the debit note, the granting authority will enforce
recovery in accordance with Article 22.4.
22.3.5 Audit implementation after final payment — Revised final grant amount — Recovery
If — after the final payment (in particular, after checks, reviews, audits or investigations; see
48
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Article 25) — the granting authority rejects costs or contributions (see Article 27) or reduces the grant
(see Article 28), it will calculate the revised final grant amount for the beneficiary concerned.
The beneficiary revised final grant amount will be calculated in the following step:
Step 1 — Calculation of the revised total accepted EU contribution
Step 1 — Calculation of the revised total accepted EU contribution
The granting authority will first calculate the ‘revised accepted EU contribution’ for the beneficiary,
by calculating the ‘revised accepted costs’ and ‘revised accepted contributions’.
After that, it will take into account grant reductions (if any). The resulting ‘revised total accepted EU
contribution’ is the beneficiary revised final grant amount.
If the revised final grant amount is lower than the beneficiary’s final grant amount (i.e. its share in the
final grant amount for the action), it will be recovered in accordance with the following procedure:
The beneficiary final grant amount (i.e. share in the final grant amount for the action) is calculated
as follows:
{{total accepted EU contribution for the beneficiary
divided by
total accepted EU contribution for the action}
multiplied by
final grant amount for the action}.
The granting authority will send a pre-information letter to the beneficiary concerned:
- formally notifying the intention to recover, the amount to be recovered and the reasons why and
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered (confirmation letter),
together with a debit note with the terms and the date for payment.
Recoveries against affiliated entities (if any) will be handled through their beneficiaries.
If payment is not made by the date specified in the debit note, the granting authority will enforce
recovery in accordance with Article 22.4.
22.4 Enforced recovery
If payment is not made by the date specified in the debit note, the amount due will be recovered:
(a) by offsetting the amount — without the coordinator or beneficiary’s consent — against any
amounts owed to the coordinator or beneficiary by the granting authority.
In exceptional circumstances, to safeguard the EU financial interests, the amount may be offset
before the payment date specified in the debit note.
49
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
For grants where the granting authority is the European Commission or an EU executive
agency, debts may also be offset against amounts owed by other Commission services or
executive agencies.
(b) by drawing on the financial guarantee(s) (if any)
(c) by holding other beneficiaries jointly and severally liable (if any; see Data Sheet, Point 4.4)
(d) by holding affiliated entities jointly and severally liable (if any, see Data Sheet, Point 4.4)
(e) by taking legal action (see Article 43) or, provided that the granting authority is the European
Commission or an EU executive agency, by adopting an enforceable decision under Article 299
of the Treaty on the Functioning of the EU (TFEU) and Article 100(2) of EU Financial
Regulation 2018/1046.
The amount to be recovered will be increased by late-payment interest at the rate set out in
Article 22.5, from the day following the payment date in the debit note, up to and including the date
the full payment is received.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2015/236617 applies.
For grants where the granting authority is an EU executive agency, enforced recovery by offsetting or
enforceable decision will be done by the services of the European Commission (see also Article 43).
22.5 Consequences of non-compliance
22.5.1 If the granting authority does not pay within the payment deadlines (see above), the
beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank
(ECB) for its main refinancing operations in euros (‘reference rate’), plus the rate specified in the
Data Sheet (Point 4.2). The reference rate is the rate in force on the first day of the month in which the
payment deadline expires, as published in the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
on request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
If payments or the payment deadline are suspended (see Articles 29 and 30), payment will not be
considered as late.
17 Directive (EU) 2015/2366 of the European Parliament and of the Council of 25 November 2015 on payment
services in the internal market, amending Directives 2002/65/EC, 2009/110/EC and 2013/36/EU and Regulation (EU)
No 1093/2010, and repealing Directive 2007/64/EC (OJ L 337, 23.12.2015, p. 35).
50
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
22.5.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 29) and the grant or the coordinator may be terminated (see Article 32).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 23 — GUARANTEES
23.1 Prefinancing guarantee
If required by the granting authority (see Data Sheet, Point 4.2), the beneficiaries must provide (one
or more) prefinancing guarantee(s) in accordance with the timing and the amounts set out in the
Data Sheet.
The coordinator must submit them to the granting authority in due time before the prefinancing they
are linked to.
The guarantees must be drawn up using the template published on the Portal and fulfil the following
conditions:
(a) be provided by a bank or approved financial institution established in the EU or — if requested
by the coordinator and accepted by the granting authority — by a third party or a bank or
financial institution established outside the EU offering equivalent security
(b) the guarantor stands as first-call guarantor and does not require the granting authority to first
have recourse against the principal debtor (i.e. the beneficiary concerned) and
(c) remain explicitly in force until the final payment and, if the final payment takes the form of a
recovery, until five months after the debit note is notified to a beneficiary.
They will be released within the following month.
23.2 Consequences of non-compliance
If the beneficiaries breach their obligation to provide the prefinancing guarantee, the prefinancing
will not be paid.
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 24 — CERTIFICATES
24.1 Operational verification report (OVR)
Not applicable
24.2 Certificate on the financial statements (CFS)
If required by the granting authority (see Data Sheet, Point 4.3), the beneficiaries must provide
51
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
certificates on their financial statements (CFS), in accordance with the schedule, threshold and
conditions set out in the Data Sheet.
The coordinator must submit them as part of the periodic report (see Article 21).
The certificates must be drawn up using the template published on the Portal, cover the costs declared
on the basis of actual costs and costs according to usual cost accounting practices (if any), and fulfil
the following conditions:
(a) be provided by a qualified approved external auditor which is independent and complies with
Directive 2006/43/EC18 (or for public bodies: by a competent independent public officer)
(b) the verification must be carried out according to the highest professional standards to ensure
that the financial statements comply with the provisions under the Agreement and that the costs
declared are eligible.
The certificates will not affect the granting authority's right to carry out its own checks, reviews or
audits, nor preclude the European Court of Auditors (ECA), the European Public Prosecutor’s Office
(EPPO) or the European Anti-Fraud Office (OLAF) from using their prerogatives for audits and
investigations under the Agreement (see Article 25).
If the costs (or a part of them) were already audited by the granting authority, these costs do not need
to be covered by the certificate and will not be counted for calculating the threshold (if any).
24.3 Certificate on the compliance of usual cost accounting practices (CoMUC)
Not applicable
24.4 Systems and process audit (SPA)
Not applicable
24.5 Consequences of non-compliance
If a beneficiary does not submit a certificate on the financial statements (CFS) or the certificate is
rejected, the accepted EU contribution to costs will be capped to reflect the CFS threshold.
If a beneficiary breaches any of its other obligations under this Article, the granting authority may
apply the measures described in Chapter 5.
ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
25.1 Granting authority checks, reviews and audits
25.1.1 Internal checks
The granting authority may — during the action or afterwards — check the proper implementation of
18 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
52
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
the action and compliance with the obligations under the Agreement, including assessing costs and
contributions, deliverables and reports.
25.1.2 Project reviews
The granting authority may carry out reviews on the proper implementation of the action and
compliance with the obligations under the Agreement (general project reviews or specific issues
reviews).
Such project reviews may be started during the implementation of the action and until the time-limit
set out in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiary
concerned and will be considered to start on the date of the notification.
If needed, the granting authority may be assisted by independent, outside experts. If it uses outside
experts, the coordinator or beneficiary concerned will be informed and have the right to object on
grounds of commercial confidentiality or conflict of interest.
The coordinator or beneficiary concerned must cooperate diligently and provide — within the deadline
requested — any information and data in addition to deliverables and reports already submitted
(including information on the use of resources). The granting authority may request beneficiaries
to provide such information to it directly. Sensitive information and documents will be treated in
accordance with Article 13.
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
the outside experts.
For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including
to the outside experts) and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a project review report will be drawn up.
The granting authority will formally notify the project review report to the coordinator or beneficiary
concerned, which has 30 days from receiving notification to make observations.
Project reviews (including project review reports) will be in the language of the Agreement.
25.1.3 Audits
The granting authority may carry out audits on the proper implementation of the action and compliance
with the obligations under the Agreement.
Such audits may be started during the implementation of the action and until the time-limit set out in
the Data Sheet (see Point 6). They will be formally notified to the beneficiary concerned and will be
considered to start on the date of the notification.
The granting authority may use its own audit service, delegate audits to a centralised service or use
external audit firms. If it uses an external firm, the beneficiary concerned will be informed and have
the right to object on grounds of commercial confidentiality or conflict of interest.
The beneficiary concerned must cooperate diligently and provide — within the deadline requested —
53
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
any information (including complete accounts, individual salary statements or other personal data)
to verify compliance with the Agreement. Sensitive information and documents will be treated in
accordance with Article 13.
For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including
for the external audit firm) and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a draft audit report will be drawn up.
The auditors will formally notify the draft audit report to the beneficiary concerned, which has 30 days
from receiving notification to make observations (contradictory audit procedure).
The final audit report will take into account observations by the beneficiary concerned and will be
formally notified to them.
Audits (including audit reports) will be in the language of the Agreement.
25.2 European Commission checks, reviews and audits in grants of other granting
authorities
Where the granting authority is not the European Commission, the latter has the same rights of checks,
reviews and audits as the granting authority.
25.3 Access to records for assessing simplified forms of funding
The beneficiaries must give the European Commission access to their statutory records for the periodic
assessment of simplified forms of funding which are used in EU programmes.
25.4 OLAF, EPPO and ECA audits and investigations
The following bodies may also carry out checks, reviews, audits and investigations — during the
action or afterwards:
- the European Anti-Fraud Office (OLAF) under Regulations No 883/201319 and No 2185/9620
- the European Public Prosecutor’s Office (EPPO) under Regulation 2017/1939
- the European Court of Auditors (ECA) under Article 287 of the Treaty on the Functioning of
the EU (TFEU) and Article 257 of EU Financial Regulation 2018/1046.
If requested by these bodies, the beneficiary concerned must provide full, accurate and complete
information in the format requested (including complete accounts, individual salary statements or
19 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC)
No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ
L 248, 18/09/2013, p. 1).
20 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15/11/1996, p. 2).
54
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
other personal data, including in electronic format) and allow access to sites and premises for
on-the-spot visits or inspections — as provided for under these Regulations.
To this end, the beneficiary concerned must keep all relevant information relating to the action, at
least until the time-limit set out in the Data Sheet (Point 6) and, in any case, until any ongoing checks,
reviews, audits, investigations, litigation or other pursuits of claims have been concluded.
25.5 Consequences of checks, reviews, audits and investigations — Extension of results of
reviews, audits or investigations
25.5.1 Consequences of checks, reviews, audits and investigations in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to
rejections (see Article 27), grant reduction (see Article 28) or other measures described in Chapter 5.
Rejections or grant reductions after the final payment will lead to a revised final grant amount (see
Article 22).
Findings in checks, reviews, audits or investigations during the action implementation may lead to a
request for amendment (see Article 39), to change the description of the action set out in Annex 1.
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud
or breach of obligations in any EU grant may also lead to consequences in other EU grants awarded
under similar conditions (‘extension to other grants’).
Moreover, findings arising from an OLAF or EPPO investigation may lead to criminal prosecution
under national law.
25.5.2 Extension from other grants
Results of checks, reviews, audits or investigations in other grants may be extended to this grant, if:
(a) the beneficiary concerned is found, in other EU grants awarded under similar conditions, to
have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that
have a material impact on this grant and
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — within the time-limit for audits set out in the Data Sheet (see
Point 6).
The granting authority will formally notify the beneficiary concerned of the intention to extend the
findings and the list of grants affected.
If the extension concerns rejections of costs or contributions: the notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings
(b) the request to submit revised financial statements for all grants affected
(c) the correction rate for extrapolation, established on the basis of the systemic or recurrent errors,
to calculate the amounts to be rejected, if the beneficiary concerned:
55
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
If the extension concerns grant reductions: the notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the correction rate for extrapolation, established on the basis of the systemic or recurrent
errors and the principle of proportionality.
The beneficiary concerned has 60 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method/rate.
On the basis of this, the granting authority will analyse the impact and decide on the implementation
(i.e. start rejection or grant reduction procedures, either on the basis of the revised financial statements
or the announced/alternative method/rate or a mix of those; see Articles 27 and 28).
25.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently
substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may
be reduced (see Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 26 — IMPACT EVALUATIONS
26.1 Impact evaluation
The granting authority may carry out impact evaluations of the action, measured against the objectives
and indicators of the EU programme funding the grant.
Such evaluations may be started during implementation of the action and until the time-limit set out
in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiaries and
will be considered to start on the date of the notification.
If needed, the granting authority may be assisted by independent outside experts.
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
26.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the granting authority may apply
the measures described in Chapter 5.
CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE
56
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
SECTION 1 REJECTIONS AND GRANT REDUCTION
ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS
27.1 Conditions
The granting authority will — at beneficiary termination, interim payment, final payment or
afterwards — reject any costs or contributions which are ineligible (see Article 6), in particular
following checks, reviews, audits or investigations (see Article 25).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 25).
Ineligible costs or contributions will be rejected.
27.2 Procedure
If the rejection does not lead to a recovery, the granting authority will formally notify the coordinator
or beneficiary concerned of the rejection, the amounts and the reasons why. The coordinator or
beneficiary concerned may — within 30 days of receiving notification — submit observations if it
disagrees with the rejection (payment review procedure).
If the rejection leads to a recovery, the granting authority will follow the contradictory procedure with
pre-information letter set out in Article 22.
27.3 Effects
If the granting authority rejects costs or contributions, it will deduct them from the costs or
contributions declared and then calculate the amount due (and, if needed, make a recovery; see
Article 22).
ARTICLE 28 — GRANT REDUCTION
28.1 Conditions
The granting authority may — at beneficiary termination, final payment or afterwards — reduce the
grant for a beneficiary, if:
(a) the beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) the beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
57
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant (see Article 25).
The amount of the reduction will be calculated for each beneficiary concerned and proportionate to the
seriousness and the duration of the errors, irregularities or fraud or breach of obligations, by applying
an individual reduction rate to their accepted EU contribution.
28.2 Procedure
If the grant reduction does not lead to a recovery, the granting authority will formally notify the
coordinator or beneficiary concerned of the reduction, the amount to be reduced and the reasons why.
The coordinator or beneficiary concerned may — within 30 days of receiving notification — submit
observations if it disagrees with the reduction (payment review procedure).
If the grant reduction leads to a recovery, the granting authority will follow the contradictory procedure
with pre-information letter set out in Article 22.
28.3 Effects
If the granting authority reduces the grant, it will deduct the reduction and then calculate the amount
due (and, if needed, make a recovery; see Article 22).
SECTION 2 SUSPENSION AND TERMINATION
ARTICLE 29 — PAYMENT DEADLINE SUSPENSION
29.1 Conditions
The granting authority may — at any moment — suspend the payment deadline if a payment cannot
be processed because:
(a) the required report (see Article 21) has not been submitted or is not complete or additional
information is needed
(b) there are doubts about the amount to be paid (e.g. ongoing audit extension procedure, queries
about eligibility, need for a grant reduction, etc.) and additional checks, reviews, audits or
investigations are necessary, or
(c) there are other issues affecting the EU financial interests.
29.2 Procedure
The granting authority will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day the notification is sent.
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining time to pay (see Data Sheet, Point 4.2) will resume.
If the suspension exceeds two months, the coordinator may request the granting authority to confirm
if the suspension will continue.
58
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
If the payment deadline has been suspended due to the non-compliance of the report and the revised
report is not submitted (or was submitted but is also rejected), the granting authority may also terminate
the grant or the participation of the coordinator (see Article 32).
ARTICLE 30 — PAYMENT SUSPENSION
30.1 Conditions
The granting authority may — at any moment — suspend payments, in whole or in part for one or
more beneficiaries, if:
(a) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed or is suspected of
having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant.
If payments are suspended for one or more beneficiaries, the granting authority will make partial
payment(s) for the part(s) not suspended. If suspension concerns the final payment, the payment (or
recovery) of the remaining amount after suspension is lifted will be considered to be the payment that
closes the action.
30.2 Procedure
Before suspending payments, the granting authority will send a pre-information letter to the
beneficiary concerned:
- formally notifying the intention to suspend payments and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite the
observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will
formally notify that the procedure is discontinued.
At the end of the suspension procedure, the granting authority will also inform the coordinator.
The suspension will take effect the day after the confirmation notification is sent.
If the conditions for resuming payments are met, the suspension will be lifted. The granting authority
will formally notify the beneficiary concerned (and the coordinator) and set the suspension end date.
59
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
During the suspension, no prefinancing will be paid to the beneficiaries concerned. For interim
payments, the periodic reports for all reporting periods except the last one (see Article 21) must
not contain any financial statements from the beneficiary concerned (or its affiliated entities). The
coordinator must include them in the next periodic report after the suspension is lifted or — if
suspension is not lifted before the end of the action — in the last periodic report.
ARTICLE 31 — GRANT AGREEMENT SUSPENSION
31.1 Consortium-requested GA suspension
31.1.1 Conditions and procedure
The beneficiaries may request the suspension of the grant or any part of it, if exceptional circumstances
— in particular force majeure (see Article 35) — make implementation impossible or excessively
difficult.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the date the suspension takes effect; this date may be before the date of the submission of the
amendment request and
- the expected date of resumption.
The suspension will take effect on the day specified in the amendment.
Once circumstances allow for implementation to resume, the coordinator must immediately request
another amendment of the Agreement to set the suspension end date, the resumption date (one day
after suspension end date), extend the duration and make other changes necessary to adapt the action
to the new situation (see Article 39) — unless the grant has been terminated (see Article 32). The
suspension will be lifted with effect from the suspension end date set out in the amendment. This date
may be before the date of the submission of the amendment request.
During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities
implemented during grant suspension are not eligible (see Article 6.3).
31.2 EU-initiated GA suspension
31.2.1 Conditions
The granting authority may suspend the grant or any part of it, if:
(a) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed or is suspected of
having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
60
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant
(c) other:
(i) linked action issues: not applicable
(ii) additional GA suspension grounds: not applicable.
31.2.2 Procedure
Before suspending the grant, the granting authority will send a pre-information letter to the
coordinator:
- formally notifying the intention to suspend the grant and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite the
observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will
formally notify that the procedure is discontinued.
The suspension will take effect the day after the confirmation notification is sent (or on a later date
specified in the notification).
Once the conditions for resuming implementation of the action are met, the granting authority will
formally notify the coordinator a lifting of suspension letter, in which it will set the suspension
end date and invite the coordinator to request an amendment of the Agreement to set the resumption
date (one day after suspension end date), extend the duration and make other changes necessary to
adapt the action to the new situation (see Article 39) — unless the grant has been terminated (see
Article 32). The suspension will be lifted with effect from the suspension end date set out in the lifting
of suspension letter. This date may be before the date on which the letter is sent.
During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities
implemented during suspension are not eligible (see Article 6.3).
The beneficiaries may not claim damages due to suspension by the granting authority (see Article 33).
Grant suspension does not affect the granting authority’s right to terminate the grant or a beneficiary
(see Article 32) or reduce the grant (see Article 28).
ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION
32.1 Consortium-requested GA termination
32.1.1 Conditions and procedure
61
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
The beneficiaries may request the termination of the grant.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the date the consortium ends work on the action (‘end of work date’) and
- the date the termination takes effect (‘termination date’); this date must be after the date of the
submission of the amendment request.
The termination will take effect on the termination date specified in the amendment.
If no reasons are given or if the granting authority considers the reasons do not justify termination,
it may consider the grant terminated improperly.
32.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit a periodic
report (for the open reporting period until termination).
The granting authority will calculate the final grant amount and final payment on the basis of the report
submitted and taking into account the costs incurred and contributions for activities implemented
before the end of work date (see Article 22). Costs relating to contracts due for execution only after
the end of work are not eligible.
If the granting authority does not receive the report within the deadline, only costs and contributions
which are included in an approved periodic report will be taken into account (no costs/contributions
if no periodic report was ever approved).
Improper termination may lead to a grant reduction (see Article 28).
After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality and
security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks,
reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and
42 (assignment of claims)) continue to apply.
32.2 Consortium-requested beneficiary termination
32.2.1 Conditions and procedure
The coordinator may request the termination of the participation of one or more beneficiaries, on
request of the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing)
- the date the beneficiary ends work on the action (‘end of work date’)
62
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
- the date the termination takes effect (‘termination date’); this date must be after the date of the
submission of the amendment request.
If the termination concerns the coordinator and is done without its agreement, the amendment request
must be submitted by another beneficiary (acting on behalf of the consortium).
The termination will take effect on the termination date specified in the amendment.
If no information is given or if the granting authority considers that the reasons do not justify
termination, it may consider the beneficiary to have been terminated improperly.
32.2.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned
(ii) a termination report from the beneficiary concerned, for the open reporting period until
termination, containing an overview of the progress of the work, the financial statement,
the explanation on the use of resources, and, if applicable, the certificate on the financial
statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
(iii) a second request for amendment (see Article 39) with other amendments needed (e.g.
reallocation of the tasks and the estimated budget of the terminated beneficiary; addition of
a new beneficiary to replace the terminated beneficiary; change of coordinator, etc.).
The granting authority will calculate the amount due to the beneficiary on the basis of the report
submitted and taking into account the costs incurred and contributions for activities implemented
before the end of work date (see Article 22). Costs relating to contracts due for execution only after
the end of work are not eligible.
The information in the termination report must also be included in the periodic report for the next
reporting period (see Article 21).
If the granting authority does not receive the termination report within the deadline, only costs and
contributions which are included in an approved periodic report will be taken into account (no costs/
contributions if no periodic report was ever approved).
If the granting authority does not receive the report on the distribution of payments within the deadline,
it will consider that:
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
If the second request for amendment is accepted by the granting authority, the Agreement is amended
to introduce the necessary changes (see Article 39).
If the second request for amendment is rejected by the granting authority (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the grant
may be terminated (see Article 32).
63
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Improper termination may lead to a reduction of the grant (see Article 31) or grant termination (see
Article 32).
After termination, the concerned beneficiary’s obligations (in particular Articles 13 (confidentiality
and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks,
reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and
42 (assignment of claims)) continue to apply.
32.3 EU-initiated GA or beneficiary termination
32.3.1 Conditions
The granting authority may terminate the grant or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 40)
(b) a change to the action or the legal, financial, technical, organisational or ownership situation
of a beneficiary is likely to substantially affect the implementation of the action or calls into
question the decision to award the grant (including changes linked to one of the exclusion
grounds listed in the declaration of honour)
(c) following termination of one or more beneficiaries, the necessary changes to the Agreement
(and their impact on the action) would call into question the decision awarding the grant or
breach the principle of equal treatment of applicants
(d) implementation of the action has become impossible or the changes necessary for its
continuation would call into question the decision awarding the grant or breach the principle
of equal treatment of applicants
(e) a beneficiary (or person with unlimited liability for its debts) is subject to bankruptcy
proceedings or similar (including insolvency, winding-up, administration by a liquidator or
court, arrangement with creditors, suspension of business activities, etc.)
(f) a beneficiary (or person with unlimited liability for its debts) is in breach of social security
or tax obligations
(g) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has been found guilty of grave professional
misconduct
(h) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed fraud, corruption, or is
involved in a criminal organisation, money laundering, terrorism-related crimes (including
terrorism financing), child labour or human trafficking
(i) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) was created under a different jurisdiction
with the intent to circumvent fiscal, social or other legal obligations in the country of origin
(or created another entity with this purpose)
(j) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed:
64
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.)
(k) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant (extension of findings
from other grants to this grant; see Article 25)
(l) despite a specific request by the granting authority, a beneficiary does not request — through
the coordinator — an amendment to the Agreement to end the participation of one of its
affiliated entities or associated partners that is in one of the situations under points (d), (f), (e),
(g), (h), (i) or (j) and to reallocate its tasks, or
(m) other:
(i) linked action issues: not applicable
(ii) additional GA termination grounds: not applicable.
32.3.2 Procedure
Before terminating the grant or participation of one or more beneficiaries, the granting authority will
send a pre-information letter to the coordinator or beneficiary concerned:
- formally notifying the intention to terminate and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite
the observations it has received, it will confirm the termination and the date it will take effect
(confirmation letter). Otherwise, it will formally notify that the procedure is discontinued.
For beneficiary terminations, the granting authority will — at the end of the procedure — also inform
the coordinator.
The termination will take effect the day after the confirmation notification is sent (or on a later date
specified in the notification; ‘termination date’).
32.3.3 Effects
(a) for GA termination:
The coordinator must — within 60 days from when termination takes effect — submit a
periodic report (for the last open reporting period until termination).
The granting authority will calculate the final grant amount and final payment on the basis of
the report submitted and taking into account the costs incurred and contributions for activities
65
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
implemented before termination takes effect (see Article 22). Costs relating to contracts due
for execution only after termination are not eligible.
If the grant is terminated for breach of the obligation to submit reports, the coordinator may
not submit any report after termination.
If the granting authority does not receive the report within the deadline, only costs and
contributions which are included in an approved periodic report will be taken into account (no
costs/contributions if no periodic report was ever approved).
Termination does not affect the granting authority’s right to reduce the grant (see Article 28)
or to impose administrative sanctions (see Article 34).
The beneficiaries may not claim damages due to termination by the granting authority (see
Article 33).
After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality
and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25
(checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant
reduction) and 42 (assignment of claims)) continue to apply.
(b) for beneficiary termination:
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned
(ii) a termination report from the beneficiary concerned, for the open reporting period
until termination, containing an overview of the progress of the work, the financial
statement, the explanation on the use of resources, and, if applicable, the certificate
on the financial statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
(iii) a request for amendment (see Article 39) with any amendments needed (e.g.
reallocation of the tasks and the estimated budget of the terminated beneficiary;
addition of a new beneficiary to replace the terminated beneficiary; change of
coordinator, etc.).
The granting authority will calculate the amount due to the beneficiary on the basis of the
report submitted and taking into account the costs incurred and contributions for activities
implemented before termination takes effect (see Article 22). Costs relating to contracts due
for execution only after termination are not eligible.
The information in the termination report must also be included in the periodic report for the
next reporting period (see Article 21).
If the granting authority does not receive the termination report within the deadline, only costs
and contributions included in an approved periodic report will be taken into account (no costs/
contributions if no periodic report was ever approved).
If the granting authority does not receive the report on the distribution of payments within the
deadline, it will consider that:
66
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
If the request for amendment is accepted by the granting authority, the Agreement is amended
to introduce the necessary changes (see Article 39).
If the request for amendment is rejected by the granting authority (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the
grant may be terminated (see Article 32).
After termination, the concerned beneficiary’s obligations (in particular Articles 13
(confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility),
21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27
(rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply.
SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE
SANCTIONS
ARTICLE 33 — DAMAGES
33.1 Liability of the granting authority
The granting authority cannot be held liable for any damage caused to the beneficiaries or to third
parties as a consequence of the implementation of the Agreement, including for gross negligence.
The granting authority cannot be held liable for any damage caused by any of the beneficiaries or
other participants involved in the action, as a consequence of the implementation of the Agreement.
33.2 Liability of the beneficiaries
The beneficiaries must compensate the granting authority for any damage it sustains as a result of the
implementation of the action or because the action was not implemented in full compliance with the
Agreement, provided that it was caused by gross negligence or wilful act.
The liability does not extend to indirect or consequential losses or similar damage (such as loss of
profit, loss of revenue or loss of contracts), provided such damage was not caused by wilful act or
by a breach of confidentiality.
ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES
Nothing in this Agreement may be construed as preventing the adoption of administrative sanctions
(i.e. exclusion from EU award procedures and/or financial penalties) or other public law measures,
in addition or as an alternative to the contractual measures provided under this Agreement (see,
for instance, Articles 135 to 145 EU Financial Regulation 2018/1046 and Articles 4 and 7 of
Regulation 2988/9521).
21 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities
financial interests (OJ L 312, 23.12.1995, p. 1).
67
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
SECTION 4 FORCE MAJEURE
ARTICLE 35 — FORCE MAJEURE
A party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of other participants involved
in the action), and
- proves to be inevitable in spite of exercising all due diligence.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
CHAPTER 6 FINAL PROVISIONS
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES
36.1 Forms and means of communication — Electronic management
EU grants are managed fully electronically through the EU Funding & Tenders Portal (‘Portal’).
All communications must be made electronically through the Portal, in accordance with the Portal
Terms and Conditions and using the forms and templates provided there (except if explicitly instructed
otherwise by the granting authority).
Communications must be made in writing and clearly identify the grant agreement (project number
and acronym).
Communications must be made by persons authorised according to the Portal Terms and Conditions.
For naming the authorised persons, each beneficiary must have designated — before the signature of
this Agreement — a ‘legal entity appointed representative (LEAR)’. The role and tasks of the LEAR
are stipulated in their appointment letter (see Portal Terms and Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Portal.
36.2 Date of communication
The sending date for communications made through the Portal will be the date and time of sending,
as indicated by the time logs.
68
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
The receiving date for communications made through the Portal will be the date and time the
communication is accessed, as indicated by the time logs. Formal notifications that have not been
accessed within 10 days after sending, will be considered to have been accessed (see Portal Terms
and Conditions).
If a communication is exceptionally made on paper (by e-mail or postal service), general principles
apply (i.e. date of sending/receipt). Formal notifications by registered post with proof of delivery will
be considered to have been received either on the delivery date registered by the postal service or the
deadline for collection at the post office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
36.3 Addresses for communication
The Portal can be accessed via the Europa website.
The address for paper communications to the granting authority (if exceptionally allowed) is the
official mailing address indicated on its website.
For beneficiaries, it is the legal address specified in the Portal Participant Register.
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT
The provisions in the Data Sheet take precedence over the rest of the Terms and Conditions of the
Agreement.
Annex 5 takes precedence over the Terms and Conditions; the Terms and Conditions take precedence
over the Annexes other than Annex 5.
Annex 2 takes precedence over Annex 1.
ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES
In accordance with Regulation No 1182/7122, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
The day during which that event occurs is not considered as falling within the period.
‘Days’ means calendar days, not working days.
ARTICLE 39 — AMENDMENTS
39.1 Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
22 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates
and time-limits (OJ L 124, 8/6/1971, p. 1).
69
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
Amendments may be requested by any of the parties.
39.2 Procedure
The party requesting an amendment must submit a request for amendment signed directly in the Portal
Amendment tool.
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3). If a change of coordinator is requested without its agreement, the submission must be done
by another beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why
- the appropriate supporting documents and
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The granting authority may request additional information.
If the party receiving the request agrees, it must sign the amendment in the tool within 45 days of
receiving notification (or any additional information the granting authority has requested). If it does
not agree, it must formally notify its disagreement within the same deadline. The deadline may be
extended, if necessary for the assessment of the request. If no notification is received within the
deadline, the request is considered to have been rejected.
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date of entry into force or other date specified in the amendment.
ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES
40.1 Accession of the beneficiaries mentioned in the Preamble
The beneficiaries which are not coordinator must accede to the grant by signing the accession form
(see Annex 3) directly in the Portal Grant Preparation tool, within 30 days after the entry into force
of the Agreement (see Article 44).
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 44).
If a beneficiary does not accede to the grant within the above deadline, the coordinator must — within
30 days — request an amendment (see Article 39) to terminate the beneficiary and make any changes
necessary to ensure proper implementation of the action. This does not affect the granting authority’s
right to terminate the grant (see Article 32).
40.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
70
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
For this purpose, the coordinator must submit a request for amendment in accordance with Article 39.
It must include an accession form (see Annex 3) signed by the new beneficiary directly in the Portal
Amendment tool.
New beneficiaries will assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the accession form (see Annex 3).
Additions are also possible in mono-beneficiary grants.
ARTICLE 41 — TRANSFER OF THE AGREEMENT
In justified cases, the beneficiary of a mono-beneficiary grant may request the transfer of the grant to
a new beneficiary, provided that this would not call into question the decision awarding the grant or
breach the principle of equal treatment of applicants.
The beneficiary must submit a request for amendment (see Article 39), with
- the reasons why
- the accession form (see Annex 3) signed by the new beneficiary directly in the Portal
Amendment tool and
- additional supporting documents (if required by the granting authority).
The new beneficiary will assume the rights and obligations under the Agreement with effect from the
date of accession specified in the accession form (see Annex 3).
ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE
GRANTING AUTHORITY
The beneficiaries may not assign any of their claims for payment against the granting authority to
any third party, except if expressly approved in writing by the granting authority on the basis of a
reasoned, written request by the coordinator (on behalf of the beneficiary concerned).
If the granting authority has not accepted the assignment or if the terms of it are not observed, the
assignment will have no effect on it.
In no circumstances will an assignment release the beneficiaries from their obligations towards the
granting authority.
ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
43.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
Special rules may apply for beneficiaries which are international organisations (if any; see Data Sheet,
Point 5).
43.2 Dispute settlement
71
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
If a dispute concerns the interpretation, application or validity of the Agreement, the parties must bring
action before the EU General Court — or, on appeal, the EU Court of Justice — under Article 272
of the Treaty on the Functioning of the EU (TFEU).
For non-EU beneficiaries (if any), such disputes must be brought before the courts of Brussels,
Belgium — unless an international agreement provides for the enforceability of EU court judgements.
For beneficiaries with arbitration as special dispute settlement forum (if any; see Data Sheet, Point 5),
the dispute will — in the absence of an amicable settlement — be settled in accordance with the Rules
for Arbitration published on the Portal.
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299
TFEU (see Articles 22 and 34), the beneficiaries must bring action before the General Court — or, on
appeal, the Court of Justice — under Article 263 TFEU.
For grants where the granting authority is an EU executive agency (see Preamble), actions against
offsetting and enforceable decisions must be brought against the European Commission (not against
the granting authority; see also Article 22).
ARTICLE 44 — ENTRY INTO FORCE
The Agreement will enter into force on the day of signature by the granting authority or the
coordinator, depending on which is later.
SIGNATURES
For the coordinator For the granting authority
[--TGSMark#signature-994605603_75_210--] [--TGSMark#signature-service_75_210--]
Jens Laustsen with ECAS id n002ii3i signed in the Participant Portal Signed by Christian STRASSER with ECAS id strasch as an authorised
on 22/11/2022 at 12:23:27 (transaction id SigId-43373-c20FhDbGaTH representative on 23-11-2022 10:37:02 (transaction id SigId-58050-4
xfVgZfNGzpFvsRJ0MBeb9kRzXArcXZun0FVaHvIZNHbw3EOB9baGzvZ reDdb6zvwfI32UEe3L4ELOsai2SNJ1nK4Ug5zmUXdpby9BhzksnUq07
zrB2UvHVmwm0zwKezwuyym-jpJZscgsw0KzOcDzY5LHew0-xzy4MS1 rgNPpRVqeAVf9sHYQNG7FnOzbX0kIJe-jpJZscgsw0KzOcDzY5LHew0-
pSXk36Hvq2m7rmPzWxZx1zLrbaM0RAZdsYOOFQmpzoQBccA80gL2 n7o8joInuTJc2AohYMl6D0ITgq2sxzvMjlM6NkRJdUDObWx6zzjUyRqd
16joK89puNXyzev4nOId7FPnk25I). Timestamp by third party at jLheNE0zkD1UcrK8HFBLN8m66pOulfC)
2022.11.22 12:23:33 CET 2022.11.23 10:37:06 CET
72
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 1
Programme for Environment
and Climate Action (LIFE)
Description of the action (DoA)
Part A
Part B
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
DESCRIPTION OF THE ACTION (PART A)
COVER PAGE
Part A of the Description of the Action (DoA) must be completed directly on the Portal Grant Preparation screens.
PROJECT
Grant Preparation (General Information screen) — Enter the info.
Project number: 101102078
Project name: 6th Concerted Action supporting Member States and participating countries
in implementing the Energy Performance of Buildings Directive
Project acronym: LIFE21-CET-CA-CAEPBD6
Call: LIFE-CET-2021-CAEPBD6-IBA
Topic: LIFE-CET-2021-CAEPBD6-IBA
Type of action: LIFE-PJG
Service: CINEA/D/01
Project starting date: fixed date: 1 November 2022
Project duration: 60 months
TABLE OF CONTENTS
Project summary ......................................................................................................................................................3
List of participants .................................................................................................................................................. 3
List of work packages .............................................................................................................................................5
Staff effort ............................................................................................................................................................. 25
List of deliverables ................................................................................................................................................27
List of milestones (outputs/outcomes) .................................................................................................................. 45
List of critical risks ............................................................................................................................................... 46
2
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
PROJECT SUMMARY
Project summary
Grant Preparation (General Information screen) — Provide an overall description of your project (including context and overall
objectives, planned activities and main achievements, and expected results and impacts (on target groups, change procedures,
capacities, innovation etc)). This summary should give readers a clear idea of what your project is about.
Use the project summary from your proposal.
The overall objective of the Concerted Action EPBD is to foster exchange of information and experience among Member
States and other associated countries (Norway) with regards to the implementation of the specific European Union
legislation and policy on the energy performance of buildings, and in particular with regards to the transposition and
implementation of the EPBD (DIRECTIVE 2018/844/EU) and the on-going revision of this directive. The specific
objectives of the CA are to:
1. Enhance and structure sharing of information and experience from national implementation and promote good practice
in activities of Member States for implementation of the Energy Performance of Buildings Directive (EPBD).
2. Create favourable conditions for faster convergence of national procedures on EPBD-related matters.
3. Develop a direct collaboration with the other two buildings-related Concerted Actions that were established within
the IEE programme: the CA-RES, focussing on transposition and implementation of the Renewable Energy Systems
Directive (DIRECTIVE 2018/2001/EU); and the CA-EED, focusing on transposition and implementation of the Energy
Efficiency Directive (DIRECTIVE 2018/2002/EU), where National Energy Plans are expexted o include initiatives
towards building energy efficiency.
4. Supplement the work of the Article 26 Committee and establish a dialogue with the European Committee for
Standardization (CEN) in their work and implementation of standards to support the implementation of the zero carbon
and life cycle calculations.
5. Support for European Member States and Norway to use National Renovation Plans to support progress on the EPBD
implementation and increased renovation activities.
As with previous instalments of the Concerted Action, CAV_EPBD will strive to result in a more harmonized approach,
improved implementation and actual application of the EPBD in all the countries involved, as well as helping to
disseminate best practices between the countries.
LIST OF PARTICIPANTS
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
1 COO DEA ENERGISTYRELSEN DK 994605603
2 BEN OIB OSTERREICHISCHES INSTITUT FUR AT 933310333
BAUTECHNIK
3 BEN CSTC CENTRE SCIENTIFIQUE ET TECHNIQUE DE BE 999432129
LA CONSTRUCTION
4 BEN SEDA SUSTAINABLE ENERGY DEVELOPMENT BG 939008695
AGENCY
5 BEN MECI MINISTRY OF ENERGY, COMMERCE AND CY 938650086
INDUSTRY
6 BEN MIT MINISTRY OF INDUSTRY AND TRADE CZ 999810332
7 BEN BAFA BUNDESAMT FUR WIRTSCHAFT UND DE 909836430
AUSFUHRKONTROLLE
3
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
8 BEN MEC MAJANDUS JA EE 963638450
KOMMUNIKATSIOONIMINISTEERIUM
9 BEN CRES CENTRE FOR RENEWABLE ENERGY SOURCES EL 999646014
AND SAVING FONDATION
10 BEN IDAE INSTITUTO PARA LA DIVERSIFICACION Y ES 994622093
AHORRO DE LA ENERGIA
11 BEN MOTIVA MOTIVA OY FI 950479042
12 BEN MTE MINISTERE DE LA TRANSITION ECOLOGIQUE FR 996384874
13 BEN MPGI MINISTARSTVO PROSTORNOGA UREDENJA, HR 953590123
GRADITELJSTVA I DRZAVNE IMOVINE
14 BEN EMI EMI EPITESUGYI MINOSEGELLENORZO HU 998707636
INNOVACIOS NONPROFIT KFT
15 BEN SEAI THE SUSTAINABLE ENERGY AUTHORITY OF IE 997611148
IRELAND
16 BEN ENEA AGENZIA NAZIONALE PER LE NUOVE IT 999988521
TECNOLOGIE, L'ENERGIA E LO SVILUPPO
ECONOMICO SOSTENIBILE
17 BEN LRAM LIETUVOS RESPUBLIKOS APLINKOS LT 950938240
MINISTERIJA
18 BEN MEAT MINISTERE DE L'ENERGIE ET DE LU 898634676
L'AMENAGEMENT DU TERRITOIRE
19 BEN EM EKONOMIKAS MINISTRIJA LV 928511355
20 BEN MTIC MINISTRY FOR TRANSPORT, MT 950554023
INFRASTRUCTURE AND CAPITAL PROJECTS
21 BEN RVO MINISTERIE VAN ECONOMISCHE ZAKEN EN NL 972778178
KLIMAAT
22 BEN ITB INSTYTUT TECHNIKI BUDOWLANEJ PL 955708409
23 BEN ADENE ADENE - AGENCIA PARA A ENERGIA PT 950873638
24 BEN MLPDA MINISTERUL DEZVOLTARII, LUCRARILOR RO 950502225
PUBLICE SI ADMINISTRATIEI
25 BEN BOVERKET BOVERKET SE 933308587
26 BEN TSUS TECHNICKY A SKUSOBNY USTAV STAVEBNY SK 957873934
n.o.
27 BEN MZI MINISTRSTVO ZA INFRASTRUKTURO SI 952242696
28 AP NVE NORGES VASSDRAGS- OG NO 933343992
ENERGIDIREKTORAT
4
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
LIST OF WORK PACKAGES
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
WP1 Project management and coordination 1 - DEA 39.00 1 60 D1.1 – Data Management Plan
D1.2 – Public presentation on progress of
CA 6
D1.3 – Extract LIFE KPIs
D1.4 – Update LIFE KRIs
WP2 Preparation of plenary meetings and Central 1 - DEA 88.25 1 60 D2.1 – Plenary Meetings, Agenda and 10
Teams liners
D2.2 – Preparation reports for plenary
meeting 01
D2.3 – Preparation reports for plenary
meeting 02
D2.4 – Preparation reports for plenary
meeting 03
D2.5 – Preparation reports for plenary
meeting 04
D2.6 – Preparation material for In-depth
workshop 01
D2.7 – Preparation reports for plenary
meeting 05
D2.8 – Preparation reports for plenary
meeting 06
D2.9 – Preparation reports for plenary
meeting 07
D2.10 – Preparation material for In-depth
workshop 02
D2.11 – Evolving strategic reports
5
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
D2.12 – Public reports from Central Teams
(first version)
D2.13 – Public reports from Central Teams
(second version)
WP3 Participation in Plenary Meeting and In-depth 1 - DEA 78.20 1 60 D3.1 – Sessions Reports from plenary
Workshops meeting 01
D3.2 – Sessions Reports from plenary
meeting 02
D3.3 – Sessions Reports from plenary
meeting 03
D3.4 – Sessions Reports from plenary
meeting 04
D3.5 – Material from In-depth workshop 01
D3.6 – Sessions Reports from plenary
meeting 05
D3.7 – Sessions Reports from plenary
meeting 06
D3.8 – Sessions Reports from plenary
meeting 07
D3.9 – Material from In-depth workshop 02
D3.10 – Coordinated Questionnaires
D3.11 – Evaluation of plenaries
WP4 Other collaboration structures / External 1 - DEA 37.95 1 60 D4.1 – Topic reports / Working Group
Stakeholders results first set
D4.2 – Report on Collaboration with CA
EED and RES
D4.3 – Presentation at events / other
projects
D4.4 – Stakeholder events
6
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
D4.5 – Topic reports / Working Group
results second set
WP5 Communication and dissemination 1 - DEA 37.50 1 60 D5.1 – Communication and dissemination
plan
D5.2 – Updated visual identity templates
D5.3 – Updating website
D5.4 – Webzines & Newsflashes
D5.5 – Brochure on impact of CA EPBD
D5.6 – Brochure on impact of CA EPBD 2
WP6 Reporting 1 - DEA 32.40 1 60 D6.1 – Country Information for Database
(first part)
D6.2 – KIDs – Key Indicators & Decisions
D6.3 – Country Information for Database
(second part)
D6.4 – Statements from countries on impact
of project
D6.5 – Electronic collection of project
centre and public material
7
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Work package WP1 – Project management and coordination
Work Package Number WP1 Lead Beneficiary 1. DEA
Work Package Name Project management and coordination
Start Month 1 End Month 60
Objectives
Overall management of the project in a way that ensures maximum impact of the CA and a high quality and timely
delivery of all technical deliverables. Ensuring coordination among Consortium Members in Contractors Meetings and
implementation of key decisions related to the project
Description
Within the Danish Energy Agency (DEA), a Coordinator will be assigned as responsible for the general management
of CA EPBD 6. This includes the management of the Management Team, the Contractors Meetings and the general
communication with Partners, CINEA and DG ENER as well as the overall lead of all technical elements.
The DEA will also be responsible for the financial and the legal management of the action on behalf of the CA EPBD
6 Consortium. The work will be carried out by a specially assigned Financial Management function in the DEA. In
addition, there will be a function within the DEA in relation to legal elements. This legal function will also support the
Coordinator in the overall management of the project.
Task no 1.1: Overall coordination management of the project, (DEA)
This task covers:
• The management of the Grant Agreement and of the overall coordination of the work.
• The technical development of the CA EPBD 6 including the coordination of the work, namely the thematic coherence
between the topics discussed within the Central Teams.
• The coordination of the Management Team (participation of CTMs is financed under WP2 and WP5 respectively).
• The preparation / coordination of the CA plenaries and in-depth workshops (under WP2 and WP3), including the lead
of opening and closing sessions.
• The preparation and submission of periodic reporting to CINEA.
Task no 1.2: Management of the Contractors Meeting, (DEA)
The Contractors meeting is the main collaboration and decision forum for the project partners. This will be used where
decisions about major changes in the project needs to be taken as well as to support the progress of the deliverables and
other results. Participants will typically meet physically in connection to each plenary meeting. Virtual meetings can
also be used as well as written procedures. DEA coordination leads the Contractors Meeting.
Task no 1.3: Lead of the Management Team, (DEA)
Under this task, the Coordinator will ensure:
• The thematic coherence between the topics discussed within the Central Teams, including the thematic coherence
between the topics discussed within the Central Teams.
• The coordination of the Management Team (participation of CTMs is financed under WP2 and WP5 respectively).
Task no 1.4: Financial management and control of the project, (DEA)
The DEA will assign a Financial Management function for the project, to oversee the on-going budget, manage the
registration of payments and perform other financial tasks as needed. This function will have a practical part and a
controller part, which will ensure the internal DEA overall responsibility for the management and control of the CA
EPBD 6 budget. In particular the controller is in charge of:
• The control and management of the budget.
• The practical handling of registration of all central payments from the CA, including but not limited to meeting costs,
external participation and other payments of third parties.
• Financial reporting to CINEA.
• The Financial Manager will participate in Contractors Meetings when needed for coordination of financial issues and
reporting.
Task no 1.5: Contacts with CINEA and DG ENER on behalf of the project, (DEA)
• Contacts with CINEA, including the submission of all reports and deliverables.
8
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
• Contacts with the EC and reporting to the Programme Committee (if required).
• The control and management of the budget.
• The practical handling of registration of all central payments from the CA, including but not limited to meeting costs,
external participation and other payments of third parties.
• The receiving of funding and all payments on behalf of the overall CA Coordination (DEA).
• The collection and control of national cost statements.
Task no 1.6: Implementation of all decisions from Contractors and Management Team, (DEA)
The Coordinator with the help of the team of assistants and support functions is responsible for the implementation of
decisions by the Contractors Meeting. The Management Team helps the coordinator in this task, together with all other
elements on the technical progress on the project.
Task no 1.7: Ensuring progress with the deliverables, (DEA)
• Leading the preparation of technical reports and technical information, including coordination with the communication
team under WP6.
• For elements under the Central Teams, each Central Team Manager is responsible for such progress.
• The individual partners and in particular the National Coordinator / contact is responsible for the progress on individual
country deliverables, such as Country Reports and KIDs.
Task no 1.8: Common LIFE program activities (DEA)
Contribute, upon invitation by the Agency, to common activities related to information (like reporting on impact
indicators), dissemination and visibility, and synergies with other LIFE and EU supported actions.
1 travel for participation in meetings after request by the DG ENER / CINEA is allocated for each year.
Work package WP2 – Preparation of plenary meetings and Central Teams
Work Package Number WP2 Lead Beneficiary 1. DEA
Work Package Name Preparation of plenary meetings and Central Teams
Start Month 1 End Month 60
Objectives
Central Teams: Development and management of sessions, workshops and technical work within the different Central
Teams. The Management Team Meetings will ensure the planning of sessions at plenaries, in-depth workshops and other
technical events and deliverables. Each Central Team Manager (CTM) will be responsible for the strategic development
of the work in connection with specific articles of the EPBD in their field of competence. Development of topics
and engagement of experts. Practical management of Central Teams including working groups supporting meetings.
Reporting of overall progress in each Team and related topics, including information material on each field / specified
topics.
The Central Team Managers, CTMs, will under the leadership of the Coordinator, also be responsible for the coordination
and collaborations between these fields of competence.
Support functions: Support functions ensure the preparation and maximum impact of sessions during the CA plenary
and intermediate meetings, as to improve the impact of the preparatory work before and the reporting after meetings.
The aim of these functions is to increase efficiency, transparency, and at the same time reduce the workload for the
coordination and communication teams.
Description
2.1. Central Teams (OIB, CSTS, BAFA, MEC, MOTIVA, SEAI, ENEA, ADENE)
The Central Teams and their leaders will be responsible for the setup of sessions and other technical work in the CA
EPBD 6 project and for the reporting from this work. Most technical issues will be handled under this work package
and the participation of these CTMs in the management of the project including in the Management Team Meetings
will be part of this work package. Each Central Team Manager (CTM) will be supported by a Central Team Assistant
(CTA). Central Teams are indicated as Task 2.1.1 to 2.1.9. Additional support elements ensure the handling of the Plenary
Meetings and In-depth Workshops etc. These support functions are described as Task 2.3.1 to 2.3.5.
9
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Further work, including the lead of the Management Team and the overall coordination, is described under work package
1. The Plenary Meetings and the participation of the National Experts are handled under work package 3.
The Central Teams are set up with a very strong focus on the directive under revision in 2022 and 2023 as these indicate
the major part of the work in the CA EPBD 6 project circle. They are, however, formulated in a broad manner, in order to
adapt to changes coming in the revision process as well as handling the issues until the new provisions come into force.
The teams are formed strongly based on the graph below, as presented by DG ENER, and it is set up so that multiple
teams often will either work together on topics or complement each other under main topics; Renovation, Financing,
Decarbonisation and Modernising & System Integration.
Task 2.1.1: CT1 - National Renovation Action Plans / MEPS (BAFA, Germany)
This Central Team is related to renovation of existing buildings. Major tasks include the areas of National Renovation
Action Plans and Minimum Energy Performance Standards (MEPS) for existing buildings, as they are expected to
become part of the revised EPBD directive. National Renovation Action Plans strongly link to targets for the building
stock and activities linked to the CA EED. This work will therefore request collaboration also with the teams under
CA EED. Minimum Energy Performance Standards, MEPS, are expected to become a central element of the renovation
strategy and this team will handle the CA work on MEPS. The team will work as well with the development of
these strategies as their full implementation. Evaluation of results will therefore be a central part of the work and also
identification of measures that work, but also Long Term Renovation Strategies (until update of EPBD). The team will
address as well residential buildings as non-residential buildings.
