Information source(s)
Name of information source Ref N° in information source
Name of document / study, data base, data e.g. CEF Project N°
provider,…
NEW COLUMN
Free text Free text
Responsibility for data gathering
CNC consortium name Company name
This column contains the consortium This column contains the company
responsible for data gathering in case that dedicated for carrying out check, collection
the project is allocated to one or more and completion or modification of project
corridors: data set (this will be the respective task 2
Baltic-Adriatic, North Sea-Baltic, leader or another partner to be appointed
Mediterranean, Orient-East Med, within a consortium).
Scandinavian – Mediterranean, Rhine-
Alpine, Atlantic, North Sea-Mediterranean, [TO BE FILLED BY TASK 2 WG AND
Rhine-Danube RESPECTIVE CONSORTIUM]
[TO BE FILLED BY TASK 2 WORKING GROUP
(WG)]
NEW COLUMN NEW COLUMN
Dropdown Free text
[TO BE FILLED BY TASK 2 WORKING GROUP [TO BE FILLED BY TASK 2 WG AND
(WG)] RESPECTIVE CONSORTIUM]
Baltic-Adriatic
North Sea-Baltic
Mediterranean
Orient-East Med
Scandinavian - Mediterranean
Rhine-Alpine
Atlantic
North Sea-Mediterranean
Rhine-Danube
Project Identification
TEN-T Project ID Project name Project category
Unique project ID for all corridors; Short name or title (not only an According tender specifications, p.
details i.e. regarding code acronym) to identify the measure 17:
structure, allocation procedure (1) rail (acc. Reg. 1315, art. 11 with
and tools will be defined at a later exception to ERTMS; (2) Rail
stage ERTMS (acc. Reg. 1315, art. 3(l);
(3) Inland waterway (IWW; acc.
Reg. 1315, art. 14; (4) Road (acc.
[TO BE FILLED BY TASK 2 WG] Reg. 1315, art. 17); (5) Maritime
(acc. Reg. 1315, art. 20); (6)
Motorways of the Sea (MoS; acc.
Reg. 1315, art. 21); (7) Airport
(acc. Reg. 1315, art. 24); (8)
Multimodal (acc. Reg. 1315, art.
27); (9) Innovation (acc. Reg 1315,
art. 31, 32 and 33 of the TEN-T
Regulation,
EXPLANATIONwith exception
ADDED to
Leave free (allocation of unique Free text Dropdown
project ID will be coordinated at a
later stage)
Rail
Rail ERTMS
IWW
Road
Maritime
MoS
Airport
Multimodal
Innovation
Other
dentification
TEN-T
Project promoter Project origin
North Sea-Baltic
Mediterranean
Baltic-Adriatic
also: "Implementation body" According tender specifications, p. Indicate the corridors that are touched by the project.Hori
17: Reference for all records on any corridor. Mark with
Authority, institution or company the list whether the individual
responsible for implementing the project included has been
project, e.g. infrastructure submitted by a stakeholder OR is a
manager for building a rail line result of analysis of a relevant
national strategic document OR is
a result of the analysis of the
sections currently not compliant
with the TEN-T requirements but
not covered by any infrastructure
investment planning until 2030.
EXPLANATION ADDED 'Horizont
Free text Dropdown Mark with 'x' (mul
Submitted by a stakeholder
Result of analysis of a relevant
national strategic document
Result of the analysis of the
sections currently not compliant
with the TEN-T requirements but
not covered by any infrastructure
investment planning until 2030.
Geographical scope & affected mode
TEN-T Corridor
Member States /
Countries involved
(not allocated to any corridor)
Scandinavian-Mediterranean
North Sea-Mediterranean
Horizontal project
Orient-East Med
Rhine-Danube
Rhine-Alpine
Atlantic
ridors that are touched by the project.Horizontal projects summarise all projects that are not related to Alpha-2 country code
any corridor. Mark with x (multi selection possible) (acc. ISO 3166-1)
'Horizontal' ADDED
Mark with 'x' (multi selection possible) Free text - country
code(s)
BE
BG
CZ
DK
DE
EE
IE
EL
ES
FR
HR
IT
CY
LV
LT
LU
HU
MT
NL
AT
PL
PT
RO
SI
SK
FI
SE
UK
EU-28
& affected mode
Section or node Cross-border section Last-mile section Pre-identified
CEF section / project
Enter the name of Indicate if project is Indicate if project refers Indicate if project
Section, Station, located on cross-border to the "development of refers to CEF pre-
terminal section; apply definition the comprehensive identified section or
border crossing, etc. of Reg. 1315: "'cross- network in urban nodes node; refer to CEF
(free text) border section' means ... that are the starting regulation .
