Sotsiaalministeerium · 5. detsember 2022
Sisu (failidest)
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
EUROPEAN HEALTH AND DIGITAL EXECUTIVE AGENCY
(HADEA)
Director
GRANT AGREEMENT
Project 101082572 — CIRCE-JA
PREAMBLE
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the European Health and Digital Executive Agency (HADEA) (‘EU executive agency’ or ‘granting
authority’), under the powers delegated by the European Commission (‘European Commission’),
and
on the other part,
1. ‘the coordinator’:
SERVICIO ANDALUZ DE SALUD (SAS), PIC 998853621, established in AVENIDA DE LA
CONSTITUCION 18, SEVILLA 41071, Spain,
and the following other beneficiaries, if they sign their ‘accession form’ (see Annex 3 and Article 40):
2. DIOIKHSH YGEIONOMIKHS PERIFEREIAS KRHTHS (7HRC), PIC 944960033,
established in 3RD KM NATIONAL ROAD HERAKLION MOIRES, HERAKLION 71500, Greece,
3. AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S), PIC
959886490, established in VIA PUGLIE 23, ROMA 00187, Italy,
4. NARODOWY FUNDUSZ ZDROWIA (NFZ), PIC 998161332, established in
UL.RAKOWIECKA 26/30, WARSZAWA 02-528, Poland,
5. NACIONALNI INSTITUT ZA JAVNO ZDRAVJE (NIJZ), PIC 948891346, established in
TRUBARJEVA CESTA 2, LJUBLJANA 1000, Slovenia,
6. MINISTERUL SANATATII (MS-MoH), PIC 999831478, established in Cristian Popisteanu
Street 1-3, BUCHAREST 70109, Romania,
7. AGENCE WALLONNE DE LA SANTE, DE LA PROTECTION SOCIALE, DU HANDICAP
ET DE LA FAMILLE (AVIQ), PIC 920108439, established in RUE DE LA RIVELAINE 21,
CHARLEROY 6061, Belgium,
1
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
8. ADMINISTRACAO CENTRAL DO SISTEMA DESAUDE IP (ACSS), PIC 997349539,
established in AVENIDA DO BRASIL 53, PARQUE DE SAUDE DE LISBOA EDIFICIO 16, Lisboa
1700-063, Portugal,
9. GESUNDHEIT OSTERREICH GMBH (GÖG), PIC 928836208, established in STUBENRING
6, WIEN 1010, Austria,
10. HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO (CIPH), PIC 998128255, established in
ROCKEFELLEROVA 7, ZAGREB 10000, Croatia,
11. SOTSIAALMINISTEERIUM (MSAE), PIC 998429731, established in Suur-Ameerika 1,
TALLINN 10122, Estonia,
12. NEMZETI NEPEGESZSEGUGYI KOZPONT (NNK), PIC 998706957, established in
ALBERT FLORIAN UT 2-6, BUDAPEST 1097, Hungary,
13. LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (MoH-RL), PIC
933839468, established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania,
14. SOCIALSTYRELSEN (NBHW), PIC 998248147, established in RALAMBSVAGEN 3,
STOCKHOLM 106 30, Sweden,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator and
affiliated entities (if any).
If only one beneficiary signs the grant agreement (‘mono-beneficiary grant’), all provisions referring
to the ‘coordinator’ or the ‘beneficiaries’ will be considered — mutatis mutandis — as referring to
the beneficiary.
The parties referred to above have agreed to enter into the Agreement.
By signing the Agreement and the accession forms, the beneficiaries accept the grant and agree to
implement the action under their own responsibility and in accordance with the Agreement, with all
the obligations and terms and conditions it sets out.
The Agreement is composed of:
Preamble
Terms and Conditions (including Data Sheet)
2
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Annex 1 Description of the action1
Annex 2 Estimated budget for the action
Annex 2a Additional information on unit costs and contributions (if applicable)
Annex 3 Accession forms (if applicable)2
Annex 3a Declaration on joint and several liability of affiliated entities (if applicable)3
Annex 4 Model for the financial statements
Annex 5 Specific rules (if applicable)
1 Template published on Portal Reference Documents.
2 Template published on Portal Reference Documents.
3 Template published on Portal Reference Documents.
3
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
TERMS AND CONDITIONS
TABLE OF CONTENTS
GRANT AGREEMENT.................................................................................................................................................... 1
PREAMBLE........................................................................................................................................................................1
TERMS AND CONDITIONS...........................................................................................................................................4
DATASHEET...................................................................................................................................................................... 9
CHAPTER 1 GENERAL..............................................................................................................................................16
ARTICLE 1 — SUBJECT OF THE AGREEMENT ..................................................................................... 16
ARTICLE 2 — DEFINITIONS........................................................................................................................16
CHAPTER 2 ACTION................................................................................................................................................. 17
ARTICLE 3 — ACTION................................................................................................................................. 17
ARTICLE 4 — DURATION AND STARTING DATE...................................................................................17
CHAPTER 3 GRANT...................................................................................................................................................17
ARTICLE 5 — GRANT...................................................................................................................................17
5.1 Form of grant......................................................................................................................................17
5.2 Maximum grant amount..................................................................................................................... 18
5.3 Funding rate........................................................................................................................................18
5.4 Estimated budget, budget categories and forms of funding.............................................................. 18
5.5 Budget flexibility................................................................................................................................18
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS......................................19
6.1 General eligibility conditions............................................................................................................. 19
6.2 Specific eligibility conditions for each budget category................................................................... 20
6.3 Ineligible costs and contributions...................................................................................................... 24
6.4 Consequences of non-compliance...................................................................................................... 25
CHAPTER 4 GRANT IMPLEMENTATION............................................................................................................ 25
SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER
PARTICIPANTS........................................................................................................................................ 25
ARTICLE 7 — BENEFICIARIES................................................................................................................... 25
ARTICLE 8 — AFFILIATED ENTITIES....................................................................................................... 27
ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION................................................... 30
9.1 Associated partners.............................................................................................................................30
9.2 Third parties giving in-kind contributions to the action.................................................................... 30
9.3 Subcontractors.....................................................................................................................................30
4
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
9.4 Recipients of financial support to third parties..................................................................................30
ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS....................................................................... 31
10.1 Non-EU participants......................................................................................................................... 31
10.2 Participants which are international organisations...........................................................................31
10.3 Pillar-assessed participants............................................................................................................... 32
SECTION 2 RULES FOR CARRYING OUT THE ACTION...........................................................................34
ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION............................................................ 34
11.1 Obligation to properly implement the action................................................................................... 34
11.2 Consequences of non-compliance.................................................................................................... 34
ARTICLE 12 — CONFLICT OF INTERESTS.............................................................................................. 34
12.1 Conflict of interests.......................................................................................................................... 34
12.2 Consequences of non-compliance.................................................................................................... 34
ARTICLE 13 — CONFIDENTIALITY AND SECURITY............................................................................ 35
13.1 Sensitive information........................................................................................................................35
13.2 Classified information...................................................................................................................... 35
13.3 Consequences of non-compliance.................................................................................................... 36
ARTICLE 14 — ETHICS AND VALUES...................................................................................................... 36
14.1 Ethics.................................................................................................................................................36
14.2 Values................................................................................................................................................ 36
14.3 Consequences of non-compliance.................................................................................................... 36
ARTICLE 15 — DATA PROTECTION.......................................................................................................... 36
15.1 Data processing by the granting authority....................................................................................... 36
15.2 Data processing by the beneficiaries............................................................................................... 37
15.3 Consequences of non-compliance.................................................................................................... 37
ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS —
ACCESS RIGHTS AND RIGHTS OF USE................................................................................ 37
16.1 Background and access rights to background..................................................................................37
16.2 Ownership of results.........................................................................................................................38
16.3 Rights of use of the granting authority on materials, documents and information received for
policy, information, communication, dissemination and publicity purposes...................................38
16.4 Specific rules on IPR, results and background................................................................................ 39
16.5 Consequences of non-compliance.................................................................................................... 39
ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY............................................ 39
17.1 Communication — Dissemination — Promoting the action........................................................... 39
17.2 Visibility — European flag and funding statement......................................................................... 39
17.3 Quality of information — Disclaimer..............................................................................................40
5
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
17.4 Specific communication, dissemination and visibility rules............................................................40
17.5 Consequences of non-compliance.................................................................................................... 40
ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION............................................... 41
18.1 Specific rules for carrying out the action........................................................................................ 41
18.2 Consequences of non-compliance.................................................................................................... 41
SECTION 3 GRANT ADMINISTRATION......................................................................................................... 41
ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS.................................................................... 41
19.1 Information requests......................................................................................................................... 41
19.2 Participant Register data updates..................................................................................................... 41
19.3 Information about events and circumstances which impact the action............................................41
19.4 Consequences of non-compliance.................................................................................................... 42
ARTICLE 20 — RECORD-KEEPING............................................................................................................ 42
20.1 Keeping records and supporting documents.................................................................................... 42
20.2 Consequences of non-compliance.................................................................................................... 43
ARTICLE 21 — REPORTING........................................................................................................................ 43
21.1 Continuous reporting........................................................................................................................ 43
21.2 Periodic reporting: Technical reports and financial statements....................................................... 43
21.3 Currency for financial statements and conversion into euros..........................................................44
21.4 Reporting language...........................................................................................................................45
21.5 Consequences of non-compliance.................................................................................................... 45
ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS DUE................. 45
22.1 Payments and payment arrangements.............................................................................................. 45
22.2 Recoveries.........................................................................................................................................45
22.3 Amounts due.....................................................................................................................................46
22.4 Enforced recovery.............................................................................................................................50
22.5 Consequences of non-compliance.................................................................................................... 51
ARTICLE 23 — GUARANTEES....................................................................................................................52
23.1 Prefinancing guarantee..................................................................................................................... 52
23.2 Consequences of non-compliance.................................................................................................... 52
ARTICLE 24 — CERTIFICATES................................................................................................................... 52
24.1 Operational verification report (OVR).............................................................................................52
24.2 Certificate on the financial statements (CFS).................................................................................. 52
24.3 Certificate on the compliance of usual cost accounting practices (CoMUC).................................. 53
24.4 Systems and process audit (SPA).....................................................................................................53
24.5 Consequences of non-compliance.................................................................................................... 53
6
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS..................................................................................................................................... 53
25.1 Granting authority checks, reviews and audits................................................................................ 53
25.2 European Commission checks, reviews and audits in grants of other granting authorities..............55
25.3 Access to records for assessing simplified forms of funding.......................................................... 55
25.4 OLAF, EPPO and ECA audits and investigations........................................................................... 55
25.5 Consequences of checks, reviews, audits and investigations — Extension of results of reviews,
audits or investigations.................................................................................................................... 56
25.6 Consequences of non-compliance.................................................................................................... 57
ARTICLE 26 — IMPACT EVALUATIONS................................................................................................... 57
26.1 Impact evaluation............................................................................................................................. 57
26.2 Consequences of non-compliance.................................................................................................... 57
CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE.................................................................................. 57
SECTION 1 REJECTIONS AND GRANT REDUCTION.................................................................................58
ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS...........................................................58
27.1 Conditions......................................................................................................................................... 58
27.2 Procedure.......................................................................................................................................... 58
27.3 Effects............................................................................................................................................... 58
ARTICLE 28 — GRANT REDUCTION........................................................................................................ 58
28.1 Conditions......................................................................................................................................... 58
28.2 Procedure.......................................................................................................................................... 59
28.3 Effects............................................................................................................................................... 59
SECTION 2 SUSPENSION AND TERMINATION............................................................................................59
ARTICLE 29 — PAYMENT DEADLINE SUSPENSION............................................................................. 59
29.1 Conditions......................................................................................................................................... 59
29.2 Procedure.......................................................................................................................................... 59
ARTICLE 30 — PAYMENT SUSPENSION...................................................................................................60
30.1 Conditions......................................................................................................................................... 60
30.2 Procedure.......................................................................................................................................... 60
ARTICLE 31 — GRANT AGREEMENT SUSPENSION..............................................................................61
31.1 Consortium-requested GA suspension............................................................................................. 61
31.2 EU-initiated GA suspension.............................................................................................................61
ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION......................................... 62
32.1 Consortium-requested GA termination............................................................................................ 62
32.2 Consortium-requested beneficiary termination................................................................................ 63
32.3 EU-initiated GA or beneficiary termination.................................................................................... 65
7
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE SANCTIONS............... 68
ARTICLE 33 — DAMAGES...........................................................................................................................68
33.1 Liability of the granting authority....................................................................................................68
33.2 Liability of the beneficiaries............................................................................................................ 68
ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES....................................... 68
SECTION 4 FORCE MAJEURE.......................................................................................................................... 69
ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 69
CHAPTER 6 FINAL PROVISIONS...........................................................................................................................69
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................69
36.1 Forms and means of communication — Electronic management................................................... 69
36.2 Date of communication.................................................................................................................... 69
36.3 Addresses for communication.......................................................................................................... 70
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................70
ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES..........................................................70
ARTICLE 39 — AMENDMENTS.................................................................................................................. 70
39.1 Conditions......................................................................................................................................... 70
39.2 Procedure.......................................................................................................................................... 71
ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES........................................... 71
40.1 Accession of the beneficiaries mentioned in the Preamble............................................................. 71
40.2 Addition of new beneficiaries.......................................................................................................... 71
ARTICLE 41 — TRANSFER OF THE AGREEMENT................................................................................. 72
ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE GRANTING
AUTHORITY.................................................................................................................................72
ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 72
43.1 Applicable law..................................................................................................................................72
43.2 Dispute settlement............................................................................................................................ 72
ARTICLE 44 — ENTRY INTO FORCE.........................................................................................................73
8
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
DATA SHEET
1. General data
Project summary:
Project summary
CIRCE-JA will effectively transfer and implement 6 selected best practices (BPs) in primary health care among European Member States
(MS), supported by scientific evidence-based methodology, raising MS capacity in implementing innovative care models and addressing
health system transformation at this level of care. Moreover, knowledge transfer and twinning actions will support the transferring and
implementation process, including a wide range of activities, such as workshops, staff visits and secondments, policy dialogues, expert
advice, mutual and peer learning programmes. The transferring and implementation process will be monitored and assessed. Knowledge
will be generated and shared addressing the main elements and recommendations for its success beyond the duration of the JA. CIRCE-
JA ambition looks forward to effectively transfer (implement, validate and sustain) the 6 BPs from 4 MS (Belgium, Portugal, Slovenia
and Spain) in to 45 implementation sites from 12 MS with relevant structural, organizational and institutional differences in their health
care systems. The common transversal interest is to strengthening health care systems through reinforcing primary health care. 14 EU
Member States are involved in CIRCE-JA. Beneficiaries and affiliated entities (AE) represent European healthcare systems and services
directly connected to the overall aim of this JA, being BPs owners or implementers.
Keywords: not defined
Project number: 101082572
Project name: JA TRANSFER OF BEST PRACTICES IN PRIMARY CARE
Project acronym: CIRCE-JA
Call: EU4H-2021-JA2-IBA
Topic: EU4H-2021-JA-09
Type of action: EU4H Project Grants
Granting authority: European Health and Digital Executive Agency
Grant managed through EU Funding & Tenders Portal: Yes (eGrants)
Project starting date: fixed date: 1 February 2023
Project end date: 31 January 2026
Project duration: 36 months
Consortium agreement: Yes
2. Participants
List of participants:
Short Total eligible costs Max grant
N° Role Legal name Ctry PIC
name (BEN and AE) amount
1 COO SAS SERVICIO ANDALUZ DE SALUD ES 998853621 711 550.00 569 240.00
1.1 AE FPS FUNDACION PUBLICA ANDALUZA PROGRESO Y ES 998619463 465 292.71 372 234.17
SALUD M.P.
1.2 AE SERGAS SERVIZO GALEGO DE SAUDE ES 974720409 168 525.00 134 820.00
1.3 AE ACIS AXENCIA GALEGA PARA A XESTION DO ES 923156858 199 934.85 159 947.88
CONECEMENTO EN SAUDE
1.4 AE AQUAS AGENCIA DE QUALITAT I AVALUACIO SANITARIES DE ES 949799169 149 375.21 119 500.17
CATALUNYA
1.5 AE FISABIO FUNDACION PARA EL FOMENTO DE LA ES 951714046 249 368.85 199 495.08
9
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Short Total eligible costs Max grant
N° Role Legal name Ctry PIC
name (BEN and AE) amount
INVESTIGACION SANITARIA Y BIOMEDICA DE LA
COMUNITAT VALENCIANA
1.6 AE IDIVAL FUNDACION INSTITUTO DE INVESTIGACION ES 946556944 107 647.35 86 117.88
MARQUES DE VALDECILLA
1.7 AE SCS Servicio Cántabro de Salud ES 991294023 157 290.00 125 832.00
1.8 AE SERMAS SERVICIO MADRILENO DE SALUD ES 999481987 155 150.00 124 120.00
1.9 AE FIIBAP FUNDACION PARA LA INVESTIGACION E INNOVACION ES 919231753 156 599.85 125 279.88
BIOSANITARIA DE ATENCION PRIMARIA
2 BEN 7HRC DIOIKHSH YGEIONOMIKHS PERIFEREIAS KRHTHS EL 944960033 1 549 553.67 1 239 642.94
3 BEN AGE.NA.S AGENZIA NAZIONALE PER I SERVIZI SANITARI IT 959886490 491 413.21 393 130.57
REGIONALI
3.1 AE uslumbria2 AZIENDA UNITA SANITARIA LOCALE UMBRIA N 2 IT 885492922 154 123.00 123 298.40
3.2 AE ASUR ASUR MARCHE IT 925596408 154 123.00 123 298.40
3.3 AE ASLCN2 AZIENDA SANITARIA LOCALE CN2 IT 945430289 154 123.00 123 298.40
3.4 AE ASL AL ASL AL IT 906491870 154 123.00 123 298.40
3.5 AE ASL AZIENDA SANITARIA LOCALE ROMA 1 IT 912924134 202 023.42 161 618.74
ROMA 1
3.6 AE ASL AZIENDA UNITA SANITARIA LOCALE ROMAD IT 952673473 154 123.00 123 298.40
Roma D
3.7 AE AUSL AZIENDA SANITARIA LOCALE VITERBO IT 936372720 154 123.00 123 298.40
VITERBO
3.8 AE ATS AGENZIA DI TUTELA DELLA SALUTE DI BERGAMO IT 906119875 154 123.00 123 298.40
Bergamo
3.9 AE A.LI.SA. AZIENDA LIGURE SANITARIA DELLA REGIONE IT 932080179 154 123.00 123 298.40
LIGURIA
3.10 AE Liguria AZIENDA SOCIOSANITARIA LIGURE N. 1 IT 888215518 154 123.00 123 298.40
ASL 1
3.11 AE Liguria AZIENDA SANITARIA LIGURE 4 CHIAVARESE IT 885485550 154 123.00 123 298.40
ASL 4
3.12 AE ASUGI AZIENDA SANITARIA UNIVERSITARIA GIULIANO IT 895742718 154 123.00 123 298.40
ISONTINA
3.13 AE ASL AZIENDA UNITA SANITARIA LOCALE DI TERAMO IT 893843458 154 123.00 123 298.40
TERAMO
3.14 AE BOLOGNA AZIENDA UNITA' SANITARIA LOCALE DI BOLOGNA IT 951425568 154 123.00 123 298.40
3.15 AE MODENA AZIENDA UNITA SANITARIA LOCALE DI MODENA IT 999571518 154 123.00 123 298.40
3.16 AE PARMA AZIENDA USL DI PARMA IT 919552726 154 123.00 123 298.40
3.17 AE ROMAGNA AZIENDA USL DELLA ROMAGNA IT 911127209 154 123.00 123 298.40
3.18 AE ASL AZIENDA SANITARIA LOCALE ROMA 2 IT 887912296 154 123.00 123 298.40
ROMA 2
4 BEN NFZ NARODOWY FUNDUSZ ZDROWIA PL 998161332 924 351.60 739 481.28
5 BEN NIJZ NACIONALNI INSTITUT ZA JAVNO ZDRAVJE SI 948891346 649 602.35 519 681.88
6 BEN MS-MoH MINISTERUL SANATATII RO 999831478 202 648.37 162 118.70
6.1 AE UMF-CD UNIVERSITATEA DE MEDICINA SI FARMACIE CAROL RO 999875613 194 794.57 155 835.66
DAVILA DIN BUCURESTI
6.2 AE INSP INSTITUTUL NATIONAL DE SANATATE PUBLICA RO 985926237 167 342.93 133 874.34
7 BEN AVIQ AGENCE WALLONNE DE LA SANTE, DE LA BE 920108439 282 036.06 225 628.85
PROTECTION SOCIALE, DU HANDICAP ET DE LA
FAMILLE
8 BEN ACSS ADMINISTRACAO CENTRAL DO SISTEMA DESAUDE IP PT 997349539 44 728.14 35 782.51
8.1 AE MS-DGS MINISTERIO DA SAUDE - REPUBLICA PORTUGUESA PT 986364095 99 564.55 79 651.64
8.2 AE ULSM UNIDADE LOCAL DE SAUDE DE MATOSINHOS EPE PT 951404907 134 821.58 107 857.26
8.3 AE CHLC CENTRO HOSPITALAR DE LISBOA CENTRAL, EPE PT 940798539 134 821.58 107 857.26
10
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Short Total eligible costs Max grant
N° Role Legal name Ctry PIC
name (BEN and AE) amount
8.4 AE CHLO CENTRO HOSPITALAR DE LISBOA OCIDENTAL EPE PT 898131925 134 821.58 107 857.26
8.5 AE ARSLVT ADMINISTRACAO REGIONAL DE SAUDE DE LISBOA E PT 885184365 134 821.58 107 857.26
VALE DO TEJO I P
9 BEN GÖG GESUNDHEIT OSTERREICH GMBH AT 928836208 183 275.42 146 620.34
10 BEN CIPH HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO HR 998128255 178 458.44 142 766.75
11 BEN MSAE SOTSIAALMINISTEERIUM EE 998429731 226 042.85 180 834.28
11.1 AE UTARTU TARTU ULIKOOL EE 999895013 265 739.85 212 591.88
12 BEN NNK NEMZETI NEPEGESZSEGUGYI KOZPONT HU 998706957 141 748.25 113 398.60
13 BEN MoH-RL LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS LT 933839468 203 241.36 162 593.09
MINISTERIJA
14 BEN NBHW SOCIALSTYRELSEN SE 998248147 483 484.85 386 787.88
Total 12 170 161.03 9 736 128.83
Coordinator:
– SERVICIO ANDALUZ DE SALUD (SAS)
3. Grant
Maximum grant amount, total estimated eligible costs and contributions and funding rate:
Total eligible costs Funding rate Maximum grant amount Maximum grant amount
(BEN and AE) (%) (Annex 2) (award decision)
12 170 161.03 80 9 736 128.83 9 736 128.83
Grant form: Budget-based
Grant mode: Action grant
Budget categories/activity types:
- A. Personnel costs
- A.1 Employees, A.2 Natural persons under direct contract, A.3 Seconded persons
- A.4 SME owners and natural person beneficiaries
- B. Subcontracting costs
- C. Purchase costs
- C.1 Travel and subsistence
- C.2 Equipment
- C.3 Other goods, works and services
- D. Other cost categories
- D.1 Financial support to third parties
- E. Indirect costs
Cost eligibility options:
- Standard supplementary payments
- Limitation for subcontracting
- Travel and subsistence:
11
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
- Travel: Unit or Actual costs
- Accommodation: Unit or Actual costs
- Subsistence: Unit or Actual costs
- Equipment: depreciation only
- Costs for providing financial support to third parties (actual cost; max amount for each recipient: EUR 0.00)
- Indirect cost flat-rate: 7% of the eligible direct costs (categories A-D, except volunteers costs and exempted
specific cost categories, if any)
- VAT: Yes
- Other ineligible costs
Budget flexibility: Yes (no flexibility cap)
4. Reporting, payments and recoveries
4.1 Continuous reporting (art 21)
Deliverables: see Funding & Tenders Portal Continuous Reporting tool
4.2 Periodic reporting and payments
Reporting and payment schedule (art 21, 22):
Reporting Payments
Deadline
Reporting periods Type Deadline Type
(time to pay)
RP No Month from Month to
30 days from entry
into force/10 days
before starting date/
Initial prefinancing financial guarantee
(if required)
– whichever
is the latest
1 1 18 Periodic report 60 days after end Interim payment 90 days from
of reporting period receiving
periodic report
2 19 36 Periodic report 60 days after end Final payment 90 days from
of reporting period receiving
periodic report
Prefinancing payments and guarantees:
Prefinancing payment Prefinancing guarantee
Guarantee
Type Amount Division per participant
amount
Prefinancing 1 (initial) 2 920 838.65 n/a 1 - SAS n/a
1.1 - FPS n/a
1.2 - SERGAS n/a
1.3 - ACIS n/a
1.4 - AQUAS n/a
1.5 - FISABIO n/a
1.6 - IDIVAL n/a
12
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Prefinancing payment Prefinancing guarantee
Guarantee
Type Amount Division per participant
amount
1.7 - SCS n/a
1.8 - SERMAS n/a
1.9 - FIIBAP n/a
2 - 7HRC n/a
3 - AGE.NA.S n/a
3.1 - uslumbria2 n/a
3.2 - ASUR n/a
3.3 - ASLCN2 n/a
3.4 - ASL AL n/a
3.5 - ASL ROMA 1 n/a
3.6 - ASL Roma D n/a
3.7 - AUSL VITERBO n/a
3.8 - ATS Bergamo n/a
3.9 - A.LI.SA. n/a
3.10 - Liguria ASL 1 n/a
3.11 - Liguria ASL 4 n/a
3.12 - ASUGI n/a
3.13 - ASL TERAMO n/a
3.14 - BOLOGNA n/a
3.15 - MODENA n/a
3.16 - PARMA n/a
3.17 - ROMAGNA n/a
3.18 - ASL ROMA 2 n/a
4 - NFZ n/a
5 - NIJZ n/a
6 - MS-MoH n/a
6.1 - UMF-CD n/a
6.2 - INSP n/a
7 - AVIQ n/a
8 - ACSS n/a
8.1 - MS-DGS n/a
8.2 - ULSM n/a
8.3 - CHLC n/a
8.4 - CHLO n/a
8.5 - ARSLVT n/a
9 - GÖG n/a
10 - CIPH n/a
11 - MSAE n/a
11.1 - UTARTU n/a
12 - NNK n/a
13 - MoH-RL n/a
14 - NBHW n/a
Reporting and payment modalities (art 21, 22):
13
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Mutual Insurance Mechanism (MIM): No
Restrictions on distribution of initial prefinancing: The prefinancing may be distributed only if the minimum number of
beneficiaries set out in the call condititions (if any) have acceded to the Agreement and only to beneficiaries that have
acceded.
Interim payment ceiling (if any): 90% of the maximum grant amount
No-profit rule: Yes
Late payment interest: ECB + 3.5%
Bank account for payments:
ES1101825566790011503217
Conversion into euros: Double conversion
Reporting language: Language of the Agreement
4.3 Certificates (art 24):
Certificates on the financial statements (CFS):
Conditions:
Schedule: interim/final payment, if threshold is reached
Standard threshold (beneficiary-level):
- financial statement: requested EU contribution to costs ≥ EUR 325 000.00
4.4 Recoveries (art 22)
First-line liability for recoveries:
Beneficiary termination: Beneficiary concerned
Final payment: Coordinator
After final payment: Beneficiary concerned
Joint and several liability for enforced recoveries (in case of non-payment):
Limited joint and several liability of other beneficiaries — up to the maximum grant amount of the beneficiary
Joint and several liability of affiliated entities — n/a
5. Consequences of non-compliance, applicable law & dispute settlement forum
Applicable law (art 43):
Standard applicable law regime: EU law + law of Belgium
Dispute settlement forum (art 43):
Standard dispute settlement forum:
EU beneficiaries: EU General Court + EU Court of Justice (on appeal)
14
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Non-EU beneficiaries: Courts of Brussels, Belgium (unless an international agreement provides for the
enforceability of EU court judgements)
6. Other
Specific rules (Annex 5): Yes
Standard time-limits after project end:
Confidentiality (for X years after final payment): 5
Record-keeping (for X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Reviews (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Audits (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
Extension of findings from other grants to this grant (no later than X years after final payment): 5 (or 3 for grants of
not more than EUR 60 000)
Impact evaluation (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000)
15
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and terms and conditions applicable to the grant
awarded for the implementation of the action set out in Chapter 2.
ARTICLE 2 — DEFINITIONS
For the purpose of this Agreement, the following definitions apply:
Actions — The project which is being funded in the context of this Agreement.
Grant — The grant awarded in the context of this Agreement.
EU grants — Grants awarded by EU institutions, bodies, offices or agencies (including EU executive
agencies, EU regulatory agencies, EDA, joint undertakings, etc.).
Participants — Entities participating in the action as beneficiaries, affiliated entities, associated
partners, third parties giving in-kind contributions, subcontractors or recipients of
financial support to third parties.
Beneficiaries (BEN) — The signatories of this Agreement (either directly or through an accession
form).
Affiliated entities (AE) — Entities affiliated to a beneficiary within the meaning of Article 187 of
EU Financial Regulation 2018/10464 which participate in the action with similar rights
and obligations as the beneficiaries (obligation to implement action tasks and right to
charge costs and claim contributions).
Associated partners (AP) — Entities which participate in the action, but without the right to charge
costs or claim contributions.
Purchases — Contracts for goods, works or services needed to carry out the action (e.g. equipment,
consumables and supplies) but which are not part of the action tasks (see Annex 1).
Subcontracting — Contracts for goods, works or services that are part of the action tasks (see Annex 1).
In-kind contributions — In-kind contributions within the meaning of Article 2(36) of EU Financial
4 For the definition, see Article 187 Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council
of 18 July 2018 on the financial rules applicable to the general budget of the Union, amending Regulations (EU)
No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013,
(EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom)
No 966/2012 (‘EU Financial Regulation’) (OJ L 193, 30.7.2018, p. 1): “affiliated entities [are]:
(a) entities that form a sole beneficiary [(i.e. where an entity is formed of several entities that satisfy the criteria for
being awarded a grant, including where the entity is specifically established for the purpose of implementing an
action to be financed by a grant)];
(b) entities that satisfy the eligibility criteria and that do not fall within one of the situations referred to in Article 136(1)
and 141(1) and that have a link with the beneficiary, in particular a legal or capital link, which is neither limited to
the action nor established for the sole purpose of its implementation”.
16
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Regulation 2018/1046, i.e. non-financial resources made available free of charge by
third parties.
Fraud — Fraud within the meaning of Article 3 of EU Directive 2017/13715 and Article 1 of the
Convention on the protection of the European Communities’ financial interests, drawn
up by the Council Act of 26 July 19956, as well as any other wrongful or criminal
deception intended to result in financial or personal gain.
Irregularities — Any type of breach (regulatory or contractual) which could impact the EU
financial interests, including irregularities within the meaning of Article 1(2) of EU
Regulation 2988/957.
Grave professional misconduct — Any type of unacceptable or improper behaviour in exercising one’s
profession, especially by employees, including grave professional misconduct within
the meaning of Article 136(1)(c) of EU Financial Regulation 2018/1046.
Applicable EU, international and national law — Any legal acts or other (binding or non-binding)
rules and guidance in the area concerned.
Portal — EU Funding & Tenders Portal; electronic portal and exchange system managed by the
European Commission and used by itself and other EU institutions, bodies, offices
or agencies for the management of their funding programmes (grants, procurements,
prizes, etc.).
CHAPTER 2 ACTION
ARTICLE 3 — ACTION
The grant is awarded for the action 101082572 — CIRCE-JA (‘action’), as described in Annex 1.
ARTICLE 4 — DURATION AND STARTING DATE
The duration and the starting date of the action are set out in the Data Sheet (see Point 1).
CHAPTER 3 GRANT
ARTICLE 5 — GRANT
5.1 Form of grant
The grant is an action grant8 which takes the form of a budget-based mixed actual cost grant (i.e. a
5 Directive (EU) 2017/1371 of the European Parliament and of the Council of 5 July 2017 on the fight against fraud to
the Union’s financial interests by means of criminal law (OJ L 198, 28.7.2017, p. 29).
6 OJ C 316, 27.11.1995, p. 48.
7 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities
financial interests (OJ L 312, 23.12.1995, p. 1).
8 For the definition, see Article 180(2)(a) EU Financial Regulation 2018/1046: ‘action grant’ means an EU grant to
finance “an action intended to help achieve a Union policy objective”.
17
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
grant based on actual costs incurred, but which may also include other forms of funding, such as unit
costs or contributions, flat-rate costs or contributions, lump sum costs or contributions or financing
not linked to costs).
5.2 Maximum grant amount
The maximum grant amount is set out in the Data Sheet (see Point 3) and in the estimated budget
(Annex 2).
5.3 Funding rate
The funding rate for costs is 80% of the action’s eligible costs.
Contributions are not subject to any funding rate.
5.4 Estimated budget, budget categories and forms of funding
The estimated budget for the action is set out in Annex 2.
It contains the estimated eligible costs and contributions for the action, broken down by participant
and budget category.
Annex 2 also shows the types of costs and contributions (forms of funding)9 to be used for each budget
category.
If unit costs or contributions are used, the details on the calculation will be explained in Annex 2a.
5.5 Budget flexibility
The budget breakdown may be adjusted — without an amendment (see Article 39) — by transfers
(between participants and budget categories), as long as this does not imply any substantive or
important change to the description of the action in Annex 1.
However:
- changes to the budget category for volunteers (if used) always require an amendment
- changes to budget categories with lump sums costs or contributions (if used; including
financing not linked to costs) always require an amendment
- changes to budget categories with higher funding rates or budget ceilings (if used) always
require an amendment
- addition of amounts for subcontracts not provided for in Annex 1 either require an amendment
or simplified approval in accordance with Article 6.2
- other changes require an amendment or simplified approval, if specifically provided for in
Article 6.2
- flexibility caps: not applicable.
9 See Article 125 EU Financial Regulation 2018/1046.
18
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS
In order to be eligible, costs and contributions must meet the eligibility conditions set out in this
Article.
6.1 General eligibility conditions
The general eligibility conditions are the following:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary
(ii) they must be incurred in the period set out in Article 4 (with the exception of costs relating
to the submission of the final periodic report, which may be incurred afterwards; see
Article 21)
(iii) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s
accounts in accordance with the accounting standards applicable in the country where
the beneficiary is established and with the beneficiary’s usual cost accounting practices
(vi) they must comply with the applicable national law on taxes, labour and social security
and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency
(b) for unit costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the units must:
- be actually used or produced by the beneficiary in the period set out in Article 4
(with the exception of units relating to the submission of the final periodic report,
which may be used or produced afterwards; see Article 21)
- be necessary for the implementation of the action and
(iii) the number of units must be identifiable and verifiable, in particular supported by records
and documentation (see Article 20)
(c) for flat-rate costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
19
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(ii) the costs or contributions to which the flat-rate is applied must:
- be eligible
- relate to the period set out in Article 4 (with the exception of costs or contributions
relating to the submission of the final periodic report, which may be incurred
afterwards; see Article 21)
(d) for lump sum costs or contributions (if any):
(i) they must be declared under one of the budget categories set out in Article 6.2 and
Annex 2
(ii) the work must be properly implemented by the beneficiary in accordance with Annex 1
(iii) the deliverables/outputs must be achieved in the period set out in Article 4 (with the
exception of deliverables/outputs relating to the submission of the final periodic report,
which may be achieved afterwards; see Article 21)
(e) for unit, flat-rate or lump sum costs or contributions according to usual cost accounting
practices (if any):
(i) they must fulfil the general eligibility conditions for the type of cost concerned
(ii) the cost accounting practices must be applied in a consistent manner, based on objective
criteria, regardless of the source of funding
(f) for financing not linked to costs (if any): the results must be achieved or the conditions must
be fulfilled as described in Annex 1.
In addition, for direct cost categories (e.g. personnel, travel & subsistence, subcontracting and other
direct costs) only costs that are directly linked to the action implementation and can therefore be
attributed to it directly are eligible. They must not include any indirect costs (i.e. costs that are only
indirectly linked to the action, e.g. via cost drivers).
6.2 Specific eligibility conditions for each budget category
For each budget category, the specific eligibility conditions are as follows:
Direct costs
A. Personnel costs
A.1 Costs for employees (or equivalent) are eligible as personnel costs if they fulfil the general
eligibility conditions and are related to personnel working for the beneficiary under an employment
contract (or equivalent appointing act) and assigned to the action.
They must be limited to salaries, social security contributions, taxes and other costs linked to the
remuneration, if they arise from national law or the employment contract (or equivalent appointing
act) and be calculated on the basis of the costs actually incurred, in accordance with the following
method:
20
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
{daily rate for the person
multiplied by
number of day-equivalents worked on the action (rounded up or down to the nearest half-day)}.
The daily rate must be calculated as:
{annual personnel costs for the person
divided by
215}.
The number of day-equivalents declared for a person must be identifiable and verifiable (see
Article 20).
The total number of day-equivalents declared in EU grants, for a person for a year, cannot be higher
than 215.
The personnel costs may also include supplementary payments for personnel assigned to the action
(including payments on the basis of supplementary contracts regardless of their nature), if:
- it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required
- the criteria used to calculate the supplementary payments are objective and generally applied
by the beneficiary, regardless of the source of funding used.
A.2 and A.3 Costs for natural persons working under a direct contract other than an employment
contract and costs for seconded persons by a third party against payment are also eligible as
personnel costs, if they are assigned to the action, fulfil the general eligibility conditions and:
(a) work under conditions similar to those of an employee (in particular regarding the way the
work is organised, the tasks that are performed and the premises where they are performed) and
(b) the result of the work belongs to the beneficiary (unless agreed otherwise).
They must be calculated on the basis of a rate which corresponds to the costs actually incurred for
the direct contract or secondment and must not be significantly different from those for personnel
performing similar tasks under an employment contract with the beneficiary.
A.4 The work of SME owners for the action (i.e. owners of beneficiaries that are small and medium-
sized enterprises10 not receiving a salary) or natural person beneficiaries (i.e. beneficiaries that are
natural persons not receiving a salary) may be declared as personnel costs, if they fulfil the general
10 For the definition, see Commission Recommendation 2003/361/EC: micro, small or medium-sized enterprise (SME)
are enterprises
- engaged in an economic activity, irrespective of their legal form (including, in particular, self- employed persons
and family businesses engaged in craft or other activities, and partnerships or associations regularly engaged
in an economic activity) and
- employing fewer than 250 persons (expressed in ‘annual working units’ as defined in Article 5 of the
Recommendation) and which have an annual turnover not exceeding EUR 50 million, and/or an annual balance
sheet total not exceeding EUR 43 million.
21
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
eligibility conditions and are calculated as unit costs in accordance with the method set out in Annex
2a.
B. Subcontracting costs
Subcontracting costs for the action (including related duties, taxes and charges, such as non-
deductible or non-refundable value added tax (VAT)) are eligible, if they are calculated on the basis
of the costs actually incurred, fulfil the general eligibility conditions and are awarded using the
beneficiary’s usual purchasing practices — provided these ensure subcontracts with best value for
money (or if appropriate the lowest price) and that there is no conflict of interests (see Article 12).
Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on
public procurement must also comply with the applicable national law on public procurement.
Subcontracting may cover only a limited part of the action.
The tasks to be subcontracted and the estimated cost for each subcontract must be set out in Annex 1
and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2 (or may
be approved ex post in the periodic report, if the use of subcontracting does not entail changes to the
Agreement which would call into question the decision awarding the grant or breach the principle of
equal treatment of applicants; ‘simplified approval procedure’).
C. Purchase costs
Purchase costs for the action (including related duties, taxes and charges, such as non-deductible or
non-refundable value added tax (VAT)) are eligible if they fulfil the general eligibility conditions and
are bought using the beneficiary’s usual purchasing practices — provided these ensure purchases with
best value for money (or if appropriate the lowest price) and that there is no conflict of interests (see
Article 12).
Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on
public procurement must also comply with the applicable national law on public procurement.
C.1 Travel and subsistence
Purchases for travel, accommodation and subsistence must be calculated as follows:
- travel: as unit costs in accordance with the method set out in Annex 2a if covered by Decision
C(2021)3511 or otherwise as costs actually incurred and in line with the beneficiary’s usual
practices on travel
- accommodation: as unit costs in accordance with the method set out in Annex 2a if covered by
Decision C(2021)3512 or otherwise as costs actually incurred and in line with the beneficiary’s
usual practices on travel
- subsistence: as unit costs in accordance with the method set out in Annex 2a if covered by
11 Commission Decision of 12 January 2021 authorising the use of unit costs for travel, accommodation and subsistence
costs under an action or work programme under the 2021-2027 multi-annual financial framework (C(2021)35).
12 Commission Decision of 12 January 2021 authorising the use of unit costs for travel, accommodation and subsistence
costs under an action or work programme under the 2021-2027 multi-annual financial framework (C(2021)35).
22
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Decision C(2021)3513 or otherwise as costs actually incurred and in line with the beneficiary’s
usual practices on travel.
C.2 Equipment
Purchases of equipment, infrastructure or other assets used for the action must be declared as
depreciation costs, calculated on the basis of the costs actually incurred and written off in accordance
with international accounting standards and the beneficiary’s usual accounting practices.
Only the portion of the costs that corresponds to the rate of actual use for the action during the action
duration can be taken into account.
Costs for renting or leasing equipment, infrastructure or other assets are also eligible, if they do not
exceed the depreciation costs of similar equipment, infrastructure or assets and do not include any
financing fees.
C.3 Other goods, works and services
Purchases of other goods, works and services must be calculated on the basis of the costs actually
incurred.
Such goods, works and services include, for instance, consumables and supplies, promotion,
dissemination, protection of results, translations, publications, certificates and financial guarantees,
if required under the Agreement.
D. Other cost categories
D.1 Financial support to third parties
Costs for providing financial support to third parties (in the form of grants, prizes or similar
forms of support; if any) are eligible, if and as declared eligible in the call conditions, if they fulfil the
general eligibility conditions, are calculated on the basis of the costs actually incurred and the support
is implemented in accordance with the conditions set out in Annex 1.
These conditions must ensure objective and transparent selection procedures and include at least the
following:
(a) for grants (or similar):
(i) the maximum amount of financial support for each third party (‘recipient’); this amount
may not exceed the amount set out in the Data Sheet (see Point 3) or otherwise agreed
with the granting authority
(ii) the criteria for calculating the exact amount of the financial support
(iii) the different types of activity that qualify for financial support, on the basis of a closed list
(iv) the persons or categories of persons that will be supported and
(v) the criteria and procedures for giving financial support
13 Commission Decision of 12 January 2021 authorising the use of unit costs for travel, accommodation and subsistence
costs under an action or work programme under the 2021-2027 multi-annual financial framework (C(2021)35).
23
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(b) for prizes (or similar):
(i) the eligibility and award criteria
(ii) the amount of the prize and
(iii) the payment arrangements.
Indirect costs
E. Indirect costs
Indirect costs will be reimbursed at the flat-rate of 7% of the eligible direct costs (categories A-D,
except volunteers costs and exempted specific cost categories, if any).
Contributions
Not applicable
6.3 Ineligible costs and contributions
The following costs or contributions are ineligible:
(a) costs or contributions that do not comply with the conditions set out above (Article 6.1 and
6.2), in particular:
(i) costs related to return on capital and dividends paid by a beneficiary
(ii) debt and debt service charges
(iii) provisions for future losses or debts
(iv) interest owed
(v) currency exchange losses
(vi) bank costs charged by the beneficiary’s bank for transfers from the granting authority
(vii) excessive or reckless expenditure
(viii) deductible or refundable VAT (including VAT paid by public bodies acting as public
authority)
(ix) costs incurred or contributions for activities implemented during grant agreement
suspension (see Article 31)
(x) in-kind contributions by third parties
(b) costs or contributions declared under other EU grants (or grants awarded by an EU Member
State, non-EU country or other body implementing the EU budget), except for the following
cases:
(i) Synergy actions: not applicable
24
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(ii) if the action grant is combined with an operating grant14 running during the same period
and the beneficiary can demonstrate that the operating grant does not cover any (direct
or indirect) costs of the action grant
(c) costs or contributions for staff of a national (or regional/local) administration, for activities that
are part of the administration’s normal activities (i.e. not undertaken only because of the grant)
(d) costs or contributions (especially travel and subsistence) for staff or representatives of EU
institutions, bodies or agencies
(e) other :
(i) country restrictions for eligible costs: not applicable
(ii) costs or contributions declared specifically ineligible in the call conditions.
6.4 Consequences of non-compliance
If a beneficiary declares costs or contributions that are ineligible, they will be rejected (see Article 27).
This may also lead to other measures described in Chapter 5.
CHAPTER 4 GRANT IMPLEMENTATION
SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER
PARTICIPANTS
ARTICLE 7 — BENEFICIARIES
The beneficiaries, as signatories of the Agreement, are fully responsible towards the granting authority
for implementing it and for complying with all its obligations.
They must implement the Agreement to their best abilities, in good faith and in accordance with all
the obligations and terms and conditions it sets out.
They must have the appropriate resources to implement the action and implement the action under
their own responsibility and in accordance with Article 11. If they rely on affiliated entities or other
participants (see Articles 8 and 9), they retain sole responsibility towards the granting authority and
the other beneficiaries.
They are jointly responsible for the technical implementation of the action. If one of the beneficiaries
fails to implement their part of the action, the other beneficiaries must ensure that this part is
implemented by someone else (without being entitled to an increase of the maximum grant amount
and subject to an amendment; see Article 39). The financial responsibility of each beneficiary in case
of recoveries is governed by Article 22.
14 For the definition, see Article 180(2)(b) of EU Financial Regulation 2018/1046: ‘operating grant’ means an EU grant
to finance “the functioning of a body which has an objective forming part of and supporting an EU policy”.
25
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
The beneficiaries (and their action) must remain eligible under the EU programme funding the grant
for the entire duration of the action. Costs and contributions will be eligible only as long as the
beneficiary and the action are eligible.
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Portal Participant Register up to date (see Article 19)
(ii) inform the granting authority (and the other beneficiaries) immediately of any events or
circumstances likely to affect significantly or delay the implementation of the action (see
Article 19)
(iii) submit to the coordinator in good time:
- the prefinancing guarantees (if required; see Article 23)
- the financial statements and certificates on the financial statements (CFS) (if
required; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
- the contribution to the deliverables and technical reports (see Article 21)
- any other documents or information required by the granting authority under the
Agreement
(iv) submit via the Portal data and information related to the participation of their affiliated
entities.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 11)
(ii) act as the intermediary for all communications between the consortium and the granting
authority, unless the Agreement or granting authority specifies otherwise, and in
particular:
- submit the prefinancing guarantees to the granting authority (if any)
- request and review any documents or information required and verify their quality
and completeness before passing them on to the granting authority
- submit the deliverables and reports to the granting authority
- inform the granting authority about the payments made to the other beneficiaries
(report on the distribution of payments; if required, see Articles 22 and 32)
(iii) distribute the payments received from the granting authority to the other beneficiaries
without unjustified delay (see Article 22).
The coordinator may not delegate or subcontract the above-mentioned tasks to any other beneficiary
or third party (including affiliated entities).
26
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
However, coordinators which are public bodies may delegate the tasks set out in Point (b)(ii) last
indent and (iii) above to entities with ‘authorisation to administer’ which they have created or which
are controlled by or affiliated to them. In this case, the coordinator retains sole responsibility for the
payments and for compliance with the obligations under the Agreement.
Moreover, coordinators which are ‘sole beneficiaries’15 (or similar, such as European research
infrastructure consortia (ERICs)) may delegate the tasks set out in Point (b)(i) to (iii) above to one of
their members. The coordinator retains sole responsibility for compliance with the obligations under
the Agreement.
The beneficiaries must have internal arrangements regarding their operation and co-ordination, to
ensure that the action is implemented properly.
If required by the granting authority (see Data Sheet, Point 1), these arrangements must be set out in
a written consortium agreement between the beneficiaries, covering for instance:
- the internal organisation of the consortium
- the management of access to the Portal
- different distribution keys for the payments and financial responsibilities in case of recoveries
(if any)
- additional rules on rights and obligations related to background and results (see Article 16)
- settlement of internal disputes
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The internal arrangements must not contain any provision contrary to this Agreement.
ARTICLE 8 — AFFILIATED ENTITIES
The following entities which are linked to a beneficiary will participate in the action as ‘affiliated
entities’:
- FUNDACION PUBLICA ANDALUZA PROGRESO Y SALUD M.P. (FPS), PIC
998619463, linked to SERVICIO ANDALUZ DE SALUD (SAS)
- SERVIZO GALEGO DE SAUDE (SERGAS), PIC 974720409, linked to SERVICIO
ANDALUZ DE SALUD (SAS)
- AXENCIA GALEGA PARA A XESTION DO CONECEMENTO EN SAUDE (ACIS),
PIC 923156858, linked to SERVICIO ANDALUZ DE SALUD (SAS)
- AGENCIA DE QUALITAT I AVALUACIO SANITARIES DE CATALUNYA (AQUAS),
PIC 949799169, linked to SERVICIO ANDALUZ DE SALUD (SAS)
- FUNDACION PARA EL FOMENTO DE LA INVESTIGACION SANITARIA Y
15 For the definition, see Article 187(2) EU Financial Regulation 2018/1046: “Where several entities satisfy the criteria
for being awarded a grant and together form one entity, that entity may be treated as the sole beneficiary, including
where it is specifically established for the purpose of implementing the action financed by the grant.”