Task 2.1.2: CT2- Renovation passports / EPCs (ADENE, Portugal)
This central team is related to renovation of existing buildings and in particular to Energy Performance Certificates
(EPCs). The link to and use of renovation passports as an active part of EPCs and development of action towards
realisation of the savings identified will be important elements. Control systems will be needed to ensure the success
of EPCs and in particular in their use connected to MEPS. Quality and needed training of experts and their role in
minimum energy performance standards will therefore be some of the critical elements covered by this team. Realisation
of proposals for improvement of buildings will be linked to finance and this again links to requirements for good quality.
Finally, the team will work in connection to databases for registration of EPCs and their use in the perspective of getting
better data for buildings and energy performance. The team will work with as well certification in connection to sale or
rental of buildings, but also with the regular certification of, for instance, public buildings.
Task 2.1.3: CT3 - Deep renovation and renovation passports (OIB, Austria)
This central team is linked to as well renovation for existing buildings as for finance. Some key elements in the work are
the definition and targets for deep renovations and the need for renovation passports for existing buildings in order to
reach those targets. The team will also work with inspection schemes related to renovation of buildings and to finance.
Central elements would be deep renovation standards, examples and renovation passports. Deep renovation of buildings
will be a voluntary measure to go beyond the normal requirements and this team will work with needed incentives and
organisation to go beyond the minimum energy performance standards. The team would also be responsible for elements
of general renovation and improvement of individual buildings as well for the building shell as for the Technical Building
Systems (TBS).
Task 2.1.4: CT4 - Finance (MOTIVA, Finland)
This Central Team focuses on financial aspects of the renovation wave and in particular in connection to the renovation
and improvement of existing buildings. Work will include as well private finance as finance from European funds and
national funding. A special need is collaboration with the European Investment Bank, which is expected to be in regular
interaction with the project at Plenary Meetings. Issues like bundling of investments, third party financing / energy
service companies and smart finance will be topics under this Central Team. The team will also work with the relation
of finance to other incentives for existing buildings. The work would include energy poverty, one-stop shop elements
and policy packages etc. in collaboration with other relevant teams. The team mainly focuses on existing buildings, but
the team would also occasionally work with smart finance and finance of new highly efficient buildings. The team will
also work with information activities and other incentives.
Task 2.1.5: CT5 - Decarbonization / Zero emission buildings (ENEA, Italy)
This central team will work on the agenda of decarbonisation of heating, including zero emission buildings, zero carbon
renovation and phasing out of existing fossil fuels in the whole building sector. The work will be supporting phasing
out individual heating based on fossil fuel in form of natural gas and fuel oil. Topics will include a new legal basis for
national bans of products or systems using fossil fuels. Systems using renewable energy sources such as biofuels will
be targeted as well as zero carbon districts, which is a topic that will include collaboration with CA RES. Definitions
systems on RES, nearby production or on-site will be part of the work, in collaboration with CT 6 on Calculations and
life cycle assessment.
10
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Task 2.1.6: CT6 - Calculations and life cycle (MEC, Estonia)
This Central Team would be mainly linked to decarbonization, calculations and standards. This includes life cycle
calculations, for carbon and energy, general calculation procedures and standards. Development of frameworks and
definitions of for instance primary energy factors will be targeted by this team. The team will further work with cost
efficiency, cost optimality and their implication on zero carbon buildings. Work on these rules are expected to cover as
well definitions and methods for new buildings as the application on existing buildings or the use in for instance EPCs.
The team will also handle some technical elements. The team will also look at cost optimisation and combination with
other matrixes for calculation including non-energy related matters. CEN standards in general is handled by this team
and in particular when it comes to energy performance standards and life cycle calculations.
Task 2.1.7: CT7 - Smart buildings and system integration (CSTC, Belgium)
This Central Team will mainly be active on the focus area “Modernisation & System integration”. The team would
be strongly related to smart buildings and systems. This includes the smart readiness indicator and demands for smart
systems. The upgrade of existing technical buildings systems would be included too. One of the next large steps in the
EPBD implementation will be the entry into force of the requirements on Building Automation and Control system
in 2025. A lot of preparation work is still necessary in most MS to have a fully operational regulation by then. Many
synergies can be found with the Technical Building System requirements and smart finance.
Task 2.1.8: CT8 - Buildings codes and technical requirements (SEAI, Ireland)
This Central Team would be linked to cross cutting for multiple focus areas including the use of building codes as well
for new buildings as for existing buildings. Some elements handled by the team are linked to NZEB definitions and
the development of these as well before and after the revision of the EPBD directive. Elements on indoor air quality,
ventilation and other technical building system requirements will be part of the work in connection to the respective
teams on new and existing buildings. Demands handled in this team will cover as well overall performance as individual
component requirements for as well building parts as for systems. Finally, the team will be responsible for electric
mobility requirements although some of this work are expected to be done by or in collaboration with a topic leader.
Task 2.1.9: CT9 - Information and other complementary activities (DEA, Denmark)
This Central Team would be integrated in the Communication Team and the Coordination. The Communication Team
would be assisting with sessions on information, campaigns and other tools such as one-stop shops in particular in
collaboration with the finance team. Further, the DEA Coordination will complement with some sessions where these
fall between or outside the scope of other CTM teams. Some of the sessions organised by this complementary team will
be part of this process.
Task 2.1.10: - Finalising the areas of the Central Teams (all central teams and coordination / DEA Denmark)
The development and the start of the CA EPBD 6 happens in a transition period where the new version of the EPBD
directive is not yet fully known. The individual teams should reflect as well the new version of the directive as well as
the old version including the amendments from 2018. This should ensure a rational as well as an even workload between
the teams. The final definition of the 9 teams will therefore be finalised as part of the start-up of the project and the
intention is to evaluate and adjust throughout the project in order to continue to maintain an even and reasonable share of
workload between the teams, while being able to develop interesting topics. This process also aims to take into account
the individual experience, interests and strengths of each of the CTM teams. The final description of the teams will be
included in a small document which is uploaded to Glasscubes in order to inform all experts and to give interests to be
part of a Team or even a CTM working group. The final description of each teams will further be part of the relevant
Evolving Strategic Report (in task 2.3).
Task 2.2: Participation in Management Team Meetings (all Central Teams)
The Management Team is responsible for the set-up of the CA Plenary Meetings and for the selection of topics as well
as the coherent coordination of these topics. It is the main forum for the overall technical coordination of the project.
The Management Team includes all Central Team Managers, the Support Functions and the Coordinator. The CINEA
and the EC are invited to all meetings. The Coordinator will lead these meetings. The Communication Manager and
the Technical Assistant will assist the Coordinator in setting up these meetings and will report actions, decisions and
conclusions and support the Coordinator in the implementation of these decisions. Material and decisions will be
approved by the Coordinator and shared with CTM’s within 15 working days following each meeting. Further assistance
will be set up in order to support general logistics of the CA and the interactive communication issues (further elaboration
in connection to information and web aspects).
The Management Team will meet face-to-face in connection to CA Plenary Meetings and In-depth Workshops (typically
in the afternoon of the day before) and once in between, 4-5 months in advance of each CA Plenary Meeting / In-depth
Workshop and for closing the project, meaning a total of 17 face-to-face meetings are expected. Additional meetings in
connection to other meetings such as open events or study tours can be set up, but are not included in the budget. Further
11
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
meetings will be set up as short web meetings, which could also potentially be the case for the planned preparation
meetings.
For Management Team Meetings organised in connection with CA Plenaries, the Assistants and the Junior Rapporteurs
will be invited to attend the meetings.
Other CAs (CA EED or CA RES) will be invited to Management Team Meetings for coordination, but depending on
own budgets for travel costs. Other CA members can be invited to participate in a Management Team Meeting. This
includes among others Assistants, the Junior Rapporteurs and Working Group Leaders.
Only the 9 CTMs (Central Teams and Communication & Dissemination Manager) and the Coordinator will be formal
members and have voting rights in case of voting. In case of a tie, the vote of the Coordinator will be decisive.
The time needed for the CTM’s to participate and prepare for these meetings is included in the relevant WP’s (WP2
and WP6).
The Coordinator will be supported by a Technical Assistant for the day-to-day technical tasks, communications between
participants and for preparing minutes and reports of the proceedings. The Technical Assistant and the Financial
Management function will take part in the quality assessment of the project. The Technical Assistant will participate
in all Management Teams meetings and take minutes / decisions on actions and follow up activities. Financial and
administrative support will be done internally in the DEA including all formal contractual aspects, detailed budgets,
payments and financial management issues.
Task 2.3 Evolving Strategy Reports (all central teams)
The evolving strategy reports are a key element in the selection of sessions and in keeping tract on the progress of
each of the Central Teams. Each CTM is responsible to develop the respective report and to keep them updated after
each Plenary Meeting of the CA EPBD 6. They contain a list of possible future topics, a list of held sessions and some
prioritisation of sessions as well as to key guidelines for the work. The topics for the future sessions can come directly
from partners, individual experts, from brainstorming sessions or from the last minutes of sessions, where participants
will discuss future ideas e.g. for continuation of discussions or elements to complement the session. Each report will
also include how to separate from the other Evolving Strategy Reports as well as ideas for collaboration with other
teams. First version of the report will be developed up to the first Plenary and ideas from the Plenary will help to form
the first version. After each Plenary / In-depth Workshop, the CTM will update the Evolving Strategy Report including
held sessions and new proposals for future sessions or new prioritising. The reports will help to ensure transparency,
involvement and collaboration. Selection of topics for Plenaries and In-depth Workshops will first of all be based on
the Evolving Strategy Reports.
Working groups will play an important role in defining topics, in preparation and also in developing new ideas. CTM
working group members must come from different countries and cannot come from the same country as the CTM. These
should help in collecting ideas from other partners / experts and in having a deeper discussion of possible areas for the
work. The work of the CTM working groups are reported through the updates of the Evolving Strategy Reports. These
reports are for internal use only, but the aim is that all experts can see these reports and also be able to come up with
proposals for new topics to sessions to be included.
All national expert teams and in particular the National Coordinators will be requested to give proposals for topics
for sessions. This will happen through sessions (at the end of sessions), at special sessions or through all normal
communication canals (such as email or through Glasscubes). Proposals should be given to the relevant team or in case
the expert is in doubt they can be given to the Coordinator and his team. The Central Team Managers will then include in
the Evolving Strategy Reports and take care of the prioritization of these according to relevance for the Member States,
e.g. through voting / adding stickers. In CA EPBD 6, it will be experimented with other structures for collection such as
through Glasscubes and through posters at Plenary Meetings as it is know from CA EED.
Task 2.4 Support Functions
Task 2.4.1: Support Function 1 - Central coordination of questionnaires (DEA)
The preparation of sessions during Plenaries usually requires sending questionnaires to National Coordinators in order
to collect specific input reflecting the national situation. It is important to streamline the sending of these questionnaires
to avoid overloading the National Coordinators, overlapping requests and ensure the highest impact. Therefore, as it was
the case in CA IV and CA V, CA 6 will include a Support Function to centralise the sending of questionnaires, developed
in closely collaboration with the CTMs.
12
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
It will be investigated if a central database including all questionnaires and answers can be developed. This Support
Function will be led / monitored by the Coordinator and his Assistant.
The questionnaires in CA EPBD 6 will support quantitative assessments, other elements that cannot be assessed in the
workshops, for documentation of progress in implementation in the Member States. The Assistant of the Coordinator
will lead this function. The development of the questionnaires should be a task that involves collaboration with or is
based on requests and involvement from the responsible Central Team Manager (CTM).
An attempt will be made to develop a central database collecting the questions and linking to the answers from the
coordinated questionnaires. It will be investigated to which extent the questionnaires and links to answers from previous
CAs such as CA IV and V where these questionnaires were harmonised and centralised too can be included. The aim
of this organisation is to avoid duplication and to ensure that previous results are reused and complemented instead of
repeated. In case a question is repeated in a new questionnaire, the database should help to identify the previous material
so that it could perhaps be possible to analyse the change in responses. The database of questionnaires further supports
the reporting. The database could be a simple list where each question would be registered including date, questionnaire
and which countries answered plus a link to where the results can be found in Glasscubes. This will be seen in connection
to task 2.4.3 and other IT solutions.
Task 2.4.2: Support Function 2 - Electronic registration (DEA)
The CA EPBD 6 will make further use of electronic registration and electronic meeting facilities. This includes
development of an automatic registration system based on a database structure and with access through the website /
Glasscubes.
A system will be developed for direct registration of experts at Plenary Meetings and also for online management of
information for experts and national contacts. The aim is at the same time to provide better transparency, a possibility
to easily correct, manage as well as to reduce the work in handling these registrations. The system will be based on the
evaluation of the experiences with online registration from the previous CAs (evaluated by a working group) and a wish
to increase the feedback to participants and ensure compliance with GDPR. This system will be developed through a
subcontract at the beginning of the CA EPBD 6. A company will be selected through a small tender process.
The system will be based on a database tool and will also include maintenance of the general registration of CA experts,
which will give National Coordinators right to include new national attendees, remove experts from the team and to
have an overview of registrations in general and for meetings.
Due consideration will be given to the protection of personal data. Rules for the handling of data, storage, protection
and deletion will be set by the start of the project to ensure the registration will comply with as well EU legislation as
national rules.
Task 2.4.3: Support Function 3 - Logistical arrangements for meetings (DEA)
Costs for venues and experts per diem packages will be handled centrally under a budget under WP 3 by the DEA, as it
was the case in the last part of the previous CAs. This has simplified the organisation significantly and is also expected
to contribute to keeping the meeting allowance per experts at the ceiling of 1,000 euro per meeting plus indirect costs.
In case some Plenary Meetings or In-depth Workshops are held as virtual events, the Coordination and Communication
Team will be supporting such events. Here, some of the resources (budget and time) allocated for the physical venues
will instead be used to ensure the high-quality facilitation of such meetings through external professional support. This
external contract is to ensure smooth running of the meeting and immediate response to technical issues as well as
training and handling of invitations. It also includes the necessary licenses (virtual venue / tools).
In case meetings, plenaries and open events will be held as hybrid meetings, a part of the meeting budget will be used
to ensure web transmission, for instance for a closed audience (for Plenary Meetings). It will also be made possible
for external presentations and this will among other things be used for external speakers in the last part of the project
as it is found that impact in many cases neither justify use of time nor costs by bringing speakers to the venue. The
virtual meetings have documented that this can be done efficiently from distance and that this can even be beneficial for
confidentiality reasons. It has, however, also documented that the virtual meetings in the CA EPBD are not as efficient
as the physical ones and lack elements that are crucial for the CA EPBD collaboration. This way, the virtual meetings
should only be used to a limited extend.
Task 2.4.4: Support Function 4 - Workshop preparation and creative moderation (RVO)
This function will provide support for the preparation of more interactive sessions during CA EPBD 6 meetings, one or
more training workshops in creative sessions and some lead of sessions or help in facilitation.
13
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
As part of the development of CA EPBD 6, sessions will increasingly focus on interaction between all experts. Most
countries have experiences in almost all fields of the EPBD and lessons are often learned by interaction and improvement
of existing systems, and not by copying a few examples / partners, which have deeper experience. This often request
more interactive sessions / workshops.
In order to enable this development, a professional moderator with extensive experience of creative sessions from the
RVO will provide support for moderators. This expertise will give input to planning of sessions, practical setup and to
different methods to involve participants more actively. This support will include a moderator present at each CA Plenary
Meeting and helping or leading workshops in collaboration with the Central Team Managers or other session leaders.
This support will develop monitoring skills by example and by doing and will also support the transition of Concerted
Action 6 as a more interactive forum. This can further support creative and interactive sessions by training sessions for
Central Team Managers, Central Team Assistants, Junior Rapporteurs and potential session moderators. Such sessions
could be planned in connection to physical Management Team Meetings.
Task 2.4.5: Support Function 5 – Support for Reporting (subcontract by DEA)
The CA EPBD 6 is a special structure continuing the support for the reporting of sessions on CA Plenary Meetings
and In-depth Workshops. This will complement the current structure with preparation notes for the meetings and the
conclusion / reporting from sessions. This function will be set up in connection to one of the Central Teams (as it was
the case in CA IV & V and monitored by the Coordinator and his Assistant).
A minimum of three Junior Rapporteurs (native / fluent English speaking and writing) will be present at all CA meetings
and will take the meeting reports from each stream and all sessions. Furthermore, these Junior Rapporteurs will generally
support the proceedings and functions of these meetings. This will allow for combination of multiple sessions / workshops
in one reporting document.
The reports from CA Meetings (streams including sessions and workshops) need to be sent for review by the CTM within
3 weeks of the CA Meeting and finished for circulation among participants one and a half months after the CA Meeting.
These Junior Rapporteurs will further support practical issues around sessions and the CA Meetings in general and can
also be included in work on the development of country material. The Junior Rapporteurs will need to have a relevant
background in the field of energy performance of buildings. The Assistant of the Coordinator or one of the CTM’s will
lead and control the work of these experts.
Work package WP3 – Participation in Plenary Meeting and In-depth Workshops
Work Package Number WP3 Lead Beneficiary 1. DEA
Work Package Name Participation in Plenary Meeting and In-depth Workshops
Start Month 1 End Month 60
Objectives
The Plenary Meetings are key to the success of the CA EPBD 6 and this WP shall ensure the participation of and sharing
of experience between experts from all CA countries. The key objective is to ensure the possibility for 3 national experts
per Member State to participate in each plenary meeting and 2 experts for each in-depth workshop.
Description
All partners (DEA, OIB, CSTC, SEDA, MECI, MIT, BAFA, MEC, CRES, IDEA, MOTIVA, MTE, MPGI, EMI, LRAM,
MEAT, EM, MTIC, RVO, ITB, ADENE, MLPDA, BOVERKET, TSUS, MZI)
WP 3 relates to the preparation for and the participation in the six CA plenary Meetings for each partner. Each country
will have the possibility to send three national experts to each CA plenary meeting. Costs for these experts will be paid by
the CA EPBD 6 budget, including personnel costs, travel and accommodation costs, meeting fee and per diem costs. The
three supported experts will allow each country to be present at each session or workshop as three parallel sessions are
expected at every meeting. Countries are free to send further experts at their own costs. The CA EPBD 6 will, however,
cover venue facilities also for a few additional experts from each country. Costs for organisation, venues and reporting
will be covered by other work packages (WP2, WP4).
14
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Task 3.1 Participation in plenary meetings (All Partners plus NVE)
Frequent and well-organised CA Plenary Meetings are central to the success of the Concerted Action. A meeting every
six months seems to be the right frequency to ensure sufficient interaction between experts and also to ensure sufficient
progress between meetings both for teams and for national implementation. CA EPBD 6 is therefore built on a structure
with nine CA Plenary Meetings or In-depth Workshops over 60 months.
The Coordinator supported by the Management Team shall select the location of each Plenary Meeting and In-depth
Workshop under silent approval by the CINEA and Contractors Meeting. The locations to be selected should offer
easy access from all participating countries, within reasonable travel time and cost, but also aim at having interaction
and presence in different countries over time. Preference will therefore be given to locations that will also organize
a complementary local event just prior or just after the plenary meeting, not covered by the CA budget, and where
CA participants can offer a significant “European added value” that may be useful for the advancement of EPBD
implementation locally or regionally.
CA Plenary Meetings will start with a plenary session of interest to all experts and end with a plenary session where
the main conclusions and actions from each stream are summarised. This format is similar to the structure used in the
previous CAs. In the CA EPBD 6, the organisation of sessions will be based on the Central Teams Evolving Reports;
and there will be emphasis on workshops that takes the form of multiple sessions.
Compared to the previous editions of the CA, there is a need to have a more flexible structure under CA EPBD 6. This
structure needs to be able to change, adapt, experiment and encompass significant differences in implementation, but at
the same time, it needs to give the responsive and stable structure to the implementation of the EPBD.
Each CA Meeting will include a full set of sessions on both days of interest for members of each of the basic Central
Teams; sessions will vary but still aim for countries to be able to cover the whole Plenary with 3 experts. It is the aim
to work towards having more and more interactive sessions as well as involving a larger part of the CA experts into
the management of tasks or themes. Support will be set up for theme leads and multiple sessions and workshop leads
under WP4.
It is the responsibility of the National Contact Person (NCP) to select at team, which can cover the relevant topics, and
it is the responsibility of individual experts to participate actively in these meetings and sessions, sharing experience,
interact with other teams and to bring home information and use this in the national context. All shall aim at supporting
the full implementation of the EPBD and maximizing the results.
Task 3.2 Participation in In-depth Workshops (DEA / all partners plus NVE)
Some of the Plenary Meetings can / will be replaced by In-depth Workshops. These have a structure, which can vary, but
typically they will only have two parallel streams and they might not have a closing or opening session. Furthermore,
they can be combined with study tours or other elements of collaboration.
In-depth Workshops might be set up similarly to Plenaries, but only with two parallel sessions and with two experts
from each country, but the structure for In-depth Workshops is freer than for Plenaries. In-depth Workshops can also be
shorter than Plenaries and they will focus on a more limited set of topics.
The same role apply for national contact persons as for national experts for Plenaries.
Task 3.3 Presentation of status for implementation (All Partners plus NVE)
All partners and countries will support the preparation and execution of Plenary Meetings and In-depth Workshops. This
includes filling in questionnaires deemed important for the preparation of topics and especially new elements. It further
includes presenting results at specific sessions giving an overview on implementation or presenting lessons learned or
other takeaways from the implementation.
Countries / partners should also volunteer for active roles such as session leads or organization of session elements.
It is the responsibility of the individual expert and in particular the national contact person to contribute with national
experience through the lead, through presentations or active participation in general.
Task 3.4 Reporting from sessions (DEA / all central teams)
With the help of the support function, Junior Rapporteurs and the review by the Central Teams under Work Package 2,
the Plenaries, In-depth Workshops and the included sessions will deliver reports from sessions. Each report will be on
7-10 pages and will include highlights, lessons learned and conclusions from each session. These will be for internal use
in the CA and they will ensure that information and lessons learned from sessions will stay available for all participants
15
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
in the project also after the plenaries have been concluded. Session reports will further help to feed into new sessions,
which can follow on similar topics.
Together with other session material such as presentations and results of questionnaires, session reports will be uploaded
to Glasscubes under each Plenary Meeting or each In-depth Workshop. Material will be organised in a session-by-session
format, which makes it easier for the experts to go back and investigate the results and material presented for each topic.
Reporting from sessions will also include the slides provided for the closing plenary. These will be uploaded under each
meeting under ‘opening’ and ‘closing’ together with other material from the plenaries.
Most other Work Packages will support the setup of CA Plenary Meetings. Especially the Management Team under
WP2 will lead the work on each of the Central Cutting Teams. Technical development and plenary sessions by Technical
Coordinator is under WP2. While WP2 further will provide support functions such as reports, questionnaires and IT
support, WP 4 will support with topic leaders and WP4 will also coordinate with other CA’s, projects and stakeholders.
The communication under Work Package 5 will help informing about the meetings as well as on the results obtained
in each part of the meetings.
Work package WP4 – Other collaboration structures / External Stakeholders
Work Package Number WP4 Lead Beneficiary 1. DEA
Work Package Name Other collaboration structures / External Stakeholders
Start Month 1 End Month 60
Objectives
Other forms of collaboration during and between CA meetings. The aim is to involve more partners in the development
of sessions and these will also to contribute to develop specific material for the CA.
There will also be interaction and collaboration with other CA’s for RES and EED. Further, there will be coordination with
CEN, EU-funded projects and other relevant stakeholders and initiatives at EU and national level in order to maximise
the impact of the CA beyond its immediate audience. Finally, there will be interaction with other countries and regions.
Description
All partners (DEA, OIB, CSTC, SEDA, MECI, MIT, BAFA, MEC, CRES, IDEA, MOTIVA, MTE, MPGI, EMI, LRAM,
MEAT, EM, MTIC, RVO, ITB, ADENE, MLPDA, BOVERKET, TSUS, MZI)
This Work Package is set up to support other structures to increase the outcomes of the CA EPBD 6 project. First of all,
these are structures which support and complement the outcomes of Plenary Meetings and In-depth Workshops. This
includes Working Groups and topic leads. Further, it supports the results which can be achieved in collaboration with the
other CA’s for EED and RES, including joint workshops and collaboration structures. Finally, it supports results which
can be achieved through collaboration with other projects and with countries outside Europe.
The budget for WP5 is set aside within the budget of the Coordinator, DEA, to be allocated on a case by case basis
according to the actual assignment of the work. Approval of the distribution of funds is to be made by the Coordinator
and the Management Team, and approved by the Project Advisor designated by the CINEA.
Activities to support and complement sessions at Plenary Meetings:
Some additional activities will support the development of session, workshops and side visits as well as support
complementary results. These will include Session Leaders, Working Groups and Study Groups. These structures also
aim at including further countries / partners in the development of the CA. The work in these structures will therefore
prioritise experts not coming from the partners who are involved in the Management Team, as long as experts volunteer
for the work in Working Groups / Study Groups and Session Leaders. It is the aim that all countries and especially those
not represented in the Management Team come forward with experts for these groups.
Task 4.1 Topic leaders: (all partners plus NVE)
Topic Leaders will support the development of sessions for Plenaries and study tours. They will allow partners who
are not represented in the Management Team to take actively part in the development of the CA EPBD and in specific
16
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
development of sessions. Topic leaders will work independently, but under guidance of CTMs or the Management Team
or the Coordinator.
Topic leaders will be experts that volunteer to lead specific work in the CA EPBD including leading of multiple sessions.
Usually, the topic leader will lead at least 3 sessions. Normally, these will be spread over multiple plenaries. Topics
for topic leaders will be developed in collaboration with the Management Team. These topics can either be supporting
specific Central Teams or they can be complementing the CTM structure, for instance by handling a specific group of
topics which falls outside the experience of the Central Team Managers. Alternatively, it can be done within a specific
part of the work in order to reduce the work for CTMs who have a high workload.
Leading of an individual session or a couple of sessions ad hoc will be seen as the obligation of all partners and will
not qualify for a topic lead. It needs to be an independent role and it needs to cover a cluster of sessions. Topic leaders
need to report their efforts and results in a small topic report.
Topic leaders can be allocated up to 15 days of work and topics could be joint with other CA projects (EED and RED).
Tasks 4.2 – Working Groups: (all partners plus NVE)
Working Groups will support work going on between Plenaries and should support discussions at plenaries, In-depth
Workshops or study tours. They can further develop material which complement the work in sessions. They will focus
on one or more specific topics where additional work is needed to develop material for or on the basis of discussions
in sessions and workshops. There will be two types of Working Groups: First, CTM Working Groups, which will help
Central Team Managers to develop the work of their teams, selection of topics and preparation of sessions. Second,
Topic Working Groups / Study Groups, which will be focused on one or more specific topics and or development of
material, which can support or complement sessions.
The idea with Working Groups is to include more countries and experts to develop sessions and to develop material
beyond the preparation reports and final reports from sessions. This can for instance be a database with examples, a
report of a specific challenge, a comparison between countries or a review of specific policies or examples.
Each of the CTMs can set up a CTM working group covering multiple Plenary Meetings, but members must come
from different partners as the CTM. For Topic Working Groups, the Management Team Meeting selects topics for such
working groups, but all CA experts can come up with proposals for topics for Working Groups.
Working Groups must be reported either through the CTM work / Evolving Strategic Reports or through a specific report
or outcome. Each member of a Working Group will get 4-5 extra days for the work in this group on top of the general
allocation for the Plenary Meetings, with a possibility of a couple of days more for the lead of the Working Group.
Normally, the range is within a maximum of 15 days per WG. CTMs will not get additional days for the participation
or led of CTM working groups. Usually, the members for Working Groups are expected to be part of the national expert
teams and therefore travel costs are normally not provided.
General conditions for Working Groups and Topic Leaders:
In general, the members of Working Groups will come for the groups of CA Experts, National Contacts or from the
Management Team, but external experts can be involved in this work under specific approval of the Management Team
Meeting and the CINEA. Except for the Joint Working Groups, however, there is no specific budget foreseen for travel
in these groups. Additional meetings are expected to be held virtually. In special cases, the steering group can approve
additional travel under approval by CINEA.
The Coordinator, subject to CINEA approval, can approve Working Groups and specific rules for Working Groups
between Management Team Meetings. These approvals for specific rules as for Working Groups in general will later
be discussed during the Management Team Meeting and presented for the Contractors Meeting for approval. Working
Groups can only start when there is a clear definition of aims, work and share of responsibilities / criteria for payments
of members and leaders of the groups. Budget for all Working Groups is from the start allocated by the DEA, but will
move to the respective partners when Working Groups are formed. Payments of WG members will be a part of the
periodic reporting.
Task 4.3 Activities to support the collaboration with other CAs: (DEA / all partners)
Over the past, it has been clear that there are overlaps between the CA EPBD, CA EED and CA RES leading to the
possibility of double work and lost opportunities unless there is a close collaboration between the three Concerted
Actions. In the past, this has included joint workshops, mutual participation, Joint Working Groups and general
coordination. With the revision of the directives and the implementation of Fit for 55 and the REPowerEU, the need for
coordination seems to increase even further.
Task 4.4 - Joint Working Groups: (all partners)
17
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
A Joint Working Group can be established as a way to work together with another CA (RES or EED or both). Members
will be from multiple CAs, but each CA will in general be responsible for remuneration of their own experts. These
Working Groups focus on topics, which are common for at least two CAs and will allow for more substantial collaboration
work between the CAs. It is expected that members of such a Working Group would collect information from the CA
EPBD and/or from the other CAs. As a result, reporting or outcomes would be of interest for more than one CA. Topics
for such Working Groups will be selected by the Management Team Meeting or the Coordinator in close collaboration
with the other CA Coordinators / Steering Groups (CA Coordinators).
There are topics for Joint Working Groups in areas where there are clear overlaps with the other CAs such as renovation
strategies, smart elements, integrated renewable energy, finance, public buildings or consumer behaviour. Each of these
Joint Working Groups will be handled individually depending on the needs in the collaboration, but as a starting point,
they would apply to the same conditions as the other Working Groups. For this collaboration, work there can be needed
for additional travel to meetings in the other CAs and this will be approved on an individual basis by the Management
Team or set up in the general approval or rules for these.
Joint Working Groups will follow the same rules for topic Working Groups, but these will be adjusted to fit the rules for
Working Groups in the other CA’s. There would also be travel allowance for needed participation in other CA Plenary
Meetings, but by approval by the Coordinator and CINEA.
Task 4.4 General collaboration with the Concerted Actions for RED and EED: (DEA)
Many issues cross over with the EED and the RES Directives, and the CA EPBD 6 will work to increase the collaboration
between these 3 CAs to avoid duplication and redundancy of work. The focus will be on elements that are common
between all the 3 CAs or at least for 2 CAs. This work will be a natural part of the work for many of the Central Team
Managers, Cross-cutting Teams as well as CA participants from other CAs or members involved in specific IEE/H2020
or LIFE projects relevant for the CA EPBD work.
The Coordinator will lead the overall collaboration with the other CAs, but individual elements under this Work Program
may refer to different articles of Directive 2010/31/EU addressed by Central Teams and Functions, where individual
references are made to other CAs. Interaction and activities between CAs will be based on the approval of DG ENER
and CINEA.
Examples of collaboration include:
• Sending a representative of one Management Team Member / specific CTM or the Coordinator to plenaries of the
other CAs
• Organisation of Joint Working Groups with the intent to analyse a limited aspect of a piece of legislation
• Organisation of a large Working Group with the intention to analyse a critical aspect of common areas to produce a
publishable report.
When Management Team Members or CA Experts attend in other CA meetings, this will be handled as participation in
CA EPBD plenaries (including 3 additional workdays and travel allowances).
This can also include setting up common / collaborative sessions or mutual participation, it can include joint Working
Groups as described under WP5, or it can be through development of common events or In-depth Workshops combined
for multiple CAs.
More details of this work will be developed in collaboration with the Coordinators from the other CA’s and as this
collaboration progress. Part of this will happen at yearly meetings organised by DG ENER and CINEA. These are used to
discuss the interaction between DG ENER, CINEA and the 3 CAs as well as topics of common interest. The Coordinator
of the CA EPBD will attend these meetings. The CA 6 will actively share information and seek to provide access to
relevant internal information from each Concerted Actions (EPBD, RES and EED).
Some key topics for collaboration with other CAs will be:
• Long Term Building Renovation Strategies
• National Building Renovation Plans
• Exemplary roles of public buildings in renovation
• Consumer first & capacity building
• Programs to stimulate investments and smart financing
• Smart buildings, smart equipment and smart grids
• Integration of renewable energy in buildings, production and storage
• Zero energy districts
• Flexible and grid compatible buildings
18
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
• Methodologies for assessment of energy performance and assessment of savings. Further elements to be developed
jointly with CA EED and CA RES.
Travel costs for participation for in Plenaries (four travels per year), for Management Team or similar (two travels
per year) and for Coordinators coordination meeting with other CAs and DG ENER (one travel per year). Increasing
collaborations and sharing of experience is to avoid duplication of work and preparation of joint activities.
Task 4.5 - Collaboration with other initiatives (DEA all Central Team Managers)
Many other initiatives develop knowledge which can be useful for the CA participants. This can include EU funded
projects, CEN and work from relevant stakeholders in terms of involvement in building construction and renovation
activities. It is therefore natural for the CA EPBD to interact with such initiatives. The key guidance for such interaction
aims at improving implementation in Member States and that it makes sense to make this interaction in or in connection
to CA EPBD meetings or activities. It is further important that such interaction does not impact the special CA EPBD
environment and the confidentiality which is needed in the CA EPBD. Further, it is important that interventions from
other actors help in creating fruitful discussions and do not hamper the interaction between the CA experts in general.
It will be up to session leaders / CTM teams to decide whether external presentations or interactions will support the
overall value and impact of sessions. For external participants in Plenary Meetings, the possibility of virtual connections
will be used as much as possible unless it is judged that a physical presence will add significant value.
Travel costs for external participation for plenaries (six travels per meeting) and for In-depth Workshops (four travels per
meeting). Increasing collaborations, learnings from projects and giving input to other EU funded projects is the benefit
from these participations.
Task 4.6 - Collaboration with EU-funded projects (DEA, all central teams)
The work will include the need to follow other projects and especially linked to the EU Building Stock Observatory,
the BUILD UP platform, as well as LIFE and HORIZON 2020 projects relevant for the CA EPBD. This work will
involve multiple Central Teams and work of CTMs under WP2, and the communication team under WP5. Roles for
this participation will be discussed at Management Team Meetings. Activities will include working for other CA lead
projects and participation on some of their CA meetings.
A part of this work can be achieved through participation in conferences, project meetings from other projects and by
inviting projects to present at CA plenaries, given the confidentiality can be kept (by signing confidentiality agreements
and by targeted participation).
Participation in meetings and other events aim at exchanging information, to disseminate results from CA EPBD and
to coordinate activities calculated with 3 travels per year.
Task 4.7- Coordination with CEN (DEA, ME):
Even though CEN standards are not directly implemented in the national energy performance procedures, many countries
use CEN compatible approaches and/or different CEN adaptations. Multiple paths and requirements for annexes
complicate the usage in the countries. Barriers for the use of the CEN standards have to be communicated to CEN.
Relevant work also includes re-assessing and establishing national authorities’ requirements for revised CEN EPBD
standards in the light of implementation experiences. Supporting instruments and simplified data collection are needed to
discuss further. Coordination with CEN will include meetings or workshops in connection to CA Plenary Meetings and
development of standard values. A special attention will be devoted to Zero Carbon standards and Life Cycle Calculation.
The Central Team for Technical issues and calculations will handle most of the technical content under WP 2, while
the organisation of interactive meetings with CEN will be the role of the Coordinator under this work program. The
Coordinator will further participate in coordination meetings with other CAs, CEN, CINEA, DG ENER and in EE
committee meetings as needed.
Travel is included in the above estimates for external experts at meetings.
Task 4.8 - Involvement of relevant stakeholders: (DEA, all central teams)
There is a wide range of stakeholders involved in energy performance of buildings and many other activities including
CEN work on standardisation. An effective implementation of the EPBD can only be achieved if many of these
stakeholders are engaged in the process. Interaction with the stakeholders is therefore an important element for the
Concerted Action EPBD.
The CA EPBD will organise different stakeholder / open events. These will be linked to the Information Activities and
the communication Strategy in WP5. Open events can be linked to CA Plenaries or can be held individually. Meetings
can further be either fully web-based or it can include transmission over web or recordings for the website, in order to
reach more stakeholders.
19
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
These are included in the above estimate for external experts at meetings.
Task 4.9 - Collaboration with international partners: (DEA)
Energy performance of buildings is taking up internationally. The CA EPBD will be open for international collaboration
beyond the European Union and this can for instance include presentations, mutual participation in events and
collaboration with international partners (e.g. Canada, China, Brazil, India and other EU partner countries). More
intensive collaboration or participation beyond Europe will be subject to approval by CINEA and DG ENER and will
happen in close coordination with these.
Work package WP5 – Communication and dissemination
Work Package Number WP5 Lead Beneficiary 1. DEA
Work Package Name Communication and dissemination
Start Month 1 End Month 60
Objectives
This work package will ensure that the work of the CA is communicated to the target groups, and that the outcomes
of discussions are disseminated effectively. This includes confidential dissemination within the CA membership, and
public disclosure of the results. Exploitation of these results will consist of the effective embedding of CA outcomes in
improved policy-making and practices.
Description
The team for communication will be led by a Central Team Manager (DEA), who will be part of the Management Team.
The Assistant of the Central Team Manager will also participate in Management Team meetings to ensure efficient
communication and communication support for the Management Team.
Task 5.1 Develop Communication, Dissemination and Exploitation Plan (DEA)
CA EPBD 6 will develop and implement a dedicated communication, dissemination and exploitation plan. The plan will
identify and differentiate, per target group, the correct means and messages, considering their frame of interaction with
the CA EPBD, as indicatively presented below:
A) CA participants
B) Policy makers at EU level
C) European stakeholder organisations
D) National Authorities and Agencies
E) National stakeholder organisations (see also section 3.6 Measures to maximise impact)
The plan will be updated at the end of each reporting period, each time giving an indication of the progress achieved
against the performance indicators, and applying lessons learned on an on-going basis. Its effectiveness will also be
evaluated by online surveys aimed at various target groups.
Task 5.2 Visual Identity & Templates (DEA)
The CA EPBD 6 will develop a new visual identity, to be applied consistently to all types of formats of public material,
including website, database, factsheets & reports, power point presentations, backdrop slides, event flyers, webzine, etc.
Rules for the proper use of the new identity, including logo variations, fonts, color pallets, as well as the EU banner and
legal disclaimers, will be set out in an Identity Charter. This task also includes the development of standard templates
for factsheets & reports, power point presentations, backdrop slides, event flyers, webzines and other deliverables. CA
participants will be obliged to follow the Charter.
Task 5.3 Update of project Website (DEA)
The CA EPBD website (http://www.epbd-ca.eu) will be revamped using the basic concept of “one page scroll down”. Its
main objective is to communicate the work of the CA EPBD and its objectives, as well as major developments around
the related CA's (CA RES, CA EED). Website content will be regularly updated according to a process of approval
and quality control that will be defined in this task. The website will disseminate the results of CAEPBD 6 as well as
the previous CAs EPBD I-V. The website will include the public version of the Database (see Task 5.7) consolidating
the main structured outputs of the CA EPBD. The website for CA EPBD will also serve as a central point for entering
the internal online project centre (Glasscubes), as well as the registration tool (see 4.3) for plenary meetings, through
20
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
respective login links. The website revamp will include appropriate security measures as well as making it usable on
mobile devices.
The task includes: Development of terms of reference; Web development including consistent graphic layout and identity;
Migration of existing content; Review, copywriting and upload of regular posts; Regular hosting, maintenance & backup;
Security; Improved Search Engine Optimisation.
Task 5.4 Setup online collaborative workspace (DEA)
Glasscubes will be maintained as the online collaborative workspace where all confidential CA EPBD documents
(meeting minutes, session reports, survey results, presentations, etc.) are stored, possibly offering additional functions for
structured communication / interaction, as e.g.: mail integration, direct links to/from the website, automatic registration,
participants list.
Rules for access and authoring rights shall be set or adjusted by the Coordinator. Generally, experts from each country,
appointed through the National Coordinator, plus the members of the Management Team Meetings and certain people
appointed by the EC/CINEA shall have read-only access. A predefined group of people, e.g. the Coordinator and his
assistant(s), the Communications Team Manager and his assistant(s), as well as the Central Team Managers and their
assistants, will receive authoring rights to specific rooms in the project centre. Experts from other CAs (RES and EED)
will receive access after agreement between the 3 CAs or upon approval by the Coordinator. The coordinator can approve
additional people either for full or restricted access.
This task includes the development of the initial folders and structure for CA6 EPBD, maintenance and backup, regular
management of user rights and support to users.
The upload of CA plenary meeting information, presentations, detailed agendas and other material, falls under the
responsibility of the corresponding Central Team Managers with the help of the rapporteurs (for parallel sessions and
workshops) and the Coordinator with the help of his assistant.
Task 5.5 Develop and Produce Webzines & Newsflashes (DEA)
Dissemination and communication of confidential material aimed at CA EPBD participants will rely on the regular
webzine, circulated for preparation of the CA EPBD plenary meetings, three to two months in advance of each meeting,
by e-mail. The webzine will be complemented by shorter emailed newsflashes distributed on an ad-hoc basis upon
demand to the same target group.
Task 5.5 includes: Planning & contents proposal; Organisation, requests, collection of material; Review and simple
editing; Writing 2 articles per news edition; Layout; Import of recipients list; Testing & send out.
The Coordinator reviews and approves the webzine before send out. CTMs and other partners contribute input of draft
texts. Production and mailing of the webzine will be handled through a commercial service such as Mailchimp or
Campaign Monitor, which also allows statistical tracking.
Task 5.6 Maintain and expand the CA Database of Contents (DEA)
CA EPBD 6 will advance the database driven book concept envisaged in CAV EPBD. The database will be a self-
standing deliverable, i.e. a public online version of structured information from the CA EPBD. This approach maintains
and builds upon the value of information provided through the CAV EPBD. At the same time, it simplifies the procedure
for further updates, in the focus on corrections, additional content, etc. The database will be used to store and structure
new factsheets, Country and CTM reports. All content will be extensively ‘tagged’. In addition, the database may also
serve for cross-referencing, simple storing, or structured presentation of other information formats as, e.g. statistical data
or KI’s. However, it is assumed that a more sophisticated structure for the presentation of KID’s will be developed and
hosted by the EU Building Stock Observatory outside of this Grant Agreement.
The CA EPBD 6 thus maintains the database and content developed in the context of the CA V database driven book on
the Atlassian Confluence infrastructure, as a tool for on-line structuring of public information, enhanced to feature a more
professional layout and to support responsive web design, viewable on mobile devices. Content will be downloadable
as simple automatically generated PDF.
The task includes: restructuring of the database content to allow for easy location and update of specific aspects and
parameters of EPBD implementation at the national level; further development of the database capabilities, extended
by commercial plug-ins.
Final contents for feeding the database are approved by the Coordinator.
Task 5.7 Update country reports + Upload (DEA)
21
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Each country is expected to deliver, through the contract period, at least one update of the country reports and included
in this the best practice case story, which are a part of these reports.
The review procedure for country reports / material includes one round of technical review by the Coordinator and an
English check. The content is then uploaded, tagged/structured and integrated in the existing database, accessible for
viewing online.
This task includes: support to Coordinator in defining the list of topics; customisation of factsheet template for specific
topics; light language review; upload of approved factsheets content; final layout improvements of factsheets prior to
online publication.
Task 5.8 Prepare the Upload of CTM reports (DEA)
Each CTM will summarise all discussions that have taken place within a specific Central Team, in the form of a dedicated
report (typically 12-15 pages), twice within the duration of the Action. A review procedure will be described involving
the Coordinator and the CINEA and DG ENER, as well as a language check. The content is then uploaded, tagged/
structured and integrated in the existing database, accessible for viewing online.
This task includes: language review; upload of approved CTM reports into database; final layout improvements prior
to online publication.
Task 5.9 Prepare the Upload of Country reports (DEA)
Each country or for Belgium each region will summarise status of implementation in a structured way in text (country
report) and in numbers and definitions (KIDs – Key Indicators & Decisions) that have taken place within the project
period, in the form of a dedicated report (typically 12-15 pages), twice within the duration of the Action. In the CA
EPBD 6 project, this will be an update of the information delivered in the CA EPBD V project adding on to existing
elements. This can be new sections or updating existing material. This will be done in different parts over the project. A
review procedure will be described involving the Coordinator as well as a language check. The content is then uploaded,
tagged/structured and integrated in the existing database, accessible for viewing online. By month 48 all reports should
be at least partly updated.
This task includes: language review; upload of approved country reports and KIDs into database; final layout
improvements prior to online publication.
Task 5.10 Produce Multimedia Content (DEA)
The CA EPBD envisages to make use of modern electronic forms to disseminate and communicate information. This
may include webinars, interviews (either written or using video), infographics, videos, electronic surveys.
Task 5.11 Exchange communication/dissemination material with other initiatives (DEA)
Close collaboration with initiatives that have strong contextual links to CA EPBD, e.g. BUILD UP, CA RES and CA
EED, EU Building Stock Observatory, will be elaborated. This will facilitate sharing of approved confidential or public
information, always under the agreement of the Coordinator and CINEA.
Work package WP6 – Reporting
Work Package Number WP6 Lead Beneficiary 1. DEA
Work Package Name Reporting
Start Month 1 End Month 60
Objectives
Efficient public reporting on the CA activities and progress of EPBD implementation in participating countries. This
Work Package will further include technical quality assurance of deliverables from Countries and the CA in general. A
specific focus will be to document the impact of the CA6_EPBD, based on specific indicators.
Description
An important deliverable of the CA 6 is the reporting on resources spending as well as on progress in the project
implementation.
22
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Task 6.1 Country Reporting (DEA, all partners)
Every participating country (partner) shall supply country information for the reporting and uploading in the database
(i.e. updates of relevant sections to reflect progress in the national EPBD transposition) and lessons learned (as described
under WP6). The responsibility for these reports rests with the National Coordinators and material will be developed as
part of the reporting. In the CA EPBD 6, the reporting will not be done as a onetime update of the reports, but as multiple
smaller adjustments, replacements or additions, each time focusing on specific sections, where significant change is
foreseen.
The KIDs, Key Indicators and Decisions (KI&Ds), will be maintained and further developed in the CA EPBD 6. The
work with external collaboration and hosting, which can allow a more interactive use of these KIDs will continue and
also the development of the database of knowledge where the KIDs are presented and can be combined from country to
country. Especially the BSO and the expected request for reporting for this database should be integrated in the process
on KIDs, where a full integration in the BSO database and/or reporting would be considered to avoid duplication of
work and strengthening of both initiatives.
Countries will further develop confidential material for the reporting including statements on the implementation of the
EPBD and how the CA has helped in this process.
All material from countries will be collected and reviewed through WP6. This includes needed inclusion of comments
from CINEA for some elements. All published elements of the material will go through a simple language check under
WP5 and the handling of the publication will further take place under WP5.
No personal data will be collected under country reporting.
Task 6.2 Central Team Reporting (DEA, all central teams)
Reporting from Central Teams will in general take place under WP2, under the responsibility of each CTM, but all these
reports will also be part of the overall reporting taking place in this Work Package.
The publishable deliverables shall concentrate on the general progress and topics discussed at sessions in Plenary
Meetings. It shall be ensured that contributions are shared with the Central Teams / country coordinators before they are
published for control / approval before these are published. The responsibility for preparing such reports rests with the
Central Team Managers (in WP2), under the leadership of the Coordinator supported by the Management Team.
The public Central Team reports shall adopt similar formats, although some variations may be needed given the breadth
of topics to be covered. These reports will be published and final edited (layout etc.) though the WP6 activities.
The evolving strategic Central Team reports (including all the meeting minutes and reports, the collection of webzines
and news in the Project Centre) will be strictly confidential to the participants, the National Authorities they represent
and the EC.
Internal reporting from Central Teams will include strategic reports, material from sessions and from Working Groups.
All this material will be developed under WP2, WP3 and WP4 but compiled and edited for reporting through WP6.
No personal data will be collected in connection to central team reporting.
Task 6.3 Editor / writer for external reports (DEA)
In general, the Communication Team is responsible for language review and consistency check of external material. This
is also the case with Country and CTM reports. Past experience has, however, shown that there are different skills for
writing from the different teams and countries. This has resulted in a slowdown of the process, which has been increased
by the spread of COVID 19 and the change from physical to virtual meetings. This resulted in delays in delivery of
reports and it has made the process of review of reports more complicated. In the last part of the CAV_EPBD project,
an external writer has been included to help with specific reports. This can either be through review and editing or it
can be a help for the writing and analytic process itself.
This function will give the coordinator the possibility to have some reports go through a more significant editing and
perhaps rewriting of sections or parts, or it could even be allocated to help ensuring that some of the reports come in first
draft, by offering assistance to the crafting process. This will aim to ensure efficient delivery of reports in high quality.
Hopefully, it can also help to reduce the bottleneck of reports to be edited and reviewed by the coordination team in the
very last part of the project. The work of the external writer will mainly be linked to the mentioned reports in task 6.1
& 6.2, but the writer could potentially also be involved in other external deliverables such as 6.4.
Task 6.4 The CA Report (DEA)
A key element in reporting is the CA Report, which will include a report with short statements from participants (collected
23
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
under task 6.1, detailing all the activities undertaken during the CA (participation at meetings, WGs, etc.), as well as
indicating how the CA contributed to an improved implementation and actual application of the EPBD in their country.
Further qualitative statements on the CAs role in connection to national implementation will be collected in focus
interviews conducted by a professional Survey Company. These will target national contacts and other central experts.
These results will be combined with results from CTM reports and other material collected under other Work Programs
(WP2, WP3, WP4 and WP6). Examples shall be compiled in a summary document that may, possibly, be released as
a public document to show the added value of the CA towards the overall goal of an effective EPBD implementation
across the whole of Europe. Publication will depend on approval through the national contacts (Contractors Meeting).
As the information from the CA is specific and highly related to a key audience, the quantitative statements will be
supported by some qualitative assessments showing how well the received information fulfils these specific needs and
satisfy the user (Developed under WP6).
Task 6.5 Further contribution: (DEA / all central teams)
The Coordinator, assisted by the Management Team, will further contribute to the following tasks:
• Contribution to the development of online information systems under CINEA management (e.g. project fact sheets,
reports, slides, electronic deliverables, images) in the quality and form specified;
• Contribution to events, workshops, conferences and publications of the EC related to the EPBD.
• Contribution, upon invitation by the CINEA, to common information and dissemination activities to increase synergies
between, and the visibility of LIFE supported actions.