the section which point or the final
ensures the continuity destination ("last mile") (Mark with 'x')
of a project of common for passengers and
interest between the freight moving on the
nearest urban nodes on TEN-T network..."; refer
both sides of the border to Reg. 1315, Article 30.
of two Member States
or between a Member (Mark with 'x')
State and a
neighbouring country."
Free text Mark with 'x' Mark with 'x' Mark with 'x'
Project description
Scope of w
Short Project Description
Infrastructure works
- rehabilitation
Study
Describe objectives and scope of measure e.g. introduction of RIS, ERTMS, Mark with x apart from telematics application (Dropd
rail line electrification, upgrade one to dual track.
Indicate qualitative or quantitative information regarding socio-economic
and environmental impacts of projects, if applicable.
Indicate quantifiable parameters e.g. length of project, number of
stations,….
(Free text)
Free text Mark with Mark with
'x' 'x'
Project description
Scope of work (multi selection)
(according Reg. 1315, Article 32; excluding
Clean fuels (IWW/Maritime, Road, Air)
Sustainable freight transport services
(according Reg. 1315, Article 31)
Maintenance equipment (IWW)
Rolling Stock, Vehicles, Barges
Administrative procedures
Telematics application
Infrastructure works
Infrastructure works
- new construction
KPI: Electrification
- upgrade
MoS)
k with x apart from telematics application (Dropdown); Multiselection possible Dropdown list:
(1) KPI target achieved
(2) KPI improved;
this applies if the TEN-T target valu
project have been upgraded to the
'KPI: Track gauge 1435 mm': Only t
gauge lines that are modified to 1,
Modifie ERTMS Input
d added KPI WG
Mark with Mark with Mark with Mark with Mark with Mark with Drop- Mark with Dropdown
'x' 'x' 'x' 'x' 'x' 'x' down 'x' for all KPIs
ERTMS KPI target
achieved
RIS KPI improved
ITS
VTMIS
SESAR
OTHER
Rail
KPI: Axle load >= 22.5 tonnes (Core freight
KPI: Line speed >= 100 km/h (Core freight
Elimination of current or potential future
KPI: Train length >= 740m (Core freight
Elimination of strong incline
KPI: ERTMS implementation
KPI: Track gauge 1435 mm
capacity bottleneck
lines)
lines)
lines)
Dropdown list: Further parameters linked to the projects'
(1) KPI target achieved elimination of bottlenecks.
(2) KPI improved;
this applies if the TEN-T target value has not been achieved or if only sections of the (Mark with 'x')
project have been upgraded to the TEN-T target value.
'KPI: Track gauge 1435 mm': Only to be considered for new lines or broad/narrow
gauge lines that are modified to 1,435 mm.
Input Input Input Input Input NEW NEW
KPI WG KPI WG KPI WG KPI WG KPI WG
Drop-down Drop-down Drop-down Drop-down Drop-down Mark with 'x' Mark with 'x'
Contribution to corridor objectives (KPI) and elimination of bottlenecks
IWW Road
Contribution to good navigation status
Removal of single track section
KPI: Express road/ motorway
KPI: RIS implementation
KPI: Draught >= 2.5m
KPI: ECMT class >= IV
KPI: Height >= 5.25m
arameters linked to the projects' Dropdown list:
on of bottlenecks. (1) KPI target achieved
(2) KPI improved;
th 'x') this applies if the TEN-T target value has not been achieved or if only sections of the project have been upgraded to
Definitions IWW:
Good navigation status (according Reg. 1315, §15, 3b):
Percentage of days per year, on which the fairway meets the minimum requirements for fairway depth and width.
(Definition to be refined by the complementary study on the good navigation status.)
'KPI: Capability of handling intermodal units': Technical and operational capability to transship lorries, trailers, semi-
road.