27
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
BIOMEDICA DE LA COMUNITAT VALENCIANA (FISABIO), PIC 951714046, linked
to SERVICIO ANDALUZ DE SALUD (SAS)
- FUNDACION INSTITUTO DE INVESTIGACION MARQUES DE VALDECILLA
(IDIVAL), PIC 946556944, linked to SERVICIO ANDALUZ DE SALUD (SAS)
- Servicio Cántabro de Salud (SCS), PIC 991294023, linked to SERVICIO ANDALUZ DE
SALUD (SAS)
- SERVICIO MADRILENO DE SALUD (SERMAS), PIC 999481987, linked to SERVICIO
ANDALUZ DE SALUD (SAS)
- FUNDACION PARA LA INVESTIGACION E INNOVACION BIOSANITARIA DE
ATENCION PRIMARIA (FIIBAP), PIC 919231753, linked to SERVICIO ANDALUZ DE
SALUD (SAS)
- AZIENDA UNITA SANITARIA LOCALE UMBRIA N 2 (uslumbria2), PIC 885492922,
linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- ASUR MARCHE (ASUR), PIC 925596408, linked to AGENZIA NAZIONALE PER I
SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA SANITARIA LOCALE CN2 (ASLCN2), PIC 945430289, linked to AGENZIA
NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- ASL AL (ASL AL), PIC 906491870, linked to AGENZIA NAZIONALE PER I SERVIZI
SANITARI REGIONALI (AGE.NA.S)
- AZIENDA SANITARIA LOCALE ROMA 1 (ASL ROMA 1), PIC 912924134, linked to
AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA UNITA SANITARIA LOCALE ROMAD (ASL Roma D), PIC 952673473,
linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA SANITARIA LOCALE VITERBO (AUSL VITERBO), PIC 936372720, linked
to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AGENZIA DI TUTELA DELLA SALUTE DI BERGAMO (ATS Bergamo), PIC
906119875, linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI
(AGE.NA.S)
- AZIENDA LIGURE SANITARIA DELLA REGIONE LIGURIA (A.LI.SA.), PIC
932080179, linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI
(AGE.NA.S)
- AZIENDA SOCIOSANITARIA LIGURE N. 1 (Liguria ASL 1), PIC 888215518, linked to
AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA SANITARIA LIGURE 4 CHIAVARESE (Liguria ASL 4), PIC 885485550,
linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA SANITARIA UNIVERSITARIA GIULIANO ISONTINA (ASUGI), PIC
28
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
895742718, linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI
(AGE.NA.S)
- AZIENDA UNITA SANITARIA LOCALE DI TERAMO (ASL TERAMO), PIC
893843458, linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI
(AGE.NA.S)
- AZIENDA UNITA' SANITARIA LOCALE DI BOLOGNA (BOLOGNA), PIC
951425568, linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI
(AGE.NA.S)
- AZIENDA UNITA SANITARIA LOCALE DI MODENA (MODENA), PIC 999571518,
linked to AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA USL DI PARMA (PARMA), PIC 919552726, linked to AGENZIA NAZIONALE
PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA USL DELLA ROMAGNA (ROMAGNA), PIC 911127209, linked to AGENZIA
NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- AZIENDA SANITARIA LOCALE ROMA 2 (ASL ROMA 2), PIC 887912296, linked to
AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S)
- UNIVERSITATEA DE MEDICINA SI FARMACIE CAROL DAVILA DIN
BUCURESTI (UMF-CD), PIC 999875613, linked to MINISTERUL SANATATII (MS-MoH)
- INSTITUTUL NATIONAL DE SANATATE PUBLICA (INSP), PIC 985926237, linked to
MINISTERUL SANATATII (MS-MoH)
- MINISTERIO DA SAUDE - REPUBLICA PORTUGUESA (MS-DGS), PIC 986364095,
linked to ADMINISTRACAO CENTRAL DO SISTEMA DESAUDE IP (ACSS)
- UNIDADE LOCAL DE SAUDE DE MATOSINHOS EPE (ULSM), PIC 951404907, linked
to ADMINISTRACAO CENTRAL DO SISTEMA DESAUDE IP (ACSS)
- CENTRO HOSPITALAR DE LISBOA CENTRAL, EPE (CHLC), PIC 940798539, linked
to ADMINISTRACAO CENTRAL DO SISTEMA DESAUDE IP (ACSS)
- CENTRO HOSPITALAR DE LISBOA OCIDENTAL EPE (CHLO), PIC 898131925,
linked to ADMINISTRACAO CENTRAL DO SISTEMA DESAUDE IP (ACSS)
- ADMINISTRACAO REGIONAL DE SAUDE DE LISBOA E VALE DO TEJO I P
(ARSLVT), PIC 885184365, linked to ADMINISTRACAO CENTRAL DO SISTEMA
DESAUDE IP (ACSS)
- TARTU ULIKOOL (UTARTU), PIC 999895013, linked to SOTSIAALMINISTEERIUM
(MSAE)
Affiliated entities can charge costs and contributions to the action under the same conditions as the
beneficiaries and must implement the action tasks attributed to them in Annex 1 in accordance with
Article 11.
29
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Their costs and contributions will be included in Annex 2 and will be taken into account for the
calculation of the grant.
The beneficiaries must ensure that all their obligations under this Agreement also apply to their
affiliated entities.
The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF,
Court of Auditors (ECA), etc.) can exercise their rights also towards the affiliated entities.
Breaches by affiliated entities will be handled in the same manner as breaches by beneficiaries.
Recovery of undue amounts will be handled through the beneficiaries.
If the granting authority requires joint and several liability of affiliated entities (see Data Sheet,
Point 4.4), they must sign the declaration set out in Annex 3a and may be held liable in case of enforced
recoveries against their beneficiaries (see Article 22.2 and 22.4).
ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION
9.1 Associated partners
Not applicable
9.2 Third parties giving in-kind contributions to the action
Other third parties may give in-kind contributions to the action (i.e. personnel, equipment, other goods,
works and services, etc. which are free-of-charge), if necessary for the implementation.
Third parties giving in-kind contributions do not implement any action tasks. They may not charge
costs or contributions to the action and the costs for the in-kind contributions are not eligible.
The third parties and their in-kind contributions should be set out in Annex 1.
9.3 Subcontractors
Subcontractors may participate in the action, if necessary for the implementation.
Subcontractors must implement their action tasks in accordance with Article 11. The costs for the
subcontracted tasks (invoiced price from the subcontractor) are eligible and may be charged by the
beneficiaries, under the conditions set out in Article 6. The costs will be included in Annex 2 as part
of the beneficiaries’ costs.
The beneficiaries must ensure that their contractual obligations under Articles 11 (proper
implementation), 12 (conflict of interest), 13 (confidentiality and security), 14 (ethics), 17.2
(visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping) also
apply to the subcontractors.
The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF,
Court of Auditors (ECA), etc.) can exercise their rights also towards the subcontractors.
9.4 Recipients of financial support to third parties
If the action includes providing financial support to third parties (e.g. grants, prizes or similar forms of
30
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
support), the beneficiaries must ensure that their contractual obligations under Articles 12 (conflict of
interest), 13 (confidentiality and security), 14 (ethics), 17.2 (visibility), 18 (specific rules for carrying
out action), 19 (information) and 20 (record-keeping)also apply to the third parties receiving the
support (recipients).
The beneficiaries must also ensure that the bodies mentioned in Article 25 (e.g. granting authority,
OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the recipients.
ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS
10.1 Non-EU participants
Participants which are established in a non-EU country (if any) undertake to comply with their
obligations under the Agreement and:
- to respect general principles (including fundamental rights, values and ethical principles,
environmental and labour standards, rules on classified information, intellectual property
rights, visibility of funding and protection of personal data)
- for the submission of certificates under Article 24: to use qualified external auditors which
are independent and comply with comparable standards as those set out in EU Directive
2006/43/EC16
- for the controls under Article 25: to allow for checks, reviews, audits and investigations
(including on-the-spot checks, visits and inspections) by the bodies mentioned in that Article
(e.g. granting authority, OLAF, Court of Auditors (ECA), etc.).
Special rules on dispute settlement apply (see Data Sheet, Point 5).
10.2 Participants which are international organisations
Participants which are international organisations (IOs; if any) undertake to comply with their
obligations under the Agreement and:
- to respect general principles (including fundamental rights, values and ethical principles,
environmental and labour standards, rules on classified information, intellectual property
rights, visibility of funding and protection of personal data)
- for the submission of certificates under Article 24: to use either independent public officers or
external auditors which comply with comparable standards as those set out in EU Directive
2006/43/EC
- for the controls under Article 25: to allow for the checks, reviews, audits and investigations
by the bodies mentioned in that Article, taking into account the specific agreements concluded
by them and the EU (if any).
For such participants, nothing in the Agreement will be interpreted as a waiver of their privileges or
immunities, as accorded by their constituent documents or international law.
16 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
31
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Special rules on applicable law and dispute settlement apply (see Article 43 and Data Sheet, Point 5).
10.3 Pillar-assessed participants
Pillar-assessed participants (if any) may rely on their own systems, rules and procedures, in so far as
they have been positively assessed and do not call into question the decision awarding the grant or
breach the principle of equal treatment of applicants or beneficiaries.
‘Pillar-assessment’ means a review by the European Commission on the systems, rules and procedures
which participants use for managing EU grants (in particular internal control system, accounting
system, external audits, financing of third parties, rules on recovery and exclusion, information on
recipients and protection of personal data; see Article 154 EU Financial Regulation 2018/1046).
Participants with a positive pillar assessment may rely on their own systems, rules and procedures,
in particular for:
- record-keeping (Article 20): may be done in accordance with internal standards, rules and
procedures
- currency conversion for financial statements (Article 21): may be done in accordance with
usual accounting practices
- guarantees (Article 23): for public law bodies, prefinancing guarantees are not needed
- certificates (Article 24):
- certificates on the financial statements (CFS): may be provided by their regular internal
or external auditors and in accordance with their internal financial regulations and
procedures
- certificates on usual accounting practices (CoMUC): are not needed if those practices
are covered by an ex-ante assessment
and use the following specific rules, for:
- recoveries (Article 22): in case of financial support to third parties, there will be no recovery if
the participant has done everything possible to retrieve the undue amounts from the third party
receiving the support (including legal proceedings) and non-recovery is not due to an error or
negligence on its part
- checks, reviews, audits and investigations by the EU (Article 25): will be conducted taking
into account the rules and procedures specifically agreed between them and the framework
agreement (if any)
- impact evaluation (Article 26): will be conducted in accordance with the participant’s internal
rules and procedures and the framework agreement (if any)
- grant agreement suspension (Article 31): certain costs incurred during grant suspension are
eligible (notably, minimum costs necessary for a possible resumption of the action and costs
relating to contracts which were entered into before the pre-information letter was received and
which could not reasonably be suspended, reallocated or terminated on legal grounds)
32
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
- grant agreement termination (Article 32): the final grant amount and final payment will be
calculated taking into account also costs relating to contracts due for execution only after
termination takes effect, if the contract was entered into before the pre-information letter was
received and could not reasonably be terminated on legal grounds
- liability for damages (Article 33.2): the granting authority must be compensated for damage
it sustains as a result of the implementation of the action or because the action was not
implemented in full compliance with the Agreement only if the damage is due to an
infringement of the participant’s internal rules and procedures or due to a violation of third
parties’ rights by the participant or one of its employees or individual for whom the employees
are responsible.
Participants whose pillar assessment covers procurement and granting procedures may also do
purchases, subcontracting and financial support to third parties (Article 6.2) in accordance with their
internal rules and procedures for purchases, subcontracting and financial support.
Participants whose pillar assessment covers data protection rules may rely on their internal standards,
rules and procedures for data protection (Article 15).
The participants may however not rely on provisions which would breach the principle of equal
treatment of applicants or beneficiaries or call into question the decision awarding the grant, such as
in particular:
- eligibility (Article 6)
- consortium roles and set-up (Articles 7-9)
- security and ethics (Articles 13, 14)
- IPR (including background and results, access rights and rights of use), communication,
dissemination and visibility (Articles 16 and 17)
- information obligation (Article 19)
- payment, reporting and amendments (Articles 21, 22 and 39)
- rejections, reductions, suspensions and terminations (Articles 27, 28, 29-32)
If the pillar assessment was subject to remedial measures, reliance on the internal systems, rules and
procedures is subject to compliance with those remedial measures.
Participants whose assessment has not yet been updated to cover (the new rules on) data protection
may rely on their internal systems, rules and procedures, provided that they ensure that personal data is:
- processed lawfully, fairly and in a transparent manner in relation to the data subject
- collected for specified, explicit and legitimate purposes and not further processed in a manner
that is incompatible with those purposes
- adequate, relevant and limited to what is necessary in relation to the purposes for which they
are processed
- accurate and, where necessary, kept up to date
33
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
- kept in a form which permits identification of data subjects for no longer than is necessary for
the purposes for which the data is processed and
- processed in a manner that ensures appropriate security of the personal data.
Participants must inform the coordinator without delay of any changes to the systems, rules and
procedures that were part of the pillar assessment. The coordinator must immediately inform the
granting authority.
Pillar-assessed participants that have also concluded a framework agreement with the EU, may
moreover — under the same conditions as those above (i.e. not call into question the decision awarding
the grant or breach the principle of equal treatment of applicants or beneficiaries) — rely on the
provisions set out in that framework agreement.
SECTION 2 RULES FOR CARRYING OUT THE ACTION
ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION
11.1 Obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement, the call conditions and all legal obligations under applicable EU,
international and national law.
11.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 12 — CONFLICT OF INTERESTS
12.1 Conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the Agreement could be compromised for reasons involving family, emotional life,
political or national affinity, economic interest or any other direct or indirect interest (‘conflict of
interests’).
They must formally notify the granting authority without delay of any situation constituting or likely
to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The granting authority may verify that the measures taken are appropriate and may require additional
measures to be taken by a specified deadline.
12.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28) and the grant or the beneficiary may be terminated (see Article 32).
34
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 13 — CONFIDENTIALITY AND SECURITY
13.1 Sensitive information
The parties must keep confidential any data, documents or other material (in any form) that is identified
as sensitive in writing (‘sensitive information’) — during the implementation of the action and for at
least until the time-limit set out in the Data Sheet (see Point 6).
If a beneficiary requests, the granting authority may agree to keep such information confidential for
a longer period.
Unless otherwise agreed between the parties, they may use sensitive information only to implement
the Agreement.
The beneficiaries may disclose sensitive information to their personnel or other participants involved
in the action only if they:
(a) need to know it in order to implement the Agreement and
(b) are bound by an obligation of confidentiality.
The granting authority may disclose sensitive information to its staff and to other EU institutions and
bodies.
It may moreover disclose sensitive information to third parties, if:
(a) this is necessary to implement the Agreement or safeguard the EU financial interests and
(b) the recipients of the information are bound by an obligation of confidentiality.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party
(b) the information becomes publicly available, without breaching any confidentiality obligation
(c) the disclosure of the sensitive information is required by EU, international or national law.
Specific confidentiality rules (if any) are set out in Annex 5.
13.2 Classified information
The parties must handle classified information in accordance with the applicable EU, international or
national law on classified information (in particular, Decision 2015/44417 and its implementing rules).
Deliverables which contain classified information must be submitted according to special procedures
agreed with the granting authority.
17 Commission Decision 2015/444/EC, Euratom of 13 March 2015 on the security rules for protecting EU classified
information (OJ L 72, 17.3.2015, p. 53).
35
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Action tasks involving classified information may be subcontracted only after explicit approval (in
writing) from the granting authority.
Classified information may not be disclosed to any third party (including participants involved in the
action implementation) without prior explicit written approval from the granting authority.
Specific security rules (if any) are set out in Annex 5.
13.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 14 — ETHICS AND VALUES
14.1 Ethics
The action must be carried out in line with the highest ethical standards and the applicable EU,
international and national law on ethical principles.
Specific ethics rules (if any) are set out in Annex 5.
14.2 Values
The beneficiaries must commit to and ensure the respect of basic EU values (such as respect for
human dignity, freedom, democracy, equality, the rule of law and human rights, including the rights
of minorities).
Specific rules on values (if any) are set out in Annex 5.
14.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 15 — DATA PROTECTION
15.1 Data processing by the granting authority
Any personal data under the Agreement will be processed under the responsibility of the data
controller of the granting authority in accordance with and for the purposes set out in the Portal Privacy
Statement.
For grants where the granting authority is the European Commission, an EU regulatory or executive
agency, joint undertaking or other EU body, the processing will be subject to Regulation 2018/172518.
18 Regulation (EU) 2018/1725 of the European Parliament and of the Council of 23 October 2018 on the protection of
natural persons with regard to the processing of personal data by the Union institutions, bodies, offices and agencies
36
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
15.2 Data processing by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with the applicable
EU, international and national law on data protection (in particular, Regulation 2016/67919).
They must ensure that personal data is:
- processed lawfully, fairly and in a transparent manner in relation to the data subjects
- collected for specified, explicit and legitimate purposes and not further processed in a manner
that is incompatible with those purposes
- adequate, relevant and limited to what is necessary in relation to the purposes for which they
are processed
- accurate and, where necessary, kept up to date
- kept in a form which permits identification of data subjects for no longer than is necessary for
the purposes for which the data is processed and
- processed in a manner that ensures appropriate security of the data.
The beneficiaries may grant their personnel access to personal data only if it is strictly necessary
for implementing, managing and monitoring the Agreement. The beneficiaries must ensure that the
personnel is under a confidentiality obligation.
The beneficiaries must inform the persons whose data are transferred to the granting authority and
provide them with the Portal Privacy Statement.
15.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND
RESULTS —ACCESS RIGHTS AND RIGHTS OF USE
16.1 Background and access rights to background
The beneficiaries must give each other and the other participants access to the background identified
as needed for implementing the action, subject to any specific rules in Annex 5.
‘Background’ means any data, know-how or information — whatever its form or nature (tangible or
intangible), including any rights such as intellectual property rights — that is:
and on the free movement of such data, and repealing Regulation (EC) No 45/2001 and Decision No 1247/2002/EC
(OJ L 295, 21.11.2018, p. 39).
19 Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural
persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive
95/46/EC (‘GDPR’) (OJ L 119, 4.5.2016, p. 1).
37
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(a) held by the beneficiaries before they acceded to the Agreement and
(b) needed to implement the action or exploit the results.
If background is subject to rights of a third party, the beneficiary concerned must ensure that it is able
to comply with its obligations under the Agreement.
16.2 Ownership of results
The granting authority does not obtain ownership of the results produced under the action.
‘Results’ means any tangible or intangible effect of the action, such as data, know-how or information,
whatever its form or nature, whether or not it can be protected, as well as any rights attached to it,
including intellectual property rights.
16.3 Rights of use of the granting authority on materials, documents and information
received for policy, information, communication, dissemination and publicity purposes
The granting authority has the right to use non-sensitive information relating to the action and
materials and documents received from the beneficiaries (notably summaries for publication,
deliverables, as well as any other material, such as pictures or audio-visual material, in paper or
electronic form) for policy, information, communication, dissemination and publicity purposes —
during the action or afterwards.
The right to use the beneficiaries’ materials, documents and information is granted in the form of a
royalty-free, non-exclusive and irrevocable licence, which includes the following rights:
(a) use for its own purposes (in particular, making them available to persons working for the
granting authority or any other EU service (including institutions, bodies, offices, agencies,
etc.) or EU Member State institution or body; copying or reproducing them in whole or in part,
in unlimited numbers; and communication through press information services)
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes)
(c) editing or redrafting (including shortening, summarising, inserting other elements (e.g.
meta-data, legends, other graphic, visual, audio or text elements), extracting parts (e.g. audio
or video files), dividing into parts, use in a compilation)
(d) translation
(e) storage in paper, electronic or other form
(f) archiving, in line with applicable document-management rules
(g) the right to authorise third parties to act on its behalf or sub-license to third parties the modes
of use set out in Points (b), (c), (d) and (f), if needed for the information, communication and
publicity activity of the granting authority
38
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(h) processing, analysing, aggregating the materials, documents and information received and
producing derivative works.
The rights of use are granted for the whole duration of the industrial or intellectual property rights
concerned.
If materials or documents are subject to moral rights or third party rights (including intellectual
property rights or rights of natural persons on their image and voice), the beneficiaries must ensure
that they comply with their obligations under this Agreement (in particular, by obtaining the necessary
licences and authorisations from the rights holders concerned).
Where applicable, the granting authority will insert the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the [name of granting authority]
under conditions.”
16.4 Specific rules on IPR, results and background
Specific rules regarding intellectual property rights, results and background (if any) are set out in
Annex 5.
16.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such a breach may also lead to other measures described in Chapter 5.
ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY
17.1 Communication — Dissemination — Promoting the action
Unless otherwise agreed with the granting authority, the beneficiaries must promote the action and its
results by providing targeted information to multiple audiences (including the media and the public),
in accordance with Annex 1 and in a strategic, coherent and effective manner.
Before engaging in a communication or dissemination activity expected to have a major media impact,
the beneficiaries must inform the granting authority.
17.2 Visibility — European flag and funding statement
Unless otherwise agreed with the granting authority, communication activities of the beneficiaries
related to the action (including media relations, conferences, seminars, information material, such as
brochures, leaflets, posters, presentations, etc., in electronic form, via traditional or social media, etc.),
dissemination activities and any infrastructure, equipment, vehicles, supplies or major result funded
by the grant must acknowledge EU support and display the European flag (emblem) and funding
statement (translated into local languages, where appropriate):
39
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
The emblem must remain distinct and separate and cannot be modified by adding other visual
marks, brands or text.
Apart from the emblem, no other visual identity or logo may be used to highlight the EU support.
When displayed in association with other logos (e.g. of beneficiaries or sponsors), the emblem must
be displayed at least as prominently and visibly as the other logos.
For the purposes of their obligations under this Article, the beneficiaries may use the emblem without
first obtaining approval from the granting authority. This does not, however, give them the right to
exclusive use. Moreover, they may not appropriate the emblem or any similar trademark or logo, either
by registration or by any other means.
17.3 Quality of information — Disclaimer
Any communication or dissemination activity related to the action must use factually accurate
information.
Moreover, it must indicate the following disclaimer (translated into local languages where
appropriate):
“Funded by the European Union. Views and opinions expressed are however those of the author(s) only
and do not necessarily reflect those of the European Union or [name of the granting authority]. Neither
the European Union nor the granting authority can be held responsible for them.”
17.4 Specific communication, dissemination and visibility rules
Specific communication, dissemination and visibility rules (if any) are set out in Annex 5.
17.5 Consequences of non-compliance
40
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION
18.1 Specific rules for carrying out the action
Specific rules for implementing the action (if any) are set out in Annex 5.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such a breach may also lead to other measures described in Chapter 5.
SECTION 3 GRANT ADMINISTRATION
ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS
19.1 Information requests
The beneficiaries must provide — during the action or afterwards and in accordance with Article 7 —
any information requested in order to verify eligibility of the costs or contributions declared, proper
implementation of the action and compliance with the other obligations under the Agreement.
The information provided must be accurate, precise and complete and in the format requested,
including electronic format.
19.2 Participant Register data updates
The beneficiaries must keep — at all times, during the action or afterwards — their information stored
in the Portal Participant Register up to date, in particular, their name, address, legal representatives,
legal form and organisation type.
19.3 Information about events and circumstances which impact the action
The beneficiaries must immediately inform the granting authority (and the other beneficiaries) of any
of the following:
(a) events which are likely to affect or delay the implementation of the action or affect the EU’s
financial interests, in particular:
(i) changes in their legal, financial, technical, organisational or ownership situation
(including changes linked to one of the exclusion grounds listed in the declaration of
honour signed before grant signature)
(ii) linked action information: not applicable
41
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
19.4 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 20 — RECORD-KEEPING
20.1 Keeping records and supporting documents
The beneficiaries must — at least until the time-limit set out in the Data Sheet (see Point 6) — keep
records and other supporting documents to prove the proper implementation of the action in line with
the accepted standards in the respective field (if any).
In addition, the beneficiaries must — for the same period — keep the following to justify the amounts
declared:
(a) for actual costs: adequate records and supporting documents to prove the costs declared (such
as contracts, subcontracts, invoices and accounting records); in addition, the beneficiaries’
usual accounting and internal control procedures must enable direct reconciliation between
the amounts declared, the amounts recorded in their accounts and the amounts stated in the
supporting documents
(b) for flat-rate costs and contributions (if any): adequate records and supporting documents to
prove the eligibility of the costs or contributions to which the flat-rate is applied
(c) for the following simplified costs and contributions: the beneficiaries do not need to keep
specific records on the actual costs incurred, but must keep:
(i) for unit costs and contributions (if any): adequate records and supporting documents to
prove the number of units declared
(ii) for lump sum costs and contributions (if any): adequate records and supporting
documents to prove proper implementation of the work as described in Annex 1
(iii) for financing not linked to costs (if any): adequate records and supporting documents
to prove the achievement of the results or the fulfilment of the conditions as described
in Annex 1
(d) for unit, flat-rate and lump sum costs and contributions according to usual cost accounting
practices (if any): the beneficiaries must keep any adequate records and supporting documents
to prove that their cost accounting practices have been applied in a consistent manner, based on
objective criteria, regardless of the source of funding, and that they comply with the eligibility
conditions set out in Articles 6.1 and 6.2.
42
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Moreover, the following is needed for specific budget categories:
(e) for personnel costs: time worked for the beneficiary under the action must be supported
by declarations signed monthly by the person and their supervisor, unless another reliable
time-record system is in place; the granting authority may accept alternative evidence
supporting the time worked for the action declared, if it considers that it offers an adequate
level of assurance
(f) additional record-keeping rules: not applicable
The records and supporting documents must be made available upon request (see Article 19) or in the
context of checks, reviews, audits or investigations (see Article 25).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Article 25), the beneficiaries must keep these
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The granting authority may accept
non-original documents if they offer a comparable level of assurance.
20.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently
substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may
be reduced (see Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 21 — REPORTING
21.1 Continuous reporting
The beneficiaries must continuously report on the progress of the action (e.g. deliverables,
milestones, outputs/outcomes, critical risks, indicators, etc; if any), in the Portal Continuous
Reporting tool and in accordance with the timing and conditions it sets out (as agreed with the granting
authority).
Standardised deliverables (e.g. progress reports not linked to payments, reports on cumulative
expenditure, special reports, etc; if any) must be submitted using the templates published on the Portal.
21.2 Periodic reporting: Technical reports and financial statements
In addition, the beneficiaries must provide reports to request payments, in accordance with the
schedule and modalities set out in the Data Sheet (see Point 4.2):
- for additional prefinancings (if any): an additional prefinancing report
- for interim payments (if any) and the final payment: a periodic report.
The prefinancing and periodic reports include a technical and financial part.
43
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
The technical part includes an overview of the action implementation. It must be prepared using the
template available in the Portal Periodic Reporting tool.
The financial part of the additional prefinancing report includes a statement on the use of the previous
prefinancing payment.
The financial part of the periodic report includes:
- the financial statements (individual and consolidated; for all beneficiaries/affiliated entities)
- the explanation on the use of resources (or detailed cost reporting table, if required)
- the certificates on the financial statements (CFS) (if required; see Article 24.2 and Data Sheet,
Point 4.3).
The financial statements must detail the eligible costs and contributions for each budget category
and, for the final payment, also the revenues for the action (see Articles 6 and 22).
All eligible costs and contributions incurred should be declared, even if they exceed the amounts
indicated in the estimated budget (see Annex 2). Amounts that are not declared in the individual
financial statements will not be taken into account by the granting authority.
By signing the financial statements (directly in the Portal Periodic Reporting tool), the beneficiaries
confirm that:
- the information provided is complete, reliable and true
- the costs and contributions declared are eligible (see Article 6)
- the costs and contributions can be substantiated by adequate records and supporting documents
(see Article 20) that will be produced upon request (see Article 19) or in the context of checks,
reviews, audits and investigations (see Article 25)
- for the final periodic report: all the revenues have been declared (if required; see Article 22).
Beneficiaries will have to submit also the financial statements of their affiliated entities (if any). In case
of recoveries (see Article 22), beneficiaries will be held responsible also for the financial statements
of their affiliated entities.
21.3 Currency for financial statements and conversion into euros
The financial statements must be drafted in euro.
Beneficiaries with general accounts established in a currency other than the euro must convert the
costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C
series of the Official Journal of the European Union (ECB website), calculated over the corresponding
reporting period.
If no daily euro exchange rate is published in the Official Journal for the currency in question, they
must be converted at the average of the monthly accounting exchange rates published on the European
Commission website (InforEuro), calculated over the corresponding reporting period.
44
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Beneficiaries with general accounts in euro must convert costs incurred in another currency into euro
according to their usual accounting practices.
21.4 Reporting language
The reporting must be in the language of the Agreement, unless otherwise agreed with the granting
authority (see Data Sheet, Point 4.2).
21.5 Consequences of non-compliance
If a report submitted does not comply with this Article, the granting authority may suspend the
payment deadline (see Article 29) and apply other measures described in Chapter 5.
If the coordinator breaches its reporting obligations, the granting authority may terminate the grant or
the coordinator’s participation (see Article 32) or apply other measures described in Chapter 5.
ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS
DUE
22.1 Payments and payment arrangements
Payments will be made in accordance with the schedule and modalities set out in the Data Sheet (see
Point 4.2).
They will be made in euro to the bank account indicated by the coordinator (see Data Sheet, Point 4.2)
and must be distributed without unjustified delay (restrictions may apply to distribution of the initial
prefinancing payment; see Data Sheet, Point 4.2).
Payments to this bank account will discharge the granting authority from its payment obligation.
The cost of payment transfers will be borne as follows:
- the granting authority bears the cost of transfers charged by its bank
- the beneficiary bears the cost of transfers charged by its bank
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
Payments by the granting authority will be considered to have been carried out on the date when they
are debited to its account.
22.2 Recoveries
Recoveries will be made, if — at beneficiary termination, final payment or afterwards — it turns out
that the granting authority has paid too much and needs to recover the amounts undue.
The general liability regime for recoveries (first-line liability) is as follows: At final payment, the
coordinator will be fully liable for recoveries, even if it has not been the final recipient of the undue
amounts. At beneficiary termination or after final payment, recoveries will be made directly against
the beneficiaries concerned.
Beneficiaries will be fully liable for repaying the debts of their affiliated entities.
45
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
In case of enforced recoveries (see Article 22.4):
- the beneficiaries will be jointly and severally liable for repaying debts of another beneficiary
under the Agreement (including late-payment interest), if required by the granting authority
(see Data Sheet, Point 4.4)
- affiliated entities will be held liable for repaying debts of their beneficiaries under the
Agreement (including late-payment interest), if required by the granting authority (see
Data Sheet, Point 4.4).
22.3 Amounts due
22.3.1 Prefinancing payments
The aim of the prefinancing is to provide the beneficiaries with a float.
It remains the property of the EU until the final payment.
For initial prefinancings (if any), the amount due, schedule and modalities are set out in the
Data Sheet (see Point 4.2).
For additional prefinancings (if any), the amount due, schedule and modalities are also set out in
the Data Sheet (see Point 4.2). However, if the statement on the use of the previous prefinancing
payment shows that less than 70% was used, the amount set out in the Data Sheet will be reduced by
the difference between the 70% threshold and the amount used.
Prefinancing payments (or parts of them) may be offset (without the beneficiaries’ consent) against
amounts owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
22.3.2 Amount due at beneficiary termination — Recovery
In case of beneficiary termination, the granting authority will determine the provisional amount due
for the beneficiary concerned. Payments (if any) will be made with the next interim or final payment.
The amount due will be calculated in the following step:
Step 1 — Calculation of the total accepted EU contribution
Step 1 — Calculation of the total accepted EU contribution
The granting authority will first calculate the ‘accepted EU contribution’ for the beneficiary for all
reporting periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate
to the accepted costs of the beneficiary), taking into account requests for a lower contribution to costs
and CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit,
flat-rate or lump sum contributions and financing not linked to costs, if any).
46
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
After that, the granting authority will take into account grant reductions (if any). The resulting amount
is the ‘total accepted EU contribution’ for the beneficiary.
The balance is then calculated by deducting the payments received (if any; see report on the
distribution of payments in Article 32), from the total accepted EU contribution:
{total accepted EU contribution for the beneficiary
minus
{prefinancing and interim payments received (if any)}}.
If the balance is positive, the amount will be included in the next interim or final payment to the
consortium.
If the balance is negative, it will be recovered in accordance with the following procedure:
The granting authority will send a pre-information letter to the beneficiary concerned:
- formally notifying the intention to recover, the amount due, the amount to be recovered and
the reasons why and
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered and ask this amount to be
paid to the coordinator (confirmation letter).
The amounts will later on also be taken into account for the next interim or final payment.
22.3.3 Interim payments
Interim payments reimburse the eligible costs and contributions claimed for the implementation of
the action during the reporting periods (if any).
Interim payments (if any) will be made in accordance with the schedule and modalities set out the
Data Sheet (see Point 4.2).
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The interim payment will be calculated by the granting authority in the following steps:
Step 1 — Calculation of the total accepted EU contribution
Step 2 — Limit to the interim payment ceiling
Step 1 — Calculation of the total accepted EU contribution
The granting authority will calculate the ‘accepted EU contribution’ for the action for the reporting
period, by first calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the
accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, and
CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate
or lump sum contributions and financing not linked to costs, if any).
47
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
After that, the granting authority will take into account grant reductions from beneficiary termination
(if any). The resulting amount is the ‘total accepted EU contribution’.
Step 2 — Limit to the interim payment ceiling
The resulting amount is then capped to ensure that the total amount of prefinancing and interim
payments (if any) does not exceed the interim payment ceiling set out in the Data Sheet (see Point 4.2).
Interim payments (or parts of them) may be offset (without the beneficiaries’ consent) against amounts
owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
22.3.4 Final payment — Final grant amount — Revenues and Profit — Recovery
The final payment (payment of the balance) reimburses the remaining part of the eligible costs and
contributions claimed for the implementation of the action (if any).
The final payment will be made in accordance with the schedule and modalities set out in the
Data Sheet (see Point 4.2).
Payment is subject to the approval of the final periodic report. Its approval does not imply recognition
of compliance, authenticity, completeness or correctness of its content.
The final grant amount for the action will be calculated in the following steps:
Step 1 — Calculation of the total accepted EU contribution
Step 2 — Limit to the maximum grant amount
Step 3 — Reduction due to the no-profit rule
Step 1 — Calculation of the total accepted EU contribution
The granting authority will first calculate the ‘accepted EU contribution’ for the action for all reporting
periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the total
accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, CFS
threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate or
lump sum contributions and financing not linked to costs, if any).
After that, the granting authority will take into account grant reductions (if any). The resulting amount
is the ‘total accepted EU contribution’.
Step 2 — Limit to the maximum grant amount
If the resulting amount is higher than the maximum grant amount set out in Article 5.2, it will be
limited to the latter.
48
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Step 3 — Reduction due to the no-profit rule
If the no-profit rule is provided for in the Data Sheet (see Point 4.2), the grant must not produce a
profit (i.e. surplus of the amount obtained following Step 2 plus the action’s revenues, over the eligible
costs and contributions approved by the granting authority).
‘Revenue’ is all income generated by the action, during its duration (see Article 4), for beneficiaries
that are profit legal entities.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible
costs approved by the granting authority (as compared to the amount calculated following Steps 1 and
2 minus the contributions).
The balance (final payment) is then calculated by deducting the total amount of prefinancing and
interim payments already made (if any), from the final grant amount:
{final grant amount
minus
{prefinancing and interim payments made (if any)}}.
If the balance is positive, it will be paid to the coordinator.
The final payment (or part of it) may be offset (without the beneficiaries’ consent) against amounts
owed by a beneficiary to the granting authority — up to the amount due to that beneficiary.
For grants where the granting authority is the European Commission or an EU executive agency,
offsetting may also be done against amounts owed to other Commission services or executive
agencies.
Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and
30).
If the balance is negative, it will be recovered in accordance with the following procedure:
The granting authority will send a pre-information letter to the coordinator:
- formally notifying the intention to recover, the final grant amount, the amount to be recovered
and the reasons why
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered (confirmation letter),
together with a debit note with the terms and date for payment.
If payment is not made by the date specified in the debit note, the granting authority will enforce
recovery in accordance with Article 22.4.
22.3.5 Audit implementation after final payment — Revised final grant amount — Recovery
If — after the final payment (in particular, after checks, reviews, audits or investigations; see
49
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Article 25) — the granting authority rejects costs or contributions (see Article 27) or reduces the grant
(see Article 28), it will calculate the revised final grant amount for the beneficiary concerned.
The beneficiary revised final grant amount will be calculated in the following step:
Step 1 — Calculation of the revised total accepted EU contribution
Step 1 — Calculation of the revised total accepted EU contribution
The granting authority will first calculate the ‘revised accepted EU contribution’ for the beneficiary,
by calculating the ‘revised accepted costs’ and ‘revised accepted contributions’.
After that, it will take into account grant reductions (if any). The resulting ‘revised total accepted EU
contribution’ is the beneficiary revised final grant amount.
If the revised final grant amount is lower than the beneficiary’s final grant amount (i.e. its share in the
final grant amount for the action), it will be recovered in accordance with the following procedure:
The beneficiary final grant amount (i.e. share in the final grant amount for the action) is calculated
as follows:
{{total accepted EU contribution for the beneficiary
divided by
total accepted EU contribution for the action}
multiplied by
final grant amount for the action}.
The granting authority will send a pre-information letter to the beneficiary concerned:
- formally notifying the intention to recover, the amount to be recovered and the reasons why and
- requesting observations within 30 days of receiving notification.
If no observations are submitted (or the granting authority decides to pursue recovery despite the
observations it has received), it will confirm the amount to be recovered (confirmation letter),
together with a debit note with the terms and the date for payment.
Recoveries against affiliated entities (if any) will be handled through their beneficiaries.
If payment is not made by the date specified in the debit note, the granting authority will enforce
recovery in accordance with Article 22.4.
22.4 Enforced recovery
If payment is not made by the date specified in the debit note, the amount due will be recovered:
(a) by offsetting the amount — without the coordinator or beneficiary’s consent — against any
amounts owed to the coordinator or beneficiary by the granting authority.
In exceptional circumstances, to safeguard the EU financial interests, the amount may be offset
before the payment date specified in the debit note.
50
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
For grants where the granting authority is the European Commission or an EU executive
agency, debts may also be offset against amounts owed by other Commission services or
executive agencies.
(b) by drawing on the financial guarantee(s) (if any)
(c) by holding other beneficiaries jointly and severally liable (if any; see Data Sheet, Point 4.4)
(d) by holding affiliated entities jointly and severally liable (if any, see Data Sheet, Point 4.4)
(e) by taking legal action (see Article 43) or, provided that the granting authority is the European
Commission or an EU executive agency, by adopting an enforceable decision under Article 299
of the Treaty on the Functioning of the EU (TFEU) and Article 100(2) of EU Financial
Regulation 2018/1046.
The amount to be recovered will be increased by late-payment interest at the rate set out in
Article 22.5, from the day following the payment date in the debit note, up to and including the date
the full payment is received.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2015/236620 applies.
For grants where the granting authority is an EU executive agency, enforced recovery by offsetting or
enforceable decision will be done by the services of the European Commission (see also Article 43).
22.5 Consequences of non-compliance
22.5.1 If the granting authority does not pay within the payment deadlines (see above), the
beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank
(ECB) for its main refinancing operations in euros (‘reference rate’), plus the rate specified in the
Data Sheet (Point 4.2). The reference rate is the rate in force on the first day of the month in which the
payment deadline expires, as published in the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
on request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
If payments or the payment deadline are suspended (see Articles 29 and 30), payment will not be
considered as late.
20 Directive (EU) 2015/2366 of the European Parliament and of the Council of 25 November 2015 on payment
services in the internal market, amending Directives 2002/65/EC, 2009/110/EC and 2013/36/EU and Regulation (EU)
No 1093/2010, and repealing Directive 2007/64/EC (OJ L 337, 23.12.2015, p. 35).
51
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
22.5.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 29) and the grant or the coordinator may be terminated (see Article 32).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 23 — GUARANTEES
23.1 Prefinancing guarantee
If required by the granting authority (see Data Sheet, Point 4.2), the beneficiaries must provide (one
or more) prefinancing guarantee(s) in accordance with the timing and the amounts set out in the
Data Sheet.
The coordinator must submit them to the granting authority in due time before the prefinancing they
are linked to.
The guarantees must be drawn up using the template published on the Portal and fulfil the following
conditions:
(a) be provided by a bank or approved financial institution established in the EU or — if requested
by the coordinator and accepted by the granting authority — by a third party or a bank or
financial institution established outside the EU offering equivalent security
(b) the guarantor stands as first-call guarantor and does not require the granting authority to first
have recourse against the principal debtor (i.e. the beneficiary concerned) and
(c) remain explicitly in force until the final payment and, if the final payment takes the form of a
recovery, until five months after the debit note is notified to a beneficiary.
They will be released within the following month.
23.2 Consequences of non-compliance
If the beneficiaries breach their obligation to provide the prefinancing guarantee, the prefinancing
will not be paid.
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 24 — CERTIFICATES
24.1 Operational verification report (OVR)
Not applicable
24.2 Certificate on the financial statements (CFS)
If required by the granting authority (see Data Sheet, Point 4.3), the beneficiaries must provide
52
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
certificates on their financial statements (CFS), in accordance with the schedule, threshold and
conditions set out in the Data Sheet.
The coordinator must submit them as part of the periodic report (see Article 21).
The certificates must be drawn up using the template published on the Portal, cover the costs declared
on the basis of actual costs and costs according to usual cost accounting practices (if any), and fulfil
the following conditions:
(a) be provided by a qualified approved external auditor which is independent and complies with
Directive 2006/43/EC21 (or for public bodies: by a competent independent public officer)
(b) the verification must be carried out according to the highest professional standards to ensure
that the financial statements comply with the provisions under the Agreement and that the costs
declared are eligible.
The certificates will not affect the granting authority's right to carry out its own checks, reviews or
audits, nor preclude the European Court of Auditors (ECA), the European Public Prosecutor’s Office
(EPPO) or the European Anti-Fraud Office (OLAF) from using their prerogatives for audits and
investigations under the Agreement (see Article 25).
If the costs (or a part of them) were already audited by the granting authority, these costs do not need
to be covered by the certificate and will not be counted for calculating the threshold (if any).
24.3 Certificate on the compliance of usual cost accounting practices (CoMUC)
Not applicable
24.4 Systems and process audit (SPA)
Not applicable
24.5 Consequences of non-compliance
If a beneficiary does not submit a certificate on the financial statements (CFS) or the certificate is
rejected, the accepted EU contribution to costs will be capped to reflect the CFS threshold.
If a beneficiary breaches any of its other obligations under this Article, the granting authority may
apply the measures described in Chapter 5.
ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
25.1 Granting authority checks, reviews and audits
25.1.1 Internal checks
The granting authority may — during the action or afterwards — check the proper implementation of
21 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual
accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
53
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
the action and compliance with the obligations under the Agreement, including assessing costs and
contributions, deliverables and reports.
25.1.2 Project reviews
The granting authority may carry out reviews on the proper implementation of the action and
compliance with the obligations under the Agreement (general project reviews or specific issues
reviews).
Such project reviews may be started during the implementation of the action and until the time-limit
set out in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiary
concerned and will be considered to start on the date of the notification.
If needed, the granting authority may be assisted by independent, outside experts. If it uses outside
experts, the coordinator or beneficiary concerned will be informed and have the right to object on
grounds of commercial confidentiality or conflict of interest.
The coordinator or beneficiary concerned must cooperate diligently and provide — within the deadline
requested — any information and data in addition to deliverables and reports already submitted
(including information on the use of resources). The granting authority may request beneficiaries
to provide such information to it directly. Sensitive information and documents will be treated in
accordance with Article 13.
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
the outside experts.
For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including
to the outside experts) and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a project review report will be drawn up.
The granting authority will formally notify the project review report to the coordinator or beneficiary
concerned, which has 30 days from receiving notification to make observations.
Project reviews (including project review reports) will be in the language of the Agreement.
25.1.3 Audits
The granting authority may carry out audits on the proper implementation of the action and compliance
with the obligations under the Agreement.
Such audits may be started during the implementation of the action and until the time-limit set out in
the Data Sheet (see Point 6). They will be formally notified to the beneficiary concerned and will be
considered to start on the date of the notification.
The granting authority may use its own audit service, delegate audits to a centralised service or use
external audit firms. If it uses an external firm, the beneficiary concerned will be informed and have
the right to object on grounds of commercial confidentiality or conflict of interest.
The beneficiary concerned must cooperate diligently and provide — within the deadline requested —
54
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
any information (including complete accounts, individual salary statements or other personal data)
to verify compliance with the Agreement. Sensitive information and documents will be treated in
accordance with Article 13.
For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including
for the external audit firm) and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a draft audit report will be drawn up.
The auditors will formally notify the draft audit report to the beneficiary concerned, which has 30 days
from receiving notification to make observations (contradictory audit procedure).
The final audit report will take into account observations by the beneficiary concerned and will be
formally notified to them.
Audits (including audit reports) will be in the language of the Agreement.
25.2 European Commission checks, reviews and audits in grants of other granting
authorities
Where the granting authority is not the European Commission, the latter has the same rights of checks,
reviews and audits as the granting authority.
25.3 Access to records for assessing simplified forms of funding
The beneficiaries must give the European Commission access to their statutory records for the periodic
assessment of simplified forms of funding which are used in EU programmes.
25.4 OLAF, EPPO and ECA audits and investigations
The following bodies may also carry out checks, reviews, audits and investigations — during the
action or afterwards:
- the European Anti-Fraud Office (OLAF) under Regulations No 883/201322 and No 2185/9623
- the European Public Prosecutor’s Office (EPPO) under Regulation 2017/1939
- the European Court of Auditors (ECA) under Article 287 of the Treaty on the Functioning of
the EU (TFEU) and Article 257 of EU Financial Regulation 2018/1046.
If requested by these bodies, the beneficiary concerned must provide full, accurate and complete
information in the format requested (including complete accounts, individual salary statements or
22 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC)
No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ
L 248, 18/09/2013, p. 1).
23 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15/11/1996, p. 2).
55
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
other personal data, including in electronic format) and allow access to sites and premises for
on-the-spot visits or inspections — as provided for under these Regulations.
To this end, the beneficiary concerned must keep all relevant information relating to the action, at
least until the time-limit set out in the Data Sheet (Point 6) and, in any case, until any ongoing checks,
reviews, audits, investigations, litigation or other pursuits of claims have been concluded.
25.5 Consequences of checks, reviews, audits and investigations — Extension of results of
reviews, audits or investigations
25.5.1 Consequences of checks, reviews, audits and investigations in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to
rejections (see Article 27), grant reduction (see Article 28) or other measures described in Chapter 5.
Rejections or grant reductions after the final payment will lead to a revised final grant amount (see
Article 22).
Findings in checks, reviews, audits or investigations during the action implementation may lead to a
request for amendment (see Article 39), to change the description of the action set out in Annex 1.
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud
or breach of obligations in any EU grant may also lead to consequences in other EU grants awarded
under similar conditions (‘extension to other grants’).
Moreover, findings arising from an OLAF or EPPO investigation may lead to criminal prosecution
under national law.
25.5.2 Extension from other grants
Results of checks, reviews, audits or investigations in other grants may be extended to this grant, if:
(a) the beneficiary concerned is found, in other EU grants awarded under similar conditions, to
have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that
have a material impact on this grant and
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — within the time-limit for audits set out in the Data Sheet (see
Point 6).
The granting authority will formally notify the beneficiary concerned of the intention to extend the
findings and the list of grants affected.
If the extension concerns rejections of costs or contributions: the notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings
(b) the request to submit revised financial statements for all grants affected
(c) the correction rate for extrapolation, established on the basis of the systemic or recurrent errors,
to calculate the amounts to be rejected, if the beneficiary concerned:
56
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
If the extension concerns grant reductions: the notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the correction rate for extrapolation, established on the basis of the systemic or recurrent
errors and the principle of proportionality.
The beneficiary concerned has 60 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method/rate.
On the basis of this, the granting authority will analyse the impact and decide on the implementation
(i.e. start rejection or grant reduction procedures, either on the basis of the revised financial statements
or the announced/alternative method/rate or a mix of those; see Articles 27 and 28).
25.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently
substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may
be reduced (see Article 28).
Such breaches may also lead to other measures described in Chapter 5.
ARTICLE 26 — IMPACT EVALUATIONS
26.1 Impact evaluation
The granting authority may carry out impact evaluations of the action, measured against the objectives
and indicators of the EU programme funding the grant.
Such evaluations may be started during implementation of the action and until the time-limit set out
in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiaries and
will be considered to start on the date of the notification.