Task 6.6 Approval Process: (DEA)
Reports for public dissemination will include an approval process, which takes into account comments from CINEA and
for CTM reports from DG ENER. The public material reported to CINEA / DG ENER includes substantial new material
for the database and material presented on the website.
Reports for public dissemination or reporting will be shared with participants in the Central Team under the lead of the
CTM and national contacts will have access to the reports through the project centre for possible commenting / approval,
and a suitable period given for comments, additions and other changes before these are published. The Coordinator will
lead the process with Review and the final approval of all deliverables.
At the discretion and agreement of the WG participants, this executive summary from Working Groups may be prepared
in a publishable format to permit widespread distribution of this section. The remainder of the reports will be strictly
confidential to the participants, the EC and CINEA.
24
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
STAFF EFFORT
Staff effort per participant
Grant Preparation (Work packages - Effort screen) — Enter the info.
Participant WP1 WP2 WP3 WP4 WP5 WP6 Total Person-Months
1 - DEA 39.00 20.75 3.55 35.90 37.50 24.30 161.00
2 - OIB 3.55 0.30 3.85
3 - CSTC 13.50 3.75 0.60 17.85
4 - SEDA 3.55 0.30 3.85
5 - MECI 3.55 0.30 3.85
6 - MIT 2.50 0.30 2.80
7 - BAFA 3.55 0.30 3.85
8 - MEC 1.25 0.30 1.55
9 - CRES 3.55 0.30 3.85
10 - IDAE 1.25 0.30 1.55
11 - MOTIVA 13.50 1.25 0.30 15.05
12 - MTE 3.55 0.30 3.85
13 - MPGI 2.50 0.30 2.80
14 - EMI 2.30 0.30 2.60
15 - SEAI 13.50 3.55 0.30 17.35
16 - ENEA 13.50 2.50 0.30 16.30
17 - LRAM 3.55 0.30 3.85
18 - MEAT 3.55 0.30 3.85
19 - EM 3.55 0.30 3.85
25
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Staff effort per participant
Grant Preparation (Work packages - Effort screen) — Enter the info.
Participant WP1 WP2 WP3 WP4 WP5 WP6 Total Person-Months
20 - MTIC 2.50 0.30 2.80
21 - RVO 3.55 2.05 0.30 5.90
22 - ITB 2.30 0.30 2.60
23 - ADENE 13.50 2.30 0.30 16.10
24 - MLPDA 3.35 0.30 3.65
25 - BOVERKET 3.35 0.30 3.65
26 - TSUS 1.15 0.30 1.45
27 - MZI 3.35 0.30 3.65
Total Person-Months 39.00 88.25 78.20 37.95 37.50 32.40 313.30
26
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
LIST OF DELIVERABLES
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D1.1 Data Management Plan WP1 1 - DEA R — Document, report SEN - Sensitive 4
D1.2 Public presentation on progress of CA 6 WP1 1 - DEA OTHER PU - Public 4
D1.3 Extract LIFE KPIs WP1 1 - DEA OTHER SEN - Sensitive 9
D1.4 Update LIFE KRIs WP1 1 - DEA OTHER SEN - Sensitive 60
D2.1 Plenary Meetings, Agenda and 10 liners WP2 1 - DEA OTHER SEN - Sensitive 4
D2.2 Preparation reports for plenary meeting 01 WP2 1 - DEA R — Document, report SEN - Sensitive 4
D2.3 Preparation reports for plenary meeting 02 WP2 1 - DEA R — Document, report SEN - Sensitive 10
D2.4 Preparation reports for plenary meeting 03 WP2 1 - DEA R — Document, report SEN - Sensitive 16
D2.5 Preparation reports for plenary meeting 04 WP2 1 - DEA R — Document, report SEN - Sensitive 22
D2.6 Preparation material for In-depth workshop WP2 1 - DEA R — Document, report SEN - Sensitive 28
01
D2.7 Preparation reports for plenary meeting 05 WP2 1 - DEA R — Document, report SEN - Sensitive 34
D2.8 Preparation reports for plenary meeting 06 WP2 1 - DEA R — Document, report SEN - Sensitive 40
D2.9 Preparation reports for plenary meeting 07 WP2 1 - DEA R — Document, report SEN - Sensitive 46
27
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D2.10 Preparation material for In-depth workshop WP2 1 - DEA R — Document, report SEN - Sensitive 52
02
D2.11 Evolving strategic reports WP2 1 - DEA R — Document, report SEN - Sensitive 8
D2.12 Public reports from Central Teams (first WP2 1 - DEA R — Document, report PU - Public 36
version)
D2.13 Public reports from Central Teams (second WP2 1 - DEA R — Document, report PU - Public 60
version)
D3.1 Sessions Reports from plenary meeting 01 WP3 1 - DEA R — Document, report SEN - Sensitive 8
D3.2 Sessions Reports from plenary meeting 02 WP3 1 - DEA R — Document, report SEN - Sensitive 14
D3.3 Sessions Reports from plenary meeting 03 WP3 1 - DEA R — Document, report SEN - Sensitive 20
D3.4 Sessions Reports from plenary meeting 04 WP3 1 - DEA R — Document, report SEN - Sensitive 26
D3.5 Material from In-depth workshop 01 WP3 1 - DEA R — Document, report SEN - Sensitive 32
D3.6 Sessions Reports from plenary meeting 05 WP3 1 - DEA R — Document, report SEN - Sensitive 38
D3.7 Sessions Reports from plenary meeting 06 WP3 1 - DEA R — Document, report SEN - Sensitive 44
D3.8 Sessions Reports from plenary meeting 07 WP3 1 - DEA R — Document, report SEN - Sensitive 50
D3.9 Material from In-depth workshop 02 WP3 1 - DEA R — Document, report SEN - Sensitive 56
D3.10 Coordinated Questionnaires WP3 1 - DEA OTHER SEN - Sensitive 4
D3.11 Evaluation of plenaries WP3 1 - DEA R — Document, report SEN - Sensitive 8
28
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D4.1 Topic reports / Working Group results first WP4 1 - DEA R — Document, report SEN - Sensitive 30
set
D4.2 Report on Collaboration with CA EED and WP4 1 - DEA R — Document, report SEN - Sensitive 30
RES
D4.3 Presentation at events / other projects WP4 1 - DEA OTHER PU - Public 30
D4.4 Stakeholder events WP4 1 - DEA OTHER PU - Public 30
D4.5 Topic reports / Working Group results WP4 1 - DEA R — Document, report SEN - Sensitive 60
second set
D5.1 Communication and dissemination plan WP5 1 - DEA R — Document, report SEN - Sensitive 8
D5.2 Updated visual identity templates WP5 1 - DEA OTHER SEN - Sensitive 6
D5.3 Updating website WP5 1 - DEA DEC —Websites, patent PU - Public 6
filings, videos, etc
D5.4 Webzines & Newsflashes WP5 1 - DEA OTHER SEN - Sensitive 8
D5.5 Brochure on impact of CA EPBD WP5 1 - DEA R — Document, report PU - Public 30
D5.6 Brochure on impact of CA EPBD 2 WP5 1 - DEA R — Document, report PU - Public 60
D6.1 Country Information for Database (first part) WP6 1 - DEA R — Document, report PU - Public 36
D6.2 KIDs – Key Indicators & Decisions WP6 1 - DEA R — Document, report PU - Public 36
29
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D6.3 Country Information for Database (second WP6 1 - DEA R — Document, report PU - Public 60
part)
D6.4 Statements from countries on impact of WP6 1 - DEA OTHER PU - Public 60
project
D6.5 Electronic collection of project centre and WP6 1 - DEA OTHER SEN - Sensitive 60
public material
30
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D1.1 – Data Management Plan
Deliverable Number D1.1 Lead Beneficiary 1. DEA
Deliverable Name Data Management Plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 4 Work Package No WP1
Description
A small data management plan setting rules for handling of data with information on partners and experts including the
registration for meetings, webzines and other information. This will include rules and drafts for disclaimers and for the
deletion of material as well during project operation and after completion. The plan will include rules for security and
protection of data as well as access and will ensure the data management is complying with GDPR.
Deliverable D1.2 – Public presentation on progress of CA 6
Deliverable Number D1.2 Lead Beneficiary 1. DEA
Deliverable Name Public presentation on progress of CA 6
Type OTHER Dissemination Level PU - Public
Due Date (month) 4 Work Package No WP1
Description
A set of power points / presentation material will be developed to describe the CAEPBD 6 project and the progress
made. One set of descriptions of the project in general and on different elements on the project, objectives and goals
will be developed shortly after the start of the project. These power points will be used for presentations for external
partners and stakeholders. Sections on outcomes of the CAEPBD 6 project will be updated over the lifetime of the
project to include the results, progress and the new element. One or multiple versions will be kept in the Glasscubes under
management team, easily accessible for all management team. The coordinator is responsible for these power points,
but with support from the communication team and the CTMs for content on development of topics (each delivering
some slides).
Deliverable D1.3 – Extract LIFE KPIs
Deliverable Number D1.3 Lead Beneficiary 1. DEA
Deliverable Name Extract LIFE KPIs
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 9 Work Package No WP1
Description
Extract of project data from the LIFE LPI webtool.
Deliverable D1.4 – Update LIFE KRIs
Deliverable Number D1.4 Lead Beneficiary 1. DEA
Deliverable Name Update LIFE KRIs
31
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 60 Work Package No WP1
Description
Update extract of the project data from the LIFE KPI webtool.
Deliverable D2.1 – Plenary Meetings, Agenda and 10 liners
Deliverable Number D2.1 Lead Beneficiary 1. DEA
Deliverable Name Plenary Meetings, Agenda and 10 liners
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 4 Work Package No WP2
Description
Selection of session topics for plenary meetings and in-depth workshops, development of agenda, objectives and 10 liners
(short summary description of content). Content for opening and closing plenary sessions. Responsible; Management
Team, led by Technical Coordinator, select a list of topics. The Technical Coordinator complements and completes the
agenda, with input from all CTMs for 10 liners for relevant sessions. Each CTM will be responsible for their own set of
objectives and 10 liners. The selection of topics will be agreed with DG ENER and the materiel will take in comments
from DG ENER and CINEA. First reporting for plenary meeting 01 after 4 months. Update of reporting at least every
year (after each 2 additional meetings).
Deliverable D2.2 – Preparation reports for plenary meeting 01
Deliverable Number D2.2 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 01
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 4 Work Package No WP2
Description
Preparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.3 – Preparation reports for plenary meeting 02
Deliverable Number D2.3 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 02
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 10 Work Package No WP2
Description
Preparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
32
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.4 – Preparation reports for plenary meeting 03
Deliverable Number D2.4 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 03
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 16 Work Package No WP2
Description
reparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.5 – Preparation reports for plenary meeting 04
Deliverable Number D2.5 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 04
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 22 Work Package No WP2
Description
Preparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.6 – Preparation material for In-depth workshop 01
Deliverable Number D2.6 Lead Beneficiary 1. DEA
Deliverable Name Preparation material for In-depth workshop 01
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 28 Work Package No WP2
Description
Preparation material for first in-depth workshop. Outlines for program, background information, questions to be
discussed and possible site visits or similar. Material to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Respective CTMs are responsible for material under their Central Team topics and as agreed by
management team.
Deliverable D2.7 – Preparation reports for plenary meeting 05
Deliverable Number D2.7 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 05
33
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 34 Work Package No WP2
Description
Preparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.8 – Preparation reports for plenary meeting 06
Deliverable Number D2.8 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 06
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 40 Work Package No WP2
Description
Preparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.9 – Preparation reports for plenary meeting 07
Deliverable Number D2.9 Lead Beneficiary 1. DEA
Deliverable Name Preparation reports for plenary meeting 07
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 46 Work Package No WP2
Description
Preparation reports for sessions and workshops. Outlines for sessions, material from previous meetings, background
information and questions to be discussed. Session reports to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Each CTM responsible for reports under their Central Team topics and as agreed by management team.
Deliverable D2.10 – Preparation material for In-depth workshop 02
Deliverable Number D2.10 Lead Beneficiary 1. DEA
Deliverable Name Preparation material for In-depth workshop 02
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 52 Work Package No WP2
Description
Preparation material for second in-depth workshop. Outlines for program, background information, questions to be
discussed and possible site visits or similar. Material to be uploaded to Glasscubes at least 2 months before the first
plenary meeting. Respective CTMs are responsible for material under their Central Team topics and as agreed by
management team.
34
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D2.11 – Evolving strategic reports
Deliverable Number D2.11 Lead Beneficiary 1. DEA
Deliverable Name Evolving strategic reports
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 8 Work Package No WP2
Description
Each central team will make an Evolving Strategic Report (CT1-CT9). These reports will serve as a central tool for
the development of topics for selection of sessions as well as keeping trach on sessions held within each Central Team.
Proposals will be collected through an open process from partners, individual experts, in special brainstorms or by
end of sessions. Sessions will further be prioritised in collaboration with national experts / partners. Evolving Strategy
Reports will further include a small description of the Central Team. First version of the Evolving Strategy Report will
be developed as part of the preparation of the first plenary meeting and include proposals for sessions coming from this
meeting. After each plenary meeting / in-depths workshop the evolving reports will be updated to reflect held sessions
and new proposals. CTM working groups will be reported through these reports.
Deliverable D2.12 – Public reports from Central Teams (first version)
Deliverable Number D2.12 Lead Beneficiary 1. DEA
Deliverable Name Public reports from Central Teams (first version)
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP2
Description
Each Central team (Core Team) will develop a report on progress of the work in the team. This will include material
discussed in sessions, but found ready for public dissemination in summary. These reports will focus on outcomes,
lessons learned and recommendations to be given for the implementation of policies for energy performance in buildings
in the area of the work in this particular team. Work done by working groups in connection to the Central Team can
be included in the report. The reports will all follow a similar structure, with the fixed sections. The content in the
individual reports will be coordinated to avoid duplication / overlap through the steering group and through a review by
the Coordinator. DG ENER will get possibility to review these reports. If First version of reports will be delivered after
28 months and then published in database and on website through help from Communication team Work Package 5.
Deliverable D2.13 – Public reports from Central Teams (second version)
Deliverable Number D2.13 Lead Beneficiary 1. DEA
Deliverable Name Public reports from Central Teams (second version)
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 60 Work Package No WP2
Description
Public report on central team works developed under deliverable 2.21 will be updated / complemented by the end of the
CA. These new sections will follow the same stricture as for the first version and mainly happen through added sections.
Individual sections can however also be updated or complemented in this process and all new material will be uploaded
through the database. Each Central Team Manager is responsible for the final report of their team. The communication
team will be responsible for preparation for publishing including layout under Work Package 5.
35
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D3.1 – Sessions Reports from plenary meeting 01
Deliverable Number D3.1 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 01
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 8 Work Package No WP3
Description
Short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
01. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
Work Package 2, but responsibility of each report lies by session leader and the relevant CTMs. Session reports must
be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from sessions such as
presentations and results from possible questionnaires, photos documentation etc. Possible commenting by all session
participants (CA experts and Commission) through Glasscubes, comments to be included in final version.
Deliverable D3.2 – Sessions Reports from plenary meeting 02
Deliverable Number D3.2 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 02
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 14 Work Package No WP3
Description
Short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
02. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
WP2 but responsibility of each report lies by session leader and the relevant CTMs under Work Package 2. Session
reports must be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from
sessions such as presentations and results from possible questionnaires, photos documentation etc. Possible commenting
by all session participants (CA experts and Commission) through Glasscubes, comments to be included in final version.
Deliverable D3.3 – Sessions Reports from plenary meeting 03
Deliverable Number D3.3 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 03
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 20 Work Package No WP3
Description
Short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
03. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
Work Package 2, but responsibility of each report lies by session leader and the relevant CTMs. Session reports must
be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from sessions such as
presentations and results from possible questionnaires, photos documentation etc. Possible commenting by all session
participants (CA experts and Commission) through Glasscubes, comments to be included in final version.
36
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D3.4 – Sessions Reports from plenary meeting 04
Deliverable Number D3.4 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 04
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 26 Work Package No WP3
Description
Short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
04. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
WP2 but responsibility of each report lies by session leader and the relevant CTMs under Work Package 2. Session
reports must be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from
sessions such as presentations and results from possible questionnaires, photos documentation etc.
Deliverable D3.5 – Material from In-depth workshop 01
Deliverable Number D3.5 Lead Beneficiary 1. DEA
Deliverable Name Material from In-depth workshop 01
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 32 Work Package No WP3
Description
Short reports summarizing discussions, outcomes learned from in-depth workshop 01. Report length limited, but can
be linked to further material. Junior rapporteurs assist in reporting under Work Package 2, but responsibility of each
report lies by the relevant CTMs or organisation team. Workshop reports must be uploaded to Glasscubes at the latest 2
months after the in-depth workshop, together with material from sessions such as presentations and results from possible
questionnaires, photos documentation etc. Possible commenting by all participants (CA experts and Commission)
through Glasscubes, comments to be included in final version.
Deliverable D3.6 – Sessions Reports from plenary meeting 05
Deliverable Number D3.6 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 05
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 38 Work Package No WP3
Description
short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
05. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
WP2 but responsibility of each report lies by session leader and the relevant CTMs under Work Package 2. Session
reports must be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from
sessions such as presentations and results from possible questionnaires, photos documentation etc. Possible commenting
by all session participants (CA experts and Commission) through Glasscubes, comments to be included in final version.
37
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D3.7 – Sessions Reports from plenary meeting 06
Deliverable Number D3.7 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 06
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 44 Work Package No WP3
Description
Short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
05. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
Work Package 2, but responsibility of each report lies by session leader and the relevant CTMs. Session reports must
be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from sessions such as
presentations and results from possible questionnaires, photos documentation etc. Possible commenting by all session
participants (CA experts and Commission) through Glasscubes, comments to be included in final version.
Deliverable D3.8 – Sessions Reports from plenary meeting 07
Deliverable Number D3.8 Lead Beneficiary 1. DEA
Deliverable Name Sessions Reports from plenary meeting 07
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 50 Work Package No WP3
Description
Short reports summarizing discussions, outcomes and lessons learned from each session / workshop of plenary meeting
07. Report length limited to 10 pages, but can be linked to further material. Junior rapporteurs assist in reporting under
WP2 but responsibility of each report lies by session leader and the relevant CTMs under Work Package 2. Session
reports must be uploaded to Glasscubes at the latest 2 months after the plenary meeting, together with material from
sessions such as presentations and results from possible questionnaires, photos documentation etc.
Possible commenting by all session participants (CA experts and Commission) through Glasscubes, comments to be
included in final version.
Deliverable D3.9 – Material from In-depth workshop 02
Deliverable Number D3.9 Lead Beneficiary 1. DEA
Deliverable Name Material from In-depth workshop 02
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 56 Work Package No WP3
Description
Short reports summarizing discussions, outcomes learned from in-depth workshop 02. Report length limited, but can
be linked to further material. Junior rapporteurs assist in reporting under Work Package 2, but responsibility of each
report lies by the relevant CTMs or organisation team. Workshop reports must be uploaded to Glasscubes at the latest 2
months after the in-depth workshop, together with material from sessions such as presentations and results from possible
questionnaires, photos documentation etc. Possible commenting by all participants (CA experts and Commission)
through Glasscubes, comments to be included in final version.
38
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D3.10 – Coordinated Questionnaires
Deliverable Number D3.10 Lead Beneficiary 1. DEA
Deliverable Name Coordinated Questionnaires
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 4 Work Package No WP3
Description
Coordinated questionnaires for each CA Plenary Meeting. Sent to national coordinators to distribute and collect answers
on behalf of partner / MS. Handled through electronic system e.g. Survey Monkey. Sent to national coordinators
approximately 2 months before the plenary meeting. Aiming to reduce workload, by reuse of results and answers and
through high quality of questions / choices. Reporting to be updated annually.
Deliverable D3.11 – Evaluation of plenaries
Deliverable Number D3.11 Lead Beneficiary 1. DEA
Deliverable Name Evaluation of plenaries
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 8 Work Package No WP3
Description
Evaluation of satisfaction with CA plenaries and individual sessions. Survey is done electronically through Survey
Monkey and sent to all participants. Questionnaires can include general issues such as communication and dissemination,
preparation material, selection of topics or general issues for the CA EPBD. Evaluation in electronic questionnaires can
be replaced or complemented by electronic voting or other medias. First evaluation results 2 month after first plenary
meeting and following after each plenary meeting of the CA. Reporting to be updated annually.
Deliverable D4.1 – Topic reports / Working Group results first set
Deliverable Number D4.1 Lead Beneficiary 1. DEA
Deliverable Name Topic reports / Working Group results first set
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 30 Work Package No WP4
Description
Working groups will develop material for sessions at plenary meetings and workshops. Each topic or joint working group
will also develop a final report with a small description of the work, lessons learned and other material developed by the
working groups. For CTM working groups the report from the working group can be integrated in the evolving strategic
report (deliverable 2.1), for other working groups this must be an independent report based on a template developed
under communication and based on general guidelines approved by the Management Team.
First set of reports are expected to be finalised by end of first half of the CAV. Number of working groups in the CA
will depend on the requests and interests by national experts. The deliverable is meant to report activities which do not
naturally fall under the CTM teams and the level of reporting especially in the first part will depend on interest but also
on how fast such groups are formed.
39
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D4.2 – Report on Collaboration with CA EED and RES
Deliverable Number D4.2 Lead Beneficiary 1. DEA
Deliverable Name Report on Collaboration with CA EED and RES
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 30 Work Package No WP4
Description
Collaboration between the three CA projects; CA EED, CA RES and CA EPBD, becomes more and more critical as
the directives expand as they become a supporting element for the FIT for 55 package. Some elements are mentioned in
multiple directives or are set as targets in one and implemented in another. This means increased collaboration, which can
be through joint working groups, joint sessions, collaborative meetings or interaction on management team / coordinator
level. Activities will be reported first after half of CA and then by the end of the project.
Deliverable D4.3 – Presentation at events / other projects
Deliverable Number D4.3 Lead Beneficiary 1. DEA
Deliverable Name Presentation at events / other projects
Type OTHER Dissemination Level PU - Public
Due Date (month) 30 Work Package No WP4
Description
Presentation sat other events or for other projects, organisations or groups is an important part of the dissemination of
results from the CA EPBD. This can either be on an European level or beyond EU, for instance through collaboration
with other organisations or collaborations such as IEA and UNEP. For projects especially, other EU funded projects
under Horison 2020 or LIFE.
Deliverable D4.4 – Stakeholder events
Deliverable Number D4.4 Lead Beneficiary 1. DEA
Deliverable Name Stakeholder events
Type OTHER Dissemination Level PU - Public
Due Date (month) 30 Work Package No WP4
Description
Stakeholder events will be held in connection to CA plenaries or as individual meetings or web events. Material
developed in connection to such events, presentations and possible recordings if meetings is transmitted over the web
will be presented / uploaded to the website and reported through news items. Open events could be linked to collaboration
for instance with the BSO.
Deliverable D4.5 – Topic reports / Working Group results second set
Deliverable Number D4.5 Lead Beneficiary 1. DEA
Deliverable Name Topic reports / Working Group results second set
40
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 60 Work Package No WP4
Description
or joint working group will also develop a final report with a small description of the work, lessons learned and other
material developed by the working groups. For CTM working groups the report from the working group can be integrated
in the evolving strategic report (deliverable 2.1), for other working groups this must be an independent report based on
a template developed under communication and based on general guidelines approved by the Management Team.
Second set of reports are expected to be finalised by end of the CAV. Number of working groups in the CA will depend
on the requests and interests by national experts. The deliverable is meant to report activities which do not naturally
fall under the CTM teams and the level of reporting. Second reporting will include those working groups not reported
in first part.
Deliverable D5.1 – Communication and dissemination plan
Deliverable Number D5.1 Lead Beneficiary 1. DEA
Deliverable Name Communication and dissemination plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 8 Work Package No WP5
Description
The CAV EPBD will develop and implement a clear communication and dissemination strategy to support CA
participants (appointed national policy makers) in exchanging views in a closed environment, while reaching out to
disseminate the public results of the work to other interested parties and, potentially, collect their feedback. The dedicated
communication and dissemination plan, will identify per target group, the correct means, considering their frame of
interaction as indicatively presented below: A. CA participants (designated national EPBD policy makers from 27
countries, >200 non-permanent representatives). B. Policy makers at EU level. C. European stakeholder organisations of
the energy/construction sector, including professional associations, industry federations, research institutions, consumer
associations. D. National Authorities and Agencies involved in energy efficiency in buildings policy, legislation,
implementation. E. National stakeholders organisations, such as professional associations, technical chambers, industry
federations, research institutions, consumer associations, think tanks, banks and insurance companies, F. Individual
professionals interested in the broader EU policy field.
Deliverable D5.2 – Updated visual identity templates
Deliverable Number D5.2 Lead Beneficiary 1. DEA
Deliverable Name Updated visual identity templates
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 6 Work Package No WP5
Description
Following the Communication Plan, the CA EPBD 6 will adapt all types of formats of public material, to ensure a visual
identity, to be applied consistently to all types of formats of public material, including website, database, factsheets
& reports, power point presentations, backdrop slides, event flyers, webzine, etc. Rules for the proper use of the new
identity, including logo variations, fonts, color pallets, as well as the EU banner and legal disclaimers, will be set out in an
Identity Charter which is updated in relation to previous CA EPBD. This task also includes the development of standard
templates for reports, power point presentations, backdrop slides, event flyers, webzines and other deliverables. CA
participants and in particularly the Management Team and Central Teams will be obliged to follow the Identity Charter.
41
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D5.3 – Updating website
Deliverable Number D5.3 Lead Beneficiary 1. DEA
Deliverable Name Updating website
Type DEC —Websites, patent Dissemination Level PU - Public
filings, videos, etc
Due Date (month) 6 Work Package No WP5
Description
The CA EPBD website (http://www.epbd-ca.eu) will be updated to reflect the new project CA EPBD 6 and also the
new structure of central teams. Its main objective is to communicate the work of the CA EPBD and its objectives, as
well as major developments around the related CA's (CA RES, CA EED). Website content will be regularly updated
according to a process of approval and quality control that will be defined in this task. The website will disseminate
the results of CAEPBD 6 as well as keeping results from the previous CAs EPBD 1, 2, 3, IV and V. The website will
include the public version of the Database consolidating the main structured outputs of the CA EPBD as well as a historic
archive on reports and material. The website for CA EPBD will also serve as a central point for entering the internal
online project centre (Glasscubes). The website adaptation will include appropriate security measures as well as keeping
it usable on mobile devices.
Deliverable D5.4 – Webzines & Newsflashes
Deliverable Number D5.4 Lead Beneficiary 1. DEA
Deliverable Name Webzines & Newsflashes
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 8 Work Package No WP5
Description
The webzine will continuously inform CA experts on the development of the CAV EPBD progress and will be a
main information for meetings giving all participants information on agenda, content on sessions, results and practical
information. The webzine will come out 2-3 months before plenaries. Results and outcomes will be communicated either
as Webzines or as Newsflahes. First version will come in Month 4 and webzines will follow continuously through the
whole CA project with 3-4 versions of webzine or newsflash per year or at least 2 per plenary meeting. After first version
the deliverable will be updated at least once every year.
Deliverable D5.5 – Brochure on impact of CA EPBD
Deliverable Number D5.5 Lead Beneficiary 1. DEA
Deliverable Name Brochure on impact of CA EPBD
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 30 Work Package No WP5
Description
The CA EPBD will prepare material on the progress of the project. This could be in form of a brochure, a small report
or info graphics or other formats. This will give outside stakeholders a possibility to get a feeling of the work of the CA
EPBD and to gain information on the progress. A first version will be done before the end of first half of the project and
a second or updated version will be at the end of the project. Further details and the form will be developed as part of
the communication plan mentioned in deliverable 5.1.
42
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D5.6 – Brochure on impact of CA EPBD 2
Deliverable Number D5.6 Lead Beneficiary 1. DEA
Deliverable Name Brochure on impact of CA EPBD 2
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 60 Work Package No WP5
Description
The CA EPBD will prepare material on the progress of the project. This could be in form of a brochure, a small report
or info graphics or other formats. This will give outside stakeholders a possibility to get a feeling of the work of the CA
EPBD and to gain information on the progress. A first version will be done before the end of first half of the project and
a second or updated version will be at the end of the project. Further details and the form will be developed as part of
the communication plan mentioned in deliverable 5.1.
Deliverable D6.1 – Country Information for Database (first part)
Deliverable Number D6.1 Lead Beneficiary 1. DEA
Deliverable Name Country Information for Database (first part)
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP6
Description
Collection of information from partners on progress with implementation of the EPBD, country reports, will built directly
on the existing database in Atlassian Confluence, which are available on the website. The update will take place in one
or more parts, where countries are asked to give additional information on current status for the implementation. This
information can be updating some existing sections, it can be replacing existing sections or it can be one or more new
sections for new elements included in the EPBD. Examples could be general updating for new developments, section
on MEPs or replacement of elements on Long Term Renovation Plans with new Renovation Action Plans. At least one
request for update will be done in first half of the project. Information will be available in database and as pdf.
Deliverable D6.2 – KIDs – Key Indicators & Decisions
Deliverable Number D6.2 Lead Beneficiary 1. DEA
Deliverable Name KIDs – Key Indicators & Decisions
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP6
Description
The Key Indicators and Decisions (KIDs) will be maintained and updated in the CA EPBD project. This process will
be done in smaller pieces where some indicators or description of decisions could be added, updated, changed or even
replaced each time. Perhaps some central indicators could even be updated multiple times during the project. Then CA
EPBD 6 project will search for increased visibility and use of the KIDs through collaboration with other platforms such
as the Building Stock Observatory or the IEA datahub. Updating of KIDs could potentially be replaced by reporting to
the BSO or by full integration in this platform.
43
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Deliverable D6.3 – Country Information for Database (second part)
Deliverable Number D6.3 Lead Beneficiary 1. DEA
Deliverable Name Country Information for Database (second part)
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 60 Work Package No WP6
Description
Collection of information from partners on progress with implementation of the EPBD, country reports, will built directly
on the existing database in Atlassian Confluence, which are available on the website. The update will take place in one
or more parts, where countries are asked to give additional information on current status for the implementation. This
information can be updating some existing sections, it can be replacing existing sections or it can be one or more new
sections for new elements included in the EPBD. Examples could be general updating for new developments, section
on MEPs or replacement of elements on Long Term Renovation Plans with new Renovation Action Plans. At least one
request for update will be done in second half of the project. Information will be available in database and as pdf.
Deliverable D6.4 – Statements from countries on impact of project
Deliverable Number D6.4 Lead Beneficiary 1. DEA
Deliverable Name Statements from countries on impact of project
Type OTHER Dissemination Level PU - Public
Due Date (month) 60 Work Package No WP6
Description
At the end of the CA EPBD 6 project statements will be collected from experts, national contacts and management team
on how the project has succeeded in its main objectives. The result will be collected to a small report or other information
material to document the results of the project.
Deliverable D6.5 – Electronic collection of project centre and public material
Deliverable Number D6.5 Lead Beneficiary 1. DEA
Deliverable Name Electronic collection of project centre and public material
Type OTHER Dissemination Level SEN - Sensitive
Due Date (month) 60 Work Package No WP6
Description
At the end of the CAV EPBD project all material developed in the project including the material in Glasscubes,
the website other publications and material will be uploaded to a CD rom and sent to CINEA as part of the final
documentation.
44
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
LIST OF MILESTONES
Milestones
Grant Preparation (Milestones screen) — Enter the info.
Milestone Milestone Name Work Package No Lead Beneficiary Means of Verification Due Date
No (month)
1 Plenary Meeting 01 WP2, WP3 1-DEA Session reports uploaded. 6
2 Plenary Meeting 02 WP2, WP3 1-DEA Session reports upoaded. 12
3 Plenary Meeting 03 WP2, WP3 1-DEA Session reports uploaded. 18
4 Plenary Meeting 04 WP2, WP3 1-DEA Session reports uploaded. 24
5 In-depth workshop 01 WP2, WP3 1-DEA Workshop reports uploaded. 30
6 Plenary meeting 05 WP2, WP3 1-DEA Session reports uploaded. 36
7 Plenary meeting 06 WP2, WP3 1-DEA Session reports uploaded. 42
8 Plenary meeting 07 WP2, WP3 1-DEA Session reports uploaded. 48
9 In-depth workshop 02 WP2, WP3 1-DEA Workshop reports uploaded. 54
10 Website updated WP2, WP1, WP5 1-DEA CA EPBD 6 is integrated in the website 5
11 Database updated WP2, WP6, WP1, 1-DEA New CTM reports and new elements on country 36
WP5 reports are included in the Database of content.
12 Database updated final WP2, WP6, WP1, 1-DEA Database updated with final CTM reports and 60
WP5 sections fo the country reports added / updated.
45
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
LIST OF CRITICAL RISKS
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
1 As implementation progress and the needs change WP2, WP3 A flexible structure has been planned for central teams, which can adapt to new needs and
this could result in less impact of the CA’s over time. national experts are involved in working group, which influence the selection and develop
With change in directive the focus of countries shifts topics for sessions. Content of central teams are not fully fixed for the whole CA EPBD 6
towards new needs. Unless the CA is adapted to new and gives better possibility to adapt to changes.
needs the impact of the CA could be significantly
reduced. This is likely to happen.
2 For many elements of the EPBD directive most WP2, WP3 More focus on deeper workshops, giving possibility to go more in detail and more interaction
countries have systems in place, and there is less between national teams depending on different organisations. Flexibility in structure giving
focus on development of new systems and more possibility to adapt and focus on longer sessions in order to do deeper in different solutions.
on specific details, which becomes obvious during Focus on fewer and longer sessions (double sessions).
the implementation. Countries could therefore be
reluctant to learn from other organisations in other
countries.
3 As the whole EPBD becomes more complex by each WP2, WP3, WP4 With 2 annual meetings a structure we be searched where the meetings could be more
revision and as many details are covered by the latest thematic or better adapted to be covered by only 3 experts. The more frequent meetings
revisions, including funding, fuel poverty, complex should also lead to that less than 18 parallel sessions at each meeting. If more sessions
lifecycle calculations or electro mobility it can be are added they should support the existing element an to a higher degree aim at the same
difficult for many organisations to find 3 experts expertise. More sessions should become double sessions or at least linked sessions. Some
that can cover all areas at one meeting if these are elements could perhaps also be better planned at individual workshops or in collaboration
covering the whole spectrum. with the other CAs to ensure the right participation.
4 Unforseen events such as mutations of the COVID WP3 More frequent meetings are planned and time is foreseen for the time of the year where the
19 virus, a new pandemic or other events, could travel restrictions has been smaller in in COVID 19 pandemic. In case meetings will need to
make prysical meetings impossible and this would be cancelled due to such reasons structure and timing will be adapted as much as possible
impact the impact whcih can be achieved by the CA in order to gather experts.
EPBD project as it was seen in the CA EPBD v and
from the other CA's.
5 As the project starts the final revision of the EPBD WP2, WP4 The structure of the CA is made more flexible through the system of central teams adopted
46
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
directive is not known. The new elements of the to the four main areas of new focus areas and some overlaps. Increased collaboration and use
directive are the ones with the highest potential for of working groups make it possible to take up new topics. Topic leads are further a flexible
learning from first movers or from different options. structure which can help to raise new elements, not foreseen in the originally structure.
At the same time this can lead to different workload This will request more collaboration between teams. Increased collaboration with CA EED
for the central teams. This is likely to happen, but and CA RES is foreseen. The share between teams will be revised through the CA EPBD 6.
impact can be reduced through flexibility.
6 It has in the past been very difficult to collect inputs WP5 A more flexible structure has been planned where elements in the database can be uploaded
for the reporting from Countries as well as to run the and updated instead of needing all sections to be published in one go (as one printed book).
review process and this tends to intensify because Further the review process has been made simpler and also a reduced need for contribution
of an increasing pressure of many of the national from each country at the time.
experts. This as lead to significant delays on the A possibility of having the country sections to be updated in multiple smaller updates will be
book in the past. Some individual elements can considered. As example focusing on adding one or a few sections or a clean update of existing
delay the overall outcome. As the implementation is material instead of a complex new version. The possibility of having external writing / editing
done by different parts of the organisations or even support will also be investigated in the CA EPBD 6 as this was very successful in the CA
by different organisations and not only by the CA EPBD V project.
partner itself. It is likely that similar issues will exist
also in CA EPBD 6, but impact will be smaller as
structure of reporting is changed.
7 It has in CA IV & V been difficult to collect the WP6 A process with focus on “mandatory spread sheets” for country economic reports has been
national contributions for the periodic economic foreseen for CA V reporting, making it easier for the coordination to push for reporting
reporting and process has been little transparent, and also to support the countries. Similar a boost on the economy support is foreseen in
because of the new use of reporting directly in comparison with CA IV and the first half of the CA V project.
the ECAS portal. This can impact some key
deliverables, such as content database and KIDs,
significantly and must be foreseen.
8 In the recent year inflation has increased WP2, WP3, WP4 The costs for flying and the costs for hotels will be evaluated and it will be checked if the
significantly and in particular there is an increase maximum levels should be changed to average levels or if they need to be increased. In case
in flight tickets at the same time as options to fly this would lead to lack of funding it will be considered to make more meetings virtual e.g.
has decreased. This could lead to that experts and the last In-depth workshop or more meetings. It will however be aimed that this does not
management team cannot keep flight and hotel costs account for multiple meetings in a row as this seems to reduce the impact of the CA EPBD.
47
Project: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
below 1000 € for plenary meetings and 900 € for
management team meetings.
48
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Programme for the Environment and Climate
Action (LIFE)
Description of the Action (DoA)
Part B
(LIFE Standard SAPs and OAGs)
Version 2.0
14 November 2022
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
History of Change
Change # Change Date Place
V1.0 Initial version. (1.0) 29.06 2022
V2.0 Grant Preparation first version. (2.0) 22.09 2022
1 ESR comment: 22.09 2022 Annex 1 Part A,
WP2, just before
The definition of CTs could have been more detailed as regards important the description of
elements, e.g. building inspections, digital logbooks, data task 2.1.
collection/exchange/databases, the EU taxonomy and state aid policy.
Consortium reply:
Some new sections have been introduced under work package 2 to
describe the need for knowing the revised EPBD better before the work of
these teams are fully decided. This will include link to articles in the final
version of the directive.
2 ESR comment: 22.09 2022 Annex 1 Part A,
WP2, just before
The inter-linkages between the various CTs could have been better the description of
highlighted, for example as regards EPCs, renovation passports and the
task 2.1.
SRI. Once the new EPBD is adopted, the proposal should look into
visualizing the relations between CTs and the articles of the Directive.
Consortium reply:
Similar to the point above. This has been inserted just before the
description of tasks in WP2.
3 ESR comment: 22.09 2022 Annex 1, Part B,
1.4 Concept and
The procedures to identify the topics for technical sessions and to collect
methodology
input from and engage partners not represented in the Management
Team are not sufficiently detailed.
Consortium reply:
Sections have been included under Parallel Sessions and Plenary
Meetings to describe such options.
4 ESR comment: 22.09 2022 Annex 1, Part B,
1.4 Concept and
Regarding the structure of the Plenary Meetings, the proposal is methodology
encouraged to develop a structure that truly allows for interaction and
informal exchanges.
Consortium reply:
A section has been included under Parallel Sessions.
5 ESR comment: 22.09 2022
The proposal should also consider indicators reflecting the impacts on
implementing policies and measures, including references in policy
documents/impact assessments, or testimonials who would confirm
impacts on implementation processes and documents.
Consortium reply:
Concerted Action EPBD is strongly integrated in the implementation
process as the key actors are deeply involved in the project. It has
therefore been found difficult to provide indicators which could reflect
what would have happened if the CA EPBD did not exist. Quantitative
documentation for the impact would therefore relate to session reports,
number of presentations, questions analyses in questionnaires, number
1
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
of countries or experts participating in meetings (as described in
deliverables …). A more qualitative documentation of the impact will be
made through key statements from each of the participating organisations
/ experts and through surveys such as Poll Everywhere at plenary
meetings.
6 ESR comment: 22.09 2022 Annex 1 Part A,
WP 6,
There is no sufficient quantification of the public factsheets on best Communication
practice, which could further support the impact of the proposed action. Plan
Consortium reply:
Factsheets have been removed from WP6 and integrated in the work on
the communication plan, as factsheets are one of the elements that will
be handled as part of this plan.
7 ESR comment: 22.09 2022 Annex 1 Part A,
Deliverables D4.1
In WP4, it is not sufficiently clear what some of the activities aim to to D4.8
achieve, notably Task 4.1 and Task 4.2 and how they interact.
Consortium reply:
Task 4.1 and 4.2 have been combined into one section on working
groups and study groups. Now task 4.2 as task 4.2 on Topic Leads has
been made section 4.1. Whole section with tasks 4.1 to 4.8 has been
separated in 3 set of activities each with indication of specific aims.
8 ESR comment: 22.09 2022 Annex 1 Part A,
WP2,
In WP2, the central database with questionnaires (support function 1) questionnaires
needs to be better explained.
Consortium reply:
More details have been added under WP2, focusing on possibilities to
register questions and list of countries having answered.
9 ESR comment: 22.09 2022
The opportunity to streamline these should not be missed e.g. by
developing a single integrated IT platform or at the very least to ensure
interoperability.
Consortium reply:
Some elements such as listing of questionnaires will be linked to
Glasscubes and will be accessible for CTMs and perhaps all CA experts,
while other elements will be for the coordination only or they need to be
handled in a system with very limited / controlled access such at e.g.
register of participating experts. It will therefore be quite different
systems, but integration and similarity in user interface will be searched
as much as possible. Text has been adjusted under the individual
elements.
10 ESR comment: 22.09 2022 Annex 1 Part A,
Deliverable D2.1,
The proposal should explore merging or bundling some of the Mile Stones
deliverables to improve consistency.
Consortium reply:
Agendas and 10 lines have been combined into one deliverable D2.1 and
deliveries on uploading and finalizing material in database and website
has been transformed into a few Milestones (combining results of multiple
WPs)
11 ESR comment: 22.09 2022 Annex 1 Part A,
Deliverable D4.2
It is also unclear what material will be collected for D4.2.
2
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Consortium reply:
Material collected under this deliverable is depending on what type of
activity. In joined workshops or joint working groups the material will be
similar to the internal workshops and working groups, but adjusted to fit
with relevant CAs. For general collaboration it will be included in different
work or outcomes. The main deliverable under D4.2 is therefore a report,
summarising these activities and outcomes. D4.2 is adjusted to clarify this
reporting.
12 ESR comment: 22.09 2022 Annex 1 Part A,
Deliverable D6.1,
It is very positive that only relevant sections of the country reports (D6.1) D6.2 and D6.3.
will be updated, but this should preferably be done on a rolling basis
rather than only once during the project lifetime.
Consortium reply:
D6.1, D6.2 and D6.3 as well as Work Package 6 description has been
updated to reflects that elements could be updated in multiple but each
smaller piece only considering some of the sections. The link to BSO is
further strengthened as this could also influence towards and more
periodic updating of some elements.
13 ESR comment: 22.09 2022 Annex 1 Part B,
4.1 Setup of the
The management of the action appears rather rigid, with an exceptionally project
strong role of the overall coordinator and a management team that
oversees all main processes and decisions. The proposal does not
sufficiently detail how the partners outside this inner circle are involved in
decision-making.
Consortium reply:
Text on the contractors meeting has been included in the section 4.1 on
setup of the project as well as possibilities of influence on the selection of
topics or sessions has been included multiple places under WP2
(Evolving Strategy Reports) and throughout the description of the
structure and organization.
14 ESR comment: 22.09 2022 Annex 1 Part A,
WP2, months of
Where the allocation should reflect the fact that some Central Team work
Managers are outsourced.
Consortium reply:
The months of work has been adjusted to reflect the outsourcing of CTM
roles etc.
15 ESR comment: 22.09 2022 Annex 1 Part A,
WP4, task 4.7 and
The use of resources for international collaboration should be carefully 4.8
weighed against the benefits to support the implementation of the EPBD
in the Member States and Norway.
Consortium reply:
Text on tasks 4.7 and 4.8 on international collaboration has been
clarified.
16 ESR comment: 22.09 2022 Annex 1 Part B,
4.3 Green
The proposal should consider environmentally friendly forms of Management
transportation and accommodation when organising CA meetings.
Consortium reply:
A section on transport has been added under 4.3 Green Management.
3
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
17 CINEA comment: Annex 1 Part A,
WP1, task no 1.8.
Please include the following in WP1:
Task no 1…: Common LIFE program activities. Contribute, upon
invitation by the Agency, to common activities related to information (like
reporting on impact indicators), dissemination and visibility, and synergies
with other LIFE and EU supported actions.
Consortium reply:
Included in WP1 as task 1.8. Travel included as part of the 30 travels for
other events below.
18 CINEA comment: Annex 1 Part A,
WP1, deliverables
Please include the following deliverables in WP1: D1.3 and D1.4.
• ‘Extract of the project data from LIFE KPI webtool’ by month 9.
• ‘Update extract of the project data from LIFE KPI webtool’ by
M60.
Consortium reply:
Included in WP1 as deliverables D1.3 and D1.4.
19 CINEA comment: Annex 1 Part A,
WP1, deliverables
A brief description of each deliverable needs to be provided, including and WPs
format and language.
Consortium reply:
Text for each deliverable is included as part of these descriptions.
20 CINEA comment: Throughout all
documents /
Please check systematically that acronyms of participants in Part B and in annexes and in
the detailed budget (Excel file) are identical to those in Part A (e.g. those ECAS portal.
automatically generated by the system).
Consortium reply:
All acronyms have been adapted in collaboration with relevant partners
and documents have been adjusted to include consistent acronyms for
partners
21 CINEA comment: Annex 1 part B.
Please add the annex with the description of beneficiaries at the end of
Part B (this will become Section 5 – Composition of the consortium).
Consortium reply:
Added to annex 1 part B.
4
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
TABLE OF CONTENTS
1. RELEVANCE ....................................................................................................................................................................2
1.1 Background and general project objectives ...............................................................................................................2
1.2 Specific project objectives...........................................................................................................................................3
1.3 Compliance with LIFE programme objectives and call topic .....................................................................................4
1.4 Concept and methodology ..........................................................................................................................................5
1.5 Upscaling results of other EU funded projects ...........................................................................................................8
1.6 Complementarity with other actions ...........................................................................................................................9
1.7 Synergies and co-benefits with other LIFE sub-programmes .................................................................................10
1.8 Synergies and co-benefits with other EU policy areas ............................................................................................10
2. IMPACT ...........................................................................................................................................................................11
2.1 Ambition of the impacts .............................................................................................................................................11
2.2 Credibility of the impacts ...........................................................................................................................................12
2.3 Sustainability of project results .................................................................................................................................13
2.4 Exploitation of project results ....................................................................................................................................13
2.5 Catalytic potential: Replication and upscaling ..........................................................................................................15
3. IMPLEMENTATION ........................................................................................................................................................15
3.1 Work plan ..................................................................................................................................................................15
3.2 Stakeholder input and engagement..........................................................................................................................16
3.3 Timetable (n/a for stage 1) ........................................................................................................................................18
3.4 Impact monitoring and reporting ...............................................................................................................................19
3.5 Communication, dissemination and visibility ............................................................................................................19
4. RESOURCES..................................................................................................................................................................22
4.1 Consortium set-up .....................................................................................................................................................22
4.2 Project management .................................................................................................................................................23
4.3 Green management ..................................................................................................................................................25
5. MEMBERS OF THE CONSORTIUM .............................................................................................................................25
5.1 DEA / DK (DENMARK) 01 ........................................................................................................................................25
5.2 OIB / AT (AUSTRIA) 02 ............................................................................................................................................26
5.3 CSTC / BE (BELGIUM) 03 ........................................................................................................................................27
5.4 SEDA / BG (BULGARIA) 04 .....................................................................................................................................30
5.5 MECI / CY (CYPRUS) 05..........................................................................................................................................31
5.6 MIT / CZ (CZECH REPUBLIC) 06 ............................................................................................................................32
5.7 BAFA / DE (GERMANY) 07 ......................................................................................................................................33
5.8 MEC / EE (Estonia) 08 ..............................................................................................................................................34
5.9 CRES / EL (GREECE) 09 .........................................................................................................................................35
5.10 IDAE / ES (SPAIN) 10 .............................................................................................................................................37
5.11 MOTIVA / FI (FINLAND) 11 ....................................................................................................................................38
5.12 MTE / FR (FRANCE) 12 .........................................................................................................................................40
5.13 MPGI / HR (CROATIA) 13 ......................................................................................................................................41
5.14 EMI / HU (HUNGARY) 14 .......................................................................................................................................43
5.15 SEAI / IR (IRELAND) 15 .........................................................................................................................................44
5.16 ENEA / IT (ITALY) 16 ..............................................................................................................................................45
5.17 LRAM / LT (LITHUANIA) 17 ...................................................................................................................................46
5.18 MEAT / LU (LUXEMBOURG) 18 ............................................................................................................................47
5.19 ME / LV (LATVIA) 19...............................................................................................................................................48
5.20 MTIC / MT (MALTA) 20 ...........................................................................................................................................49
5.21 RVO / NL (NETHERLANDS) 21 .............................................................................................................................49
5.22 ITB / PL (POLAND) 22 ............................................................................................................................................51
5.23 ADENE / PT (PORTUGAL) 23................................................................................................................................52
5.24 MLPDA / RO (ROMANIA) 24 ..................................................................................................................................54
5.25 BOVERKET / SE (SWEDEN) 25 ............................................................................................................................55
5.26 TSUS / SK (SLOVAKIA) 26 ....................................................................................................................................56
5.27 MZI SL (SLOVENIA) 27 ..........................................................................................................................................57
28 NVE NO (NORWAY) Associated Partner..................................................................................................................58
1
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
1. RELEVANCE
1.1 Background and general project objectives
Background and general project objectives
Buildings are responsible for approximately 40 % of the final energy consumption and 36 % of energy-
related greenhouse gas emissions in the European Union. Buildings therefore need to contribute
significantly to the climate mitigation and reduction targets of the EU.
Buildings energy performance is regulated in multiple European Union Directives and in particular in the
Energy Performance of Buildings Directive 2018/844/EU. However, most of the provisions are left for
implementation by the individual Member States and there is significant room for national adaptation.
Since buildings are complex and since there are many actors involved in this sector, a large potential is
still untapped in this field. The implementation of policies, and specifically the different elements of the
EPBD, vary significantly between Member States.
The main objective of the Concerted Action EPBD is to support a full and efficient implementation of the
EPBD Directive in all Member States and beyond. The aim is to accelerate this process through exchange
of good and bad experiences in all Member States. By acting as a forum for information exchange, the
CA allows participating countries to develop new and more effective solutions and discuss pros and cons
of specific approaches.
It is also the aim of the project to help countries converge towards common and efficient solutions, where
experiences from all Member States can help improving existing approaches and create additional
savings by lessons learned across Europe. By learning from mistakes and successes of other Member
States, the project helps countries develop efficient solutions, which are in some ways similar but still
adapted to the national circumstances. This leads to convergence without the issues of malfunction due
to special national circumstances, which could be the issue of a full harmonisation.