'KPI: 740m train terminal accessibility': Suitability of at least one receiving/departing track and at least one transship
'KPI: Electrified train terminal accessibility': Suitability to enter or leave the receiving/departing track and the transsh
NEW Input Input Input Input NEW Input
KPI WG KPI WG KPI WG KPI WG KPI WG
Mark with 'x' Drop-down Drop-down Drop-down Drop-down Mark with 'x' Drop-down
ives (KPI) and elimination of bottlenecks
Road Airport Seaport
KPI: ECMT Class IV waterway connection
KPI: Facilities for ship generated waste
KPI: Availability of clean fuels
KPI: Availability of clean fuels
KPI: Availability of clean fuels
KPI: Connection to rail
KPI: Connection to rail
y sections of the project have been upgraded to the TEN-T target value.
um requirements for fairway depth and width.
avigation status.)
nal capability to transship lorries, trailers, semi-trailers with or without tractor unit, swap bodies or containers of 20 feet suitable for intermodal transp
eiving/departing track and at least one transshipment track to accommodate trains with a length of 740 m, without splitting the train.
ve the receiving/departing track and the transshipment track(s) directly with electric main line locomotive, without using shunting locomotives.
Input Input Input Input Input Input Input
KPI WG KPI WG KPI WG KPI WG KPI WG KPI WG KPI WG
Drop-down Drop-down Drop-down Drop-down Drop-down Drop-down Drop-down
Inland port RR terminals
KPI: Capability of handling intermodal units
KPI: Electrified train terminal accessibility
KPI: ECMT Class IV waterway connection
KPI: 740m train terminal accessibility
KPI: Availability of clean fuels
KPI: Connection to rail
tainers of 20 feet suitable for intermodal transport according to Directive 92/106/EC between rail and
0 m, without splitting the train.
tive, without using shunting locomotives.
Input Input Input Input Input Input
KPI WG KPI WG KPI WG KPI WG KPI WG KPI WG
Drop-down Drop-down Drop-down Drop-down Drop-down Drop-down
Maturity by reference time
Reference time for Planning stage / Preliminary project Environmental Impact
information pre-feasibility analysis/ Feasibility Assessment (EIA) / Detailed
studies / Strategic studies Design / Detailed
Environmental Implementation Plan /
Assessment (SEA) Administrative Permits and
Licences
MM/YYYY
SEA added
Enter reference month Dropdown Dropdown Dropdown
[MM/YYYY] or date
[DD.MM.YYYY]
08/2005 not started not started not started
in progress in progress in progress
concluded concluded concluded
Project status
ence time
Construction/ Project Project end date
implementation (% of start date
completion)
Project start date of Project end date of
study or works; if study or works; if
project includes project includes
study & works, study & works,
project start date is project end date is
equal to finalisation equal to start of
time of works. works.
Format: MM/YYYY Format: MM/YYYY
If start month is not If start month is not
known, fill in known, fill in
00/YYYY. 00/YYYY.
Explanation & Explanation &
Format added Format added
To be calculated Date [MM/YYYY] Date [MM/YYYY]
automatically between
start date and end date,
related to the Reference
time for information
08/2010
Project status
Administrative implementation
Implementation strategy Land acquisition Environmental Impact
Assessment (EIA)
Indicate if project part of larger
investment implemented per phases
(describe rationale underpinning
identification of phases and time horizon
for total project completion i.e. 2020-
2030, after 2030)
Free text Dropdown Dropdown
Completed EIA under preparation or
updating
Not completed EIA completed
EIA approved
Administrative implementation issues
Final project approval by CBA State existing bilateral or Source of costs /
relevant governmental & multilateral agreements financing
administrative authorities and any other information
administrative
implementation issue.
According Tender
specifications, page
13: For information
on the cost of all
projects, the source
of information shall
be indicated:
Stakeholder,
Member States,
Strategic document
Description modified EXPLANATION
MODIFIED
Dropdown Dropdown Free text Dropdown
not submitted yet Performed Stakeholder
submitted, decision pending Not performed Member State
approved Strategic document
Total costs Explanation of Project with Explanation on Expenditures until
project costs potential revenues potential revenues reference time of
information
Amount in Describe differences Mark projects that If previous column Amount in
Million Euro of cost figure might generate (Project with Million Euro
(1) without VAT, (2) compared to revenues after potential revenues)
without extra standard (without completion. is marked with 'x' ,
budget for risks and VAT, without extra provide further
(3) at present budget for risks, at details regarding
prices. present prices). nature of revenues
and figures.