If needed, the granting authority may be assisted by independent outside experts.
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
26.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the granting authority may apply
the measures described in Chapter 5.
CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE
57
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
SECTION 1 REJECTIONS AND GRANT REDUCTION
ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS
27.1 Conditions
The granting authority will — at beneficiary termination, interim payment, final payment or
afterwards — reject any costs or contributions which are ineligible (see Article 6), in particular
following checks, reviews, audits or investigations (see Article 25).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 25).
Ineligible costs or contributions will be rejected.
27.2 Procedure
If the rejection does not lead to a recovery, the granting authority will formally notify the coordinator
or beneficiary concerned of the rejection, the amounts and the reasons why. The coordinator or
beneficiary concerned may — within 30 days of receiving notification — submit observations if it
disagrees with the rejection (payment review procedure).
If the rejection leads to a recovery, the granting authority will follow the contradictory procedure with
pre-information letter set out in Article 22.
27.3 Effects
If the granting authority rejects costs or contributions, it will deduct them from the costs or
contributions declared and then calculate the amount due (and, if needed, make a recovery; see
Article 22).
ARTICLE 28 — GRANT REDUCTION
28.1 Conditions
The granting authority may — at beneficiary termination, final payment or afterwards — reduce the
grant for a beneficiary, if:
(a) the beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) the beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
58
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant (see Article 25).
The amount of the reduction will be calculated for each beneficiary concerned and proportionate to the
seriousness and the duration of the errors, irregularities or fraud or breach of obligations, by applying
an individual reduction rate to their accepted EU contribution.
28.2 Procedure
If the grant reduction does not lead to a recovery, the granting authority will formally notify the
coordinator or beneficiary concerned of the reduction, the amount to be reduced and the reasons why.
The coordinator or beneficiary concerned may — within 30 days of receiving notification — submit
observations if it disagrees with the reduction (payment review procedure).
If the grant reduction leads to a recovery, the granting authority will follow the contradictory procedure
with pre-information letter set out in Article 22.
28.3 Effects
If the granting authority reduces the grant, it will deduct the reduction and then calculate the amount
due (and, if needed, make a recovery; see Article 22).
SECTION 2 SUSPENSION AND TERMINATION
ARTICLE 29 — PAYMENT DEADLINE SUSPENSION
29.1 Conditions
The granting authority may — at any moment — suspend the payment deadline if a payment cannot
be processed because:
(a) the required report (see Article 21) has not been submitted or is not complete or additional
information is needed
(b) there are doubts about the amount to be paid (e.g. ongoing audit extension procedure, queries
about eligibility, need for a grant reduction, etc.) and additional checks, reviews, audits or
investigations are necessary, or
(c) there are other issues affecting the EU financial interests.
29.2 Procedure
The granting authority will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day the notification is sent.
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining time to pay (see Data Sheet, Point 4.2) will resume.
If the suspension exceeds two months, the coordinator may request the granting authority to confirm
if the suspension will continue.
59
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
If the payment deadline has been suspended due to the non-compliance of the report and the revised
report is not submitted (or was submitted but is also rejected), the granting authority may also terminate
the grant or the participation of the coordinator (see Article 32).
ARTICLE 30 — PAYMENT SUSPENSION
30.1 Conditions
The granting authority may — at any moment — suspend payments, in whole or in part for one or
more beneficiaries, if:
(a) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed or is suspected of
having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant.
If payments are suspended for one or more beneficiaries, the granting authority will make partial
payment(s) for the part(s) not suspended. If suspension concerns the final payment, the payment (or
recovery) of the remaining amount after suspension is lifted will be considered to be the payment that
closes the action.
30.2 Procedure
Before suspending payments, the granting authority will send a pre-information letter to the
beneficiary concerned:
- formally notifying the intention to suspend payments and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite the
observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will
formally notify that the procedure is discontinued.
At the end of the suspension procedure, the granting authority will also inform the coordinator.
The suspension will take effect the day after the confirmation notification is sent.
If the conditions for resuming payments are met, the suspension will be lifted. The granting authority
will formally notify the beneficiary concerned (and the coordinator) and set the suspension end date.
60
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
During the suspension, no prefinancing will be paid to the beneficiaries concerned. For interim
payments, the periodic reports for all reporting periods except the last one (see Article 21) must
not contain any financial statements from the beneficiary concerned (or its affiliated entities). The
coordinator must include them in the next periodic report after the suspension is lifted or — if
suspension is not lifted before the end of the action — in the last periodic report.
ARTICLE 31 — GRANT AGREEMENT SUSPENSION
31.1 Consortium-requested GA suspension
31.1.1 Conditions and procedure
The beneficiaries may request the suspension of the grant or any part of it, if exceptional circumstances
— in particular force majeure (see Article 35) — make implementation impossible or excessively
difficult.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the date the suspension takes effect; this date may be before the date of the submission of the
amendment request and
- the expected date of resumption.
The suspension will take effect on the day specified in the amendment.
Once circumstances allow for implementation to resume, the coordinator must immediately request
another amendment of the Agreement to set the suspension end date, the resumption date (one day
after suspension end date), extend the duration and make other changes necessary to adapt the action
to the new situation (see Article 39) — unless the grant has been terminated (see Article 32). The
suspension will be lifted with effect from the suspension end date set out in the amendment. This date
may be before the date of the submission of the amendment request.
During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities
implemented during grant suspension are not eligible (see Article 6.3).
31.2 EU-initiated GA suspension
31.2.1 Conditions
The granting authority may suspend the grant or any part of it, if:
(a) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed or is suspected of
having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
61
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.), or
(b) a beneficiary (or a person having powers of representation, decision-making or control, or
person essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant
(c) other:
(i) linked action issues: not applicable
(ii) additional GA suspension grounds: not applicable.
31.2.2 Procedure
Before suspending the grant, the granting authority will send a pre-information letter to the
coordinator:
- formally notifying the intention to suspend the grant and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite the
observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will
formally notify that the procedure is discontinued.
The suspension will take effect the day after the confirmation notification is sent (or on a later date
specified in the notification).
Once the conditions for resuming implementation of the action are met, the granting authority will
formally notify the coordinator a lifting of suspension letter, in which it will set the suspension
end date and invite the coordinator to request an amendment of the Agreement to set the resumption
date (one day after suspension end date), extend the duration and make other changes necessary to
adapt the action to the new situation (see Article 39) — unless the grant has been terminated (see
Article 32). The suspension will be lifted with effect from the suspension end date set out in the lifting
of suspension letter. This date may be before the date on which the letter is sent.
During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities
implemented during suspension are not eligible (see Article 6.3).
The beneficiaries may not claim damages due to suspension by the granting authority (see Article 33).
Grant suspension does not affect the granting authority’s right to terminate the grant or a beneficiary
(see Article 32) or reduce the grant (see Article 28).
ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION
32.1 Consortium-requested GA termination
32.1.1 Conditions and procedure
62
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
The beneficiaries may request the termination of the grant.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the date the consortium ends work on the action (‘end of work date’) and
- the date the termination takes effect (‘termination date’); this date must be after the date of the
submission of the amendment request.
The termination will take effect on the termination date specified in the amendment.
If no reasons are given or if the granting authority considers the reasons do not justify termination,
it may consider the grant terminated improperly.
32.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit a periodic
report (for the open reporting period until termination).
The granting authority will calculate the final grant amount and final payment on the basis of the report
submitted and taking into account the costs incurred and contributions for activities implemented
before the end of work date (see Article 22). Costs relating to contracts due for execution only after
the end of work are not eligible.
If the granting authority does not receive the report within the deadline, only costs and contributions
which are included in an approved periodic report will be taken into account (no costs/contributions
if no periodic report was ever approved).
Improper termination may lead to a grant reduction (see Article 28).
After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality and
security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks,
reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and
42 (assignment of claims)) continue to apply.
32.2 Consortium-requested beneficiary termination
32.2.1 Conditions and procedure
The coordinator may request the termination of the participation of one or more beneficiaries, on
request of the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must submit a request for amendment (see Article 39), with:
- the reasons why
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing)
- the date the beneficiary ends work on the action (‘end of work date’)
63
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
- the date the termination takes effect (‘termination date’); this date must be after the date of the
submission of the amendment request.
If the termination concerns the coordinator and is done without its agreement, the amendment request
must be submitted by another beneficiary (acting on behalf of the consortium).
The termination will take effect on the termination date specified in the amendment.
If no information is given or if the granting authority considers that the reasons do not justify
termination, it may consider the beneficiary to have been terminated improperly.
32.2.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned
(ii) a termination report from the beneficiary concerned, for the open reporting period until
termination, containing an overview of the progress of the work, the financial statement,
the explanation on the use of resources, and, if applicable, the certificate on the financial
statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
(iii) a second request for amendment (see Article 39) with other amendments needed (e.g.
reallocation of the tasks and the estimated budget of the terminated beneficiary; addition of
a new beneficiary to replace the terminated beneficiary; change of coordinator, etc.).
The granting authority will calculate the amount due to the beneficiary on the basis of the report
submitted and taking into account the costs incurred and contributions for activities implemented
before the end of work date (see Article 22). Costs relating to contracts due for execution only after
the end of work are not eligible.
The information in the termination report must also be included in the periodic report for the next
reporting period (see Article 21).
If the granting authority does not receive the termination report within the deadline, only costs and
contributions which are included in an approved periodic report will be taken into account (no costs/
contributions if no periodic report was ever approved).
If the granting authority does not receive the report on the distribution of payments within the deadline,
it will consider that:
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
If the second request for amendment is accepted by the granting authority, the Agreement is amended
to introduce the necessary changes (see Article 39).
If the second request for amendment is rejected by the granting authority (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the grant
may be terminated (see Article 32).
64
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Improper termination may lead to a reduction of the grant (see Article 31) or grant termination (see
Article 32).
After termination, the concerned beneficiary’s obligations (in particular Articles 13 (confidentiality
and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks,
reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and
42 (assignment of claims)) continue to apply.
32.3 EU-initiated GA or beneficiary termination
32.3.1 Conditions
The granting authority may terminate the grant or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 40)
(b) a change to the action or the legal, financial, technical, organisational or ownership situation
of a beneficiary is likely to substantially affect the implementation of the action or calls into
question the decision to award the grant (including changes linked to one of the exclusion
grounds listed in the declaration of honour)
(c) following termination of one or more beneficiaries, the necessary changes to the Agreement
(and their impact on the action) would call into question the decision awarding the grant or
breach the principle of equal treatment of applicants
(d) implementation of the action has become impossible or the changes necessary for its
continuation would call into question the decision awarding the grant or breach the principle
of equal treatment of applicants
(e) a beneficiary (or person with unlimited liability for its debts) is subject to bankruptcy
proceedings or similar (including insolvency, winding-up, administration by a liquidator or
court, arrangement with creditors, suspension of business activities, etc.)
(f) a beneficiary (or person with unlimited liability for its debts) is in breach of social security
or tax obligations
(g) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has been found guilty of grave professional
misconduct
(h) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed fraud, corruption, or is
involved in a criminal organisation, money laundering, terrorism-related crimes (including
terrorism financing), child labour or human trafficking
(i) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) was created under a different jurisdiction
with the intent to circumvent fiscal, social or other legal obligations in the country of origin
(or created another entity with this purpose)
(j) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed:
65
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during its award (including
improper implementation of the action, non-compliance with the call conditions,
submission of false information, failure to provide required information, breach of ethics
or security rules (if applicable), etc.)
(k) a beneficiary (or person having powers of representation, decision-making or control, or person
essential for the award/implementation of the grant) has committed — in other EU grants
awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or
serious breach of obligations that have a material impact on this grant (extension of findings
from other grants to this grant; see Article 25)
(l) despite a specific request by the granting authority, a beneficiary does not request — through
the coordinator — an amendment to the Agreement to end the participation of one of its
affiliated entities or associated partners that is in one of the situations under points (d), (f), (e),
(g), (h), (i) or (j) and to reallocate its tasks, or
(m) other:
(i) linked action issues: not applicable
(ii) additional GA termination grounds: not applicable.
32.3.2 Procedure
Before terminating the grant or participation of one or more beneficiaries, the granting authority will
send a pre-information letter to the coordinator or beneficiary concerned:
- formally notifying the intention to terminate and the reasons why and
- requesting observations within 30 days of receiving notification.
If the granting authority does not receive observations or decides to pursue the procedure despite
the observations it has received, it will confirm the termination and the date it will take effect
(confirmation letter). Otherwise, it will formally notify that the procedure is discontinued.
For beneficiary terminations, the granting authority will — at the end of the procedure — also inform
the coordinator.
The termination will take effect the day after the confirmation notification is sent (or on a later date
specified in the notification; ‘termination date’).
32.3.3 Effects
(a) for GA termination:
The coordinator must — within 60 days from when termination takes effect — submit a
periodic report (for the last open reporting period until termination).
The granting authority will calculate the final grant amount and final payment on the basis of
the report submitted and taking into account the costs incurred and contributions for activities
66
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
implemented before termination takes effect (see Article 22). Costs relating to contracts due
for execution only after termination are not eligible.
If the grant is terminated for breach of the obligation to submit reports, the coordinator may
not submit any report after termination.
If the granting authority does not receive the report within the deadline, only costs and
contributions which are included in an approved periodic report will be taken into account (no
costs/contributions if no periodic report was ever approved).
Termination does not affect the granting authority’s right to reduce the grant (see Article 28)
or to impose administrative sanctions (see Article 34).
The beneficiaries may not claim damages due to termination by the granting authority (see
Article 33).
After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality
and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25
(checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant
reduction) and 42 (assignment of claims)) continue to apply.
(b) for beneficiary termination:
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned
(ii) a termination report from the beneficiary concerned, for the open reporting period
until termination, containing an overview of the progress of the work, the financial
statement, the explanation on the use of resources, and, if applicable, the certificate
on the financial statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3)
(iii) a request for amendment (see Article 39) with any amendments needed (e.g.
reallocation of the tasks and the estimated budget of the terminated beneficiary;
addition of a new beneficiary to replace the terminated beneficiary; change of
coordinator, etc.).
The granting authority will calculate the amount due to the beneficiary on the basis of the
report submitted and taking into account the costs incurred and contributions for activities
implemented before termination takes effect (see Article 22). Costs relating to contracts due
for execution only after termination are not eligible.
The information in the termination report must also be included in the periodic report for the
next reporting period (see Article 21).
If the granting authority does not receive the termination report within the deadline, only costs
and contributions included in an approved periodic report will be taken into account (no costs/
contributions if no periodic report was ever approved).
If the granting authority does not receive the report on the distribution of payments within the
deadline, it will consider that:
67
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
If the request for amendment is accepted by the granting authority, the Agreement is amended
to introduce the necessary changes (see Article 39).
If the request for amendment is rejected by the granting authority (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the
grant may be terminated (see Article 32).
After termination, the concerned beneficiary’s obligations (in particular Articles 13
(confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility),
21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27
(rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply.
SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE
SANCTIONS
ARTICLE 33 — DAMAGES
33.1 Liability of the granting authority
The granting authority cannot be held liable for any damage caused to the beneficiaries or to third
parties as a consequence of the implementation of the Agreement, including for gross negligence.
The granting authority cannot be held liable for any damage caused by any of the beneficiaries or
other participants involved in the action, as a consequence of the implementation of the Agreement.
33.2 Liability of the beneficiaries
The beneficiaries must compensate the granting authority for any damage it sustains as a result of the
implementation of the action or because the action was not implemented in full compliance with the
Agreement, provided that it was caused by gross negligence or wilful act.
The liability does not extend to indirect or consequential losses or similar damage (such as loss of
profit, loss of revenue or loss of contracts), provided such damage was not caused by wilful act or
by a breach of confidentiality.
ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES
Nothing in this Agreement may be construed as preventing the adoption of administrative sanctions
(i.e. exclusion from EU award procedures and/or financial penalties) or other public law measures,
in addition or as an alternative to the contractual measures provided under this Agreement (see,
for instance, Articles 135 to 145 EU Financial Regulation 2018/1046 and Articles 4 and 7 of
Regulation 2988/9524).
24 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities
financial interests (OJ L 312, 23.12.1995, p. 1).
68
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
SECTION 4 FORCE MAJEURE
ARTICLE 35 — FORCE MAJEURE
A party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of other participants involved
in the action), and
- proves to be inevitable in spite of exercising all due diligence.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
CHAPTER 6 FINAL PROVISIONS
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES
36.1 Forms and means of communication — Electronic management
EU grants are managed fully electronically through the EU Funding & Tenders Portal (‘Portal’).
All communications must be made electronically through the Portal, in accordance with the Portal
Terms and Conditions and using the forms and templates provided there (except if explicitly instructed
otherwise by the granting authority).
Communications must be made in writing and clearly identify the grant agreement (project number
and acronym).
Communications must be made by persons authorised according to the Portal Terms and Conditions.
For naming the authorised persons, each beneficiary must have designated — before the signature of
this Agreement — a ‘legal entity appointed representative (LEAR)’. The role and tasks of the LEAR
are stipulated in their appointment letter (see Portal Terms and Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Portal.
36.2 Date of communication
The sending date for communications made through the Portal will be the date and time of sending,
as indicated by the time logs.
69
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
The receiving date for communications made through the Portal will be the date and time the
communication is accessed, as indicated by the time logs. Formal notifications that have not been
accessed within 10 days after sending, will be considered to have been accessed (see Portal Terms
and Conditions).
If a communication is exceptionally made on paper (by e-mail or postal service), general principles
apply (i.e. date of sending/receipt). Formal notifications by registered post with proof of delivery will
be considered to have been received either on the delivery date registered by the postal service or the
deadline for collection at the post office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
36.3 Addresses for communication
The Portal can be accessed via the Europa website.
The address for paper communications to the granting authority (if exceptionally allowed) is the
official mailing address indicated on its website.
For beneficiaries, it is the legal address specified in the Portal Participant Register.
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT
The provisions in the Data Sheet take precedence over the rest of the Terms and Conditions of the
Agreement.
Annex 5 takes precedence over the Terms and Conditions; the Terms and Conditions take precedence
over the Annexes other than Annex 5.
Annex 2 takes precedence over Annex 1.
ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES
In accordance with Regulation No 1182/7125, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
The day during which that event occurs is not considered as falling within the period.
‘Days’ means calendar days, not working days.
ARTICLE 39 — AMENDMENTS
39.1 Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
25 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates
and time-limits (OJ L 124, 8/6/1971, p. 1).
70
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
Amendments may be requested by any of the parties.
39.2 Procedure
The party requesting an amendment must submit a request for amendment signed directly in the Portal
Amendment tool.
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3). If a change of coordinator is requested without its agreement, the submission must be done
by another beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why
- the appropriate supporting documents and
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The granting authority may request additional information.
If the party receiving the request agrees, it must sign the amendment in the tool within 45 days of
receiving notification (or any additional information the granting authority has requested). If it does
not agree, it must formally notify its disagreement within the same deadline. The deadline may be
extended, if necessary for the assessment of the request. If no notification is received within the
deadline, the request is considered to have been rejected.
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date of entry into force or other date specified in the amendment.
ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES
40.1 Accession of the beneficiaries mentioned in the Preamble
The beneficiaries which are not coordinator must accede to the grant by signing the accession form
(see Annex 3) directly in the Portal Grant Preparation tool, within 30 days after the entry into force
of the Agreement (see Article 44).
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 44).
If a beneficiary does not accede to the grant within the above deadline, the coordinator must — within
30 days — request an amendment (see Article 39) to terminate the beneficiary and make any changes
necessary to ensure proper implementation of the action. This does not affect the granting authority’s
right to terminate the grant (see Article 32).
40.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
71
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
For this purpose, the coordinator must submit a request for amendment in accordance with Article 39.
It must include an accession form (see Annex 3) signed by the new beneficiary directly in the Portal
Amendment tool.
New beneficiaries will assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the accession form (see Annex 3).
Additions are also possible in mono-beneficiary grants.
ARTICLE 41 — TRANSFER OF THE AGREEMENT
In justified cases, the beneficiary of a mono-beneficiary grant may request the transfer of the grant to
a new beneficiary, provided that this would not call into question the decision awarding the grant or
breach the principle of equal treatment of applicants.
The beneficiary must submit a request for amendment (see Article 39), with
- the reasons why
- the accession form (see Annex 3) signed by the new beneficiary directly in the Portal
Amendment tool and
- additional supporting documents (if required by the granting authority).
The new beneficiary will assume the rights and obligations under the Agreement with effect from the
date of accession specified in the accession form (see Annex 3).
ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE
GRANTING AUTHORITY
The beneficiaries may not assign any of their claims for payment against the granting authority to
any third party, except if expressly approved in writing by the granting authority on the basis of a
reasoned, written request by the coordinator (on behalf of the beneficiary concerned).
If the granting authority has not accepted the assignment or if the terms of it are not observed, the
assignment will have no effect on it.
In no circumstances will an assignment release the beneficiaries from their obligations towards the
granting authority.
ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
43.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
Special rules may apply for beneficiaries which are international organisations (if any; see Data Sheet,
Point 5).
43.2 Dispute settlement
72
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
EU4H Ref.
Associated with document MGAAres(2022)7858729
— Multi & Mono:-v1.0
14/11/2022
If a dispute concerns the interpretation, application or validity of the Agreement, the parties must bring
action before the EU General Court — or, on appeal, the EU Court of Justice — under Article 272
of the Treaty on the Functioning of the EU (TFEU).
For non-EU beneficiaries (if any), such disputes must be brought before the courts of Brussels,
Belgium — unless an international agreement provides for the enforceability of EU court judgements.
For beneficiaries with arbitration as special dispute settlement forum (if any; see Data Sheet, Point 5),
the dispute will — in the absence of an amicable settlement — be settled in accordance with the Rules
for Arbitration published on the Portal.
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299
TFEU (see Articles 22 and 34), the beneficiaries must bring action before the General Court — or, on
appeal, the Court of Justice — under Article 263 TFEU.
For grants where the granting authority is an EU executive agency (see Preamble), actions against
offsetting and enforceable decisions must be brought against the European Commission (not against
the granting authority; see also Article 22).
ARTICLE 44 — ENTRY INTO FORCE
The Agreement will enter into force on the day of signature by the granting authority or the
coordinator, depending on which is later.
SIGNATURES
For the coordinator For the granting authority
[--TGSMark#signature-998853621_75_210--] [--TGSMark#signature-service_75_210--]
Diego Vargas with ECAS id narajema signed in the Participant Signed by Florina TELEA with ECAS id teleafa as an authorised
Portal on 15/11/2022 at 14:13:08 (transaction id SigId-117505-CfeC2 representative on 15-11-2022 15:42:09 (transaction id SigId-119922-
Tt2fthHZVzUGW6SBzj1pewAjig0hSoECkFMxoIDUzliRzZC85TpdyFNK V8isIs0mEDUIUUzOR4MFfKI1VfY8pyzh5OtZFJzjU5JKa8NpJLgqcUUrz
rS4i6wEndqQmSCCnSbwk4QFOWi-rS0vSrmBGYCYOonzu9chxJ-qtur V0yL8n3PkCkb3FrjoZ1DBCUiYUXQsO-rS0vSrmBGYCYOonzu9chxJ-s8
3aqypqWB3f3XCptdD0zhYrvNMw89jM7czLVOXCVESt2x0BrPNd9r4 ak0GSiyiYwhIyH1ZIFDzpxrP3eHkl9Q6pH5bTexloQtlOfzqHqUOAd3a
MsIK1PocD083wyL8pjby2PROgDiQ8). Timestamp by third party at bonDRw0K1Z4dGXSizztiBV0vMsCAS)
2022.11.15 14:13:15 CET 2022.11.15 15:42:14 CET
73
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
ANNEX 1
EU4 Health Programme (EU4H)
Description of the action (DoA)
Part A
Part B
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
DESCRIPTION OF THE ACTION (PART A)
COVER PAGE
Part A of the Description of the Action (DoA) must be completed directly on the Portal Grant Preparation screens.
PROJECT
Grant Preparation (General Information screen) — Enter the info.
Project number: 101082572
Project name: JA TRANSFER OF BEST PRACTICES IN PRIMARY CARE
Project acronym: CIRCE-JA
Call: EU4H-2021-JA2-IBA
Topic: EU4H-2021-JA-09
Type of action: EU4H-PJG
Service: HADEA/A/01
Project starting date: fixed date: 1 February 2023
Project duration: 36 months
TABLE OF CONTENTS
Project summary ......................................................................................................................................................3
List of participants .................................................................................................................................................. 3
List of work packages .............................................................................................................................................6
Staff effort ............................................................................................................................................................. 16
List of deliverables ................................................................................................................................................19
List of milestones (outputs/outcomes) .................................................................................................................. 30
List of critical risks ............................................................................................................................................... 31
2
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
PROJECT SUMMARY
Project summary
Grant Preparation (General Information screen) — Provide an overall description of your project (including context and overall
objectives, planned activities and main achievements, and expected results and impacts (on target groups, change procedures,
capacities, innovation etc)). This summary should give readers a clear idea of what your project is about.
Use the project summary from your proposal.
CIRCE-JA will effectively transfer and implement 6 selected best practices (BPs) in primary health care among European
Member States (MS), supported by scientific evidence-based methodology, raising MS capacity in implementing
innovative care models and addressing health system transformation at this level of care. Moreover, knowledge transfer
and twinning actions will support the transferring and implementation process, including a wide range of activities,
such as workshops, staff visits and secondments, policy dialogues, expert advice, mutual and peer learning programmes.
The transferring and implementation process will be monitored and assessed. Knowledge will be generated and shared
addressing the main elements and recommendations for its success beyond the duration of the JA.
CIRCE-JA ambition looks forward to effectively transfer (implement, validate and sustain) the 6 BPs from 4
MS (Belgium, Portugal, Slovenia and Spain) in to 45 implementation sites from 12 MS with relevant structural,
organizational and institutional differences in their health care systems. The common transversal interest is to
strengthening health care systems through reinforcing primary health care.
14 EU Member States are involved in CIRCE-JA. Beneficiaries and affiliated entities (AE) represent European healthcare
systems and services directly connected to the overall aim of this JA, being BPs owners or implementers.
LIST OF PARTICIPANTS
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
1 COO SAS SERVICIO ANDALUZ DE SALUD ES 998853621
1.1 AE FPS FUNDACION PUBLICA ANDALUZA ES 998619463
PROGRESO Y SALUD M.P.
1.2 AE SERGAS SERVIZO GALEGO DE SAUDE ES 974720409
1.3 AE ACIS AXENCIA GALEGA PARA A XESTION DO ES 923156858
CONECEMENTO EN SAUDE
1.4 AE AQUAS AGENCIA DE QUALITAT I AVALUACIO ES 949799169
SANITARIES DE CATALUNYA
1.5 AE FISABIO FUNDACION PARA EL FOMENTO DE LA ES 951714046
INVESTIGACION SANITARIA Y BIOMEDICA
DE LA COMUNITAT VALENCIANA
1.6 AE IDIVAL FUNDACION INSTITUTO DE INVESTIGACION ES 946556944
MARQUES DE VALDECILLA
1.7 AE SCS Servicio Cántabro de Salud ES 991294023
1.8 AE SERMAS SERVICIO MADRILENO DE SALUD ES 999481987
1.9 AE FIIBAP FUNDACION PARA LA INVESTIGACION E ES 919231753
INNOVACION BIOSANITARIA DE ATENCION
PRIMARIA
3
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
2 BEN 7HRC DIOIKHSH YGEIONOMIKHS PERIFEREIAS EL 944960033
KRHTHS
3 BEN AGE.NA.S AGENZIA NAZIONALE PER I SERVIZI IT 959886490
SANITARI REGIONALI
3.1 AE uslumbria2 AZIENDA UNITA SANITARIA LOCALE IT 885492922
UMBRIA N 2
3.2 AE ASUR ASUR MARCHE IT 925596408
3.3 AE ASLCN2 AZIENDA SANITARIA LOCALE CN2 IT 945430289
3.4 AE ASL AL ASL AL IT 906491870
3.5 AE ASL ROMA 1 AZIENDA SANITARIA LOCALE ROMA 1 IT 912924134
3.6 AE ASL Roma D AZIENDA UNITA SANITARIA LOCALE ROMAD IT 952673473
3.7 AE AUSL VITERBO AZIENDA SANITARIA LOCALE VITERBO IT 936372720
3.8 AE ATS Bergamo AGENZIA DI TUTELA DELLA SALUTE DI IT 906119875
BERGAMO
3.9 AE A.LI.SA. AZIENDA LIGURE SANITARIA DELLA IT 932080179
REGIONE LIGURIA
3.10 AE Liguria ASL 1 AZIENDA SOCIOSANITARIA LIGURE N. 1 IT 888215518
3.11 AE Liguria ASL 4 AZIENDA SANITARIA LIGURE 4 CHIAVARESE IT 885485550
3.12 AE ASUGI AZIENDA SANITARIA UNIVERSITARIA IT 895742718
GIULIANO ISONTINA
3.13 AE ASL TERAMO AZIENDA UNITA SANITARIA LOCALE DI IT 893843458
TERAMO
3.14 AE BOLOGNA AZIENDA UNITA' SANITARIA LOCALE DI IT 951425568
BOLOGNA
3.15 AE MODENA AZIENDA UNITA SANITARIA LOCALE DI IT 999571518
MODENA
3.16 AE PARMA AZIENDA USL DI PARMA IT 919552726
3.17 AE ROMAGNA AZIENDA USL DELLA ROMAGNA IT 911127209
3.18 AE ASL ROMA 2 AZIENDA SANITARIA LOCALE ROMA 2 IT 887912296
4 BEN NFZ NARODOWY FUNDUSZ ZDROWIA PL 998161332
5 BEN NIJZ NACIONALNI INSTITUT ZA JAVNO ZDRAVJE SI 948891346
6 BEN MS-MoH MINISTERUL SANATATII RO 999831478
6.1 AE UMF-CD UNIVERSITATEA DE MEDICINA SI FARMACIE RO 999875613
CAROL DAVILA DIN BUCURESTI
6.2 AE INSP INSTITUTUL NATIONAL DE SANATATE RO 985926237
PUBLICA
7 BEN AVIQ AGENCE WALLONNE DE LA SANTE, DE LA BE 920108439
PROTECTION SOCIALE, DU HANDICAP ET DE
LA FAMILLE
4
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
PARTICIPANTS
Grant Preparation (Beneficiaries screen) — Enter the info.
Number Role Short name Legal name Country PIC
8 BEN ACSS ADMINISTRACAO CENTRAL DO SISTEMA PT 997349539
DESAUDE IP
8.1 AE MS-DGS MINISTERIO DA SAUDE - REPUBLICA PT 986364095
PORTUGUESA
8.2 AE ULSM UNIDADE LOCAL DE SAUDE DE PT 951404907
MATOSINHOS EPE
8.3 AE CHLC CENTRO HOSPITALAR DE LISBOA CENTRAL, PT 940798539
EPE
8.4 AE CHLO CENTRO HOSPITALAR DE LISBOA PT 898131925
OCIDENTAL EPE
8.5 AE ARSLVT ADMINISTRACAO REGIONAL DE SAUDE DE PT 885184365
LISBOA E VALE DO TEJO I P
9 BEN GÖG GESUNDHEIT OSTERREICH GMBH AT 928836208
10 BEN CIPH HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO HR 998128255
11 BEN MSAE SOTSIAALMINISTEERIUM EE 998429731
11.1 AE UTARTU TARTU ULIKOOL EE 999895013
12 BEN NNK NEMZETI NEPEGESZSEGUGYI KOZPONT HU 998706957
13 BEN MoH-RL LIETUVOS RESPUBLIKOS SVEIKATOS LT 933839468
APSAUGOS MINISTERIJA
14 BEN NBHW SOCIALSTYRELSEN SE 998248147
5
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
LIST OF WORK PACKAGES
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
WP1 Coordination and Management 1 - SAS 201.85 1 36 D1.1 – Project Handbook
WP2 Dissemination 4 - NFZ 267.12 1 36 D2.1 – Dissemination Strategy and Action
Plan
D2.2 – Project Web Site
D2.3 – Leaflet 1 - description and
promotion of the JA
D2.4 – Leaflet 2 – JA results
D2.5 – Dissemination & communication
outcomes report
D2.6 – JA Knowledge Transfer & Capacity
building HUB
WP3 Evaluation 2 - 7HRC 158.60 1 36 D3.1 – JA assessment Plan
D3.2 – JA formative assessment progress
report
D3.3 – JA formative qualitative assessment
outcomes report
D3.4 – JA summative quantitative
evaluation report
D3.5 – Assess the impact on the EU
WP4 Sustainability 3 - AGE.NA.S 264.29 1 36 D4.1 – Report on BP implementation
D4.2 – Collection of BP implementation
recommendations
D4.3 – Scientific Publication on BP
implementation
D4.4 – Memorandum of Understanding
D4.5 – International Meeting
6
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Work packages
Grant Preparation (Work Packages screen) — Enter the info.
Work Work Package name Lead Beneficiary Effort Start End Deliverables
Package No (Person- Month Month
Months)
WP5 Methodology for transferring process and needs 2 - 7HRC 291.40 1 24 D5.1 – Scoping review
assessment D5.2 – Consensus panel report to facilitate
the implementation
D5.3 – Context-specific report
D5.4 – Context-specific report 2
D5.5 – Needs Assessment Report
WP6 Transferring process and Pilot implementation 1 - SAS 1065.35 4 36 D6.1 – Initial Implementation Plan
D6.2 – Implementation Plan
D6.3 – Transfer and implementation process
report
WP7 Capacity building 5 - NIJZ 301.04 8 34 D7.1 – Policy development repor
D7.2 – Training programme
D7.3 – Training report
D7.4 – Best practice’s management plan
7
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Work package WP1 – Coordination and Management
Work Package Number WP1 Lead Beneficiary 1. SAS
Work Package Name Coordination and Management
Start Month 1 End Month 36
Objectives
WP1 will provide oversight, a clear organisational framework and all necessary support mechanisms to enable a smooth
JA workflow, ensure that all contractual commitments
are met on time. To this purpose, the CT will provide technical, scientific, financial and administrative management and
support All WP1 structures are described in Section 2.4.
1. To provide the overall scientific direction and to drive the progress of the JA, steering efforts of the
2. To set-up a JA management structure that ensures an efficient operational management including administrative,
financial and legal issues, and appropriate liaison
with the European Commission (HaDEA and DG SANTE).
3. To ensure that the JA is appropriately managed according to the work plan, supporting the Coordinator in organising
and supervising the work.
4. To provide resources, procedures and tools for ensuring that all results are delivered on time, with an adequate quality
level and within cost, including quality control
procedures on deliverables and interim and final review of the project achievements from a management perspective.
5. To enable the appropriate communication and work dynamics to help drive the whole Consortium as a team towards
successful completion. partners for the achievement of the JA’s objectives and milestones and ensuring that the work
is undertaken with appropriate quality levels.
Description
T1.1 Scientific coordination, quality assurance & risk management (SAS, FPS, 7HRC) (M1-M36).
Scientific Coordination will deal with strategic direction and supervising WP leaders as they execute their role. A main
activity will be the monitoring of WP status measured against deliverable and milestone planning with the support of
WP3. Assessment by the CT will enable close work plan follow-up, allow for informed decision-making, risk review
and, if needed, prompt conflict resolution. To ensure that all JA outputs fulfil the best quality standards, deliverables
will be prepared by the responsible partner, reviewed by the SC and submitted to HaDEA by the Coordinator. Especially
important for the success of the JA will be the establishment of a continuous consortium communication flow, to help
in the identification of possible risks and implement appropriate contingency measures in the framework of the SC.
Furthermore, the CT will initiate appropriate contingency planning at JA level, resulting in timely adjustments of the
work plan when necessary and their translation into GA amendments
T1.2 Implementation of efficient management and support structures (FPS, SAS) (M1-M36)
This task is devoted to support partners in the day to day management, internal communication decision-making, conflict
resolution and consensus building. The CT will set-up the JA’s organisational and internal communication processes to
safeguard a smooth and efficient start and implementation. FPS will provide organisational JA management support to
ensure an efficient central performance monitoring of all JA activities, milestones, deliverables and deadlines, including
the early identification of potential opportunities, conflicts, barriers and bottlenecks. Major management procedures and
workflows will be defined in Project Handbook (D1.2). FPS will be responsible for the organization and follow-up of
the SC meetings (initially every 3 months), will give support to the organisation of the Kick off and Annual Consortium
meetings as well as production of the corresponding minutes. Besides, together with WP4 leader, FPS will orgaise the
External Policy Board metings once a year.
T1.3 Contractual, legal and ethical aspects (FPS,SAS) (M1-M36)
FPS will assist in the maintenance of contractual documents (Grant Agreement and Consortium Agreement) and will
ensure that JA partners are aware of the JA’s legal framework at all times. The governance structure set the framework for
management workflows. Should the need arise, Grant Agreement amendments will be prepared, requested immediately
to minimise delays in implementation and submitted to HaDEA. Clear rules laid out in the Consortium Agreement will
facilitate management workflows. This activity will also provide ethical oversight, analysis, and guidance. As a starting
point for the guidance, Consortium members aware of the regulations dealing with ethical use of the data and adequate
privacy control will be asked to report their assessment of ethical issues affecting (or likely to affect) the JA.
8
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
T1.4 Reporting and support of financial management & controlling (FPS, SAS) (M1-M36)
Following a 18-month reporting schedule, 2 periodic reports (P1: M1-18, P2: M19-36)) and one final report (M36) will
be submitted to HaDEA. Compilation of these reports will be managed by the Coordinator (SAS) and its affiliated entity
FPS with the rest of the CT. In addition, individual financial information will be compiled on a 9-month basis by FPS.
While the partners administer their own resources, FPS coordinates the collection and monitoring of periodic cost claims
on consortium level for the beneficiaries receiving EC funding, checks that declared costs are appropriately justified,
provides follow-up of HaDEA payments, reminds partners to provide audit certificates where necessary and consolidates
for submission of periodic reports. Deviations from the planned use of resources will be discussed with the affected
partners and brought to the attention of the WP Leader and the CT. At the beginning of the JA, a financial management
introduction will be offered by FPS to familiarise all individuals involved in the financial reporting process (scientists
and administrators) with the relevant HaDEA rules and regulations and related project internal procedures.
Work package WP2 – Dissemination
Work Package Number WP2 Lead Beneficiary 4. NFZ
Work Package Name Dissemination
Start Month 1 End Month 36
Objectives
The aim of WP2 will be the dissemination and communication of high quality information on the JA objectives, progress
and results as well as enhancing JA impact.
1. To elaborate the JA Dissemination and Communication Strategy and Action Plan
2. To ensure that the results and deliverables of the JA are available to the target groups and to accountable European
stakeholders.
3. To actively identify and engage stakeholders during the development of the JA for dissemination purposes, raising
awareness about the JA results and validate their
relevance with the targeted audience.
4. To improve knowledge generation and sharing through a common repository, in collaboration with WP3 to WP7
Description
T2.1 Definition of the Dissemination Strategy and Action Plan (NFZ, All partners) (M1-M5)
The Dissemination Strategy will define the framework and phases for the dissemination and communication of the JA
objectives, activities and results.
T2.2 Develop JA communication resources (NFZ, All partners) (M1- M36)
The JA website will work as a project-related repository of information related to the partners, dissemination activities,
project findings, resources and other relevant news.
Dissemination materials will be developed for the promotion of the JA and its results (Leaflets M7, M36) at various
European, national and regional events and engagement with the targeted stakeholders. Besides a layman version of the
final report that will be issue for interested targeted audience (M36)
T2.3 JA communication (NFZ, All partners) (M6-M36)
The participation of the JA representatives will be actively promoted in relevant regional, national or European
communications activities to present lessons learned and results of the JA. A standardized dissemination release process
will be implemented according to the rules stipulated in the Consortium Agreement. All dissemination activities will be
summarised in the Dissemination & communication outcomes report (D2.5).
T2.4 Knowledge Transfer & Capacity building HUB (NFZ, All partners) (M12-M36)
The Knowledge Transfer and Capacity building HUB will be available for JA partners during the duration of the JA and
publicly at the end of the JA. A set of supportive actions will be required to accelerate the actual use of the hub, including
awareness-raising sessions and education and training for the potential users. The JA envisages the development of online
tutorials, webinars and mentoring sessions to make the hub self-operated with minimum inputs from the JA Consortium
beyond the JA duration.
T2.5 Final conference (SAS, NFZ, All partners) (M30-36)
9
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
To organise the final conference in order to inform the targeted audience about the key findings and discuss potential
impact of the JA on the PHC agenda at the European, regional and national levels.
Work package WP3 – Evaluation
Work Package Number WP3 Lead Beneficiary 2. 7HRC
Work Package Name Evaluation
Start Month 1 End Month 36
Objectives
The key aim of this WP3 is to assess if the project is being implemented as planned and reaches the objectives and to
evaluate to what extent its implementation has been
successful.
1. To define the procedures and the methods that the consortium will use in order to assess the progress implementation
of the JA and its outcomes in a concrete formative and summative assessment approach
2. To explore JA impact on the European setting and formulate the lessons learnt.
Description
T3.1 Definition of the processes and methodology of the formative and summative assessment of the project
implementation (7HRC, UBB) (M1-M6)
Quantitative and qualitative methodology and process indicators will be set after discussed in an expert consensus panel
with CIRCE WP Leaders and a number of the European experts.
Specific indicators to assess the outcomes and impact of the action and how implementing sites are strengthening their
PHC will be defined WP3 (D.3.1) and included in the evaluation reports (D 3.4 and possibly D 3.5).
Besides a list of procedures and indicators will be delivered for the monitoring and evaluation of the JA (indicators in
section 1.2 of Part B.
T3.2 Evaluation of project progress and outcomes by quality assessment of the JA’s implementation (A focus on
formative assessment- JA monitoring) (7HRC, UBB) (M6-36)
The proposed methods for the formative assessment approach for the JA progress would be used in each implementation
site and the data from qualitative studies would be analysed by the leaders of this WP. In addition, the level of satisfaction
that it will address both, primary health care practitioners and the recipients of the action, including patients and
stakeholders would be assessed. A survey based on a questionnaire with qualitative and quantitative variables and focus
groups with the use of participatory and learning actions methodology would be implemented to that purpose.
T3.3 Evaluation of project outcomes by quality assessment of the project’s implementation (A focus on summative
assessment) (7HRC, UBB) (M6-36)
The proposed methods for the summative assessment (project’s outcomes) would be used in each implementation site
and the data from the quantitative analysis would be analysed by the leaders of this WP.
T3.4 Assess the impact of the project implementation and explore the lessons learnt for EU-wide transformation (7HRC,
UBB) (M25-36)
An expert consensus panel will be carried-out by the 7HRC in collaboration with UBB. Experts from all participating in
the project countries, the members of the project consortium and representatives from selected European stakeholders
will be invited.
Work package WP4 – Sustainability
Work Package Number WP4 Lead Beneficiary 3. AGE.NA.S
Work Package Name Sustainability
Start Month 1 End Month 36
10
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Objectives
The aim of WP4 is to support the sustainability of CIRCE transfers and implementation.
1. To identify characteristics and contextual factors such as differences in population, service structures, and socio-
political context can influence the transfer of BPs in the
targeted settings
2. To explore to what extent additional efforts and adaptations are necessary and appropriate to sustain the achieved
outcomes and assist the targeted practices to
undertake the necessary actions in the future.
3. To explore to what extent the project outcomes include continuation of programme components, efforts towards
capacity building, and their integration into primary
healthcare and into national policies. Engagement in the development of a European network/observatory for PHC
community.
Description
T4.1 Identification of principles and characteristics of successful implementation of BPs (AGENAS, BP owners) (M3-
M14)
- To identify the contextual factors -such as differences in population, service structures, and socio-political context-
that can influence the transfer of the BP in the targeted settings and core characteristics of the implementation process
of the BP
- To identify the underlying principles of the EU strategic agenda and regulations to align the work plan of the project
and eventually contribute to the improvement of the European strategic health policies, such as contributing to more
effective, accessible and resilient health systems; sharing best practices as a step towards the creation of the European
Health Union and coordinating and facilitating the exchange of Best Practices.
- To Identify economic factors that may affect the implementation of BP
- A questionnaire in all implementation sites will be proposed, also based on the literature search made by WP5 (task 5.1).
T4.2 Support implementers in ensuring the sustainability of the practice in the future (AGENAS, BP implementers)
(M13-M33)
A mixed-method approach, quantitative with questionnaires and qualitative methods with focus groups, will be adopted
to explore to what extent the objectives achieved could be further supported and sustained.
T4.3 Generate new knowledge and understanding based on the results of implementation by implementers also involving
PHC stakeholders (ASL ROMA, All partners) (M18-M36)
An expert panel meeting, composed of External Policy Board members and further components to be defined, will
be carried out by AGENAS with the aim to develop and draft a set of recommendations for further supporting those
achieved on implementation and evaluation.
Main characteristics (professionals, target groups, objectives, timeline, responsible actors, etc.) of each BP
implementations will be described, the recommendations and indicators will be shared within CIRCE-JA participants,
in collaboration with WP6.
Possible financial solutions that can facilitate the sustainability of BP over time will be explored (association funds,
non-profits)
New organisational models (residential and health care facilities emergency, technologies, devices, information
technology and telematics) will be explored
T4.4 Development of a European Primary Health Care Observatory which would ensure the sustainability of the results
beyond the JA also defining principle and recommendations for implementing national PHC policy (7HRC/AGENAS,
All partners) (M25-M36)
To develop a European Primary Health Care Observatory composed of External Policy Board members, other consortium
partners and representatives from selected European stakeholders including WHO, WONCA Europe, EFPC, etc. and
it will integrate with the experiences already in place at European level, such as the Public Health Best Practice Portal
led by the European Commission (https://webgate.ec.europa.eu/dyna/bp-portal/). The Observatory will support the
implementation of the BPs, share knowledge and experience, and further reinforce capacities of national, regional and
local health authorities on PHC. Field experience and lessons learnt together with evidence-based practice will be the
core principle.
The Observatory will promote the alignment of the local experiences to reference BPs, the continuous improvement, the
11
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
partnerships, the knowledge sharing, the evaluation, and the creation of recommendations and useful documentation for
all the Countries, even the ones not included in the CIRCE-JA Consortium..
Work package WP5 – Methodology for transferring process and needs assessment
Work Package Number WP5 Lead Beneficiary 2. 7HRC
Work Package Name Methodology for transferring process and needs assessment
Start Month 1 End Month 24
Objectives
The overall aim of WP5 is to explore and develop the methodology for effective transferring process. WP5 objectives:
1. Assessing the needs in the participating settings and defining the methodological framework.
2. Setting standards and mechanisms for transferring the selected best practices into the implementation settings.
3. Description of the procedures to respond on how to improve the ability for the implementation site to learn from the
other setting on what elements of the best practice this work should address.
4. Supporting methodological transference of the selected best practices in the implementation sites
Description
T5.1 Analysis and definition of the methodological framework where the transferring process would be built (7HRC,
All WP leaders) (M1-M4)
A literature search as well as in EC research and implementation projects will be carried-out by 7th HRC to select the
appropriate methodological framework to be used for the transferring of the select ed best practices. SQUIRE and TO-
REACH project recommendations will be included.
T5.2 Analysis, assessment of the existing needs and definition of key priority areas for the implementation settings, based
on collaborative learning process and implementation sites’ abilities and capacity improvement (7HRC, All partners)
(M5-M12)
A consensus meeting with the core group in each implementation site and the key people from the coordinator site and
the leader of this WP. The framework of the TO-REACH project will guide the process of this meeting that will prepare
a report on needs, priorities, potential weakness and barriers for implementation as well as actions for improvement.
T5.3 Adapting and preparing the transferring process of the best practices in the implementation sites taking into account
those discussed and assessed in the Task 5.1 and Task 5.2 (7HRC, All partners) (M10-M24)
One meeting in each implementation site will be carried-out to prepare the design of the transferring process of the
selected best practice. The Normalisation Process Theory for Implementing, Embedding, and Integrating the best
Practices will be used to support the implementation of the best practice (https://bmcmedicine.biomedcentral.com/
articles/10.1186/1741-7015-8-63). The tools of the theory used in the RESTORE project funded by the European
Commission under FP7. will be used to support the work of implementation, while two selected tools: the interactive
toolkit will assist the way of thinking the implementation problems and 23 item survey instrument (NOMAD, https://
www.implementall.eu/17-nomad.html) will assist the project in assessing implementation processes from the perspective
of professionals involved in implementation
Work package WP6 – Transferring process and Pilot implementation
Work Package Number WP6 Lead Beneficiary 1. SAS
Work Package Name Transferring process and Pilot implementation
Start Month 4 End Month 36
Objectives
WP6 focus on supporting the transferring process and the implementation of the BP in the different implementing sites.
12
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
1. Initiate and develop the transferring process, based on the selection of specific elements of the BP, defining a specific
plan for each pilot implementation.