When new provisions come into place, for instance through a revision of the directives, the CA EPBD will
support a faster and more efficient implementation through the sharing of knowledge on best practices
and experiences with the first implementation. This way all Member States can learn from success stories
as well as they can learn from less successful implementations or challenges in other countries. This way
the project aims to speed up the full implementation of provisions and support a higher impact.
Although the project in many areas focus on interaction between Member States, it also supports the
communication between the European Commission (DG ENER) and the Member States and it creates
room for informal dialogue between all parties involved in the implementation of the EPBD. It further
attempts to make the most benefit from other projects financed by the EU, research done by its institutions
as well as lessons learned by stakeholders or organisations.
In many countries, the national team involved in a specific area of the EPBD Directive is small but in other
cases, the national teams could be of one or a few persons for a specific topic. Through the Concerted
Action, these people are then brought together across Europe with the aim to create a larger environment
where solutions can be discussed among experts having the same issues to solve or the same challenges.
To achieve its main targets, the Concerted Action brings together key experts involved in the
implementation of the EPBD from all Member States. A central part of this is done through the Concerted
Action Plenary Meetings, In-depth Workshops or Study Tours, where each Member State is allowed to
send a group of experts (typically 3 from each partner at Plenary Meetings). At these meetings, experts
learn from best practices, challenges and solutions in all other Member States. As this happens in a
confidential environment with many interactive and informal elements, it becomes possible to learn as well
from good as from bad experiences. They can also seek new solutions or solve challenges in free and
confidential discussions. Plenary meetings, In-depth Workshops and Study Tours are therefore at the core
of the project.
9 meetings are planned for the CA EPBD 6 of which 2 are expected to be In-depth workshops with 2
parallel streams, while 7 are planned as Plenary Meetings with 3 parallel streams. From the beginning of
the project, one meeting is planned to be virtual (the last In-depth workshop), but if budget and the situation
around COVID 19 allows it, all these meetings will be held as physical meetings.
To support these meetings and to share further experiences between the meetings, a support structure
of communication through Glasscubes, Webzines and News items is set in place to foster a free
2
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
information flow. Some of these are for CA members only and therefore confidential. Other structures
such as the CA EPBD Website and published reports aim at a broader group of experts.
As there are hundreds of millions of building owners and actors across the European Union, other
stakeholders play a significant role in the rolling out of energy efficient solutions. The CA EPBD therefore
aims to involve stakeholders in the implementation of the directive. Some of the activities of the Concerted
Action are therefore aimed at sharing experience and ideas with important stakeholders, especially EU
umbrella organisations from the building value chain, of which many are active in the field of energy
performance of buildings. Some specific activities such as stakeholder meetings or public reporting aims
at fostering this exchange of views and knowledge.
The CA EPBD develops and maintains a strong and important network in the field of Energy Performance
of Buildings, probably the best network in this area anywhere in the world. This network helps to share
experience between its members, at the main activities, but also between meetings. This network aims to
be at the top of the implementation of energy efficiency in buildings and aims to support all its members
in gaining knowledge and power to implement efficient policies in every part of energy use as well in new
as in existing buildings.
It is a further aim of the project to make this capacity available also outside the European Union to support
implementation of energy performance in buildings policies more widely over the world. This will be done
as well through learning from other countries or continents as well as from a wider dissemination of the
results and good solutions found in the CA EPBD project, as well as through ad-hoc interaction with non-
EU countries’ administrations.
1.2 Specific project objectives
Specific project objectives
As the CA EPBD 6 starts, the EPBD is under revision and a new version will be implemented during the
timing of this project. This means that the CA EPBD 6 project will run under 3 different phases:
Phase 1 will support the full and efficient implementation of the EPBD Directive with the recast in 2010
and amendment in 2018.
Phase 2 will support the preparation and implementation of the new EPBD, which is expected to come
into force in 2023.
Phase 3 will support the full and efficient revision of the reviewed Directive once the provisions have come
into force.
This will require more flexibility and readiness to adapt than it was the case for previous versions of the
CA EPBD, notably since the ongoing revision is expected to further increase the range of thematic areas
to be addressed. Again, this requests a more flexible set up, notably in the structure of the teams
supporting the work of the CA. Objectives and details will therefore change and will depend on the results
of the negotiations.
Some of the objectives as these are seen in 2022:
1. Enhance and structure the sharing of information and experience from national implementation and
promote good practice in activities required of Member States for implementation of the Energy
Performance of Buildings Directive (EPBD).
2. Create favourable conditions for faster convergence of national procedures on EPBD-related matters.
3. Develop a direct link with the other two buildings-related Concerted Actions that were established
within the IEE programme. First, the CA-RES, focussing on transposition and implementation of the
Renewable Energy Directive (2018/2001/EC). Second, the CA-EED, focusing on transposition and
implementation of the Energy Efficiency Directive (DIRECTIVE 2018/2002EU), where National
Energy and Climate Plans are expected to include initiatives towards building energy efficiency.
4. Supplement the work of the Article 26 Committee and possible ad-hoc groups on CEN (European
Committee for Standardization) standards and certification exercises.
5. Establish a dialogue with the CEN in their work and implementation standards to support the
implementation of the latest versions of the EPBD and preparation of a life cycle carbon calculation
method.
3
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
6. Support European Member States to use their National Energy and Climate Plans, Long Term
Renovation Strategies and Energy Renovation Action Plans to report progress on the EPBD
implementation.
As with previous instalments of the Concerted Action, CA EPBD 6 will strive to result in a more harmonized
approach, improved implementation and actual application of the EPBD in all the countries involved, as
well as helping to disseminate best practices between the countries.
1.3 Compliance with LIFE programme objectives and call topic
Compliance with LIFE Programme objectives
The Concerted Action EPBD 6 directly supports the following LIFE Clean Energy sub-programme
objective:
“support the development, implementation, monitoring and enforcement of relevant Union legislation and
policy on the transition to sustainable renewable energy or increased energy efficiency, including by
improving governance at all levels, in particular through enhancing capacities of public and private actors
and the involvement of civil society”.
The project will notably contribute to the area of intervention on “Building a national, regional and local
policy framework supporting the clean energy transition”, by building the capacity of public authorities to
deliver under relevant plans and strategies (e.g. long-term renovation strategies), by supporting the
development and effective implementation of clean energy policies and supporting actions that put into
practice the enabling provisions included in the European legislation on clean energy.1
CA EPBD 6 further supports the implementation of the 2030 energy and climate policy framework, the
EU’s climate neutrality objective by 2050, and the new EU strategy on adaptation to climate change.
This happens mainly through the support for energy performance in buildings, focusing on energy
efficiency and integration of the small-scale renewable energy systems in the supply or directly in buildings
(nearby). In particular, the support is linked to a strong and efficient implementation of the EPBD directive,
but also through the collaborations with the Concerted Actions on the EED and RES Directives, where
further elements are covered.
The major impact of the CA EPBD comes through its contribution to achieving the full potential of the
EPBD Directive’s implementation. In this way it contributes to the objectives and targets of the EPBD:
As the impact assessment estimates in its MIXwoEPBD scenario, the primary energy consumption will
decrease by 10% by 2030 whereas final energy consumption will decrease by 24% by 2030.2 The
Moderate and High1 scenario estimate a reduction between 3.6%-11.7% in 2030 and 15.8-34% by 2050.3
Therefore, the EPBD will contribute significantly to the EU’s energy independence and energy security.
1
Annex to the Commission Implementing Decision on the adoption of the multiannual work programme for the years 2021-2024 for the LIFE
programme, Brussels, 9.7.2021 C(2021) 4997 final ANNEX 1, https://eur-lex.europa.eu/legal-
content/EN/TXT/PDF/?uri=CELEX:32021R0783&from=EN
2
COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT REPORT Accompanying the Proposal for a Directive of the
European Parliament and of the Council on the energy performance of buildings (recast), 15.12.2021 SWD(2021) 453 final PART 1/4, pp.
68-69.
3
COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT REPORT Accompanying the Proposal for a Directive of the
European Parliament and of the Council on the energy performance of buildings (recast), 15.12.2021 SWD(2021) 453 final PART 1/4, p. 76.
4
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
The socio-economic impacts are also significant in terms of how the implementation of the EPBD will
affect energy poverty. It is estimated that by 2030, energy poverty will reduce by 0,4-1,7 percent. Energy
costs for consumers are expected to be between 2-8% lower by 2030 and 12-27,6% lower by 2050.4
For the environment, MIXwoEPBD scenario estimates a reduction of 0,6 percentage points of GHG-
emissions by 2030.5 Between the Moderate and High1 scenarios, GHG-emissions in space heating and
cooling will reduce by 4.2-22.8% by 2030 and 20.6-53.5% by 2050.6
Compliance with the call topic
This proposal is submitted in response to a call to identified beneficiaries, aiming at funding the next
instalment of the EPBD Concerted Action. The project includes all partners defined by the call and is
developed to fit with the project time on 5 years.
1.4 Concept and methodology
Concept and methodology
A general assumption is that all Member States actually want to implement the EPBD provisions in an
efficient way and that they want to achieve energy savings and reductions of emissions as this supports
as well international as national targets. The issue is, however, that there are economical, technical,
legislative and knowledge issues that hamper such a full implementation. Especially, it is assumed that
large gaps exist in the field of knowledge in policy development, on efficient solutions and good arguments
for such policies. As many of the provisions result in large costs, there could be significant opposition to
new policies or efficient implementation. None of the Member States has optimal solutions covering all
the articles of the Directive but all countries do have good examples in some parts of the Directive. In
other words, there is much information on solutions, but it is spread all over Europe and many of the
responsible teams sits in smaller national, regional or local networks, impeding the efficient allocation of
information between Member States. The Concerted Action contributes to overcoming this barrier and
helps the transfer of knowledge between like-minded experts all over the European Union.
The Concerted Action EPBD therefore aims to offer a platform where information on successful
implementation, tackling of challenges and knowledge on implementation is shared between key actors
in the policy development and between all Member States. This is done in a confidential environment
where good as well as bad experiences can be freely exchanged. Alternative solutions can be discussed
and pros and cons can be given to such solutions as well as feedback on challenges or solutions to
overcome such challenges can be shared.
Plenary Meetings and In-depth Workshops
A key element of the Concerted Action EPBD is to bring central experts together from all EU Member
States. These experts represent ministries, agencies, universities, research institutes and control
authorities all having a central place in the national implementation of the Directive. They further represent
all parts of the Directive.
A very central part of this are the Plenary Meetings and In-depth Workshops. It is the intention of the CA
EPBD 6 to have one Plenary Meeting approximately every 6 months throughout the whole project. This
gives the possibility to have a meeting every spring and every autumn during the five years of the project.
This is more frequent than in the previous Concerted Actions for the EPBD. As there would need to be
4
COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT REPORT Accompanying the Proposal for a Directive of the
European Parliament and of the Council on the energy performance of buildings (recast), 15.12.2021 SWD(2021) 453 final PART 1/4, pp.
86-87.
5 COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT REPORT Accompanying the Proposal for a Directive of the
European Parliament and of the Council on the energy performance of buildings (recast), 15.12.2021 SWD(2021) 453 final PART 1/4, p. 69.
6
COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT REPORT Accompanying the Proposal for a Directive of the
European Parliament and of the Council on the energy performance of buildings (recast), 15.12.2021 SWD(2021) 453 final PART 1/4, p. 76.
5
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
additional time before the first meeting for the planning and after the last meeting for reporting, this would
result in 9 meetings in total. Meetings are expected to be held in April and in October every year, but will
be planned with due respect to the CA EED and the CA RES meetings, either to avoid overlap or to
ensure increased synergy, if possible to organise joint meetings.
A Plenary Meeting will typically last for two days and have three parallel streams of sessions. The three
streams will typically contain 12, 15 or 18 of technical sessions in total. They will start with a plenary
session, presenting common information relevant for all participants and will end by a closing session
where some of the results of the technical sessions will be shared among all participants. In the previous
CA EPBD projects, there were nearly always 18 sessions at each plenary. The CA EPBD 6 will experiment
with a more flexible setup for sessions, with a greater use of double or triple sessions allowing a deeper
dive into a subject. The CA EPBD 6 will also include other formats where e.g. the sessions cross over or
breaks out in even smaller groups.
In-depth Workshops will typically only have 2 parallel sessions and will have a smaller number of
sessions. They can further be combined with study tours, with site visits or other types of elements and
the plenary sessions will be optional, depending on the need for common discussions / information. In-
depth workshops will have a free format.
While there is typically the possibility for each country to participate with 3 experts paid by the project for
the plenary meetings, the number of experts for in-depth workshops would be only 2. As well for plenaries
as for in-depth workshops, the countries are allowed to send additional experts at own costs.
The format of as well plenaries as in-depth workshops will develop over the project based on the needs
for sessions and the feedback from the participants. In any case, the selected sessions will be agreed
with DG ENER and CINEA.
Plenary meetings and in-depth workshops will be planned for physical participation, as the results and
impacts of the meetings require physical presence, interaction, confidentiality and informal elements, but
in case of travel restrictions (as seen with COVID 19) or because of budgetary reasons, such meetings
can in individual cases be planned for virtual participation.
Parallel sessions:
The parallel sessions of the plenaries and the in-depth workshops are the central place for the exchange
of technical information on implementation of the EPBD, for development of policies and the sharing of
experience on best practices and challenges in policies or implementation issues.
Parallel sessions can for instance include presentations and discussions of Member State examples,
overview on policies, poster presentations, round table discussions, panels or different forms for voting
or knowledge collection. They will typically be of 90 minutes, but sessions can be planned for longer or
shorter depending on topics or circumstances.
It is the aim that sessions should be interactive and use the large collective knowledge represented in the
group of experts, but it is the expectation that multiple formats will be used for the sessions at each of the
plenaries or in-depth workshops. The CA EPBD will prioritise to work with on-site sessions allowing for
round table discussions (cabaret setup), as this has shown to be the most useful for interactive sessions.
There will further be organised training elements (by RVO) for interactive sessions (for CTMs and possible
session leaders), encouragements for double sessions and sessions where the number of presentations
are limited. However, each session should reflect the topics discussed and level of prior knowledge.
All participants can at any stage propose ideas for sessions and topics in general. This can happen though
the sessions where such ideas are collected, through special sessions focusing on future topics, though
informal sessions, though a poster or similar at each plenary, though working groups, direct contact to
CTMs or coordinator and though the Glasscubes. CTMs will then include these ideas in the list of possible
topics for sessions in the Evolving Strategic Reports for selection of these at the Management Team
Meetings. All CA experts will further be encouraged to take the lead of sessions.
For each parallel session a short objective, a 10-liner describing the main elements, a small preparation
report (max 7 pages) and a session report including main conclusions (max 10 pages) will be developed.
In some cases, a questionnaire will be circulated and filled in in advance in order to evaluate the current
situation / implementation in all Member States. All material for sessions including mentioned documents
and presentations will be uploaded to the CA EPBD Glasscubes for internal use in the project. These will
be confidential under the CA agreement (see below).
Sessions will further be used to share experiences from other projects or from research, for instance from
the Joint Research Centre (JRC) or EU-funded projects. These external speakers will typically be
speaking on remote distance, in order to avoid traveling for a short intervention as well as for
confidentiality reasons. In case the external speaker or active participant plays a central role in the
6
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
session, it will however be preferred that these are present and not online. This will be decided on an
individual basis.
Organisation of plenary meetings
The Management Team consisting of all Central Team Managers (CTMs) and CINEA sets up each CA
plenary meeting and in-depth workshop. The Coordinator leads these meetings. One or multiple Central
Team Managers or an appointed session leader will be responsible for each of the parallel sessions. The
Management Team, based on proposals coming from each CTM, the Management Team, CINEA or the
Commission, will be responsible for the selection of topics. The interest for sessions among countries will
further be collected through sessions, questionnaires and interactive elements such as interactive voting
or listing and tagging through other medias (flip charts / white boards). Countries will further be able to
support the development of topics through working groups and especially through CTM Working Groups
(see WP4 description).
A summary of the outcomes from each session/workshop will be made by Junior Rapporteurs under the
supervision of CTMs and session leaders. Outcomes will be further summarised in the public Central
Team Reports.
The CA EPBD 6 will introduce sessions where the topics are more open or organised based on reflections
from participants during the plenary or through an open forum / collection in Glasscubes, where all
partners and experts can contribute. These sessions will allow for continuing discussions, additional
topics, for discussions on sessions needed in the future, and will give all participants possibility to
influence coming sessions. It will also be continued to have informal sessions, where any CA participant
can propose a topic and take the lead in a discussion – these more informal sessions will typically be
limited to 1 hour.
The Coordinator is responsible for the plenary sessions at the opening and the closing of the Plenary
Meetings. These plenary sessions will handle topics common to all CA experts and will give all experts a
general understanding of the work in the parallel sessions, results of those sessions and information on
the general progress of the CA, from CINEA and the Commission.
For the planning of each plenary meeting the work is a cycle as follows:
• The process starts with selecting a list of sessions based on the Evolving Strategic Reports,
inputs from CTMs, DG ENER and CINEA.
• The preparation then includes the drafting of Objectives, 10-liners and Preparatory Reports and
other practical preparation (e.g. questionnaires).
• The Plenary Meeting is held and material from the sessions is uploaded to Glasscubes.
• The meeting is evaluated and session reports with lessons learned are developed and uploaded.
• Then the Evolving Strategic Reports are updated based on the topics discussed and proposals
from experts and partners.
• Then the cycle starts over again.
At the start of the project, the different structures and tools of the project is developed including the first
Strategic Reports and by the end of the project, the results are then reported.
This can be illustrated in the following graph:
7
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Confidentiality
In order to ensure free exchange of information, discussions in CA meetings are fully confidential, unless
otherwise agreed in consensus by all national contacts. By signing the CA contract, all participating
organisations assume the duty to guarantee this confidentiality agreement for all the participants that they
bring to the meetings, both their own staff and any experts under subcontract or secondment.
Subcontracts within this CA work must expressly include this confidentiality requirement.
Any person invited to participate in CA meetings from outside the consortium and the European
Commission shall sign a suitable confidentiality agreement, according to the scope of their participation,
under terms to be decided by the Management Team of the CA and in accordance with the terms
stipulated in the Grant Agreement.
Through the existing grant agreements for the CA EED, the CA RES and the CA EPBD, all experts from
each Concerted Action is bound by confidentiality for all three CA’s and collaboration can hence be done
without further confidentiality agreement for these. In this context, the three CAs can share relevant
information and provide access to their internal documents, such as working group papers, presentations
and meeting notes, and Glasscubes without compromising the overall confidentiality of the work and
discussions delivered in each Concerted Action. A selected number of Management Team members /
national experts from the CA EED and CA RES will be granted access to the CA EPBD Glasscubes.
Individual deliverables (e.g. reports) marked in this proposal as confidential can be made publicly
available if agreed by the Management Team and the CINEA. Should the deliverables contain specific
information regarding the participant countries (e.g. results from questionnaires), consent will be required
from all the relevant partners. The Management Team and the CINEA may decide how best to request
this consent. For example, participant countries may be requested to confirm via email within a specific
deadline. In case a specific deliverable involved other Concerted Actions (EED and/or RES), their consent
will also be sought.
1.5 Upscaling results of other EU funded projects
Upscaling results of other EU funded projects
Explain if and how the proposal builds on or up-scales results of other EU funded projects.
The CA EPBD 6 builds on and continues previous CA EPBD projects funded under IEE and H2020
programs. This includes continuation of the established and highly experienced network of CA EPBD
experts in all EU Member States as well as building on established structures and principles for this
collaboration. This way, the activities of the project are well tested and have proven successful in the past
8
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
many years, but having been refined and continuously updated to build on last possible knowledge and
technology. CA EPBD 6 continues this development and builds further new elements too in order to
address new challenges or refining previous methods.
As part of this, the project will continue and further develop the repository of material produced since the
CA EPBD first started, including specific areas with documents and presentations from CA EPBD 1, CA
EPBD 2, CA EPBD 3, CA EPBD IV and CA EPBD V. This includes as well material from held plenaries,
working groups, Central Teams as from managing the project. The CA EPBD Glasscubes will remain
confidential and for the members of the CA EPBD only. At the start of the project, the experts not
continuing in the CA EPBD 6 will lose the access to the CA EPBD Glasscubes while all new experts will
gain access also to material from previous CA EPBD projects to ensure the maximum reuse of materials.
The project will also build on and further develop the existing website; https://epbd-ca.eu/. As the team
behind the communication will change completely, the website will be adapted to this new situation and it
will be evaluated if the website needs any makeover to serve as the external face of the CA EPBD 6
project. It will further be updated to the new structure and the new content of the CA EPBD 6 as well as
the Directive in transition to a new revision.
The database with public reports from the CA EPBD will be continued in the CA EPBD 6 and it will be
evaluated how the new public information reports from countries and CTM teams most efficiently can be
updated in the process of the CA EPBD 6. This will include that some sections are kept, some updated,
some changed and perhaps some elements be deleted, if these no longer serve the purpose. All previous
reports will however still be kept in pdf versions in the document repository connected to the website. This
means that all previous reports and books from the CA EPBD 1 to CA EPBD V is still kept in the document
archive.
It is the aim of this process that the learnings and results from previous projects can still be used for
implementation in all Member States and that duplication of efforts can be avoided and instead be
changed into a process where exiting results and experience is taken further and made available for the
relevant audience. This includes a process where the possibility of developing a better structure or index
is explored.
The project CA EPBD 6 additionally interacts with other LIFE and HORIZON 2020 projects. This includes
projects that are found relevant will be invited to specific sessions. Among other things, this will include
presentations of results and outcomes, discussion of these and sometimes participation in group
discussions with CA EPBD experts.
These projects will be a part of the preparation of plenaries for which CINEA will deliver input. They could
be relevant for the individual sessions and it will then be up to the session managers to investigate /
decide how these can contribute to the results of the sessions.
Results from CA EPBD will further be disseminated and presented at specific events or in direct
interventions with these projects. This interaction will also be supported through presentations at major
conferences as well as information provided by such events and through the network in general.
Open events where the CA EPBD invites other projects as well as external stakeholders to present will
be part of this strategy. This way, the projects can learn from the CA EPBD results as the CA EPBD
community can seek information through a direct dialogue with those projects. Such open events would
typically be connected to other CA events such as the plenary meetings or in-depth workshops, allowing
experts to participate without major travel costs. At least two open events are foreseen in the CA EPBD
6 project.
1.6 Complementarity with other actions
Complementarity with other actions
CA EPBD 6 has overlapping provisions or areas of work especially with the CA EED and the CA RES.
Some of the key areas are further overlapping or complementary. It will be explored how the collaboration
can be taken further, including making material available across these 3 projects as well as the
collaboration with these projects will be continued and strengthened to avoid duplication and to ensure
synergies of the work..
The CA EPBD will therefore work closely together with the other CA EED and CA RED projects. This will
include, that the 3 CA Coordinators will hold regular meetings for coordination and there will be further
effort on mutual participation in as well plenaries as Management Team meetings on a regular basis,
which can help to foster further use of overall experience as well as collaborative efforts such as joint
working groups or other common projects.
9
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Many elements explored in CA EED and in CA RES have true value for the work of the experts in CA
EPBD implementation. For CA EED, it is among other; targets, NEAPs and public buildings, while there
are some significant overlaps with CA RES on small renewable and building integrated systems as well
as zero energy districts. It will be investigated how we can better build on the accumulated experience
and how we can further develop common approaches and projects. This effort will focus on all levels from
individual experts to central teams and at the coordinator level. It is also expected that the coordinators
coordination forum will be continued in collaboration with DG ENER.
Joint events or mutual participation in each other’s plenaries, workshops or study tours can also contribute
to this interaction and integration. Joint working groups can be set up for collaborative work in order to
use the whole knowledge database and to avoid the duplication in projects. To facilitate easier
collaboration between the 3 CA projects, the confidentiality agreement for each project automatically
covers the other projects. This way, results and presentations etc. can be shared more broadly or access
can be granted to Glasscubes.
CA EPBD will also interact with the EU Building Stock Observatory as well on data use as on a data
supply level. It will be investigated how this platform can be used to expand the results of the CA EPBD
and in particular, the Key Implementing Decisions (KIDs), which are collected from countries as part of
the reporting.
1.7 Synergies and co-benefits with other LIFE sub-programmes
Synergies and co-benefits with other LIFE sub-programmes
The project contributes to the objectives of the LIFE sub-programmes on:
• “Climate Change Mitigation and Adaptation” by contributing to a better implementation of the
EPBD and thus a reduction of greenhouse gas emissions from the EU building stock;
• “Circular Economy and Quality of Life”, by discussing circular and life-cycle approaches as well
as a reduced use of resources in the build environment. These efforts are expected to be
increased with the Life Circle Carbon Assessment approach that might become a part of the
EPBD directive and therefore also a part of the CA EPBD in the future.
1.8 Synergies and co-benefits with other EU policy areas
Synergies and co-benefits with other EU policy areas
The full implementation of the EPBD, which is the aim of the project, has several positive synergy effects
and co-benefits. In the impact assessment to the EPBD7, where the proposed EPBD is a mixture of the
Moderate and High1 scenario, estimates within a certain range on several outcomes can be made.
For growth and job creation, the energy performance of buildings requires a large use of skilled labour
and large investments for renovations of buildings. The resulting enhanced efficiency in buildings
therefore increases the employment in all Member States, regionally and locally. As 99% of the firms in
the building and construction sector in the EU are small and medium-sized enterprises (SME’s), and with
a renovation rate expected to increase by 0.2-1.35% by 2030 compared to the current renovation rate, a
significant amount of low- and medium skilled jobs will be created. In the impact assessment relating to
the EPBD, it is estimated in the Moderate and High1 scenarios that more than 400.000 jobs will be created
in the EU and somewhat below 1.8 million jobs. Renovation of buildings and improved efficiency in general
support growth and especially when this is combined with efficient use of international or national funding.
This is targeted through the project aim of all provisions of the directive and in particular through work on
smart or intelligent funding. For instance, in the Moderate scenario and High1 scenario in the impact
assessment, between EUR 29-104 billion per year of value added is created by 2030.
7
COMMISSION STAFF WORKING DOCUMENT IMPACT ASSESSMENT REPORT Accompanying the Proposal for a Directive of the European
Parliament and of the Council on the energy performance of buildings (recast), 15.12.2021 SWD(2021) 453 final PART 1/4.
10
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
The EPBD contribution to the reduction of CO2 emissions and emissions of particles as described in 1.3,
will in addition contribute significantly to the reduction of air pollution and water use. This reduction of air
pollution will have health benefits and help alleviate premature deaths across the EU. The many foreseen
renovations can also contribute to strengthening the indoor air climate, contributing to health and
productivity of the EU population.
Moreover, as communicated in the Commission’s RePowerEU plan, the revised EPBD will also contribute
to the EU’s energy independency through significant energy savings and installation of solar energy on
buildings via the Solar Rooftop Initiative, creating a legal obligation to install solar rooftops for certain
categories of buildings.8
Further, ceteris paribus, the implementation of the EPBD and the resulting lower demand for energy will
also assist increased biodiversity. This is because a lower demand for energy will reduce the demand for
land to install e.g. renewable energy (wind or solar), making it less costly to use an area of land for
biodiversity.
Overall, the implementation of the EPBD will therefore contribute to jobs and growth, help alleviate energy
poverty, reduce GHG-emissions and air pollution. It further provide health benefits as a consequence of
less pollution and better indoor climates in buildings, and it contributes to the energy independency of the
EU, and finally, it can contribute to increased biodiversity.
2. IMPACT
2.1 Ambition of the impacts
Ambition of the impacts
The CA EPBD is highly interlinked with the process of policy development and implementation in all the
EU Member States. It is therefore difficult to say what comes from the project and what comes from the
daily implementation. It is, however, beyond doubt that the project through this knowledge exchange and
learning from good and bad practices improves the implementation in all countries. A percentage better
implementation would result in a percentage better results and in the same way a faster implementation
through learning from other countries or experimenting together would lead to higher savings. It is however
not possible to quantify this.
The way to measure the impact of the project is therefore to document that it is good in achieving its
objectives on knowledge exchange and learning from good and bad experience. The KPIs of the project
are therefore linked to the efficiency of the plenary meetings, in-depth workshops, internal and external
communication structures as well as some qualitative statements from the national teams.
If topics were good in terms of timing and relevant information and sessions were convincing as well as
the participating experts found they learned useful new lessons or solutions, then it must be expected that
this then informed the national development of rules, solutions and improved the implementation.
Essential for this learning and use of information is the network of the CA EPBD and the possibilities to
discuss informally during meetings and keeping contacts between the meetings, as well as the storage of
information in Glasscubes. This makes it possible to access information exactly when it is needed or to
come back to previous discussions for elements that become relevant. The usefulness of the Glasscubes
and the website are other parameters to monitor.
Finally, the system of the Evolving Strategic Reports helps to ensure that all good proposals from experts
are collected and are valuated in order to make the best possible timing for sessions. This often happens
through voting or other kind of support for topics in order to plan for the most relevant topics at any given
time in the project.
When experts find it is the right time to discuss a topic, they are also more likely to learn from the
discussions and to use the results.
8 COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE EUROPEAN COUNCIL, THE COUNCIL, THE
EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS, Brussels, 18.5.2022 COM(2022) 230 final p. 6.
11
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
2.2 Credibility of the impacts
Credibility of the impacts
A central part of the project are plenary meeting and in-depth workshops. These meetings and sessions
only work if a large number of the participating countries and experts participate in meetings and session.
For Plenary Meetings the KPIs are:
Output: Impact/Indicator: Means of verification:
7 plenary meetings At least 90% of countries Meetings attendance lists
participate in meetings
At least 120 experts participate in Meetings attendance lists
each meeting
At least 80% of participants find e-survey sent after Plenary
topics relevant and sessions Meeting)
useful
At least 80% of participants e-survey sent after Plenary
satisfied with organisation of the Meeting)
event (e.g. logistics)
In-depth workshops are more targeted and the number of sessions are smaller (only 2 streams). The KPIs
are:
Output: Impact/Indicator: Means of verification:
2 In-depth Workshops (or study At least 80% of countries Meeting attendance lists
visits) participating in workshops
At least 70 participants in each Meeting attendance lists
workshop
At least 80% of participants e-survey sent after event
satisfied with the event
The Glasscubes online collaborative workspace plays an important role in the internal communication of
the project, offering a repository of all the work done by the CA. The KPI’s for the Glasscubes are:
Output: Impact/Indicator: Means of verification:
1 intranet available for CA At least 70% of CA Participants Glasscubes statistics, specific
members (Glasscubes) actively using the Glasscubes survey by PollEverywhere
At least 80% of the CA national
experts (3 per country) using the
Glasscubes at least from time to
time
At least 75% of actual users
being satisfied with the content of
Glasscubes
At least 90 % of the documents
for Plenary Meetings made
available for participants at least
3 weeks in advance of the
Plenary Meeting
At least 90 % of the presentations
and session reports made
available within 6 weeks after the
Plenary Meeting.
The website is central for the external communication of the project results. The KPIs for the website are:
Output: Impact/Indicator: Means of verification:
12
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
1 public website At least 32,000 visits on the Website statistics
website
At least 5,000 downloads from
the website and the database
with content
At least 75% percent of actual
users being satisfied with the
website and finding information
useful and relevant
Additionally, the overall impact of the CA EPBD 6 will be measured through the following qualitative
targets:
Output: Impact/Indicator: Means of verification:
Provide Member States with a Enhanced capacity/expertise in Interviews of
platform to discuss EPBD administrations Contractors/country teams
implementation
More robust and better-informed Interviews of
policy development Contractors/country teams
2.3 Sustainability of project results
Sustainability of project results
The better implementation of the EPBD provisions in the Member States will have an impact, which goes
long beyond the project itself. Once countries have implemented better and more efficiently the regulation,
they are not expected to go back.
For the lessons learned, good methodologies or solutions developed, it is part of the setup that these
remain available throughout and after the end of the project. This includes the structure of the Glasscubes,
which today already includes the results gained in all previous five Concerted Actions EPBD, CA EPBD
1, CA EPBD 2, CA EPBD 3, CA EPBD IV and CA EPBD V. When experts gain access to Glasscubes,
they also gain access to all previous results and body of knowledge, including session reports,
presentations and other internal reports.
It is the intention to continue in the same structure and to ensure that this structure will continue long after
the CA EPBD 6 will have ended.
Similarly, the public reports are disseminated and kept beyond the project. Again, the public country
reports, CTM reports or other material have been maintained since the start of the first CA EPBD project.
In the CA EPBD V project, the reports were developed into a database, which will be reused in the CA
EPBD 6. Moreover, it is the aim to further develop this and to prepare for this information to exist also
after the project ends. This way, experts as well as stakeholders and other countries can continue to learn
from lessons learned and systems and solutions developed.
2.4 Exploitation of project results
Exploitation of project results
The essence of the CA EPBD is in many ways exploitation of results and lessons learned from all Member
States. It is the aim of the project that all Member States in the EU learn from good and bad experience
in other countries. The sharing of experience takes place mainly through interaction at sessions and
workshops, where countries learn directly from each other and target common challenges in a very
collaborative way.
The structure of communication in the project is targeted to support this sharing of experience through
internal channels such as Glasscubes, Webzines and internal reports. These make sure that information
stays available for a long time and that these are ready to use when the countries need such information.
In order to share also the less favourable results, these channels are confidential and for project members
only. These elements are the backbone of the communication strategy.
13
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
External information and dissemination happen through some official and public sources of which the
website, the database of content and public reports are the most visible. These aim for exploitation through
involvement of stakeholders, which play a central role in the implementation of the EPBD policies, as well
on EU level as on the individual country level. A full implementation of the regulation for energy
performance in buildings will only be efficient and successful if there is understanding and support among
these stakeholder groups.
Finally, the external information target other countries throughout the world and give the possibility of
reusing results in an area where the EU takes a leading role globally. This global exploitation will be
supported through collaboration with other countries or organisations such as the International Energy
Agency (IEA).
Communication / exploitation strategy
A number of channels will be used, some of them for disseminating results and others for communicating
key messages (for example, webinars). Some channels will be used for both communication and
dissemination – specifically, these are the project website, the webzines distributed to CA members, and
the "Glasscubes" online project centre.
A detailed plan (Deliverable 5.1) will set out the strategy with regard to each target group, explaining what
messages will be conveyed to each group and the means of doing so as well as measuring the plan's
effectiveness. The principal target groups are as follows:
A. CA participants
B. Policy makers at EU level
C. European stakeholder organisations
D. National Authorities and Agencies
E. National stakeholder organisations
These stakeholder groups are further described in 3.6
The communication, dissemination and exploitation plan will in further detail describe; the overall strategy
to communicate the work of the CA; the aims and objectives per target group including performance
indicators for each; the channels used for communication for each target group; key messages to
communicate to each target group; guidelines for the project branding, logos, templates and use of
material.
Dissemination and exploitation of results
Dissemination of the CA results will be achieved first of all via the plenary meetings and in-depth
workshops, where the participants directly share knowledge. Secondly, the outcomes of the parallel
sessions will be disseminated to the CA participants via the Glasscubes online project centre and
webzines. Thirdly, publishable summaries of the outcomes will be disseminated publicly via the project
website, the database of contents, and/or multimedia content.
The channels for dissemination are as follows:
• the plenary meetings, as described in section 1.3 and WP3;
• an online project centre, "Glasscubes", which facilitates further confidential exchange of
information between CA experts (authorised persons);
• a webzine and newsflashes sent to CA participants, communicating items of interest to them;
• a public website disseminating results and outcomes of the CA EPBD to all relevant target
groups, during and after the project;
• public factsheets and CTM reports disseminating details on a particular subject or best practice;
• a database providing structured information of public outcomes of the CA EPBD;
• multimedia content such as webinars, interviews, info-graphics, videos or public newsletters, to
further spread relevant messages and information.
Exploitation shall consist of embedding the CA's results into new or improved policies or practices, at EU,
national, regional or local levels.
A communication, dissemination and exploitation strategy in Work Package 6 will set this out in greater
detail.
Communication Activities
14
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Communication activities foster awareness raising about the project and its relevance during the contract,
as well as interaction among the relevant target groups. Communication in CA EPBD 6 will consist of:
• the Plenary meetings, where main interaction among CA participants takes place within a
confidential environment;
• the Project centre, which is the repository of confidential information about the CA, additionally
offering facilities for commenting, rating, sharing, etc.;
• the Webzine and Newsflashes, communicating important messages in relation to the CA
progress to CA participants;
• the Website, communicating what the CA EPBD is about to the public;
• various forms of multimedia content to inform the public about the CA (e.g. interviews, info-
graphics), some of which offers an opportunity for interaction and sharing of opinions (e.g. the
webinars, through the Q&A sessions).
2.5 Catalytic potential: Replication and upscaling
Catalytic potential: Replication and upscaling
Replication of results is one of the central pillars of the CA EPBD project. Especially the plenary meetings
and the in-depth workshops are a forum for replication of good examples and good solutions as well as
the confidentiality ensure that learning can also be drawn across countries due to discussion of less
successful elements. The format of discussions in individual sessions leaves a maximum of possibility of
replicating between countries or even that all countries can learn for one best practice and copy some
elements in their own implementation.
Replication of results is further supported by Glasscubes, which includes material from previous
discussions in sessions. Countries will therefore be able to learn and also copy from previous sessions all
the way back to the CA EPBD 1 project. In case a need is found and budget can be allocated, the project
will further support study tours where participants can have hands on experiences with finalised projects
and buildings. These could either be combined to plenaries, in-depth workshops or they could be handled
as a separate meeting.
Through the public parts of the project, some of the main results can also be replicated outside the project
partners (by non-EU countries) and on a more global scale. It is therefore part of the project to develop
descriptions of country progress as well as summaries on major topics from the discussions in each of
the individual teams. Through the CA EPBD 6, this will build further on the experiences collected in CA
EPBD V as well as the database of knowledge developed under this project. This work will mainly take
place though the website, but also through interventions at relevant events or projects. A special focus
would be paid to IEA, which has work in some major economies outside Europe and activities targeting
major developing countries all over the world.
On a larger scale, the CA EPBD project will also work closely with the CA EED and CA RES projects to
avoid duplication of work but to ensure replication also across the 3 projects and in particular for those
areas where there are overlaps between the projects such as for example public buildings or renovation
action plans and NEAPS with CA EED and use of renewable energy in connection to NZEB or zero fossil
fuel buildings or districts with CA RES.
3. IMPLEMENTATION
3.1 Work plan
Work plan
15
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
The CA EPBD 6 is a project, which mainly has a cyclic organisation. Especially for the key element on
Plenary Meetings and In-depth workshops, the process takes place on a regular basis. For the CA EPBD
6, this is planned to happen every 6 months over the project and 9 times in total.
The work packages and the tasks in these are mainly organised around functions and roles in the project
and for most of the tasks, this starts at the beginning of the project or three months into the project and
then it ends at the same time as the project or three months before.
The project is structured around 6 work packages:
WP1: Project management and coordination, covers the overall management on the project and
the lead of the Management team as well as the Contractors Meeting.
WP2: Preparation of plenary meetings and Central Teams, covers the work of Central Teams /
Management Team.
WP3: Participation in Plenary Meeting and In-depth Workshops, covers all partners
preparation and participation in these meetings
WP4: Other collaboration structures / External Stakeholders, involves all partners and covers
working groups, topic leads, support for the preparation of session, other collaboration and external
elements, working with CA EED and CA RES
WP5: Communication and dissemination, covers internal as well as external, including work with
Glasscubes, website and the database.
WP6: Reporting from the project, involves all partners, the Coordination, the Central Teams and
Communication Team
The main structure of the work plan is connected to the preparation of the plenary meetings and in-depth
workshops. These are the major contributions from WP1, WP2, WP3, WP4 and WP5. The flow of these
work packages can be illustrated by the following PERT chart.
Most of the work packages will also contribute to the reporting of the project. This is in particular the case
for the WP1, through general reporting, WP2, through CTM reports, WP3, through country reports and
results, WP5 communication reports, layout and database and WP6 reporting.
3.2 Stakeholder input and engagement
Stakeholder input
Stakeholders play an important role in the implementation at the EU level as well as at the national level.
Engaged stakeholders can support implementation of the provisions of the directive and can help ensuring
the impact of these. In the field of buildings, there are many stakeholders across Europe. These includes
organisations for producers or products, organisations of skilled workers, building over organisations as
well as research and academia. Many of these are the main concern of the EC in connection to the EPBD,
16
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
but the CA EPBD can help addressing these as well on the European scene as it can help countries in
addressing these at a national level. Two open events are foreseen in the CA EPBD project most likely
in connection to plenary meetings.
One of the main contributions by the CA EPBD is to share information on activities on progress in
implementation and new initiatives among Member States. This will be done through the natural
information channels such as website and database of content, but it could also include direct interaction
though open events or by participation in events by these stakeholders, presenting results from the CA
EPBD work.
Input from other CAs for EED and RES plus the Commission could help fostering such information
exchange, as well as EU funded projects can be invited for presentations or discussions. EIB and other
finance institutions are other organisations that can be used for such interactions.
17
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in implementing the Energy Performance of Buildings Directive]
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
3.3 Timetable (n/a for stage 1)
Timetable (projects of more than 2 years)
Half 1, 2023 Half 2, 2023 Half 1, 2024 Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028
Name
O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N
1 Start Contract
2 MTM 01
3 Plenary Meeting 01
4 MTM 03
5 Plenary Meeting 02
6 MTM 05
7 Plenary Meeting 03
8 MTM 07
9 Plenary Meeting 04
10 MTM 09
11 In-depth Workshop 01
12 MTM 11
13 Plenary Meeting 05
14 MTM 13
15 Plenary Meeting 06
16 MTM 15
17 Plenary Meeting 07
18 MTM 17
19 In-depth Workshop 02
20 Glascubes in the air
21 Communication plan
22 New Website
23 Database running
24 Upload first CTM reports
25 Upload country material
26 Upload second CTM reports
27 Final reporting
18
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
3.4 Impact monitoring and reporting
Impact monitoring, evaluation and reporting strategy
Each of the plenaries will be evaluated through a survey measuring the satisfaction of the participants.
This will include questions about the relevance, usefulness of the sessions and if there are things to take
home and use in the national process. Additionally, there will from time to time be organised a poll during
the meeting to evaluate effectiveness of communication and of the project in general.
Countries will also be asked to give statements on the use of the results from the project. Some of these
might be more anecdotal while others are expected to be a bit more concrete.
The handling of webzines, Glasscubes and other internal communication tools will be evaluated and it will
be tested if the CA members are aware of these, if they use them and if they find these functional etc.
Communication:
The success of all communication, dissemination and exploitation activities will be evaluated against the
targets and indicators given in Table
Table Indicators and targets for communication and dissemination activities:
Indicator Target by M48 Means of monitoring
Communication
Number of website visits 32,000 Google analytics
Percentage of recurring website visitors 36% Google analytics
Google search results at least 3 terms in top Google search
5
Number of unique active links from website 200 SEO profiler
Number of views of CA EPBD video content* >500 per video YouTube
Number of visits per individual interview* >100 Downloads or
YouTube
Number of attendees for online public events* >70 per event WebEx
Dissemination
CA participants logged-in to Glasscubes >80% Glasscubes
CA participants actively using Glasscubes >70% Survey
Webzine/newsflash readability (click-through) >75% per message MailChimp or other
tool
Overall satisfaction rate among CA members >80% Survey
Communication survey response rate 60% Survey
* These indicators will only be collected to the extend these multimedia elements
are included in the communication and dissemination plan and implemented.
3.5 Communication, dissemination and visibility
Communication, dissemination and visibility of funding
The main stakeholders include:
A. CA participants (designated national EPBD policy makers from 27 countries). In practice, this
group comprises over 200 non-permanent representatives who may attend CA meetings.
Exchanges aimed exclusively at this group shall remain confidential. Activities will comprise:
informing them first-hand of relevant developments; facilitating the sharing of experiences and
opinions; identifying challenges; suggesting solutions to problems; raising awareness of
19
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
important stakeholder needs, possible trends and market developments, thereby enabling them
to implement more effective national policies.
B. Policy makers at EU level. Activities aimed at this group will include communication of the CA
EPBD's work as well as challenges, developments and good practice examples; communication
of relevant national policy developments and market trends; exchange of information on relevant
EU developments and trends.
C. European stakeholder organisations. This target group comprises professional associations,
industry federations, research institutions, consumer associations, think tanks and the like
representing the European energy/construction sector, whose attention is typically focused on
EU-level developments and/or developments in multiple countries. Activities aimed at this group
will include: communication of the CA EPBD's work as well as challenges, developments and
good practice examples; communication of relevant EU policy developments and market trends;
exchange of knowledge, including feedback from the market.
D. National Authorities and Agencies. This target group is involved in energy efficiency in
buildings policy, legislation, implementation as well as compliance monitoring. It typically includes
ministries, energy agencies, and local authorities. They may be active at the national or EU
levels. Activities aimed at this group will include: communication of the CA EPBD's work as well
as challenges, developments and good practice examples; communication of relevant
national/EU policy developments and market trends.
E. National stakeholder organisations. This target group includes professional associations,
technical chambers, industry federations, research institutions, consumer associations, think
tanks, banks and insurance companies. They typically focus on their national context. Activities
aimed at this group will include: communication of the CA EPBD's work as well as challenges,
developments and good practice examples; communication of relevant national/EU policy
developments and market trends; exchange of knowledge including feedback from the market.
Activities for the different stakeholders will include:
Overview of Communication and Dissemination Activities
All relevant activities and means are summarised in Table 2.2.
Channel Purpose and content Target audiences Planning Level of Type:
dissemi Communication
nation Dissemination
Exploitation
Plenary See WP3 A. CA participants; See WP3 CO C, D, PoE
meetings including where
necessary selected
people outside the CA
Website Communicate the A. CA participants; Existing website PU C, D
work of CA EPBD B. Policy makers at EU revamped by M4.
and its objectives. level;
Entry point for CA C. European
participants for the
organisations;
"Glasscubes" project
centre and for D. National Authorities
registration to & Agencies;
plenary meetings E. National
organisations.
Project centre Online collaborative A. CA participants; Operable CO C, D
"Glasscubes" workspace where all including where immediately from
CA EPBD necessary selected M1 onwards
documents are people outside the CA
stored, with
functions for
structured
interaction
Webzine Communication of A. CA participants; 2-3 months in CO C, D
important issues including where advance of each
necessary selected plenary meeting
people outside the CA
Newsflash Communication of A. CA participants; Ad-hoc news CO C, D
important issues including where announcement
20
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
necessary selected
people outside the CA
Database of Self-standing tool for A. CA participants; Database PU D, PoE
content online structuring B. Policy makers at EU operable from M7
and easy to find level;
(based on topic of
C. European
interest) information/
organisations;
outcomes from the
CA EPBD D. National Authorities
& Agencies;
E. National
organisations.
CTM reports Summaries of the A. CA participants; Twice within the PU D, PoE
CA discussions B. Policy makers at EU contract, first
within each level; update in M36,
individual CT, second in M60
C. European
communicating in a
organisations;
comprehensive
manner information D. National Authorities
on a specific topic to & Agencies;
the broader public E. National
organisations.
Country Summaries of the A. CA participants; Update of reports
reports CA progress within B. Policy makers at EU during project
each country, level; period expected in
communicating in a C. European M48
comprehensive
organisations;
manner information
on a specific topic to D. National Authorities
the broader public & Agencies;
E. National
organisations.
Exchange Facilitate better A. CA participants; Upon demand
communicatio exchange and B. Policy makers at EU
n/disseminati sharing of approved level;
on material internal or public
with other information material C. European
initiatives between or with e.g. organisations;
CA RES, CA EED, D. National Authorities
CEN, BUILD UP, EU & Agencies;
Building Stock E. National
Observatory organisations.
Interaction Interaction and European stakeholder Upon demand
and dissemination of organisations, national
exchange information with stakeholders, individual
with European and companies
stakeholders national
stakeholders,
collection of
information
Interaction Integration with Countries and important Upon demand
and major economies stakeholders beyond
exchange outside Europe the EU, international
beyond the Dissemination organisations such as
European beyond the IEA and UNEP
union European Union
Multimedia A well-weighted C, D, PoE
content choice from the A. CA participants;
following options: B. Policy makers at EU
Webinars to level;
communicate C. European
developments, organisations; tbc PU C, D, PoE
results or findings on D. National Authorities
a specific topic & Agencies; C, D
Interviews to share E. National
one experts’ opinion organisations.
and knowledge C, D
21
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Infographics as a
graphic
representation of the
status quo on a C
specific topic.
Level: CO: Confidential only for CA members / the consortium PU: Public
Type: C: Communication D: Dissemination PoE: Preparation of
Exploitation
4. RESOURCES
4.1 Consortium set-up
Consortium cooperation and division of roles (if applicable)
Each of the partners in the project is selected by their involvement and role in the implementation of the
EPBD in their specific country. All must play a central role in the implementation. It is the national
representation in the article 26 committee, which has identified and selected the partner for the project
from each of the 27 Member States. This ensures the maximum capacity of knowledge on
implementation of the EPBD as well as the largest possible impact of the work of the CA EPBD 6.
Major decisions in the project on implementation and changes are decided during the Contractors
Meeting. Each partner is represented in the Contractors Meeting by the national coordination / contact
person (NCP) and the project coordinator leads these meetings. The Contractors Meeting is responsible
for the progress of the project and for the overall delivery of the project deliverables and milestones.
Major changes in the project including changes in economy or amendments are decided by the
Contractors Meeting and major guidelines or descriptions of work will be presented and discussed by the
contractors in this forum.
The coordinator is responsible for the follow up on decisions in the contractors meeting and also for the
general management of the project between meetings and the coordinator is responsible for the
preparation of the Contractors Meeting. Meetings between contractors will typically take place in
connection to Plenary Meetings and In-depth Workshops, but additional meetings can be made either as
physical meetings or as virtual meetings.
Each partner through a national coordinator selects the team of National Experts for the participation
depending on the selected topics. These experts are selected either through the organisation itself or
through in-kind contributions or subcontracts when this is needed. This ensures the expertise down to
each individual session or streams of sessions, as each country typically can send 3 experts as it is also
the number of streams.
The plenary meetings are essential in the exchange of information and the development of new solutions.
Each country sends for instance 3 experts for each plenary meeting, but the knowledge base / the
members of the CA EPBD is in general a larger number of experts, and for each plenary the best suiting
experts are selected depending on the topics to be discussed.
Leading roles are selected between the Member States / partners based on interest and special
knowledge and skills. Especially the leaders of the central teams, the CTMs, are selected in a way so
that these complement each other and to cover the whole spectrum of articles in the EPBD directive.
Through the work of the Management Team of the CA EPBD 6, these CTMs complement each other
and give feedback to ensure a maximum capacity.
When there is a shortage of experience among the CTMs on specific areas, it is possible to complement
the CTMs with topic leaders who have specific and extraordinary experiences and skills in particular
areas, e.g. electromobility, which could fall outside the general knowledge of more general building
performance experts.