In case of
differences to this
standard cost
calculation, an
explanation of
project costs shall
be provided in next
column.
EXPLANATION NEW COLUMN NEW COLUMN NEW COLUMN
ADDED
Amount in Million Free text Mark with 'x' Free text Amount in
Euro Million Euro
Project costs/financing**
Funding source Funding source Funding source
Amount in Funding Indicate Amount in Funding Indicate Amount in
Million Euro programme potential or Million Euro programme potential or Million Euro
name approved name approved
funding funding
Amount in Free text Dropdown Amount in Free text Dropdown Amount in
Million Euro Million Euro Million Euro
potential potential
approved approved
Funding source Funding source Funding source
Fundig Indicate Amount in Funding Indicate Amount in Funding
programme potential or Million Euro programme potential or Million Euro programme
name e.g. TEN- approved name approved name
T funding, funding funding
ERDF, CEF,…
Dropdown Dropdown Amount in Free text Dropdown Amount in Free text
Million Euro Million Euro
ERDF potential potential
CEF approved approved
...
Funding source Funding source Remarks
Indicate Amount in Funding Indicate Remarks
potential or Million Euro programme potential or
approved name approved
funding funding
e.g. information on
potential technical, physical,
political or financial
constraints
Dropdown Amount in Free text Dropdown
Million Euro
potential potential
approved approved
Project Identification
Project name Project Project Project origin
category promoter
Free text Dropdown Free text Dropdown
Geographical scope & affected mode
TEN-T Corridor
Member States / Section or node Cross- Last-mile Pre-
Countries involved border section identifie
(not allocated to any
Horizontal project
section d
Orient-East Med
North Sea-Baltic
Mediterranean
Mediterranean
Mediterranean
CEF
Rhine-Danube
Scandinavian-
Baltic-Adriatic
Rhine-Alpine
section /
North Sea-
project
Atlantic
Mark with 'x' (multi selection possible) Enter only country Free text Mark Mark Mark
code(s) with 'x' with 'x' with 'x'
Short Project Description
Free text
h
Project description
rk
'x'
Study
Infrastructure works
k
'x'
- rehabilitation
Infrastructure works
k
'x'
- upgrade
Infrastructure works
k
'x'
- new construction
Maintenance
k
'x'
equipment (IWW)
Rolling Stock, Vehicles,
k
'x'
Barges
Clean fuels
k
'x'
(IWW/Maritime, Road,
Administrative
Scope of work (multi selection)
k
'x'
wit with with with with with with with
procedures
Telematics application
n
dow
(according Reg. 1315,
Sustainable freight
k
'x'
with
transport services
n
KPI: Electrification
KPI: Track gauge 1435
n
mm
KPI: ERTMS
n
implementation
KPI: Line speed >= 100
n
km/h (Core freight lines)
KPI: Axle load >= 22.5
n
Rail
tonnes (Core freight
KPI: Train length >=
n
dow dow dow dow dow dow
740m (Core freight
Elimination of current
k
'x'
or potential future
Elimination of strong
k
'x'
incline
Removal of single track
k
'x'
section
KPI: ECMT class >= IV
KPI: Draught >= 2.5m
KPI: Height >= 5.25m
IWW
KPI: RIS implementation
Contribution to good
'x'
navigation status
KPI: Express road/
motorway
Road
KPI: Availability of clean
with with with wn wn wn wn with wn wn
Ma Mar Mar Mar Mar Mar Mar Mar Drop Mar Drop Drop Drop Drop Drop Drop Mar Mar Mar Dro Dro Dro Dro Mar Dro Dro
pdo pdo pdo pdo k pdo pdo
fuels
Contribution to corridor objectives (KPI) and elimination of bottlenecks
KPI: Connection to rail
KPI: Availability of clean Airport
fuels
KPI: Connection to rail
KPI: ECMT Class IV
r objectives (KPI) and elimination of bottlenecks
waterway connection
KPI: Availability of clean
wn wn wn wn wn
Seaport
fuels
KPI: Facilities for ship
generated waste
KPI: ECMT Class IV
waterway connection
KPI: Connection to rail
Inland port
KPI: Availability of clean
fuels
KPI: Capability of
handling intermodal
KPI: 740m train terminal
accessibility
KPI: Electrified train
RR terminals
wn wn wn wn wn wn
Dro Dro Dro Dro Dro Drop Dro Dro Dro Dro Dro Dro
pdo pdo pdo pdo pdo down pdo pdo pdo pdo pdo pdo
terminal accessibility
Project status
Maturity by reference time Administrative implementation issues
Reference Planning stage / Preliminar Environmental Impact Construction/ Project Project Implementation strategy Land Environm Final project CBA State existing bilateral
time for pre-feasibility y project Assessment (EIA) / implementation (% start date end date acquisitio ental approval by or multilateral
informatio studies / analysis/ Detailed Design / of completion) n Impact relevant agreements and any
n Strategic Feasibility Detailed Assessme governmental & other administrative
Environmental studies Implementation Plan / nt (EIA) administrative implementation issue.