2. Support actions to facilitate the implementation of pilots, following the defined implementing plans.
3. Collect experiences to support implementation assessment.
Description
T6.1 Initial implementation plan: Identification, definition and selection of the specific interventions to be implemented
by each pilot site (SAS, FPS, implementing sites) (M4-M14)
This task focuses on the initial activities to successfully implement the BP. Each pilot site will identify the selection
of the specific elements of the BP to be implemented in each of them. To better identify the characteristics of the BP
selected by each pilot site, specific workshops will be organised by SAS following the analysis performed in WP4. All
pilot implementers will design an initial implementation plan with the initial selection of elements and actors involved
to implement, which will address their needs that had been identified in WP5. Specific initial implementation plans will
be issued by all implementing sites (D6.1)
T6.2 Transferring process support (SAS, FPS, ACIS, All partners) (M10-M24)
Following the definition of the initial implementation plans, several activities to better support the transferring process
will be put in place, following the methodology defined in WP5. The support for the transferring process will include:
a. Study visits to the BP: the six BP will be the subject of specific study visits that will be organised to facilitate
implementing sites a deeper knowledge on specific aspects of each one of them. During the study visits, a specific session
will be dedicated to explaining the transferring methodology defined.
b. Secondments: selected teams from the implementing sites will have the opportunity to spend a short stay at the BP
sites, to acquire a deeper understanding of the day-to-day development of the BP. The number of secondments will be
adjusted according to the pandemic situation and availability both from the BP and implementing side participants.
c. Workshops: The implementation process will incoporate training programmes for end users to support implementers
in the process of implementation, in collaboration with WP7.
d. Mentoring support from BP to pilot site: access to experts on BP for support and advice.
e. Policy Dialogue: a specific meeting addressing context and policy oriented issues, to be held in the Committee of the
Regions, in collaboration with WP2, WP4 and WP7.
Implementing sites will update their initial implementation plan and adapt it to the current situation in each case,
considering the characteristics to implement and the expected situation after the transferring process. It will consider
aspects such as cultural barriers, healthcare systems characteristics, resources and actors involved, and other aspects
identified in WP5 implementation methodology. The CT will be in charge of operational support for the transferring
activities.
T6.3 Implementation and validation (SAS, FPS, Implementers) (M13-M36)
According to each implementing site implementation plan, interventions and actions in each of them will be developed.
Implementation site teams will:
a. Define specific objectives
b. Identify concrete activities for the implementation
c. Select KPI
d. Report progress and results
e. Support sustainability of the implementation
Interventions and actions will be reviewed by the CT, and analysed to extract commonalities and feed WP4. Implementing
sites will develop the implementation plan and include a more detailed description of the activities, defining specific
actors and institutions involved (who), roles and functions (what), timeline (when) and place (where).
Specific activities will follow the plan and will contribute to its sustainability beyond the duration of the JA.
At the beginning of the implementation (M13-M18), specific follow-up will be organised, including study visits to
implementing sites. This will help implementers to better understand the local process, to highlight the transferring/
implementation process at local level, to initiate the validation of the implementation (in coordination with WP3) and to
contribute to the sustainability of the implementation (in coordination with WP4 and training session for end user with
WP7). All workshops will be described in the corresponding report.
Training programmes for end users (i.e. professionals at adopters’ places) will be provided at adopters’ places during
13
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
this phase. The training programme will be implemented through online and face to face sessions using the materials
developed by Task 7.2. Close follow-up of each implementing site will be carried out by the coordination team.
At the end of the implementation period, a validation of the situation in the implementing sites will be carried out
in coordination with WP3. Support will be provided to implementing sites for the drafting of the report. The overall
experience will be shared at the last annual Consortium meeting, when all implementing sites will report on their
experiences and learning process.
Work package WP7 – Capacity building
Work Package Number WP7 Lead Beneficiary 5. NIJZ
Work Package Name Capacity building
Start Month 8 End Month 34
Objectives
1. To reinforce and build capacities in MS for development, implementation, surveillance and evaluation of BPs,
including activities are based on assessment of the
features of health care system, characteristic of the BP and of the sociocultural context.
2. To assure policy support and financial mechanisms for implementation of best practices.
3. To develop and support training programmes, to train the trainers.
Description
T7.1 Policy developments and financial mechanisms (stakeholders involvement process) (GÖG/NIJZ, All other CA;
Implementing organisations) (M8-M16)
For successful sustainable implementation of BP, legislation or other health system’s regulatory framework, sources of
financing, other resources, training programmes, surveillance structures and activities, are needed to be developed and
enforced. WP7 will, in collaboration with other WPs, build these capacities. WP4, Task 4.1 will provide in-depth analysis
of core characteristics of BP, of health system and of the sociocultural context including needs in transferring countries.
Based on these outcomes, Task 7.1 will identify relevant stakeholders, organize workshops (in collaboration with WP6)
and facilitate policy process. Policy process shall result in regulatory background (i.e. documents such as laws or by-
laws or regulations) for implementation of BP(s), including contents, resources for provision, training and continuous
support, surveillance and evaluation. Besides, financial mechanisms in transferring countries will be identified and plan
of actions will be prepared, aimed at sustainable financing of BP(s). Framework for these activities will be provided
through WP6, Task 6.2. Task 7.1 is country/region specific and will be performed in every transferring country/region.
Task 7.1 contributes to WP4, Tasks 4.3 and 4.4.
T7.2 Development and provision of training programmes (NIJZ, CAs, Implementing organisations) (M10-M22)
This task will facilitate and support CAs and/or their AEs involved in the implementation of BP(s) to develope and
provide training programmes for professional teams at adopters’ places.
Training activities will be organized in 3 steps:
- Development of training programme is the first step.
- Training the trainers is the second step.
- Training the end-users is the third step.
T7.2 deals wit first two steps and supports T6.2 and 6.3 with the third step. Input for this task are specific elements
of the BP which will be implemented in each specific transferring country/region, delivered in Task 6.1. WP7 will
provide knowledge transfer for planning and providing training programmes; these will include educational objectives,
methods, tools, topics, identified trainers, draft schedule and all other resources needed. We expect multidisciplinary
teams to be engaged in implementing best practices, thus training programmes need to respond also to issues of multi-
and interdisciplinarity in teamwork. BP Owners will contribute to train the trainers in transferring countries/regions,
based on best practice or elements of best practices selected through workshops and mentoring (in collaboration with
WP6). Training programmes are country/region specific and are adapted to the environment of transferring organisation.
14
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Training programmes for end users (i.e. professionals at adopters’ places) shall be implemented and provided at adopters’
places under T6.2 and 6.3 in WP6.
T7.3 Management capacities in transferring organisations (NIJZ, All other competent authorities, implementing
organisations) (M10-M34)
For sustainable provision of preventive and curative programmes in primary health care, such as best practices in CIRCE-
JA, a permanent management structure is needed. Tasks of management structure are: organising and providing training
activities, monitoring training processes and assessing competencies of staff, collecting data, assessing and evaluating
clinical processes and outcomes, advocacy and collaboration with policy makers. This task will facilitate and support
transferring organisations to to develop and implement management of best practices in primary care (in collaboration
with T4.2), through Policy Dialogue (T6.2).
15
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
STAFF EFFORT
Staff effort per participant
Grant Preparation (Work packages - Effort screen) — Enter the info.
Participant WP1 WP2 WP3 WP4 WP5 WP6 WP7 Total Person-Months
1 - SAS 39.00 24.00 4.00 3.00 3.00 56.00 4.00 133.00
1.1 - FPS 36.00 15.00 3.00 0.50 1.00 9.00 2.00 66.50
1.2 - SERGAS 2.00 7.00 1.00 22.00 3.00 35.00
1.3 - ACIS 2.00 3.00 5.00 18.00 6.00 34.00
1.4 - AQUAS 2.00 3.00 1.00 3.00 3.00 12.00 2.00 26.00
1.5 - FISABIO 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
1.6 - IDIVAL 2.00 1.50 1.00 4.00 4.00 8.50 2.50 23.50
1.7 - SCS 1.00 2.00 1.00 2.00 19.50 4.50 30.00
1.8 - SERMAS 2.00 1.00 4.00 4.00 14.00 4.00 29.00
1.9 - FIIBAP 2.00 1.00 1.00 1.00 2.00 14.00 3.00 24.00
2 - 7HRC 40.00 26.00 76.00 35.00 86.00 112.00 22.00 397.00
3 - AGE.NA.S 11.00 17.00 2.00 46.00 3.00 79.00
3.1 - uslumbria2 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.10 - Liguria ASL 1 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.11 - Liguria ASL 4 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.12 - ASUGI 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.13 - ASL TERAMO 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.14 - BOLOGNA 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.15 - MODENA 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
16
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Staff effort per participant
Grant Preparation (Work packages - Effort screen) — Enter the info.
Participant WP1 WP2 WP3 WP4 WP5 WP6 WP7 Total Person-Months
3.16 - PARMA 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.17 - ROMAGNA 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.18 - ASL ROMA 2 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.2 - ASUR 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.3 - ASLCN2 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.4 - ASL AL 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.5 - ASL ROMA 1 0.50 1.25 1.00 11.00 3.00 14.00 3.50 34.25
3.6 - ASL Roma D 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.7 - AUSL VITERBO 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.8 - ATS Bergamo 0.50 1.25 1.00 2.59 3.00 14.00 3.50 25.84
3.9 - A.LI.SA. 1.85 1.85 1.60 3.60 4.30 20.35 5.14 38.69
4 - NFZ 15.00 80.52 8.00 20.00 24.00 112.00 28.00 287.52
5 - NIJZ 11.00 18.00 2.00 7.00 6.00 47.00 49.00 140.00
6 - MS-MoH 1.00 2.00 3.00 10.00 12.00 56.00 12.40 96.40
6.1 - UMF-CD 9.00 10.00 10.00 1.00 6.00 36.00
6.2 - INSP 1.00 3.00 2.00 6.00 6.00 30.00 6.00 54.00
7 - AVIQ 1.00 3.00 1.00 3.75 5.10 9.00 3.00 25.85
8 - ACSS 0.50 3.00 1.00 3.00 5.00 7.00 3.00 22.50
8.1 - MS-DGS 2.00 3.00 2.00 5.00 6.00 9.00 3.00 30.00
8.2 - ULSM 0.50 1.50 1.00 2.50 3.00 14.00 3.50 26.00
8.3 - CHLC 0.50 1.50 1.00 2.50 3.00 14.00 3.50 26.00
17
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Staff effort per participant
Grant Preparation (Work packages - Effort screen) — Enter the info.
Participant WP1 WP2 WP3 WP4 WP5 WP6 WP7 Total Person-Months
8.4 - CHLO 0.50 1.50 1.00 2.50 3.00 14.00 3.50 26.00
8.5 - ARSLVT 0.50 1.50 1.00 2.50 3.00 14.00 3.50 26.00
9 - GÖG 1.00 1.00 3.00 1.00 13.00 19.00
10 - CIPH 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
11 - MSAE 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
11.1 - UTARTU 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
12 - NNK 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
13 - MoH-RL 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
14 - NBHW 2.00 3.00 2.00 5.00 6.00 28.00 7.00 53.00
Total Person-Months 201.85 267.12 158.60 264.29 291.40 1065.35 301.04 2549.65
18
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
LIST OF DELIVERABLES
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D1.1 Project Handbook WP1 1 - SAS R — Document, report SEN - Sensitive 6
D2.1 Dissemination Strategy and Action Plan WP2 4 - NFZ R — Document, report PU - Public 5
D2.2 Project Web Site WP2 4 - NFZ DEC —Websites, patent PU - Public 6
filings, videos, etc
D2.3 Leaflet 1 - description and promotion of the WP2 4 - NFZ OTHER PU - Public 7
JA
D2.4 Leaflet 2 – JA results WP2 4 - NFZ OTHER PU - Public 36
D2.5 Dissemination & communication outcomes WP2 4 - NFZ R — Document, report PU - Public 36
report
D2.6 JA Knowledge Transfer & Capacity building WP2 4 - NFZ DEC —Websites, patent PU - Public 24
HUB filings, videos, etc
D3.1 JA assessment Plan WP3 2 - 7HRC R — Document, report PU - Public 6
D3.2 JA formative assessment progress report WP3 2 - 7HRC R — Document, report PU - Public 18
D3.3 JA formative qualitative assessment WP3 2 - 7HRC R — Document, report PU - Public 30
outcomes report
D3.4 JA summative quantitative evaluation report WP3 2 - 7HRC R — Document, report PU - Public 34
19
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D3.5 Assess the impact on the EU WP3 2 - 7HRC R — Document, report PU - Public 36
D4.1 Report on BP implementation WP4 3 - AGE.NA.S R — Document, report PU - Public 14
D4.2 Collection of BP implementation WP4 3 - AGE.NA.S DATA — data sets, PU - Public 24
recommendations microdata, etc
D4.3 Scientific Publication on BP implementation WP4 3 - AGE.NA.S R — Document, report PU - Public 30
D4.4 Memorandum of Understanding WP4 3 - AGE.NA.S R — Document, report PU - Public 36
D4.5 International Meeting WP4 3 - AGE.NA.S OTHER PU - Public 36
D5.1 Scoping review WP5 2 - 7HRC R — Document, report PU - Public 4
D5.2 Consensus panel report to facilitate the WP5 2 - 7HRC R — Document, report PU - Public 12
implementation
D5.3 Context-specific report WP5 2 - 7HRC R — Document, report PU - Public 16
D5.4 Context-specific report 2 WP5 2 - 7HRC R — Document, report PU - Public 24
D5.5 Needs Assessment Report WP5 2 - 7HRC R — Document, report SEN - Sensitive 12
D6.1 Initial Implementation Plan WP6 1 - SAS R — Document, report SEN - Sensitive 14
D6.2 Implementation Plan WP6 1 - SAS R — Document, report PU - Public 24
D6.3 Transfer and implementation process report WP6 1 - SAS R — Document, report PU - Public 30
D7.1 Policy development repor WP7 5 - NIJZ R — Document, report PU - Public 16
20
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverables
Grant Preparation (Deliverables screen) — Enter the info.
The labels used mean:
Public — fully open ( automatically posted online)
Sensitive — limited under the conditions of the Grant Agreement
EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444
Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date
No Package (month)
No
D7.2 Training programme WP7 5 - NIJZ R — Document, report PU - Public 12
D7.3 Training report WP7 5 - NIJZ R — Document, report PU - Public 22
D7.4 Best practice’s management plan WP7 5 - NIJZ R — Document, report PU - Public 34
21
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D1.1 – Project Handbook
Deliverable Number D1.1 Lead Beneficiary 1. SAS
Deliverable Name Project Handbook
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 6 Work Package No WP1
Description
Document to support the participants through the JA’s activities and processes
Format: pdf,
Language: English
Deliverable D2.1 – Dissemination Strategy and Action Plan
Deliverable Number D2.1 Lead Beneficiary 4. NFZ
Deliverable Name Dissemination Strategy and Action Plan
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 5 Work Package No WP2
Description
A dissemination strategy and Action Plan will be prepared, outlining the roadmap, monitoring, and assessment of
dissemination & communication activities during the JA. Language: English
Deliverable D2.2 – Project Web Site
Deliverable Number D2.2 Lead Beneficiary 4. NFZ
Deliverable Name Project Web Site
Type DEC —Websites, patent Dissemination Level PU - Public
filings, videos, etc
Due Date (month) 6 Work Package No WP2
Description
A JA website, integrated in NFZ website and linked to partners’, will be released at M6 to allow information sharing,
collaboration, and
networking at EU and international level. The website will contain a JArelated repository of information related to the
partners, dissemination activities, project findings, resources and other relevant news.
Language: English (minimum), optional national partners languages
Deliverable D2.3 – Leaflet 1 - description and promotion of the JA
Deliverable Number D2.3 Lead Beneficiary 4. NFZ
Deliverable Name Leaflet 1 - description and promotion of the JA
Type OTHER Dissemination Level PU - Public
Due Date (month) 7 Work Package No WP2
22
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Description
This leaflet promotes the JA and its objectives at the beginning of the JA.
Language: English
Deliverable D2.4 – Leaflet 2 – JA results
Deliverable Number D2.4 Lead Beneficiary 4. NFZ
Deliverable Name Leaflet 2 – JA results
Type OTHER Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP2
Description
This leaflet promotes the main JA output and key findings at the end of the JA.
Language: English
Deliverable D2.5 – Dissemination & communication outcomes report
Deliverable Number D2.5 Lead Beneficiary 4. NFZ
Deliverable Name Dissemination & communication outcomes report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP2
Description
A final report taking stock of all activities implemented and events organised by the project will be drafted. It will include
the description of actions implemented, key outcomes achieved, and overall evaluation of the dissemination strategy.
Language: English
Deliverable D2.6 – JA Knowledge Transfer & Capacity building HUB
Deliverable Number D2.6 Lead Beneficiary 4. NFZ
Deliverable Name JA Knowledge Transfer & Capacity building HUB
Type DEC —Websites, patent Dissemination Level PU - Public
filings, videos, etc
Due Date (month) 24 Work Package No WP2
Description
The JA HUB will be a knowledge transfer focal point of all partners and project experts. The repository of the provisions
of BPs in PHC and their implementations, platform for the general public (people, patients, media etc.) and professional
audiences in health and care as well as in the health and care administrations. The project HUB will be available as long
as the JA website, at least 2 years more after the JA ends.
Language: English, partner language (for selected content, publications, etc.)
23
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D3.1 – JA assessment Plan
Deliverable Number D3.1 Lead Beneficiary 2. 7HRC
Deliverable Name JA assessment Plan
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 6 Work Package No WP3
Description
A detailed Plan with the process of the evaluation and the methods that they will be used to assess the JA’s progress
and outcomes.
Deliverable D3.2 – JA formative assessment progress report
Deliverable Number D3.2 Lead Beneficiary 2. 7HRC
Deliverable Name JA formative assessment progress report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 18 Work Package No WP3
Description
The progress of the JA per BP would be assessed with the used of the agreed qualitative methodologies.
Deliverable D3.3 – JA formative qualitative assessment outcomes report
Deliverable Number D3.3 Lead Beneficiary 2. 7HRC
Deliverable Name JA formative qualitative assessment outcomes report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 30 Work Package No WP3
Description
The outcomes of the JA per BP and level of satisfaction would be assessed with the used of the agreed qualitative
methodologies
Deliverable D3.4 – JA summative quantitative evaluation report
Deliverable Number D3.4 Lead Beneficiary 2. 7HRC
Deliverable Name JA summative quantitative evaluation report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 34 Work Package No WP3
Description
The outcomes of the JA per BP would be assessed with the used of the agreed quantitative methodologies
24
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D3.5 – Assess the impact on the EU
Deliverable Number D3.5 Lead Beneficiary 2. 7HRC
Deliverable Name Assess the impact on the EU
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP3
Description
The impact of the project implementation and lessons learnt for EU-wide transformation will be assessed.
Deliverable D4.1 – Report on BP implementation
Deliverable Number D4.1 Lead Beneficiary 3. AGE.NA.S
Deliverable Name Report on BP implementation
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 14 Work Package No WP4
Description
Report on the characteristics and features of success and hindrance factors of the BPs’
implementation
Deliverable D4.2 – Collection of BP implementation recommendations
Deliverable Number D4.2 Lead Beneficiary 3. AGE.NA.S
Deliverable Name Collection of BP implementation recommendations
Type DATA — data sets, Dissemination Level PU - Public
microdata, etc
Due Date (month) 24 Work Package No WP4
Description
Interactive database useful for the knowledge and experience sharing on BBPP implementation
Deliverable D4.3 – Scientific Publication on BP implementation
Deliverable Number D4.3 Lead Beneficiary 3. AGE.NA.S
Deliverable Name Scientific Publication on BP implementation
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 30 Work Package No WP4
Description
Scientific publication on the new knowledge generated by the implementation of the BP with the involvement of the AEs
25
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D4.4 – Memorandum of Understanding
Deliverable Number D4.4 Lead Beneficiary 3. AGE.NA.S
Deliverable Name Memorandum of Understanding
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP4
Description
Draft a Memorandum of Understanding among partners and open to all EU healthcare institutes/ agencies/ associations/
units interested to establish a Primary Care Network/Observatory
Deliverable D4.5 – International Meeting
Deliverable Number D4.5 Lead Beneficiary 3. AGE.NA.S
Deliverable Name International Meeting
Type OTHER Dissemination Level PU - Public
Due Date (month) 36 Work Package No WP4
Description
A meeting opened to all the EU countries and entities will be organized in order to promote the Observatory and share
the Memorandum of Understanding.
Deliverable D5.1 – Scoping review
Deliverable Number D5.1 Lead Beneficiary 2. 7HRC
Deliverable Name Scoping review
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 4 Work Package No WP5
Description
It would be a complete scoping review that will be written under the PRISMA guidance
that it will summarise what it has been learnt from published experiences.
Deliverable D5.2 – Consensus panel report to facilitate the implementation
Deliverable Number D5.2 Lead Beneficiary 2. 7HRC
Deliverable Name Consensus panel report to facilitate the implementation
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 12 Work Package No WP5
Description
With this report, the consortium will review the results of the scoping review (D5.1) and the mechanisms and methods
in learning from the experiences that they will have gained from the implementation sites.
26
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D5.3 – Context-specific report
Deliverable Number D5.3 Lead Beneficiary 2. 7HRC
Deliverable Name Context-specific report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 16 Work Package No WP5
Description
This report will summarize the experiences gained from the implementation sites when the attempt the preparation for
the transferring process. It will facilitate the implementation of the Tasks of the WP6.
Deliverable D5.4 – Context-specific report 2
Deliverable Number D5.4 Lead Beneficiary 2. 7HRC
Deliverable Name Context-specific report 2
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 24 Work Package No WP5
Description
This report will summarize the experiences gained from the implementation sites when the attempt the preparation for
the transferring process. It will facilitate the implementation of WP6’s tasks
Deliverable D5.5 – Needs Assessment Report
Deliverable Number D5.5 Lead Beneficiary 2. 7HRC
Deliverable Name Needs Assessment Report
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 12 Work Package No WP5
Description
This report will include the analysis, assessment of the existing needs and definition of key priority areas for the
implementation settings.
Deliverable D6.1 – Initial Implementation Plan
Deliverable Number D6.1 Lead Beneficiary 1. SAS
Deliverable Name Initial Implementation Plan
Type R — Document, report Dissemination Level SEN - Sensitive
Due Date (month) 14 Work Package No WP6
Description
Report describing the initial plans for BPs implementation in each pilot.
27
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D6.2 – Implementation Plan
Deliverable Number D6.2 Lead Beneficiary 1. SAS
Deliverable Name Implementation Plan
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 24 Work Package No WP6
Description
Description of the final implementation plans by each pilot.
Deliverable D6.3 – Transfer and implementation process report
Deliverable Number D6.3 Lead Beneficiary 1. SAS
Deliverable Name Transfer and implementation process report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 30 Work Package No WP6
Description
Summary of the transfer and implementation process
Deliverable D7.1 – Policy development repor
Deliverable Number D7.1 Lead Beneficiary 5. NIJZ
Deliverable Name Policy development repor
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 16 Work Package No WP7
Description
Report describing regulatory solution for implementation of BP(s), and its financing.
Deliverable D7.2 – Training programme
Deliverable Number D7.2 Lead Beneficiary 5. NIJZ
Deliverable Name Training programme
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 12 Work Package No WP7
Description
Training programme specific for each transferring organisation
28
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Deliverable D7.3 – Training report
Deliverable Number D7.3 Lead Beneficiary 5. NIJZ
Deliverable Name Training report
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 22 Work Package No WP7
Description
Report describing the organisation and delivery of the train-the-trainers activities, including planning activities,
implementation, outcomes and recommendations for future use.
Deliverable D7.4 – Best practice’s management plan
Deliverable Number D7.4 Lead Beneficiary 5. NIJZ
Deliverable Name Best practice’s management plan
Type R — Document, report Dissemination Level PU - Public
Due Date (month) 34 Work Package No WP7
Description
Document describing management structures and processes for sustainable implementation of best practices. Input to
T4.3 and D4.3.
29
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
LIST OF MILESTONES
Milestones
Grant Preparation (Milestones screen) — Enter the info.
Milestone Milestone Name Work Package No Lead Beneficiary Means of Verification Due Date
No (month)
1 Kick-off meeting held WP1 1-SAS Minutes of the first meeting of the Consortium 2
2 Availability of website WP2 4-NFZ The website, integrated in NFZ website, will 6
provide all information about the JA, partnership,
funding and results. It will disseminate high
quality information on key activities, methods &
tools, and outcomes of the project.
3 Final conference WP2 1-SAS Conference agenda, presentations, photos (for 36
stationary meetings) or video (for on-line
formulas) organised as scheduled.
4 JA assessment Plan approved WP3 2-7HRC Document verifying the approval 6
5 Collection of experiences WP4 3-AGE.NA.S Questionnaire issued, and responses collected 9
6 Collection of criteria WP4 3-AGE.NA.S Questionnaire employed and focus group 17
7 Recommendations WP4 5-ASL ROMA 1 Expert panel constituted, consensus conference 22
carried out and recommendations drawn up
8 Literature search finalized WP5 2-7HRC Literature search performed and reported 4
9 Consensus meeting celebration WP5 2-7HRC Report of the consensus meeting 12
10 Transferring activities started WP6 1-SAS Report on transferring activities 12
11 Training programme finalised WP7 5-NIJZ Each transferring organisation establishes its own 21
team of professionals. Key staff is trained by
M21.
30
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
LIST OF CRITICAL RISKS
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
1 Changes in the participating entities (Low-Medium) WP1 Adaptations of the tasks to be performed, included the required amendments will be put
in place by the coordinator. . The coordinator will prepare a proposal for the reallocation
of budget according to the distribution of tasks and responsibilities. An amendment will
be agreed with the consortium and will be proposed to the EC. This will be specifically
monitored in the case of BP owners and implementing sites.
2 Difficulties in the participation of HCPs and WP4, WP3, WP6, Both BP owners and implementers involved in the transferring process, will have to include
other stakeholders due to overloads related to the WP7, WP5 stakeholders in each territory with the needed profiles. Adaptations to the allowed number of
COVID-19 pandemic (Low-Medium) participants for meetings, transferring support activities, contributing to the description of the
BPs and identification of needs, will be carried out by the coordination team, in collaboration
with partners involved.
3 Limitations to organise face-to-face meetings due to WP4, WP3, WP6, All face-to-face meetings planned would be adapted to the COVID-19 situation by
restrictions resulting emergency measures related to WP2, WP1, WP7, either transforming them into online conferences, webinars or workshops. Adaptable
COVID-19 pandemic (Medium) WP5 methodologies and support systems will be put in place to make the meetings as productive
as face-to-face meetings.
Travel budget distribution will be updated according to the situation during the duration of
the JA , after consultation and agreement with the EC services.
4 Delays in deliverables or official notifications to the WP1 The coordinator will closely follow up deriverables and reports and will check, 15 days earlier
HaDEA (Medium) of the deadline, the status of every deliverable or milestone to be sent to HaDEA (and in every
control meeting). In case of potential delays, it will be informed and justified beforehand
establishing the real deadline, and resources will be redirected to ensure the objectives and
results as stated.
5 Results not disseminated as expected (Low) WP4, WP3, WP6, CIRCE-JA impact will be measured in two levels: a) the Joint Action in overall (including
WP7, WP5 impact on external stakeholders) and b) the implementers SMART key performance
indicators will be tailored to each implementing site according to the selected BP
implemented to avoid unnecessary duplication or unrealistic indicators. The customization
31
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
of the indicators will be framed into transfer WPs (WP 5-7) during the definition of specific
interventions and action to implement.
6 Lack or insufficient agreement on indicators (Low) WP4, WP3, WP6, CIRCE-JA impact will be measured in two levels: a) the Joint Action in overall (including
WP7, WP5 impact on external stakeholders) and b) the implementers SMART key performance
indicators will be tailored to each implementing site according to the selected BP
implemented to avoid unnecessary duplication or unrealistic indicators. The customization
of the indicators will be framed into transfer WPs (WP 5-7) during the definition of specific
interventions and action to implement.
7 Evaluation is not feasible (Low) WP4, WP3, WP6, WP3 has been designed to provide a methodological framework for assessing the JA progress
WP7, WP5 and impact. The WP3 has a thorough plan to monitor the progress of the project as well as
the impact by using tailored indicators based on scientific grounds that will be reviewed and
updated if necessary, in order to provide a better outlook on the progression and fulfilment
of objectives.
8 Limited sustainability beyond CIRCE-JA duration WP4 CIRCE-JA WP4 is addressing the issue of sustainability of BP implementations and wider
(Low) outreach of the JA impact. The configuration of a network/observatory to collect experiences
and support implementers and other stakeholders will deal with this issue, with contributions
from the EAB.
9 Transfer methodology designed is difficult to adapt WP6, WP7, WP5 WP 5 leader will tackle also the needed customisation of the transferring methodology
to implementers (Low-Medium) designed, enabling all implementing sites to define a specific implementation plan. The
identification of principles and characteristics of BPs successful implementation in WP4 will
help the implementation process. WP6 leader will contribute to this adaptation too.
In case WP5 methodology development is not achieved, an alternative proven methodology
approach (PDSA) in previous Joint Actions (CHRODIS+, JADECARE) will be used.
10 Transfer support activities are delayed (Medium) WP6 WP6 leader will monitor the effective deployment of the different support activities
envisaged in CIRCE-JA. A deeper knowledge of the different BPs together with the set of
support activities included in WP6 will prevent delays in the transferring and implementation
process. Close monitoring of all implementation sites will be carried out by WP6 leader, and
specific extra support will be provided. BP owners will ensure guidance to the process.
11 Cultural, financial, professional, healthcare systems WP6, WP7 All implementing sites have committed to start the implementation of the BP as scheduled,
32
Project: 101082572 — CIRCE-JA — EU4H-2021-JA2-IBA
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Critical risks & risk management strategy
Grant Preparation (Critical Risks screen) — Enter the info.
Risk Description Work Package Proposed Mitigation Measures
number No(s)
and regional legislative barriers hampered the Close monitoring by WP6 leader will identify difficulties and address them in collaboration
implementation of BPs (Low-Medium) with implementing sites, supported by WP7 on capacity building activities. . If needed,
further fine-tuning of the support activities will be put in place to ensure the implementation
of BPs. Involvement of local stakeholders will be key to limit the potential barriers to
implementation, with the support of WP7 leader for addressing policy developments and
financial mechanisms needed.
12 Difficulties in the coordination among partnership WP4, WP3, WP6, All partners are involved in the action. The coordinator and the WPs leaders will provide
(Low-Medium) WP2, WP1, WP7, extra support to relevant partners (BPs owners and implementing sites). Additional virtual
WP5 meetings of the CT and the SC will be planned, to share a common understanding of roles,
tasks, activities and deadlines.
33
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
ANNEX 1
EU4Health Programme (EU4H)
Application Form
Technical Description (Part B)
(EU4H Standard)
Version 1.0
15 April 2021
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
TECHNICAL DESCRIPTION (PART B)
COVER PAGE
Part B of the Application Form must be downloaded from the Portal Submission System, completed and then assembled
and re-uploaded as PDF in the system.
Note: Please read carefully the conditions set out in the Call document (for open calls: published on the Portal). Pay
particular attention to the award criteria; they explain how the application will be evaluated.
PROJECT
Project name: JA TRANSFER OF BEST PRACTICES IN
PRIMARY CARE
Project acronym: CIRCE-JA
Coordinator contact: SERVICIO ANDALUZ DE SALUD (SAS)
HISTORY OF CHANGES
HISTORY OF CHANGES
VERSIO PUBLICATION
CHANGE
N DATE
1.0 15.04.2021 Initial version (new MFF).
1.1 05/09/2022 Removed sections from the PartB: to avoid repetition of
sections already uploaded to SyGMa (PartA). Detail of
sections removed:
• 2.7. Risk management
• 4.2 Work packages and activities (including WP
objectives, description, deliverables and
milestones)
• Annex 1 of the PartB: detailed budget table.
Included as a separate Annex on SyGMa
1.1 05/09/2022 Part A WP 1 Periodic and final Reports to HaDEA
removed as deliverables
1.1 05/09/2022 Part A Budget: As requested details of travel and
subsistence have been included in the financial
information. This action has generated some
discrepancies (cents level) and adjustments has been
done to avoid them
1.1 05/09/2022 Part A Budget: Minor modifications (cent level) have been
carried out in:
• AGENAS (Personnel +0.32);
2
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
• All Italian AEs (3.1-3.18): Personnel +0,2 each AE /
Travel+ 0,39 each AE, Other Costs +0,78 each AE;
CIPH: Reduce in Personnel -0,41 €
1.1 05/09/2022 Part A Budget: Affiliated 3.18 Asl Roma 2’s budget was
empty in the platform and it has been completed as in the
proposal submitted
1.1 05/09/2022 Part A Budget: Affiliated 3.5 Asl Roma 1 Requested EU
contribution corrected to reflect 80% EC funding (=
Maximun EU contribution)
1.1 05/09/2022 Part A Budget: Ben 5 NIJZ Budget corrected: 4000 €
included under C.2 equipment for the acquisition of 2
computers to be used 100% in the project; Category C.3
Other goods update to 27.500. Category C.1 Travel has
been decreased proportionally.
1.1 05/09/2022 Part A Budget: Ben 9 GOG Budget corrected: Category C1
increased in +2746 €, Category A Personnel reduced
accordingly
1.1 05/09/2022 Part A Risk Management: Description on how the risk will
be mitigated included
1.1 05/09/2022 Part A WP1. Periodic and Final Reports erased them from
the list of milestones.
1.1 05/09/2022 Part A WP3 Panels clarification included
1.1 05/09/2022 Part A WP3 D 3.2 one delivery date stablished (instead of
4 as it was in the proposal stage)
1.1 05/09/2022 Part A WP3 D 3.4 report type added into which the data
sets would be incorporated
1.1 05/09/2022 Part A, WP4. T4.4 was rewritten: A clarification on the
development of a European Primary Health Care
Observatory was included:
• The suggestion of integration with the Public Health
Best Practice Portal of the European Commission
was added.
The sentence "for all the Countries, even the ones not
included in the CIRCE-JA Consortium" was added.
1.1 05/09/2022 Part A, WP4: MS9 description was rewritten
1.1 05/09/2022 Part A, WP4: Deliverable D4.5 for the dissemination of the
creation of the Observatory was added.
1.1 05/09/2022 Part A, WP4: The word “network” was replaced by
“observatory”.
1.1 05/09/2022 Part A WP7: Review and update of tasks 7.1 ,7.2 and 7.3.
1.1 05/09/2022 Part A WP7: Deliverable D7.1 name updated.
1.1 05/09/2022 Part A WP7: Deliverable D7.4 added to the table.
1.1 05/09/2022 Part A, WP4: Participants name and role of task 4.1 and
4.2 updated
3
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
1.1 05/09/2022 Part A WP5: needs assessment has been made more
visible including an specific objective and T5.2 has been
modified accordingly
Part A WP5 D5.3 reduced to 1 deliverable in M16, D5.4
included as an update of D5.3 with delivery date M24
1.1 05/09/2022 Part A WP5: T 5.3 toolkit url updated and additional details
included
1.1 05/09/2022 Part A WP7: Deliverable D7.1 Lead Beneficiary updated.
1.2 12/10/2022 Part A Ben 6 affiliated 6.1 UBB has been replaced by
UMF-CD after the request of Ben 6 and the OK of the PO
(pending short name change on WP tasks in SEDIA WP
tasks)
1.2 12/10/2022 Part A Budget: budget and p/m shift between Ben 6 and its
affiliated 6.2
1.2 12/10/2022 Part A WP 3 DG SANTE suggestions on indicators have
been included in WP 3 and T3.1 and D.3.1 has been
rewritten accordingly
1.2 12/10/2022 Part A WP4 T4.1 The description of the contribution to the
EU agenda has been improved in T4.1
1.2 12/10/2022 Part A T4.3 and T4.4 input from the External Policy Board
included and meeting periodicity in T1.2
1.2 12/10/22 Part A WP5 A new deliverable D5.5 Needs Assessment
Report has been included
1.2 12/10/2022 Part A WP6 D6.3 Renamed “Transfer and implementation
process report”
1.1 05/09/2022 Part B. 1.1 Background and general objectives. Few
changes in description of Slovenian BP6
1.1 05/09/2022 1.2 Needs analysis and specific objectives. Data Sources
and data clarifications were included.
1.1 05/09/2022 1.2 Needs analysis and specific objectives. Description of
Poland Health Care Systems was included.
1.1 05/09/2022 1.2 Needs analysis and specific objectives. Indicators were
updated.
1.1 05/09/2022 1.2 Clarification on the analysis of needs and generation of
the initial mapping. Corrected map of adopting BP
1.1 05/09/2022 1.2 MSs’ legislation, contribution to the EU strategic and
legislative contexts and regional legislation aspects
commented
1.1 05/09/2022 1.3 Potential use of JA results beyond participating MS
better explained
1.1 05/09/2022 1.3 Complementarity with other actions and innovation —
European added value. Description of innovation updated
1.1 05/09/2022 2.1 Concept and Methodology, Sustainability. A
clarification on the development of a European Primary
Health Care Observatory was included:
4
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
• The suggestion of integration with the Public Health
Best Practice Portal of the European Commission
was added.
• A database reference was added.
1.1 05/09/2022 2.1 Concept and Methodology, Sustainability. The word
“network” was replaced by “observatory”.
1.1 05/09/2022 2.1 Concept and methodology: few changes in description
of WPs
1.1 05/09/2022 2.1 Corrected map of adopting BP
1.1 05/09/2022 2.1 Normalisation Process Theory toolkit url replaced
1.1 05/09/2022 2.1 IT tools facilitating the implementation of BP TELEA
explained
1.1 05/09/2022 2.1 References: 2 additional references included
1.1 05/09/2022 2.3 Project teams, staff and experts. Project teams and
staff section updated
1.1 05/09/2022 2.3 Project teams, staff and experts. Spanish, Greek
Italian, Polish, Slovenian and Portuguese experts section
updated
1.1 05/09/2022 2.4 Management Structure updated (managerial and
scientific bodies composition)
1.1 05/09/2022 3.1 Further description of innovation regarding transferring
process included
1.1 05/09/2022 3.1 Impact and ambition. Patients/health care users
section was updated.
1.1 05/09/2022 3.3 Sustainability and continuation. The word “network”
was replaced by “observatory”.
1.1 05/09/2022 4.1 Work plan. The word “network” was replaced by
“observatory”.
1.1 05/09/2022 4.3 Timetable. The word “network” was replaced by
“observatory”.
1.1 05/09/2022 4.3 Timetable: titles of tasks 7.2 and 7.3 changed
1.1 05/09/2022 Annex 2: Tables deleted (staff and experts profile
integrated in section 2.3 “Project teams, staff and experts”.
URL of the full CV file updated.
1.1 05/09/2022 Annex 3 UOC GÖG previous projects included
1.2 12/10/2022 Part B Experts: A sentence has been included confirming
that each pilot site will engage doctors, nurses and social
workers as required.
1.2 12/10/2022 Part B Experts: Experts profiles from SERGAS (Galicia),
AQUAS (Catalonia) and AVIQ have been included
1.2 12/10/2022 Part B AE 6.2 UBB replaced by UMF-CD along the text
1.2 12/10/2022 Part B section 1.2, 1.3 and 2.1 the number of
implementing sites has been corrected along the text.
1.2 12/10/2022 Part B section 2.1More details have been included to
justify the methodological framework chosen
5
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
1.3 08/11/2022 Part a an Part B CIRCE Acronym has been replaced by
CIRCE-JA in order to avoid potential trademark issues.
1.3 08/11/2022 Part A WP2 MS2 and D2.2 have been updated: the
project website will be integrated in NFZ website
1.3 08/11/2022 Part A W6 T6.3 The missing reference to Training
programmes for end users has been included in T6.3.
1.3 08/11/2022 Part B Section 2.4 details on the role of the EBP have
been included
1.3 08/11/2022 Part B annex 4 created with the list of the initial
implementing sites
1.3 08/11/2022 Part A and B During the validation process, the AE
‘Agrupamento de centros de saúde de Lisboa Central
(ACES LC)’ was substituted by ‘ADMINISTRAÇÃO
REGIONAL DE SAÚDE DE LISBOA E VALE DO TEJO
(ARSLVT)’.
ACES Lisboa Central is under the administration of other
entity (ARSLVT). As ACES LC was not validated, they
decided to make this modification. The team participating
in the project is the same
6
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
TABLE OF CONTENTS
TECHNICAL DESCRIPTION (PART B) ........................................................................... 2
COVER PAGE ............................................................................................................... 2
HISTORY OF CHANGES ............................................................................................... 2
PROJECT SUMMARY ................................................................................................... 9
1. RELEVANCE ............................................................................................................. 9
1.1 Background and general objectives ....................................................................... 9
1.2 Needs analysis and specific objectives ................................................................ 15
1.3 Complementarity with other actions and innovation — European added value .... 28
2. QUALITY ................................................................................................................. 30
2.1 Concept and methodology ................................................................................... 30
2.2 Consortium set-up................................................................................................ 35
2.3 Project teams, staff and experts ........................................................................... 37
2.4 Consortium management and decision-making ................................................... 73
2.5 Project management, quality assurance and monitoring and evaluation strategy . 76
2.6 Cost effectiveness and financial management ..................................................... 77
3. IMPACT ................................................................................................................... 79
3.1 Impact and ambition............................................................................................. 79
3.2 Communication, dissemination and visibility ........................................................ 81
3.3 Sustainability and continuation ............................................................................. 85
4. WORK PLAN, WORK PACKAGES, TIMING AND SUBCONTRACTING ................ 86
4.1 Work plan ............................................................................................................ 86
4.3 Timetable ............................................................................................................. 87
4.4 Subcontracting ..................................................................................................... 88
5. OTHER..................................................................................................................... 90
5.1 Ethics ................................................................................................................... 90
5.2 Security................................................................................................................ 90
6. DECLARATIONS ..................................................................................................... 90
ANNEXES ...................................................................................................................... 92
Annex 2: CVs ............................................................................................................. 92
Annex 3 List of previous projects ............................................................................... 92
Annex 4. Initial Adopting Sites ................................................................................. 113
7
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Abbreviations
AE Affiliated entity
BPs Best practices
CA Competent authority
COPD Chronic obstructive pulmonary disease
COVID-19 Coronavirus disease 2019
CVD Cardiovascular disease
CT Coordination Team
EFPC European Forum for Primary Care
EMA European Medicines Agency
EP Essencial project
EPB External Policy Board
EU European Union
EUPHA European Public Health Association
GA General Assembly
GDP Gross Domestic Product
GPs General practitioners
HaDEA Health and Digital Executive Agency
HERA Health Emergency Preparedness and Response Authority
HCPs Healthcare professionals
HCPWP Healthcare professionals’ Working Party
HPCs Health promotion centres
IMG Implementers Working Group
JA Joint action
KPI Key performance indicators
LVCPs Low value clinical practices
MS Member States
NCDs Non-communicable diseases
OWG BP Owners Working Group
PAPs Personalised Action Plans
PC Primary care
PHC Primary health care
SC Steering Committee
WHO World Health Organization
WONCA World Organization of Family Doctors
8
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
PROJECT SUMMARY
Project summary
See Abstract (Application Form Part A).
1. RELEVANCE
1.1 Background and general objectives
Background and general objectives
Describe the background and rationale of the project.
How is the project relevant to the scope of the call? How does the project address
the general objectives of the call? What is the project’s contribution to the priorities of
the call?
According to the World Health Organisation (WHO) and UNICEF, primary health care
(PHC) is “a whole-of society approach to health that aims at ensuring the highest
possible level of health and well-being and their equitable distribution”. Since 1978, the
importance of PHC has been internationally recognised by the adoption of the Alma-
Ata declaration1, which identified PHC as key to attainment of the goal of Health for
All. Over 40 years on, these principles are still relevant today, indeed, they were
revisited in the Astana Declaration2 of 2018. The second commitment of the Astana
Declaration is to “build sustainable PHC”. Additionally to the Astana Declaration, two
key documents should be considered providing the background for it, namely: (a) A
Vision for Primary Health Care in the 21st Century (World Health Organization, 2018)3
and (b) Primary Health Care: Transforming Vision into Action – Operational Framework
(World Health Organization, 2020)4. The vision document proposes a set of levers to
help countries accelerate progress across the key components of PHC, while the
operational framework proposes how these levers can be implemented (Kluge et al,
2019)5. The three interrelated and synergistic components towards achieving this aim
are: 1. Meeting people’s health needs through comprehensive promotive, protective,
preventive, curative, rehabilitative, and palliative care throughout the life course,
strategically prioritising key health care services aimed at individuals and families
through primary care and the population through public health functions as the central
elements of integrated health services; 2. Systematically addressing the broader
determinants of health (including social, economic and environmental factors, as well
as individual characteristics and behaviour) through evidence-informed policies and
actions across all sectors; and 3. Empowering individuals, families, and communities
to optimise their health, as advocates for policies that promote and protect health and
well-being, as co-developers of health and social services, and as self-carers and
caregivers. People’s fundamental right to the highest attainable standard of health and
well-being, and the world’s renewed commitment to social justice, are expressed
through adequate social protection and concerted efforts to address the needs of those
who are most disadvantaged. Identifying best practices, establishing sound methods
for evidence and practice transfer, sharing knowledge and expanding research are key
aspects critical for efficiency and innovation of PHC and the sustainability thereof.
Furthermore, although there has been a shift towards evidence-based PHC in most
European countries, the processes by which knowledge is transferred across systems
and between research institutions, healthcare professionals (HCPs), and patients
(Yallop et al. 2006)6 remains an issue largely unaddressed.
9
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Furthermore, health is central to the 2030 Sustainable Development Goals (SDGs)
agenda with Universal Health Coverage (UHC) and ‘leaving no one behind’ being a
key subgoal the target (SDG 3.8) for SDG3 the achievement of which necessitates a
strong focus on PHC health and strengthening PHC are their cornerstones. PHC is
rooted in a commitment to the principles of social justice, equity, solidarity and
participation based on health being a fundamental right for all.
When it comes to European Union (EU) policies and recommendations, it is important
to note that the emphasis on primary care represents a priority highlighted repeatedly
in country-specific recommendations (CSRs) prior to the pandemic7, as well as in the
context of the coronavirus disease 2019 (COVID-19) pandemic (2020/REF/European
Semester). Primary care has been identified as a key priority in terms of elements
needed to strengthen the resilience of their health systems, as well as to improve their
accessibility in many cases. Furthermore, the COVID-19 pandemic highlighted that
where primary care services were adequate, accessible and effective, there was less
pressure on hospitals and across the health system, with all that this implies in terms
of patient safety and better outcomes. There is also a substantial body of research
demonstrating the role of primary care in increasing preparedness and contributing to
societal cohesion. At EU level, the Cohesion Policy 2021-2027, closely linked with the
CSRs implementation, explicitly mentions support to primary care as one of the
objectives of the European Regional Development Fund’s investments.
Furthermore, the foremost panel of experts in the European Commission -the Expert
Panel on effective ways of investing in health (EXPH)- has repeatedly highlighted the
importance of primary health care for the future of Europe, examining which tools and
methodologies are required to assess the performance of primary care (2017)8, and
revisiting this key topic in the context of established by the European Commission
assessed “European solidarity in public health emergencies” in 2021, to provide advice
related to effective, accessible and resilient health systems. One of the EXPH’s critical
recommendations was the urgent need to strengthen PHC, public health and mental
health support systems. Prevention, health promotion and management of chronic
care and vulnerability with a focus on mental well-being are important elements for
strengthening health and solidarity within Europe.
The aim of PHC is to address people’s health in a continuous and high-quality
comprehensive system/approach through their lifetime in a people-centred manner,
which includes their physical, mental and social well-being. PHC is the most inclusive,
cost-effective and efficient approach to improve and maintain Health for All and
provides a frontline interface for public health and citizens engagement that is
necessary for effectively tackling the health crises of communicable and non-
communicable disease of the future.
The COVID-19 pandemic has highlighted the value of primary care in the context of
preparedness and resilience. PHC has played a critical role in the health systems
emergency response and will continue to do so in the recovery. The COVID-19 crisis
has starkly highlighted the importance of placing PHC at the core of health systems.
The recent OECD report (Feb 2021)9 emphasises the importance and relevance of
strong primary health care, organised in multidisciplinary teams and with innovative
roles for health professionals, integrated with community health services, equipped
with digital technology, and working with well-designed incentives, to help deliver a
successful health system response. Transformation and implementation of lessons
learnt from the pandemic are necessary in moving towards better health systems
across Europe. During the pandemic there was a rapid rise in remote consultations,
10
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
with some regions in England having 90% remote consultations, but due to
socioeconomic inequalities some vulnerable patients were excluded. Studies
conducted in the United Kingdom and Germany identified a substantial reduction in
new diagnosis and consultations for non-communicable diseases such as
cardiorespiratory conditions, diabetes and cancers. Furthermore, practitioners felt that
remote consultations compromised some aspects of care due to difficulties in remote
clinical decision-making and reduced frequency in non-COVID related consultations.
The pandemic forced the digital expansion of primary care, now it is imperative that we
coordinate and plan it. The postponement of chronic physical and mental care will have
long term repercussions for the future, which is why investing in healthcare and
particularly PHC is key for a resilient health system. For example, central and eastern
European countries with chronic underfunded healthcare systems have been worse
affected in terms of highest per capita COVID-19 death rates.