A major part of the knowledge and experience comes from the network of experts. These more than 150
experts represent leading experts and central persons in the implementation of the EPBD in their
countries. It is part of the responsibility of the central teams to ensure that all these experts work closely
together and share their knowledge, especially at the Plenary Meetings and the In-depth Workshops.
Working Groups further help the central teams in collecting input and efforts from the leading experts in
each field. Further, there can be set up topic leads when special knowledge is needed in one particular
22
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
area, which is not so strongly represented in the management team / by the CTM leaders. This also gives
more experts the possibility of taking leading roles for a shorter period.
The key roles in the project are:
The Coordinator is responsible for the overall execution of the project as well as for the daily
management of the project between the meetings. The coordinator prepares and leads the Contractors
Meeting and the Management Team Meetings. The coordinators assists and supports in the preparation
of meetings and the daily management of the project. The coordinator also supports the overall budget
control in the project together with the internal DEA budget controller.
Each of the Central Team Managers are responsible for individual sessions and for proposals for
sessions in their specific field. They are also responsible for Evolving Strategic Reports, which ensure
that requests from countries and individual experts are taken into consideration by a selection of topics,
as well as for technical reporting for instance though CTM reports for their own area.
The Communication Team Manager is responsible for an efficient communication through the internal
sources such as Glasscubes, Webzines, Newsflashes and through the internal channels such as the
Website, Newsletters or other external material. The Communication Team is also responsible for the
language review of external material, for layout of published material and for upload of material to the
communication and storage systems including the database. For the work on publications, they are
supported by an External Writer.
The National Coordinators / National Contact Persons are responsible for the individual selection of
their national team of experts for meetings, for the response to questionnaires as well as the national
reporting in country reports, KIDs and similar. They are responsible for the national use of the budgets
and for the reporting of costs. They are further responsible for coordination of national presentations and
response to questionnaires. All teams are expected to present regularly as part of their participation in
meetings.
The National Experts are responsible for an active participation in meetings and for presentations of
national experience and progress, including lessons learned from challenges and less favourable
experience. National experts must contribute to make sessions interactive and useful for themselves and
for others.
Topic Leaders can be national experts or others with a specific knowledge in fields of the EPBD not so
strongly represented in the Management Team. These support preparation and lead of sessions in a
particular field. They are responsible for these sessions in typically at least 3 or 4 plenaries and within a
similar field.
Junior rapporteurs are responsible for the first draft for session reports and can be included in other
documents such as preparation reports. They also support the practical execution of sessions. Central
Team Managers are responsible for the finalisation of reports and also for the upload to Glasscubes, but
can be assisted in this process by the Junior Rapporteurs.
4.2 Project management
Project management, quality assurance and monitoring of progress
Two groups of meetings are essential for the management of the CA EPBD project:
The Contractors Meeting consists of the National Coordinators / Contact Persons from each partner
of the project. This group is responsible for the overall progress and for major changes in the project and
the budget as well as for general follow up on budgets and deliverables by all partners. Meetings are
expected regularly twice a year. Additional meeting can be called for by the coordinator. The coordinator
leads and prepare these meetings. Usually, decisions in the Contractors Meeting are taken by consensus,
but in case of a vote and if there is a tie, the coordinator’s vote is decisive.
The Management Team consists of the Central Team Managers, the Coordinator and the
Communication Manager. This group is responsible for the setup of meetings and the technical content
in the project and in particular the Plenary Meetings, In-depth Workshops, Study Tours and Open Events.
Content of major events are further agreed with the DG ENER, through a process of commenting and by
participating in preparation meetings.
Contractors / National Coordinators represent each individual partner and their national experts in
formal decisions in the project. They meet regularly at the Contractors Meeting in connection to each
Plenary or In-depth Workshop. This means approximately twice every year. Additional meetings e.g.
virtual meetings can be called if needed or there can be made a written procedure / approval process.
23
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Partners can change the National Coordinator during the project but must notify the coordinator and also
adjust in the ECAS portal, when this happens.
The Management Team meets in connection to Plenary Meetings and In-depth Workshops for a shorter
meeting to ensure the progress and execution of the plenary / workshop. One additional meeting per
plenary is used for preparation of the meeting and for more extensive discussions on progress of the
project as well as more general technical discussions. It is expected that the Management Team will meet
physically approximately 4 times per year.
Between Contractors Meetings and Management Team Meetings the Coordinator takes care of the
management of the project and the coordinator is leading the implementation of the decisions made by
these meetings.
DG ENER and CINEA are invited to the Management Team Meetings and the Contractors Meetings, but
they have no voting rights.
For meetings where it makes sense (among other for the travel issues), such as in connection to plenary
meetings, the Central Team Assistants and Junior Rapporteurs are invited to Management Team
Meetings and these are also able to access material from the Management Team Meetings in
Glasscubes, but only CTMs have voting rights. The Coordinator’s assistant / support takes minutes from
these meetings.
Quality assurance and progress:
All public reports go through a systematic review process. This includes a technical review by the
coordinator, a language review by the Communication and for some reports a layout process (CTM,
Country Reports and Brochures etc.). CTM reports and public progress reporting further goes through a
review with commenting by DG ENER and CINEA.
The Coordinator presents progress of the project for the Contractors Meeting and the Management Team
for technical issues. These teams are then in collaboration with the coordinator responsible for the follow
up on preparation, management and reporting as well as general progress of the project. Coordinator’s
takes minutes and supports the implementation of the decisions in the Contractors Meeting and
Management Team Meetings.
Effective communication
The Glasscubes is a key element in the internal communication. All experts fulfilling the requirements to
become CA EPBD experts are approved for use of Glasscubes but on different levels based on the role
in the project. Major information especially around meetings are then placed in Glasscubes under each
meeting and can be accessed by the experts. This includes preparation material, presentations and
reporting material for sessions as well as registrations etc. Glasscubes ensure that all information can be
accessed before, under and after meetings and even for previous CA EPBD projects. There are specific
areas for the Contractors and for the Management Team Members where information in connection to
their meetings and roles can be handled.
Before a meeting, a Webzine is sent out. This Webzine is used to present meeting, sessions and general
information in connection to the preparation of the meeting, including registration, booking of hotels and
other important information. After the meetings, a Newsflash will indicate the upload of material and other
important information. In addition, Webzines as Newsflashes often refer to Glasscubes, which ensures
that material stay confidential despite of the many participants in CA EPBD 6.
In order to get access to Glasscubes, each expert must be appointed by the national coordinator and to
accept confidentiality and registration terms. Glasscubes is therefore a centre in keeping information
confidential and for members only. Much of Glasscubes will however also be open for many experts from
the other CA’s.
Direct mailing or mails from Glasscubes will also be used for information and sections in Glasscubes can
be set up for other types of collaboration.
For external communication, the main sources will be the Website, the Database with knowledge,
Newsletters and similar. These will be fully open to the public.
The Website will include the main public material on the project, including a storage and access of public
reports from the CA EPBD 6 and from previous CA EPBD projects. It will also include current descriptions
of the project and the teams, as well as news about the project and relevant information for the members
of the CA EPBD and some main stakeholders, but it does not aim to be a portal.
The Database of Technical Content will in particular include material from CTM reports, from Country
Reports and KIDs. This will be organised in a structured way where specific sections can be taken out of
for instance country reports or KIDs and be compared between all or some specific countries.
24
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Newsletters are to be used internally or perhaps including key stakeholders, but this is to be decided as
part of the communication and dissemination plan.
Exploitation of the information obtained in the CA EPBD is a key feature of the project. Plenary Meetings
and In-depth Workshops are designed with the aim that countries can learn from each other’s successes
and failures. It does therefore not make much sense to separate in Information and Dissemination
compared to Exploitation
4.3 Green management
Green management
Green procurement measures will be included as part of the selection criteria for venues. This will
include requesting information on energy performance certificates, information on general environmental
policies and measures for instance for reduction of plastic and other environmentally friendly actions.
This will be part of the qualitative assessment in order to find best value for the price.
Concerning travel, we will try to avoid travel for short interventions, meaning that external speakers in
most cases will speak from distance (Webex connection). This is especially the case when the external
expert only makes a shorter presentation or panel participation. Decisions on external participation on
site for more active roles will be decided from case to case.
The visit in different countries is an important part of the CA concept and is among other things used to
influence national decision makers to pay more attention to the implementation of the EPBD. It will,
however, by the selection of venues be taken into consideration how attendees can use sustainable
transportation such as trains. Participants will further be encouraged to use green transport whenever
this is possible and in particular when the meetings are held in the central European area.
5. MEMBERS OF THE CONSORTIUM
5.1 DEA / DK (DENMARK) 01
Participant 1
Legal name (short name): Energistyrelsen/Danish Energy Agency – (DEA)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Danish Energy Agency by the Coordinator will be responsible for the general management of the CA EPBD
6. This includes the management of the Contractors Meetings and the Management Team. Between the
meetings, the Coordinator will lead the daily management on behalf of the Danish Energy Agency. The Danish
Energy Agency will be responsible for the financial and legal oversight on behalf of the CA EPBD6 Consortium
as well as for communication with partners and CINEA. Each of the national partners can include subcontracts
and in-kind contributions, providing this is approved as part of the project or approved by DEA, the Contractors
Meeting and endorsed by CINEA.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Jens Henning Laustsen, male, chief advisor / Coordinator, Architect
Jens has been leading the CA EPBD IV as Technical Coordinator from October 2015 until October 2018 and
also for the first part of the CA EPBD V. In the past, Jens has been an employee of the Danish Energy Agency
for more than 13 years (1992 - 2006) and again since May 2020. He has led the work on development and
implementation of certification schemes, boilers' inspection systems, information activities, grants for renewable
energy, information policy and has supported the work on setting up energy demands in buildings and policy
development. Jens was part of the negotiation team for the EPBD in 2002 and 2003 and responsible for the
transposition for the first EPBD directive in Denmark in 2006. He has been leading the CA EPBD since October
2015 in different roles and he was also part of the team that set up the first CA EPBD, management team for
25
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
technical issues and leader (CTM) of the team for certification for more than 2 years. He further has a very long
experience internationally, in Europe as well as the rest of the world including 5 years leading energy efficiency
policy in buildings work in the International Energy Agency (IEA).
Christoffer Høj Rühne, Male, Advisor, Master of Science (political science)
Christoffer is assisting Jens with the coordination of the Concerted Action EPBD. He has been employed by the
DEA since August 2021. Further, he has been involved with the negotiation process of the recast EPBD since
December 2021, coordinating instructions and written remarks for the Danish position in the negotiations of the
EPBD on behalf of the DEA.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
CA EPBD 1; Central team leader for Core Team Certification. Member of steering group. Participation in
plenaries by national experts.
CA EPBD 2: Participation in plenaries by national experts. Central team leader for Core Team Certification,
subcontracted to DK Building institute.
CA EPBD 3: Participation in plenaries by national experts. Central team leader for Core Team Technical
elements, subcontracted to DK Building institute.
CA EPBD IV: Overall coordinator for the project. Participation in plenaries by national experts. Central team
leader for Core Team Technical elements, subcontracted to DK Building institute.
CA EPBD V: Overall coordinator for the project. Participation in plenaries by national experts. Central team
leader for Core Team Technical elements, subcontracted to DK Building institute.
affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
Not applicable
5.2 OIB / AT (AUSTRIA) 02
Participant 02
Legal name (short name): Osterreichisches Institut fur Bautechnik/Austrian Institute
of Construction Engineering - (OIB)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Austrian Institute of Construction Engineering (OIB) was established in 1993 on the basis of an agreement
concluded by the Austrian federal states in accordance with Article 15a B-VG (Federal Constitution Act)
concerning the cooperation in the construction sector. OIB is a non-profit organization with headquarters in
Vienna, having as members the Austrian provinces of Burgenland, Carinthia, Lower Austria, Upper Austria,
Salzburg, Styria, Tyrol, Vorarlberg and Vienna. The activities of the association extend to the entire territory of
the Republic of Austria. Furthermore, OIB serves as a common „spokesperson” in European and international
professional bodies.
The Austrian Institute of Construction Engineering (OIB) is the coordinating platform of the federal states for
construction products and construction technology and performs the following tasks:
• OIB is a European technical assessment body and national approval body for construction products;
• It issues the OIB guidelines, in order to enable federal states to harmonize the technical requirements in the
building regulations;
• As market surveillance authority, the OIB ensures that the construction products on the Austrian market fulfil
all legal requirements and do not endanger health and safety;
26
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
• As a product contact point, the OIB provides information about the currently valid technical requirements for
construction products in Austria.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Wolfgang Thoma, male, head of unit, advanced university degree
Wolfgang Thoma is more than 25 years head of the building physics unit at OIB and has deep experience in
energy performance of buildings and renewable energy technologies. He holds a university degree in Technical
Physics from the Technical University of Vienna and has been national coordinator for CA I to V.
Robert Stadler, male, senior expert, advanced university degree, qualified private lecturer
Robert Stadler has been working for more than three years at OIB on topics relevant for the EPBD such as the
LTRS, the SRI and the OIB Guidelines 6 (Energy savings and heat insulation) and 7 (Sustainable use of natural
resources). He obtained a PhD in Technical Chemistry from the Technical University of Vienna and a habilitation
(PD) in Computational Materials Science at the University of Vienna. He is part of the Working Group on the SRI
in the EPBD CA and coordinates the national test phase on the SRI in Austria.
The Austrian Institute of Construction Engineering (OIB) as a non-profit association of the Austrian Länder will
receive support as in-kind contribution against payment from regional governments (Länder) e.g. Joachim
Weinberger, male, acting as senior expert with advanced university degree who is employed at Amt der
Salzburger Landesregierung (Amt d. S LReg) to be able to cover all 3 Sessions of the CA VI Plenary Meetings.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
• Concerted Action EPBD 1 — CA1 (2005-2007)
• Concerted Action EPBD 2 — CA2 (2007- 2011)
• Concerted Action EPBD 3 — CA3(2011- 2015)
• Concerted Action EPBD IV — CAIV (2015 – 2018)
• Concerted Action EPBD V — CAV (2018 – 2022)
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.3 CSTC / BE (BELGIUM) 03
Participant 03
Legal name (short name): Centre Scientifique et Technique de la Construction – (CSTC)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Belgian Building Research Institute (BBRI) (In French "Centre Scientifique et Technique de la Construction",
CSTC www.cstc.be) is a private research institute founded in 1960 under impulse of the National Federation of
Belgian Building Contractors in application of the so-called "De Groote" decree-law of 1947. This decree-law
was specifically aimed at the promotion of applied research in the construction industry, in order to improve its
competitiveness.
According to its statutes, the BBRI has the following three main tasks: 1. to perform scientific and technical
research for the benefit of its members; 2. to supply technical information, assistance and advice to its members;
27
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
and 3. to contribute to the general innovation and development in the construction sector, more specifically by
performing contractual research upon the request of the industry and the authorities.
To fulfil these tasks, the BBRI pools on the expertise of almost 280 highly skilled staff members coming from
various educational backgrounds, working in multidisciplinary teams depending on the treated subject.
Since 2000, CSTC is the key technical partner in the preparation phase of energy performance regulations in
Belgium. CSTC has coordinated several EU projects linked to EPBD implementation, in particular
QUALICHeCK, ENPER (2000-2003), ASIEPI and the Buildings Platform, BUILD UP 1 and BUILD UP 2. With
respect to the EPBD implementation, CSTC has set up and was the leading partner of a consortium of over 10
teams assisting the 3 regions of Belgium in their EPBD implementation.
Since the start of the EPBD CA, CSTC is the national coordinator for Belgium, is involved in the Management
Team and has been in charge of communication activities. CSTC was involved in EPBD CA III in the Core Team
“Compliance and Control”, in EPBD CA IV CSTC was responsible for the Core Team “Certification and quality
of inspection” and in EPBD CA V CSTC was responsible for the Central Team “Smart Buildings”.
Within different projects and activities, CSTC has also set up different research and validation actions related to
smart buildings and the market uptake of BIM (Building Information Modelling).
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Xavier Loncour, male, Civil Engineer
Xavier Loncour (Belgium) has a degree of civil engineer of the University of Louvain (UCLouvain) and is leader
of the group “Energy and buildings” at the Belgian Building Research Institute (CSTC), the collective research
centre for the construction in Belgium.
Within EPBD CA 6VI, he will be the Belgian national coordinator and he will also be the central team leader for
the topic “Smart Buildings”. He was involved in the EPBD CAIII in the core-team “compliance and control”. In
EPBD CA IV, he was central team leader of the team “Certification, Control system and Quality of inspection”.
In EPBD CA V, he was responsible for the central team “Smart Buildings”. He has collaborated on the
implementation of the EPBD in the three Belgian regions;: he has coordinated the development of the energy
certification of existing residential buildings in the Walloon Region and was involved in the development of tools
for the execution of detailed energy audits in the residential sector. He has worked on several European EIE
projects as QUALICHECK or ENPER EXIST. He is animator of the CSTC Technical Committee “Hygrothermal
Performance of Buildings” and is involved in the Technical Committee “Smart and Sustainable Construction”.
Peter D’Herdt, male, Civil Engineer
Peter D’Herdt (Belgium) has a degree of civil engineer of the University of Gent (UGent) and works in the division
Intelligent Installations and Sustainable Solutions of the Belgian Building Research Institute (BBRI), the collective
research centre for the construction sector in Belgium. He was central team assistant (CTA) of the team “Smart
Buildings” (CT6) in EPBD CA V.
He has supported and has been strongly involved in the implementation of the EPBD in the three Belgian regions
since the beginning of the implementation of the Directive and has worked on different research projects on the
Energy performance calculation method and its implementation, as well as in projects on smart solutions, their
practical implementation and valorisation within different frameworks. He has worked on the European SAVE
project ASIEPI and is member of the Expert Board of the H2020-project Smartbuilt4EU. He is involved in the
Technical Committee “Smart and Sustainable Constructions” within the BBRI, mainly in the sub working group
“Smart and Data-driven buildings”.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action EPBD I - Concerted Action EPBD V (2005-2022) – www.epbd-ca.eu
The Concerted Action EPBD (CA EPBD) addresses the Energy Performance of Buildings Directive (EPBD). It
aims to contribute to the reduction of energy use in European buildings, through the exchange of knowledge and
best practices in the field of energy efficiency and energy savings between all 28 EU Member States plus
Norway. The CA EPBD is a joint initiative between the EU Member States and the European Commission. It
involves representatives of national ministries or their affiliated institutions who are in charge of preparing the
technical, legal and administrative framework for the Energy Performance of Buildings Directive in each EU
Member State, plus Norway. The objective is to enhance the sharing of information and experiences from
national adoption and implementation of this important European legislation. The first CA EPBD was launched
in 2005 and came to an end in June 2007. A second phase followed immediately after the first CA EPBD, a third
28
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
phase ran from 2011 to 2015 and a fourth one from October 2015 to March 2018. The fifth phase started on May
2018 and runs until October 2022 and aims to support the transposition and implementation the EPBD amended
Directive 2018/844/EU.
Since the start of the EPBD CA, CSTC is the national coordinator for Belgium, is involved in the management
team and has been in charge of communication activities. CSTC was involved in EPBD CA III in the core team
“Compliance and Control”. In EPBD CA IV CSTC was responsible for the core team “Certification and quality of
inspection” and in EPBD CA V, CSTC was responsible for the central team “Smart Buildings”.
SBO NEPBC - Next generation building assessment methods towards a carbon neutral building stock (2017-2021)
In this project, supporter by the Flemish FWO (Fund Scientific Research – Fonds Wetenschappelijk Onderzoek),
two universities (UGent and KULeuven), the platform for energy neutral construction (Pixii) and BBRI
investigates how the framework of building energy assessment methods used in the EPB regulation in Flanders
should evolve to take evolutions in science and technology into account. Three specific issues were given
particular attention: the performance gap between the theoretical energy use predicted by energy performance
assessment methods, and the actual energy use in dwellings; the position of the choice for a calculated yearly
energy balance as a basis for performance assessment in relation to future evolutions and decarbonization of
the grid; and finally the integration of market responses, building-grid interaction and embodied energy in
materials and systems installed to reduce operational energy use.
Through (academic) research, intensive contacts with the government administrations and other validation
activities, the projected created and shared knowledge on the particular themes to support the transition to a
carbon neutral housing stock by 2050. BBRI was responsible for organizing the link and discussion with the
administration representatives and to identify opportunities and tackle specific challenges in relation to the
standardization and legislative aspects. BBRI was also responsible for a particular task on the exploration of the
opportunities offered by BIM (Building Information Modelling) to support the EPB legislation.
Energy Performance Regulation supporting Platform (2013 – 2021)
From 2013 until 2021, BBRI has lead a consortium of over 10 institutes in charge of supporting the 3 Belgian
Regions (Brussels Region, Flanders and Walloon Region) in their coherent and uniform implementation of the
EPBD and in particular in the development of their Energy Performance regulations and calculation methods for
new buildings. A part of the work was also dedicated to the Energy Performance certification method applicable
for existing non-residential buildings. Through this consortium; BBRI was involved in the technical studies, the
development of legislative text, the organization of ad-hoc stakeholder consultations and in impact assessment.
LIFE BEreel ! (2018-2024) - https://be-reel.be/ (LIFE16 IPC/BE/000005)
BE REEL! is a LIFE integrated project supporting Belgium in reaching its climate goals in which 10 partners
work on 4 ambitious subprojects all based on a strong communication and dissemination strategy.
1. New policy instruments: BE REEL! will develop, test and improve new policy instruments: renovation
advice, Woningpas (Dwelling ID), quickscan tool, road map, building passport and global dossier. It will
also set up pilot projects in different segments of the housing market. The policy instruments will later
be rolled out across the entire Flemish and Walloon territory.
2. Innovative business models for renovation : BE REEL! will test ‘one-stop-shops’, which offer renovation
advice and guidance. In addition, the project will develop and test innovative business models for such
things as the private rental market, district and group renovation, key-on-the-door turnkey homes and
large apartment buildings with co-owners.
3. The partner cities will demonstrate the technical and financial feasibility of in-depth renovations. The
focus here is on a collective approach. The demonstration projects include collective renovations of
houses into low-energy and nearly Zero Energy Building almost-energy-neutral homes, thorough
renovations of large and small apartment blocks, communal solar panels, district renovations, shallow
geothermal energy, energy investments for vulnerable groups of the population and third-party funding
for energy renovations.
4. Capacity Building: With intensive knowledge-building and training among regional and local authorities
and stakeholders (construction sector, social housing, education, renovation consultants, financial
sector), the new policy instruments, innovative business models and good practices will be
implemented in the society as a whole. Learning networks will increase the interregional and
international collaboration and ensure that the results of BE REEL! will be improved and put to optimum
use.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
29
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Not applicable
5.4 SEDA / BG (BULGARIA) 04
Participant 04
Legal name (short name):
Sustainable Energy Development Agency (SEDA)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Sustainable Energy Development Agency (SEDA) is a legal entity and has the status of an executive agency
within the Ministry of Energy with headquarters in Sofia. The SEDA is at state budget support.
The Agency is managed by Mr. Ivaylo Aleksiev, Executive Director, supported by a staff of 60 experts.
SEDA’s website: www.seea.government.bg
The main activities of the SEDA include:
• Elaboration of the energy efficiency strategy.
• Organizes annually the preparation and publishing of an analysis of the energy efficiency situation in
Bulgaria and of the annual progress of implementation of the policy and measures for improving
energy efficiency, including achieving of the total cumulative target of energy savings in final energy
consumption for the period from 2021 to 2030;
• Organize the compilation of information on the progress of implementation of the policy and
measures for improving energy efficiency for the purposes of reporting on the Integrated Energy and
Climate Plan of the Republic of Bulgaria;
• Prepares proposals for the distribution of the individual energy savings targets under the Energy
Efficiency Obligation Scheme;
• Carries out monitoring and evaluation of the achieved annual energy savings, including the
performance of the individual targets for energy savings of the persons under the Energy Efficiency
Obligation Scheme;
• Prepares analyses and evaluations for the effects of applied activities and measures to increase
energy efficiency, including the applicable financial instruments and schemes to promote;
• Supports the development and actualization of the Integrated Energy and Climate Plan of the
Republic of Bulgaria;
• Expansion of EE and RES policy on local level;
• Exercises control over observance of the legislation in the field of energy efficiency.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Tsvetomira Kulevska, female, Senior expert, Diploma Engineer
High level of expertise in the analysis of energy consumption and implemented energy efficiency policy
measures, evaluation of improvements of energy efficiency and achieved energy savings. Provides
methodological assistance in the implementation of obligations under the Energy Efficiency Act of the obligated
parties. Interacts with the local authorities and provides assistance in the implementation of activities and
measures to improve energy efficiency at national and local level. Participates in the preparation of the annual
reports on the implementation of National Energy Efficiency Action Plan and National Energy Efficiency target
according to Directive 2012/27/EC. Contact point for Concerted Action for the Energy Efficiency Directive (CA
EED) projects funded by H2020 Program. Responsible for the Mure Database update for the ODYSSEE- MURE
projects.
Lyudmil Kostadinov, male, Senior expert, Diploma Engineer
High level of expertise in the analysis of energy consumption and implemented energy efficiency policy
measures, evaluation of improvements of energy efficiency and achieved energy savings, operation with
database and calculation of specific energy efficiency indicators. Participation in similar projects under the H2020
Programme. Participates in the preparation of the annual reports on the implementation of National Energy
Efficiency Action Plan and National Energy Efficiency target according to Directive 2012/27/EC. Person in charge
of work for the ODYSSEE- MURE projects.
30
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Ognian Markovski, male, Expert, Master of Economics
High level of expertise in economic analysis of the implemented energy efficiency policy measures and
improvements of energy efficiency and usage of renewable energy sources, operation with database and
calculation of specific energy efficiency indicators; Expertise in annual reporting on the implementation of the
National Energy Efficiency Action Plan; Special expertise in application of funding support schemes and
instruments for promotion of the energy efficiency and usage of renewables; Large experience in technical and
financial management of various projects under the Horizon 2020 Programme. Contact point for CA EPBD
projects funded by H2020 Programme.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
• Concerted Action EPBD V (CAV_EPBD) in the framework of H2020 programme (https://epbd-ca.eu)
– ongoing project;
• Concerted Action EED - Support to Member States and participating countries for the implementation
of the Energy Efficiency Directive (CA-EED2) in the framework of H2020 programme (http://www.ca-
eed.eu) – finalized in 2022;
• Monitoring EU energy efficiency first principle and policy implementation (ODYSSEE-MURE) #847082
in the framework of H2020 programme (https://www.odyssee-mure.eu/) - finalized in 2021
• Bulgarian Energy Efficiency Forum on Smart Finance for Smart Buildings (BeSMART) in the
framework of H2020 programme (https://www.besmartproject.net) – ongoing project.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.5 MECI / CY (CYPRUS) 05
Participant 05
Legal name (short name): Ministry of Energy, Commerce and Industry - (MECI)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Ministry of Energy, Commerce and Industry has the overall responsibility for all energy issues in Cyprus. Its
mission is to ensure the energy security of the country with the most efficient way from economic, environmental
and technical point of view. Within this framework it monitors and participates in the shaping of European policy
on energy, suggests ways to transpose European Directives into national legislation, establishes and implements
national action plans and other programs to promote renewable energy and energy saving. The Energy Service
of the Ministry of Energy, Commerce and Industry is the competent authority for implementing EPBD in Cyprus.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Nicos Hadjinicolaou, Male, Industrial Extension Officer A, BSc and MSc in Mechanical Engineering and
Master’s in Public Sector Management
Coordination of the Ministry’s unit for the energy efficiency of buildings and for the energy efficiency of products.
Represents Cyprus as a national expert in the Energy Performance of Buildings Committee of European
Commission and is the National Coordinator at the "Concerted Action EPBD 5" program.
Ioanna Zymara, female, Industrial Extension Officer, BSc and MSc in Electrical Engineering
Responsible for issues related to national methodology for calculating energy performance of buildings, Energy
Performance Certificates and their control system and the Smart Readiness Indicator. Participates in the
"Concerted Action EPBD 5" program.
Christis Yiallouros, Male, Industrial Extension Officer, BSc and MSc in Mechanical Engineering.
31
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Responsible for the transposition and implementation of EBPD articles on heating and air conditioning
inspections and technical building systems. Coordination of sample inspections for Implementation of minimum
energy performance requirements and energy performance category on commercial ads. Participates in
Concerted Action for the Energy Performance of Buildings 5.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.6 MIT / CZ (CZECH REPUBLIC) 06
Participant 06
Legal name (short name): Ministry of Industry and Trade - (MIT)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Ministry of Industry and Trade is the central body of the government administration involved in:
The National Industry Policy, the Energy Policy, the Trade Policy in the context of the European Common Market,
the Export Promotion Policy, the Integrated Raw Materials Policy and the Use of Mineral Resources.
The Ministry implements the European legislation in the field of Energy Efficiency and Energy Performance of
Buildings into national legislation. The Ministry is also adopting and amending implementing regulations in the
field of Energy Efficiency and Energy Performance of Buildings Directive. Further, it provides exams to obtain
permission for the energy specialists issuing the Energy Performance Certificates or performing heating and AC
systems inspections. The Ministry produces the National Action Plan to increase the number of nearly zero
energy buildings performs its updating and evaluation. Ministry developed the Long-term Renovation Strategy.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Vojtěch Svoboda, male, NCP, Energy specialist
10-year long work experience in the field of energy. Directly involved in implementation of EPBD on a national
level. Preparation of legislative acts in the field of energy performance of buildings and energy efficiency.
Member of the Examining Board for EPC issuers, energy audits and assessments performing heating and
cooling system inspections. Member of the working group for the preparation of technical standards in the field
of energy performance of buildings.
Involved in preparation of the Czech´s LTRS.
National coordinator of previous Concerted Actions (CA 3, CA IV and CA V). Member of Energy Performance of
Building Committee (Directive 2010/31/EU).
Ján Čiampor, male, National Expert, Head of Energy management unit
32
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
3 year long work experience in the field of energy .Head of energy management unit at the Ministry of Industry
and Trade. Directly involved in implementation of EPBD on a national level. Preparation of legislative acts in the
field of energy performance of buildings and energy efficiency. Member of CA-EPBD a CA-EED for the Czech
Republic.
1,5 year long experience in DG ENERG – energy efficiency directive.
Nathalie Marková, female, National Expert, Energy specialist
3 year long work experience in the field of energy. Directly involved in implementation of EPBD on a national
level. Preparation of legislative acts in the field of energy performance of buildings and energy efficiency.
Member of CA-EPBD and NCP of CA-EED for the Czech Republic. Monitoring of all subsidies program for
building.
Involved in preparation of the Czech´s LTRS.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
• Participated in/processed documents by the organisation:
• Long-term Renovation Strategy
• National Energy and Climate Plan
• Concerted Action for Energy Performance of Building Directive
• Concerted Action for Energy Efficiency Directive
• Cost-optimum report (art. 5(2) of EPBD)
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.7 BAFA / DE (GERMANY) 07
Participant 07
Legal name (short name): Bundesstelle für Energieeffizienz, Bundesamt für
Wirtschaft und Ausfuhrkontrolle - (BAFA)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Federal Energy Efficiency Center (BfEE) is allocated within the Federal Office for Economic Affairs and
Export Control (BAFA). The Center was established in 2009 by order of the Federal Ministry for Economic Affairs
and Energy (BMWi), inter alia to support the implementation of the European Energy Services Directive (EU
ESD, 2006/32/EC) and to assume the role as designated national authority according to that directive. The
directive was transposed into national law via the Act on Energy Services (EDL-G) in 2010, which defines the
BfEE’s responsibilities. The EDL-G was amended in 2015 in reaction to the adoption of the EU Energy Efficiency
Directive (2012/27/EU).
BAFA’s supervisory body is the Federal Ministry for Economic Affairs and Climate Action (BMWK). The BfEE is
a division within BAFA department V “Energy Efficiency, Renewable Energies, Special Compensation Rule”.
The BfEE particularly supports the Federal Ministry for Economic Affairs and Energy scientifically on all aspects
of energy efficiency.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Jonas Rosenberger, male, Engineer
Expertise with German laws, regulations and norms concerning the energy-performance of buildings.
33
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Sabrina Strehlke , female, Engineer
Expertise with German laws, regulations and norms concerning the energy-performance of buildings etc.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
CA EPBD V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.8 MEC / EE (Estonia) 08
PARTICIPANT 1
Legal name (short name): Majandus Ja Kommunikatsiooniministeerium/Ministry of
Economic Affairs and Communications - (MEC)
DESCRIPTION OF PARTICIPANT
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The objectives of the Ministry of Economic Affairs and Communications is to create overall conditions for the
growth of the competitiveness of the Estonian economy and its balanced and vital development through the
drafting and implementation of Estonian economic policy and evaluating its outcomes.
In the area of government of the Ministry are the following fields: economic development; transport; tourism;
foreign trade; internal market of the European Union; information society; the energy sector; construction and
housing. The main strategic objectives of the Ministry include encouragement of entrepreneurship and legal
environment that will ensure the market participants, at uniform grounds; innovative Estonian enterprises that
are competitive at international level; an effective, safe, secure and environmentally friendly transport system;
information society development and steady and stable energy supply with the minimum burden on
environment and with a justified price.
In the construction and housing sector, the related efforts of the Ministry should ensure the safety, quality and
energy performance of buildings and the balanced and sustainable development of the living environment.
KEY STAFF
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed
activities.
Hannamary Seli, female, National Contractor, MSc. Thermal power engineering
Hannamary Seli is the Head of Sustainable Construction at the Ministry of Economic Affairs and
Communications. She has been the National Contractor in the CA EPBD V project. Previously worked at US
Green Building Council as a technical advisor on atmosphere and energy topics.
PROJECTS OR ACTIVITIES
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
34
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Previously, Estonia has participated in both CA EPBD IV and CA EPBD V. In the CA EPBD IV project, KredEx9
was in charge of the project overall coordination. In CA EPBD V, the Ministry of Economic Affairs and
Communications took over the overall coordination, as the topics covered in the project, were more related to
legislative field.
AFFILIATED ENTITIES / ASSOCIATED PARTNERS
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.9 CRES / EL (GREECE) 09
Participant 09
Legal name (short name): Centre for Renewable Energy Sources & Saving – (CRES)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
Centre for Renewable Energy Sources & Saving (CRES) is a public entity supervised by the Ministry of
Environment and Energy, and has financial and administrative independence. CRES is active in the fields of
Renewable Energy Sources (RES), Rational Use of Energy (RUE) and Energy Saving (ES). Its primary aim is
to promote technological applications in the above-mentioned fields both at a national and international level.
CRES has been appointed by Law 2244/94 and Law 2702/99 as the National Centre for Coordination in the
fields of its activity. It acts as an advisor to the Greek State, and has established a highly visible profile of a
strong and reliable national energy centre.
CRES has a scientific staff of more than 100 highly qualified engineers and other scientists (among a total
personnel of 120) and, over the years, has participated in more than 1.000 European and national projects.
These include R&D projects, demonstration projects, development of energy information systems & models,
assessment and analysis of energy policies, feasibility studies, technical and economic studies, market research,
as well as training and promotional activities on the RES/RUE/ES related issues.
CRES co-operates with other institutes, organisations, universities, consultants, international organisations
(such as the IEA, UNESCO, ISES, PLEA, IEC, CEN, etc), while it is an active member of various European and
international networks, such as the EnR, MEDENER, EUFORES, OPET, EUREC Agency, etc.
CRES has supported numerous municipalities and regional authorities to develop sustainable energy plans,
energy efficiency interventions and promotional campaigns and has also developed national energy sustainable
energy schemes for municipalities. Since February 2012, CRES is the Greek National Coordinator for the
Covenant of Mayors. Additionally, CRES has strong competencies on borehole heat exchangers and heat
pumps technology research, demonstration and market development. Specific expertise and skills include
technology optimization, operation, monitoring and evaluation, technical & financial case studies compilation,
sectorial analysis, innovation system analysis, business models, development of market introduction supporting
measures, as well as in management and dissemination actions.
The Department of Buildings in the Division of Energy Efficiency in CRES has long experience on:
Technical support of the state on the energy performance of buildings and ES, of the industry on the optimisation
of building materials and elements and of the private sector (including households, offices, hospitals, industrial,
educational and tourist buildings) with the bioclimatic design of buildings and open spaces, the optimisation of
energy performance of the building and the use of RES and ES applications in buildings.
• Conduction of energy audits in buildings and industrial plants.
• Development of passive solar systems and new ES technologies on the building envelope.
9
As of January 2022, KredEx and Enterprise Estonia merged. The legal name of the new organisation is now Estonian Business and
Innovation Agency
35
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
• Support of the public and private sector on ES investments with new financial mechanisms.
• Contribution on the design of ES at national level and the implementation of EU directives, regarding
energy savings in the building sector.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Andreas Androutsopoulos, male, senior expert, Mechanical engineer MSc
He is working at CRES in the Buildings Department / Division of Energy Efficiency since 1994. Additionally, he
is involved with the quality assurance and accreditation of the building components thermal testing laboratory
according to EN ISO/IEC 17025 and his is currently in charge of the Energy Measurements Laboratory. He has
participated in many European and national projects regarding energy efficiency of buildings, passive solar
systems, natural ventilation, thermal comfort in buildings, and thermal energy systems. He has participated in
numerous projects regarding energy efficiency in industry and carried out energy audits in industrial plants as
well the implementation of energy management system in enterprises. His research activities are in the areas of
energy efficiency, renewable energy sources, thermal and solar building applications along with dynamic
analysis methods applied to the energy performance in buildings. He has also participated in national committees
for the implementation of EPBD in Greece, carried out projects for the up-taking of EPCs and energy renovation
in buildings and is member of various national technical committees regarding energy efficiency in buildings.
Since 2015 he is the national contact for the CA EPBD consortium and participates in all CA events. He has
more than 70 publications in scientific journals and conferences, and 25 publications in technical magazines.
Argyro Giakoumi, female, senior expert, Physicist MSc
She has graduated in the department of Physics from the National & Kapodistrian University of Athens (NKUA)
in Greece and holds a Master in Production and Management of Energy from the National Technical University
of Athens (NTUA), with a focus to Renewable Energy Sources and Energy Saving in the building sector. She is
working in the Centre for Renewable Energy Sources & Saving (CRES) since 2006 in the areas of energy policy
analysis and planning, national and European legislation, policy recommendations and design of support
frameworks for increased penetration of renewable technologies and energy efficiency measures. She has been
involved in a number of European and national projects with activities that concern among others, Third Party
Financing and retrofits through Energy Performance Contracting, development of the energy service market and
energy service companies (ESCOs), implementation of ISO 50001, implementing energy efficiency
improvements towards nearly zero energy building standards in public buildings. She has also experience in
performing energy measurements and monitoring for energy audits in the building sector and analysis of
gathered data. Finally, she has published 2 articles in international journals and several others in national
journals and has also participated and presented studies in national and European conferences.
Nestor Mavropoulos, male, senior expert, Mechanical engineer MSc
He is working at Ministry of Environment and Energy (YPEN), in the Energy Efficiency Department, since 2017
and before that, he was involved in spatial planning of Athens metropolitan area for 2 years (2015-2017). He
was supervising engineer and designer of mechanical public works for 14 years (2001- 2015). He has
participated, as national representative, in EU Committee meetings of the revised Energy Performance of
Buildings Directive. He has also participated in national committees, meetings and forum for the implementation
of the EPBD in Greece. Since 2019, he participates in the CA EPBD works. He has also participated in some
CA EED and CA RES events.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action EPBD V, IV
Funding: H2020 Contract no: 820497 Period: 2015-2018; 2018-2022...
The “Concerted Action Project” is an activity which aims to foster the exchange of information and experience
among Member States and participating countries with regards to the implementation of the specific Community
legislation and policy on the energy performance of buildings.
Χ-ΤΕΝDO - eXTENDing the energy performance assessment and certification schemes via a mOdular
approach. HORIZON 2020 LC-SC3-2018, contract 649867, April ’19 – March ’22.
X-tendo supports public authorities and implementing agencies in the transition towards improved compliance,
reliability, usability and convergence of next-generation energy performance assessment and certification by
developing a modular web-based toolbox, containing 10 potential features of the next-generation EPC: smart
36
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
readiness indicator, comfort, outdoor air pollution, real energy consumption, district heating, EPC databases,
building logbook, tailored recommendations, financing options, and one stop shops.
ePANACEA - ‘Smart European Energy Performance AssessmeNt And CErtificAtion’ HORIZON 2020 – LC-SC3
EE 2019, contract 884411, Jun ‘20 – May ’23.
ePANACEA aims to: 1) demonstrate the potential for improvement of the effectiveness of energy performance
assessments and EPCs; 2) generate trust in the market, in order to contribute to trigger investments in the
energy efficient buildings; 3) develop a standardised data format, enabling the exchange of building data related
to the EPC framework.
QualDeEPC - “High-quality Energy Performance Assessment and Certification in Europe Accelerating Deep
Energy Renovation”, HORIZON 2020, contract 649867, Sept. ’19 – Feb. ’23.
QualDeEPC tries to converge, on a EU-wide scale, the building assessment and the issuance, design, and use
of quality-enhanced EPCs as well as their recommendations for building renovation.
Harmonisation of the Greek Legislative/Regulatory framework with the new Energy Efficiency Directive
2010/31/EU
Funding: Ministry of Environment and Energy - Contract no: 170803/64/20.1.2017 - Period: 2017-2019
Coordination and preparation of required studies/ reports to determine cost-optimal minimum energy efficiency
requirements for buildings; coordination and preparation of studies/reports for the definition of requirements for
buildings with nearly zero energy consumption (nZEB). It included the project management of the study for cost
optimal methodology for buildings in Greece and the minimum requirements of nearly zero energy buildings.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
No
5.10 IDAE / ES (SPAIN) 10
Participant 10
Legal name (short name): Instituto para la Diversificacion y Ahorro de la Energia/
Institute for Energy Diversification and Conservation -
(IDAE)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Institute for the Diversification and Energy Saving, IDAE, is a body attached to the Ministry for the Ecological
Transition and the Demographic challenge, through the Secretariat of State for Energy, who relies on organically,
forming part of its organization chart.
IDAE contributes to the achievement of the national objectives in energy efficiency, renewable energy and other
low carbon technologies.
In this sense, the IDAE carries out dissemination and training, technical support, development of specific
programs and financing of projects of technological innovation and replicable character. Likewise, the Institute
leads an intense international activity in the framework of various European programs and cooperation with third
countries.
IDAE plays a very important role in the implementation of the EPBD, since it carries out technical support to the
Ministry of Ecological Transition, which is responsible for its transposition into Spanish regulations. Within the
technical support IDAE collaborates to the drafting of legal texts and has developed and implemented tools that
technicians should use to certify buildings in Spain.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
37
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Domínguez Martín, Aitor, male, Project Coordinator, Industrial engineer
Coordinator of projects related to the transposition of the Energy Efficiency Directives in buildings since 2010,
and participant and coordinator in the Concerted Action III-V
Guillermo López, Alonso, male, Technical advisor Ministry of Ecological Transition
Responsible for the transposition of the EPBD Directive in Ministry of Ecological Transition
Diez de Pablo, Ainhoa, female, Head of the Habitability and Sustainability Area Ministry of transport and
urban agenda
Responsible for the transposition of the EPBD Directive Ministry of transport and urban agenda.
Ministry of Ecological Transition.
Ministry of transport and urban agenda.
Both Ministries, as co-responsible for the transposition of the Energy Efficiency of Buildings Directive, are
expected to collaborate actively in the technical development of the project, without the need to establish
contractual links or subcontracting, they will participate in CA plenaries as in-kind contribution against payment
as two of three experts per plenary meeting.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Coordinators and participants of the different stages of the Concerted Action project from its origin to the
present:
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.11 MOTIVA / FI (FINLAND) 11
Participant 11
Legal name (short name): MOTIVA OY - (Motiva)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
Motiva is an expert company promoting efficient and sustainable use of energy and materials. Motiva provides
information, solutions and services for the public sector, businesses, and municipalities. The company’s entire
share stock is in Finnish state ownership. Motiva has a staff of 44 and turnover of M€5,55 (2021).
Motiva has an active role in building sector energy efficiency implementation and promotion activities. Motiva
implements the building sector programs for energy efficiency programmes, e.g., coordination of national
information campaigns on energy certificates and inspections of air-conditioning units and national long-term
renovation strategy and its roadmap, through annual contracts commissioned by the Ministry of the Environment.
Motiva coordinates the national energy-efficient house promotional campaign focusing on the nZEB objectives
and the voluntary energy efficiency agreements in property and housing sectors.
38
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
The Ministry of the Environment has nominated Motiva to act as official representative of Finland in the CA EPBD
6. Motiva has participated in several EU-wide and national projects as a coordinator and a partner in the field of
energy efficiency and renewable energy sources e.g. CA EPBD, CA EED/ESD and CA RES and numerous IEE-
projects.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Päivi Laitila, Female, senior expert, Lic.Sc. (Tech.)
Ms. Päivi Laitila, Lic.Sc. (Tech.) has extensive and versatile experience with, over 30 years of experience in
energy efficiency on different sectors such as buildings, transport, consumers and communities. She is also
experienced in smart finance, competency building and behavioural approaches in implementation and
dissemination of energy efficiency issues. Laitila works as the Director (Energy Efficiency) for Motiva a Finnish
hundred percent state-owned sustainable development company. Prior to Motiva, she worked for the Technical
Research Centre of Finland VTT in Building Technology.
Ms. Laitila has graduated from the Helsinki University of Technology in the field of HVAC technology and energy
economy. After her Master’s degree, she has pursued studies in communication and leadership and completed
her licentiate thesis at Aalto University. She has been a core team leader of Finance and Information at the CA
EPBD V and a national contact point in the CA EPBD work commissioned by the Ministry of the Environment
since 2011. She has also contributed to the corresponding issues at the CA ESD/EED.
During her career, Ms. Laitila has worked in several international projects as a project manager (e.g. Finnish
Sustainable Energy Investment Forums (SEIF 1 and 2), BEHAVE, GreenLabels Purchase, End Users’ Energy
Guidebook), and as a member of steering groups (e.g. Euforie, IEE BUILD UP Skills, EU7 Changing behaviour,
and the ongoing EEMAP’s national steering group). She has also organized international events relating to
energy efficiency and renewable energy.
Kirsi-Maaria FORSSELL, female, expert, BBA
Ms Forssell has been working in Motiva since 1997 and works at present as an expert in Motiva Oy responsible
for projects related to building energy efficiency. Projects include communication and advisory services on
energy performance certification, energy efficiency advice and communication for technical building systems,
and communication and promotion services for nZEB construction and renovation of single-family homes. Kirsi-
Maaria is also involved in projects on energy efficiency financing and she is the core team assistant for the EU
Concerted action EPBD Finance and information core team. She is also involved in national projects on energy
efficiency financing.
As a communications expert, Kirsi-Maaria is responsible for marketing and communications on building energy
efficiency related projects and is involved in Motiva's projects, research and surveys relating to buildings and
real estate as well as urban and municipal areas.
Kirsi-Maaria has been involved in developing Motiva's online services, as well as various advisory materials
related to energy efficiency in households, construction and real estate, and she has long experience in
communications and marketing, and she has been involved in organising international conferences such as
BEHAVE2012 and EEMODS2015. Kirsi-Maaria has been a representative of Motiva in the international EnR
network, especially in the Labelling Working Group focusing on eco-design and energy labelling. She is a
member of the Real estate sector communicators’ network as well as the HVAC Ladies association.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
CA EPBD V: Motiva is a partner/national coordinator in the CA EPBD V project and in charge of the Finance
and Information Central Team.
CA EED: Motiva is a partner in the CA EED project, in charge of the domain planning, monitoring, verifications
and savings calculations.
Motiva conducts several projects linked with the implementation of the EPBD for the Ministry of the Environment
of Finland. These include projects on energy performance certification, technical building systems, new
buildings, with both information and advisory elements. Motiva has also been heavily involved in the
development of the Finnish Long Term Renovation Strategy and its implementation roadmap.
Financing energy efficiency has been a key project for several years (as a part of the annual work programme
for the Energy Authority of Finland). The project has been complimented with cooperation with for eg.e.g. EU
initiatives such as Sustainable Energy Investment Forums that have been organised with Motiva in 2020 and
2021. In 2021 Motiva launched a four-year project on sustainable finance with the Ministry of the Environment,
39
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Energy Authority and other partners. The project aims at establishing an information hub on finance as well as
cross-sectoral roundtables on sustainable financing.
Motiva has an extensive annual work programme under the Energy Authority of Finland, which includes such
major topics as energy efficiency agreements, energy auditing, monitoring, verification and evaluation,
renewable energy, consumer advice and communication.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.12 MTE / FR (FRANCE) 12
Participant 12
Legal name (short name): Ministère de la Transition Écologique - (MTE)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Directorate for Housing, Town Planning and Landscapes (DHUP) is a part of both the Ministry for an
Ecological and Solidary Transition and the Ministry of Territory Cohesion.
The DHUP aims, among other things, at defining the technical policy for construction. It develops and implements
the economical, industrial and social policy of the French state in both building and construction engineering
fields.
A representative of the General Directorate for Energy and Climate (also a part of the Ministry for an Ecological
and Solidary Transition) is also usually involved .in the Concerted Actions. This Directorate defines the French
energy policy, including the renewables and low carbon emission energies.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Quentin Deslot, male, Ms Science (Energy)
DHUP, Ministry of Ecological Transition and Solidarity; Head of the office of technical quality and technical
regulation of construction. Quentin DESLOT is an engineer of Ponts,Eaux et Forêts, a graduate of Ecole
Polytechnique and holds a Master of Science from Stanford University. In 2017, he joined the Directorate
General for Energy and Climate (DGEC) where he coordinates energy and climate projections activities, in
particular concerning the National Low Carbon Strategy. From 2019, he is in charge of the office of technical
regulation of construction at the Directorate of Housing, Urban Planning and Landscapes (DHUP) which pilots
various areas of regulation (safety, risks, health, accessibility, energy performance ). In this capacity, he
manages the team and the work associated with environmental regulations for new buildings on behalf of the
DHUP.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
40
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.13 MPGI / HR (CROATIA) 13
Participant 13
Legal name (short name): Ministarstvo prostornoga uređenja, graditeljstva i državne
imovine/Ministry of Physical Planning, Construction and
State Assets
(MPGI)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
Within the scope of the Ministry of Physical Planning, Construction and State Assets in the Sector for Energy
Efficiency in Buildings’ normative, administrative, and expert-analytical tasks of promoting rational energy
management and energy efficiency in buildings shall be performed.
In the Sector for Energy Efficiency in Buildings, tasks are performed of harmonisation of the legislation of the
Republic of Croatia in the area of energy efficiency in buildings with the acquis of the European Union; monitoring
and participating in the development of Croatian standards at the national standards body; monitoring the
application of regulations in the areas of energy efficiency and of special regulations as well as giving opinions
on regulations in the process of adoption; the introduction of new technologies in the field of energy efficiency in
construction; monitoring and initiating measures related to the increase in the quality of services, designing,
construction and maintenance of buildings in terms of energy efficiency of buildings.