Assessment Administrative Permits authorities
(SEA) and Licences
Enter Dropdown Dropdown Dropdown To be calculated Date Date Free text Dropdow Dropdow Dropdown Dropdow Free text
reference automatically [MM/YYY [MM/YYY n n n
month between start date Y] Y]
[MM/YYY and end date,
Y] or date related to the
[DD.MM.Y Reference time for
YYY] information
Project costs/financing**
Project with potential
revenues
Source of Total costs Explanatio Explanation on Expendit
costs / n of potential revenues ures until
financing project reference
informatio costs time of
n informati
on
Dropdown Amount in Free text Mark Free text Amount
Million with 'x' in
Euro Million
Euro
Project costs/financing**
Funding source"State" Funding source"Regional/Local" Funding source"EU" Funding source"IFI" Funding source"Private" Funding source"Other" Remarks
Amount Funding Indicate Amount Funding Indicate Amount Fundig Indicate Amount Funding Indicate Amount Funding Indicate Amount Funding Indicate Remarks
in Million program potential in Million program potential in Million programme potential in Million program potential in Million program potential in Million program potential
Euro me name or Euro me name or Euro name e.g. or Euro me name or Euro me name or Euro me name or
approved approved TEN-T approved approved approved approved
funding funding funding, funding funding funding funding
ERDF, CEF,…
Amount Free text Dropdow Amount Free text Dropdow Amount Free text Dropdow Amount Free text Dropdow Amount Free text Dropdow Amount Free text Dropdow
in n in n in n in n in n in n
Million Million Million Million Million Million
Euro Euro Euro Euro Euro Euro
x
Sections belonging to several corridors: which contractor does data encoding
- Warsaw-Lodz (rail)
- Warsaw node
- Prerov node
- Zilina node
Baltic-Adriatic
- Brno-Vienna
- Padova-Ravenna (rail)
- Bologna node, Venice node
- Adriatic ports (Koper, Trieste, Venice, Ravenna)
- Warsaw-Lodz (road)
- Lodz node
- Poznan node
North Sea-Baltic
- Berlin node
- Bremen-Bremerhaven/Wilhelmshaven
- Amsterdam-Utrecht
- Pragersko-Padova
- Inland waterway to Ravenna
Mediterranean
- Algeciras-Madrid
- Madrid node, Milano node, Ljubljana node
- Brno-Bratislava
- Hamburg-Dresden (inland waterways)
Orient/East-Med
- Prag-Brno
- Budapest-BG border
- Helsinki node
- Hamburg/Bremen – Hannover
Scandinavian-Mediterranean
- Rostock-Berlin
- Verona node
- Rhine
- Amsterdam-Rhine Kanaal (inland waterways)
Rhine-Alpine - Antwerpen-Köln
- Rechtsrheinisch
- Mannheim node, Novara node
- Metz-Strasbourg
Atlantic
- Strasbourg node
- Rotterdam-Antwerpen
- Inland waterways south of Rotterdam
North Sea-Mediterranean - Lyon-Marseille
- Linksrheinisch
- Paris node
- Budapest node, Wien node, Bratislava node
- Wien-Bratislava-Budapest
Rhine-Danube
- Würzburg-Nürnberg
- München node
NB: “node” covers the relevant inland ports, seaports, airports and rail-road terminals. Where not indica
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Baltic-Adriatic
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
North Sea-Baltic
x
x
x
x
x
x
x
x
x
x
Mediterranean
x
x
x
x
x
x
x
x
x
x
Orient-East Med
x
x
x
x
x
x
x
x
x
Scandinavian-
Mediterranean
TEN-T Corridor
x
x
x
x
x
x
x
x
x
x
Rhine-Alpine
x
x
x
x
x
x
x
x
x
Atlantic
x x x
x x
x
x
erminals. Where not indicated differently, links are to be considered multimodal.