General objectives
The EU4Health 2021-2027 agenda aims to improve and foster health in the European
Union (EU) and strengthen health systems. Primary care has been part of the Country
specific recommendations (CSRs) since 2019 and 2020. Coordination in health among
European countries will protect people in normal times and health crises.
The overall objectives of the Joint Action are to effectively transfer and implement the
selected best practices (BPs) among Member States (MS), based on scientific
evidence-based methodology, raising MS capacity in implementing innovative care
models in primary care and addressing health system transformation at this level of
care. Moreover, knowledge transfer and twinning actions will support the transferring
and implementation process, including a wide range of activities, such as policy
dialogues, workshops, staff visits and secondments, expert advice, mutual and peer
learning programmes, and to monitor and assess the pilot implementation. The
transferring and implementation process will be reported, addressing the main
elements and recommendations for its success.
In December 2020, the European Commission launched a call for collecting good
practices in PHC, agreed by the Steering Group on Health Promotion, Disease
Prevention and Management of Non-Communicable Diseases (SGPP). Practices
selected based on evidence of impact, transferability and sustainability were presented
to the Member States during an online Marketplace event (June 2021). Those selected
as the best by Member States are the six that have been included in the Joint Action
Transfer of Best Practices in Primary Care – CIRCE-JA.
Best practises have been selected due to their success and effectiveness in local
regions of development. The six selected best practices are:
1. Integrated Health Association –Region of Wallonia, Belgium
2. TELEA: Home telemonitoring in Primary Care for chronic disease and
Covid-19 – Galicia, Spain
3. Integrated care for complex chronic patients in Andalusia (Spain):
Personalised care action plans (PAPs) – Andalusia, Spain
4. Essencial Project: Adding value to clinical primary care practice –
Catalonia, Spain
5. ‘Health Action for Children and Youth at Risk’ & ‘Health Action for Gender,
Violence and Lifecycle’ – Portugal
6. Health Promotion Centres (HPCs) – Slovenia
1. Integrated Health Association –Region of Wallonia, Belgium
11
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
The Integrated Health Association (ASI) is a practice originally deployed in the region
of Wallonia, Belgium and owned by the AVIQ. Subsequently established the same
system in the regions of Flanders and Brussels, currently there are 101 ASIs that are
active in 52 municipalities, with just over half located in urban areas. These ASI centres
are primary care practices incorporating a multidisciplinary team offering basic
services, including medical care, nursing, physiotherapy and psycho-social assistance.
The team members consult each other in coordination meetings, assessing the needs
of the beneficiaries, including for implementation of /or to consider community health
projects that could help them. Evaluation of these ASI centres has shown a positive
impact on patient health and cost-effectiveness. The lessons learnt from this practice
are that 1) the coordination of providers leads to better quality care in a patient centred
way; 2) the multidisciplinary team coordination allows for the “right care by the right
carer”; 3) the establishment of community health activities.
2. TELEA: Home telemonitoring in Primary Care for chronic disease and Covid-19 –
Galicia, Spain
The Galician Health Service has developed the TELEA tool, integrated into the
electronic clinical record, performing telemedicine and home telemonitoring. Any
patient with specific access, can send information in a pre-established format to his
own electronic record. It is accessible to healthcare personnel from any point of the
Galician healthcare network in real time. TELEA is a home-care platform integrated
with clinical information systems, improving management of chronic illnesses and
balancing the cost of resources used. TELEA integrates several functionalities:
Videoconferencing, Personal Health Record, Custom Notifications, and is ready to
incorporate any clinical protocol, allowing customization. 3,809 patients with chronic
diseases plus 60,607 patients with COVID-19 are being followed up by TELEA in
primary care. Profiles include: arterial hypertension, heart failure, diabetes mellitus,
chronic obstructive pulmonary disease (COPD), COVID-19, oral anticoagulation
treatment, among others. Significant improvements in health outcomes and reductions
in resources required by patients; 17.23% reduction of patients accessing hospital
emergency and admissions, 90.75% reductions in care nursing visits and 31.46%
reduction in primary care doctor visits, with a user satisfaction above 85%. The lessons
learnt from this practice include 1) there has been resistance to change by
professionals and users for new health technologies, which have been overcome with
the use of the well-designed technology, 2) new telemonitoring technology does
improve user satisfaction and the management of their chronic disease.
3. Integrated care for complex chronic patients in Andalusia (Spain): Personalised
care action plans (PAPs) –Andalusia, Spain
Personalised Action Plans (PAPs) are a key element to provide the needed holistic
care for comprehensive health plans designed to tackle the most relevant health
problems in the region by the Andalusian Health Service (SAS-Servicio Andaluz de
Salud). The PAPs are implemented in primary healthcare centres in collaboration with
other levels of care, based on a comprehensive assessment of key aspects of patient
status; including targeting symptoms, functionality and quality of life, and their
preferred desired outcomes. These plans have been designed by multidisciplinary
teams; family physicians, nurses, internists, case manager nurses, pharmacists, social
workers, among others, with the consultation of each patient and/or caregivers. PAPs
are regularly reviewed and revised depending on patient status and needs which are
recorded and stored on the electronic health record facilitating coordination throughout
the healthcare system. There was an overall reduction in the expected healthcare
services utilisation compared to previous year, resulting in a 23.5% reduction in
economic impact costs compared to expected trajectory. Moreover, there was
improvement in health status perceived by patients. The lessons learnt from this
12
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
practice include 1) Guidelines and online training course availability is key for HCPs 2)
A corporate information system for electronic health records in important for PAPs
implementation 3) HCPs’ agendas need to be adapted for performing PAPs 4) the
support of key leaders is vital for the practice’s success.
4. Essencial Project: Adding value to clinical primary care practice -Catalonia, Spain
The Essencial Project (EP) is a public policy initiative that was implemented in 2015,
in primary care centres of Catalonia. The EP is based on knowledge transfer,
evidence-based practices to avoid unnecessary care by the elaboration of
recommendations to reduce low value clinical practices (LVCPs), such as
overdiagnosis, overtreatment, overuse. EP includes four phases: 1) identification of
LVCPs from HCPs, identification of clinical leaders in the primary care teams 2)
prioritisation and elaboration of recommendations, 3) implementation of
recommendations and impact assessment, feedback to monthly primary care teams
using electronic health records and 4) communication of the products adapted to the
citizens and patients. In total, 169 primary care teams participated. The impact of this
practice demonstrated a reduction in LVCP, including a 33% reduction in prostate-
specific antigen screening and 44% reduction in statin prescriptions for cardiovascular
disease prevention. Out of 86 recommendations for primary care, 25 were
implemented. A survey identified that 69% of the HCPs believe that they are best
positioned to deal with LVCPs. Also 64% of HCPs need to decide based on LVCP
more than once per week. The lessons learnt from this project include: 1) the
importance of considering local context for the de-adoption of strategies, 2) providing
adequate training and communication material for patients and clinicians, 3) supporting
key role of clinical leaders from providers 4) addressing barriers identified needs a
multidisciplinary approach and broad stakeholder commitment.
5. ‘Health Action for Children and Youth at Risk’ & ‘Health Action for Gender,
Violence and Lifecycle’ –Portugal
The Health Action for Children and Youth at Risk was created in 2008, by order of
no.31292/2008, and supported by the National Program for the prevention of violence
in Lifecycle. Its main goal was the creation of a structured response for the promotion
of children’s rights and the prevention of abuse and maltreatment in the National Health
Service. The practice incorporates both primary health care and hospital with
paediatric care settings orchestrated through the “National Network of Support Centres
for Children and Youth at Risk”. The model was developed with specific guidelines
from health professionals and disseminated using manuals, flowcharts, register
systems, which allow the standardised working process throughout the NHS. 295
support teams are working in the NHS, including multidisciplinary teams of medical
doctors, nurses, psychologists and social workers. These teams are responsible for
raising awareness among community and health professionals, training HCPs and
partners in addition to providing consulting for HCPs regarding child maltreatment. In
very complex situations, these teams can directly intervene which leads to the situation
being flagged in the health service. Families are assessed using risk indicators
regarding the child, the family, and the socio-economic context. Additionally, there is
close collaboration between health professionals, police, child protection services,
educational, judicial and social protection systems. This network enables early
intervention, appropriate tracking of violent situations and health surveillance of
children and youths at risk to promote the well-being of children and their families.
Between 2008 and 2019, 80,000 children have been monitored. 80% of these children
did not need judicial intervention and were supported at the first level of intervention
with their families allowing their best interests to be met. The lessons learnt from this
practice include: 1) optimum results of intervention are obtained by connecting both
primary care and hospitals, 2) early detection of risk factors by HCPs are key to
13
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
success, 3) Intersectional communication and articulation to the community are
important, 4) it is necessary to improve human resources and time allocation for HCPs
to work on the intervention.
6. Health Promotion Centres (HPCs) –Slovenia
PHC centres are well established in Slovenia, representing the first point of contact for
patients, providing access to curative and preventive services. Given their gatekeeping
role, PHC centres have a wide range of practitioners including general practitioners
(GPs), paediatricians, gynaecologists, community nurses, midwives, dentists for adults
and children, pharmacists, physical therapists, psychologists and others. Every PHC
centre in the country has a Health Promotion Centre (HPC) within its structure. These
centres were introduced in 2002 alongside the National programme for prevention of
cardiovascular diseases, theoretically and conceptually based on a bio-psyco-social
model of care. HPCs provide fee-free lifestyle intervention programmes on healthy
nutrition, physical activity, mental health, smoking and alcohol drinking. An upgrade to
the HPCs was established in 2013 with interventions focused on vulnerable
populations. Twenty-five Health Care Centres across Slovenia implemented the
upgrade project from the period of 2018-2019 lead by the National Institute of Public
Health of Slovenia. An important component of this project has been in linking different
stakeholders in the local communities with the health services, identifying the needs
and accessing vulnerable groups. New professionals, such as dieticians and
kinesiologists, have been added to multidisciplinary teams previously composed of
nurses, physiotherapists and psychologists. Nurses are recommended to lead the
multidisciplinary teams as well as providing services and interventions. The HPCs are
integrated with primary health services which provide preventive check-ups to detect
individuals at risk of non-communicable diseases (NCDs). HPCs provide information,
counselling, motivation, practical lessons, skills training and follow up of users to
change life-style habits due to increased risk for or early stage of chronic NCDs. In
over 15 years of NCDs preventive programme and operating HPCs, more than half of
the adult population has been screened for lifestyle risk factors. There have been
trends in reduced premature mortality due to cardiovascular disease by 19% between
2007 and 2015. However, disparities still exist between regions and income categories.
The lessons learnt with this practice include: 1) multidisciplinary teams in HPCs have
a broad spectrum of competencies and skills to provide health promotion and disease
prevention programmes, 2) Primary health care services together with public health
services reaching out to communities have proved to be a powerful vehicle to reaching
vulnerable groups.
The importance of reinforcing PHC in health systems to address challenges such as
accessibility, continuity, the need to build multidisciplinary teams, achieving balance
between face to face and on-line healthcare, and improving integrated care within the
health systems. The six BPs selected to be implemented in CIRCE-JA are included in
these priorities.
References:
1. International Conference on Primary Health Care. Declaration of Alma-Ata. WHO
Chron. 1978 Nov;32(11):428-30.
2. World Health Organization. Declaration of Astana. Geneva: World Health
Organization. Available: https://www.who.int/primary-health/conference-
phc/declaration. Accessed: February 15, 2022.
3. World Health Organization. A Vision for Primary Health Care in the 21st Century.
Available: https://www.who.int/publications/i/item/WHO-HIS-SDS-2018.15.
Accessed: February 15, 2022.
14
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
4. World Health Organization. Primary Health Care: Transforming Vision into Action
– Operational Framework. Available:
https://www.who.int/publications/i/item/9789240017832. Accessed: February
15,2022.
5. World Health Organization. Creating 21st century primary care in Flanders and
beyond. Copenhagen: WHO Regional Office for Europe; 2019.
6. Yallop JJ, McAvoy BR, Croucher JL, Tonkin A, Piterman L; CH@ Study Group.
Primary health care research--essential but disadvantaged. Med J Aust. 2006 Jul
17;185(2):118-20. doi: 10.5694/j.1326-5377.2006.tb00488.x.
7. Azzopardi-Muscat N, Clemens T, Stoner D, Brand H. EU Country Specific
Recommendations for health systems in the European Semester process: trends,
discourse and predictors. Health Policy. 2015 Mar;119(3):375-83. doi:
10.1016/j.healthpol.2015.01.007. Epub 2015 Jan 20. PMID: 25650138.
8. https://ec.europa.eu/health/system/files/2019-
11/017_assessing_performance_primarycare_en_0.pdf
9. OECD. Strengthening the frontline: How primary health care helps health systems
adapt during the COVID 19 pandemic. 2021 [cited 2021 26th August]; Available
from: https://www.oecd.org/coronavirus/policy-responses/strengthening-the-
frontline-how-primary1626 health-care-helps-health-systems-adapt-during-the-
covid-19-pandemic-9a5ae6da/ Accessed: February 15, 2022.
1.2 Needs analysis and specific objectives
Needs analysis and specific objectives
Describe how the objectives of the project are based on a sound needs analysis in line
with the specific objectives of the call. What issue/challenge/gap does the project aim to
address?
The objectives should be clear, measureable, realistic and achievable within the duration
of the project. For each objective, define appropriate indicators for measuring
achievement (including a unit of measurement, baseline value and target value).
‘Strengthening health systems’ has become one of the general objectives of the
EU4Health Programme. The COVID19 crisis has evidenced the need of :“strengthening
the capability of the Union for prevention of, preparedness for, and rapid response to,
serious cross-border threats to health in accordance with relevant Union legislation, and
improving the management of health crises, particularly through the coordination,
provision and deployment of emergency healthcare capacity, supporting data gathering,
information exchange, surveillance, the coordination of voluntary stress testing of national
healthcare systems, and the development of quality healthcare standards at national
level”.
PHC is a fundamental component of resilient, strong and sustainable health system.
There is need for innovation and improvement of PHC. Collaborative transnational work
focused on the identification and adoption of BPs can be an effective and efficient way of
improving health care system performance. Never the less, there is great need to develop
effective ways of transference of those good practices transnationally in order to take
advantage from the diversity and common health interests of the different systems.
A brief description of Health Care Systems profiles in participating countries and high
level performance indicators1 has been identified (Data source: Country Health Profiles
2021, European Commission, OECD, European Observatory on Health Systems and
15
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Policies. Health in Transition series, European Observatory on Health Systems and
Policies.) https://ec.europa.eu/health/state-health-eu/country-health-profiles_en), trying to
focus the main performance validated indicators and institutional macro arrangements of
interest for defining the transference context and needs.
Austria Health Care System (Bismarck)
Population (Millions): 8.9
Federal government is responsible for regulating
Population over age 65 (%): 19.0
1 social health insurance (SHI) and most areas of
GDP per capita( p/c) : 36,972 €
health care provision. States (9 Länders) regulate,
Relative poverty rate (%,2019):
plan, organise and finance hospital care. Health
13.3
care financing is mixed, with federal level, regional
level and SHI contribution. SHI funds finance the
Life expectancy, years (2020):
largest share of health expenditure. Direct
81.3.
government spending also constitutes a large share
Health spending p/c (2019):
(30 %).
3,943€
Provision of health services is relatively unrestricted
Health Spending Share of GDP:
access to all levels of care including GPs,
10.4 %
specialists and hospitals. There is no formal
Preventable mortality rate2: 157
gatekeeping system. Health care provision remains
Treatable mortality rate3: 75
strongly focused on hospital care.
Physician workforce is comparatively large but with
Outpatient care spending p/c:
a low share of general practitioners and relatively
1.179€
low numbers of nurses.
Outpatient share of total
2014 Health Promotion Strategy put greater
spending: 30%
emphasis on prevention and health promotion. In
Effective primary care4: 599
2017, a reform was put in place with the aim of
Resilience [Population rate with 2
strengthening primary care, including developing
doses COVID19 Vaccine/August
multidisciplinary primary care centers.
2021]: 57%
1. All € figures expressed in EUR PPP. 2019. p/c=Per capita
2. Preventable causes mortality (Age-standardized per 100.000 population.2018)
3. Treatable causes of mortality (Age-standardized per 100.000 population.2018)
4. Avoidable hospital admissions for chronic conditions (Age-standardized rate of avoidable admissions per
100 000 population aged 15+)
Belgium Health Care System (Bismarck)
Population (Millions): 11.5
Federal authorities are responsible for regulating
Population over age 65 (%): 19.1
compulsory health insurance, health products,
GDP per capita: 34,783€
health professions and for setting ambulatory and
Relative poverty rate (%,2019):
hospital budgets. Federated entities (regions and
14.8
communities) are responsible for health promotion &
prevention, organization of primary care (PC) social
Life expectancy, years (2020):
services and community care, financing hospital
80.9
infrastructure and heavy medical equipment, and
Health spending p/c: 3,733 €.
establishing hospital licensing standards.
Health Spending Share of GDP:
Health system is based on compulsory health
10.7%
insurance. Other sources: government subsidies
Preventable mortality rate: 146
and taxes. Health services coverage is nearly
Treatable mortality rate: 71
universal:99 % population.
Patients can consult any GP or specialist without
Outpatient care spending p/c: 877
referral (no gatekeeping). PC doctors mostly self-
€
employed and work in solo practices. Number of
Outpatient share of total spending
nurses has increased over the past decade. Position
23%
16
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Effective primary care: 63 of advanced practice nurse was legally created in
Resilience [Population rate with 2 2019.
doses COVID19 Vaccine/August Initiatives have also been developed to improve the
2021]: 70% continuity and quality of care (care pathways, pilot
projects on integrated care).
Croatia Health Care System (Bismarck)
Ministry of Health (MoH) is responsible for health
Population (Millions): 4,0 policy, planning and evaluation, public health
Population over age 65 (%): 21.0 programmes and regulation of capital investments
GDP per capita: 19,103 € for publicly owned health care providers. MoH is
Relative poverty rate: 18.3 % responsible for tertiary care provision, including
university hospitals. Counties are accountable for
Life expectancy, years (2020): organization and management of primary (health
77.8. centers, public health services, public pharmacies)
Health spending per capita: 1,329 and secondary care (general and specialized
€ hospitals).
Health Spending Share of GDP: Croatia has a mandatory social health insurance
7.0 % system with public financing under a single entity:
Preventable mortality rate: 239 Croatian Health Insurance Fund (CHIF). Most health
Treatable mortality rate: 133 care providers (especially in secondary and tertiary
care) remain under public ownership. Private
Outpatient care spending p/c: 528 providers have grown in number, notably in primary
Outpatient share of total care, dental services and specialized clinics. Most
spending:38% primary care practices have been privatized, with
Effective primary care: N/A the remaining ones in public ownership operating as
Resilience [Population rate with 2 health centers. Primary care doctors –GPs,
doses COVID19 Vaccine/August pediatricians, gynecologists- are usually patients’
2021]: 39% first point of contact with the health system, and act
as gatekeepers.
Estonia Health Care System (Bismarck)
Population (Millions): 1.,3 Ministry of Social Affairs (MoSA) and its agencies
Population over age 65 (%): 20.0 oversee health system. Financing is mainly
GDP per capita: 25,6913€ organized by independent Estonian Health
Relative poverty rate (%,2019): Insurance Fund (EHIF)semi-autonomous public
21.7 organization, pooling most of the public funding for
health and organizing the purchasing of health care.
Life expectancy, years (2020): The health care system is mainly publicly funded
78.6 through solidarity-based mandatory health insurance
Health spending per capita: contributions.
1,733 Primary care network, mostly private family doctors,
Health Spending Share of GDP: acts as the first point of contact. Secondary health
6.7(%) care services are available at hospitals and
Preventable mortality rate: 253 outpatient care clinics; all major hospitals publicly
Treatable mortality rate: 133 owned. Low numbers of nurses and other allied
health professionals (nutritionists, physiotherapists)
Outpatient care spending p/c: reduces potential for task-shifting.
722€ Recent reforms aim to strengthen PHC by
Outpatient share of total establishing health centers through incentivizing
spending 42% mergers between solo practices that provide a wider
Effective primary care: 463 scope of PHC services. Family nurses can now
17
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Resilience [Population rate with 2 prescribe a limited number of medicines, mainly for
doses COVID19 Vaccine/August chronic conditions.
2021]: 41%
Greece Health Care System (Bismarck)
Population (Millions): 10.7 Since 2011, Greece has a highly centralised mixed
Population over age 65 (%): 22.3 health system model: single health insurer collecting
GDP per capita: 19,031 € contributions combined with substantial funding from
Relative poverty rate (%,2019): central government. National Organisation for the
17.9 Provision of Health Services (EOPYY) manages
unified health insurance fund and purchases publicly
Life expectancy, years (2020): funded health services delivered by the National
81.2 Health System (ESY) also contracts private
Health spending per capita: providers, mainly to deliver primary and outpatient
1,603€ care and diagnostic services. Ministry of Health is
Health Spending Share of GDP: responsible for the extensive regulation of the entire
7.8 % system.
Preventable mortality rate: 139 Health care system is strongly centered around
Treatable mortality rate: 90 hospitals. Primary care has not been developed
fully; patients face problems with access, care
Outpatient care spending p/c: continuity, coordination and comprehensiveness of
367€ services.
Outpatient share of total Majority of doctors are specialists, GPs accounting
spending 23% only 7 % of all. Low number of nurses is available.
Effective primary care: N/A Reform aims to increase access and strengthen
Resilience: [Population rate with community level PC, health promotion and
2 doses COVID19 preventive services. Longer-term objective of
Vaccine/August 2021]: 55% progressing to integrated health care model.
Hungary Health Care System (Bismarck)
Until end 2020, Ministry of Human Capacities
Population (Millions): 9.8
administered health care system through the
Population over age 65 (%): 19.9
National Healthcare Service Centre, absorbed by
GDP per capita: 22,103€
newly established National Directorate-General for
Relative poverty rate (%,2019):
Hospitals under Ministry of Interior. A single health
12.3
insurance fund provides health care coverage for
nearly all residents. Fund is administered by:
Life expectancy, years (2020):
National Institute of Health Insurance Fund
75.7
Management (NEAK).
Health spending per capita:
As part of reforms initiated by during COVID-19
1,551€
pandemic, the government introduced additional
Health Spending Share of: 6.4%
funding for wages for GPs who established group
Preventable mortality rate: 326
practices. Group practices that co-operate closely
Treatable mortality rate:176
receive greater amounts of funding in exchange for
preparing a competency map and development plan
Outpatient care spending p/c:
for skills and equipment. Preventive care has not
457€
been a key priority: spending on prevention fell from
Outpatient share of total spending
3.9 % to 3.2 % of total health spending between
29.5%
2010-2019. In an effort to improve preventive care,
Effective primary care: N/A
in 2019, Minister of Human Capacities introduced 5
Resilience [Population rate with 2
national health programmes (2019-22): child,
doses COVID19 Vaccine/August
circulatory diseases, mental health, musculoskeletal
2021]: 60%
disorders and cancer.
18
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Italy Health Care System (Beveridge)
Italy’s National Health Service (SSN) provides
Population (Millions): 59.6
regionally organized universal coverage largely free
Population over age 65 (%): 23.2
of charge at the point of delivery. Ministry of Health
GDP per capita 28,002 €
sets the principles and goals of the health system,
Relative poverty rate
determines core benefit package of health services
(2019):20.1%
guaranteed across the country, and allocates
national funds to the regions. Regions are
Life expectancy, years (2020):
responsible for organizing and delivering health
82.4
care. Geographically based local health authorities
Health spending per capita:
(ASL) deliver public health, community health
2,525€
services and primary care directly, and secondary
Health Spending Share of
and specialist care directly or through public
GDP:8.7%
hospitals or accredited private providers.
Preventable mortality rate: 104
Network of accredited public and private hospitals
Treatable mortality rate: 65
provide inpatient care. GPs and pediatrician. play
gatekeeping role. Primary care services are
Outpatient care spending p/c: 799
delivered by health districts, operative branches of
Outpatient share of total spending
local health authorities. Some regions provide acute
32 %
and chronic care and preventive services for whole
Effective primary care: 293
population by multidisciplinary teams.
Resilience: Population rate with 2
Number of doctors in public hospitals and GPs is
doses COVID19 Vaccine/August
declining. Italy employs fewer nurses than nearly all
2021: 60%
western European countries.
Lithuania Health Care System (Bismarck)
MoH is major player in health system regulation,
Population (Millions): 2.8
setting standards and requirements, licensing
Population over age 65 (%): 19.9
health-care providers and professionals and
GDP per capita: 25,878€
approving capital investments. Municipalities play
Relative poverty rate
important role in service delivery, owning many of
(%,2019):20.6
the primary care centers and small to medium-sized
hospitals, also finance and provide some public
Life expectancy, years (2020):
health services.
75.1
System is organised around a single payer: National
Health spending per capita):
Health Insurance Fund (NHIF), which purchases
1,885€
services on behalf of the insured population.
Health Spending Share of GDP:
Primary care is delivered by a GP or a primary care
7,0%
team. Development of the GP gatekeeping function
Preventable mortality rate: 293
has been an important goal of PC reforms.
Treatable mortality rate: 186
Specialist outpatient care is delivered by outpatient
hospitals departments or separate legal polyclinics,
Outpatient care spending: 614€
as well as by private providers. Increasingly, GPs
Outpatient share of total spending
play a greater role in prevention and management of
33 %
non-communicable conditions through priority
Effective primary care: 985
programmes (cancer screening, management of
Resilience: Population rate with 2
cardiovascular diseases -CVD- and diabetes) for
doses COVID19 Vaccine/August
which they receive additional funding based on
2021: 55%
results.
Poland Bismarck
19
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Governance of the public health system is divided
Population (Millions): 38,0 between Ministry of Health (and supporting
Population over age 65 (%): institutions) and three levels of territorial
18,2 government. Municipalities oversee primary care;
GDP per capita: 22.718 € counties are responsible for (often) smaller
Relative povertyy rate county hospitals; and voivodeships (regions) are
(%,2019):15,4 responsible for generally larger regional hospitals.
Ministry of Health supervises the highly
Life expectancy,years (2020). specialised tertiary care providers. The National
76,6 Health Fund (NFZ) remains the sole purchaser in
Health spending per capita): the statutory health care system. Poland’s health
1.582 system is based on social health insurance (SHI).
Health Spending Share of Primary health care (PHC) is the entry point to the
GDP 2019 (%): 6,5 Polish health care system, with PHC providers
Preventable mortality rate: serving as “gate keepers” to more specialized
222. care. Specialist ambulatory care, which had been
Tratable mortality rate:): 133 separated from inpatient care since early 1990s,
Outpatient care spending: 485 is being moved back to hospitals.
€ Numerous programmes of coordinated care have
Outpatiente share of total been implemented since 2015 improving
spending: 31 % integration of primary and secondary care. Since
late 2017, coordination of care has also been
Effective primary care:1.000 piloted within primary care – care for patients with
Resilience: Population rate selected chronic diseases coordinated by teams
with 2 doses COVID19 of physician, nurse, school nurse and midwife.
Vaccine/August 2021: 50%
Portugal Health Care System (Beveridge)
Population (Millions): 10.3 Planning and regulation take place at central level
Population over age 65 (%): 22.1 by MoH and its institutions and management of the
GDP per capita: 23,062€ NHS takes place at regional level, by regional health
Relative poverty rate administrations (RHAs).
(%,2019):17.2 Health system is characterized by three co-existing
and overlapping systems: the universal tax-financed
Life expectancy, years NHS; special health insurance schemes for
(2020).81.1 particular professions and sectors («health
Health spending per capita: subsystems») and private voluntary health
2,314€ insurance (VHI).
Health Spending Share of GDP: PC is delivered by a mix of public and private health
9.5% service providers. GPs act as gatekeepers to
Preventable mortality rate:138 specialist visits, especially within NHS, and are also
Treatable mortality rate: 83 expected to support integration of care. The creation
of Family Health Units (staffed by multiprofessional
Outpatient care spending: 1,074 € teams), in 2007, and Primary Healthcare Centre
Outpatient share of total Groups, in 2008, restructured the organization of PC
spending: 46% to provide integrated primary care for the local
Effective primary care: 235 population. Secondary and tertiary care is mainly
Resilience: Population rate with 2 provided in hospitals, which are grouped into
doses COVID19 Vaccine/August Hospital Centers covering a given geographical
2021: 74% area.
20
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Romania Health Care System (Bismarck)
MoH is responsible for overall governance of the
Population (Millions): 19.3
social health insurance (SHI) system, while the
Population over age 65 (%): 18.9
National Health Insurance House administers and
GDP per capita: 21,296 €
regulates National Health Insurance Fund (NHIF).
Relative poverty rate
Health care providers are also paid by MoH under
(%,2019):23.8
national programmes.
GPs provide PC mainly in (private) solo practices
Life expectancy, years
contracted by district health insurance funds. GPs
(2020):74.2
have gatekeeping role, although patients with
Health spending per capita: 1,310
certain conditions can access specialists directly.
€
Specialized ambulatory care is provided through a
Health Spending Share of GDP:
network of hospital outpatient departments and
5.7%
polyclinics, specialized medical centers, centers for
Preventable mortality rate: 306
diagnosis and treatment and individual specialist
Treatable mortality rate: 210
physician offices contracted by district health
insurance. Inpatient care is provided by a large
Outpatient care spending: 630€
hospital network.
Outpatient share of total
New screening programmes were introduced:
spending: 27%
cancer, CVDs and Tuberculosis (2018).
Effective primary care: 870
Underserved areas received mobile health units to
Resilience: Population rate with 2
promote prevention. There is scope for introducing
doses COVID19 Vaccine/August
public health programmes tackling key risk factors
2021: 27%
(smoking and alcohol consumption.
Slovenia Health Care System (Bismarck)
MoH is responsible for planning and regulation.
Population (Millions): 2.0
State owns almost all hospitals, largest share of
Population over age 65 (%): 20.2
outpatient specialist care and the entire tertiary care
GDP per capita: 26,414 €
sector. PC is mostly provided by a network of
Relative poverty rate (%,2019):
community-level PHC centers, owned and run by
12.0
municipalities. Patients choose PC physician, who
acts as a gatekeeper. Compulsory social health
Life expectancy, years (2020):
insurance (SHI) system with single public insurer:
80.6
Health Insurance Institute of Slovenia (HIIS)
Health spending per capita: 2,283
provides near universal coverage. General taxation
€
is only a modest source of funding.
Health Spending Share of GDP:
Initiatives have been implemented over the last
8.5%
decade to strengthen care coordination and
Preventable mortality rate: 175
integration. Since 2011, GP “family medicine
Treatable mortality rate: 77
practices” (FMP) introduced new preventive services
and coordination of care for chronic conditions.
Outpatient care spending: 746€
Registered nurses joined family medicine teams,
Outpatient share of total
tasks were shifted from physicians to nurses. In
spending: 33%
2021, more than 90 % FMP operate under this new
Effective primary care: 447
model. Since 2017 new health promotion centers
Resilience [Population rate with 2
deliver integrated public health interventions and
doses COVID19 Vaccine/August
PHC services to improve lifestyle risk factors for
2021]: 43%
chronic diseases.
Spain Health Care System (Beveridge)
21
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
The national health system (SNS) is based on
Population (Millions): 47.3
universal coverage and mainly funded from taxes.
Population over age 65 (%): 19.6
National planning and regulation is the responsibility
GDP per capita: 25,611€
of the MoH. Health competences and jurisdiction
Relative poverty rate
over operational planning, resource allocation,
(%,2019):20.7
purchasing and provision are devolved to the 17
regional health authorities.
Life expectancy, years (2020):
PC is essentially provided by public providers,
82.4
specialized family doctors and staff nurses, who
Health spending per capita: 2.488
provide preventive services and acute and chronic
€
care. PC doctors are the system first contact point
Health Spending Share of GDP:
and have gatekeeper roll. Secondary care takes the
9.1%
form of outpatient specialized care, inpatient care,
Preventable mortality rate: 113
day-case care or emergency care.
Treatable mortality rate: 65
PHC teams provide acute and chronic care, as well
as some health promotion and preventive services,
Outpatient care spending: 893 €
for the whole population. All care levels act de facto
Outpatient share of total
as integrated providers, facilitating continuity of care
spending: 36%
and reducing the risk of fragmentation. The
Effective primary care: 418
Strategic Framework for Primary and Community
Resilience: Population rate with 2
Care was designed in 2019 to enhance primary care
doses COVID19 Vaccine/August
and patient involvement in the Spanish health
2021: 70%
system.
Sweden Health Care System (Beveridge)
Population (Millions): 10.3
The national government is responsible for
Population over age 65 (%): 20.0
regulation and supervision, and the 21 Swedish
GDP per capita: 36,643€
counties have responsibility for financing,
Relative poverty rate (%,2019):
purchasing and providing health services. The
17.1
counties oversee primary, specialist and psychiatric
health care, while the 290 municipalities are
Life expectancy, years (2020):
responsible for care for people with disabilities,
82.4
rehabilitation services, home care, social care for
Health spending per capita:
children and adults, elderly care and school health
3,837€
care. Health care is largely financed by taxes in
Health Spending share GDP:
Sweden. Coverage is universal, with health services
10.9%
either freely available or with small co-payments.
Preventable mortality rate: 118
Both public and privately owned health care facilities
Treatable mortality rate: 66
are publicly funded in Sweden. Public hospitals at
the regional level provide most of the acute care,
Outpatient care spending: 1,292
while university hospitals provide highly specialized
Outpatient share of total
care.
spending: 34%
GPs account for only one in seven physicians.
Effective primary care: 458
Nurses have taken on an expanded role in primary
Resilience: Population rate with 2
care, with the ability to prescribe medicines and
doses COVID19 Vaccine/August
coordinate care.
2021: 58%
CIRCE-JA will transfer 6 best practices in primary care and will support the Member
States to raise their capacity in implementing innovative care models in their health
22
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
systems. These 6 best practices were presented to the participating entities from each
MS. A specific questionnaire was designed to allow participants to select the best
practices to be implemented, and their justification for their initial selection. Alignment with
national/regional priorities, better integration between health and social services,
reorganization of services, strengthening health promotion and synergies with community
care, better coordination of care, previous experiences and similar projects already in
place were among the reasons for the selection of the best practices. Further analysis of
needs will be carried out during de development of CIRCE-JA.
The initial map of adopting BP grouped by MS is as follows:
Lithuania
Romania
Slovenia
Hungary
Sweden
Portugal
Greece
Croatia
Estonia
Poland
TOTAL
Spain
Italy
1. Belgium Integrated Health Association X 2 X
2. Spain_GAL Home Telemonitoring in PC X X 2
3. Spain_AND Personalized Care Action Plans X X X XX X 6
4. Spain_CAT Adding Value to Clinical PC Practice X X X 3
5. Portugal Health Action for Children-Youth-Gender-Violence-Lifecycle X X X X 4
6. Slovenia Health Promotion Centres X X X X X X X X 8
Mix & Match X 1
MSs that ‘own’ the selected best practices will help other MSs interested in implementing
them in their territories. Activities will entail knowledge-transfer and twinning actions
between the ‘owners’ of best practices and the implementers (e.g. workshops, staff visits
and secondments, policy dialogues, short courses, expert advice, mutual peer learning
programmes, etc). There will also be pilots for the actual ‘replication’ of the best practices,
as well as activities to monitor and assess the pilot implementation in the ‘interested’ MSs.
As described before, the situation in the participant MS is diverse, with different healthcare
systems, regulatory frameworks, sources of financing or activities included. An initial in-
depth analysis of the health systems context (socio-cultural, legislative) will be carried out
at the beginning of the action, clarifying if changes are needed and feasible at national or
regional level, as well as the links to the EU strategic and regulatory contexts.
Overall objective
Effectively transfer and implementation of the selected best practices among Member
States, supported by a scientifically based methodology, raising MS capacity in
implementing innovative care models in primary care and addressing health system
transformation at this level of care. Knowledge transfer and twinning actions will support
the transferring and implementation process, including a wide range of activities (e.g.
workshops, policy dialogues, staff visits and secondments, expert advice, mutual and peer
learning programmes, etc.), and to monitor and assess the pilot implementation. The
transferring and implementation process will be reported, addressing the main elements
and recommendations for its success.
Specific Objectives
1. To effectively transfer and implement selected best practices among Member
States/implementing sites
2. To support transference process in pilot sites
23
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
3. To improve capacity in implementing innovative care models and practices in Primary
Care
4. To improve knowledge and skills of transfer methodologies and tools
5. To create a community of stakeholders that includes care givers (owners and
implementers), health care experts, academia, policy makers and/or general public
6. To support implementers in facilitating the sustainability of the practice with plans for
action at local/ regional /national level
7. To perform a systematic appraisal of the quality of the transfer and implementation
process, understanding, evaluating and reporting the experience of adopting BBPP in
heterogeneous implementation sites.
Indicators:
OBJECTIVE Measurement BASELINE TARGET
INDICATORS UNIT VALUE VALUE
1. Number of
To effectively transfer Beneficiaries (MS)
and implement selected adopting BPs
1.1 % 0 >85%
best practices among successfully/Total
Member Beneficiaries MS
States/implementing Participating x100
sites Number of Pilot sites
1.2and implementation Number (N) 42 42
Indicators intend to plans identified
monitor action level
progress and measure the Number of
impact in population Implementation Plans
covered by BPs 1.3 developed/Number of % >85%
Pilot implementation
sites identified
Number of pilot sites
implementing BPs
1.4successfully/Total % >70%
pilots identified
participating x100
Number of BPs
1.5implemented N/% 6 >65%
successfully
Estimated Population
under BPs 1.039.922
1.7implementation (BPs N of persons
(*)
pilots)
Estimated Population
after BPs 28.697.565
1.8 N of persons
implementation (BP (**)
deployment)
(*) Agregated population covered by BPs in pilot sites, estimated by Beneficiaries
(**)Agregated population covered by BPs in deployment areas, estimated by
Beneficiaries
24
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
OBJECTIVE Measurement BASELINE TARGET
INDICATORS UNIT VALUE VALUE
2. Number of activities of field
To support support planned: study visits to
transference 2.1 the owners BPs (6) N 0 18
process in pilot +Secondments
sites Implementation teams (12)
Indicators for Number of activities of field
transference 2.2 support performed/Number of % 0 >85%
support activity field support planned x 100
progress measure
OBJECTIVE Measurement BASELINE TARGET
INDICATORS UNIT VALUE VALUE
3. Number of Policy Dialogue
To improve sessions performed/N of policy
3.1 % >80%
capacity in dialogue sessions planned (1
implementing for beneficiary/MS) x 100
innovative care Number of relevant
models and stakeholders identified
practices in 3.2 (Stakeholders x N >48
Primary Care Country/Region= 4x)
Indicators of Analysis of context, actors and
progress in scenarios of adopters
3.3 implementation sites % >70%
capacity building
performed and reported/N of
implementation sites x100
Number of Training
programmes designed (1x
3.4 transferring % >85%
country/region)/Number of
country/region x100
Number of training
programmes
3.5 implemented/number of % >90%
training programmes designed
x100
OBJECTIVE Measurement BASELINE TARGET
INDICATOR
UNIT VALUE VALUE
4. Transference Framework
To improve 4.1 model revision and Reports 2
knowledge and formulation
skills of transfer Number of consensus
methodologies and meetings with core group
tools 4.2 in each implementation % > 90 %
site/ N of implementation
site x100
25
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Indicators of progress Number of public
4.3 /published reports of BP N 0 6
implementation
Number of professionals
Number of
4.4 participating in knowledge >1000
persons
exchange actions
Number of scientific
publications and
communications in > 30
4.5 Number 0
relevant regional, national
and international
dissemination activities
OBJECTIVE Nº INDICATOR Measurement BASELINE TARGET
UNIT VALUE VALUE
5. 5.1 Conference
Celebration of final
celebrated
To create a community conference with
of stakeholders that targeted audience
includes care givers 5.2 Memorandum of DRAFT
(owners and Understanding to signed
implementers), health establish a
care experts, academia, European Primary
policy makers and/or Health Care
general public Network
5.3
Indicators for process Number of
measure and outcome stakeholders’ >12
events implemented
5.4 Number of
stakeholders
involved in the % >15%
transference
process/ N of
stakeholders
identified x 100
OBJECTIVE Measurement BASELINE TARGET
Nº INDICATOR
UNIT VALUE VALUE
6. Guidelines and standard
operation procedures for
To support 6.1 N documents >1
BPs uptake and
implementers in sustainability
facilitating the
sustainability of the N of consensus meetings
practice with plans with delegates from all
for action at local/ participating settings for
regional /national 6.2 % >80%
sustainability action plans
level at beneficiary level/N
beneficiaries x100
26
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Indicators of
progress on Number of action plans of
sustainability sustainable finance of BP
planning of BP and 6.3 prepared in transferring % 0 >10
output/results countries/regions /N
countries/region x100
OBJECTIVE Measurement BASELINE TARGET
Nº INDICATOR
UNIT VALUE VALUE
7.
N of evaluation reports
To perform a generated (based on
systematic appraisal quantitative and qualitative
of the quality of the 7.1 methodology and set of % >85%
transfer and process indicators
implementation discussed, agreed and
process, implemented) /N of reports
understanding, planned x 100
evaluating and
reporting the
experience of
adopting BBPP in Level of satisfaction
heterogeneous addressed with JA
implementation sites. progression (PHC
7.2 % >80%
practitioners/recipients of
Indicators of general the action, patients and
progress of the JA and other stakeholders)
output/results
27
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
1.3 Complementarity with other actions and innovation — European added value
Complementarity with other actions and innovation
Explain how the project builds on the results of past activities carried out in the field
and describe its innovative aspects. Explain how the activities are complementary to
other activities carried out by other organisations.
Illustrate the European dimension of the activities: trans-national dimension of the
project; impact/interest for a number of EU countries; possibility to use the results in
other countries, potential to develop mutual trust/cross-border cooperation among EU
countries, etc.
Which countries will benefit from the project (directly and indirectly)? Where will the
activities take place?
This JA is based on the overarching principles of the Astana Declaration, adding on its
vision with and European perspective. The operational framework of this Declaration
provides to the project an excellent template to work upon and translate the 6 different
BPs in one will tailored European strategy for PHC.
CIRCE-JA will benefit from the work carried out in previous European Union (EU) joint
actions (JA) and projects with a focus on the cross-border transfer of practices.
Regarding JA, two are of especial interest: CHRODIS-PLUS JA, already ended, and
JADECARE, currently in place, in which seven CIRCE-JA participating MSs are also
involved.
CHRODIS-PLUS (2017-2020) contributed to the reduction of the burden of chronic
diseases by the implementation of policies and practices that have demonstrated to be
successful. The sharing of these practices across EU countries was the core of this
action, like CIRCE-JA. Altogether, 21 implementation pilots were put in place in the
following areas: health promotion & primary prevention, an integrated multimorbidity
model, fostering quality care for people with chronic diseases, ICT-based patient
empowerment and employment and chronic diseases. Most of the implementation
pilots were based on PHC and four CIRCE-JA participating MS were involved in
CHRODIS-PLUS, with entities also participating in CIRCE-JA.
The currently active JADECARE (2020-2023), is the joint action on implementation of
digitally enabled integrated person-centred care, which was launched to face the
challenges of the transformation of health and care in the EU. JADECARE intends to
reinforce the capacity of health authorities to successfully address aspects of health
system transformation, in particular the transition to digitally enabled, integrated,
person-centred care in the EU. Out of the 17 EU countries participating, six are also
involved in CIRCE-JA. In JADECARE, four original good practices from “early
adopters” will be transferred to next adopters, generating knowledge into the
healthcare systems of the participating partners.
These JAs represents a solid base for the work to be carried out in CIRCE-JA, helping
to reinforce through BP transfer the capacity of health system to strengthening PHC.
The participating entities have been actively involved in other JAs, assuring the
background and experience for collaborating within and across EU countries.
The SCIROCCO Exchange EU project (2019-2022) aims to support health and social
care authorities in the adoption and scaling-up of integrated care. The ambition of the
project is to maximise the value and impact of the SCIROCCO tool for regions and
organisations involved in the deployment of integrated care. Polish CA (NFZ) has been
28
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
in charge of its dissemination and is leading the same WP in CIRCE-JA, taking
advantage of this experience.
Considering research and innovation perspective, four CIRCE-JA participants have
been involved in TO-REACH, a Coordination and Support Action (CSA) to prepare a
joint European research programme aimed at producing research evidence supporting
healthcare services and systems to become more resilient, effective, equitable,
accessible, sustainable and comprehensive in Europe. TO-REACH focuses on
transferring innovation in health systems and its results and materials will contribute to
the success of CIRCE-JA.
Activation of service providers and their support by the public payer during the
implementation of pilots testing best practices in primary care is an innovative form of
intersectoral cooperation. Conducting pilots in an atmosphere of dialogue and
providing contractors with tools to facilitate the organization, implementation of
procedures as well as translated and adapted information and educational materials
for patients is an important element of testing and scaling new solutions in healthcare.
Thus, based on the previous experience in participation in EU initiatives, CIRCE-JA
constitutes a step forward in a collaborative approach to engage healthcare authorities
and systems in the field of PHC for the first time. The knowledge and experience
generated during the duration of this JA will be shared beyond the CIRCE-JA
consortium, expanding this vision and contributing to the European added value of this
initiative. The development of a European Primary Care Observatory will serve as a
repository for CIRCE-JA results, which will be available beyond the duration of the JA
and to other non-participating countries. This will allow the possibility to build further
collaboration and coordination among countries in the future.
Overall, 14 EU MS are participating in CIRCE-JA, 12 of them will implement 42 pilots
based on six BPs from three EU MS.
CIRCE-JA geographical coverage
29
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
2. QUALITY
2.1 Concept and methodology
Concept and methodology
Outline the approach and methodology behind the project. Explain why they are the
most suitable for achieving the project’s objectives.
In December 2020, the European Commission launched a call for collecting best
practices in PHC, agreed by the Steering Group on Health Promotion, Disease
Prevention and Management of Non-Communicable Diseases (SGPP). Practices
selected on the basis of evidence of impact, transferability and sustainability were
presented to the Member States during an online Marketplace event (June 2021).
Those selected as the best by Member States are the six that have been included in
the Joint Action Transfer of Best Practices in Primary Care - CIRCE-JA
Effective transference of those six BPs (getting them implemented, validated and
sustainable in a new adopting setting) requires a decision from the side of eventual
adopting implementers, based on their needs, about what of those BPs are they
interested in. As a result of this preliminary approach the following matrix has been
generated:
Lithuania
Romania
Slovenia
Hungary
Sweden
Portugal
Greece
Croatia
Estonia
Poland
TOTAL
Spain
Italy
1. Belgium Integrated Health Association X 2 X
2. Spain_GAL Home Telemonitoring in PC X X 2
3. Spain_AND Personalized Care Action Plans X X X XX X 6
4. Spain_CAT Adding Value to Clinical PC Practice X X X 3
5. Portugal Health Action for Children-Youth-Gender-Violence-Lifecycle X X X X 4
6. Slovenia Health Promotion Centres X X X X X X X X 8
Mix & Match X 1
Transference involves both owners and implementers of the BPs, in an iterative
complex process of needs, contexts, actors and key elements of the practices analysis,
assessment and understanding and developing of the required capacities for a
successful implementation of the practice with all the required adaptations to local
conditions.
It is necessary to understand the nature of the BP as well as the needs of implementers
environment. In order to enhance this interchange, a formal common shared vision is
needed for the whole process and the goals to be achieved by the different
beneficiaries and implementing sites.
Methodological framework
A sound methodology of transference concepts and transferring process will be
developed (WP5) in order to support, based in a common shared, conceptually and
terminology, the implementation process in the different sites. A literature search as
well as in EC research and implementation projects will be carried-out to select the
appropriate methodological framework to be used for the transferring of the selected
best practices (T5.1), combining scientific and practical inputs in this selection. The
30
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
SQUIRE (Standards for Quality Improvement Reporting Excellence) guidelines for
quality improvement reporting: explanation and elaboration will guide the transferring
process1. The TO-REACH project (Nolte and Groenewegen, 2021) will be included
among them2.
Given that reference model, contextual conditions, needs assessment and objectives
and expected outcomes, the key priority areas are for the implementation settings will
be defined (T5.2) using collaborative methods that enhance learning from the
experiences gained from other settings and from the sites of this JA. A consensus
meeting with the core group in each implementation site and the key people from the
coordination team and WP5 leader will be held. The framework of the TO-REACH
project (Nolte and Groenewegen, 2021) will guide the process of this meeting that will
prepare a report on priorities, potential weakness and barriers for implementation as
well as actions for improvement.
One meeting in each implementation site will be carried-out to prepare the design of
the transferring process of the selected best practice. The Normalisation Process
Theory for Implementing, Embedding, and Integrating the best Practices will be used
to support the implementation of the best practice
(https://bmcmedicine.biomedcentral.com/articles/10.1186/1741-7015-8-63). The tools
of the theory used in the RESTORE project funded by the European Commission
under FP7will be used to support the work of implementation, while two selected
tools: the interactive toolkit will assist the way of thinking the implementation problems
and 23 item survey instrument (NOMAD https://www.implementall.eu/17-nomad.html)
will assist the project in assessing implementation processes from the perspective of
professionals involved in implementation.