The Ministry has developed a network of contacts, professional and competent persons and institutions that their
work can support the work on the implementation of EU legislation in the field of energy efficiency in buildings.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Irena Križ Šelendić, female, M.C.E., Authorised to Perform the Duties of Director of Directorate for Energy
Efficiency in the Buildings Sector, European Union Projects and Programmes
Civil engineer, M.C.E, Faculty of civil engineering, University of Zagreb, Croatia
Working in the Ministry of Physical Planning, Construction and State Property since 2009.
Performed normative, administrative and expert tasks in the implementation of the energy efficiency policy of
the Government of the Republic of Croatia in the building sector.
• Developing of legislative and regulatory framework for implementation and monitoring of energy
efficiency policy in buildings sector ( The Energy Efficiency Act, The Building Act, Regulation on
contracting and implementation of energy services in the public sector, Ordinance on the systematic
energy management in the public sector, Ordinance on conditions and criteria for establishing a quality
system of services and works for certificated installers of renewable energy – photovoltaic, small-scale
biomass boilers and stoves, solar thermal systems, shallow geothermal systems and heat pumps) -
national implementation of EU directives
• Implementation of individual general measures for buildings according to the Second National Energy
Efficiency Action Plan for the period until the end of 2013
• Developing of national plan for energy renovation of residential buildings, implementation of renewable
energy sources in energy building renovation, preparation and implementation of the “Plan for public
buildings energy renovation 2012.-2013.”
• Development of Long-term strategy for mobilising investments in the renovation of the national building
stock of the Republic of Croatia
41
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
• Development of 2014-2015 Energy Renovation Programme for Public Sector Buildings, monitoring the
implementation
• Development of 2016-2020 Energy Renovation Programme for Public Sector Buildings
• Development of the national Programme for the energy renovation of single-family houses 201-2020,
monitoring the implementation
• Development of the national Programme for the energy renovation of multi-apartment buildings 2014-
2020, monitoring the implementation
• Preparation of the 3rd National Energy Efficiency Action Plan (under the EED)
• Participation in the preparation of the Partnership Agreement with The European Commission on using
EU Structural and Investment Funds for growth and jobs in 2014-2020 in the field of competence of the
Ministry, defining national goals in the sector of energy efficiency in the public and residential buildings
• Participation in the preparation of the Operational programme competitiveness and cohesion 2014 –
2020 in the field of EE in buildings
• Preparation of national energy renovation buildings programs for co-financing from the European
Regional Development Fund with JASPERS experts
• Development of information systems and computer applications for the Ministry (the auditors date base,
construction elements date base, the application for issuing energy certificates, the registry and date
base of certified installers renewable energy systems)
• Energy Efficiency Directive Committee member - appointed representative of Ministry of Construction
and Physical Planning
• BUILT-UP SKILSS project (CRO- SKILLS) - national team member
• BUILT - UPON - national team member
• The Concerted Action for the Energy Efficiency Directive (CA EED) - national team member
• Providing and organizing information about the work of the Ministry for the public (responding to the
requests and queries from citizens, texts and graphic editing, maintaining the content on Ministry official
web site, data acquisition, data import and processing and analysis of work results, presentations and
publications)
• Annual reporting for Government
Diana Horvat, female, M.Arch., Authorised to Perform the Duties of Head of Sector for Energy Efficiency in
Buildings
• Master’s degree in architecture 1990 on the Faculty of Architecture, University of Zagreb. Authorized
to Perform the Duties of Head of Sector for Energy Efficiency in Buildings. Working in the Ministry of
Physical Planning, Construction and State Property for 16 years and since 2011 in the Sector for Energy
Efficiency in Buildings. Within its scope, the Sector performs normative, administrative, and
professional-analytical tasks of encouraging rational energy management and energy efficiency in
buildings, monitoring the development of the Program for energy renovation of buildings, and drafting
regulations and implementing directives into regulations. Organizes and participates in the work of
Expert Committees. Participates in international and EU projects.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
- CA EPBD - MPGI is a member of the Project since 2007, as an institution responsible for the transposition and
implementation of the Energy Performance of Buildings Directive in national legislation and was participating as
a member of the Steering Group
- CA EED - A targeted action to implement the Energy Efficiency Directive was launched in the spring of 2013
and aims to support the effective implementation of the Energy Efficiency Directive in all Member States. CA
EED's work is structured around eight core themes covering key EED requirements and is funded by Intelligent
Energy Europe
- EDMC (Energy Demand Management Committee) at the EC to support the transfer and verification of the
EPBD, and to prepare amendments to the existing directive. A representative of the Ministry is a member of the
Board and regularly participates in meetings
- BUILT-UP SKILSS project (CRO - SKILLS)
42
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
- BUILD- UPON
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.14 EMI / HU (HUNGARY) 14
Participant 14
Legal name (short name): EMI EPITESUGYI MINOSEGELLENORZO INNOVACIOS
NONPROFIT KFT - (EMI)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
ÉMI Non-Profit Limited Liability Company for Quality Control and Innovation in Building (ÉMI) is Hungary’s
largest complex institute in construction and building materials industry with more than 200 employees,
established in 1963 owned and managed by the Ministry of Innovation and Technology. Activities are issuing
technical assessment, testing, inspection, laboratory experiences, research and development, certification and
trainings for professionals. Regarding innovation, we are working from applied research to the market uptake.
ÉMI has been participating in many fields of building energy efficiency; it was the technical project manager of
the Hungarian national residential refurbishment programme and has been acted as technical assessor of the
structural funds in the national environmental and energy operation programme (KEOP).
ÉMI is an active member of a number of European and international organizations (EOTA, EGOLF, ENBRI,
WFTAO, CIB, ECTP, UEA etc.) and an observer member of IEA EBC. ÉMI has long experience in European
research being active in FP5, FP6, FP7 and H2020 projects as well. ÉMI will be active in Digital Urban Transition,
Green Deal and European Bauhaus initiatives, and working closely with Municipalities on Smart Cities and
Communities issues.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed
activities.
Dr. Károly Matolcsy, male, senior expert, architect
Károly has been working in ÉMI since 1989. He acted as research director from 2011 to 2015, now he is the
head of International R&D research. He graduated as architect at TU Budapest, Hungary. Later he became a
post-graduated expert in waterproofing, insulation and acoustic. Working in ÉMI for more than 30 years he has
a lot of experiences in testing, expertise and research practice of building envelopes and building constructions.
He is actively participating in the international organizations and in 2019 has been elected for the president of
European Network of Building Research Institutes (ENBRI) and represents ÉMI in the European Construction
Technology Platform (ECTP).
Péter Tóth, male, senior expert, civil engineer
Péter’s qualifications include structural engineering, building insulation and real estate expertise as well as
construction technical inspection. From 2013 he acted as chief engineer and then between 2017 and 2020 as
technical director at ÉMI. He gained notable experiences as researcher, expert and inspector, visiting factories
in Europe and East Asia. Beside his wide field within ÉMI he is board member/representative in CIB, UEATc
and WFTAO.
Dávid Jenei, male, energy engineer
Dávid graduated in Budapest University of Technology and Economics as energy engineer and has been
working at ÉMI since 2012. He has been involved in many building energy efficiency related project, worked on
the national LTRS and national building energy strategy, implementation of the EPC system and relevant
regulation with coordination of the Ministry of Innovation and Technology.
43
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
CAV EPBD (H2020): EMI is already involved in the CAV EPBD project representing Hungary with the aim to
contribute to the reduction of energy use in European buildings, through the exchange of knowledge and best
practices in the field of energy efficiency and energy savings between all 28 EU Member States plus Norway.
BUS-GoCircular (H2020): BUS-GoCircular is formed by a coalition of former BUILD UP Skills and Construction
Skills projects strengthened by partners understanding the demand side. The aim is to address and overcome
the challenges of the stimulation of demand for green energy skilled workforce, along with hands-on capacity
building to increase the number of skilled workforce across the value chain.
POCITYF (H2020): It involves cities with heritage sites in Europe’s renewable energy transition. In lighthouse
cities the project demonstrates solutions at building and district level that enable the increase of energy self-
consumption, energy savings and high share of locally produced renewable energy. Fellow cities than replicate
these solutions around Europe. EMI is acting as technical partner of Újpest fellow city.
MINISTOR: in the ongoing H2020 EEB project “MINImal Size Thermal and Electrical Energy STORage System
for In-Situ Residential Installation” EMI is the leader of the task “Functional and quality acceptance tests” where
EMI will carry out the verification and the quality assurance tests of the developed minimal size storage system.
BRESAER: EMI was the leader of the task “BRESAER system testing and validation” in this H2020 EeB2 project
("Breakthrough solutions for adaptable envelopes for building refurbishment"). EMI carried out different type of
tests such as impact resistance tests, bending tests, wind resistance tests, acoustic performance test, reaction
to fire tests, mechanical tests such as pull-through resistance tests, water absorption test, freeze-thaw resistance
test.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.15 SEAI / IR (IRELAND) 15
Participant 15 (use same partner numbering as on Submission System screens).
Legal name (short name): Sustainable Energy Authority of Ireland - (SEAI)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
In Ireland, the implementation of the Recast EPBD is the overall responsibility of the Department of Housing,
Planning, Community and Local Government (DHPCLG) and the Department of Communications, Climate
Action and Environment (DCCAE). DHPCLG has direct responsibility for building energy performance
requirements. The Sustainable Energy Authority of Ireland (SEAI) is designated by legislation as the ‘issuing
authority’ in relation to building energy certification. SEAI provides the framework for the tools, system, training
and quality assurance to enable implementation. The enforcement authorities for both energy performance
requirements and energy certification are the Building Control Offices within the local authorities / municipalities.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Chris Hughes, male, Programme Manager
Chris Hughes is the programme manager with Sustainable Energy Authority of Ireland (SEAI) with responsibility
for the implementation of all aspects of the Energy Performance of Buildings Directive (EPBD). Chris is a member
of the inter departmental EPBD Implementation Group.
Chris also works on major SEAI events including the Energy Show and the Sustainable Energy Awards. Prior to
joining SEAI, he held a number of positions in energy management. Chris holds a Master in Business
44
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Administration from Dublin Institute of Technology, Master of Engineering Science (Mechanical Engineering)
and is a mechanical engineering graduate from National University of Ireland Galway.
Georgina Molloy, Female, Programme Manager, Chartered Engineer
Georgina Molloy is a Programme Manager with the Sustainable Energy Authority of Ireland (SEAI) with
responsibility for EPBD Concerted Action and the implementation of the Energy Performance of Buildings
Directive (EPBD) in Ireland. Georgina is part of the EPBD/Building Energy Rating (BER) technical team in SEAI.
Georgina is a Chartered Engineer with a degree in structural engineering from TU Dublin and a higher,
postgraduate diploma in project management from Trinity College Dublin. Prior to joining the SEAI, Georgina
gained over 20 years’ experience working in the private sector, in design consultancy and contracting with
particular interest in existing building refurbishment. Georgina is a member of Engineers Ireland’s inclusion and
diversity group and is the co-founder and Chair of Engineer’s Ireland’s women in engineering group.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.16 ENEA / IT (ITALY) 16
Participant 16
Legal name (short name): Agenzia Nazionale per le Nuove Tecnologie, l'energia e lo
Sviluppo Economico Sostenibile/National Agency for New
Technologies, Energy and Sustainable Economic
Development - (ENEA)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
ENEA, the Italian National Agency for New Technologies, Energy and Sustainable Economic Development, is a
governmental body carrying out research, innovation and technology transfer.
ENEA assists the Ministry of Ecological Transition for EPBD and EED implementation and for EU Ecodesign
and Ecolabel, providing support for developing and monitoring the Italian NECP and the National Energy
Strategy.
ENEA also manages the governmental financial instruments for private (110% and 55-65% tax deduction
scheme) and governmental (3%3) building renovation and the national information system of regional Energy
Performance Certificates (SIAPE).
ENEA has long-standing experience and expertise in building EP calculation methodologies, energy audits,
training and qualification of local administrators and professionals, consultation of relevant Stakeholders for
EPBD implementation.
ENEA participated in CAIII_EPBD, was the Italian contractor for CAIV_EPBD where the national coordinator
also covered the role of Core Team Leader for the function “Collaboration with other CAs and EU projects” and
for CAV_EPBD.
45
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
GABRIELLA AZZOLINI, female, Researcher at ENEA, Architect
Gabriella Azzolini’s areas of expertise include defining, implementing and monitoring of EE policies and
measures for existing buildings; estimating energy consumption of buildings and identifying tools and
technologies in order to increase the energy performance of buildings and plants in the residential and tertiary
sector.
FRANCESCA HUGONY, female, Researcher at ENEA, Environmental Engineer
Experties in technical support to Public Administrations for the development and implementation of energy
strategies, focusing on building sector. Experties on EPCs and EPC digital register, and on digital tools to support
and monitoring the building stock policies.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
• Concerted Action for the Energy Performance of Buildings 1
• Concerted Action for the Energy Performance of Buildings 2
• Concerted Action for the Energy Performance of Buildings 3
• Concerted Action for the Energy Performance of Buildings IV
• Concerted Action for the Energy Performance of Buildings V
• EPBD and EED implementation,
• support for developing and monitoring the Italian NECP and the National Energy Strategy,
• manages the governmental financial instruments for private and governmental building renovation
• building EP calculation methodologies
• training and qualification of local administrators and professionals
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.17 LRAM / LT (LITHUANIA) 17
Participant 17
Legal name (short name): Lietuvos Respublikos Aplinkos Ministerija/Ministry of
Environment of Republic of Lithuania - (LRAM)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Ministry of Environment of Republic of Lithuania is a Government led institution that is ensuring sustainable
development through legal frameworks, regulations and policy development in the state’s environmental
protection, territorial planning, construction, housing, waste management and utilities provision.
One of the main goals of the Ministry of Environment is ensuring a proper environmental quality, taking into
account the norms and standards of the European Union.
The Ministry of Environment and the Ministry of Energy are jointly responsible for the implementation and
transposition of the Energy Performance of Buildings Directive in Lithuania.
46
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Aurelija Bielskytė, female
Chief Specialist of the Spatial Planning Policy Group
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.18 MEAT / LU (LUXEMBOURG) 18
Participant 18
Legal name (short name): Ministere de l’Energie et de l’Amanagement du Territoire -
(MEAT)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
In Luxembourg, the implementation of the EPBD is the overall responsibility of the Ministry of the Economy.
Some partial responsibilities lie with the Ministry of Sustainable Development and Infrastructures as e.g. some
inspection systems for heating systems (liquid fuel and biomass) and AC systems as well as aid schemes for
households. In the Ministry of the Economy, the General Directorate of Energy and as a part of it the Directorate
for Sustainable Energies is the managing body of the implementation. The role of my energy, the national
structure for the promotion, information, raising awareness and basic advice for energy efficiency, renewable
energy and sustainable construction is to support the implementation of the government’s sustainable energy
policy by providing support to households, local communities, companies and professionals of the energy sector
and by providing assistance to energy policy developments.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Pascal WORRÉ, Male, Mechanical Engineer
Director Energy Efficiency at Ministère de l'Énergie et de l'Aménagement du Territoire
Tom WINANDY, Male
Energy efficiency Attaché
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
47
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.19 EM / LV (LATVIA) 19
Participant 18
Legal name (short name): Ekonomikas Ministrija/Ministry of Economics of Latvia -
(EM)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Ministry of Economics is the leading state administrative institution in the field of economic policy formation
in Latvia. The Ministry of Economics plans and manages housing policy, which includes energy performance of
buildings policy.
The Ministry also prepares projects of legislative acts about energy performance of buildings, for example Law
On the Energy Performance of Buildings, which contains legal norms arising from Directive 2010/31/EC of the
European Parliament and of the Council of 19 May 2010 on the energy performance of buildings.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Karina Truhanova, female, Deputy Director, lawyer
National and EU regulation on energy efficiency of buildings
Auders Martins, male, Department Director, lawyer
National regulation on energy efficiency of buildings.
Elvijs Kalnkambers, male, Senior Expert, lawyer
National renovation strategy issues
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Karina Truhanova – expert in CA EPBD V; CAMS project 2019-2022 (Climate adaptation and mitigation
synergies in energy efficiency projects)
Mārtiņš Auders – expert in CA EPBD IV and V
Elvijs Kalnkambers – preparation of Long Term Renovation Strategy in Latvia
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
48
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
5.20 MTIC / MT (MALTA) 20
Participant 20
Legal name (short name): Building Regulation Office, Ministry for Transport,
Infrastructure and Capital Projects (MTIC)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
This is the Authority responsible for the design, implementation and dissemination of policies together with the
consolidation and review of laws and regulations, in the form of a national building code. It is an autonomous
Authority set up by an act of parliament, XIV of 2021.
The Authority is authorised to collaborate with other agencies, corporations, authorities, government and non-
government entities and other persons for the carrying out of its functions.
The Building and Construction Authority is responsible for the implementation of Directive 2010/31/EU, 844/18
EU, by means of Legal Notices 47/2018, and 134/2020 (subsidiary to the Building regulations Act) and is
responsible for representing Malta for technical aspects including the sustainability and the energy performance
of buildings.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Matthew Degiorgio, Male, SH Energy Performance of Buildings, B.E.&A.(Hons.), A.&C.E., M.Sc EDE (lond.)
Architect and Civil Engineer, with specialisation in Environmental Design and Engineering with over 10 years of
experience in building regulation and policy.
Antoine Bartolo, Male, CO Core Operations, [B.Sc. I.T. (Hons.) CSE]
Chief officer responsible for Core Operations of the Building and Construction Authority, with over 20 years of
experience in Process Engineering, Project Management and I.T., Telecom Systems and IOT Engineering and
Architecture.
Samuel Farrugia, Male, B.Eng; M.Sc. Building services engineering
Mechanical engineer specialised in building services engineering with over 10 years of experience in building
regulation and policy.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.21 RVO / NL (NETHERLANDS) 21
Participant 21
49
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Legal name (short name): Ministerie van Economische Zaken en Klimaat - (RVO)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Netherlands Enterprise Agency (RVO.nl) encourages sustainable growth in the Netherlands and supports
the Dutch Government in translating policy into action; it is part of the Ministry of Economic Affairs. The
Netherlands Enterprise Agency implements national legislation by providing support to businesses via subsidy
and support schemes, establishing and supporting knowledge networks and provides access to partner search
mechanisms.
RVO.nl and its predecessors have a long history in the field of energy efficiency and have been involved in the
implementation of the EPBD since its coming into force in 2010. The Netherlands Enterprise Agency is entrusted
with developing and implementing EPBD-related tools as the EPC database, the inspection of air conditioning
systems and heating systems, system requirements for technical building systems and the LTRS. RVO.nl also
supports the Ministry of the Interior and Kingdom relations at developing the national energy performance
methodology, the QA system for EPC’s, cost optimal studies to set the demands of the energy performance in
building regulations etc.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Gerelle van Cruchten, female, policy officer, NCP CA EPBD V, policy studies on EPC related to cost, QA
system, evaluation of EPC
• NCP in CA EPBD V as of August 2019
• Responsible for the QA system of energy experts for the former EPC internet tool (up to December
2020)
• Evaluation of the cost of EPCs in the Netherlands including an international comparison
• Evaluation of the new energy label classes (as of January 2021)
• Counterpart for the Ministry of the Interior and Kingdom Relations for the recast of the EPBD
Carmen Heinze, female, moderator, is a professional passionate moderator with more than 20 years of
experience in moderating small and large groups.
• She has been working for CAEPBD as well as CAEED and has therefore sufficient knowledge on the
various relevant topics to be a able to design and moderate successful workshops.
• Additionally, she can develop customised trainings in order to teach others how to make workshops
more interactive and getting the most out of all participants.
• Where needed, she can advise others on their workshop designs.
• Getting results and making use of the input and energy of all participants are key for her approach.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
• Concerted Action for the Energy Performance of Buildings 1
• Concerted Action for the Energy Performance of Buildings 2
• Concerted Action for the Energy Performance of Buildings 3
• Concerted Action for the Energy Performance of Buildings IV
• Concerted Action for the Energy Performance of Buildings V
• Development and implementation of the EPC system (as of the first introduction in the EPBD)
including the EPC database, QA system, market introduction, communication and evaluation of EPC
system and EPC data;
• Support to the development of the present EP calculation method, calculation software, QA system
and coordination of interaction of the various elements of the present EPC system;
50
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
• Coordination of the development of the inspection of air conditioning and heating systems and the
requirements for technical building systems
• Coordination of cost optimal studies to set the demands of the energy performance in building
regulations;
• Development of the LTRS
• Collecting and monitoring of EPC data
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.22 ITB / PL (POLAND) 22
Participant 22
Legal name (short name): Instytut Techniki Budowlanej/Building Research Institute
(Poland) - ITB
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The basic aim of research and development works carried out in ITB, is to ensure the quality of the Polish
building industry and to protect the interests of users of the construction works. Institute develops the bases of
technical and functional requirements for buildings and building products; methods for calculation and designing
of building elements; test methods and assessment criteria for construction works, their elements and building
products; and technical bases for the building policy of the State.
For the needs of Polish Technical Approvals and European Technical Assessments (ETA) and certification of
products, the Group of Testing Laboratories operating within the Building Research Institute carry out tests,
which are the basis for marking products with B or CE mark.
The Building Research Institute, as a Technical Assessment Body (TAB) is authorized to issue European
Technical Assessments, is a Notified Body to the European Commission and to other Member States of the
European Union under the number 1488.
Institute actively participates to the work of many technical committees, commissions and working groups within
international scientific (RILEM, CICIND, EGOLF, ENBRI, ECO Platform, ICPIC) and standardization (ISO, CEN)
organizations, as well as those for the assessment of building materials (UEAtc, EOTA, WFTAO).
The Thermal Physics, Acoustics and Environment Department of ITB is focused on energy efficiency and
environmental performance assessments aspects.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Dobrosława Kaczorek, female, researcher, ISCED Level 8, Class A top grade researcher,
PhD D.Sc eng, a scientist with over 20 years of experience as an expert in laboratory research, providing
technical and expert support in important works of sustainable construction: in the field of energy efficiency in
buildings, building physics, renewable energy in buildings and ventilation-related construction product testing.
Experience in work and cooperation with national institutions: member of the Polish Committee for
Standardization PKN KT 316 (heating systems) PKN KT 179 (thermal protection of buildings), ZAE (Chamber
of Energy Auditors) as an associate member, PZITB (Chamber of Construction Professionals) as an associate
member. Participant of several national and European research projects on energy-efficient buildings and
building materials. 5 years of experience as the Manager of the Energy Efficiency Laboratory. Author of scientific
publications related to energy use in building
Michał Piasecki, male, researcher, ISCED Level 8, Class A top grade researcher
51
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
PhD D.Sc eng, profesor at ITB, researcher, 20 years of experience in the area of civil engineering. Co-author of
the international EN standards and national codes. Practical experience of undertaking the environmental tests,
indoor air quality evaluations and energy/sustainable performance assessments of buildings and construction
products. Experience of working and cooperation with International institutions: CEN TC 350 (sustainable
construction), PKN KT 307 (sustainable construction-normalization, mirror to TC 350) as president. EOTA PT12
(sustainable use of resources, European CPR regulation) expert. ECO Platform (eco products- European
association) as board member, SB Alliance (building sustainable assessment), ex national representative, ZAE
(Energy Auditors Chamber) as associate member, PZITB (Construction Professionals Chamber) as associate
member, OECD GGSD as nation representative, ECTP as ITB’s proxy, KIS WG8 (National smart
Specializations) as ITB’s proxy. Participant in several national and EC research projects on the energy efficient
buildings and construction material. 3 years’ experience as Head of Accredited Laboratory testing construction
product (thermal physics, acoustic, environment). Main leader in establishing national EPD system
(Environmental Product Declaration) (ISO 14025) in Poland. Author of WoS publications. (citations 415, h-index
13, i10 index 14).
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
LIFE Ceplafib, H-house, METABUILDING LABS
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.23 ADENE / PT (PORTUGAL) 23
Participant 23
Legal name (short name): Agencia Para a Energia (ADENE)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
ADENE, the Portuguese Energy Agency is a private non-profit making public utility association with the mission
to develop public interest activities in the areas of energy and energy efficiency, including mobility and the
efficient use of water.
ADENE’s main purpose is to foster projects of national interest under the scope of energy policy, developing its
activity within the different economic sectors and resourcing, for this purpose, to the support of public or private
entities and specialized market agents. ADENE's mission is to promote and develop activities of public interest
in the fields of energy and its interfaces with relevant non-energy sectors and policies, aiming to contribute to
increase energy efficiency in all economic sectors, to foster market penetration of RES and to participate in the
national effort of GHG reduction. Hereupon, ADENE holds the responsibility in the support of conception,
development and promotion of initiatives under the framework of community and national energy policies,
targeting a sustainable development.
The Directorate of Energy (DGEG) who should represent Portugal is responsible for the implementation of the
EPBD directive in Portugal. The participation in CA EPBD is assigned to ADENE, but for some elements the
Ministry will be contributing to CA meetings with experts. From the undergoing initiatives, ADENE outlines three
that have special relevance within the context and, consequently, within the project objectives and call contents:
• The Energy Certification System (SCE) – The Energy Certification of Buildings, implemented in 2007
through the transposition of the European Directive on the Energy Performance of Buildings (EPBD),
which assesses the energy efficiency of a property on a pre-defined scale of 8 classes, in which A+ is
very efficient and F is very inefficient. It also provides owners with information on the impacts of this
52
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
classification on comfort, health and energy consumption related to air conditioning and domestic hot
water. Through a digital document (Energy Certificate) issued by independent and qualified
professionals, the necessary measures customized to the property are also identified, which will
potentially enable a reduction in the energy consumption.
• The casA+ Portal – The Portuguese one-stop-shop (OSS) is an online portal managed by ADENE and
aims to promote energy and water efficiency, cost and energy savings, and the thermal comfort of
homeowners living in residential buildings. The OSS’s main goals are to provide detailed information
to end-users about their houses, encourage them to improve their homes, facilitate the communication
between building owners and the market/technical experts, and to monitor the uptake of improvement
measures. Furthermore, it signposts appropriate financing opportunities and makes available guides
on energy and water efficiency.
• The Portuguese Long-Term Renovation Strategy (LTRS) – the national strategy designed to support
the renovation of the national stock of residential and non-residential buildings, both public and
private, into a highly energy efficient and decarbonised building stock by 2050, facilitating the cost-
effective transformation of existing buildings into nearly zero-energy buildings (NZEB), including a
roadmap with measures and indicative milestones for 2030, 2040 and 2050, specifying how they
contribute to achieving the Union’s energy efficiency targets and reducing GHG emissions. Currently,
ADENE is part of the LTRS Coordination Group, which aims to evaluate and monitor the implementation
status of the LTRS in Portugal.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Rui, Fragoso, male, director
Graduated in Civil Engineering and obtained a postgraduate degree in Planning and Sustainable Construction
and as well as in Building Acoustics.
In 2010, he joined ADENE - Portuguese Energy Agency and between 2012 and 2018, he was the Head of the
Buildings Department, responsible for managing the EPC scheme and its implementation. Designed and
implemented the on-stop-shop Portal casA+ and provide technical assistance to the implementation of financial
instruments. He is’s currently the Head of the Projects Department. He also participates in current and past
European and International projects like the CA-EPBD, among others.
Claudia Monteiro, female, expert
Graduated in Architecture by Instituto Superior Técnico, Lisbon University. She also holds a PhD in Sustainable
Energy Systems by MIT Portugal, IST, Lisbon University.
Energy expert in International and European cooperation projects in the fields of urban planning and energy
efficiency of buildings. Currently working at ADENE, namely as Central-Team Assistant for the CA-EPBD V, and
as member of the coordination group for the Portuguese Long-Term Renovation Strategy. Responsible for the
implementation of the short-mid-long renovation strategies and methodologies in the existing building stock and
involved in the development of future EPC schemes and applications on sustainable cities. In the past years,
she has also participated in several national and international research projects related to urban building energy
modelling and urban building databases supporting smart cities.
Nuno Baptista, male, coordinator
Started his career in design offices, where he worked during for 15 years. In 2010, he joined the ADENE building
department, working on quality assessment and managing the platform for issuing energy certificates. In this
position, he was involved in technical support related to the energy performance of buildings and the issuance
of energy certificates, but also in projects related to building renovation. He is also a national representative in
the concerted action of the Energy Performance of Buildings Directive (CA-EPBD). Since 2019, he is the
Coordinator of the Energy Certification of Buildings System, responsible for the support and training of
technicians, EPC registry, management and maintenance of the EPC database, information and statistical
analysis, and quality assessment.
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
53
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Portuguese National System for Energy Certification of Buildings, (2006), https://www.sce.pt/
Portuguese Building Long Term Renovation Strategy (2021), https://energy.ec.europa.eu/topics/energy-
efficiency/energy-efficient-buildings/long-term-renovation-strategies_en
casA+ Portal, https://portalcasamais.pt/
X-tendo project, (2019-2022), https://x-tendo.eu/
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.24 MLPDA / RO (ROMANIA) 24
Participant 24
Legal name (short name): Ministerul Dezvoltarii, Lucrarilor Publice Si
Administratiei/Ministry of Regional Development and
Public Administration and European Funds - (MLPDA)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
MLPDA (Ministerul Dezvoltarii, Lucrarilor Publice Si Administratiei/Ministry of Regional Development and Public
Administration and European Funds) is a Governmental Institution and it performs, as appropriate, together with
the line ministries, the government policy in areas like: regional development, cohesion and spatial development,
discipline in construction, spatial planning, urban planning and architecture, habitation, housing, residential
buildings, energy efficiency in public buildings, thermal rehabilitation of buildings, public works, construction,
central and local public administration, development of public community services, state aid provided to local
public administration authorities, public service management etc.
In these areas, the MLPDA initiates, finances and / or manages / implements, under the law, development
programs and projects of national, regional and local interest in areas like: housing, energy efficiency in public
buildings, thermal rehabilitation of buildings, reducing seismic vulnerability of buildings, public utility
infrastructure of the water supply and sewer service and / or of thermal energy supply service for localities,
databases etc. The MLPDA also provides financial and technical management of some programmes and
projects, co-financed by the European Regional Development Fund, under the Regional Operational
Programme, as well as by other European financing instruments specific to its areas of activity.
In the construction field, the regulatory activity of MLPDA covers the entire area with an application-oriented,
experimental and system-based approach. The Ministry carries out government policies in construction’s
legislation and specific technical regulations, transposes and implements the European legislation in
construction, including energy performance of buildings.
List of MLPDA most relevant actions in the implementation of the EPBD and EED (buildings section)
• Pilot programme for thermal rehabilitation of public domain buildings with the function of social
assistance and / or health care, under the administration of local public administration authorities. Co-
financed by Swiss Fund and governmental funds
• Multiannual national programme of increasing energy efficiency in residential buildings. Governmental
funds.
• National programme on thermal rehabilitation of residential buildings financed by bank loans with
• government guarantee. Governmental funds
• Thermal rehabilitation programmes with financing from European funds. Co-financed by European
funds
54
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
• MLPDA only requests travel allowance for 3 national experts for CA meetings while salary costs will be
paid as an internal contribution due to national legislation.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Anca GINAVAR, female, Certified Architect
Director of the Technical Directorate, within the Regional development and infrastructure general directorate
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.25 BOVERKET / SE (SWEDEN) 25
Participant 25
Legal name (short name): The National Board of Housing, Building and Planning -
(BOVERKET)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Swedish National Board of Housing, Building and Planning, under Ministry of Finance, is the main Swedish
authority for the implementation of the EPBD and has been appointed by the Swedish government to do so. This
is because Boverket has got the main responsibility for the practical work with the Planning and Building act
within which the energy demands are incorporated into Swedish legislation.
Most of the developing work in this matter is done under the Ministry of the Infrastructure in close collaboration
with the Swedish Energy Agency.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Roger Antonsson, male, Analyst, System developer
Roger Antonsson has for several years developed and implemented the EPC system ad register in Sweden. He
has previously been involved in CA EPBD, 1, 2, 3, IV, and V. And since CA EPBD V, he is our main contact. He
is currently working on the Swedish embodied GWP regulation implementation.
Mikael Näslund, male, Energy expert, PhD
Mikael Näslund has for several years been involved in the EPBD implementation in Swedish legislation and
understands both technical and jurisdictional boundaries and has indeed a deep understanding of technical
issues, both regarding energy sources, energy carriers, heating appliances and other technical details in the
building such as SRI, Individual metering and BACS.
Projects or Activities
55
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
The Swedish National Board of Housing Building and Planning has from the very first EPBD been responsible
for the practical work on incorporating the directive into Swedish legislation. Boverket also handles the EPC
register and are responsible for the design, control and supervision of EPC. Boverket are currently implementing
a database, register and control system for embodied GWP. Boverket also handles other EU initiatives and
directives such as CPR, digital logbook, EED and Taxonomy issues in all parts where housing, building and/or
planning are involved.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
5.26 TSUS / SK (SLOVAKIA) 26
Participant 26 (use same partner numbering as on Submission System screens).
Legal name (short name): Technicky a skusobny ustav stavebny - (TSUS)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
Technický a skúšobný ústav stavebný, n.o. (Building Testing and Research Institute, NPO; ref. TSUS) is active
in different areas of construction in Slovakia and other countries and cooperates with other institutes in EU.
TSUS has represented SR in all CA EPBD since 2005.
The main activities in research have been focused on energy performance of buildings, thermal protection
requirements, energy certification of buildings and building units, cost-optimal calculations. TSUS particularly
concentrates on elaboration of legal and technical regulation and standards focused on energy performance of
buildings. Furthermore, TSUS is intensively involved in education, training, publishing and expertise. TSUS is
appointed as the authorized and notified body for assessment of construction products in the regulated sector.
Further, the Institute is active as the TAB (member of the EOTA) issuing ETAs and as an authorized person for
a national technical assessment of non-harmonized construction products. The accredited inspection body is
primarily active in granting licenses to contractors executing specialized construction works.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Zuzana Sternova, female, contractor representing SK (director of TSUS, senior researcher), qualification: civil
engineer (MSc.), PhD., Prof., authorized engineer, expert for energy certification, forensic expert
The director of Building Testing and Research Institute (TSUS), NPO (since 2008), the chairwoman of national
TC 58 mirror to CEN/TC 89, the chairwoman of the Board of Advisors for National Technical Standardisation,
the chairwoman of the Slovak Association for ETICS (OZ ZPZ), the vice president of EAE (European Association
for ETICS). Senior research worker in the field of renovation of existing buildings, energy performance of
buildings, thermal protection of buildings and analyses with the main focus on research, design, consulting and
diagnostics. Publishing activities are related to building energy performance of buildings, indoor climate, thermal
protection, ETICS and renewal of existing buildings, legal requirements. Since 1978 lecturing at Slovak
technological university and since 2007 a lecturer in official training of experts for energy certification of buildings
56
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
(EPBD) organized by Slovak Chamber of Civil Engineers and the member of examination board for experts for
energy certification of buildings (legislation and thermal protection, energy performance certification).
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Since 2005 contractor for Slovak Republic and national representative in implementation of EPBD in
Concerted Action:
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3 (CT leader)
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V (CT Manager)
Leading participation at legal works related to implementation of EPBD in Slovak Republic. Participation in
different research projects at national and international level (e.g. EBRD project focused on implementation of
EPB national legislation in Moldova and Kyrgyzstan, EU GUGLE project, Cost-optimal calculation of minimal
energy performance of buildings requirements for SR etc.). Author of some national technical standards
(Thermal protection of buildings, Performance of ETICS). Works on National Annexes to EN and ISO
standards, national comments on EN standards developed by CEN/TC 89.
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreeen to be performed by them.
N/A
5.27 MZI SL (SLOVENIA) 27
Participant 1 (use same partner numbering as on Submission System screens).
Legal name (short name): Ministrstvo Za Infrastructuro - (MZI)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Ministry of Infrastructure ensures continuous improvements to Slovenian transport and energy
infrastructure. MZI maintain, plan, regulate, and improve the field of rail, road, air, cableway, and maritime
transport as well as inland waterway transport.
MZI are also responsible for transport policies and infrastructure. We strive to achieve sustainable mobility and
transport, which should be safer, more economical, and green. We ensure that energy supply is reliable and
set the foundations for transitioning into a society, which uses energy products more effectively and generates
energy mainly from renewable sources.
The transposition of the EPBD in Slovenia is the overall responsibility of the Ministry of Infrastructure and is
primarily transposed by the Energy Act1, covering the topics of NZEB, energy performance certification,
inspection of heating and AC systems and energy efficiency information programmes. In addition, the Building
Construction Act gives the legal basis for building codes (with minimum requirements for building energy
performance, technical building systems and the calculation methodology), while the Environmental Protection
Act addresses the inspection of boilers.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Erik POTOCAR, male
57
Call: [LIFE-CET-2021-CAEPBD6-IBA] — [6th Concerted Action supporting Member States and participating countries in
implementing the Energy Performance of Buildings Directive] Associated with document Ref. Ares(2022)8025859 - 21/11/2022
EU Grants: Application form (LIFE): V1.0 – 15.04.2021
Head of Efficiency and Renewable Energy Policy Division
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Insert text
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please
describe the entity / partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
28 NVE NO (NORWAY) Associated Partner
Associated Participant
Legal name (short name): Norwegian Water Resources and Energy
Directorate (NVE)
Description of participant
Provide a short description of the participant, with an explanation on how it matches its main role and tasks in the proposal.
The Norwegian Water Resources and Energy Directorate (NVE) is a directorate under the Ministry of Petroleum
and Energy. NVE’s mandate is to ensure an integrated and environmentally sound management of the country’s
water resources, promote efficient energy markets and cost-effective energy systems and contribute to efficient
energy use. The directorate plays a central role in the national flood contingency planning, the prevention of
damage caused by landslides and bears overall responsibility for maintaining national power supplies.
Key staff
Provide a short description of the profile of the persons who will be primarily responsible for carrying out the proposed activities.
Olav Karstad Isachsen, Male, Senior Advicer
Projects or Activities
List of up to 5 relevant previous projects or activities, connected to the subject of this proposal.
Concerted Action for the Energy Performance of Buildings 1
Concerted Action for the Energy Performance of Buildings 2
Concerted Action for the Energy Performance of Buildings 3
Concerted Action for the Energy Performance of Buildings IV
Concerted Action for the Energy Performance of Buildings V
Affiliated Entities / Associated Partners
Does the participant envisage that part of its work is performed by affiliated entities or associated partners? If yes, please describe the entity
/ partner, their link to the participant, and describe and justify the tasks foreseen to be performed by them.
N/A
58
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Detailed Budget Table
CA EPBD 6
Important:
You may add rows but no additional tabs. This may result in your proposal being considered inadmissible.
Please ensure that the file can be printed on a format of 1 page wide (number of pages depending on the number of participants).
Please make sure that the figures in this table are consistent with the total budget provided in part A section 3 of the application.
In case of inconsistencies, part A will prevail.
Staff effort allocation
Fill in the effort per work package and Beneficiary/Affiliated Entity.
Please indicate the number of person-months over the whole duration of the planned work.
Adapt the columns to the number of work packages in your proposal.
Identify the work-package leader for each work package by showing the relevant person-month figure in bold.
Participant Number/Short Name WP1 WP2 WP3 WP4 WP5 WP6 WPx… Total
1. DEA 39 20,75 3,55 35,9 37,5 24,3 161
2. OIB 3,55 0,3 3,85
3. CSTC 13,5 3,75 0,6 17,85
4. SEDA 3,55 0,3 3,85
5. MECI 3,55 0,3 3,85
6. MIT 2,5 0,3 2,8
7. BAFA 3,55 0,3 3,85
8. MEC 1,25 0,3 1,55
9. CRES 3,55 0,3 3,85
10. IDAE 1,25 0,3 1,55
11. MOTIVA 13,5 1,25 0,3 15,05
12. MTE 3,55 0,3 3,85
13. MPGI 2,5 0,3 2,8
14. EMI 2,3 0,3 2,6
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
15. SEAI 13,5 3,55 0,3 17,35
16. ENEA 13,5 2,5 0,3 16,3
17. LRAM 3,55 0,3 3,85
18. MEAT 3,55 0,3 3,85
19. EM 3,55 0,3 3,85
20. MTIC 2,5 0,3 2,8
21. RVO 3,55 2,05 0,3 5,9
22. ITB 2,3 0,3 2,6
23. ADENE 13,5 2,3 0,3 16,1
24. MLPDA 3,35 0,3 3,65
25. BOVERKET 3,35 0,3 3,65
26. TSUS 1,15 0,3 1,45
27. MZI 3,35 0,3 3,65
Total person-months 39 88,25 78,2 37,95 37,5 32,4 0 313,3
Personnel costs
Present your estimated “Personnel costs” split into 3 categories as per the table below. If you do not have any personnel costs falling under “A.4 SME owners and natural person
beneficiaries” or “A.5 Volunteers”, all personnel costs should be budgeted under “A1. Employees (or equivalent); A2. Natural persons under direct contract and A3. Seconded
Persons”.
For A.4 SME owners and natural person beneficiaries: please note that as per Annex 2a of the LIFE General Model Grant Agreement (MGA), a unit cost is applied to this cost
category. The units are the days spent working on the action (rounded up to the nearest half-day) and the amount per unit (daily rate) is calculated according to the following formula:
{EUR 5 080 / 18 days = EUR 282,22 per day} multiplied by {country-specific correction coefficient of the country where the beneficiary is established}
Note that the country specific correction coefficient to use is the one applied for the Marie Sklodoska-Curie Actions (MSCA). Yearly rates are published in the Horizon Europe Work
Programme – Marie Sklodowksa-Curie Actions under the funding and tender portal Reference Documents (work programme and call documents section), available at
https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/how-to-participate/reference-documents;programCode=HORIZON.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
A1. Employees
Subtotal personnel
(or equivalent); A.4 SME owners
costs without A.5 Volunteers
Number of A2. Natural and natural
volunteers (Unit costs)
person months Average monthly persons under person (sole Total Personnel
Participant Number/Short Name Country (A1+A2+A3+A4) - must be the
(staff effort per salary rate direct contract trader) costs
must be the same same as in part
beneficiary) and A3. beneficiaries
as in part A A section 3
Seconded (Unit costs in €)
section 3
Persons (costs)
1. DEA 161,00 8.782 € 1.413.864 € 1.413.864 € 1.413.864 €
2. OIB 3,85 13.600 € 52.360 € 52.360 € 52.360 €
3. CSTC 17,85 10.585 € 188.940 € 188.940 € 188.940 €
4. SEDA 3,85 3.423 € 13.179 € 13.179 € 13.179 €
5. MECI 3,85 4.220 € 16.248 € 16.248 € 16.248 €
6. MIT 2,80 3.200 € 8.960 € 8.960 € 8.960 €
7. BAFA 3,85 9.600 € 36.960 € 36.960 € 36.960 €
8. MEC 1,55 4.240 € 6.572 € 6.572 € 6.572 €
9. CRES 3,85 2.932 € 11.288 € 11.288 € 11.288 €
10. IDAE 1,55 15.107 € 23.416 € 23.416 € 23.416 €
11. MOTIVA 15,05 9.836 € 148.032 € 148.032 € 148.032 €
12. MTE 3,85 7.302 € 28.112 € 28.112 € 28.112 €
13. MPGI 2,80 3.394 € 9.504 € 9.504 € 9.504 €
14. EMI 2,60 3.767 € 9.794 € 9.794 € 9.794 €
15. SEAI 17,35 9.427 € 163.552 € 163.552 € 163.552 €
16. ENEA 16,30 5.328 € 86.848 € 86.848 € 86.848 €
17. LRAM 3,85 3.200 € 12.320 € 12.320 € 12.320 €
18. MEAT 3,85 5.280 € 20.328 € 20.328 € 20.328 €
19. EM 3,85 3.418 € 13.160 € 13.160 € 13.160 €
20. MTIC 2,80 6.438 € 18.025 € 18.025 € 18.025 €
21. RVO 5,90 12.631 € 74.520 € 74.520 € 74.520 €
22. ITB 2,60 7.535 € 19.592 € 19.592 € 19.592 €
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
23. ADENE 16,10 7.329 € 117.992 € 117.992 € 117.992 €
24. MLPDA 3,65 0€ 0€ 0€ 0€
25. BOVERKET 3,65 8.933 € 32.604 € 32.604 € 32.604 €
26. TSUS 1,45 3.840 € 5.568 € 5.568 € 5.568 €
27. MZI 3,65 6.078 € 22.184 € 22.184 € 22.184 €
Total 313,30 2.553.922 € 0€ 2.553.922 € 0€ 2.553.922 €
Subcontracting
Give details on subcontracted action tasks (if any) and explain the reasons why (as opposed to direct implementation by the participants).
Subcontracting — Subcontracting means the implementation of action tasks, i.e. specific tasks which are part of the action and are described in Annex 1 of the Grant Agreement.
Note: Subcontracting concerns the outsourcing of a part of the action to a party outside the Consortium. It is not simply about purchasing goods or services. We normally expect the
participants to have sufficient operational capacity to implement the project activities themselves. Sub-contracting should therefore be exceptional.
Include only subcontracts that comply with the rules (i.e. best value for money and no conflict of interest; coordinator tasks can normally not be subcontracted).
Justification
Participant Number/Short Name Subcontract Description Cost (€) WP
(Why is subcontracting necessary?)
Database for registration of experts in the CA Development of databases is best handled by a vendor, which has
EPBD a large experience with the development of such databases based
The development of a system for electronic on the selected tool. This knowledge is not available within the DEA
registration of participants will be developed and usually the DEA uses a contract through a preselected
through a contract through the pre-qualified WP 2, company. It is the expectation that this will lead to the most
01 DEA company / organisations for IT solutions under 10.000 € task efficient system as well as the cheapest development.
the DEA through the standard agreements 2.4.2
under the Danish government. This will be
developed as a standard database system and
will be fully compliant with the General Data
Protection Rules.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Venue organiser / practical support to The organization of meeting venues and negotiation with hotels
meetings requests specific skills and networks which falls outside the
For the practical organisations of CA meetings experience of the DEA. A professional venue organizer will
and negotiations with venues, a professional therefore ensure the best agreements for the venue of meetings
conference organiser will be selected according and for the accommodation for the participants. It will also ensure
to Article 13. This organiser will take care of international experience and professional handling.
practical elements on meeting organisation
such as negotiation, contracting, and follow-up,
WP 2
including agreements on hotel rooms for
01 DEA 114.500 € task
participants for plenaries and in-depth
2.4.3
workshops. This task will further support other
meetings as needed eg. for organisation of
open events and management team meetings,
web streaming for open events or virtual
meetings.
The location for each larger event will be found
through a process in accordance to article 13.
This function will be found through a public
tender.
Junior Rapporteurs Junior rapporteus was previous delivered by the UK BRE institute,
The Junior Rapporteurs will report from session but becaue of Uss exit of the EU this is no longer possible. None of
in the CA EPBD plenaries and in-depth the Partners have volunteered to take this role, whic requests as
workshops. 3 rapporteurs will participate in the well technical knowledge and exellent English skills. This tyoe of
Plenaries Meetings and 2 in each of the In- experts are found on universities or building reserach institutes, but
depth Workshops. After the meeting they will not in the DEA. A good vendor will be found though a public tender
prepare the first draft of the session reports, either from Denmark or from another European country.
which will then be reviewed by the session
leaders and relevant CTMs. They will also WP 2
1 DEA assist in practical elements in these sessions 61.640 € task
and can help in as well preparation of material. 2.4.5
Finally, they can help in uploading and keeping
track on elements on the Glasscubes. They
are expected to have a technical background
in buildings/energy consumption and they need
to have excellent English skills. Most likely
they will come from a university or a building
research institution.
This function will be found through a public
tender.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Communication external support The use of some of the tools needed in the management of
Different tools used for the communication communication for the CA EPBD will request very specific
request very specific skills and licenses. This knowledge and experience. In some cases it will not be efficient to
includes the use of the Atlassian Confluence built this experience inside the DEA, but it will be more efficient and
which is used for the database of content. A less costly to use experts which are already familiar with the tools
specialist of those tools will be searched of or who has the equipment needed.
this function. Other elements can be graphic WP 5
design or elements for development of identity task
01 DEA 54.000 € 5.6,
or special reports. Further those elements can
be including language quality checking or 5.10 &
production of info graphic or videos. 5.11
The specific elements of this task will be
defined in the communication plan for the CA
EPBD 6.
Different elements might be found by different
tendering processes according to the specific
needs.
Editor / writer for external reports The help for development of reports requests a large experience in
In general, the communication manager is such editing and rewriting as well as it requests a large flexibility
responsible for language review and and the possibility to set in large support in a short period of time
consistency check of published material. exactly when this is needed. It is the expectation that this will lead
Reports are in general prepared by CTM teams to the most efficient support as well as the cheapest overall costs
or country experts. Because of the different and ensure the delivery of these reports in right time.
skills for writing from the different teams and
countries there is in some case a need for a
deeper editing and language review which can
WP 6
include recrafting and development of new
01 DEA 35.000 € task
material. This has resulted in a slowdown of the
6.3
process in previous CAs. This can result in
delays in delivery of reports and it can make
the process of review of reports very
complicated. An external writer is therefore
including help with specific reports, this can
either be through review and editing or it can
be a help for the writing and analytic process
itself.
This function will be found through a public
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Core Team Management CT3 – for Deep The benefit of this organisation will be that it will be possible to
Renovation and renovation passports. have a team with experience from as well national and regional
OIB will handle the lead of the core team CT3 implementation of policies as well as a more practical involvement
for Deep Renovation and renovation passports in projects for energy efficiency in practice. This will help to handle
through one or more subcontracts. The tasks the very complex elements of energy efficiency in existing
on the existing buildings will request knowledge WP 2 buildings, which will require a wide range of skills. This organisation
02 / OIB on legislation, implementation, organisation, 229.300 € task will also allow for the organisation of the work and flexibility, which
administration, practical implementation and 2.1.3 requires intense preparation in various parts of the process,
technical solutions. The role will request for something which could be more difficult in the agency.
relevant experience with organisation of
sessions and share of knowledge.
As well the CTM role as the CTA role will be
subcontracted.
National experts # Implementation of the EPBD requests the expertise of multiple
MIT expects to use subcontracted experts for actors and agencies. Sometimes the main expertise in a particular
plenary meetings, but the expert will depend on field is outside the beneficiary and the full impact of the CA is only
WP
06 MIT the selected topics. It is expected that this will 11.200 € achieved through the involvement of these experts. This will ensure
3&4
be approximately one per meeting. that they can give the right input of experience for other countries
to learn and also take the experience from the meeting home and
ensure the impact on the national development of such policies.
Core Team Management CT1 – for Renovation The benefit of this organisation will be that it will be possible to
action plans and MEPS. have a team with experience from as well implementation of policies
BAFA will handle the Central Team Manager as well as a more practical experience and involvement of
and Central Team Assistant for Renovation academia. This will help to handle the very complex elements of
WP 2
Action Plans and MEPS through a subcontract. 315.940 € energy efficiency in connection to renovation action plans and
07 / BAFA task
BAFA will select a CTM through a call for MEPS, which requires a large variation of skills. This organisation
2.1.1
tender. The expert will primarily prepare and will also allow for the organisation of the work and flexibility, which
lead the sessions contend-related while the requires intense preparation in various parts of the process,
participant is in charge of coordinating the something which could be more difficult in the agency.