x
x
x
x
x
x
x
x
x
x
North Sea-
Mediterranean
x
x
x
x
x
x
x
x
x
Rhine-Danube
x
x
x
x
Saatja: Martin Malinovski <
[email protected]>
Saatmisaeg: 17. veebruar 2016. a. 14:32
Adressaat: VA_eva
Teema: FW: TEN-T projektide kinnitamine
Manused: CNC_Project-List_EST_VTA.xlsx
From: Martin Malinovski
Sent: Thursday, February 11, 2016 2:15 PM
To: '
[email protected]'
Subject: TEN-T projektide kinnitamine
Tere!
Ernst & Young viib Euroopa Komisjoni tellimusel l�bi TEN-T
transpordikoridoridega seotud uuringut.
Tegemist on rahvusvahelise projektiga, milles Eesti kontekstis tegeleme
P�hjamere-Balti
transpordikoridorile j��vate Eesti projektide kaardistamisega ja Euroopa
Komisjoni poolt etteantud
andmetabeli t�itmisega. Saime Teie kontakti Majandus- ja
Kommunikatsiooniministeeriumi n�unikult Anti
Moppelilt.
Tegeleme hetkel potentsiaalsete TEN-T transpordikoridoriga seotud
projektide kaardistamisega ning
sooviksime saada Teilt kinnitust ka Veeteede Ameti projektidele:
1. New icebreaker for Gulf of Finland (both sides)
2. Reconstruction of Hundipea Port (Icebreakers and other safety
support fleet, navigation aid)
Seoses sellega palun kinnitust, kas eelnimetatud projektid on aktuaalsed,
asjakohased ja nende
ingliskeelsed nimetused korrektsed? Samuti palun kinnitada, kas toodud
projektide loetelu on ammendav
v�i on Teil kavandamisel ka teisi projekte, mis vajavad TEN-T kontekstis
v�ljatoomist. Teie poolne huvi
v�iks seisneda selles, et info projektide kohta j�uab Euroopa Komisjoni
liikuvuse ja transpordi
peadirektoraati (DG MOVE), kus v�etakse kaardistatud projeke arvesse kui
potentsiaalseid abik�lblikke
TEN-T transpordikoridoridega seotud projekte.
Praeguses etapis peame Euroopa Komisjonile esitama aktuaalsete projektide
nimekirja, mist�ttu paluksin
kinnitada teie projektide nimekiri esimesel v�imalusel. Lisaks sellele
peame j�rgmises etapis t�itma
projektide kohta Komisjoni poolt etteantud tabeli (lisatud manuses). Ka
selleks vajame Teie sisendit, kuid
sellega on m�nev�rra rohkem aega.
K�ikide k�simuste korral v�tta julgelt �hendust. T�nud ette!
Tervitades / Best regards,
Martin Malinovski | Advisory Services | Consultant
Ernst & Young Baltic AS
R�vala pst. 4, Tallinn 10143, Estonia
Direct: +372 611 4537 | Mobile: +372 5345 3858 |
[email protected]
Office: +372 611 4610 | Fax: +372 611 4611 | EY/Comm: **372 34537
Website: http://www.ey.com/ee
___________________________________
The information contained in this communication is intended solely for
the use of the individual
or entity to whom it is addressed and others authorized to receive it. It
may contain confidential
or legally privileged information. If you are not the intended recipient
you are hereby notified
that any disclosure, copying, distribution or taking any action in
reliance on the contents of this
information is strictly prohibited and may be unlawful. If you have
received this communication
in error, please notify us immediately by responding to this email and
then delete it from your
system. EY is neither liable for the proper and complete transmission of
the information
contained in this communication nor for any delay in its receipt.