The transferring process is part of the implementation effort, a complex intervention in
various and different European settings. Considering that there is a gap between
research and implementation (Murray et al, 2010)3, the normalisation process theory
will address the factors needed for successful implementation and integration of
interventions into routine work.
Initial implementation plan: Identification, definition and selection of the specific
interventions to be implemented by each pilot site. Each pilot site will identify the
selection of the specific elements of the BPs to be implemented in each of them (T6.1).
To better identify the characteristics of the BPs selected by each pilot site, specific
workshops will be organized following the analysis performed in WP5. This initial
selection will be supported by all six BPs owners’ teams. All pilot implementers will
design an initial implementation plan with the initial selection of elements and actors
involved to implement, which will address their needs that had been identified in WP5.
Specific initial implementation plans will be issued by all implementing sites.
Implementation and validation
According to each implementing site implementation plan, interventions and actions in
each of them will be developed. Implementation site teams will: a) Define specific
objectives. b) Identify concrete activities for the implementation c) Select KPI d) Report
progress and results e) Support sustainability of the implementation. Interventions and
actions will be reviewed by the coordination team and analyzed to extract
commonalities and feed WP4 on sustainability.
31
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
In the case of the BP on home telemonitoring in PC -TELEA-, which is based on a
specific IT tool, the implementing sites (4 in Italy and 1 in Sweden) that have selected
this one have previous experiences or solutions already in place, and will improve and
expand the existing services.
Implementing sites will develop the implementation plan and include a more detailed
description of the activities, defining specific actors and institutions involved (who),
roles and functions (what), timeline (when) and place (where). Specific activities will
follow the plan and will contribute to its sustainability beyond the duration of the Joint
Action.
At the beginning of the implementation, specific follow-up will be organized, including
study visits to implementing sites. This will help implementers to better understand the
local process, to highlight the transferring/implementation process at local level, to
initiate the validation of the implementation (in coordination with WP3) and to contribute
to the sustainability of the implementation (in coordination with WP4 and WP7).
Close follow-up of each implementing site will be carried out by the coordination team.
At the end of the implementation period, a validation of the situation in the
implementing sites will be carried out (T6.3; T3.4).
The overall experience will be shared at the last annual Consortium meeting, when all
implementing sites will report on their experiences and learning process, which will
contribute to update WP4 and WP7 outputs.
Evaluation
Continuous evaluation of the process must allow the progress follow up and the early
detection of any deviations, problems and/or risk surveillance. Transversal evaluation
of the different pilots and settings must allow identification of facilitators and barriers to
implementation and feedback for knowledge generation and further support.
An evaluation model is going to be developed and implemented, based on formative
evaluation approach, as a rigorous assessment process designed to identify potential
and actual influences on the effectiveness of implementation efforts4 (Stetler et al,
2006). Given the number and diversity of the CIRCE-JA consortium, quantitative and
qualitative methodology and use of a set of process indicators could be discussed in
an expert consensus panel (T3.1). All the members of the consortium and a number
of the European experts would be invited. The Rand/UCLA appropriateness method
(RAM) will be used to find consensus5. The expert panel will use the Proctor, et al
(2011)6 taxonomy of available implementation outcomes, including acceptability,
adoption, appropriateness, feasibility, fidelity, implementation cost, penetration/reach,
and sustainability/sustainment. A detailed table that is contained in the Smith and
Hasan publication (2020)7 and it can guide the discussion in the meeting. Several tools
and resources to facilitate evaluation in all implementation sites would be offered to
the panelists, including the RE_AIM evaluation framework8 as well as evaluation
models, including that of Collaborative Care Model9. The meeting will deliver a list of
procedures and indicators to be used for the evaluation of the project.
The proposed methods for the formative evaluation would be used in each
implementation site and the data from qualitative studies would be analyzed by the
leaders of WP3. In addition, the level of satisfaction that it will address both primary
health care practitioners and the recipients of the action, including patients and
32
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
stakeholders would be assessed; a survey based on a questionnaire with qualitative
and quantitative variables and focus groups with the use of participatory and learning
actions methodology would be implemented to that purpose.
The proposed methods for the summative assessment (project’s outcomes) would be
used in each implementation site and the data from the quantitative analysis would
also be analyzed by the leaders of WP3.
Sustainability
Last but not least, the JA ambition looks for sustainability of the successfully
implemented practices in the pilot site, and its scalability to broader parts of the health
system, if not the whole one. That will require a deep understanding of the elements
needed for sustainability and generating the knowledge, skills and capacities to further
development of sustainable good practices. Stakeholders and policy analysis and
dialogue will be explored in order to generate recommendations and, eventually,
sustainability plans for the actors involved.
Achievement of this ambition will be supported by inputs coming from:
• Identification of contextual factors -such as differences in population, service
structures, and socio-political context- that can influence the transfer of the BPs in
the targeted settings, as well as Economic factors that may affect the
implementation of BPs (T4.1). Questionnaire in all implementation sites will be
proposed, also based on the literature search made (T5.1).
• A mixed-method approach, quantitative with questionnaires and qualitative
methods with focus groups, will be adopted to explore to what extent the objectives
achieved could be further supported and sustained (T4.2). An interactive database
useful for the knowledge and experience sharing on BPs implementation will be
created and stored by AGENAS, all the data stored will respect the principles of
the General Data Protection Regulation-GDPR (Regulation (EU) 2016/679).
• New knowledge and understanding based on the results of implementation by next
adopters also involving the stakeholders of primary care (T4.3 and T7.3). To reach
this:
o An expert panel meeting will be carried out with the aim to develop and draft
a set of recommendations for further supporting those achieved on
implementation and evaluation.
o Main characteristics (professionals, target groups, objectives, timeline,
responsible actors, etc.) of each BP will be described, the
recommendations and indicators will be shared within CIRCE-JA
participants.
o Possible financial solutions that can facilitate the sustainability of BPs over
time will be explored (association funds, non-profits).
o New organizational models (residential and health care facilities
emergency, technologies, devices, information technology and telematics)
will be promoted.
• Assessment of the impact of the project implementation and exploration of the
lessons learnt for EU-wide transformation. An expert consensus panel will be
carried-out (T4.3). Experts from all participating in the project countries, the
members of the project consortium and representatives from selected European
33
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
stakeholders will be invited. The consensus process methodology that is described
above will be used10.
Finally, development of a European Primary Health Care BPs Observatory would
ensure the sustainability of the results beyond the JA, also defining principle and
recommendations for implementing national health primary care policy. The European
Primary Health Care BPs Observatory will be composed of consortium partners and
representatives from selected European stakeholders including WHO, WONCA
Europe, European Forum of Primary Care, EUPHA etc. and it will integrate with the
experiences already in place at European level, such as the Public Health Best
Practice Portal led by the European Commission
(https://webgate.ec.europa.eu/dyna/bp-portal/). The Observatory will support the
implementation of the BPs, share knowledge and experience, and further reinforce
capacities of national, regional and local health authorities on PHC. Field experience
and lessons learnt together with evidence-based practice will be the core principle. The
Observatory will promote the alignment of the local experiences to the good practice
of reference, the continuous improvement, the partnerships, the knowledge sharing,
the evaluation of the experiences, and the creation of recommendations and useful
documentation.
Capacity building
Capacity building and support to training programmes will be specifically developed
(WP7), since transferring organizations will, during the implementation of BPs, need to
provide legislative framework, employ/engage professionals, provide physical
resources (offices, equipment, IT support), monitor training process and assess
competencies of staff, organize teams and provision of services, collect data, assess
and evaluate clinical processes and outcomes. Training programmes (for end-users)
(T7.2) should include educational objectives, methods, tools, topics, identified trainers,
draft schedule and all other resources needed. We expect multidisciplinary teams to
be engaged in implementing best practices, thus training programmes need to respond
also to issues of multi- and interdisciplinarity in teamwork.
Owners of BPs will contribute to train the trainers in transferring countries/regions,
based on best practice or elements of best practices selected. Training programmes
are country/region specific and are adapted to the environment of transferring
organization.
References:
1. Ogrinc G, et al. The SQUIRE (Standards for Quality Improvement Reporting
Excellence) guidelines for quality improvement reporting: explanation and
elaboration. Qual Saf Health Care. 2008 Oct;17 Suppl 1(Suppl_1):i13-32. doi:
10.1136/qshc.2008.029058. https://pubmed.ncbi.nlm.nih.gov/18836062/
2. Nolte E, Groenewegen P. How can we transfer service and policy innovations
between health systems? [Internet]. Copenhagen (Denmark): European
Observatory on Health Systems and Policies; 2021. PMID: 34279871.
https://eurohealthobservatory.who.int/publications/i/how-can-we-transfer-
service-and-policy-innovations-between-health-systems
3. Murray E, Treweek S, Pope C, MacFarlane A, Ballini L, Dowrick C, Finch T,
Kennedy A, Mair F, O'Donnell C, Ong BN, Rapley T, Rogers A, May C.
Normalisation process theory: a framework for developing, evaluating and
34
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
implementing complex interventions. BMC Med. 2010 Oct 20;8:63. doi:
10.1186/1741-7015-8-63. PMID: 20961442; PMCID: PMC2978112.
4. Stetler, Cheryl B et al. “The role of formative evaluation in implementation
research and the QUERI experience. Journal of general internal medicine vol.
21, Suppl 2 (2006): S1-8. doi:10.1111/j.1525-1497.2006.00355.x
5. Fitch K, Bernstein S, Aguilar M, et al. The RAND/UCLA appropriateness
method user’s manual. Santa Monica (CA): RAND. European Commission.
2001
6. Proctor E, Silmere H, Raghavan R, et al. Outcomes for implementation
research: conceptual distinctions, measurement challenges, and research
agenda. Adm Policy Ment Health. 2011;38(2):65-76. doi:10.1007/s10488-010-
0319-7
7. Smith JD, Hasan M. Quantitative approaches for the evaluation of
implementation research studies. Psychiatry Res. 2020 Jan;283: 112521. doi:
10.1016/j.psychres.2019.112521. Epub 2019 Aug 17. PMID: 31473029;
PMCID: PMC7176071.
8. https://re-aim.org/resources-and-tools/
9. Unützer J et al. Collaborative care management of late-life depression in the
primary care setting: a randomized controlled trial. JAMA. 2002 Dec
11;288(22):2836-45. doi: 10.1001/jama.288.22.2836. PMID: 12472325.
10. Fitch K, Bernstein S, Aguilar M, et al. The RAND/UCLA appropriateness
method user’s manual. Santa Monica (CA): RAND. European Commission.
2001.
11. Lionis C, Papadakaki M, Saridaki A, Dowrick C, O'Donnell CA, Mair FS, van
den Muijsenbergh M, Burns N, de Brún T, O'Reilly de Brún M, van Weel-
Baumgarten E, Spiegel W, MacFarlane A. Engaging migrants and other
stakeholders to improve communication in cross-cultural consultation in
primary care: a theoretically informed participatory study. BMJ Open. 2016 Jul
22;6(7):e010822.
12. Lionis C, Petelos E, Mechili EA, Sifaki-Pistolla D, Chatzea VE, Angelaki A,
Rurik I, Pavlic DR, Dowrick C, Dückers M, Ajdukovic D, Bakic H, Jirovsky E,
Mayrhuber ES, van den Muijsenbergh M, Hoffmann K. Assessing refugee
healthcare needs in Europe and implementing educational interventions in
primary care: a focus on methods. BMC Int Health Hum Rights. 2018 Feb
8;18(1):11.
2.2 Consortium set-up
Consortium cooperation and division of roles (if applicable)
Describe the participants (Beneficiaries, Affiliated Entities and Associated Partners, if
any) and explain how they will work together to implement the project. How will they
bring together the necessary expertise? How will they complement each other?
In what way does each of the participants contribute to the project? Show that each
has a valid role and adequate resources to fulfil that role.
Note: When building your consortium you should think of organisations that can help
you reach objectives and solve problems.
14 EU Member States (MMSS) are involved in CIRCE-JA. Beneficiaries and affiliated
entities (AE) are directly connected to the overall aim of this JA, being BPs owners or
35
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
implementers. The six selected BP are from 4 MS (Belgium, Portugal, Slovenia and
Spain) and all will be transferred to 12 MS, both individually or in a mixed approach.
SAS (Andalusian Health Service), Spanish Competent Authority (CA), is the
Coordinator of this JA. It is the public healthcare provider in Andalusia, with a wide
experience both in European projects and particularly in previous JAs. Together with
its affiliated entity (AE), FPS (Progress and Health Andalusian Public Foundation) will
be in charge of the CIRCE-JA overall coordination and management (WP1). SAS will
also be leading WP6, dedicated to the transferring process and pilot implementation.
One of the BP is owned by SAS, the Personalised Action Plans. Also affiliated to the
SAS, other two BP owners are involved: SERGAS, with TELEA-home telemonitoring
in PHC, and AQuAS, with the Essencial project-adding value to clinical PHC practice.
Contributing to WP6, the Spanish AE SERGAS with ACIS will support the coordinator
in executing the task on transferring support.
Narodowy Fundusz Zdrowia (National Health Fund -NFZ-), Polish CA, leads the
dissemination & communication of the JA (WP2). NFZ has strong experience in
leading communication and exploitation activities at national level and additional
international experience in the EU project - Scirocco Exchange (webside, social media
activities, international conferences). Moreover, several other partners including the
Coordinator have previous experience in EU projects and in the dissemination of their
results at national and international levels.
7HRC (7th Health Region in Crete - Dioikhsh Ygeionomikhs Perifereias Krhths), the
Greek CA is supporting the coordinator in the scientific aspects of the development of
the JA and is in charge of two WPs, WP3 and WP5. WP3 addresses the evaluation of
the JA, both at project monitoring as well as impact assessment levels. To carry out
the task included in this WP, 7HRC will be assisted by MS-MoH (Ministerul Sănătății
România/ Ministry of Health), Romanian CA, together with its AE, UMF-CD
(Universitatea de Medicina Si Farmacie Carol Davila Din Bucaresti). WP5 focuses on
the methodology for the transferring process and identification of needs and priorities
in the transferring pilots, thanks to the academic background of the team participating
in CIRCE-JA WP5.
WP4 on Sustainability is led by AGE.NA.S. (Agenzia Nazionale per i Servizi Sanitari
Regionali), Italian CA, with the support of 7HRC. AGE.NA.S have been involved in
previous JAs also leading the Sustainability WP.
NIJZ (Nacionalni inštitut za javno zdravje), Slovenian CA, is leading WP7 on capacity
building to ensure an optimal transferring process. Besides, NIJZ is the owner of the
Slovenia BP Health Promotion Centres.
GÖG (Gesundheit Oesterreich Gmbh.) will carry out the co-leading of WP7 and will
participate in WP4 Sustainability (Task 4.1) as well as have minor participation in other
WPs and will participate to better learn about the Slovenian BP and will consider its
implementation in a later stage.
Besides the BP already mentioned from Spain (3) and Slovenia, the owners of the
other two BP from Belgium and Portugal, are also beneficiaries in CIRCE-JA. The
Belgian CA, AVIQ (Agence pour une Vie de Qualité) is the owner of the Belgium
Integrated Health Association BP, and will participate in supporting the transferring of
this BP. The Portuguese AE, MS (Directorate-General of Health) is the owner of the
36
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Portuguese BP Health Action for Children-Youth and Gender-Violence Lifecycle. Their
contribution is vital for the transferring process.
The transferring pilots are both beneficiaries and AE. CA implementing pilots are: NFZ
(Poland), NIJZ (Slovenia), MS-MoH (Romania) supported by AE UMF-CD and NIPH
(National Institute of Public Health), ACSS (Administração Central do Sistema de
Saúde, Portugal), CIPH (Croatian Institute of Public Health, Croatia), MSAE
(Sotsiaalministeerium, Estonia), NNK (Nemzeti Népegészségügyyi Központ -National
Public Health Center-, Hungary), MoH-RL (Ministry of Health, Lithuania) and NBHW
(The National Board of Health and Welfare, Sweden), as well as 7HRC, the Greek
CA, and ACSS (Administração Central do Sistema de Saúde), the Portuguese one.
The list of implementing pilots is completed by AE from several MMSS. Spanish AEs
are DGSPiA (Dirección General Salud Pública de Valencia) together with FISABIO
(Fundación para el Fomento de la Investigación Sanitaria y Biomédica de la Comunitat
Valenciana), SERMAS (Servicio Madrileño de Salud) together with FIIBAP
(Fundación para la Investigación e Innovación Biosanitaria de Atención Primaria) and
SCS (Servicio Cántabro de Salud) together with IDIVAL (Fundación Instituto de
Investigación Marqués de Valdecilla), as well as SERGAS with ACIS that will have a
doublé role as BP owner and implementer. Italian AEs are 18 PHC from 9 regions
(Regione Umbria USL Umbria 2 Terni; ASUR Marche; Regione Piemonte ASL CN2
and ASL AL; Regione Lazio ASL ROMA 2, ASL ROMA 1, ASL ROMA 3 and ASL
Viterbo; Regione Lombardia ATS Bergamo; Friuli Venezia Giulia ASU Giuliano
Isontina; Regione Abruzzo ASL 4 Teramo; Regione Emilia-Romagna- USL Modena,
USL Bologna, USL Parma and USL Romagna; Regione Liguria ASL 1, A.Li.Sa and
ASL 4). Portuguese AEs are ULSM (Unidade Local de Saúde de Matosinhos, E.P.E.),
CHLC (Centro Hospitalar de Lisboa Central, EPE), CHLO (Centro Hospitalar de
Lisboa Ocidental, EPE), ARSLVT (Administração Regional de Saúde de Lisboa e
Vale Do Tejo - ACES Lisboa Central). Estonian AE is UTARTU (University of Tartu).
Almost all entities in CIRCE-JA represent National, Regional or Local Health Services
directly involved in the provision of PHC in their territories, and they all have committed
to the implementation of one or more of the BPs selected. All BPs’ owners are also
participating either as CA or AE. A total of 42 implementation sites are envisaged.
2.3 Project teams, staff and experts
Project teams and staff
Describe the project teams and how they will work together to implement the project.
List the staff included in the project budget (budget category A) by function/profile (e.g.
project manager, senior expert/, junior expert, trainers/teachers, technical personnel,
administrative personnel etc. — use the same profiles as in the detailed budget table,
if any) and describe briefly their tasks. Provide CVs of all key actors (if required).
Name and
Organisation Role/tasks/professional profile and expertise
function
SPAIN
MD, Specialist in Paediatrics. Head of Operational
Planning Service in charge of primary care. Member
Sebastián
of the Spanish Paediatrician’s Association and the
Tornero, Senior SAS
Spanish Technical Aid Response Team –
expert
Emergency Medical Team. He will act as principal
investigator of SAS and will coordinate the
37
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
participation of the Andalusian researchers in the JA
(CV attached).
Inmaculada Mesa, SAS MD, PhD. Specialist in Family and Community
Senior expert Medicine. Deputy Director of Health Management at
SAS. Member of the Andalusian Society of Family
and Community Medicine. She will ease the internal
coordination of needed SAS resources within the
frame of the JA (CV attached).
Nieves Lafuente, SAS Nursing degree. Specialization Diploma in Health
Senior expert Management and Master in Health promotion and
community health. Experience as hospital and
primary healthcare nurse. Director of the
Andalusian Care Strategy. She will ease the sharing
of all the information on the Andalusian best
practice within the JA (CV attached).
Head of Health SAS As responsible for operational planning, direction
District (TBD), and management of the primary healthcare in a
Senior Expert given area, he/she will be in charge of showing the
daily work of the healthcare professional with the
best practice with real cases of its application.
Sonia Basulto- FPS Degree in Economic Sciences, Master in European
Financial Project Union Law. Specialist in the management of
manager European projects, with almost 20 years of
experience (both in the public and private sectors).
As financial officer in FPS, she will be in charge of
financial reports, financial support, budget
preparation, etc.
TBD - Project FPS Degree in the field of health sciences, with wide
Manager experience in the participation and management of
international R&D&I projects and knowledge of
healthcare systems. He/she will participate as
facilitator and will be in charge of the overall project
supervision.
Deputy Director General Directorate for Healthcare
Alfonso Alonso SERGAS. Policy maker or regulator, incl.
Fachado – Senior SERGAS standardisation body. Tasks: Testing/validation of
expert approaches and ideas; Prototyping and
demonstration
María Blanca SERGAS Head Healthcare Integration Service, General
Cimadevila Directorate for Healthcare SERGAS. Tasks:
Álvarez; Senior Testing/validation of approaches and ideas;
expert Prototyping and demonstration
José María ACIS Director Health Innovation Area ACIS. Tasks:
Romero Fidalgo, Project management, Communication,
Senior expert dissemination and engagement
She has experience in health technology
assessment, health care research (health quality
and variability in clinical practice), quaternary
Caridad Almazán- prevention with the development of
AQuAS
Senior expert recommendations to avoid low-value clinical
practices. She in charge of the Participation Area of
the Catalan Agency for Health Quality and
Assessment, which generates knowledge for
38
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
decision-making in value-based healthcare and
person-centered care. It promotes the effective
participation of professionals, patients and citizens
for the transformation of the healthcare system and
to boost informed and shared decisions. Relevant
initiatives in the Area are Essential and Shared
Decisions
Johanna Caro AQuAS She has acquired knowledge in public health related
Mendivelso- to quaternary prevention, low-value clinical
Senior expert practices, overuse, overdiagnosis, overtreatment,
and quality of care. She works at the AQuAS in the
Participation Area as a responsible value-based
healthcare. She mainly in the line of value-based
health care with the participation of professionals
and citizens, providing tools for decision-making
about health and being able to influence the
improvement of clinical practice and the
sustainability of the health system. In this area,
there are strategic projects such as the Essential
Project and Shared Decisions.
Gemma Cabré AQuAS Head financial officer at AQuAS.
Esteve- Senior
expert
Marcel Olivé AQuAS EU-funded projects coordinator at AQuAS. Degree
Elias- Project in Political Science and Master in Public and Social
manager Policy (Universitat Pompeu Fabra). He is involved
in EU-funded project management since 2008. He
has combined it with the participation in primary
care and health promotion research projects
undertaking economic evaluation. Since 2015 he
has participated in and has coordinated projects on
innovation procurement and other sort of innovation
and foresight projects.
Garazi Carrillo AQuAS Garazi Carrillo Aguirre, RN, RM, MPH (Pompeu
Aguirre- Senior Fabra University, Barcelona). She has clinical
expert experience in acute and community settings and
has worked in three different National Health
Services (Spain, Italy, UK). She has been involved
in academic and scientific research with special
interest in sexual and reproductive health, health
inequity, evidence-based medicine, health care
services, low-value practice, patient centered
approach and patient experience. Currently,
working as a researcher for the Catalan Agency for
Health Quality and Assessment (AQuAS) in the
Essencial Project and collaborating in several
national and international initiatives.
Rosana Peiró- Public Health Authority. Leading Research / Public
FISABIO
Senior expert Health
Joan Quiles-- FISABIO Public Health Authority. Technical staff / Public
Technical Health
personnel
39
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Mar Caturla-- FISABIO Technical staff and researcher in Public Health
Technical
personnel
Joan Paredes- FISABIO Technical staff/ Primary health care
Technical
personnel
Lucas Donat - FISABIO Adminitrative staff; EU Project Manager
Project Manager
IDIVAL Desk officer in IDIVAL, both manage administrative
Paloma Gonzalez,
requirements, coordinate meetings and events,
Project manager
reports. As project manager will participate in WP2
(communication) giving support to the WP leader
and will promote the project results in social
networks
Sarah Berrocoso, IDIVAL Desk officer in IDIVAL, both manage administrative
project manager requirements, coordinate meetings and events,
reports. As project manager will participate in WP2
(communication) giving support to the WP leader
and will promote the project results in social
networks
Natalia Puente, IDIVAL Financial officer in IDIVAL, in charge of financial
Administrative reports, financial support, budget preparation, etc.
Personnel
Teresa Ugarte is the managing director of Primary
Teresa Ugarte, Care department in the Cantabrian Health Service.
Senior SCS Teresa will act as principal investigator for SCS and
Researcher will coordinate the participation of SCS’s
researchers in this joint action, CV attached.
Alvaro Ramos – SCS Deputy director of nursing in primary care
senior researcher management of Cantabria. He has worked as
Assistant nurse in primary care in the Health
Services of Cantabria. Alvaro will participate as
researcher and will be in charge of the pilots
supervision
Antonio Martinez SCS Medical Director of the Primary Care Management
Torre – Senior in the Cantabria Heath Service. He is Specialist in
researcher Family and Community medicine by Marqués de
Valdecilla University Hospital. Antonio will
participate in the pilots development
Monica del Amo SCS Community Nurse; she works as responsible for the
Santiago - Quality Area of the Primary Care Management in
researcher the Cantabrian Health Service. She will participate
in the preparation of the pilots
Carmen Secades SCS Permanent statutory physiotherapist in the
Muñiz - Cantabrian Health Service (SCS), Research and
researcher Quality Unit of the Primary Care Management. She
will participate in the preparation of the pilots
Tomás Gomez FIIBAP General Director. Family medicine
Gascón, Senior SERMAS practitioner and SERMAS researcher. Function:
expert Health management.
40
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Jaime Barrio FIIBAP PhD in Medicine and Surgery (Doctorate program in
Cortés, Senior Medicine). Researcher for Biomedical Innovation in
researcher Madrid Primary Care.
Sara Parra Bernal, FIIBAP Technical Support Office to European Programmes
Project Manager (UTAPE). Technology Transfer and
Commercialization Professional; Intellectual
Property support. Contributor to: WP5 Methodology
for the transferring process, analysis of oBBPP and
needs assessment; WP6 Transferring process and
Pilot implementation
GREECE
Aimilia 7HRC Head of Health Policies Development and
Magkanaraki, Deployment Directorate (7HRC).
senior expert Degree in Applied Informatics from the University of
Macedonnia and a Master’s Degree in Information
Systems from the Computer Science Department of
the University of Crete. She has a 11-year
experience in Health Information Systems as Head
of Information Systems Department of the 7HRC.
Since 2014, she runs the Health Policies
Development and Deployment Directorate.
Amongst her responsibilities is the public Primary
Healthcare network control and coordination. She is
also responsible for the establishment and
operation of the Local Health Units, a project funded
since 2017 from the Partnership Agreement for the
Development Framework 2014-2020. She has
participated in proposals for european and national
cofunded projects, in several European projects as
research assistant in FORTH Crete (from 2001-
2004), participates as team member in three (3)
Joint Actions of the 3rd EU Health Programme and
is the 7HRC project manager for the H2020
PANACEA project. She has a number of
publications in the fields of semantic web,
information systems and cybersecurity, as well as
conference presentations in the field of primary and
public health issues. Furthermore, he has teaching
experience in adult education.
Kalliopi 7HRC Employee of Research and Development
Anastasopoulou, Department/ Special Account for Research and
Researcher Development Grants (7HRC)
Dr Kalliopi Anastasopoulou is an employee in the
Research and Development (R&d) Department of
7HRC since 2018. She is also a Senior Researcher
in Privacy and Data Protection at the University of
Bristol, UK. She holds a PhD in Privacy Decision-
Making and an MSc in Technologies and
Management of Information and Communication
Systems from the School of Engineering at the
University of the Aegean, Greece. Her experience
41
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
in the fields of smart technologies, data protection
and cybersecurity was acquired through
participation in various EU H2020 and National
research projects from smart transportation to
mobile eHealth environments (e.g.: FLOURISH
MOBILITY UK; REPLICATE; UKCRIC – CORONA;
Panacea; SCYPE). She has also worked for more
than seven years as a project manager in various
R&D projects, and as an information systems
consultant in the industry. She has been certified as
Information Security Management Systems (ISMS)
Lead Auditor based on ISO 27001:2013, and she is
a member of ACM (Association for Computing
Machinery) and IAPP (International Association of
Privacy Professionals).
George 7HRC Head of Information Technology Directorate
Moschovakis, (7HRC)
Senior expert Mr George Moschovakis is Head of the Information
Technology Department of the 7th HealthCare
Region of Crete. He holds a diploma on Electrical
engineering from the School of Electrical and
Computer Engineering of the National Technical
University of Athens (NTUA) and a Master of
Science in the Administration of Health Units from
the Open University of Greece. He has been the
Manager of the General Hospital of Rethymno
(2010-2012) and the General Hospital “Venizeleio-
Pananeio” (2015-2019). He has more than 20 years
of experience in the areas of information systems
development and has participated in the
deployment of the Integrated Health Information
System of the 7HRC. Furthermore, he has teaching
experience in adult education.
MD PhD FRCGP (Hon) FESC FWONCA, Professor
of General Practice and Primary Health Care at the
School of Medicine, University of Crete, Greece.
Member of the EC Expert Panel on Effective Ways
of Investing in Health, Member of EMA SAG
Vaccines, Chair of the WONCA Working Party on
Christos Lionis,
Mental Health with a high involvement in
Professor 7HRC
international and European research projects.
Project manager
Scientific Coordinator and Project Manager that will
supervise the implementation of all activities.
Christos Lionis is the foremost primary care
researcher in academia, with approximately thirty
thousand citations https://orcid.org/0000-0002-
9324-2839
Elena Petelos PANEPISTIMIO Senior researcher at the University of Crete,
Senior KRITIS Greece,Lecturer at Maastricht University, Visiting
Researcher (UNIVERSITY Lecturer at Charité – Universitätsmedizin Berlin.
OF CRETE) - Elena Petelos (ORCID ID: 0000-0001-8838-7470)
UOC is a public health specialist with a background in
medicine, molecular biology, oncology and
42
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
evidence-based medicine (EBM), retrained mid-
career in public health, policy and health
economics. An expert on Health Technology
Assessment, implementation research, and
foresight studies, , she also with extensive
experience on trial design (interventional and
observational). She serves as the representative of
the EFPC e to HERA and as Member of the
Healthcare Professionals’ Working Party of the
European Medicines Agency. Strong involvement in
international and European societies and networks
including those of payers and WHO relevant to
health information, digital health, public health and
primary care research. Deputy Scientific
Coordinator.
Ioanna Tsiligianni PANEPISTIMIO MD PhD and Associate Professor in General
(MD PhD, MPH) KRITIS Practice and Public Health at the Clinic of Social and
Senior (UNIVERSITY Family Medicine. School Medicine, University of
Researcher OF CRETE) - Crete, Greece. Expert on diseases management in
UOC primary care with a focus on respiratory system with
a high experience in international projects. Deputy
Scientific Coordinator.
George PANEPISTIMIO MD PhD and Professor of Cardiology, Dean of
Kochiadakis KRITIS School of Medicine, University of Crete, President
Senior (UNIVERSITY Elect of the Hellenic Society of Cardiology. Head of
Researcher OF CRETE) - Cardiology Department (ESY), General University
UOC Hospital of Heraklion, Crete. A high expertise on
international and European research projects.
Maria Marketou PANEPISTIMIO MD PhD, FESC and Associate Professor of
Senior KRITIS Cardiology, Director of Hypertension and
Researcher (UNIVERSITY Cardiovascular outpatient Clinic of the Cardiology
OF CRETE) - Department (ESY), General University Hospital of
UOC Heraklion, Crete and Molecular Cardiology
laboratoty, School of Medicine, Crete
(https://orcid.org/0000-0003-1888-3430). Expert on
hypertension, heart failure, cardiovascular imaging
and quality of care of people with cardiovascular
diseases.
Marilena PANEPISTIMIO Senior researcher at the Clinic of Social and Family
Anastasaki KRITIS Medicine, School of Medicine University of Crete,
Senior researcher (UNIVERSITY Greece with a background on Mathematics and
OF CRETE) - Master degree in Biostatistics (MSc) with an
UOC expertise on Public Health and Epidemiology and a
high involvement in the European and international
research projects.
Sophia Papadakis PANEPISTIMIO Senior researcher at the Clinic of Social and Family
Senior KRITIS Medicine, School of Medicine, University of Crete,
Researcher (UNIVERSITY Greece and affiliated researcher in the Division of
OF CRETE) - Prevention and Rehabilitation at the University of
UOC Ottawa Heart Institute, and Adjunct Professor,
Faculty of Medicine, University of Ottawa (Canada).
Expert in prevention and health promotion
43
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
programmes with a focus on behaviour and life style
change.
Myron Galenianos PANEPISTIMIO Financial Manager of the Clinic of Social and Family
Administrative KRITIS Medicine, School of Medicine, University of Crete,
(UNIVERSITY Greece. Mr. Myron Galenianos, MSc, is a Financial
OF CRETE) - Manager with an extensive 11-year experience in
UOC handling FP7, 3rd Health Programme, Horizon2020
framework European projects, as well as national
and international research grants at the Clinic of
Social and Family Medicine (CSFM), School of
Medicine, University of Crete (UoC).
Irene Vasilaki PANEPISTIMIO She has graduated from the Department of
Administrative KRITIS Economics, University of Thessaly. Irene has been
(UNIVERSITY working to the research projects of the Clinic of
OF CRETE) - Social and Family Medicine at University of Crete
UOC having management of research programs under
the National Strategic Reference Framework
(NSRF) as well as clinical studies..
Agapi Angelaki PANEPISTIMIO a Fellow Scientific Research in Clinical Social
Junior Researcher KRITIS Family Medicine, Faculty of Medicine, University of
(UNIVERSITY Crete since March 2011 and up until today. She is
OF CRETE) - experienced in undertaking the development of
UOC several European research and capacity-building
projects.
ITALY
Medical Director. Scientific Responsible and Project
Alice Borghini, Manager that will supervise the implementation of
AGENAS
Project Manager all activities, either scientific or administrative ones,
carried out by the staff dedicated to the project.
Antonio Fortino, AGENAS Medical Doctor. Qualified healthcare professional
Technical Staff who will support the Scientific Responsible in
carrying out the scientific tasks.
Randazzo Maria, AGENAS Statistician who will support the Scientific
Technical Staff Responsible in carrying out the scientific tasks.
Furfaro Simone, AGENAS Support the Scientific Responsible in carrying out
Administrative the scientific tasks.
staff
Leta Ivano, AGENAS Support the Scientific Responsible in carrying out
Technical Staff the scientific tasks.
Iodice Maddalena, AGENAS Qualified nurse who will support the Scientific
Technical Staff Responsible in carrying out the scientific tasks.
Cosentino AGENAS Support the Scientific Responsible in carrying out
Mimma, the scientific tasks.
Administrative
staff
Marica Scotellaro, AGENAS Qualified nurse who will support the Scientific
Technical Staff Responsible in carrying out the scientific tasks.
Giacomo Giolo, AGENAS Support the Project Manager in carrying out the
Administrative administrative tasks.
staff
TBD AGENAS To be defined during implementation. Support to the
above-mentioned people
44
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Azienda
USL Healthcare Director supporting General Manager, in
Simona Bianchi,
Umbria 2
the overall governance of the Local Health Trust
Project manager that commissions and provide healthcare to a
population of 380.000 inhabitants. Duties of
Healthcare Director are related to management and
development of healthcare services in integration
with all the company departments and
municipalities.
Simona Marches,i Azienda USL Head of Valnerina Health Districts and Hospitals.
Senior Manager Umbria 2 Remodeling of the hospital activities and health
services in Valnerina area after the sismic events of
2016. Management of Internal Medicine and chronic
patient outpatients hospital and Cardiology
outpatiens clinic.
Asur Marche Socio – Health District Director
Claudio Martini
Senior expert
Asur Marche Public Health resident physician
Elena di Tondo
Senior expert
Asur Marche Public Health resident physician
Alessandro
Catalini
Junior expert
Asur Marche Public Health resident physician
Elena Bianchi
Junior expert
Asur Marche Public Mental Health Nurse
Maurizio Ercolani
Project manager
Giuliana CHIESA, ASLCN2 Technical and Professional Manager at the SS
Project Manager Transparency, Anti-corruption and Innovative
Projects.
Team leader of several business projects for the
development of new innovative paths in the field of
territorial medicine and implementation of
telemedicine services and models in the ASLCN2
and in the territory of the 76 municipalities of the
territory of reference. She is member of several
working group of ASLCN2. Will coordinate the tasks
and internal resources involved.
Elio ASLCN2 Director of Territorial Medicine of ASLCN2.
LAUDANI, Biostatistic in the inter-company ethics committee,
Scientific ASLCN2, ASO CUNEO, ASLCN1. Publications on
Coordinator medical journals. Publications on Local and
National Epidemiological Bulletins. Local chronic
plan co-ordinator ans Social Care plan contributor
for ASLCN2. Will lead health strategies and drive
the healthcare and social-care workflows.
Other personnel ASLCN2 staff to be hired
Guglielmo Pacileo ASL AL Project manager, senior expert and teacher. Quality
– project manager Head at ASL AL
45
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Maria Elisena ASL AL Director of the health professions unit at ASL AL
Focati – senior
expert
Silvana Romano – ASL AL Head of the Continuity of Care Operating Centre at
senior expert ASL AL
Roberto Stura – ASL AL Health District Director at ASL AL
senior expert
Medical Doctor ASL Roma 1 District Director, for project implementation and
integration with other territorial activities.
Coordination in needs assessment activities and in
the definition of the appropriate responses.
Medical Doctor ASL Roma 1 Local Health Authority coordinator. Support in
defining the indicators to be monitored.
Nurse Manager ASL Roma 1 Definition of integrated care pathways and nursing
coordination.
Medical Doctor ASL Roma 1 Definition of integrated care pathways.
Medical Doctor ASL Roma 1 Definition of integrated care pathways.
Nurse ASL Roma 1 Definition of integrated care pathways.
Nurse ASL Roma 1 Definition of integrated care pathways.
Social Worker ASL Roma 1 Definition of integrated care pathway and
coordination of social workers.
Administrative ASL Roma 1 Economic profile, to support the elaboration of a
personnel financing plan linked to the actions to be taken.
Support in defining the indicators to be monitored.
Antonio Salvatore ASL Roma 2 MD. Director of Clinical care paths and
Miglietta, Project Telemedicine Programme of community Healthcare
Manager/Staff Delivery in ASL Rome 2
Coordinator
Doctor Livia ASL Roma 2 Expertise in Economic and Administrative
Domizia Barberini, Procedural Pathways for Healthcare Systems ASL
Senior Expert Rome 2 Lazio Region Italy
Doctor Piero ASL Roma 2 Fellow International Political and economics
Palazzetti, Junior Administrative Communication in Healthcare
Expert Delivery ASL Rome 2 Lazio Region Italy
Doctor Barbara ASL Roma 2 Coordinator Nurses Programme for Telemedicine
Porcelli, Senior and Community Healthcare ASL Rome 2 Lazio
Expert. Region Italy
Doctor Giovanni ASL Roma 2 Director Digital Health and Statisitics Act ASL Rome
Profico, Senior 2 Lazio Region Italy
expert.
Project manager ASL Roma 3 Overall coordination of the project activities,
monitoring of the project progress, reference
contact of the project, responsible for the interim
and final reporting and internal evaluation.
Nurse (Qualified ASL Roma 3 Disease prevention, health promotion,
healthcare technological innovation, facilitated access to
professional) healthcare for frail persons.
46
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Physician ASL Roma 3 Prevention of psychological distress, treatment of
psychological effects and unravelling post-
pandemic psychiatric vulnerability.
Physician ASL Roma 3 Prevention, public health, home healthcare and
related care network with social health integration
Physiotherapist ASL Roma 3 Diagnostic assessment of childhood disorders,
assessment and treatment of children at risk
Administrative ASL Roma 3 Support to the project manager for the monitoring
staff and technical and financial reporting phases of the
project
Gianni Vicario, ASL Viterbo Director of health process evaluation unit.
Senior expert Physician, specialised in Public Health. Experience
in Health services organization, health planning,
epidemiology.
Simona Giacomini ASL Viterbo Nurse. Experience in project management, health
services organization
Isabella Trezzi, ATS Bergamo Isabella will be the Project Manager programming
Project Leader and coordinating the project team activities. She will
also be the main operative contact with Project
partners.
Massimo ATS Bergamo General manager – Chief Director of ATS. Massimo
Giupponi, Senior is the high level Institutional representative. He will
expert lead the policy discussion with Agenas, Lombardy
Regional and with the Territorial further institutions.
Michele Sofia, ATS Bergamo Policy and territorial institutional discussant.
Senior expert Michele will support the Chief Director of ATS upon
Clinical/Health specific Competence areas. He will
lead the policy discussion with Territorial Primary
Care Actors.
Alberto Zucchi, ATS Bergamo Epidemiology and demographical understanding.
Senior expert Alberto will lead the initial Population health and
socio-assistance analysis in order to benchmark the
Best practices VS Local territory contest. He’ll also
lead the ATS analysts in the Data based Pilot
Monitoring and KPI extraction
Elvira Beato, ATS Bergamo Epidemiology and demographical understanding.
Senior expert Elvira will support (as domain expert) the data
gathering and management for the Contests
benchmark evaluation and the Pilot Performance
analysis.
Roberta ATS Bergamo Data Science Specialist. Roberta will support (as
Ciampichini, data manager expert) the data gathering and
Senior expert management for the Contests benchmark
evaluation and the Pilot Performance analysis.
Alessandro ATS Bergamo
Primary Care Policy specialist. Alessandro we’ll be
Scardoni, Senior
the Operation Manager of territorial Primary Care.
expert
Carmen Tereanu, ATS Bergamo Health Care Prevention and Multicultural Population
Senior Expert Engagement Specialist. Carmen will support
Alessandro on specific Primary care focus area (i.e.
47
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Prevention and Multicultural Integration) and will
also support the project Accounting and Reporting.
Massimo Totaro ATS Bergamo Massimo will lead the Strategic Communication and
specific event communication and participant
engagement
Technical ATS Bergamo She/He will support the Technical (ICT) mapping
personnel - and pilot design and set up.
Administrative ATS Bergamo She/He will lead Project Accounting and Reporting
personnel
Ilaria Camplone, AUSL Bologna Health Care District Director. Dr. Camplone is a
MD, Project public health MD. She implemented a pilot project
manager based on multidisciplinary and interinstitutional
team in charge for taking of a micro-area (1.200
inhabitants) with poor health and social
determinants. She will be responsible for the
adaptation of the international best practice at the
local normative and institutional context.
AUSL Bologna MD. Primary Health Care Unit Director Dr. Pagliacci
Donatella
is the director of the Primary Health Care Unit in the
Pagliacci, Senior
city of Bologna, where she coordinates around 300
expert
GPs. She will be involved in the implementation of
the best practice with the aim of involving GPs and
their associations in the implementation of
multidisciplinary teams and/or networks with other
health and social professionals.
Nadialina Assueri, AUSL Bologna Responsible nurse. She has a master's degree in
Coordinator Nurse nursing and clinical and community psychology.
She coordinates the primary care nursing service
for homeless people, migrants and prisons.
Raffaella AUSL Bologna Medical doctor. A medical doctor specialised in
Campalastri, Psychiatry, Clinical Toxicology and Infectious
Senior expert Disease.
Other AUSL Bologna
personnel/staff to
be hired
Silvana Borsari, AUSL Modena Directorate General. Supervision of the
Scientific implementation of all activities, both scientific and
Responsible administrative ones, carried out by project staff.
Immacolata AUSL Modena Chiefs Nurse. MSc in Evidence-Based Practice
Cacciapuoti, Health Care, Services planning and development of
Primary Care Services such as Community Health
Centre, Community Hospital, A nursing model of
community organization for change and
telemedicine activities.
Anna Franzelli AUSL Modena Director of the Primary Health Care Department.
MD, Director of the Primary Health Care
Department, relations with General Practitioners
and Pediatricians, specialized activities.
Other AUSL Modena
personnel/staff to
be hired
48
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Silvana Borsari, AUSL Modena Directorate General. Supervision of the
Scientific implementation of all activities, both scientific and
Responsible administrative ones, carried out by project staff.
Giorgia Pifferi, AUSL Modena Primary health care department. Responsible for
Project manager the implementation of Practice A. Director of the
Practice A Clinical Psychology and Community Service of the
Modena Health Service.
Manager of the psychologist team dealing with
minors victims of abuse and maltreatment. Project
leader of the multiprofessional team for the
implementation of child protection guidelines.
Coordinator of Free from Violence center
psychologists.
Monica Dotti, AUSL Modena Primary health care department. Responsible for
Project manager the implementation of Practice B. Social Worker
Practice B Health Sociologist Department of Primary Care -
family counselling centres. Coordinator of the LDV
Center -Free from Violence Center for the treatment
of perpetrators of gender-based and intrafamilial
gender violence and intra-familiar violence at a
Family Counseling Center of the Azienda Usl of
Modena. Member of several regional groups for the
prevention of violence and maltreatment. Lecturer
on the topic violence against women.
Federica Rolli, AUSL Modena Directorate of social and health activities.
senior expert Responsible for supporting the Scientific
Responsible in carrying out scientific tasks. Director
of social services. More than 15 years of experience
in managing social services for elderly and disabled
people. Responsible for supporting integration
between municipalities and the local health
authority.
Benedetta Donati, AUSL Modena Directorate of social and health activities.
administrative Responsible for supporting the Scientific
personnel Responsible and Project managers in carrying out
project activities. Administrative assistant with
experience in European Projects gained thanks to
the participation as administrative referent for the
Modena Local Health Authority in the project
Integration and Community Care for Asylum and
Refugees in Emergency (ICARE) GRANT
AGREEMENT N.
HOME/2017/AMIF/AG/EMAS/0075, with the main
tasks of drafting administrative documents and
financial statement reports.
Other AUSL Modena
personnel/staff to
be hired
Faissal Choroma, AUSL Parma Doctor - Director of the Primary Care Department –
Senior expert District of Fidenza. Expert in local medicine, primary
care, and health care for the immigrant population.
He will be the most important element to carry out
activities and find solutions.
49
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Severino Aimi, AUSL Parma Doctor- Director of the House of Health and
Senior expert Community Hospital of San Secondo P.se. Expert
in therapeutic and care continuity between hospital
and territory, “chronic care model“ and initiative
medicine. He will be the Responsible and Project
Manager that will supervise the implementation of
all activities.
Elena Sordi – AUSL Parma
Responsible for the clinical governance of the San
Nurse, Senior
Secondo P.se Community Hospital. Expert in
expert
clinical governance, she has extensive experience
in managing nursing teams
Chiara Donetti, AUSL Parma
Doctor- physiatrist for outpatients and hospitalized
Senior expert
patients of the San Secondo P.se Community
Hospital. Rehabilitation expert, she is deeply
familiar with the problems of returning home after
hospitalization
AUSL Parma
Ermenegildo Director of the Social and Health District of Fidenza.
Deolmi, Senior Expert in health service organization and resource
expert management
Other AUSL Parma
personnel/staff to
be hired
Giuseppe Benati - AUSL Scientific Responsible and Project Manager that will
Medical Director Romagna supervise the implementation of scientific or
/Project Manager administrative activities, carried out by the staff.
Director of the Primary Care and Community
Medicine Department Forlì Cesena. In this area the
Forlimpopoli Health Home is located. The
department is primary involved in the integration of
the different services inside the facility.
Roberta Mazzoni, AUSL Ravenna District. Director /Ravenna Area. The
Project Manager Romagna District Director (DD) is responsible for health
services organization and delivery in the Ravenna
Health District, where is located one of the two
healthcare facilities part of the project (the “City Of
Russi Health Home”). The DD will supervise project
implementation, Ensuring intersectorial integration
among actors involved (health services, social
services, local authorities, voluntary sector)
Ardigò Martino – AUSL Medical Doctor. Primary Care Department (DCP)
Scientific and Romagna Staff Member. He has an experience on primary
Technical Staff health care services organization and management.
He also have experience in primary health care
research and training. At the DCP is in charge for
Health Home development and implementation.
50
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Giulia Silvestrini, AUSL Medical Doctor. Public Health Department Staff
Scientific and Romagna (DSP) Staff Member. She has a strong experience
Technical Staff health prevention and promotion, expecially in
relation to chronic pathologies. She also have
experience in public health research and training.
At the DSP is in charge for Health Home
development and implementation.
Antonella AUSL Nurse. Public Health Departement Staff (DCP) Staff
Cerchierini, Romagna Member. She is the coordinator of primary care
Technical Staff nurses. She has an experience on primary health
care services organization and management. She is
in charge for Health Home development and
implementation.
Stefano Boni, AUSL Forlì District Director. The District Director (DD) is
Technical Staff Romagna responsible for health services organization and
delivery in the Forlì Health District, where is located
the Forlimpopoli Health Home. He will support the
Scientific Responsible in carrying out the scientific
and administrative tasks, ensuring intersectorial
integration among all the actors involved
Laura Tedaldi, AUSL Registered Nurse. Qualified healthcare professional
Technical Staff Romagna who will support the Scientific Responsible in
carrying out the scientific tasks. Her experience is
mainly on primary health care services organization
and management.
Silvia Mazzini, AUSL Qualified healthcare professional who will support
Technical Staff Romagna the Scientific Responsible in carrying out the
scientific tasks. Her experience is mainly on primary
health care services organization and management.
Tiberia Garoia AUSL Social worker who will support the team project.
Romagna She’s mainly involved in the organization of the
support to care-dependent people, with an
integration between hospital and territorial services.