German participants.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Core Team Management CT6 – Calculation The benefit of this organisation will be that it will be possible to
and life cycle assessment. have a team with experience from as well implementation of policies
MEC will handle the lead of the Central Team as well as a more theoretical experience and involvement of
Manager and Central Team Assistant CT6 for academia. This will help to handle the very complex elements of
Calculation and life cycle assessment through energy efficiency in connection to calculations, zero carbon and life
one subcontract. The work will be linked to cycle calculations. This organisation will also allow for the
decarbonisation, calculations, standards WP 2 organisation of the work and flexibility, which requires intense
08 MEC assessment. The tasks on the existing 140.500 € task preparation in various parts of the process, something which could
buildings will request knowledge on calculation 2.1.6 be more difficult in the ministry.
methodology, CEN standards, circular economy
and primary energy factors. The role will
request for similar experience with organisation
of sessions and share of knowledge and a link
to academia.
As well the CTM role as the CTA role will be
subcontracted.
National experts # Implementation of the EPBD requests the expertise of multiple
Some elements of the implementation of the actors and agencies. Sometimes the main expertise in a particular
EPBD falls under different organisations: field is outside the beneficiary and the full impact of the CA is only
1. Estonian Business and Innovation Agency achieved through the involvement of these experts. This will ensure
(previously Fund KredEx) – will provide support that they can give the right input of experience for other countries
on topics related to the existing building stock, to learn and also take the experience from the meeting home and
renovation grants. ensure the impact on the national development of such policies.
2. Consumer Protection and Technical
WP
08 MEC Regulatory Authority – will handle topics related 24.200 €
3&4
to the implementation, verification, inspection,
supervision of the EPCs.
The impact of the Estonian participation will
therefore request participation from experts
linked to these organisations. Dependent on
the actual topics to be handled in meetings
such experts will therefore be involved. MEC
expects to use 2 subcontracted experts per
meeting.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
National experts # Implementation of the EPBD requests the expertise of multiple
Some elements of the implementation of the actors and agencies. Sometimes the main expertise in a particular
EPBD falls under different organisations field is outside the beneficiary and the full impact of the CA is only
including the VTT Technical Research Centre of achieved through the involvement of these experts. This will ensure
Finland Ltd and the ARA, the Housing Finance that they can give the right input of experience for other countries
and Development Centre of Finland. WP to learn and also take the experience from the meeting home and
11 MOTIVA The impact of the Finnish participation will 70.000 € ensure the impact on the national development of such policies.
3&4
therefore request participation from experts
linked to these organisations. Dependent on
the actual topics to be handled in meetings
such experts will therefore be involved.
MOTIVA expects to use 2 subcontracted
experts per meeting.
National experts # Implementation of the EPBD requests the expertise of multiple
MGIPU expects to use subcontracted experts actors and agencies. Sometimes the main expertise in a particular
for plenary meetings, but the expert will depend field is outside the beneficiary and the full impact of the CA is only
WP
13 MGPI on the selected topics. It is expected that this 10.528 € achieved through the involvement of these experts. This will ensure
3&4
will be approximately one per meeting. that they can give the right input of experience for other countries
to learn and also take the experience from the meeting home and
ensure the impact on the national development of such policies.
National experts # Implementation of the EPBD requests the expertise of multiple
EMI expects to use subcontracted experts for actors and agencies. Sometimes the main expertise in a particular
plenary meetings, but the expert will depend on field is outside the beneficiary and the full impact of the CA is only
WP
14 EMI the selected topics. It is expected that this will 12.400 € achieved through the involvement of these experts. This will ensure
3&4
be approximately one per meeting. that they can give the right input of experience for other countries
to learn and also take the experience from the meeting home and
ensure the impact on the national development of such policies.
National experts # Implementation of the EPBD requests the expertise of multiple
Some elements of the implementation of the actors and agencies. Sometimes the main expertise in a particular
EPBD falls under different organisations field is outside the beneficiary and the full impact of the CA is only
including CTI, the Italian Thermotechnical achieved through the involvement of these experts. This will ensure
Committee, affiliated to UNI (Italian that they can give the right input of experience for other countries
Standardization Body). WP to learn and also take the experience from the meeting home and
16 ENEA 12.712 €
The impact of the Italian participation will 3&4 ensure the impact on the national development of such policies.
therefore request participation from experts
linked to these organisations. Dependent on
the actual topics to be handled in meetings
such experts will therefore be involved. ENEA
expects to use 1 subcontracted expert per
meeting.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
National experts # Implementation of the EPBD requests the expertise of multiple
MTIC expects to use subcontracted experts for actors and agencies. Sometimes the main expertise in a particular
plenary meetings, but the expert will depend on field is outside the beneficiary and the full impact of the CA is only
WP
20 MTIC the selected topics. It is expected that this will 13.720 € achieved through the involvement of these experts. This will ensure
3&4
be approximately one per meeting. that they can give the right input of experience for other countries
to learn and also take the experience from the meeting home and
ensure the impact on the national development of such policies.
National experts # Implementation of the EPBD requests the expertise of multiple
Some elements of the implementation of the actors and agencies. Sometimes the main expertise in a particular
EPBD falls under different organisations field is outside the beneficiary and the full impact of the CA is only
including: achieved through the involvement of these experts. This will ensure
the Ministry of Transport and Construction of that they can give the right input of experience for other countries
the SR (MDV SR) and the Slovak Innovation WP to learn and also take the experience from the meeting home and
26 TSUS and Energy Agency (SIEA). 24.032 € ensure the impact on the national development of such policies.
3&4
The impact of the Slovakian participation will
therefore request participation from experts
linked to these organisations. Dependent on
the actual topics to be handled in meetings
such experts will therefore be involved. TSUS
expects to use 2 subcontracted experts per
National experts are responsible for active participation in plenary
meetings, including presentations, group dicussions, answering
# Comment National Experts questionnaires, bringing in information on national implementation,
experiences and active use of the results and lessons learned from
plenaries and in-depth workshops.
See also work package 3 task 3.1, 3.2, 3.3 & work package 4 task
Total estimated costs 1.139.672 €
If subcontracting for the entire project goes
beyond 30% of the total eligible costs, give Not the case here - approximately 23%
specific reasons.
¢
Other direct costs
Please complete the table below for each participant. If required add further tables at the end of this work sheet (one per participant).
Please ensure that the information provided is sufficient to assess the relevance of the costs in relation to the activities proposed. For major cost items add lines below, in order to
provide a detailed breakdown within one cost category.
For major items listed in the justification column, indicate the work package / task to which they belong.
For equipment and infrastructure, please explain if the cost represents the full cost or the depreciation.
01 / DEA Cost (€) Justification
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Experts participation in meetings:
3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshop (2*1*1000 € = 2,000 €)
Coordination participation in meetings
Coordinator, assistant, legal in plenary meetings (3*7*1000 € = 21,000 €)
Coordinator and assistant in in-depth workshop (2*1*1000 € = 2,000 €)
Coordinator and assistant in MTM (2*9*900 € = 16,200 €)
Communications participation in meetings
Travel & subsistence 174.800 € Communication manager in plenary meetings (1*7*1000 € = 7,000 €)
Communication manager in in-depth workshops (1*1*1000 € = 1,000 €)
Communication manager in MTM (1*9*900 € = 8,100 €)
Other travel costs handled by coordination
6 external experts at each plenary meeting (42*900 € = 37,800 €)
4 external experts in-depth workshop and 2 per stakeholder meeting (8*900 € = 7,200 €)
Participation in other CA plenaries, EED and RES (20*1,000 € = 20,000 €)
Participation in other CA Management team meetings etc., EED and RES (10*900 € = 9,000 €)
Other travel costs requested by DG ENER, Coordinators meeting, stakeholder’s events (25*900 € = 22,500 €)
Equipment (incl. infrastructure)
Venue costs handled by coordination:
7 Plenary meetings (7*35,000 € = 245,000 €)
In-depth workshops physical (1*25,000 € = 25,000 €)
Virtual meeting support incl. In-depth workshop (15,000 €)
9 Management team meetings (9*3000 € = 27,000 €)
2 Stakeholder meetings (2*7,500 € = 15,000 €)
Purchases, licenses for programs and other costs for communication issues:
• Website hosting (2,500 €)
• Website Security external service (3,000 €)
174,8 376.461 € • Project Centre subscription (6,000 €)
• Hosting of database (3,500 €)
• Extendable plug-ins for database (1,500 €)
• Virtual meeting tool (12,000 €)
• Mailing tool (1,800 €)
• Other licenses, incl. survey and poll everywhere (2,700 €)
Other:
Audit certificate (5,000 €)
External language review of reports (9,000 €)
Other meeting costs, badges, voting tools, signs etc. (2,461 €)
Financial support to third parties
Land purchase
Total 551.261 €
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
02 / OIB Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. Infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
03 / CSTC Cost (€) Justification
Experts participation in meetings:
3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
3 national experts at 1 in-depth workshops (3*1*1000 € = 3,000 €)
Travel & subsistence 48.100 € Central Team participation in meetings:
CTM & CTA at 7 plenary meetings (2*7*1000 € = 14,000 €)
CTM & CTA at 1 in-depth workshops (2*1*1000 € = 2,000 €)
CTM at 9 Management Team Meetings (1*9*900 € = 8,100 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 48.100 €
04 / SEDA Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
05 / MECI Cost (€) Justification
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
06 / MIT Cost (€) Justification
Experts participation in meetings:
2 national experts at 7 plenary meetings (2*7*1000 € = 14,000 €)
Travel & subsistence 16.000 €
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
One additional expert is subcontracted
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 16.000 €
07 / BAFA Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
08 / MEC Cost (€) Justification
Experts participation in meetings:
1 national experts at 7 plenary meetings (1*7*1000 € = 7,000 €)
Travel & subsistence 8.000 €
1 national experts at 1 in-depth workshops (1*1*1000 € = 1,000 €)
2 additional experts are subcontracted
Equipment (incl. infrastructure)
Other goods, works and services
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Financial support to third parties
Land purchase
Total 8.000 €
09 / CRES Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
10 / IDAE Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
11 / MOTIVA Cost (€) Justification
Experts participation in meetings:
1 national expert at 7 plenary meetings (1*7*1600 € = 11,200 €)
1 national expert at 1 in-depth workshops (1*1*1600 € = 1,600 €)
2 additional experts are subcontracted
Travel & subsistence 51.900 €
Central Team participation in meetings:
CTM & CTA at 7 plenary meetings (2*7*1600 € = 22,400 €)
CTM & CTA at 1 in-depth workshops (2*1*1600 € = 3,200 €)
CTM at 9 Management Team Meetings (1*9*1500 € = 13,500 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Land purchase
Total 51.900 €
12 / MTE Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
13 / MPGI Cost (€) Justification
Experts participation in meetings:
2 national experts at 7 plenary meetings (2*7*1000 € = 14,000 €)
Travel & subsistence 16.000 €
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
1 additional expert is subcontracted
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 16.000 €
14 / EMI Cost (€) Justification
Experts participation in meetings:
2 national experts at 7 plenary meetings (2*7*1000 € = 14,000 €)
Travel & subsistence 15.000 €
1 national experts at 1 in-depth workshops (1*1*1000 € = 1,000 €)
One additional expert is subcontracted
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 15.000 €
15 / SEAI Cost (€) Justification
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Experts participation in meetings:
3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Travel & subsistence 47.100 € Central Team participation in meetings:
CTM & CTA at 7 plenary meetings (2*7*1000 € = 14,000 €)
CTM & CTA at 1 in-depth workshops (2*1*1000 € = 2,000 €)
CTM at 9 Management Team Meetings (1*9*900 € = 8,100 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 47.100 €
16 / ENEA Cost (€) Justification
Experts participation in meetings:
2 national experts at 7 plenary meetings (2*7*1000 € = 14,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
One additional expert is subcontracted
Travel & subsistence 40.100 €
Central Team participation in meetings:
CTM & CTA at 7 plenary meetings (2*7*1000 € = 14,000 €)
CTM & CTA at 1 in-depth workshops (2*1*1000 € = 2,000 €)
CTM at 9 Management Team Meetings (1*9*900 € = 8,100 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 40.100 €
17 / LRAM Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
18 / MEAT Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
19 / EM Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
20 / MTIC Cost (€) Justification
Experts participation in meetings:
2 national experts at 7 plenary meetings (2*7*1000 € = 14,000 €)
Travel & subsistence 16.000 €
2 national experts at 1 in-depth workshops (1*2*1000 € = 2,000 €)
One additional expert is subcontracted
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 16.000 €
21 / RVO Cost (€) Justification
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Experts participation in meetings:
3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Travel & subsistence 31.800 €
Creative sessions / moderator:
Creative Moderator at 7 plenary meetings (1*7*1000 € = 7,000 €)
Creative workshop at 2 Management Team Meetings (1*2*900 € = 1,800 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 31.800 €
22 / ITB Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
23 / ADENE Cost (€) Justification
Experts participation in meetings:
3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Travel & subsistence 47.100 € Central Team participation in meetings:
CTM & CTA at 7 plenary meetings (2*7*1000 € = 14,000 €)
CTM & CTA at 1 in-depth workshops (2*1*1000 € = 2,000 €)
CTM at 9 Management Team Meetings (1*9*900 € = 8,100 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 47.100 €
24 / MLPDA Cost (€) Justification
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Experts participation in meetings:
Travel & subsistence 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 23.000 €
25 / BOVERKET Cost (€) Justification
Experts participation in meetings:
Travel & subsistence 29.900 € 3 national experts at 7 plenary meetings (3*7*1300 € = 27,300 €)
2 national experts at 1 in-depth workshops (2*1*1300 € = 2,600 €)
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 29.900 €
26 / TSUS Cost (€) Justification
Experts participation in meetings:
1 national experts at 7 plenary meetings (1*7*1000 € = 7,000 €)
Travel & subsistence 8.000 €
1 national experts at 1 in-depth workshops (1*1*1000 € = 1,000 €)
2 additional experts are subcontracted
Equipment (incl. infrastructure)
Other goods, works and services
Financial support to third parties
Land purchase
Total 8.000 €
27. MZI Cost (€) Justification
Experts participation in meetings:
27 / MZI 23.000 € 3 national experts at 7 plenary meetings (3*7*1000 € = 21,000 €)
2 national experts at 1 in-depth workshops (2*1*1000 € = 2,000 €)
27 / MZI
Other goods, works and services
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Financial support to third parties
Land purchase
Total 23.000 €
All Partners Total Cost (€) Justification
Travel & subsistence 848.800 €
Equipment (incl. infrastructure)
Other goods, works and services 376.461 €
Financial support to third parties
Land purchase
Total 1.225.261 €
Proposal Info Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Proposal ID Call for Proposal Topic Type of Action
SEP-210861689 LIFE-CET-2021-CAEPBD6- LIFE-CET-2021-CAEPBD6- LIFE-PJG
IBA IBA
LIFE Programme – Application Forms (Part C – KPI)
Horizontal KPIs for all LIFE applicants (Mandatory to report on all the KPIs of this section).
Innovation Governance Plans & strategies
1 1 1
Is your project proposal developing, Is your project proposal improving Is you project proposal implementing
demonstrating and promoting governance through enhancing key plans or strategies?
innovative techniques and capacities of public and private actors
approaches? and the involvement of civil society? Yes
No
Yes Yes
No No
Catalytic effect - Financial Catalytic effect - Spatial Catalytic effect - Thematic
Will your project trigger additional Will the results of your project be Will the results of your project be
investments? replicated beyond its intended replicated (transferred) beyond its
geographical scope? intended thematic scope?
Yes
No Yes Yes
No No
Catalytic effect - Societal Rio markers for climate, biodiversity and air quality
Will your project : Please indicate if your proposal:
a) Contribute to the development of new or existing national • Has climate change/ biodiversity/ air quality as their
legislation, policies, regulations, incentives and voluntary primary objective
commitments?
• Has climate change/ biodiversity/ air quality as their
b) Achieve a step-change in more effective compliance with secondary objective and provide substantial contributions to
and enforcement of Union environmental and climate these objectives
legislation and/or in policy implementation?
• Does not contribute significantly to climate change/
c) Achieve a step-change in awareness and support of biodiversity/ air quality
environmental and climate matters?
Climate change
d) Establish a new macroregional or national model of
cooperation (networking)? Primary Objective
Yes Biodiversity
No
Not contributing
Air quality
Secondary Objective
Clean Energy Transition – Specific KPIs (Please report on KPIs you consider relevant).
Primary Energy Savings
Please enter the Primary Energy Savings in GWh/year triggered by the project
Submitted 18-11-2022 10:16:31 LIFECETKPI v3 Page 1
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Project-End Value 5 years beyond Project-End Value Unit
0 0 GWh/year
Final Energy Savings
Please enter the Final Energy Savings in GWh/year triggered by the project
Project-End Value 5 years beyond Project-End Value Unit
0 0 GWh/year
Renewable Energy generation
Please enter the Renewable Energy generation in GWh/year triggered by the project
Project-End Value 5 years beyond Project-End Value Unit
0 0 GWh/year
GHG emissions
Please enter the reduction of greenhouse gas emissions in tons of CO2 equivalent per year (tCO2eq/year) triggered by the
project
Project-End Value 5 years beyond Project-End Value Unit
0 0 tCO2eq/year
Investments in sustainable energy
Please enter the amount of cumulative invstments in sustainable energy triggered by the project
Project-End Value 5 years beyond Project-End Value Unit
0 0 mEUR
Legislation And policy
Please enter the number of legislation, policies or strategies created/adapted [to include sustainable energy issues] at any
governance levels due to the project
Project-End Value 5 years beyond Project-End Value Unit
0 0 Number of documents
Innovation Uptake 1
Please enter the number of products (goods or services), processes and methods launched into the market by the project
Project-End Value 5 years beyond Project-End Value Unit
0 0 Number of products /
processes / methods
Innovation Uptake 2
Please enter the number of real life implementation sites carried out by the project
Project-End Value 5 years beyond Project-End Value Unit
0 0 Number of real life
implementation sites
Skills
Please enter the number of market stakeholders trained with increased skills and competencies on energy issues due to the
project
Project-End Value 5 years beyond Project-End Value Unit
0 0 Number of people trained
Submitted 18-11-2022 10:16:31 LIFECETKPI v3 Page 2
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Communication
Please enter the number of stakeholders reached through media and events during the project
Project-End Value 5 years beyond Project-End Value Unit
10,000 12,000 Number of people
Employment
Please enter the number of jobs created in FTE
Project-End Value 5 years beyond Project-End Value Unit
0 0 FTE
Submitted 18-11-2022 10:16:31 LIFECETKPI v3 Page 3
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
ANNEX 2
ESTIMATED BUDGET FOR THE ACTION
Estimated eligible1 costs (per budget category) Estimated EU contribution2
Direct costs Indirect costs EU contribution to eligible costs
Maximum
B. Total costs Maximum EU Requested EU grant amount6
A. Personnel costs Subcontracting C. Purchase costs D. Other cost categories E. Indirect costs 3
Funding rate %4
contribution5 contribution
costs
A.1 Employees A.4 SME owners A.5 Volunteers B. Subcontracting C.1 Travel and C.2 Equipment C.3 Other goods, D.1 Financial D.2 Land E. Indirect costs
(or equivalent) and natural person subsistence works and support to third purchase
beneficiaries services parties
A.2 Natural
persons under
direct contract
A.3 Seconded
persons
Forms of funding Actual costs Unit costs7 Unit costs7 Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs Flat-rate costs8
e = flat-rate * (a1
f=a+b+
a1 a3 a4 b c1 c2 c3 d1a d2 + a3 + b + c1 + U g = f * U% h m
c+d+e
c2 + c3 + d1a)
1 - DEA 1 413 864.00 0.00 0.00 275 140.00 174 800.00 0.00 376 461.00 0.00 0.00 156 818.55 2 397 083.55 95 2 277 229.37 2 277 229.00 2 277 229.00
2 - OIB 52 360.00 0.00 0.00 229 300.00 23 000.00 0.00 0.00 0.00 0.00 21 326.20 325 986.20 95 309 686.89 309 686.00 309 686.00
3 - CSTC 188 940.00 0.00 0.00 0.00 48 100.00 0.00 0.00 0.00 0.00 16 592.80 253 632.80 95 240 951.16 240 951.00 240 951.00
4 - SEDA 13 179.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 2 532.53 38 711.53 95 36 775.95 36 775.00 36 775.00
5 - MECI 16 248.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 2 747.36 41 995.36 95 39 895.59 39 895.00 39 895.00
6 - MIT 8 960.00 0.00 0.00 11 200.00 16 000.00 0.00 0.00 0.00 0.00 2 531.20 38 691.20 95 36 756.64 36 756.00 36 756.00
7 - BAFA 36 960.00 0.00 0.00 315 940.00 23 000.00 0.00 0.00 0.00 0.00 26 313.00 402 213.00 95 382 102.35 382 102.00 382 102.00
8 - MEC 6 572.00 0.00 0.00 164 700.00 8 000.00 0.00 0.00 0.00 0.00 12 549.04 191 821.04 95 182 229.99 182 229.00 182 229.00
9 - CRES 11 288.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 2 400.16 36 688.16 95 34 853.75 34 853.00 34 853.00
10 - IDAE 23 416.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 3 249.12 49 665.12 95 47 181.86 47 181.00 47 181.00
11 - MOTIVA 148 032.00 0.00 0.00 70 000.00 51 900.00 0.00 0.00 0.00 0.00 18 895.24 288 827.24 95 274 385.88 274 385.00 274 385.00
12 - MTE 28 112.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 3 577.84 54 689.84 95 51 955.35 51 955.00 51 955.00
13 - MPGI 9 504.00 0.00 0.00 10 528.00 16 000.00 0.00 0.00 0.00 0.00 2 522.24 38 554.24 95 36 626.53 36 626.00 36 626.00
14 - EMI 9 794.00 0.00 0.00 12 400.00 15 000.00 0.00 0.00 0.00 0.00 2 603.58 39 797.58 95 37 807.70 37 807.00 37 807.00
15 - SEAI 163 552.00 0.00 0.00 0.00 47 100.00 0.00 0.00 0.00 0.00 14 745.64 225 397.64 95 214 127.76 214 127.00 214 127.00
16 - ENEA 86 848.00 0.00 0.00 12 712.00 40 100.00 0.00 0.00 0.00 0.00 9 776.20 149 436.20 95 141 964.39 141 964.00 141 964.00
17 - LRAM 12 320.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 2 472.40 37 792.40 95 35 902.78 35 902.00 35 902.00
18 - MEAT 20 328.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 3 032.96 46 360.96 95 44 042.91 44 042.00 44 042.00
19 - EM 13 160.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 2 531.20 38 691.20 95 36 756.64 36 756.00 36 756.00
20 - MTIC 18 025.00 0.00 0.00 13 720.00 16 000.00 0.00 0.00 0.00 0.00 3 342.15 51 087.15 95 48 532.79 48 532.00 48 532.00
21 - RVO 74 520.00 0.00 0.00 0.00 31 800.00 0.00 0.00 0.00 0.00 7 442.40 113 762.40 95 108 074.28 108 074.00 108 074.00
22 - ITB 19 592.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 2 981.44 45 573.44 95 43 294.77 43 294.00 43 294.00
23 - ADENE 117 992.00 0.00 0.00 0.00 47 100.00 0.00 0.00 0.00 0.00 11 556.44 176 648.44 95 167 816.02 167 816.00 167 816.00
24 - MLPDA 0.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 1 610.00 24 610.00 95 23 379.50 23 379.00 23 379.00
25 - BOVERKET 32 604.00 0.00 0.00 0.00 29 900.00 0.00 0.00 0.00 0.00 4 375.28 66 879.28 95 63 535.32 63 535.00 63 535.00
26 - TSUS 5 568.00 0.00 0.00 24 032.00 8 000.00 0.00 0.00 0.00 0.00 2 632.00 40 232.00 95 38 220.40 38 220.00 38 220.00
27 - MZI 22 184.00 0.00 0.00 0.00 23 000.00 0.00 0.00 0.00 0.00 3 162.88 48 346.88 95 45 929.54 45 929.00 45 929.00
28 - NVE
Σ consortium 2 553 922.00 0.00 0.00 1 139 672.00 848 800.00 0.00 376 461.00 0.00 0.00 344 319.85 5 263 174.85 5 000 016.11 5 000 000.00 5 000 000.00
Page 1 of 2
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
LIFE Ref.
Associated with document MGAAres(2022)8025859
— Multi & Mono:-v1.0
21/11/2022
1 See Article 6 for the eligibility conditions. All amounts must be expressed in EUR (see Article 21 for the conversion rules).
2 The consortium remains free to decide on a different internal distribution of the EU funding (via the consortium agreement; see Article 7).
3 Indirect costs already covered by an operating grant (received under any EU funding programme) are ineligible (see Article 6.3). Therefore, a beneficiary/affiliated entity that receives an operating grant during the action duration cannot declare indirect costs for the year(s)/reporting period(s) covered by the operating grant, unless they can
demonstrate that the operating grant does not cover any costs of the action. This requires specific accounting tools. Please immediately contact us via the EU Funding & Tenders Portal for details.
4 See Data Sheet for the funding rate(s).
5 This is the theoretical amount of the EU contribution to costs, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is then capped by the 'maximum grant amount'.
6 The 'maximum grant amount' is the maximum grant amount decided by the EU. It normally corresponds to the requested grant, but may be lower.
7 See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit).
8 See Data Sheet for the flat-rate.
Page 2 of 2
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 2a
ADDITIONAL INFORMATION ON UNIT COSTS AND CONTRIBUTIONS
SME owners/natural person beneficiaries without salary (Decision C(2020) 71151)
Type: unit costs
Units: days spent working on the action (rounded up or down to the nearest half-day)
Amount per unit (daily rate): calculated according to the following formula:
{EUR 5 080 / 18 days = 282,22}
multiplied by
{country-specific correction coefficient of the country where the beneficiary is established}
The country-specific correction coefficients used are those set out in the Horizon Europe Work Programme
(section Marie Skłodowska-Curie actions) in force at the time of the call (see Portal Reference Documents).
Volunteers (Decision C(2019)26462)
Type: unit costs
Units: days spent working on the action (rounded up or down to the nearest half-day)
Amount per unit (daily rate):
Country Daily rate in €
Denmark, Ireland, Luxembourg, Netherlands, Austria, Sweden,
157
Liechtenstein, Norway
Belgium, Germany, France, Italy, Finland, United Kingdom, Iceland 131
Czech Republic, Greece, Spain, Cyprus, Malta, Portugal, Slovenia 78
Bulgaria, Estonia, Croatia, Latvia, Lithuania, Hungary, Poland, 47
Romania, Slovakia
Australia, Canada, Hong King, Israel, Japan, Kuwait, Macao, New 92
Zealand, Qatar, United Arab Emirates, United States of America,
Switzerland.
Albania, Angola, Antigua and Barbuda, Argentina, Barbados, Bosnia 45
and Herzegovina, Brazil, Chile, Colombia, Comoros, Cook Islands,
Dominica, Gabon, Grenada, Ivory Coast, Former Yugoslav Republic
of Macedonia, Kosovo, Lebanon, Libya, Mexico, Montenegro,
Nigeria, Peru, Saint Kitts And Nevis, Saint Lucia, Saint Vincent And
the Grenadines, Sao Tome and Principe, Serbia, Seychelles, Thailand,
Turkey, Ukraine, Uruguay, Venezuela, Zambia, Zimbabwe
Afghanistan, Azerbaijan, Bahamas, Bolivia, Burkina Faso, Cameroon, 32
China, Congo, Costa Rica, Djibouti, Dominican Republic, Ecuador, El
1
Commission Decision of 20 October 2020 authorising the use of unit costs for the personnel costs of the owners of small and medium-
sized enterprises and beneficiaries that are natural persons not receiving a salary for the work carried out by themselves under an
action or work programme (C(2020)7715).
2
Commission Decision of 10 April 2019 authorising the use of unit costs for declaring personnel costs for the work carried out by
volunteers under an action or a work programme (C(2019)2646).
1
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
Salvador, Georgia, Guatemala, Guinea-Bissau, Haiti, Iran, Iraq,
Jamaica, Jordan, Kazakhstan, Kenya, Micronesia, Morocco,
Mozambique, Namibia, Palestine, Panama, Papua New Guinea,
Paraguay, Senegal, South Africa, Surinam, Swaziland, Russia,
Trinidad and Tobago, Vanuatu
Algeria, Armenia, Bangladesh, Belarus, Belize, Benin, Bhutan, 17
Botswana, Myanmar, Burundi, Cambodia, Cape Verde, Central
African Republic, Chad, Congo – Democratic Republic of the-, Cuba,
Korea (DPR), Egypt, Eritrea, Ethiopia, Equatorial Guinea, Fiji Island,
Gambia, Ghana, Guinea, Guyana, Honduras, India, Indonesia, Kiribati,
Kyrgyzstan, Laos, Lesotho, Liberia, Madagascar, Malawi, Malaysia,
Maldives, Mali, Marshall Islands, Mauritania, Mauritius, Moldova,
Mongolia, Nauru, Nepal, Nicaragua, Niger, Niue, Pakistan, Palau,
Philippines, Rwanda, Samoa, Sierra Leone, Solomon, Somalia, South
Sudan, Sri Lanka, Sudan, Syria, Tajikistan, Tanzania, Timor-Leste –
Democratic Republic of, Togo, Tonga, Tunisia, Turkmenistan, Tuvalu,
Uganda, Uzbekistan, Vietnam, Yemen
2
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
OSTERREICHISCHES INSTITUT FUR BAUTECHNIK (OIB), PIC 933310333, established in
SCHENKENSTRASSE 4, WIEN 1010, Austria,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-933310333_75_210--]
1
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
CENTRE SCIENTIFIQUE ET TECHNIQUE DE LA CONSTRUCTION (CSTC), PIC
999432129, established in Rue du Lombard 42, BRUXELLES 1000, Belgium,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999432129_75_210--]
2
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SUSTAINABLE ENERGY DEVELOPMENT AGENCY (SEDA), PIC 939008695, established in
37 EKZARH JOSSIF STR., SOFIA 1000, Bulgaria,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-939008695_75_210--]
3
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTRY OF ENERGY, COMMERCE AND INDUSTRY (MECI), PIC 938650086,
established in 6, Andreas Araouzos str., Nicosia 1076, Cyprus,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-938650086_75_210--]
4
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTRY OF INDUSTRY AND TRADE (MIT), PIC 999810332, established in Na Frantisku,
32, PRAHA 11015, Czechia,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999810332_75_210--]
5
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESAMT FUR WIRTSCHAFT UND AUSFUHRKONTROLLE (BAFA), PIC 909836430,
established in FRANKFURTERSTRASSE 29-35, ESCHBORN 65760, Germany,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-909836430_75_210--]
6
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MAJANDUS JA KOMMUNIKATSIOONIMINISTEERIUM (MEC), PIC 963638450,
established in SUUR-AMEERIKA 1, TALLINN 10122, Estonia,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-963638450_75_210--]
7
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
CENTRE FOR RENEWABLE ENERGY SOURCES AND SAVING FONDATION (CRES),
PIC 999646014, established in MARATHONOS 19TH KM, PIKERMI 19009, Greece,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999646014_75_210--]
8
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITUTO PARA LA DIVERSIFICACION Y AHORRO DE LA ENERGIA (IDAE), PIC
994622093, established in CALLE MADERA 8, MADRID 28004, Spain,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-994622093_75_210--]
9
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MOTIVA OY (MOTIVA), PIC 950479042, established in POHJOINEN RAUTATIEKATU 25,
HELSINKI 00100, Finland,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-950479042_75_210--]
10
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERE DE LA TRANSITION ECOLOGIQUE (MTE), PIC 996384874, established in
Grande Arche - Tour Sequoia, Paris - La Défense 92055, France,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-996384874_75_210--]
11
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTARSTVO PROSTORNOGA UREDENJA, GRADITELJSTVA I DRZAVNE
IMOVINE (MPGI), PIC 953590123, established in REPUBLIKE AUSTRIJE 20, ZAGREB 10000,
Croatia,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-953590123_75_210--]
12
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
EMI EPITESUGYI MINOSEGELLENORZO INNOVACIOS NONPROFIT KFT (EMI), PIC
998707636, established in DOZSA GYORGY ST 26, SZENTENDRE 2000, Hungary,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998707636_75_210--]
13
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND (SEAI), PIC 997611148,
established in WILTON PLACE WILTON PARK HOUSE, DUBLIN 2, Ireland,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-997611148_75_210--]
14
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE, L'ENERGIA E LO SVILUPPO
ECONOMICO SOSTENIBILE (ENEA), PIC 999988521, established in LUNGOTEVERE
GRANDE AMMIRAGLIO THAON DI REVEL 76, ROMA 00196, Italy,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999988521_75_210--]
15
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
LIETUVOS RESPUBLIKOS APLINKOS MINISTERIJA (LRAM), PIC 950938240, established
in A. JAKSTO 4/9, VILNIUS LT-01105, Lithuania,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-950938240_75_210--]
16
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERE DE L'ENERGIE ET DE L'AMENAGEMENT DU TERRITOIRE (MEAT), PIC
898634676, established in 4 PLACE DE L'EUROPE, LUXEMBOURG 1499, Luxembourg,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-898634676_75_210--]
17
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
EKONOMIKAS MINISTRIJA (EM), PIC 928511355, established in BRIVIBAS IELA 55, RIGA
LV 1519, Latvia,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-928511355_75_210--]
18
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTRY FOR TRANSPORT, INFRASTRUCTURE AND CAPITAL PROJECTS (MTIC),
PIC 950554023, established in TRIQ FRANCESCO BUONAMICI, Floriana FRN 1700, Malta,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-950554023_75_210--]
19
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERIE VAN ECONOMISCHE ZAKEN EN KLIMAAT (RVO), PIC 972778178,
established in BEZUIDENHOUTSEWEG 73, The Hague 2595 AC, Netherlands,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-972778178_75_210--]
20
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTYTUT TECHNIKI BUDOWLANEJ (ITB), PIC 955708409, established in UL FILTROWA
1, WARSAW 00 611, Poland,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-955708409_75_210--]
21
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
ADENE - AGENCIA PARA A ENERGIA (ADENE), PIC 950873638, established in AVENIDA
5 DE OUTUBRO 208, LISBOA 1050 065, Portugal,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-950873638_75_210--]
22
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERUL DEZVOLTARII, LUCRARILOR PUBLICE SI ADMINISTRATIEI (MLPDA),
PIC 950502225, established in BDL LIBERTATII 16 BL LATURA NORD, BUCURESTI 010873,
Romania,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-950502225_75_210--]
23
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BOVERKET (BOVERKET), PIC 933308587, established in DROTTNINGGATAN 18,
KARLSKRONA 37123, Sweden,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-933308587_75_210--]
24
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
TECHNICKY A SKUSOBNY USTAV STAVEBNY n.o. (TSUS), PIC 957873934, established in
STUDENA 3, BRATISLAVA 821 04, Slovakia,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-957873934_75_210--]
25
Grant Agreement number: 101102078 — LIFE21-CET-CA-CAEPBD6 — LIFE-CET-2021-CAEPBD6-IBA
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTRSTVO ZA INFRASTRUKTURO (MZI), PIC 952242696, established in LANGUSOVA
ULICA 4, LJUBLJANA 1000, Slovenia,
hereby agrees
to become beneficiary
in Agreement No 101102078 — LIFE21-CET-CA-CAEPBD6 (‘the Agreement’)
between ENERGISTYRELSEN (DEA) and the European Climate, Infrastructure and
Environment Executive Agency (CINEA) (‘EU executive agency’ or ‘granting authority’), under
the powers delegated by the European Commission (‘European Commission’),
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this accession form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and terms and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-952242696_75_210--]
26
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 4 LIFE MGA — MULTI + MONO
FINANCIAL STATEMENT FOR [PARTICIPANT NAME] FOR REPORTING PERIOD [NUMBER]
1 2
Eligible costs (per budget category) EU contribution Revenues
Direct costs Indirect costs EU contribution to eligible costs
Total requested EU Income generated by the
Total costs
Requested EU contribution action
A. Personnel costs B. Subcontracting costs C. Purchase costs D. Other cost categories 2 3 4
E. Indirect costs Funding rate % Maximum EU contribution contribution
A.4 SME owners and
C.3 Other goods, works and D.X Financial support to third
A.1 Employees (or equivalent) natural person A.5 Volunteers B. Subcontracting C.1 Travel and subsistence C.2 Equipment D.2 Land purchase E. Indirect costs
services parties
beneficiaries
A.2 Natural persons under
direct contract
A.3 Seconded persons
Forms of funding Actual costs 5 5 Actual costs Actual costs Actual costs Actual costs Actual costs Actual costs 6
Unit costs Unit costs Flat-rate costs
e=
f=
a1 a3 a4 b c1 c2 c3 d1a d2 flat-rate * (a1 + a3 + b + c1 + c2 U g = f*U% h m (i) n
a+b+c+d+e
+ c3 + d1a)
XX – [short name beneficiary/affiliated entity]
The beneficiary/affiliated entity hereby confirms that:
The information provided is complete, reliable and true.
The costs and contributions declared are eligible (see Article 6).
The costs and contributions can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 19, 20 and 25).
For the last reporting period: that all the revenues have been declared (see Article 22).
i Please declare all eligible costs and contributions, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial statements can be taken into account lateron, in order to replace costs/contributions that are found to be ineligible.
1
See Article 6 for the eligibility conditions. All amounts must be expressed in EUR (see Article 21 for the conversion rules).
2
If you have also received an EU operating grant during this reporting period, you cannot claim indirect costs - unless you can demonstrate that the operating grant does not cover any costs of the action. This requires specific accounting tools. Please contact us immediately via the Funding & Tenders Portal for
details.
3
See Data Sheet for the reimbursement rate(s).
4
This is the theoretical amount of EU contribution to costs that the system calculates automatically (by multiplying the reimbursement rates by the costs declared). The amount you request (in the column 'requested EU contribution') may be less.
5
See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit).
6
See Data Sheet for the flat-rate.
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
ANNEX 5
SPECIFIC RULES
INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS —
ACCESS RIGHTS AND RIGHTS OF USE (— ARTICLE 16)
Rights of use of the granting authority on results for information, communication,
dissemination and publicity purposes
The granting authority also has the right to exploit non-sensitive results of the action for
information, communication, dissemination and publicity purposes, using any of the
following modes:
- use for its own purposes (in particular, making them available to persons working for
the granting authority or any other EU service (including institutions, bodies, offices,
agencies, etc.) or EU Member State institution or body; copying or reproducing them
in whole or in part, in unlimited numbers; and communication through press
information services)
- distribution to the public in hard copies, in electronic or digital format, on the
internet including social networks, as a downloadable or non-downloadable file
- editing or redrafting (including shortening, summarising, changing, correcting,
cutting, inserting elements (e.g. meta-data, legends or other graphic, visual, audio or
text elements extracting parts (e.g. audio or video files), dividing into parts or use in a
compilation
- translation (including inserting subtitles/dubbing) in all official languages of EU
- storage in paper, electronic or other form
- archiving in line with applicable document-management rules
- the right to authorise third parties to act on its behalf or sub-license to third parties,
including if there is licensed background, any of the rights or modes of exploitation set
out in this provision
- processing, analysing, aggregating the results and producing derivative works
- disseminating the results in widely accessible databases or indexes (such as through
‘open access’ or ‘open data’ portals or similar repositories, whether free of charge or
not.
The beneficiaries must ensure these rights of use for the whole duration they are protected by
industrial or intellectual property rights.
If results are subject to moral rights or third party rights (including intellectual property rights
or rights of natural persons on their image and voice), the beneficiaries must ensure that they
1
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
comply with their obligations under this Agreement (in particular, by obtaining the necessary
licences and authorisations from the rights holders concerned).
COMMUNICATION, DISSEMINATION AND VISIBILITY (— ARTICLE 17)
Communication and dissemination plan
The beneficiaries must provide a detailed communication and dissemination plan, setting out
the objectives, key messaging, target audiences, communication channels, social media plan,
planned budget and relevant indicators for monitoring and evaluation.
Additional communication and dissemination activities
The beneficiaries must engage in the following additional communication and dissemination
activities:
- present the project (including project summary, coordinator contact details, list of
participants, European flag and funding statement and special logo and project results)
on the beneficiaries’ websites or social media accounts
- for actions involving equipment, infrastructure or works, display as soon as the work on
the action starts a printed or electronic sign of appropriate size, with European flag
and funding statement and special logo
- upload the public project results to the LIFE Project Results platform, available
through the Funding & Tenders Portal .
Special logos
Communication activities and infrastructure, equipment or major results funded by the grant
must moreover display the following logo:
- the LIFE Programme logo
and
- for projects in Natura 2000 sites or contributing to the integrity of Natura 2020
network: the Natura 2000 logo
2
Associated with document Ref. Ares(2022)8025859 - 21/11/2022
SPECIFIC RULES FOR CARRYING OUT THE ACTION (— ARTICLE 18)
Durability
Unless exempted by the granting authority, beneficiaries of Standard Action Projects,
Strategic Nature Projects and Strategic Integrated Projects must commit to continue to use and
maintain after the end of the action equipment bought and eligible at full costs, for activities
pursuing the action’s objectives. Such equipment must be used for these purposes — for at
least five years after the end of the action (see Data Sheet, Point 1) or until the end of its
economic lifespan (i.e. until it has been fully depreciated) — whichever is earlier.
Specific rules for blending operations
When implementing blending operations, the beneficiaries acknowledge and accept that:
- the grant depends on the approved financing from the Implementing Partner and/or
public or private investors for the project
- they must inform the granting authority both about the approval for financing and the
financial close — within 15 days
- the payment deadline for the first prefinancing is automatically suspended until the
granting authority is informed about the approval for financing
- both actions will be managed and monitored in parallel and in close coordination with
the Implementing Partner, in particular:
- all information, data and documents (including the due diligence by the
Implementing Partner and the signed agreement) may be exchanged and may
be relied on for the management of the other action (if needed)
- issues in one action may impact the other (e.g. suspension or termination in
one action may lead to suspension also of the other action; termination of the
grant will normally suspend and exit from further financing and vice versa,
etc.)
- the granting authority may disclose confidential information also to the Implementing
Partner.
3
Digitally sealed by the European Commission
Date: 2022.11.21 12:31:00 CET
This electronic receipt is a digitally signed version of the document submitted by your
organisation. Both the content of the document and a set of metadata have been digitally
sealed.
This digital signature mechanism, using a public-private key pair mechanism, uniquely
binds this eReceipt to the modules of the Funding & Tenders Portal of the European
Commission, to the transaction for which it was generated and ensures its full integrity.
Therefore a complete digitally signed trail of the transaction is available both for your
organisation and for the issuer of the eReceipt.
Any attempt to modify the content will lead to a break of the integrity of the electronic
signature, which can be verified at any time by clicking on the eReceipt validation
symbol.
More info about eReceipts can be found in the FAQ page of the Funding & Tenders
Portal.
(https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/support/faq)
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111
CA EPBD 6 Grant Agreement
Work Package 6: Reporting
An important deliverable of the CA 6 is the reporting on resources spending as well as on progress
in the project implementation.
Task 6.1 Country Reporting (DEA, all partners)
Every participating country (partner) shall supply country information for the reporting and
uploading in the database (i.e. updates of relevant sections to reflect progress in the national
EPBD transposition) and lessons learned (as described under WP6). The responsibility for these
reports rests with the National Coordinators and material will be developed as part of the
reporting. In the CA EPBD 6, the reporting will not be done as a onetime update of the reports, but
as multiple smaller adjustments, replacements or additions, each time focusing on specific
sections, where significant change is foreseen.
The KIDs, Key Indicators and Decisions (KI&Ds), will be maintained and further developed in the CA
EPBD 6. The work with external collaboration and hosting, which can allow a more interactive use
of these KIDs will continue and also the development of the database of knowledge where the
KIDs are presented and can be combined from country to country. Especially the BSO and the
expected request for reporting for this database should be integrated in the process on KIDs,
where a full integration in the BSO database and/or reporting would be considered to avoid
duplication of work and strengthening of both initiatives.
Countries will further develop confidential material for the reporting including statements on the
implementation of the EPBD and how the CA has helped in this process.
All material from countries will be collected and reviewed through WP6. This includes needed
inclusion of comments from CINEA for some elements. All published elements of the material will
go through a simple language check under WP5 and the handling of the publication will further
take place under WP5.
No personal data will be collected under country reporting.
Task 6.2 Central Team Reporting (DEA, all central teams)
Reporting from Central Teams will in general take place under WP2, under the responsibility of
each CTM, but all these reports will also be part of the overall reporting taking place in this Work
Package.
The publishable deliverables shall concentrate on the general progress and topics discussed at
sessions in Plenary Meetings. It shall be ensured that contributions are shared with the Central
Teams / country coordinators before they are published for control / approval before these are
published. The responsibility for preparing such reports rests with the Central Team Managers (in
WP2), under the leadership of the Coordinator supported by the Management Team.
CA EPBD 6, Grant Agreement Draft 14 November 2022 1
CA EPBD 6 Grant Agreement
The public Central Team reports shall adopt similar formats, although some variations may be
needed given the breadth of topics to be covered. These reports will be published and final edited
(layout etc.) though the WP6 activities.
The evolving strategic Central Team reports (including all the meeting minutes and reports, the
collection of webzines and news in the Project Centre) will be strictly confidential to the
participants, the National Authorities they represent and the EC.
Internal reporting from Central Teams will include strategic reports, material from sessions and
from Working Groups. All this material will be developed under WP2, WP3 and WP4 but compiled
and edited for reporting through WP6.
No personal data will be collected in connection to central team reporting.
Task 6.3 Editor / writer for external reports (DEA)
In general, the Communication Team is responsible for language review and consistency check of
external material. This is also the case with Country and CTM reports. Past experience has,
however, shown that there are different skills for writing from the different teams and countries.
This has resulted in a slowdown of the process, which has been increased by the spread of COVID
19 and the change from physical to virtual meetings. This resulted in delays in delivery of reports
and it has made the process of review of reports more complicated. In the last part of the
CAV_EPBD project, an external writer has been included to help with specific reports. This can
either be through review and editing or it can be a help for the writing and analytic process itself.
This function will give the coordinator the possibility to have some reports go through a more
significant editing and perhaps rewriting of sections or parts, or it could even be allocated to help
ensuring that some of the reports come in first draft, by offering assistance to the crafting process.
This will aim to ensure efficient delivery of reports in high quality. Hopefully, it can also help to
reduce the bottleneck of reports to be edited and reviewed by the coordination team in the very
last part of the project. The work of the external writer will mainly be linked to the mentioned
reports in task 6.1 & 6.2, but the writer could potentially also be involved in other external
deliverables such as 6.4.
Task 6.4 The CA Report (DEA)
A key element in reporting is the CA Report, which will include a report with short statements
from participants (collected under task 6.1, detailing all the activities undertaken during the CA
(participation at meetings, WGs, etc.), as well as indicating how the CA contributed to an improved
implementation and actual application of the EPBD in their country. Further qualitative statements
on the CAs role in connection to national implementation will be collected in focus interviews
conducted by a professional Survey Company. These will target national contacts and other
central experts.
These results will be combined with results from CTM reports and other material collected under
other Work Programs (WP2, WP3, WP4 and WP6). Examples shall be compiled in a summary
document that may, possibly, be released as a public document to show the added value of the CA
towards the overall goal of an effective EPBD implementation across the whole of Europe.
Publication will depend on approval through the national contacts (Contractors Meeting).
CA EPBD 6, Grant Agreement Draft 14 November 2022 2
CA EPBD 6 Grant Agreement
As the information from the CA is specific and highly related to a key audience, the quantitative
statements will be supported by some qualitative assessments showing how well the received
information fulfils these specific needs and satisfy the user (Developed under WP6).
Task 6.5 Further contribution: (DEA / all central teams)
The Coordinator, assisted by the Management Team, will further contribute to the following tasks:
• Contribution to the development of online information systems under CINEA management
(e.g. project fact sheets, reports, slides, electronic deliverables, images) in the quality and
form specified;
• Contribution to events, workshops, conferences and publications of the EC related to the
EPBD.
• Contribution, upon invitation by the CINEA, to common information and dissemination
activities to increase synergies between, and the visibility of LIFE supported actions.
Task 6.6 Approval Process: (DEA)
Reports for public dissemination will include an approval process, which takes into account
comments from CINEA and for CTM reports from DG ENER. The public material reported to CINEA
/ DG ENER includes substantial new material for the database and material presented on the
website.
Reports for public dissemination or reporting will be shared with participants in the Central Team
under the lead of the CTM and national contacts will have access to the reports through the
project centre for possible commenting / approval, and a suitable period given for comments,
additions and other changes before these are published. The Coordinator will lead the process
with Review and the final approval of all deliverables.
At the discretion and agreement of the WG participants, this executive summary from Working
Groups may be prepared in a publishable format to permit widespread distribution of this section.
The remainder of the reports will be strictly confidential to the participants, the EC and CINEA.
CA EPBD 6, Grant Agreement Draft 14 November 2022 3
CA EPBD 6 Grant Agreement
Work package 2, Preparation of Plenary Meetings and Central Teams
2.1. Central Teams (OIB, CSTS, BAFA, MEC, MOTIVA, SEAI, ENEA, ADENE)
The Central Teams and their leaders will be responsible for the setup of sessions and other
technical work in the CA EPBD 6 project and for the reporting from this work. Most technical
issues will be handled under this work package and the participation of these CTMs in the
management of the project including in the Management Team Meetings will be part of this work
package. Each Central Team Manager (CTM) will be supported by a Central Team Assistant (CTA).
Central Teams are indicated as Task 2.1.1 to 2.1.9. Additional support elements ensure the
handling of the Plenary Meetings and In-depth Workshops etc. These support functions are
described as Task 2.3.1 to 2.3.5.
Further work, including the lead of the Management Team and the overall coordination, is
described under work package 1. The Plenary Meetings and the participation of the National
Experts are handled under work package 3.
The Central Teams are set up with a very strong focus on the directive under revision in 2022 and
2023 as these indicate the major part of the work in the CA EPBD 6 project circle. They are,
however, formulated in a broad manner, in order to adapt to changes coming in the revision
process as well as handling the issues until the new provisions come into force. The teams are
formed strongly based on the graph below, as presented by DG ENER, and it is set up so that
multiple teams often will either work together on topics or complement each other under main
topics; Renovation, Financing, Decarbonisation and Modernising & System Integration.
Task 2.1.1: CT1 - National Renovation Action Plans / MEPS (BAFA, Germany)
This Central Team is related to renovation of existing buildings. Major tasks include the areas of
National Renovation Action Plans and Minimum Energy Performance Standards (MEPS) for
existing buildings, as they are expected to become part of the revised EPBD directive. National
Renovation Action Plans strongly link to targets for the building stock and activities linked to the
CA EED. This work will therefore request collaboration also with the teams under CA EED.
Minimum Energy Performance Standards, MEPS, are expected to become a central element of the
renovation strategy and this team will handle the CA work on MEPS. The team will work as well
with the development of these strategies as their full implementation. Evaluation of results will
therefore be a central part of the work and also identification of measures that work, but also
Long Term Renovation Strategies (until update of EPBD). The team will address as well residential
buildings as non-residential buildings.
Task 2.1.2: CT2- Renovation passports / EPCs (ADENE, Portugal)
This central team is related to renovation of existing buildings and in particular to Energy
Performance Certificates (EPCs). The link to and use of renovation passports as an active part of
EPCs and development of action towards realisation of the savings identified will be important
elements. Control systems will be needed to ensure the success of EPCs and in particular in their
use connected to MEPS. Quality and needed training of experts and their role in minimum energy
performance standards will therefore be some of the critical elements covered by this team.
Realisation of proposals for improvement of buildings will be linked to finance and this again links
CA EPBD 6, Grant Agreement Draft 14 November 2022 1
CA EPBD 6 Grant Agreement
to requirements for good quality. Finally, the team will work in connection to databases for
registration of EPCs and their use in the perspective of getting better data for buildings and energy
performance. The team will work with as well certification in connection to sale or rental of
buildings, but also with the regular certification of, for instance, public buildings.
Task 2.1.3: CT3 - Deep renovation and renovation passports (OIB, Austria)
This central team is linked to as well renovation for existing buildings as for finance. Some key
elements in the work are the definition and targets for deep renovations and the need for
renovation passports for existing buildings in order to reach those targets. The team will also work
with inspection schemes related to renovation of buildings and to finance. Central elements would
be deep renovation standards, examples and renovation passports. Deep renovation of buildings
will be a voluntary measure to go beyond the normal requirements and this team will work with
needed incentives and organisation to go beyond the minimum energy performance standards.
The team would also be responsible for elements of general renovation and improvement of
individual buildings as well for the building shell as for the Technical Building Systems (TBS).
Task 2.1.4: CT4 - Finance (MOTIVA, Finland)
This Central Team focuses on financial aspects of the renovation wave and in particular in
connection to the renovation and improvement of existing buildings. Work will include as well
private finance as finance from European funds and national funding. A special need is
collaboration with the European Investment Bank, which is expected to be in regular interaction
with the project at Plenary Meetings. Issues like bundling of investments, third party financing /
energy service companies and smart finance will be topics under this Central Team. The team will
also work with the relation of finance to other incentives for existing buildings. The work would
include energy poverty, one-stop shop elements and policy packages etc. in collaboration with
other relevant teams. The team mainly focuses on existing buildings, but the team would also
occasionally work with smart finance and finance of new highly efficient buildings. The team will
also work with information activities and other incentives.
Task 2.1.5: CT5 - Decarbonization / Zero emission buildings (ENEA, Italy)
This central team will work on the agenda of decarbonisation of heating, including zero emission
buildings, zero carbon renovation and phasing out of existing fossil fuels in the whole building
sector. The work will be supporting phasing out individual heating based on fossil fuel in form of
natural gas and fuel oil. Topics will include a new legal basis for national bans of products or
systems using fossil fuels. Systems using renewable energy sources such as biofuels will be
targeted as well as zero carbon districts, which is a topic that will include collaboration with CA
RES. Definitions systems on RES, nearby production or on-site will be part of the work, in
collaboration with CT 6 on Calculations and life cycle assessment.
Task 2.1.6: CT6 - Calculations and life cycle (MEC, Estonia)
This Central Team would be mainly linked to decarbonization, calculations and standards. This
includes life cycle calculations, for carbon and energy, general calculation procedures and
standards. Development of frameworks and definitions of for instance primary energy factors will
be targeted by this team. The team will further work with cost efficiency, cost optimality and their
implication on zero carbon buildings. Work on these rules are expected to cover as well definitions
and methods for new buildings as the application on existing buildings or the use in for instance
EPCs. The team will also handle some technical elements. The team will also look at cost
CA EPBD 6, Grant Agreement Draft 14 November 2022 2
CA EPBD 6 Grant Agreement
optimisation and combination with other matrixes for calculation including non-energy related
matters. CEN standards in general is handled by this team and in particular when it comes to
energy performance standards and life cycle calculations.
Task 2.1.7: CT7 - Smart buildings and system integration (CSTC, Belgium)
This Central Team will mainly be active on the focus area “Modernisation & System integration”.
The team would be strongly related to smart buildings and systems. This includes the smart
readiness indicator and demands for smart systems. The upgrade of existing technical buildings
systems would be included too. One of the next large steps in the EPBD implementation will be
the entry into force of the requirements on Building Automation and Control system in 2025. A lot
of preparation work is still necessary in most MS to have a fully operational regulation by then.
Many synergies can be found with the Technical Building System requirements and smart finance.
Task 2.1.8: CT8 - Buildings codes and technical requirements (SEAI, Ireland)
This Central Team would be linked to cross cutting for multiple focus areas including the use of
building codes as well for new buildings as for existing buildings. Some elements handled by the
team are linked to NZEB definitions and the development of these as well before and after the
revision of the EPBD directive. Elements on indoor air quality, ventilation and other technical
building system requirements will be part of the work in connection to the respective teams on
new and existing buildings. Demands handled in this team will cover as well overall performance
as individual component requirements for as well building parts as for systems. Finally, the team
will be responsible for electric mobility requirements although some of this work are expected to
be done by or in collaboration with a topic leader.
Task 2.1.9: CT9 - Information and other complementary activities (DEA, Denmark)
This Central Team would be integrated in the Communication Team and the Coordination. The
Communication Team would be assisting with sessions on information, campaigns and other tools
such as one-stop shops in particular in collaboration with the finance team. Further, the DEA
Coordination will complement with some sessions where these fall between or outside the scope
of other CTM teams. Some of the sessions organised by this complementary team will be part of
this process.
Task 2.1.10: - Finalising the areas of the Central Teams (all central teams and coordination / DEA)
The development and the start of the CA EPBD 6 happens in a transition period where the new
version of the EPBD directive is not yet fully known. The individual teams should reflect as well the
new version of the directive as well as the old version including the amendments from 2018. This
should ensure a rational as well as an even workload between the teams. The final definition of
the 9 teams will therefore be finalised as part of the start-up of the project and the intention is to
evaluate and adjust throughout the project in order to continue to maintain an even and
reasonable share of workload between the teams, while being able to develop interesting topics.
This process also aims to take into account the individual experience, interests and strengths of
each of the CTM teams. The final description of the teams will be included in a small document
which is uploaded to Glasscubes in order to inform all experts and to give interests to be part of a
Team or even a CTM working group. The final description of each teams will further be part of the
relevant Evolving Strategic Report (in task 2.3).
CA EPBD 6, Grant Agreement Draft 14 November 2022 3
CA EPBD 6 Grant Agreement
Task 2.2: Participation in Management Team Meetings (all Central Teams)
The Management Team is responsible for the set-up of the CA Plenary Meetings and for the
selection of topics as well as the coherent coordination of these topics. It is the main forum for the
overall technical coordination of the project.
The Management Team includes all Central Team Managers, the Support Functions and the
Coordinator. The CINEA and the EC are invited to all meetings. The Coordinator will lead these
meetings. The Communication Manager and the Technical Assistant will assist the Coordinator in
setting up these meetings and will report actions, decisions and conclusions and support the
Coordinator in the implementation of these decisions. Material and decisions will be approved by
the Coordinator and shared with CTM’s within 15 working days following each meeting. Further
assistance will be set up in order to support general logistics of the CA and the interactive
communication issues (further elaboration in connection to information and web aspects).
The Management Team will meet face-to-face in connection to CA Plenary Meetings and In-depth
Workshops (typically in the afternoon of the day before) and once in between, 4-5 months in
advance of each CA Plenary Meeting / In-depth Workshop and for closing the project, meaning a
total of 17 face-to-face meetings are expected. Additional meetings in connection to other
meetings such as open events or study tours can be set up, but are not included in the budget.
Further meetings will be set up as short web meetings, which could also potentially be the case for
the planned preparation meetings.
For Management Team Meetings organised in connection with CA Plenaries, the Assistants and
the Junior Rapporteurs will be invited to attend the meetings.
Other CAs (CA EED or CA RES) will be invited to Management Team Meetings for coordination, but
depending on own budgets for travel costs. Other CA members can be invited to participate in a
Management Team Meeting. This includes among others Assistants, the Junior Rapporteurs and
Working Group Leaders.
Only the 9 CTMs (Central Teams and Communication & Dissemination Manager) and the
Coordinator will be formal members and have voting rights in case of voting. In case of a tie, the
vote of the Coordinator will be decisive.
The time needed for the CTM’s to participate and prepare for these meetings is included in the
relevant WP’s (WP2 and WP6).
The Coordinator will be supported by a Technical Assistant for the day-to-day technical tasks,
communications between participants and for preparing minutes and reports of the proceedings.
The Technical Assistant and the Financial Management function will take part in the quality
assessment of the project. The Technical Assistant will participate in all Management Teams
meetings and take minutes / decisions on actions and follow up activities. Financial and
administrative support will be done internally in the DEA including all formal contractual aspects,
detailed budgets, payments and financial management issues.
CA EPBD 6, Grant Agreement Draft 14 November 2022 4
CA EPBD 6 Grant Agreement
Task 2.3 Evolving Strategy Reports (all central teams)
The evolving strategy reports are a key element in the selection of sessions and in keeping tract on
the progress of each of the Central Teams. Each CTM is responsible to develop the respective
report and to keep them updated after each Plenary Meeting of the CA EPBD 6. They contain a list
of possible future topics, a list of held sessions and some prioritisation of sessions as well as to key
guidelines for the work. The topics for the future sessions can come directly from partners,
individual experts, from brainstorming sessions or from the last minutes of sessions, where
participants will discuss future ideas e.g. for continuation of discussions or elements to
complement the session. Each report will also include how to separate from the other Evolving
Strategy Reports as well as ideas for collaboration with other teams. First version of the report will
be developed up to the first Plenary and ideas from the Plenary will help to form the first version.
After each Plenary / In-depth Workshop, the CTM will update the Evolving Strategy Report
including held sessions and new proposals for future sessions or new prioritising. The reports will
help to ensure transparency, involvement and collaboration. Selection of topics for Plenaries and
In-depth Workshops will first of all be based on the Evolving Strategy Reports.
Working groups will play an important role in defining topics, in preparation and also in
developing new ideas. CTM working group members must come from different countries and
cannot come from the same country as the CTM. These should help in collecting ideas from other
partners / experts and in having a deeper discussion of possible areas for the work. The work of
the CTM working groups are reported through the updates of the Evolving Strategy Reports. These
reports are for internal use only, but the aim is that all experts can see these reports and also be
able to come up with proposals for new topics to sessions to be included.
All national expert teams and in particular the National Coordinators will be requested to give
proposals for topics for sessions. This will happen through sessions (at the end of sessions), at
special sessions or through all normal communication canals (such as email or through
Glasscubes). Proposals should be given to the relevant team or in case the expert is in doubt they
can be given to the Coordinator and his team. The Central Team Managers will then include in the
Evolving Strategy Reports and take care of the prioritization of these according to relevance for
the Member States, e.g. through voting / adding stickers. In CA EPBD 6, it will be experimented
with other structures for collection such as through Glasscubes and through posters at Plenary
Meetings as it is know from CA EED.
Task 2.4 Support Functions
Task 2.4.1: Support Function 1 - Central coordination of questionnaires (DEA)
The preparation of sessions during Plenaries usually requires sending questionnaires to National
Coordinators in order to collect specific input reflecting the national situation. It is important to
streamline the sending of these questionnaires to avoid overloading the National Coordinators,
overlapping requests and ensure the highest impact. Therefore, as it was the case in CA IV and CA
V, CA 6 will include a Support Function to centralise the sending of questionnaires, developed in
closely collaboration with the CTMs.
It will be investigated if a central database including all questionnaires and answers can be
developed. This Support Function will be led / monitored by the Coordinator and his Assistant.
CA EPBD 6, Grant Agreement Draft 14 November 2022 5
CA EPBD 6 Grant Agreement
The questionnaires in CA EPBD 6 will support quantitative assessments, other elements that
cannot be assessed in the workshops, for documentation of progress in implementation in the
Member States. The Assistant of the Coordinator will lead this function. The development of the
questionnaires should be a task that involves collaboration with or is based on requests and
involvement from the responsible Central Team Manager (CTM).
An attempt will be made to develop a central database collecting the questions and linking to the
answers from the coordinated questionnaires. It will be investigated to which extent the
questionnaires and links to answers from previous CAs such as CA IV and V where these
questionnaires were harmonised and centralised too can be included. The aim of this organisation
is to avoid duplication and to ensure that previous results are reused and complemented instead
of repeated. In case a question is repeated in a new questionnaire, the database should help to
identify the previous material so that it could perhaps be possible to analyse the change in
responses. The database of questionnaires further supports the reporting. The database could be
a simple list where each question would be registered including date, questionnaire and which
countries answered plus a link to where the results can be found in Glasscubes. This will be seen in
connection to task 2.4.3 and other IT solutions.
Task 2.4.2: Support Function 2 - Electronic registration (DEA)
The CA EPBD 6 will make further use of electronic registration and electronic meeting facilities.
This includes development of an automatic registration system based on a database structure and
with access through the website / Glasscubes.
A system will be developed for direct registration of experts at Plenary Meetings and also for
online management of information for experts and national contacts. The aim is at the same time
to provide better transparency, a possibility to easily correct, manage as well as to reduce the
work in handling these registrations. The system will be based on the evaluation of the
experiences with online registration from the previous CAs (evaluated by a working group) and a
wish to increase the feedback to participants and ensure compliance with GDPR. This system will
be developed through a subcontract at the beginning of the CA EPBD 6. A company will be
selected through a small tender process.
The system will be based on a database tool and will also include maintenance of the general
registration of CA experts, which will give National Coordinators right to include new national
attendees, remove experts from the team and to have an overview of registrations in general and
for meetings.
Due consideration will be given to the protection of personal data. Rules for the handling of data,
storage, protection and deletion will be set by the start of the project to ensure the registration
will comply with as well EU legislation as national rules.
Task 2.4.3: Support Function 3 - Logistical arrangements for meetings (DEA)
Costs for venues and experts per diem packages will be handled centrally under a budget under
WP 3 by the DEA, as it was the case in the last part of the previous CAs. This has simplified the
organisation significantly and is also expected to contribute to keeping the meeting allowance per
experts at the ceiling of 1,000 euro per meeting plus indirect costs.
CA EPBD 6, Grant Agreement Draft 14 November 2022 6
CA EPBD 6 Grant Agreement
In case some Plenary Meetings or In-depth Workshops are held as virtual events, the Coordination
and Communication Team will be supporting such events. Here, some of the resources (budget
and time) allocated for the physical venues will instead be used to ensure the high-quality
facilitation of such meetings through external professional support. This external contract is to
ensure smooth running of the meeting and immediate response to technical issues as well as
training and handling of invitations. It also includes the necessary licenses (virtual venue / tools).
In case meetings, plenaries and open events will be held as hybrid meetings, a part of the meeting
budget will be used to ensure web transmission, for instance for a closed audience (for Plenary
Meetings). It will also be made possible for external presentations and this will among other things
be used for external speakers in the last part of the project as it is found that impact in many cases
neither justify use of time nor costs by bringing speakers to the venue. The virtual meetings have
documented that this can be done efficiently from distance and that this can even be beneficial for
confidentiality reasons. It has, however, also documented that the virtual meetings in the CA EPBD
are not as efficient as the physical ones and lack elements that are crucial for the CA EPBD
collaboration. This way, the virtual meetings should only be used to a limited extend.
Task 2.4.4: Support Function 4 - Workshop preparation and creative moderation (RVO)
This function will provide support for the preparation of more interactive sessions during CA EPBD
6 meetings, one or more training workshops in creative sessions and some lead of sessions or help
in facilitation.
As part of the development of CA EPBD 6, sessions will increasingly focus on interaction between
all experts. Most countries have experiences in almost all fields of the EPBD and lessons are often
learned by interaction and improvement of existing systems, and not by copying a few examples /
partners, which have deeper experience. This often request more interactive sessions /
workshops.
In order to enable this development, a professional moderator with extensive experience of
creative sessions from the RVO will provide support for moderators. This expertise will give input
to planning of sessions, practical setup and to different methods to involve participants more
actively. This support will include a moderator present at each CA Plenary Meeting and helping or
leading workshops in collaboration with the Central Team Managers or other session leaders. This
support will develop monitoring skills by example and by doing and will also support the transition
of Concerted Action 6 as a more interactive forum. This can further support creative and
interactive sessions by training sessions for Central Team Managers, Central Team Assistants,
Junior Rapporteurs and potential session moderators. Such sessions could be planned in
connection to physical Management Team Meetings.
Task 2.4.5: Support Function 5 – Support for Reporting (subcontract by DEA)
The CA EPBD 6 is a special structure continuing the support for the reporting of sessions on CA
Plenary Meetings and In-depth Workshops. This will complement the current structure with
preparation notes for the meetings and the conclusion / reporting from sessions. This function will
be set up in connection to one of the Central Teams (as it was the case in CA IV & V and monitored
by the Coordinator and his Assistant).
CA EPBD 6, Grant Agreement Draft 14 November 2022 7
CA EPBD 6 Grant Agreement
A minimum of three Junior Rapporteurs (native / fluent English speaking and writing) will be
present at all CA meetings and will take the meeting reports from each stream and all sessions.
Furthermore, these Junior Rapporteurs will generally support the proceedings and functions of
these meetings. This will allow for combination of multiple sessions / workshops in one reporting
document.
The reports from CA Meetings (streams including sessions and workshops) need to be sent for
review by the CTM within 3 weeks of the CA Meeting and finished for circulation among
participants one and a half months after the CA Meeting.
These Junior Rapporteurs will further support practical issues around sessions and the CA
Meetings in general and can also be included in work on the development of country material. The
Junior Rapporteurs will need to have a relevant background in the field of energy performance of
buildings. The Assistant of the Coordinator or one of the CTM’s will lead and control the work of
these experts.
CA EPBD 6, Grant Agreement Draft 14 November 2022 8
KÄSUNDUSLEPINGU ERITINGIMUSED (projekt)
Majandus- ja Kommunikatsiooniministeerium, registrikood 70003158, asukoht Suur-
Ameerika 1, Tallinn 10122, mida esindab Majandus- ja Kommunikatsiooniministeeriumi
hankekorra alusel kantsler Ahti Kuningas (edaspidi käsundiandja)
ja
Tallinna Tehnikaülikool, registrikood 74000323, asukoht Ehitajate tee 5, Tallinn 19086, mida
esindab Tallinna Tehnikaülikooli rektori 20.12.2022 käskkirja nr 1-8/64 ja 04.05.2023
käskkirja nr 1-8/20 alusel ettevõtlusprorektor Erik Puura (edaspidi käsundisaaja), keda edaspidi
nimetatakse ka üheskoos pooled ja eraldi pool,
sõlmivad käsunduslepingu (edaspidi leping) alljärgnevate tingimuste kohaselt:
1. Lepingu dokumendid ja lepingu alus
1.1. Lepingu sõlmimise alus on teadus- ja arendustegevuse erand (RHS § 11 lg 1 p 19)
kooskõlas MKM hankekorra §-ga 121.
1.2. Leping koosneb käesolevatest eritingimustest (edaspidi eritingimused) ja üldtingimustest
(edaspidi üldtingimused) ning nende lisadest. Eritingimused sisaldavad üldtingimuste
täiendusi ja parandusi.
1.3. Lepingu dokumentide prioriteetsus on järgmine: eritingimused (I), lepingu lisad (II) ja
üldtingimused (III). Vastuolude korral lepingu dokumentide vahel prevaleerib
prioriteetsem dokument.
2. Teenuse objekt ja tähtaeg
2.1. Käsundisaaja kohustub lepinguga osutama käsundiandjale teenust, mis seisneb Euroopa
Liidu Kliima-, Infrastruktuuri- ja Keskkonnaagentuuri (CINEA) LIFE projekti „6th
Concerted Action supporting Member States and participating countries in implementing
the Energy Performance of Buildings Directive“ (edaspidi projekt) käigus teostatavas ELi
riikides kasutatavate energiatõhususe arvutusmeetodite analüüsis ja uute
arvutusmetoodikate väljaarendamises, mis peavad võimaldama arvutada objektiivsel
viisil „Hoonete energiatõhususe direktiivi“ (edaspidi direktiiv) uustöötluses nõutud
primaarenergia- ja taastuvenergiaindikaatoreid, mh nullheitega (süsinikuvabadele)
hoonetele. Töö käsitleb süsteemipiiride määratlusi, staatiliste ja dünaamiliste
primaarenergia tegurite raamistikke ning dünaamilise energiasimulatsiooni rakendusi.
Töö käigus teostatakse kulutõhususe, kuluoptimaalsuse ja olelusringi arvutusi ning
hinnatakse nende mõju direktiivi uustöötlusele. Töö tehniline kirjeldus on esitatud
lepingu lisas 3. Projekti teostamine eeldab tsentraalses töögrupis osalemist, tsentraalse
töö koordineerimist ning läbiviimist, sh töösessioonide ettevalmistamist, läbiviimist,
vajalike analüüside läbiviimist ning küsimustike koostamist, asjakohaste raportite
koostamist ja esitamist projekti koordinaatorile. Teenusena käsitatakse kõiki tegevusi, sh
lepingus nimetamata tegevusi, mis on vajalikud lepingus ettenähtud tulemuse
saavutamiseks, samuti teenuse vastuvõtmiseks vajaliku dokumentatsiooni
vormistamisega seotud toiminguid.
1 08.05.2023 käskkiri nr 38 „Teadus- ja arendusteenuse "Energiatõhususe arvutuste ja hoonete olelusringi hindamise ning tsentraalse töögrupi
juhtimine projektis Concerted Action EPBD 6" tellimine, vastutava isiku ja komisjoni nimetamine“
2.2. Käsundisaaja kaasab teenuse osutamisesse ainult neid käsundisaaja töötajaid, kes on
hoonete energiatõhususe ja sisekliima eksperdid. Teenuse osutamiseks rakendatakse
korraga kahte eksperti. Üks ekspert täidab töögrupi juhi (Central Team Manager) rolli ja
kannab kaasnevaid kohustusi ning teine ekspert täidab töögrupi juhi juhiabi (Central
Team Assistant) rolli ja kohustusi, toetades ja abistades töögrupi juhti tema töös.
Töögrupis teostatavate tegevuste kirjeldus on esitatud käesoleva lepingu Lisades 1, 2 ja
3.
2.3. Lisas 1 on kirjeldatud tsentraalse töögrupi ülesehitust ning töögruppide töövaldkondade
jaotust teemade kaupa koos lühikirjeldustega. Lisa 2 kirjeldab käesoleva lepingu alusel
pakutava teenuse aruandlust. Lisas 3 on esitatud täpsem töö eestikeelne tehniline
kirjeldus. Lisa 4 on projekti toetusleping (Grant Agreement), milles on esitatud
koostöövõrgustiku projekti Concerted Action EPBD 6 kirjeldus.
2.4. Poolte eelnval kokkuleppel osutab Käsundisaaja teenust alates 12.12.2022. Leping lõpeb
31.10.2027.
3. Tasu suurus, väljamaksmise tähtaeg ja kord
3.1. Käsundisaaja esindab Käsundiandjat projekti töökohtumistel. Projekti raames on
kogu projekti perioodi jooksul kavandatud 7 plenaariumkohtumist (Plenary Meeting),
kusjuures iga plenaariumkohtumine kestab kuni 3 tööpäeva ning ühe tööpäeva kohta
arvestatakse 8 töötundi. Samuti toimub projekti raames kuni kaks töötuba (In-depth
workshop), ühe töötoa kestus on kuni 2 tööpäeva ning ühe tööpäeva kohta arvestatakse
8 töötundi. Lisaks toimub veel kuni 9 juhtkonnakoosolekut (Management Team
Meeting), millel on ette nähtud töögrupi juhi osalemine, töögrupi juhiabi osalemine
toimub vastavalt vajadusele. Tööga seotud tegevuste alla kuuluvad ka tegevused, mis on
vajalikud töökohtumiste ettevalmistamiseks ja raportite koostamiseks.
3.2. Käsundiandja hüvitab käsundisaaja töötajate (töögrupi juht ja juhiabi) teenuse
osutamisega seotud kulud maksimummääras kuni 140 500 (sada nelikümmend tuhat
viissada) eurot, sh käibemaks. Käsundiandja esindamisega seotud kuludeks on
sõidukulud (sh lennukulud) ja majutuskulud ning kindlustus.
3.3. Käsundiandja tasub käsundisaaja töötajatele teenuse osutamise eest tasu tunnitasu
alusel, töögrupi juhi tunnitasu 50,84 eurot/tund (ilma km-ta) ja töögrupi juhiabi
37,50 eurot/tund (ilma km-ta).
3.4. Käsundiandja hüvitab käsundisaaja poolt esitatud e-arve, kuludokumentide ja
digiallkirjastatud üleandmise-vastuvõtmise akti alusel käsundisaaja esindamisega seotud
kulud ja tasub osutatud teenuse eest hiljemalt 21 kalendripäeva jooksul arvates arve
saamise kuupäevast.
3.5. Käsundisaaja on kohustatud täitma tööajatabelit (Lisa 5). Käsundisaaja täidab
tööajatabelit, kui on tellitava teenuse raames toimunud kohtumine ning esitab
tööajatabeli Käsundiandjale vastava kuu viimaseks tööpäevaks koos
kuludokumentidega.
3.6. Käsundisaaja on kohustatud teenuse üle andma digiallkirjastatud üleandmise-
vastuvõtmise aktiga (edaspidi akt; Lisa 6). Teenus loetakse vastuvõetuks kui
käsundiandja on allkirjastanud sellekohase akti.
3.6.1. 2023. aasta tööajatabelis esitatakse andmed alates 12.12.2022 tehtud tööde kohta.
3.6.2. 2027. aastal tuleb tööajatabel Käsundiandjale esitada hiljemalt 10. oktoobriks 2027.
4. Volitatud esindajad
4.1. Käsundiandja volitatud esindaja lepingu tingimuste täitmisel, täitmise kontrollimisel ja
teenuse vastuvõtmisel on keskkonnasäästliku ehituse valdkonnajuht Hannamary Seli,
telefon +372 639 7650, e-post
[email protected].
4.2. Käsundisaaja volitatud esindaja lepingu tingimuste täitmisel ja täitmise kontrollimisel
on Jarek Kurnitski, tel +372 58 66 4370, e-post:
[email protected].
4.3. Käsundi täitjateks on Jarek Kurnitski, e-post:
[email protected] ja Raimo
Simson, e-post:
[email protected].
5. Lepingu lisad
5.1. Lepingu juurde kuuluvad allkirjastamise hetkel lisadena alljärgnevad dokumendid:
Lisa 1 – Work package 2 Central Teams (GA 14-11-2022)
(vt Task 2.1.6: CT6 - Calculations and life cycle (MEC, Estonia)
Lisa 2 – Work Package 6 Reporting (GA 14-11-2022)
Lisa 3 – Töö tehniline kirjeldus
Lisa 4 – Grant Agreement
Lisa 5 – Tööaja tabel
Lisa 6 – Üleandmise-vastuvõtmise akt
6. Muud sätted
6.1. Käsundisaaja kinnitab, et on üldtingimustega tutvunud riigihangete registris või
elektroonselt Majandus- ja Kommunikatsiooniministeeriumi kodulehel aadressil:
https://mkm.ee/ministeerium-uudised-ja-kontakt/ministeerium-ja-ministrid/hanketeated
6.2. Leping allkirjastatakse digitaalselt.
Käsundiandja Käsundisaaja
Majandus- ja Kommunikatsiooniministeerium Tallinna Tehnikaülikool
Ahti Kuningas Erik Puura
kantsler ettevõtlusprorektor
/allkirjastatud digitaalselt/ /allkirjastatud digitaalselt/
Lepingu lisa
Lisa 5 – Tööaja tabel
Tööajatabelis annab käsundi täitja ülevaate ühe kalendrikuu jooksul tehtud töödest ja tegevustest ning
nendega seotud töötundidest projektis Concerted Action EPBD 6. Vastavalt tööajatabelis esitatud
töötundidele toimub käsundi täitjate töötasu väljamaksmine.
Käsundisaaja täidab tööajatabelit, kui on tellitava teenuse raames toimunud kohtumine ning esitab
tööajatabeli Käsundiandjale vastava kuu viimaseks tööpäevaks koos kuludokumentidega.
Selguse huvides esitab käsundisaaja tööaja tabeli arvestuse kahes osas:
I osa: teenuse osutamiseks vajalike sisuliste tegevuste (sh kohtumiste ettevalmistamine)
kirjeldus ja tööajakulu;
II osa: töökohtumistel osalemisega seotud tööajakulu.
Tabel 1. I OSA: Teenuse osutamiseks vajalike sisuliste tegevuste kirjeldus ja tööajakulu
Tööaja periood Töö selgitus Tööpakett, mille Sisulisele tööle
raames töid tehti kulunud töötunnid,
h
Nt 01.04 - 30.04.2023 Nt WP2, WP6
Tabel 2: II OSA: Töökohtumistel osalemisega seotud tööajakulu
Kohtumise toimumisaeg Töökohtumise toimumiskoht Töökohtumisel osalemisega
seotud töötunnid, h
Nt 18.04-20.04.2023 Nt Rooma
Tööaja tabeli täitmise ja esitamise kuupäev: ____________________
Tööaja tabeli täitja ees- ja perekonnanimi: ____________________
Kinnitan, et tabelis esitatud andmed on õiged.
/ allkirjastatud digitaalselt /
LEPINGU LISA 3
ARENDUS-TEADUSTÖÖ TEHNILINE KIRJELDUS
Hoonete energiatõhususe ja hoone olelusringi alane teadus-arendustöö
1. Uuringu ese
Hanke esemeks on teenus, mis seisneb Euroopa Liidu keskkonna- ja kliimameetmete
programmi LIFE projekti „6th Concerted Action supporting Member States and participating
countries in implementing the Energy Performance of Buildings Directive“ (edaspidi projekt)
tsentraalses töögrupis „Hoonete energiatõhususe ja hoone olelusringi alase teadus-arendustöö“
tegemises (edaspidi teenus).
Täpsem info töö tehnilisest sisust ning kaasnevates eesmärkides on esitatud käesoleva
dokumendi punktides 2 ja 3, töö metoodikat kirjeldab punkt 4, tegevuskava kirjeldus on esitatud
punktis 5. Töö tulemid ja mõju ning vastutus on kirjeldatud vastavalt punktides 6 ja 7.
Käesolev teenus tellitakse CPV koodiga 73000000-2 (uurimis- ja arendusteenused ja
seonduvad nõustamisteenused).
Teenusega saadavat uut teadmist ja tulemusi kasutatakse Eesti avaliku sektori tegevuste
kavandamiseks hoonete energiatõhususe valdkonnas ja hoonete energiatõhusust puudutava
õigusloome arendamisel seoses hoonete energiatõhususe direktiivi uustöötluse ülevõtmisega.
Sellest tulenevalt puudub arendustööl turustamise eesmärk.
2. Taustainfo
Projekti taustainfo
Concerted Action EPBD VI on koostöövõrgustik (edaspidi koostöövõrgustik), kus jälgitakse
Euroopa Liidu liikmesriikides toimuvaid uusi arenguid „Hoonete energiatõhususe direktiivi
2018/844/EU“ (edaspidi direktiivi) rakendamisel. Koostöövõrgustiku üldeesmärgiks on
soodustada teabe- ja kogemuste vahetust ELi liikmesriikide ja teiste assotsieerunud riikide
(Norra) vahel seoses EL õigusaktide ja hoonete energiatõhususe alase poliitika rakendamisega,
eelkõige direktiivi ülevõtmise ja rakendamise ning hetkel käimasoleva direktiivi
läbivaatamisega. Projekti kestvuseks on 5 aastat.
Projekti rahastatakse läbi Euroopa Kliima-, Infrastruktuuri- ja Keskkonnaagentuur (CINEA)
Life programmi. Projekti eelarve kogumaht on 5 miljonit eurot.
Concerted Action EPBD VI koostöövõrgustiku üldeesmärgid on:
o Tõhustada ja struktureerida direktiivi riikliku rakendamisega seotud teabe ja kogemuste
jagamist ning edendada head tava liikmesriikide tegevuses direktiivi rakendamisel.
o Luua soodsad tingimused siseriiklike menetluste kiiremaks ühtlustamiseks direktiiviga
seotud küsimustes.
o Luua dialoog Euroopa Standardikomiteega (CEN), tehes koostööd standardite
rakendamises, toetamaks süsinikuneutraalsuse ja olelusringi arvutuste rakendamist.
o Toetada projektis osalejaid (EL liikmesriike ja Norrat) nende riiklike
renoveerimiskavade kasutuselevõtul, eesmärgiga toetada direktiivi rakendamise
edusamme ja soodustada seeläbi renoveerimistegevust.
o Projekt püüab saavutada ühtlustatud lähenemisviisi, hõlpsamat rakendamist
liikmesriikides ning aitab jagada parimaid tavasid ja praktikaid projektis osalevate
riikide vahel.
Projekti ülesehitus: partnerid, töögrupid, kohtumised
Projekti juhib ja koordineerib Taani Energiaagentuur (Danish Energy Agency). Projekt jaguneb
kuueks tööpaketiks:
o WP1 – Projektijuhtimine ja koordineerimine (Project management and coordination).
o WP2 – Plenaariumkohtumiste ettevalmistus ja tsentraalsed töögrupid (Preparation
of plenary meetings and Central Teams).
o WP3 – Osalemine plenaariumkohtumistel ja töötubades (Participation in Plenary
Meeting and In-depth Workshops).
o WP4 – Muud koostööstruktuurid / Välised turuosalised (Other Collaboration structures
/ External Stakeholders).
o WP5 – Kommunikatsioon ja info jagamine (Communication and dissemination)
o WP6 – Raporteerimine/aruandlus (Reporting)
Käesolevas dokumendis on kirjeldatud ja fookusesse tõstetud eeskätt tööpakett WP2
(Preparation of Plenary Meetings and Central Teams) ning sellega kaasnevad ülesanded.
5 aasta jooksul toimuvad mitmed plenaariumkohtumised ja töötoad, milles osalevad iga partneri
poolt määratud riiklikud eksperdid, k.a MKMi esindaja. Projektis on oluline ja kandev roll
justnimelt töögruppidel. Töögrupid keskenduvad 2022. ja 2023. aastal läbivaatamisel olevale
direktiivile ning direktiivist tulenevatele nõuetele-kohustustele, mille rakendamine on
kohustuslik kõikidele EL liikmesriikidele.
Töögrupid, nende roll ja eesmärk
Tööpaketi nr 2 raames tegutsevad tsentraalsed töögrupid, keda on kokku üheksa. Töögruppide
eesmärk on arendada ja juhtida töösessioone, töötubasid ning töögruppides toimuvat
tehnilist tööd.
Iga töögruppi juhib töögrupi juht, kelle ülesandeks on oma pädevusvaldkonnas töö strateegiline
arendamine seoses direktiivi ja rakenduvate nõuete-kohustustega, teema arendamine ja
ekspertide kaasamine. Töögrupi juhi ülesannete hulka kuulub ka töögrupi töö praktiline
juhtimine.
Igas töögrupis koostatakse üldised edusammud ja nendega seotud teemade raport, sh
teabematerjal töögrupi teemade kohta.
Projekti üldkoordinaatori (DEA) juhtimisel vastutavad töögruppide juhid pädevusvaldkondade
vahelise koostöö ja selle koordineerimise eest. Tsentraalsed töögrupid kannavad ka
tugifunktsiooni – lisaks tehnilisele arendustööle on nende ülesandeks projekti
plenaarkohtumistele eelneva ettevalmistava töö ja pärast koosolekuid esitatava aruandluse
teostamine.
Majandus- ja Kommunikatsiooniministeeriumi roll töögrupis nr 6
Majandus- ja Kommunikatsiooniministeerium (MKM) on CA EPBD koostöövõrgustiku üheks
partneriks. MKMi kui projekti partneri ülesanne antud projektis on tagada projekti
eesmärkide saavutamiseks vajalik teadus-arendustöö sisend ja tagada, et töögrupile püstitatud
ülesandeid täidavad nõuetekohaselt vastavat pädevust ja kogemust omavad eksperdid (töögrupi
juht ja juhi abi).
Töögrupi juht ja juhi abi tagavad töögrupi tehnilise töö juhtimise ja läbiviimise, mille tulemusel
saavutatakse töögrupile seatud eesmärgid. Töögrupi nr 6 fookuses on hoonete energiatõhususe
arvutusmetoodikate välja töötamine ja olelusringi arvutused. Täpsem kirjeldus töögrupile
püstitatud ülesannetest, eesmärkidest ja nende saavutamiseks vajalikest töödest on esitatud
punktis 3.
Pädevused ja kogemused
Antud töögrupi keskseks ülesandeks on teostada kõrgtasemel teadus-arendustööd, mistõttu
tuleb selle töögrupi töö teostamiseks – s.t vastavaid arvutusmetoodikaid välja töötama ning
sellest tulenevaid arvutusi teostama – kaasata hoonete energiatõhususe valdkonna pädevaid ja
kogenud teadureid.
Kõrgetasemelise teadus-arendustöö teostamine eeldab pikaajalist teadustöökogemust ning
põhjalikke ja valdkonnakeskseid teadmisi hoonete energiatõhususe arvutusmetoodikatest, CEN
standarditest, olelusringi arvutustes ning energiakandjate primaarenergiateguritest. Töö teostaja
peab olema teinud teadustööd energiatõhususe alal, tundma standardeid, olema kaasatud
akadeemilistesse ringkondadesse ja omama kogemust hoonete energiatõhususe alase poliitika
rakendamisel.
Töö tehniline sisu ja vajalikkus
Töö käigus teostatakse ELi riikides kasutatavate energiatõhususe arvutusmeetodite analüüs ja
arendatakse välja uued arvutusmetoodikad, mis peavad võimaldama arvutada objektiivsel viisil
„Hoonete energiatõhususe direktiivi“ (edaspidi direktiiv) uustöötluses nõutud primaarenergia-
ja taastuvenergiaindikaatoreid mh nullheitega (süsinikuvabadele) hoonetele. Töö käsitleb
süsteemipiiride määratlusi, staatiliste ja dünaamiliste primaarenergiategurite raamistikke ning
dünaamilise energiasimulatsiooni rakendusi. Töö käigus teostatakse kulutõhususe,
kuluoptimaalsuse ja olelusringi arvutusi ning hinnatakse nende mõju direktiivi uustöötlusele.
Direktiivi põhimõtete rakendamiseks katsetatakse töö käigus erinevaid lähenemisviise,
meetmeid ja arvutusmeetodeid, võttes arvesse ka nendest tulenevaid rahvuslikke nõudeid.
Parimaid tulemusi andvad meetodid ja meetmed ei ole ette teada ning need selguvad töö käigus.
Antud töö tulemusena valmivad ettepanekud hoonete energiatõhususe arvutusmetoodika kohta,
millest lähtuvalt tehakse ettepanekud direktiivi uustöötluse rakendamiseks LR tasemel.
Teisisõnu on teadus-arendustöö tulemus projektis osalevatele EL liikmesriikidele sisendiks EL
hoonete energiatõhususe direktiivi uustöötluse ülevõtmisel ja selle rakendamisel. Lisaks
valmivad töö tulemusena raportid, mis on avalikud kõikidele projektis osalevatele partneritele.
Eelnevast tulenevalt toob käesolev teadus-arendustöö kasu kõikidele projektis osalevatele
partneritele.
3. Eesmärk
Töögrupis nr 6 tegeletakse „Hoonete energiatõhususe direktiivi“ uuendamise käigus vajalike
uute arvutusmeetodite väljatöötamisega, mille alusel arvutatakse direktiivis nõutud
primaarenergia- ja taastuvenergiaindikaatorid.
Töögrupid ja nende juhid vastutavad projekti seansside ja muude tehniliste tööde korraldamise
ja kaasneva aruandluse eest. Iga töögruppi haldab töögrupi juht ja teda toetab töögrupi juhi abi.
Teadus- ja arendustööle seatud eesmärgid on järgmised:
Töötada välja hoonete energiatõhususe hindamise uuendatud arvutusmetoodika.
Teostada ELi riikides hetkel kasutusel olevate arvutusmeetodite analüüs ja arendada
välja uued arvutusmetoodikaid, mis võimaldavad arvutada objektiivsel viisil EL
hoonete energiatõhususe direktiivi uustöötluses nõutud primaarenergia- ja
taastuvenergiaindikaatoreid mh nullheitega hoonetele.
Määratleda süsteemipiiride, staatiliste ja dünaamiliste primaarenergiategurite
raamistikud ning dünaamilise energiasimulatsiooni rakendused.
Teostada kulutõhususe, kuluoptimaalsuse ja olelusringi arvutused ning hinnata nende
mõju hoonete energiatõhususe direktiivi uustöötlusele.
4. Töö metoodika
Töö metoodika koosneb:
- Teoreetilisest osast, mis käsitleb uudseid võimalikke arvutusmetoodika viise hoonete
energiatõhususe hindamiseks;
- Olemasoleva olukorra dokumendi- ja praktikate analüüsist, millised arvutusmetoodikad
on erinevates riikides kasutusel, millised on võimalikud riiklikud eripärad, ning milline
on olnud liikmesriikide senine rakenduspraktika;
- Info kogumiseks koostatakse mh asjakohaseid küsimustikke ning saadetakse need
projekti osalejatele vastamiseks;
- Uue arvutusmetoodika mudeldamisest, mis võtab hoonete energiatõhususe hindamisel
arvesse ka primaarenergia- ja taastuvenergiaindikaatoreid mh nullheitega hoonetele.
Töögrupid on loodud, keskendudes tugevalt 2022. ja 2023. aastal läbivaatamisel olevale
„Hoonete energiatõhususe direktiivile“ ja sellest tulenevatele nõuetele-kohustustele, mille
rakendamine on kohustuslik kõikidele EL liikmesriikidele.
Kuna direktiivi lõppsõnastus ei ole veel paigas, siis see jätab töösse omakorda palju
ettemääramatust ning loomingulist lähenemist. Ettemääramatust loob ka asjaolu, et direktiivi
rakendamiseks on riigiti võimalik kasutada erinevaid lähenemisviise, riiklikul tasemel võib
esinda rahvuslikke nõudeid, meetmeid ja arvutusmeetodeid – sellest tulenevalt on töö ja selle
lahendus ettemääramatud ning tööga saavutatavad parimad võimalikud arvutusmetoodikate
ettepanekud ei ole ette teada ning selguvad alles töö käigus.
Töö loomingulisus ja uudsus väljenduvad selles, et töö eeldab uute arvutusmetoodikate välja
töötamist ning töö täitja saab ise välja pakkuda erinevaid võimalikke lähenemisi, kuidas töö
tulemuseni jõuda. Kuna direktiivi sõnastus ei ole veel lõplik, võib töö käigus tulla ette
ootamatuseid (nt direktiivi uuendamise käigus võivad muutuda kohustuste-nõuete sõnastused
ja määratlused), millega tuleb arvutusmetoodika välja töötamisel arvestada ja jooksvalt
kohaneda.
Kuna uue direktiivi ülevõtmise ja rakendamise kohustus lasub kõikidel ELi liikmesriikidel, on
antud teadus-arendustöö tulemused ka ülekantavad.
Töö käigus analüüsitakse ja hinnatakse erinevaid rahvuslikke nõudeid, meetmeid ja
arvutusmeetodeid ning nende struktureeritud analüüsimise tulemusena jõutakse
arvutusmeetodini. Sellest lähtuvalt on antud teadus-arendustöö süstemaatiline.
5. Tegevuskava
Projekt algas 01.01.2022 ning kestab kuni 31.10.2027. Täpsemad tegevused nende aastate
jooksul kujunevad vastavalt direktiivi uustöötluse valmimisele ja selle lõppverisoonis
sisalduvatele kohustustele-nõuetele. Kuna projekt alustab tegevust ajal, mil direktiiv on endiselt
muutmisel/uuendamisel, siis tuleb arvestada teatava ettemääramatusega ka tegevuskavas.
Hetkel, olles projekti algfaasis, on võimalik koguda informatsiooni liikmesriigiti, kuidas on seni
rakendatud direktiivi, sh mis arvutusmetoodikaid on rakendatud ja millised on võimalikud
riigipõhised eripärad, millega on arvestatud.
Üldine ülesehitus on selline, et projekti kohaselt toimub kahel korral aastas
plenaariumkohtumine, mille eelselt tuleb töögruppidel teha ettevalmistusi.
Ettevalmistused kujutavad endast töögrupi teemale vastavalt küsimustike koostamist,
liikmesriikidelt tagasiside saamist vastavalt küsimustikes esitatud küsimustele. Sellele järgneb
tulemuste ning saadud info analüüsimine, nende põhjal järelduste tegemine, vastavasisusliste
aruannete koostamine ja info presenteerimine projektis osalejatele. Saadud info on oluliseks
sisendiks ettepanekute tegemisel võimalikeks uuteks arvutusmetoodikateks, mis arvestavad
direktiivi uustöötlusest tulenevate uuendusega.
Kuna direktiivi lõppversioon on alles valmimas (eeldatavasti valmib lõppversioon käesoleva
aasta suvel, hiljemalt sügisel, sõltuvalt triloogide pikkusest), siis edasisi tegevusi täna detailselt
kirjeldada on pigem keeruline. Direktiivi lõppsõnastuse valmides saab töögrupp liikmesriikidelt
tagasisidet, kuidas nad uusi nõudeid saavad ja plaanivad riigi tasandil kohaldada. See on oluline
sisend hoonete energiatõhususe ja olelusringi arvutuste ja vastavate metoodikate
väljatöötamisel.
6. Töö tulem ja mõju
6.1. Töö tulemusena valmivad hoonete energiatõhususe arvutusmetoodika ettepanekud,
mis on projekti kõikidele partneritele (EL liikmesriigid + Norra) sisendiks EL hoonete
energiatõhususe direktiivi uustöötluse ülevõtmisel ja selle rakendamisel. Töö toob kasu
kõikidele projektis osalevatele partneritele.
6.2. Töö tulemusena koostatakse raportid, mis on avalikud kõikidele projektis osalevatele
partneritele. CTM raportid valmivad kahel korral projekti kestusel: projekti keskel (36. kuul
ehk projekti 3. aastal) ja projekti lõpus (60. kuul ehk viienda aasta lõpus). Raportid sisaldavad
kokkuvõtteid CA aruteludest igas töögrupis, edastades laiemale avalikkusele igakülgsel viisil
teavet konkreetse teema kohta. Raporti sihtrühma kuuluvad CA osalejad, poliitikakujundajad
ELi tasandil, Euroopa organisatsioonid, riiklikud ametiasutused ja agentuurid,
rahvuslikud/riiklikud organisatsioonid.
6.3. Majandus- ja Kommunikatsiooniministeerium plaanib töö tulemusest saadavat uut teadmist
ja tulemusi kasutada Eesti avaliku sektori tegevuste kavandamiseks hoonete energiatõhususe
valdkonnas ning hoonete energiatõhusust puudutava õigusloome arendamisel
(Ehitusseadustiku ning seotud määruste uuendamisel) seoses hoonete energiatõhususe
direktiivi uustöötluse ülevõtmisega.
6.4. Tööst tuleneb ka positiivne mõju ja kasu ehitussektorile: kuna hoonete projekteerimisel ja
ehitamisel tuleb järgida hoone energiatõhususe miinimumnõudeid ja selle tõendamiseks
teostada energiatõhususe arvutusi, siis saavad energiatõhususe arvutusmeetodist kasu ka
ehitussektori osapooled.
6.5 Laiemalt on tööl oluline mõju Euroopa rohelise kokkuleppe ehitamise ja renoveerimisega
seotud eesmärkide saavutamisele.
7. Töökorraldus
7.1. Tellija ja töövõtja ülesanded:
7.1.1. Tellija ülesandeks on tagada töögrupi töö koordineerimine;
7.1.2. Töövõtja ülesandeks on töögrupi teadus-arenduslik sisu (töö teostamine punktis 3
loetletud eesmärkide saavutamiseks) ning seotud analüüside, raportite koostamine ja tulemuste
tutvustamine ja avaldamine projekti partneritele.
7.1.3 Töövõtja annab tellijale teavet tööde edenemise ja valminud tulemuste (ka vahetulemuste)
kohta vastavalt kokku lepitud regulaarsuse alusel.
7.1.4. Edukale pakkujale antakse peale hankelepingu sõlmimist vajalikud ligipääsud projektiga
seotud materjalidele ja keskkondadele.
7.1.5. Töövõtja esitab projekti lõppedes lõpparuande Töö tulemitega, mis on ühtlasi ka Tööde
vastuvõtmise ja üleandmise akti vormistamise aluseks.
7.1.6. Töövõtja tutvustab töö tulemust töögruppides ja Tellija meeskonnale.
7.2. Tööde teostamise aeg
7.2.1. Projekti algusajaks on 12.12.2022.
7.2.2. Pakkuja osutab teenust kuni 31.10.2027.
7.3. Vastutus:
7.3.1. Tellija poolt on vastutavaks isikuks Majandus- ja Kommunikatsiooniministeeriumi
ehitus- ja elamuosakonna keskkonnasäästliku ehituse valdkonnajuht Hannamary Seli.
7.3.2. Riskid on jaotatud hankija ja pakkuja vahel.
Lepingu lisa 6
Teenuse üleandmise-vastuvõtmise akt
Teenuse üleandmise-vastuvõtmise akt
Käesolev teenuse üleandmise-vastuvõtmise akt (edaspidi akt) on koostatud………… (edaspidi
käsundisaaja) volitatud esindaja ….……… poolt ja esitatud Majandus- ja
Kommunikatsiooniministeeriumi elamu- ja ehitusosakonna keskkonnasäästliku ehituse
valdkonnajuhile (edaspidi käsundiandja), tõendamaks, et käsundisaaja andis üle poolte vahel
2023. aastal sõlmitud lepingu nr ………… alusel osutatud teenuse alljärgnevalt:
1. …………………………… (üle antava teenuse nimetus vastavalt plenaariumkohtumistel,
töötubades ja juhtkonna koosolekutel osalemise ja töö käigus tehtud aruannetele).
2. Käsundiandja on teenuse osutamise tulemustega tutvunud ning võtab vastu ja allkirjastab
teenuse osutamise tulemused, millega ühtlasi loetakse käsundisaaja poolt üle antud teenus
vastuvõetuks.
Käesolev akt on aluseks käsundisaaja poolt käsundiandjale kooskõlas lepingu punktiga 3 arve
esitamiseks summas …….. (summa sõnades) eurot.
Käesolev akt omab digitaalselt allkirjastatuna juriidilist jõudu ning edastatakse elektrooniliselt
mõlemale poolele.
Käsundisaaja Käsundiandja
/allkirjastatud digitaalselt/ /allkirjastatud digitaalselt/