Other AUSL
personnel/staff to Romagna
be hired
Dr. Altomare FVG
Nurse, Director of the Health District n.3, one of
Ofelia
the four Community Health Systems of the Local
Health Authority of Trieste.
The Health District provides territorial care through
local assistance and the connection between
health services, citizen, family physician,
pediatrician and continuity Care Service.
Each District guarantees a coordinated and
continuous response to the health needs of the
population. It ensures primary care services
relating to health and socio-health activities and
the coordination of its activities with those of other
health services. The District is the structure that
presides the implementation of socio-health
integration models between the Departement and
51
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
the Local Authorities, based on the program
agreements and the regional legislation in force.
In each District is present “Habitat-Microareas
Programme” (HM) which has been running in
Trieste since 2006, implemented by Local Health
Authority of Trieste (ASUGI), local Municipalities of
Trieste and Muggia, and the Public Housing
Agency. These are a relevant example of integrated
action to improve health and living conditions in a
vulnerable urban neighborhood. Microareas are
aggregated territories (quarters, districts or group of
houses) incardinated in the four Health Districts of
the Public Health Authority , with between 500 and
2500 inhabitants and most of the houses are public
housing. Currently in Trieste there are sixteen
Microareas. Each Microarea has a coordinator,
identified as Community Health Manager with a
specific Job Description. The HM Project allows the
production of bundles of innovative, integrated,
place-tailored public services. The public services
are designed and implemented by aggregation of
local agents and knowledge, through participatory
community building approaches. The HM
Programme is targeted to the local community as
whole; a community that lives in a quantitatively
defined socio-demographic contexts, territorially
delimited, in which all the resident population is
proactively involved and not only the population that
presents specific social and health problems. In this
perspective, the HM objectives concern a
complexity of issues related both to the organization
and supply of services, and more generally to the
activation of processes of empowerment and
inclusion, which impact both the individual and the
community
Dr. Giacomo FVG
MD, Director of the Health District n.2, one of the
Benedetti
four Community Health Systems of the Local
Health Authority of Trieste and Director of Local
Department of Public Health
The Health District provides territorial care through
local assistance and the connection between
health services, citizen, family physician,
pediatrician and continuity Care Service.
Each District guarantees a coordinated and
continuous response to the health needs of the
population. It ensures primary care services
relating to health and socio-health activities and
the coordination of its activities with those of other
health services. The District is the structure that
presides the implementation of socio-health
integration models between the Departement and
52
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
the Local Authorities, based on the program
agreements and the regional legislation in force.
In each District is present “Habitat-Microareas
Programme” (HM) which has been running in
Trieste since 2006, implemented by Local Health
Authority of Trieste (ASUGI), local Municipalities of
Trieste and Muggia, and the Public Housing
Agency. These are a relevant example of integrated
action to improve health and living conditions in a
vulnerable urban neighborhood. Microareas are
aggregated territories (quarters, districts or group of
houses) incardinated in the four Health Districts of
the Public Health Authority , with between 500 and
2500 inhabitants and most of the houses are public
housing. Currently in Trieste there are sixteen
Microareas. Each Microarea has a coordinator,
identified as Community Health Manager with a
specific Job Description. The HM Project allows the
production of bundles of innovative, integrated,
place-tailored public services. The public services
are designed and implemented by aggregation of
local agents and knowledge, through participatory
community building approaches. The HM
Programme is targeted to the local community as
whole; a community that lives in a quantitatively
defined socio-demographic contexts, territorially
delimited, in which all the resident population is
proactively involved and not only the population that
presents specific social and health problems. In this
perspective, the HM objectives concern a
complexity of issues related both to the organization
and supply of services, and more generally to the
activation of processes of empowerment and
inclusion, which impact both the individual and the
community
Dr.Rotelli Carlo FVG MD, Head of Unit outpatient and home care unit,
therapeutic continuity. The Unit takes care of the
health needs of the people in the area of
competence, integrating the network between the
facilities, the connected health services and public
institutions in order to create an integrated individual
care project.
Dr.Cristina FVG MD, Director of Health Protection Unit for Adults and
Montesi Elderly, Head of Unit outpatient and home care unit,
therapeutic continuity. The Unit takes care of the
health needs of the people in the area of
competence, integrating the network between the
facilities, the connected health services and public
institutions in order to create an integrated individual
care project, coordinates the activities of community
primary care physician and specialist medicine, the
district nursing clinic and home nursing care
53
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Dr.Bianca FVG Nurse in charge in Health Protection Unit for Adults
Lenardoni and Elderly - District 2. The Unit takes care of the
health needs of the people in the area of
competence, integrating the network between the
facilities, the connected health services and public
institutions in order to create an integrated individual
care project.
Reanna Simsig FVG Nurse full-time coordinator acting as a “community
health manager” in Habitat Microareas project in
collaboration with Local Institution for social housing
and the Municipality of Trieste. Habitat Microareas
aims to facilitate the improvement of the quality of
life, social welfare and health services.
Martina Gojca FVG Nurse full-time coordinator acting as a “community
health manager” in Habitat Microareas project in
collaboration with Local Institution for social housing
and the Municipality of Trieste. Habitat Microareas
aims to facilitate the improvement of the quality of
life, social welfare and health services.
Dr Michela FVG Physiotherapist coordinator acting as a “community
Degrassi health manager” in Habitat Microareas project in
collaboration with Local Institution for social housing
and the Municipality of Trieste. Habitat Microareas
aims to facilitate the improvement of the quality of
life, social welfare and health services.
Dr Ghiretti Monica FVG Administrative manager, previously coordinator for
the Habitat. Microareas project whitin the Health
District n.2.
Roberto Liguria ASL1 Social health director / strategic direction / doctor /
Predonzani medicine degree / he was district health director
/health promotion expert / he was the regional
coordinator of the Health Promoting Hospitals and
and health service Ligurian network (HPH)
Alessandro Liguria ASL1 doctor / medicine degree / physiatry director /
Manelli professor of physiatry head of home rehabilitation
care of ASL1
Carlo Amoretti Liguria ASL1 Doctor / medicine degree / pediatricians specialist /
district health director / /health promotion expert
Gennaro Marina Liguria ASL1 administrative coordinator /management of family
doctors
Sartore Sara Liguria ASL1 Social worker. Staff social health direction
Maria Elena Liguria ASL4 Social and health director. She holds the position of
Secchi, Project senior management in a large company; has high
Manager leadership skills, ability to organize and manage
teamwork, problem solving skills. Has gained
training experience in the management of
international multicentre clinical trials
Maria Iris Grassi, Liguria ASL4 District manager n.14 and n.16. She holds the role
Senior Expert of manager of the health professions. He has high
organizational skills in the socio-health, nursing and
assessment of Quality Systems fields. She has
54
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
been involved in promoting research and design
and testing of innovative organizational models.
Daniela Mortello, Liguria ASL4 District manager n.15. Has concrete knowledge in
Senior Expert the field of primary care, both for training curriculum
(social worker) and for having held management
roles at macro area level in the socio-health field for
years
Monica Liguria ASL4 Department director. Considerable experience in
Arcellaschi, European planningin. in the field of asylum and
Trainer immigration.Skills in the field of young people with
risky behavior, promoter of projects in the social and
socio-health fields. Excellent working group
management and problem solving qualities.
Emilia Molinaro, Liguria ASL4 Administrative officer with organizational skills.
Administrative Training experiences in the field of project reporting.
Personnel
Cristina Giordano, Liguria A.Li.Sa Direttore Sociosanitario – Strategical managing of
Project manager the regional social health services in accordance
with the general guidelines
Isabella Roba, Liguria A.Li.Sa
Senior expert
Elisa Lidonnici, Liguria A.Li.Sa In Alisa she is responsible for the regional
Junior expert healthcare system’s palliative care services. She is
also responsible for pain therapy and legal
guardianship. Consultant in the national discussion
board on dementia. Social worker, specialized in
“Social and health policies planning and evaluation”
Laura Pozzo, Liguria A.Li.Sa In Alisa she is responsible for the regional
Junior expert healthcare system’s child neuropsychiatry services.
She is also responsible for family counselling and
eating disorders. Since the beginning of COVID-19
pandemic she has been collaborating to the
management of the emergency in schools. Social
worker, specialized in “Social and health policies
planning and evaluation”
Sonia Salvini, Liguria A.Li.Sa Administrative responsibilities within the activities
Junior expert foreseen by the Complex Structure of Mental Health
and Addictions. She cooperates with Ministry of
health, Italian National Institute of Health (ISS), Anti-
drug Department of the Presidency of the Council of
Ministers Expert in drug prevention and health
promotion. She coordinated an EU Project in 2019
and she’s partner in EU Project.
Serena Alvino, EU Liguria A.Li.Sa Expert in EU projects coordination in the healthcare
Projects sector. She got a Ph.D. in “languages, Cultures and
Coordination ICTs” in 2008. Reference person for Liguria Region
Commitment to the European Innovation
Partnership on Active and Healthy Aging (EIP on
AHA).
Valerio Filippo A.S.L. Teramo Director of Department of Territorial Services. She
Profeta, Scientific will supervise the implementation of all activities,
55
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Responsible and either scientific or administrative ones, carried out
Project Manager by the staff dedicated to the project
Giandomenico A.S.L. Teramo District Area Director. Qualified healthcare
Pinto, Senior professional who will support the Scientific
expert Responsible in carrying out the scientific and/or
administrative tasks
Antonio Petrone A.S.L. Teramo Sociologist. Support the Scientific Responsible in
carrying out the scientific and/or administrative
tasks
Antonella A.S.L. Teramo Management engineer. Support the Scientific
Calabrese. Responsible in carrying out the scientific and/or
administrative tasks
Paolo Grandinetti A.S.L. Teramo Territorial psychiatrist. Qualified healthcare
professional who will support the Scientific
Responsible in carrying out the scientific and/or
administrative tasks
Anna Ceci A.S.L. Teramo Physiotherapist coordinator of non-medical health
personnel of Department of Territorial Services.
Support the Scientific Responsible in carrying out
the scientific and/or administrative tasks.
POLAND
Role: project management
Tasks: supervision of the performed works,
cooperation between the beneficiaries and the pilot
project implementers, dissemination of the project
results, knowledge transfer, capacity building.
Qualification: Master, PhD student at the Medical
University in Wrocław
Profile & expertise: Chief Expert in National Health
Fund in Poland since 2003, Project Manager,
responsible for international cooperation and
management of innovative health-related projects.
Other skills: English, data analysis, deep
Katarzyna
knowledge of financing and organizing healthcare
Wiktorzak, Project NHF
services in Poland and EU healthcare systems,
Manager
including coordinated care and prevention,
extensive experience in similar projects (conducting
pilots, scaling), author of presentations and
publications in the field of coordinated care also in
primary care. Initiator of the use of the Fund's
potential in promoting pro-health attitudes
(applications: Sweet Pregna, CanCell Cancer and
NFZ diet portal), optimization of the organization of
healthcare services (EuroDRG, Scirocco
Exchange, OOK- organization of integrated care),
knowledge sharing (NHF Academy, NHF
Knowledge Transfer HUB) and reduction of social
inequalities in health.
.
Agata Szymczak, NHF
Role: coordinating work with project beneficiaries
Coordinator
56
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Tasks: Coordination of cooperation with project
beneficiaries in the field of communication and
publication of materials, supervision over
translations; communication with primary care
providers.
Qualification: Master, Graduate of University of
Lodz in the field of economy.
Professional experience: Chief Expert in National
Health Fund in Poland since 2012, responsible for
management of innovative health-related projects.
Other skills: English, knowledge of EU healthcare
systems, experience in participation in international
project called “EuroDRG – Diagnosis-Related
Groups in Europe: towards Efiiciency and Quality”,
“Scirocco Exchange”, the author and initiator of
innovative activities in the field of creating mobile
applications in health.
Katarzyna NHF
Role: coordinating work with primary care units
Klonowska,
Coordinator Tasks: Cooperation with primary health care
entities participating in the pilot project; participation
in the development of knowledge transfer
methodology and research on the needs of service
providers.
Qualification: Master, Graduate of University of
Gdansk in the field of economy at the specialty of
econometrics.
Professional experience: Chief Expert in National
Health Fund in Poland since 2008, responsible for
planning and developing the health services system
in Poland, coordinating cooperation with healthcare
providers in primary health care.
Other skills: English, data analysis, deep
knowledge of financing and organizing healthcare
services in Poland and EU healthcare systems,
including coordinated care and prevention,
experience in participation in international project
called “EuroDRG – Diagnosis-Related Groups in
Europe: towards Efiiciency and Quality”, “Reducing
social inequalities in health” project co-financed
from the Norwegian Financial Mechanism.
Rafał Kozłowski, NHF
Role: service of means of communication
Senior Expert
Tasks: Maintaining the project's website; Social
media [FB, TT]; participation in the development of
knowledge transfer methodology and research on
the needs of service providers.
Qualification: MSc in Health Sciences at the
Medical University of Warsaw, graphic artist
57
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Professional experience: Senior Expert in
National Health Fund in Poland since 2015,
responsible for data analysis and running the
website of the following EU projects: POZ PLUS,
Scirocco Exchange and others.
Other skills: English, knowledge of Polish
healthcare system, experience in dissemination of
international project called “Scirocco Exchange”.
The author and initiator of innovative activities in the
field of creating mobile applications in health,
blended-learning training for medical staff, graphic
design of educational materials for patients and
providers. Managing the social media of the POZ
PLUS project - You Tube, Facebook, Twitter,
creates graphic design for promotional materials.
Marta Morawska, NHF
Role: service of means of communication
Senior Expert
Tasks: Graphic development of project information
leaflets, educational materials for healthcare
providers; Social media [FB, TT]; participation in the
development of knowledge transfer methodology.
Qualification: M.Sc. IT engineer, designer, graphic
artist
Professional experience: Senior Expert in
National Health Fund in Poland since 2015,
responsible for data analysis and running the
website of the following EU projects: POZ PLUS,
Scirocco Exchange and others.
Other skills: English, knowledge of Polish
healthcare system, experience in dissemination of
international project called “Scirocco Exchange”.
The author and initiator of innovative activities in the
field of creating mobile applications in health,
blended-learning training for medical staff, graphic
design of educational materials for patients and
providers. Managing the social media of the POZ
PLUS project - You Tube, Facebook, Twitter,
creates graphic design for promotional materials.
The New hire, NHF
Role: Project management and dissemination of
Junior Expert
the project results
Tasks: internal communication, supervision of the
implementation schedule; keeping project
documentation, organizing meetings of the Project
Team
Professional profile and expertise: experience in
handling international projects, knowledge of
English at least B2 level, optional: Spanish, Italian,
Greek.
58
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Anna Czerwińska, NHF Accounting service
administrative
personnel
Katarzyna NHF HR service
Michalak,
administrative
personnel
Elżbieta NHF Financial service
Szeligowska,
administrative
personnel
SLOVENIA
Role: WP leader: Tasks: health system / provider
analysis, contextual and situation analysis,
Radivoje facilitation of capacity building process. Medical
Pribaković doctor, specialist in public health. Head of
NIJZ
Brinovec, Project Department for prevention and promotion
manager programmes management. In the last 15 years he
participated as a leader, coordinator or researcher
in several European projects.
Andreja Ošina, NIJZ Role: WP coordinating and capacity building
Junior expert activities. Tasks: development of training capacities,
workforce and workplace competencies and
requirements. Facilitation of process. University
degree in sociology (human resources
management); project coordinator on the project
Health Literacy in Slovenia.
Claudia Adamič, NIJZ Role/tasks/expertise: Project officer with a
Financial and university degree in economics. She has over 25
administ. officer years of professional experience. For the last 10
years she has been working as financial and
administrative officer for European projects at the
Research and Project Management Centre at NIJZ.
Involved in more than 50 European funded projects.
tbd, Junior expert NIJZ Role: researcher, facilitator. Tasks: health system /
provider analysis, contextual and situation analysis,
facilitation of capacity building process. University
degree in psychology / anthropology.
ROMANIA
MD, Head of Medical Assistance Unit, with
expertise in Elaboration of national public health
policies, development of health strategies,
Costin Iliuță.
MoH Ro coordinating and monitoring the implementation of
Senior expert
health programs in the Ministry of Health and
organising, coordinating and supervising
functioning of healthcare services
Amalia Șerban MoH Ro MD, Director of Medical Assistance, Emergency
Deputy Director Medicine and Public Health Programs has expertise
General in European union policies, Elaboration of national
public health policies Development of health
strategies coordinating and monitoring the
implementation of health programs in the Ministry of
59
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Health and organising, coordinating and supervising
functioning of healthcare services
Andrei Luca MoH Ro MD, PhD Counselor of EU Affairs, Expertise in EU
Counselor for EU Research programs, public policies medical
Affairs projects management, Elaboration of national public
health policies, development of health strategies,
coordinating and monitoring the implementation of
health projects in the Ministry of Health. Expertise in
structural reform projects with COM and EDQM.
Carmen Radu MoH Ro Coordination, monitoring and institutional
Senior Adviser collaboration at central level, the Ministry of Foreign
Affairs, and the Permanent Representation of
Romania to the European Union for fulfilling the
obligations deriving from the European Treaties,
strategies and programs, implementing the
Regulations and transposing the European
Directives, - coordinating and monitoring the
participation in working groups at EU Council level,
European Commission committees and groups,-
coordinating and monitoring the participation in the
working groups at the level of the Council of Europe,
institutional collaboration at central level, the
Ministry of Foreign Affairs, and the Permanent
Representation of Romania to the Council of
Europe.
Anca Șandru MoH Ro Graduate from National School of Public Health
Counselor Management and development in the health field is
a Specialist in improvement Processes. Also with
expertise in Development and coordination of public
health policies, the elaboration and implementation
of national campaigns for health promotion and
health education; and participation in the
elaboration or development of partnerships with
institutions, governmental or non-governmental
organizations, national and international.
Andreea Toma MoH Ro Has a master degree in economic studies, and has
Conselor expertise in elaboration of official instruments for
health collaboration between Romania and other
countries or international bodies and also payment
of contributions for international organizations.
Mihaela Giza MoH Ro Manages at institutional level the coordination
Counselor network in the field of European affairs at the
Ministry of Foreign Affairs, monitors the progress of
the file negotiations. Participates in the working
meetings of the inter-ministerial group on the areas
of interest of the Ministry of Health and advises the
specialized directorates in these fields.
representation of the Ministry of Health in the
working groups of the community institutions as well
as in the high-level meetings as well as of the
preparatory ones of the councils of ministers
/permanent representatives based on the
attributions of the ministry
60
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Ioana Popinceanu MoH Ro MD, Counselor with expertise in elaboration of
Head of Unit national public health policies Development of
Programs of health strategies coordinating and monitoring the
Public Health implementation of health programs in the Ministry of
Health and organising, coordinating and supervising
functioning of healthcare services and especially
Programs of Public Health
Asociate Professor at Public Health and
Management Discipline, Coordinator of the Public
Dr. Bogdan Health Research Center within the discipline of
UMF-CD
Cristian Pană PhD Public Health and Advisor supporting to the Ministry
of Health Romania. Member of the Ministry of
Health Commission for Public Health.
Project manager UMF-CD To be determined
Professor of Public Health and Management Head
of Planning, Monitoring and Risk Communication
Furtunescu Unit at National Center for Surveillance and Control
Florentina Ligia- NIPH of Communicable Diseases BP 3) Integrated care
Senior expert for complex chronic patients in Andalusia (Spain):
Personalized care action plans (PAPs) – Andalusia,
Spain
Daniela Valceanu, NIPH Public Health and Management Consultant at
Senior expert Planning, Monitoring and Risk Communication Unit
of the National Center for Surveillance and Control
of Communicable Diseases BP 6) Health Promotion
Centres (HPCs) – Slovenia
Cucu Alexandra, NIPH Public Health and Management Consultant Director
Senior expert of National Center for Evaluation and Promotion of
Health BP 2) TELEA: Home telemonitoring in
Primary Care for chronic disease and Covid-19 –
Galicia, Spain
Galan Adriana, NIPH Public Health Expert at National Center for
Senior expert Evaluation and Promotion of Health BP 5) ‘Health
Action for Children and Youth at Risk’ & ‘Health
Action for Gender, Violence and Lifecycle’ –
Portugal
Topor Vlad NIPH Public Health and Management Specialist at
Cristian, Junior Planning, Monitoring and Risk Communication Unit
expert of the National Center for Surveillance and Control
of Communicable Diseases BP 3) Integrated care
for complex chronic patients in Andalusia (Spain):
Personalized care action plans (PAPs) – Andalusia,
Spain BP 6) Health Promotion Centres (HPCs) –
Slovenia
Cioran Livia NIPH Public Health and Management Specialist at
Nicola, Junior National Center for Evaluation and Promotion of
Expert Health BP 5) ‘Health Action for Children and Youth
at Risk’ & ‘Health Action for Gender, Violence and
Lifecycle’ – Portugal
Bratu Eugenia, NIPH Public Health and Management Consultant at
Senior expert National Center for Evaluation and Promotion of
Health BP 2) TELEA: Home telemonitoring in
61
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Primary Care for chronic disease and Covid-19 –
Galicia, Spain
BELGIUM
Manager of Health, Social Action and Social
Cohesion, Department of Ambulatory and Primary
Care. The person in charge of the work related to
Gretel DUMONT - the implementation of the good practice in countries
AVIQ
Project manager that request it. Gretel was responsible for the
presentation of the good practice "Integrated Health
Association - Region of Wallonia, Belgium" in the
Marketplace.
Laurent MONT, AVIQ Director of the Department of Ambulatory and
Senior expert. Primary Care The person who will support the
project manager if she needs help in the work
related to the implementation of the good practice
"Integrated Health Association - Region of Wallonia,
Belgium". Laurent is responsible for the Department
in charge of the Marketplace presentation. He has
also participated in the Marketplace. He will bring
his expertise to this Joint Action.
Nicolas AVIQ Manager of multilateral, European and international
MAJEWSKI, projects. Support, External and International
Administrative Relations Department. He will be responsible for the
personnel. administrative management of the Joint Action for
the AVIQ in collaboration with the project manager.
Phani GOURNIS, AVIQ Manager of multilateral, European and international
Financial projects. Support, External and International
personnel. Relations Department. She will be responsible of
the financial management of the Joint Action for the
AVIQ in collaboration with the administrative
personnel.
PORTUGAL
Head of planning and innovation. Administration of
the Health System. Manage all the project and the
partners involved at the national level. Experience
Vanessa Ribeiro. in managing projects at the national level, some in
ACSS
Project Manager partnership with other countries, such as a financial
programme to incentivize integration of care and the
Joint Action on digitally enabled person centered
care (JADECARE).
Assistant-Coordinator - National Program for the
Prevention of Violence in the Lifecycle. Directorate-
General of Health
Mª B Catanho de
Good practice owner. Specialist in Child and
Menezes. Senior MS Po
Pediatric Health Nursing with experience in
Expert.
leadership of several projects regarding the
Prevention of Violence in the Lifecycle,
representative of the Ministry of Health in this
subject.
Dina Cláudia MS Po
Assistant-Coordinator - National Program for the
Simões de
Prevention of Violence in the Lifecycle. Directorate-
62
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Oliveira. Senior General of Health. Good practice owner. Specialist
Expert. in Child and Pediatric Health Nursing. Experience in
leadership of projects regarding Infant, Youth,
Reproductive and Sexual Health.
Jorge Martins, ULSM Medical doctor hospital. Provide expertise regarding
Senior integration of care and build the individual plan of
expert/technical care.
personal.
Margarida Filipe, ULSM Nurse Hospital. Provide expertise regarding
Senior integration of care and build the individual plan of
expert/technical care.
personal.
Clara Lago ULSM Social worker. Provide expertise regarding
Senior, integration of care and build the individual plan of
expert/technical care.
personal
Social worker. Provide expertise regarding the
social needs of the patients and build the Individual
Inês Espírito
plan of care. Experience in social work in a central
Santo. Senior CHLC
hospital and academic expertise regarding
exp/technical p
integration of care, researcher and author of several
papers about this subject.
Luciano Alves, CHLC Hospital nurse manager. Provide expertise
Technical regarding the health needs of the patients and build
personal. the individual plan of care. Expertise in providing
care to heart disease patients in the hospital
context.
Tânia Branco CHLC Medical doctor hospital. Provide expertise regarding
Mano, Technical the health needs of the patients and build the
personal. individual plan of care. Expertise in providing care
to heart disease patients in the hospital context.
Ana Leitão, Senior CHLO Medical doctor Hospital. Provide expertise
Expert. regarding integrated care for chronic complex
patients.
Maria Teresa CHLO Nurse Hospital. Provide expertise regarding nursing
Alves, Tecnhical care in the chronic complex patients’ program.
personal.
Medical doctor Primary care. Provide expertise
Tiago Lopes. regarding the health needs of the patients and build
ARSLVT
Senior expert the individual plan of care. Expertise in providing
care to patients in the primary care context.
Sara Caldas, ARSLVT Nurse Primary care. Provide expertise regarding the
Technical health needs of the patients and build the individual
personal. plan of care. Expertise in providing care to patients
in the primary care and hospital context.
Diogo Silva, ARSLVT Social worker Primary care. Provide expertise
Technical regarding the social needs of the patients and build
personal. the individual plan of care. Expertise in providing
care to patients in the primary care context.
AUSTRIA
63
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Kathryn GÖG 2002 doctorate in medicine, 2007 General
Hoffmann, Senior Practitioner, 2010 Master of Public Health, 2017
health expert. Habilitation/Venia docendi in General Practice and
Family Medicine. Associate professor at the Medical
University of Vienna, head of the unit Health
Services Research in Primary Care and senior
health expert at the Austrian National Public Health
Institute. Research stays at Duke University in the
USA and at Ghent University in Belgium. Author of
numerous publications and of book chapters. She
directed large EC-funded studies on primary care
and health services and system research in Europe
for Austria. Austrian representative of the EGPRN,
former advisory board member at the EFPC and a
founding member of the Austrian Forum for Primary
Care.
David GÖG Head of the unit „Coordination of Primary
Wachabauer, Healthcare Issues“ at GÖG. He is responsible for
Senior health leading and coordinating projects regarding primary
expert, healthcare with a focus on the Recovery and
Resilience Facility funded project in primary
healthcare. David Wachabauer also has profound
knowledge of healthcare planning in the ambulatory
and inpatient healthcare sector. From his
professional background he has a doctorate in
Medical Sciences, a Master degree for Business
Administration in Healthcare Management, and is
radiological technologist.
Daniela Rojatz, GÖG Doctorate in sociology. Since 2016 she has been
Senior Health working at GÖG as a health expert and project
Expert, manager in the department of health literacy and
health promotion. Her work focuses on projects to
strengthen self-help organizations, citizen- and
patient-participation as well as activities for the
systematic implementation of disease prevention,
health promotion and health literacy in primary care
units. In this context, she is also the co-coordinator
of the GÖG's internal primary care task force and
the Community of Practice Participation at the
GÖG. As part of her research, she published in
international academic journals.
Anna Wahl GÖG Junior health expert.
CROATIA
Ranko CIPH Assoc. Prof., Primarius, MD, PhD, Family Medicine
Stevanović. specialist working in the field of public health.
Senior expert Currently is Head of Division of Public Health in
CIPH. He was leader or worked in several national
and international projects regarding primary health
care system, public health and health informatics
systems.
Željka Draušnik. MD, MPH, Public Health Medicine specialist, acting
CIPH
Junior expert Head of Department for Primary Health Care within
64
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
CIPH. Her main activities and responsibilities are
planning, analyzing and evaluating policies for
Primary Healthcare. She has experience in working
with public health databases and registries,
especially ones regarding primary health care,
maternal and perinatal health.
Danijela Fuštin. CIPH MD. She is resident in Public Health Medicine with
Researcher experience in primary care work and work with
public health databases.
Bojana Raičković, CIPH MA, Psychologist, Head of Programme and Project
Project manager Management Department, National Focal Point for
Third Health Programme 2014-2020 and EU4Heath
Programme 2021-2027, CIPH’s Data Protection
Officer, CIPH’s project manager, Croatian
representative of 3HP projects NFP4Health and
CIPH’s representative of JA TEHDAS project.
ESTONIA
Kaily Susi, Senior Chief specialist of primary care in Health System
MSAE
expert Development department; general practitioner
TBD MSAE Public Health Department
Professor of Family Medicine, Institute of Family
Medicine and Public Health, University of Tartu. She
belongs to the Board of Estonian Society of Family
Ruth Kalda, Physicians and is expert of primary care in the
project manager, UTARTU ministry of Social Affairs. She will take the leading
senior expert role making contacts with piloting practices. She will
participate in working out the methodology for the
transferring process and in analysis of best
practices and working out policy recommendations.
Junior expert UTARTU Institute of Family Medicine and Public Health,
University of Tartu. He will work with methodology,
needs assessment and contacting and coordinating
the work of piloting practices. Monitoring the pilot
implementation
Liis Viitkar, UTARTU Institute of Family Medicine and Public Health,
Administrative University of Tartu. Assistance in making
personnel appointments, ordering supplies, doing site visits
and preparing reports
HUNGARY
Expert in the field of the health promotion. As project
manager play the lead role in planning, executing,
Péter Csizmadia.
NNK monitoring, controlling, and closing out the project.
Project manager
He is accountable for the entire project scope, the
Hungarian project team, and resources.
Kata Száraz- NNK Financial officer. Responsible for providing the
Füleki. Technical needed data related to the project work and budget,
personnel, preparing budgets for project, following up purchase
requests, payment orders, and other needed
documents. Prepare requested reports for the
donors and prepare for donor audits.
65
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Dr. Rita Simich. NNK Epidemiologist, head of the health promotion. She
Senior expert, is working as expert in the field of prevention.
LITHUANIA
Birute MoH-RL Advisor of Primary Health Care and Long-Term
Kavaliauskiene. Care Division. Leadership in organisation of new
Senior expert model of Municipality Health Care Center
Renata MoH-RL Accounting of project funds and others costs
Beržanskienė,
Chief Financier
Audrone MoH-RL Advisor of Health Strengthening Division.
Astrauskienė, Consulting in the issues of public health services
Senior expert and models of integration with primary health care
services
SWEDEN
NBHW Head of Unit for Department for Knowledge-based
Policy of Health Care. Task in JA: Project
Maria Hilberth. leader/person in charge of project at
Senior expert Socialstyrelsen. Full CV/Resume available at
LinkedIn: linkedin.com/in/maria-a-hilberth-
46228669
Malin Bruce. NBHW Programme Officer. Department for Knowledge-
Senior expert based Policy of Health Care. Task in JA: Scientific
Project Leader at Socialstyrelsen. Full CV/Resume
available at LinkedIn: linkedin.com/in/malin-bruce-
8605761ab
Malin Lindström. NBHW International coordinator/Programme Officer. Task
Administrative in JA: Overall coordination and administrative
personnel assistance.
Sofia Karnberger, NBHW Financial Controller.
Administrative
personnel
Outside resources (subcontracting, seconded staff, etc)
If you do not have all skills/resources in-house, describe how you intend to get them
(contributions of members, partner organisations, subcontracting, etc.).
If there is subcontracting, please also complete the table in section 4.
Partner 32 NIJZ will subcontratc 4 PHC centres through public tender to implement
the selected BP. NIJZ is responsible for managing preventive and integrated care
programs in primary care. The PHC centres could not participate as affiliated and
have no capacities for project management. With these
Experts (if applicable)
Explain if national and/or international experts will be nominated by national
authorities to support the project implementation. Describe the specific professional
and technical expertise and experience of each proposed expert and their
contribution to the project implementation. Provide CVs (if required).
66
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Minimum requirements:
• Qualification: A level of education which corresponds to a Bachelor's degree.
• Professional experience: At least 4 years of proven experience in XXX
• Other skills: ability to work in English (minimum B2 level)
Please find next the experts already nominated to contribute to specific tasks regarding
the transfer/implementation of Best Practices. Besides, during the implementation of
the pilots, each pilot site will engage the needed professional profiles (including
doctors, nurses and social workers) as required
SPAIN
Carmen Lama (Senior expert).
Qualification: MD, specialist in Family and Community Medicine.
Professional experience: Since June 2019 she is Deputy Director for Social and Health
Care, Strategies and Plans at the Regional Ministry of Health and Families of
Andalusia (Spain), and Deputy Director for Health Planning during the last 4 years.
Formerly she worked for the Andalusian Health Service as Technical Advisor of the
Operational Planning Service, Technical Advisor for the Coordination of
Comprehensive Health Developments and Technical Advisor for Management and
Evaluation Coordination. In addition, she has worked for the Regional Ministry of
Health and Families of Andalusia as Senior Advisor of the General Secretariat of
Quality, Innovation and Public Health and Deputy Director of Promotion, Participation
and Plans. Deeply knowledge of the primary healthcare system, with more of 20 years
of experience as family physician at the Andalusian Health Service and the National
Institute of Health of Spain.
Other skills: Deep knowledge of primary healthcare system. Wide experience in EU
projects (for example, JA JADECARE, ADVANTAGE JA, CHRODIS Plus JA,
VIGOUR).
Ana M. Carriazo (Senior expert).
Qualification: MD, PhD, Degree in Statistics and specialist in Preventive Medicine and
Public Health.
Professional experience: Since June 2008 she is Senior Advisor at the Regional
Ministry of Health and Families of Andalusia (Spain) in charge of International
relationships particularly with EU and its institutions and participates in different
European and International networks. Before, she worked at the Andalusian Health
Service for more than 19 years, with different responsibilities (health information
systems, e-health, healthcare basket of services among others). She has collaborated
at the Department of Preventive Medicine /Social and Health Sciences, of the
University of Seville, and has published both at the national and international level.
Other skills: English, ICT, Deep knowledge in EU Health systems, Wide experience in
similar projects (transfer of BPs, scaling up), including (JADECARE, ADVANTAGE
Joint Action, CHRODIS Plus JA, VIGOUR, scientific coordinator of PALANTE project
GA – 297260).
Susana Rodríguez (Senior expert).
Qualification: Nursing degree and Epidemiology and Clinical Research Expert
Diploma.
Professional experience: Advisor at the Regional Ministry of Health and Families of
Andalusia (Spain) in the Andalusian Care Strategy (PICUIDA), which is responsible of
the planning of the Nursing Care including the home care and nursing homes
depending on the Regional Ministry of Health and Families of Andalusia. She is also
67
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
associated professor (partial time) at the University of Sevilla. She has extensive
experience in social and healthcare focus in how to improve the final caring as well as
the coordination among different services, and participating in the development of
Plans, Strategies and Clinical Practice Guides. Member of the research group "Care
Innovation and Social Determinants of Health" (PAIDI CTS969) of the University of
Sevilla.
Other skills: English, Deep knowledge of primary healthcare system. Wide experience
in EU projects (for example, JA JADECARE, ADVANTAGE JA, CHRODIS Plus JA,
VIGOUR).
José María de la Higuera (Senior expert).
Qualification: MD, specialist in Family and Community Medicine. MSc in Health
Economics and Health Services Direction.
Professional experience: Since January 2021 he is working as independent consultant
in health systems and health care innovation. Formerly he has been working for
Regional Ministry of Health and Families of Andalusia (Spain) as director of the Public
Procurement of Innovation in Health Strategy since 2016. He has wide experience in
health services innovation management, developed in public health, hospitals and,
specially, in primary care, where he has been director of PHC services in the
Andalusian Health Service (SAS) from 1985-98 dealing with radical strategic reform
initiatives. WHO Europe collaboration (PHC REFORMS). Teacher of health systems
in the MSc programme of ICT Systems Direction in the National Health School (ENS
ISCiii) attached to the Spanish ministries of Science and Innovation and Health.
Other skills: English. Deep knowledge in EU Health systems. Wide experience in EU
projects (TIPPING THE BALANCE PHC; PHC Telematics CA; ITHACA; PICNIC;
STOP&GO; BLUEPRINT).
GALICIA
Alfonso Alonso Fachado
Role: to transfer the knowledge generated in the development and implementation of
a telemonitoring platform from a healthcare point of view.
Contributions: Share our experience of 5 years of setting up, implementing and
extending the telemedicine platform (Telea platform).
Support the development team on the difficulties and doubts that arise and explain
how they have been solved by us.
Qualification: MD PhD, European PhD, Master's Degree in Health Management and
Planning, Family Medicine Specialist.
Professional experience: Deputy Director General for Care Management and
Innovation in Regional Ministry of Health of Galicia (Spain) since 2018, Deputy
Director-General for Health Planning and Programming in Regional Ministry of Galicia
(Spain) from 2016 to 2018,
Other skills: English B1 (CEFR), expert in health innovation projects.
CATALONIA:
Mar Casanovas Marfa
Qualification: Pharmacist, degree quality management in primary care, master's in
healthcare pharmacy.
Professional experience: Primary Care pharmacy at Catalan Institute of Health (Spain)
since 2009, implementation of recommendations to avoid low value clinical practices
68
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
from and impact assessment from 2017, associate professor in pharmacology at the
University of Lleida since 2015
Other skills: English, experience in innovation health systems.
Maria Homs Riba
Qualification: PhD, Degree in Biology and postgraduate in Biostatistics
Professional experience: from 2007 to 2017, researcher in Molecular Biology at Vall
d'Hebron Hospital (Spain). Since 2018 Health Technician in Primary Care
Assessment at Catalan Institut of Health and impact assessment by means of
indicators of recommendations to avoid LVCP, since 2017.
Other skills: English, German (basic competence), Data analysis (SPSS and R) and
experience in writing reports and projects
ITALY
Experts will be involved to support the project implementation, with particular attention
to those who comes from the Italian Ministry of Health and other healthcare Agencies
or Institutes. In addition, the following 8 experts have been selected by the Italian AEs:
Guglielmo Pacileo. MD, Master in health care, economics and policy, Specialization
in Hygiene and preventive medicine, PhD in Bioethics. 2003 – 2017 researcher and
teacher at Bocconi University (healthcare management); 2017 – 2022 Quality Head at
ASL AL. Ability to work in English (B2 level). Support the project implementation
Salvatore Di Somma. MD PhD, Professor of Medicine, Director postgraduate School
of Emergency Medicine University of Rome La Sapienza, Visiting Professor University
San Diego California (USA). More 10 years of experience in Telemedicine application
in Emergency care. Coordinator Covid-19 Telemonitoring Project of Polo Pontino
University of Rome La Sapienza.
Mantovani Lorenzo: International Expert; Qualifications: Bachelor of Science in
Economics (Bocconi, Milan, 1990), Master of Science in Economics (Bocconi, Milan,
1994), Master of Science in Epidemiology (Erasmus Rotterdam, 1998), Doctor of
Science in Epidemiology (Erasmus Rotterdam, 2000). Professional Experience: 29
years experience in Health Services Research, Professor of Public Health, Director of
the Value-based Health Care Unit in a large Research and Teaching Hospital, Vice-
chair of the Doctorate in Public Health, Dean of the Post-graduate School of Public
Health. Other skills: Ability to work in English: He has been on Her Majesty’s Service
in 1996, as Consultant to the British Army Medical Directorate, Keogh Barracks, Ash
Vale, UK. He obtained a Master and a Doctorate in Rotterdam. The official language
was English. He co-authored 254 papers and 5 Books or Book Chapters in English,
he chaired 3 International Congresses in English and delivered approximately 150
lectures and presentations in English. Expert in International Projects/Studies,
including projects organized bi NICE, National Institute of Health and Care Excellence.
He will lead focal competence groups (i.e. Primary Care & Preventive Medicine, HTA)
supporting the Best practice Study and methodological approach for Pilot set-up,
monitoring and evaluation; he will also be teacher.
Montermini Dario: Senior Expert & Teacher. Biomedical Engineer (M.Phil-Politecnico
Milano,1998); Master in Telemedicine (Cefriel- Milano 2021); 20+ years of experience
in: Healthcare Data Driven Governance and Data Science (participates to European
Health Data & Evidence Network, Observational Health Data Science and
Informatics); Innovative Health Technologies and Models (e.g. Primary Care, Chronic
Disease Management, Long Term Care). He promoted initiatives of International best
69
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
practice exchange. He has been/is trainer in GPs training and Top Public Health Care.
Considering his competence areas, earlier Health Care Organizations’ International
peering experiences and his recent involvement in the ATS Bergamo's PNRR design
and implementation coordination, the named expert will bring a fundamental
contribution to the EU4H-JA10 project as Senior Expert, as leader of thematic working
groups, analyst, and teacher. As young Researcher at the Imperial College of London
from 1999 to 2001 he gained a very good level of English.
Zucchi Alberto: MD; Specialized in Medical Biostatistics and Epidemiology. Masters
in Health Economics and Health Service Organization. Director of Epidemiology Unit.
Member of scientific technical committees. Author of more than 90 publications in
referred journals; more than 140 papers presented at congresses. University contract
professor for Master courses in Biostatistics and Epidemiology. Tutor for specializing
doctors in Hygiene and Public Health. English language skills: Proficient.
Scardoni Alessandro: Doctor of Medicine, Public Health specialist. Worked as
Medical Officer at ASST Grande Ospedale Metropolitano Niguarda in Milan and as
Consultant at Gruppo San Donato. Attended residency MD program in Ospedale San
Raffaele Health Department. He has several scientific publications, abstracts and
posters in public health, value-based healthcare and hospital management. During
residency program he worked in the value-based implementation and studied artificial
intelligence role in healthcare associated infections detection. He has been
collaborating in the European University Hospital Alliance (EUHA) group and in the
presentation of the European Call Innovative Medicines Initiative (IMI) “Health
Outcomes Observatories – empower patients with tools to measure their outcomes in
a standardized manner creating transparency of health outcomes” and of the
European Horizon 2020 Call "BHC-06 AI and Digital Diagnostics". Upper-intermediate
English proficiency.
Ciampichini Roberta: Senior Statistician; MSc in Biostatistics and experimental
statistics; Master in Information Technology; MSc in Statistics and Economics; PhD in
Public Health, HTA. Experienced data manager and analyst, valuable skills in project
organisation and statistical data analysis and with good experience in healthcare
epidemiological and economic evaluation. English language skills: Proficient.
Ernesto Palummeri, graduated in Medicine and Surgery at the University of Parma,
is a specialist in Gerontology and Geriatrics and Pharmacology. He worked in Parma
at the Geriatric Hospital G Stuard and from 1990 he was Director of the SC of
Geriatrics at the Galliera Hospital in Genoa. He was Director from 2002 to 2014 of the
Department of Gerontology and Motor Sciences of the same Hospital, and from 2003
to 2011 he directed the Department of Elderly Care of ASL 3 Genovese. He is the
author of 72 scientific publications on geriatric topics reviewed on Medline and
President of the Ligurian section of the Association of Geriatricians in Outpatient
Departments (AGE). He participated in the European project Sufrail and was Scientific
Responsible for the Liguria Region of the European CONSENSO Project. He is a
consultant for A.Li.Sa. (Ligurian Health Authority) on the problems of the elderly with
reference to chronicity and fragility training since 2017. He has been a consultant for
A.Li.Sa. (Ligurian Health Authority) on the problems of the elderly with reference to
chronicity and fragility training since 2017. He is a consultant for A.Li.Sa for the
management of the Covid.19 emergency in the Liguria Nursing Home from 1 April
2020 to date.
70
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Carlo Penati (Freelance). He will support the Project Management, the Best Practice
Analysis and Pilot Evaluation
Cristina Sarchi (Freelance). She will support matching and tuning of Best Practice
roles and process translation for the Pilot Design and Tuning.
POLAND
Donata Kurpas
Qualification: Associate Professor, Habilitated doctor in the field of medical sciences
in the discipline of medicine
Professional experience: Primary care physician, Editor-in-Chief of the scientific
quarterly Medical Science Pulse, Senior Advisor of Public Health, Academic teacher,
English-language reviewer of journals (like: BMJ Open (IF 2.063), Family Medicine (IF
1.142), Rural and Remote Health (IF 0.868), Global Public Health), Project Manager
and Expert of International Projects
Other skills: English, Deep knowledge in EU Health systems, Wide experience in
similar projects (transfer of BPs, scaling up.)
Sylwia Szafraniec-Buryło
Qualification: PHD in the field of medical sciences in the discipline of medicine
Professional experience: medical doctor, scientific consultant, English-language
reviewer, Reviewer of clinical trials of medicinal products, Expert of International
Projects
Other skills: English, Deep knowledge in EU Health systems, Wide experience in
similar projects
SLOVENIA
Sanja Vrbovšek
Qualification: BSc in Nursing, BSc in Sociology, PhD candidate in social sciences,
Professional experience: Assistant in subjects on Public Health at the Faculty of
Health Sciences, University of Ljubljana. Head of coordination team for National
Programme on NCD prevention. Researcher, developer and trainer of life style
interventions in Health Promotion Centres. Lead expert on health literacy. Project
leader in ERF and ESF funded project Health Literacy.
Other skills: Fluent in English, knowledge and experience in health systems, more
than 5 yrs experience in similar projects.
Rok Poličnik
Qualification: MSc in Dietetics and nutrition, PhD candidate in biomedical sciences.
Professional experience: Lead expert on healthy nutrition. Researcher, developer
and trainer of life style interventions in Health Promotion Centres, related to healthy
nutrition and obesity. Co-author of national healthy nutrition guidelines.
Other skills: Fluent in English, more than 5 yrs experience in similar projects.
Andrea Backović Juričan
Qualification: BSc in Physiotherapy and Occupational therapy. PhD candidate in
health sciences.
Professional experience: Lead expert on physical activity for health. Researcher,
developer and trainer of life style interventions in Health Promotion Centres, related
to physical activity for health and obesity. Co-author of national guidelines on
physical activity.
71
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Other skills: Fluent in English, member of several working bodies in HEPA Europe
(Health Enhancing Physical activity).
Alenka Tančič Grum
Qualification: MSc in Psychology.
Professional experience: Lead expert on mental health and clinical communication.
Researcher, developer and trainer of life style interventions in Health Promotion
Centres, related to psychological education for persons with depression, anxiety or
experiencing stress.
Other skills: Fluent in English, more than 5 yrs experience in similar projects.
Tadeja Hočevar
Qualification: BSc in communicology, MSc in Psychology, PhD candidate in
biomedical sciences.
Professional experience: Lead expert on alcohol prevention. Researcher, developer
and trainer of life style interventions in Health Promotion Centres, related to alcohol
drinking. Project leader in ERF and ESF funded project SOPA – towards responsible
attitude on alcohol drinking.
Other skills: Fluent in English, more than 5 yrs experience in similar projects.
Jelka Zaletel
Qualification: MD, PhD, Assist.Prof., senior diabetes and policy expert.
Professional experience: Researcher, developer and trainer of life style interventions
in Health Promotion Centres, related to diabetes. Co-chair of National diabetes
programme coordination group at Ministry of Health Slovenia, senior expert in
several WHO-MoH national projects and a member of working group on optimising
service delivery, leading Task on Diabetes – a case study as a part of the project
analysis of the health system in Slovenia at MoH, and expert in several national and
EU projects, and member of Expert Panel on effective ways of investing in health at
EC.
Other skills: Fluent in English. Wide experience in similar projects (transfer of BPs,
scaling up)
Lucija Rojko
Qualification: BSc in nursing.
Professional experience: Member of coordination team for National Programme on
NCD prevention, responsible for regional networks. Developer and trainer of life style
interventions in Health Promotion Centres.
Other skills: Fluent in English, more than 5 yrs experience in similar projects.
BELGIUM:
Gretel Dumont:
Qualification: Master in Physics, Master in Art History and Archeology – Musicology;
Professional experience: Federal Public Service Health, Food Chain Safety and
Environment, Belgium (2006-2015), Project manager in health, social action and social
cohesion since 2016 (AVIQ);
Other skills: English, Health workforce planning and forecasting, Knowledge in Primary
Care and Health Integrated Associations.
72
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Laurent Mont:
Qualification: Master in Industrial Engineer in Industrial Chemistry;
Professional experience: Director in the Ambulatory and Primary Care Department
since 2016;
Other skills: English, Deep Knowledge in Primary Care and Managing skills
PORTUGAL
Marta Chaves da Silva
Qualification: Specialist in Clinical and Health Psychology, Community Psychology
and Early Intervention.
Professional experience: Different positions held in the Ministry of Health, Directorate-
General of Health and Regional Health Administration of Algarve. Clinical and Health
Psychologist in Regional Health Administration (Algarve, Portugal). Assistant
Coordinator of the National Program for the Prevention of Violence in the Lifecycle
(NPPVLC). Participant in meetings and cooperation in technical recommendation and
advice in public policies in the health sector, in the scope of violence and trafficking in
human beings, for national and international organizations.
Other skills: Fluent in English. Wide experience in similar projects
Daniela de Sousa Pereira Machado
Qualification: Degree in Clinical Psychology. Specialist Degree in Clinical Psychology
and Health and Community Psychology. Training internship in Child Mental Health.
Specialist in Victim Support.
Professional experience: Coordinator of the National Program for the Prevention of
Violence in the Life Cycle of the Directorate General for Health (DGS). Trainer and
consultant of the multidisciplinary teams of the National Health Service.
Consultancy functions in meetings and technical advice and recommendations for
National and European bodies. Clinical and Health Psychologist in Regional Health
Administration (Algarve, Portugal). Coordinator of the NPPVLC. Representative of the
Ministry of Health in the National Action Plan for Equality between Women and Men.
Other skills: Fluent in English. Wide experience in similar projects
.
2.4 Consortium management and decision-making
Consortium management and decision-making (if applicable)
Explain the management structures and decision-making mechanisms within the
consortium. Describe how decisions will be taken and how regular and effective
communication will be ensured. Describe methods to ensure planning and control.
Note: The concept (including organisational structure and decision-making
mechanisms) must be adapted to the complexity and scale of the project.
The management structure and decision-making mechanisms of CIRCE-JA have been
designed to respond to the complexity of a large-scale consortium. It aims to involve a
broad range of stakeholders at pan-European level in the implementation and
sustainability of BP. Specifically, it intends to reinforce the capacity of health authorities
73
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
and services to successfully support the BP transfer and implementation, while
respecting accepted project management standards and principles.
The multi-level management structure comprises: (1) Coordination Team (CT), (2)
Steering Committee (SC), (3) General Assembly (GA) (4) External Policy Board (EPB)
(5) BP Owners Working Group (OWG) and (6) BP Implementers Working Groups
(IWG). This management structure will support and facilitate the consortium activities,
oversee the communication and the coordination among partners and ensure a smooth
and efficient communication with the EC.
CIRCE-JA Management structure
1. Coordination Team (CT) is composed of the JA Coordinator (SAS) and the Project
Managementy Office (FPS). It will be responsible for the achievement of CIRCE-
JA goals and the contractual obligations towards the European Commission,
having overall oversight of the project as well as being responsible for day-to-day
management, including putting project monitoring framework in place to monitor
deliverables timelines and reporting obligations as well administrative topics, such
as correct financial management, meeting organisation and agendas, monitoring
of timelines as well as reporting obligations. The CT meets at least every two weeks
via tele- or web-conferencing in order to be updated on current issues of the
project.
2. Steering Committee (SC). An operational body comprising the Coordination
Team (CT), the Scientific leader (7HRC) , the WP leaders and co-leaders. The SC
will be responsible for monitoring the technical quality of the work and coordination
between WP leaders, with prerogatives regarding minor updates, and effort/budget
re-assignment as well as conflict resolution. The SC will meet at least once a month
via tele- or web-conferencing, and at least once a year face-to-face. Simple
majority will be sufficient for decision adoption.
74
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
3. General Assembly (GA) composed of one representative nominated by each CA
and chaired by CIRCE-JA Coordinator. It will be the ultimate decision-making body
in CIRCE-JA. It will deal with critical issues affecting the JA as a whole, such as
overall strategy and all other matters that the Steering Committee decides to refer
to a higher level.
4. External Policy Board (EPB) The EPB is an external board composed by
representatives of all Competent Authorities involved in CIRCE-JA that are MoHs,
national focal points for Health Programme at the European Commission (or other
representatives of MSs identified by them) from other Member States from EU and
EEA, and all other policy-oriented stakeholders that implementers will identify as
important based on their sustainability-related analyses. The role of the External
Policy Board will be to give input to sustainability plans from the focus of policy,
and the definition of core messages to support evidence based policy making with
respect to sustainability of CIRCE-JA results. The EPB will have a key role in
guaranteeing the sustainability of the Joint Action and the impact after the end of
the project. The aims of the EPB are to support successful design and
implementation of local Good Practices in next adopters from the focus of
sustainability, to further reinforce capacities of national and/or regional care
authorities to organize and deliver primary care based on lessons learnt, including
integration in policies, and to co-create EU added value of CIRCE-JA. The EPB
will be actively involved in WP4: in Task 4.3 as component of the expert panel
meeting and in Task 4.4 as member of the European Primary Health Care
Observatory. The EPB has two main advisory roles: 1. Alignment of Good Practices
to national, regional and/or local policies, strategies, plans and/or program; 2.
Identifying and building up potential EU added value of CIRCE-JA such as
implementing EU legislation, achieving economies of scale, promoting best
practice, benchmarking for decision making, considering cross-border threats,
fostering movement of people and/or networking. The EPB will achieve its
objectives participating in the workshops, focus group, meetings that will be held
during reporting period
The EPB will be established and coordinated by WP4 Leader and supported by the
Coordination Team, and will meet at least once a year either via tele- or web-
conferencing or as face-to-face meeting to discuss consistency and the
sustainability of the activities developed within the JA actions.
Furthermore, two working groups will be created to ensure the success of the
transfer process and implementation of BPs, namely the:
5. BP Owners Working Group (OWG): This group will be pertaining to WPs 3, 5, 6
and 7 participating in the transfer methodology, giving guidance and feedback in
the transfer process and in the capacity building.
6. BP Implementers Working Group (IWG) including local stakeholders in all the
participating countries. The IWG will be created in each of the implementing sites
for the adequate implementation of the selected BPs, led by the representative of
the corresponding CA or AE. It will be supported by the responsible of the original
BP as described in the transfer WPs (WP5-7). The IWG will include representatives
of health systems, HCPs, community members, and experts. All members of each
implementing site team will meet regularly in order to share their experiences and
learn from them, suggest improvements, receive and provide support, plan
different measures, review objectives, and collect and deliver information about the
implementations. During these meetings, the CA or AE representative will inform
75
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
the members of the team about the progress of the intervention in the other areas,
highlighting any problematic situation or any issues raised.
Decision-making mechanisms and effective communication and control
assurance
The CIRCE-JA JA consortium has put great care in defining the most appropriate
management structure according to its complexity. The scale of the project requires
putting great care in defining the most appropriate efficient decision-making
mechanisms.
General Management Procedures: Entities are responsible for:
• Effective financial management and conduct of operational work in accordance
with the program guidelines and with ethical and legal standards.
• Complying with general terms and conditions governing the grant and any terms
and conditions established by the HaDEA.
• Managing and supervising operational personnel.
• Meeting reporting requirements specific to HaDEA.
• Acknowledging, whenever possible, the financial support for the operational work.
2.5 Project management, quality assurance and monitoring and evaluation strategy
Project management, quality assurance and monitoring and evaluation strategy
Describe the measures planned to ensure that the project implementation is of high
quality and completed in time.
Describe the methods to ensure good quality, monitoring, planning and control.
Describe the evaluation methods and indicators (quantitative and qualitative) to
monitor and verify the outreach and coverage of the activities and results (including
unit of measurement, baseline and target values). The indicators proposed to
measure progress should be relevant, realistic and measurable.
The following methods will be set up to ensure planning and control:
Quality assurance Management: a Project Handbook will be elaborated at the
beginning of the project (M6) defining high quality criteria and deliverables acceptance
procedures. The quality of the transfer and implementation process will be assessed
through internal evaluation procedures and the project progress will be monitored to
systematically assess the quality and compliance of the project process through an
internal evaluation plan.
Conflict Resolution: Conflicts will be solved at the lowest level possible, and
preferably amicably. If an agreement cannot be reached at the task or WP level, then
the JA Coordinator will mediate. If that is not satisfactory, then the GA will decide and,
if necessary, will ask for the authorization of the EC for any envisaged changes.
Risk management process: will identify and monitor, during project implementation,
internal and external risks as well as any other issues that might affect the project
progress. A Risk Log will be used to document and communicate the risks and their
response actions. Project risks have been identified at the preparation step and a risk
assessment has been developed as detailed in section 9.6. Risks will be updated and
re-evaluated during the duration of the project. Each partner has the responsibility to
76
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
report immediately to their respective WP Lead and to the Coordinator Team any
situation that may arise and may affect the project objectives or their successful
completion. Any change in time schedule of deliverables or in the allocated budget
must be reported to the corresponding WP Lead and to the Coordinator Team. In case
of problems or delays, the Executive Board will be consulted, and it will establish
mitigation plans to reduce the impact of risk occurring.
The main tools that will be generated during JA management will be:
● JA Handbook: will summarise the project objectives and document the selected
approach for achieving the project goals. It will document the Critical Success
Factors (CSFs), define the key controlling processes, the conflict resolution and
escalation procedure, policies and rules, and the project mindsets. The Project
Handbook will document the project governance roles and their responsibilities and
define the plans necessary for managing the project as well as any methodology-
tailoring decisions. The project goals and scope (found in the Initiating Phase
documents) are key inputs to this artefact. The Project Handbook is an important
reference document for all project members and stakeholders, and along with the
Project Work Plan, is the basis on which the project is managed and executed.
● JA work plan: will be used as the basis to monitor the progress and control the
project. It will document all project activities needed to achieve the project goals
along with their detailed effort/cost estimates, their schedule and resulting project
duration and resource requirements. The project work plan will be developed and
maintained by the Coordinator team.
● JA stakeholder matrix: The Project Stakeholder Matrix lists all (key) project
stakeholders and their contact details and clearly states their role(s) in the project.
It may also include a classification or categorization of each stakeholder.
2.6 Cost effectiveness and financial management
Cost effectiveness and financial management
Describe the measures adopted to ensure that the proposed results and objectives
will be achieved in the most cost-effective way.
Indicate the arrangements adopted for the financial management of the project and,
in particular, how the financial resources will be allocated and managed within the
consortium.
Do NOT compare and justify the costs of each work package, but summarize
briefly why your budget is cost effective.
ALLOCATION OF FINANCIAL RESOURCES
The budget was elaborated jointly and reflects the distribution of responsibilities
amongst partners. Most partners have been involved in similar initiatives before, know
well the effort needed in terms of human and material resources for a JA of this scale,
and have provided the coordinator with a list of costs to ensure the successful
implementation of the JA.
The budget responses to the main objective of the JA and puts the focus on WP6
Transfer and implementation, which concentrates 41% of the resources and 42% of
the efforts and thus most of the JA costs; followed by WP7, 5 and 4, which are key
77
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
elements in facilitating the implementation of the BPs and ensure the sustainability of
the practices.
Besides, the allocation of effort and budget among partner has been categorised
based on the level of leadership (WP and task) and the role within the JA as owner,
implementer of Best Practices (from 1 to 4 BPs) or as both. In this sense CAs that
lead a WP and implement BPs concentrates an important part of the budget
Budget & effort distribution per WP
WP7 12%
14%
WP6 42%
41%
11%
WP5 10%
% P/M WP4 10%
10,7%
% Budget 6%
WP3 5,4%
WP2 10%
10,8%
WP1 8%
10,8%
0,0% 10,0% 20,0% 30,0% 40,0% 50,0%
EC financial contribution has been distributed among partners, based on: the effort
necessary to lead and/or perform a JA, travel and subsistence and organisational
costs of Consortium meetings and WPs’ focus groups, workshops, study visits and
secondments; and other costs related to dissemination and communication of the JA.
By cost category, Personnel costs represent the highest cost item (84,8%).
Budget distribution per cost category
0,20% 5,40% 3,00%
A1. Employees
B. Subcontracting costs
C.1 Travel and
Subsistance
C3. Other Costs 84,80%
FINANCIAL MANAGEMENT
Financial management will be key for delivering good management and administration
of CIRCE-JA as well as to comply with the financial rules and obligations of the Grant
Agreement (GA). Both the Project Manager and the financial manager will be included
in the coordinator team to support the adequate use of resources of the project as well
as to analyse/review/support financial issues.
78
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
SAS as JA coordinator, with the close support of its affiliated FPS will, manage the
finances of the project in accordance with the provisions of the Grant Agreement. FPS
has a wide experience in the management and coordination of EU projects and
implements sound financial management systems and procedures
Management and financial officers have been identified in each of the participating
entities and a specific communication group will be created with all of them to share
the documents and templates, review the process and analyse any potential
managerial or financial risks that could affect project implementation.
The Project handbook will be a source of assistance to project participants. This
document will provide general rules and quality norms for keeping and reporting the
financial data. In addition, teleconferences and webinars will be held to address key
and common management and financial issues.
Besides, the Steering Committee will include the financial monitoring and management
as an item in the agenda of their periodic meetings and will take decisions on
expenditures during their meetings, transfer of budget. etc
3. IMPACT
3.1 Impact and ambition
Impact and ambition — Progress beyond the state-of-the-art
Define the short, medium and long-term effects of the project.
Who are the target groups? How will the target groups benefit concretely from the
project and what would change for them?
Does the project aim to trigger change/innovation? If so, describe them and the degree
of ambition (progress beyond the status quo/state-of-the-art).
CIRCE-JA ambition looks forward to transfer effectively (let us say implement, validate
and sustain) six BPs generated in six EU regional/national health in to 42 implementation
sites, belonging to 12 MS different health care systems with relevant structural,
organizational and institutional contexts. The common transversal interest is to
strengthening health care systems through strengthening PHC.
Diversity is a challenge, but it is also an opportunity for generating knowledge, specially
know-how, through goals sharing and learning from each other coping with similar needs
and problems.
Complexity is another source of challenge in health systems management and
governance, transnational work cooperation will provide a common share framework
that will help to self-understanding in trying to explain to others needs, aims, and
practices. Complexity is also related to the number of actors involved, and so, the
different target groups that will benefit of the JA.
• Patients/health care users
Benefits will affect to a target implementation sites population, preliminary
estimated in 1.039.922 persons, based on preliminary partners estimation taking
into consideration the nature of the BP and the pilot site catchment target
population. After pilot successfully implementation and scaling up deployment in
wider areas, according to previsions of MS/region authorities, the target
population will sum up to 28.697.565.
79
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Relevant specific target population subgroups are:
o Children at risk of abuse and maltreatment
o Adults with specific preventable risks
o Chronic patients with specific and multiples diseases
o Aged and vulnerable groups
All of them will benefit of preventive, promotion, cure and palliative care services,
more accessible, secure, personalized centered PHC, specially avoiding
unnecessary overdiagnosis, overtreatment and overuse.
• Healthcare professionals.
PHC professional include a wide range of health professionals and
multidisciplinary teams in the different health systems. Mainly GPs and PC
nurses, might include also: pediatricians, gynecologists, community nurses,
midwives, dentists for adults and children, pharmacists, physical therapists,
psychologists, social workers and others, included in certain settings, internist,
psychiatrist and other allied specialized health professionals.
CIRCE-JA has identified, actually, 1433 health professional involved in different
settings. Some of the participant ones still not having a precise quantitative
estimation.
All of them will benefit of a more integrated multidisciplinary team, care
management and evidence-based tools, telemedicine. Training support and
study will facilitate change and access to peers in alternative spaces, facilitating
learning and incentivizing innovation.
• Health care provision centers and settings
Participating health care centers are mostly PHC center, in different and varied
forms of organization and infrastructure: Health Center, Health Promotion
Centers, Policlinics, Outpatient Clinics, Social-health centers, etc., even
Hospitals and Hospitals specialized units. Actually over 213 health centers units
have been identified and involved in the JA.
• Health care authorities, services organizations and collective
insurers/payers.
Given the wide range of health systems arrangements across EU, there are
different actors associated to leading organizational rolls. JA involve 35 affiliated
entities, most of them regional health authorities and public services providers,
from 14 MS (235 M citizens). All of them expect to improve quality of services,
increase health professional and patient and users’ satisfaction, and much better
value based service, not only for PHC but for the health system as a whole. A
decrease in avoidable hospital admissions for chronic conditions is expected to
be achieved as an indicator of Primary Care effectiveness.
• National Health Systems, MS and EU
CIRCE-JA action will develop and demonstrate new frameworks for enhancing
health care services innovation and diffusion. Generating know how and
transnational European communities of interest in developing PHC as a key
component of stronger and resilient health care system Health care
effectiveness combines with efficiency and sustainability is a great priority for MS
and EU in order to dealing with present and coming challenges associated with
increased demand, linked to ageing and chronic diseases and higher costs
associated to intensive technologically based healthcare provision. Not to say
about eventual new public health crisis challenges emergency.
The process of transferring six BPs into more than 40 implementing sites will require
adaptations and support, contributing to the knowledge generation as an innovative
80
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
aspect in itself, which will be shared among the participants and all interested
stakeholders.
Sustainability of the successfully implemented practices in the pilot site, and its
scalability to broader parts of the health system, if not the whole one, is also one of the
challenges the JA faces, as many other EU innovation initiative have been dealing with,
in the past and present days. That will require a deep understanding of the elements
needed for sustainability and generating the knowledge, skills and capacities to further
development of sustainable good practices.
CIRCE-JA aspire to achieve a better understanding of operational conditions for micro
level ground change associated with stakeholders and multilevel policy analysis to
identify meso and macro facilitators and barriers for diffusion and sustainable innovative
change.
3.2 Communication, dissemination and visibility
Communication, dissemination and visibility of funding
Describe the communication and dissemination activities which are planned in order to
promote the activities/results and maximise the impact (to whom, which format, how
many, etc.). Clarify how you will reach the target groups, relevant stakeholders,
policymakers and the general public and explain the choice of the dissemination
channels.
Describe how the visibility of EU funding will be ensured.
The main objective of communication and dissemination activities will be to increase the
visibility and impact of the JA and the BPs in PHC both at national and European level.
The dissemination activities will aim at sharing and promoting the progress and
achievements of the JA, as well as at facilitating the participation of relevant
stakeholders.
Three different types of mainstreaming actions will be carried out:
i. Direct mainstreaming: Direct involvement of key target groups as implementing site
participants and HCPs turning them into multipliers.
ii. Horizontal mainstreaming actions: these actions will address the main stakeholders
of the fields of the JA, with the aim to expand the potential use the JA’s outcomes at
EU and national level. The main target of these actions will be public and private
healthcare providers, insurers, civil society and patient organisations that have a
direct contact with the OWG and IWG and that can help in the sustainability of the
best practice, as well as the academia and the economic sector representatives.
iii. Vertical mainstreaming actions: these actions will address mainly policy makers,
public bodies and large networks at European, national and regional/local level, in
charge of PHC practices and public health policies and strategies, with the help of
the EPB. The aim is to raise awareness about the possibilities offered by the
exploitation of CIRCE-JA results and to integrate them into wider practices and
programmes.
The JA aims at reaching stakeholders inside and outside the JA consortium. The staff
and end-users of participating CAs and AEs will be regularly informed about its progress
and its key results. Outside, the consortium expects to reach out to more than 1M
81
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
stakeholders (general public and organisations), in connection with existing networks
were CIRCE-JA participants are already involved. Based on the experiences of past
EU-funded projects (e.g. H2020), the ‘I-CEE’ (Identifying, Connecting, Engaging, and
Enabling) Stakeholder Engagement Approach will be exploited and adapted to the JA.
This methodology, called I-CEE, has four stages, which collectively have the aim of
identifying and engaging with potential ‘multipliers’ i.e. stakeholders who can directly
and indirectly increase levels of engagement and take up of BP in PHC.
CEE approach for stakeholder engagement through dissemination
Key stakeholder typologies will be defined by partners and key messages & tools
outlined for each group:
Stakeholder Key message for stakeholder Channels & Means
Healthcare -Reduce increasingly high direct and -Dissemination events &
providers, indirect costs of disease management pilot involvement
payers, while attaining enhanced health -Awareness raising
insurers outcomes campaign
-Exploit the full potential of -Events & webinars
multidisciplinary lifestyle treatments for -Website and social medi
disease management and prevention in -Open-access platforms
PHC (from BPs) -Scientific publications
-Be better integrated, multi-sectoral, -Direct contacts by
affordable, and closer to end-users i.e. partners
patients -Newsletters
-Be more in line with the needs of end
users (citizens, formal and informal
carers) and civil society
Policy -Promote new innovative socio- -Ad-hoc policymaking
makers economically effective policies and events
interventions in PHC -Dedicated consultations
-Better coordination of care based on -Policy recommendations
PHC -Direct contacts by
-Actively contribute to strengthening PHC partners
-Define enhanced policies and initiatives -Webinars
in line with EU expectations and -Website and social medi
international frameworks e.g., SDGs for (Twitter)
enhanced healthcare prevention and
healthier lifestyles of population in PHC
Patient -Multi-sectoral cooperation with civil -Dissemination events an
organisations, society to achieve enhancement and implementations
other civil development of PHC -Awareness raising
society -Help to connect with patients and their campaign
representative families and motivate them to take part in -Website and social medi
s, and the the best practice programme
82
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
economic -Boost the transition to coordinating care - Promotional material &
sector in PHC newsletter
-Open-access platforms
-Direct contacts by
partners
Patients, their - Educate, motivate, and empower -Events
families, and citizens to improve their disease path -Pilot implementation
informal carers and well-being and uptake a direct role in -Awareness raising
managing own health in turn have a campaign
higher quality of life -Website, social media
-Be more autonomous and active in the incl. competitions and
management of the disease social influencers
-Adopt healthier lifestyles at home, in the -Promotional material and
community and at work media campaigns
-Interact better with HCPs and carers
-Enhance support and engagement from
families and informal carers in the
adoption of healthy lifestyles and other
prevention actions
Knowledge -Researchers develop fundamental -Participation in events &
transfer HUB knowledge for enhancement of health abstract presentation
and related education practices and -Awareness raising
policies campaign
-Favour tools of social innovation -Website and social media
-Advance research and innovation to -Open-access platforms
help re-engineer interventions in PHC -Scientific publications
level into healthcare sector -Direct contacts by
partners
Communication & dissemination actions
At CIRCE-JA start, a dissemination and communication strategy will be developed by
NFZ-WP2 Leader with the purpose of setting the basis for all partners regarding
dissemination and communication rules and guidelines. The strategy will include local
dissemination plans adapted to each country’s contexts. Stakeholders and the larger
public will be reached mainly through electronic means of communication (project
website, social media, newsletters, press releases, webinars, scientific reviews, etc).
Specific communication tools and media campaigns will be designed and implemented
during the JA to deliver key messages, tailored to the different stakeholder groups and
outlining CIRCE-JA’s objectives and results. A dedicated visual identity for CIRCE-JA
will be created, as well as a communication toolkit (showing EU funding) including:
logotype, leaflets, posters and roll-up banner, useful templates i.e. Ppt, Word, etc.
CIRCE-JA website, maintained along and beyond the project, will be developed at the
beginning of the project (M6). It will provide information covering objectives, funding,
partners, work packages, academic publications, results, news and events. Content will
be updated with relevant information regularly. The website will be a centralised and up-
to-date source of information about the JA, but it will also include a lively webpage for
communication, BPs updates’ sharing, and multi-actor and cross-sectorial cooperation.
Further direct dissemination of CIRCE’s outcomes to the main target groups will be
ensured via newsletters, publications, press releases (news, TV, and radio). Likewise,
partners’ own media channels will be a key driver for dissemination and communication.
CAs and AEs will contribute to outreach at national and regional level.
83
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
CIRCE-JA will also leverage the innovative technique of storytelling to raise awareness
about the experiences of the transfer the BPs in PHC. Stories will be produced
throughout the pilots and used to attract other patients and HCPs in future replication
after the end of the project. The JA will also put in place a targeted awareness raising
campaign in WP5 in order to improve the implementation process.
Furthermore, stakeholders will be engaged through the organisation and attendance of
congresses and conferences at national and European level, as well as submission of
abstracts and posters. In particular, events organised by the World Organization of
Family Doctors (WONCA), the European Forum for Primary Care (EFPC), European
Public Health Association (EUPHA) among others. These “standard” events will be
complemented with more informal dissemination events taking different forms e.g., info
days, fairs, dialogue breakfasts, etc. The choice of this combination is to ensure an
effective mix of approaches that can be adapted based on the target group of interest.
Synergies with already existing communication channels and other EU-funded projects,
including other relevant JAs, will be put in place to multiply the reach-out. Partners will
attend relevant events of these stakeholders throughout the project duration in which
project activities and results can be promoted and networking can be achieved.
Moreover, the JA will organise an international conference which serves as a key final
event to wrap up project outcomes and conclusions. Further details on communication
& dissemination activities and key events to attend are provided in WP2.
EU funding disclaimer
EU funding will be ensured in all dissemination actions/products, in line with the Grant
Agreement requirements. Disclaimer and EU emblem will be shown, in a clearly visible
way, in all deliverables, JA outputs (e.g., training programme), and any dissemination
tools/documents/results, including electronic forms. When displayed together with
another logo like the JA one, the EU emblem will have appropriate prominence. In
events and workshops, EU funding will be not only shown on dissemination products,
but during the activity the organisers will make clear that the activity is possible thanks
to EU funding, provide information about the EU4H programme and explain the aims of
the JA.
Knowledge sharing & IPR management
Deliverables and key outcomes will be public, following an open access and knowledge
sharing approach, thus allowing other healthcare organisations and governments to
access project results at any moment. Open access is addressed through
(https://www.cccoer.org/using-oer/open-licensing/).
The Consortium Agreement will indicate that beneficiaries will give each other access,
on a royalty-free basis, to background when needed to implement their own tasks
under the project. The beneficiaries will give each other access to results needed for
implementing their own tasks as well. General guiding principles about the ownership
of intellectual property rights are that each party will retain exclusive property of its
background; the modifications to or derivative works of the parties’ background will be
the property of the contributing party and foreground developed in connection with the
JA hereof will be jointly owned by parties.
84
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
3.3 Sustainability and continuation
Sustainability, long-term impact and continuation
Describe the follow-up of the project after the EU funding ends. How will the project
impact be ensured and sustained?
What will need to be done? Which parts of the project should be continued or
maintained? How will this be achieved? Which resources will be necessary to continue
the project? How will the results be used?
Are there any possible synergies/complementarities with other (EU funded) activities
that can build on the project results?
Three WPs (WP4, WP5 and WP7) contribute to the issues of sustainability. Based on
the approach of Stirman et al (2012)1, the WP4, intends to highlight the aspects related
to the sustainability of implementation in the targeted practices, focusing on the
presence of core elements of transferring the best practices and on the capacity of next
adopters to keep these core elements. Initially, this WP will explore to what extent
contextual factors such as differences in population, service structures, and socio-
political context can influence the transfer of the best practices in the targeted settings.
The efforts of this WP will facilitate planning and capacity building to sustain those
achieved across time in the targeted settings, thus supporting the actions that will be
undertaken by the new adaptors. What will be done and which elements of the best
practices could be continued and maintained and under which resources and cost they
would be achieved are planned to be discussed within this WP and especially in its Task
2 and 3. A specific focus on the WP4 is to sustain and continue the results of the project
through the development of a European Primary Health Care Observatory. This capacity
would ensure the sustainability of the results beyond this JA by providing the appropriate
advisory and consultancy to the national and regional healthcare authorities issuing
guidance and evidence-based recommendations to facilitate the implementation of the
primary care policy. This Observatory will facilitate cross-country exchanges, and as
well as exchanges with key EU bodies and stakeholders to identify financial instruments,
incl. Structural funds, etc. for reform. The development of this capacity will be guided by
the actions that they will be undertaken by the WP5 and WP7thatwill provide in-depth
analysis of core characteristics of BPs, of health system and of the sociocultural context
including needs in transferring countries (5.2 and 5.3), while based on their outcomes,
Task 7.1 will identify relevant stakeholders and facilitate policy process.
Reference:
1. Wiltsey Stirman, S., Kimberly, J., Cook, N. et al. The sustainability of new
programs and innovations: a review of the empirical literature and
recommendations for future research. Implementation Sci 7, 17 (2012).
https://doi.org/10.1186/1748-5908-7-17
85
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
4. WORK PLAN, WORK PACKAGES, TIMING AND SUBCONTRACTING
4.1 Work plan
Work plan
Provide a brief description of the overall structure of the work plan (list of work packages or graphical presentation (Pert chart or similar)).
CIRCE-JA work plan is organised in order to achieve its overall and
specific objectives. It will be developed in 7 work packages (WP), 4
horizontal ones and 3 specific ones.
Horizontal WPs are: coordination and management (WP1), dissemination
(WP2), evaluation (WP3) and sustainability (WP4). Tasks included in
these WPs will ensure CIRCE-JA workflow through a clear organisational
framework and support mechanisms, operational management and
communication with the EC. Dissemination WP will work to make CIRCE-
JA results and deliverables available to target groups and European
stakeholders, promoting its visibility and creating a Knowledge Transfer
and Capacity Building HUB. Assessing the project implementation,
evaluating the success of the implementation of pilots, exploring its impact
on European settings and formulating lessons to be shared are under
WP3. Sustainability WP4 covers aspects related to the continuity of
transferred practices beyond the duration of the JA. To do so, this WP
also will perform a detailed analysis of the BPs, identifying main elements
of their successful implementation, to support implementers in ensuring
the sustainability of the practice in the future. WP4 will collect and generate
new knowledge and understanding based on the results of the implementation, contributing to the HUB described in WP2, as the grounds for
developing a European Primary Healthcare Observatory.
Specific WPs include: methodology for the transferring process and needs assessment (WP5), transferring process and pilot implementation
(WP6) and capacity building (WP7), all tightly connected among them as well as to WP2, WP3 and WP4. A sound methodological framework
will be discussed and defined (WP5) and will be used by implementing sites, together with the definition of needs, key priority areas in each of
them (WP5). An initial local methodology for the transferring process will be initiated in WP5, to be fully developed in WP6. Under WP6, based
86
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
on the analysis of needs and the local selection of characteristics of the selected BPs, a specific plan for each pilot implementation will be
defined and updated. All support actions to facilitate the implementation will be carried out in WP6, starting at the end of year 1, till the end of
year 2, to be able to implement and validate the running of pilots during the last year of the JA. Pilot implementation experiences will be collected
and will contribute to the HUB (WP2) and the overall assessment of the JA and its impact (WP3). Reinforcing and building capabilities in MS
for development, implementation and monitoring of BPs will be carried out in WP7. It will support the whole process from the policy process and
financial mechanisms of the good practices, design training programmes with inputs from the BPs and the specificities of the transferring pilots
and will also populate the Knowledge Transfer and Capacity Building HUB.
4.3 Timetable
Timetable (projects of more than 2 years)
Fill in cells in beige to show the duration of activities. Repeat lines/columns as necessary.
Note: Use actual, calendar years and quarters. In the timeline you should indicate the timing of each activity per WP. You may add additional
columns if your project is longer than 6 years.
YEAR 1 YEAR 2 YEAR 3
WP/TASK Start End
WP/TASKS NAME Leader
CODE Month Month
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q 12
WP1 Coordination and Management 1 36 SAS
T 1.1 Scientific coordination, quality assurance & risk management. 1 36 SAS
T 1.2 Implementation of efficient management and support structures. 1 36 SAS
T 1.3 Contractual, legal and ethical aspects 1 36 SAS
T 1.4 Reporting and support of financial management & controlling. 1 36 SAS
WP2 Dissemination 1 36 NFZ
T2.1 Definition of the Dissemination Strategy and Action Plan 1 5 NFZ
T2.2 Develop JA communication resources 1 36 NFZ
T2.3 JA Communication 6 36 NFZ
T2.4 Knowledge Transfer & Capacity building HUB 12 36 NFZ
T2.5 Final conference 30 36 SAS
WP3 Evaluation 1 36 7HRC
T3.1 Definition of the processes and methodology of assessment 1 6 7HRC
T3.2 Evaluation of project progress and outcomes 6 36 7HRC
87
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
T3.3 Evaluation of project outcomes 6 36 7HRC
T3.4 Assess the impact of the project implementation 25 36 7HRC
WP4 Sustainability 3 36 AGENAS
T4.1 Identification of principles and characteristics of BPs’ successful implementation 3 14 AGENAS
T4.2 Support implementers in ensuring the sustainability of BP in the future 13 33 AGENAS
ASL
T4.3 Generate new knowledge and understanding 18 36
ROMA 1
AGENAS
T4.4 Development of a European Primary Health Care Observatory 25 36
/7HRC
WP5 Methodology for transferring process and needs assessment 1 24 7HRC
T5.1 Analysis and definition of the methodological framework 1 4 7HRC
T5.2 Definition of key priority areas for the implementation settings, 5 12 7HRC
Adapting and preparing the transferring process of the best practices in the
T5.3 10 24 7HRC
implementation sites
WP6 Transferring process and Pilot implementation 4 36 SAS
T6.1 Initial implementation plan 4 14 SAS
T6.2 Transferring process support 10 24 SAS
T6.3 Implementation and validation 13 36 SAS
WP7 Capacity building 8 34 NIJZ
T7.1 Policy developments & financial mechanisms; stakeholders involvement process 8 16 GOG
T7.2 Development and provision of training programmes 10 22 NIJZ
T7.3 Management capacities in transferring organisations 10 34 NIJZ
4.4 Subcontracting
Subcontracting
Give details on subcontracted project tasks (if any) and explain the reasons why (as opposed to direct implementation by the
Beneficiaries/Affiliated Entities).
Subcontracting — Subcontracting means the implementation of ‘action tasks’, i.e. specific tasks which are part of the EU grant and are described
in Annex 1 of the Grant Agreement.
88
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Note: Subcontracting concerns the outsourcing of a part of the project to a party outside the consortium. It is not simply about purchasing goods
or services. We normally expect that the participants have sufficient operational capacity to implement the project activities themselves.
Subcontracting should therefore be exceptional.
Include only subcontracts that comply with the rules (i.e. best value for money and no conflict of interest; no subcontracting of coordinator tasks).
Work Package Subcontract No Subcontract Description Estimated Costs Justification Best-Value-for-
No (continuous Name (including task (EUR) (why is Money
numbering (subcontract number and BEN to subcontracting (how do you intend
linked to WP) ed action which it is linked) necessary?) to ensure it?)
tasks)
6 S1.1 Part of T6.3 Partner 32 NIJZ will 30.000 € Partner 32- NIJZ is public tender
subcontratc 4 PHC responsible for
centres through managing preventive
public tender to and integrated care
implement the programs in primary
selected BP care. The PHC
centres could not
participate as
affiliated and have no
capacities for project
management.
Other issues: N/A
If subcontracting for the project goes beyond 30% of
the total eligible costs, give specific reasons.
89
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
5. OTHER
5.1 Ethics
Ethics
If the Call document contains a section on ethics, describe ethics issues that may
arise during the project implementation and the measures you intend to take to
solve/avoid them.
The JA will comply with the highest ethical standards required in the Grant agreement,
and will respect applicable international, EU and national law
None of these activities of the JA involve clinical trials, personal data, environmental
damage or any other potentially ethically dubious activities. No activities that are
prohibited in the EU will be carried, nor will their local resources be exploited or not put
the individuals taking part in the activities at risk.
5.2 Security
Security
If the Call document contains a section on security, describe security issues that may
arise during the project implementation and the measures you intend to take to
solve/avoid them.
Indicate if there is need for EU classification of information (Decision 2015/444) or
any other specific security measures.
The JA will not include activities that involve information and/or materials requiring
protection against unauthorised disclosure (EUCI). Activities will also not involve or
generate materials, methods, technologies or knowledge that could be misused for
malevolent purposes, or that could have substantial direct impacts on the security of
individuals, groups or States.
The JA will not involve information and/or materials subject to national security
restrictions. Activities will include both in person and online activities. In the latter,
security of information provided and of participants’ data will be primary concern.
Meetings will be held on the Microsoft Teams platform, which grants high level of
protection against any potential data breach. To this end, IT resources will carefully be
deployed, and support to partners promptly provided to deal with any eventual issue
6. DECLARATIONS
Higher funding rate (if applicable) YES/NO
Do you fulfil the conditions set out in the Call document for a
higher funding rate? YES
If YES, explain and provide details.
90
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
The proposal fulfils the conditions for exceptional utility in accordance with the criteria
outlined:
a) 40 % of the budget of the JA is allocated to Member States whose GNI per
inhabitant is less than 90% of the Union average;
b) Out of the 14 partners in the consortium, 10 partners (Croatia, Estonia,
Hungary, Greece, Lithuania. Malta, Poland, Portugal, Romania, Slovenia) have
a GNI per inhabitant below the 90% EU average (
https://ec.europa.eu/eurostat/databrowser/view/tec00114/default/table?lang=en
)
Double funding
Information concerning other EU grants for this project
Please note that there is a strict prohibition of double funding from YES/NO
the EU budget (except under EU Synergies actions).
We confirm that to our best knowledge neither the project as a whole NO
nor any parts of it have benefitted from any other EU grant (including
EU funding managed by authorities in EU Member States or other
funding bodies, e.g. Erasmus, EU Regional Funds, EU Agricultural
Funds, European Investment Bank, etc). If NO, explain and provide
details.
We confirm that to our best knowledge neither the project as a whole NO
nor any parts of it are (nor will be) submitted for any other EU grant
(including EU funding managed by authorities in EU Member States
or other funding bodies, e.g. Erasmus, EU Regional Funds, EU
Agricultural Funds, European Investment Bank, etc). If NO, explain
and provide details.
Financial support to third parties (if applicable)
If in your project the maximum amount per third party will be more than the threshold
amount set in the Call document, justify and explain why the higher amount is
necessary in order to fulfil your project’s objectives.
N/A
91
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
ANNEXES
Annex 2: CVs
Full CVs available at
https://consigna.juntadeandalucia.es/0d3c24ac8e70f6f81c7bd11b0c9fd955
Annex 3 List of previous projects
LIST OF PREVIOUS PROJECTS
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
SPAIN
SAS/ IMPLEMENTAL 01.10.2021. AE 16.933,99€ https://ja-
– (SAS+ implemental.eu/
FPS III Health Programme
01.10.2024 FPS)
EU
SAS GAPP May 2018 - BEN 25.517,3 € https://www.gapp-
May 2021 ja.eu/
III Health Programme
EU
SAS 761307 2017-2020 BEN 71.990 € http://chrodis.eu
CHRODIS-PLUS
III Health Programme
EU
SAS EU-JAMRAI Sept 2017 - BEN 62588,58 € https://eu-jamrai.eu/
Aug 2020
III Health Programme
EU
SAS ADVANTAGE 01.01.2017. BEN 130.000 €. https://www.advant
– ageja.eu/
III Health Programme
01.01.2020
EU
SAS HeaLIQs 4 Cities Jan 2019 - BEN 35.028,19€
Jun 2020
EIT HEALTH:
INNOVATION 2019-1
NFP4Health
FPS AE 147.531,74
III Health Programme €
EU
92
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
FPS 951442 01/10/2020 AE 89.041.12€ https://www.jadecar
- (Regional e.eu
JADECARE
30/09/2023 Ministry
III Health Programme health+FPS
EU )
FPS JATC 2017-2020 AE 67.110 € https://jaotc.eu/
III Health Programme
EU
FPS EUnetHTA JA3 01.16.2016. AE 99.704 € https://www.eunetht
– (Regional a.eu/
III Health Programme
31.05.2021 Ministry
EU
health+FPS
)
FPS CHRODIS 2014-2017 AE 37.435 € http://chrodis.eu
(Regional
III Health Programme
Ministry
EU
health+FPS
)
SERGAS CÓDIGO100: Project COO 13 M. € https://codigo100.s
Innovation plan funded period: ergas.es/
with Spanish ERDF 01/01/2017
O.P. for innovation. -
Three innovation lines 30/09/2021
were included: 1)
Patient Empowerment,
2) Professional Tools
and 3) New Therapies
(incl. cancer). 12
projects were
developed using PPI
and PCP tools.
ACIS TITTAN. Network for Project COO 1,78 M. € https://www.interreg
Technology, period: europe.eu/tittan/
Innovation and 01/04/2016
Translation in Ageing -
31/03/2023
19,999,731.
AQuAS 724130 01/10/2016 BEN https://www.eunetht
54 €
- a.eu/
JA EUnetHTA 3
31/03/2021
HEALTH
PROGRAMME
93
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
AQuAS 951442 01/10/2020 AE 4,999,032.5 https://www.jadecar
- 1€ e.eu/
JADECARE
30/09/2023
HEALTH
PROGRAMME
2,577,764.3
AQuAS 678481 01/03/2016 BEN https:/www.actonde
8€
- mentia.eu/
JA ACT ON
31/12/2019
DEMENTIA
HEALTH
PROGRAMME
01/09/2017 6,249,999.4 http://chrodis.eu/
AQuAS 761307 BEN
- 8€
JA CHRODIS PLUS 01/12/2020
HEALTH
PROGRAMME
01/01/2017 75,020,00 € http://calite.umh.es/
AQuAS PI16/00816 OTHER
- detalle.asp?det=1&i
SOBRINA 01/01/2019 d=222
AES-ISCIII. Spanish
Ministry of Economy
08/01/2014 4,034,222 € https://www.mresist
AQuAS 643552 BEN
- .eu/
m-RESIST 02/01/2018
Horizon2020
FISABIO JAHEE (GA 801600) 06/2018- AE 27.000€ https://jahee.iss.it/
3rd Health Programme 11/2021
Call2017
FISABIO RD-CODE (GA 01/2019- BEN 171.793,85 https://www.rd-
826607) 3rd Health 12/2021 code.eu/
Programme, HP-PJ-
2018, PJ-03-2018
FISABIO iPAAC (GA 801520). 10/2018- AE 64.000€ https://www.ipaac.e
3rd Health Programme 12/2021 u/
Call2017
FISABIO JARC (GA 724161) 10/2016- BEN 13.443€ https://jointactionrar
3rd Health Programme 10/2020 ecancers.eu/
Call2016
IDIVAL Grant Agreement No. 1 October AE EC https://www.jadecar
951442 - Joint Action 2020 – 30 Contributio e.eu/
94
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
(JA) on September n: € 3 999
implementation of 2023 (36 226,00
digitally enabled months)
integrated person-
centred care
(JADECARE) funded
by the third health
programme (HaDEA)
IDIVAL Grant Agreement Sep 2017- AE http://chrodis.eu/
number: 761307 - 30 nov
CHRODIS-PLUS: 2020
Implementing good
practices for chronic
diseases - funded by
the third health
programme (HaDEA)
SCS Grant Agreement No. 1 October AE EC https://www.jadecar
951442 - Joint Action 2020 – 30 Contributio e.eu/
(JA) on September n: € 3 999
implementation of 2023 (36 226,00
digitally enabled months)
integrated person-
centred care
(JADECARE) funded
by the third health
programme (HaDEA)
SCS Grant Agreement Sep 2017- AE http://chrodis.eu/
number: 761307 - 30 nov
CHRODIS-PLUS: 2020
Implementing good
practices for chronic
diseases - funded by
the third health
programme (HaDEA)
SERMAS JA AMR: Join Action Starts on: BEN Total cost: https://eu-jamrai.eu/
on Antimicrobial September 79.653 €
FIIBAP AE
Resistance and 2017
EU
Healthcare-Associated
Ends on: contribution
Infections.
September : 47.792 €
HP-JA-2016 (Joint 2022
Actions 2016)
HP-JA-04-2016
95
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
SERMAS BEAMER: BEhavioral Starts on: BEN 239.062 € https://beamerproje
and Adherence Model October ct.eu/
FIIBAP AE
for improving quality, 2021
FHUNJ health outcomes and AE
End on:
cost-Effectiveness of
healthcaRe October
2026
H2020_IMI
SERMAS CANCERLESS: Starts on: BE 79.375 € https://cancerless.e
Cancer prevention and u/
FIIBAP May 2021 AE
early detection among
the homeless End on:
population in Europe:
May 2024
Co-adapting and
implementing the
Health Navigator
Model
H2020-SC1-BHC-
2018-2020 (Better
Health and care,
economic growth and
sustainable health
systems). Topic: SC1-
BHC-17-2020. Type of
action: RIA
SERMAS iProcureSecurity-PCP Starts on: Procurer Total cost: https://project.iproc
October uresecurity.eu/
FIIBAP H2020-SU-SEC-2018- AE 1.300.000 €
2021
2019-2020 (Security)
EU
Topic: SU-GM02- End on:
contribution
2018-2020 Type of
October :
action: PCP
2026
1.170.000 €
SERMAS First responder Starts on: BE 212.500 € https://www.faster-
Advanced April 2019 project.eu/
FIIBAP AE
technologies for Safe
Ends on:
and efficienT
April 2023
Emergency Response
(FASTER)
Call: H2020-SU-SEC-
2018-2019-2020
(Security) Topic: SU-
DRS02-2018-2019-
2020 (RIA) GA:
833507
96
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
SERMAS maintaining and Starts on: COO 492.490 € https://eithealth.eu/
imPrOving the January project/positive/
FHG AE
intrinSIc capaciTy 2019
FIIBAP Involving primary care AE
Ends on:
and caregiVErs
January
(POSITIVE) 2023
Horizon 2020
EIT_Health
ID: 20683
SERMAS affecTive basEd Starts on: COO 391.250 € https://www.tender-
iNtegrateD carE for October health.eu/
FIIBAP AE
betteR Quality of Life 2019
(TeNDER) Ends on:
October
Call: H2020-SC1-
2023
DTH-2018-2020
(Digital transformation
in Health and Care).
Topic: SC1-DTH-11-
2019. Type of action:
IA
FIIBAP HARMONIzation and Starts on: BE 123.750 € https://www.harmon
integrative analysis of January icss.eu/
regional, national and 2017
international Cohorts
Ends on:
on primary Sjögren’s
June 2020
Syndrome (pSS)
towards improved
stratification, treatment
and health policy
making
HarmonicSS
H2020-SC1-2016-
2017 (Personalised
medicine)
Topic: SC1-PM-04-
2016
GREECE
7HRC BEN
EU-JAMRAI https://eu-jamrai.eu/
7HRC BEN
GAPP https://www.gapp-
ja.eu/gapp-ja/ and
97
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
7HRC BEN
iPAAC https://www.ipaac.e
u/
7HRC BEN
PANACEA https://www.panace
aresearch.eu/
UOC COO
OTC OSCIOMED: http://www.otcsocio
Assessing the Over- med.uoc.gr
The-Counter
Medications In
Primary Care And
Translating The
Theory Of Planned
Behaviour Into
Interventions, FP7
UOC BEN
RESTORE - Better http://www.fp7resto
understanding of re.eu/
dissemination and
implementation
strategies’, FP7
UOC BEN
TRANSFORM - http://www.transfor
‘Translational mproject.eu/
Medicine and Patient
Safety in Europe’ FP7
UOC BEN
EU-WISE - Self-care http://eu-wise.com/
Support for People
with Long Term
Conditions, Diabetes
and Heart Disease: A
Whole System
Approach’. FP7
UOC BEN
SPIM-EU - https://www.spimeu
Determinants of .org
Successful
Implementation of
Selective Prevention
of Cardio-metabolic
Diseases Across
Europe, Third Health
Programme/CHAFEA.
UOC BEN
FRESH AIR - Free https://www.theipcr
Respiratory Evaluation g.org/freshair
and Smoke-exposure
reduction by primary
98
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Health cAre Integrated
gRoups,H2020
UOC BEN
TiTAN TiTAN Crete - http://www.globalbri
Tobacco treatment dges.org
TrAining Network in
Crete
UOC BEN
HAPPY PATIENT https://happypatient
Health Alliance for .eu
Prudent Prescription
and Yield of Antibiotics
in a Patient-centered
Perspective’, Third
Health
Programme/CHAFEA.
UOC BEN
TRANSCARE - https://transcare-
‘Improving access to project.eu
healthcare for
transgender--Justice
Programme (JUST) -
Rights, Equality and
Citizenship (REC)
Programme
UOC COO
NAFLD/NASH - https://nash.med.uo
‘Developing, c.gr
implementing and
evaluating a clinical
care pathway for
NASH/NAFLD primary
care patients: a multi-
centre study’.
(Coordinator)
UOC
EUR-HUMAN - 2016 COO http://eur-
EUropean Refugees-
human.uoc.
HUman Movement
and Advisory Network gr
(717319), Third Health
Programme/CHAFEA
UOC BEN
VIGOUR -Evidence- 2016 - www.vigour-
Based Guidance to 2022 integratedca re.eu
Scale-up Integrated
Care in Europe
(826640), Third Health
Programme/CHAFEA
99
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
UOC BEN
ATHLETE - 874583, 2020-2024 https://athleteprojec
Advancing Tools for t.eu/
Human Early Life
course Exposome
Research and
Translation, H2020
ITALY
AGENAS JADECARE 2021-2023 CA €215.066,0 https://www.jadecar
5 e.eu/
AGENAS EUnetHTA JA3 2016-2021 BEN €639.359,5 https://eunethta.eu/
2
AGENAS TOREACH 2016-2021 BEN €52.640,00 https://to-reach.eu
AGENAS CHRODIS+ 2017-2020 AE €30.281,00 http://chrodis.eu
AGENAS ADVANTAGE initiative 2017-2019 BEN €30.421,47 https://www.advant
ageja.eu
AGENAS SEPEN 2017-2020 BEN €188.840,0 http://healthworkfor
0 ce.eu/
AGENAS OASES 2021-2024 COO €134.826,4 https://oasesproject
2 .eu/
POLAND
Narodowy SCIROCCO 1/01/2019 – BEN 2,649,587 SCIROCCO
Fundusz Exchange project 28/02/2022 Exchange -
Zdrowia (826676) which has Supporting Health
[National received funding from and Social Care
Health the European Union’s Authorities
Fund] Health Programme
(2014-2020)
Narodowy Przygotowanie, 28/11/2-17 COO 16,500,000 POZ PLUS |
Fundusz przetestowanie i – Akademia NFZ
Zdrowia wdrożenie do systemu 31/03/2022
[National opieki zdrowotnej
Health organizacji opieki
Fund] koordynowanej (OOK)
Etap II Faza
pilotażowa – model
POZ PLUS; no.
POWR.05.02.00-00-
0039/17-02;
100
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Operational Program
Knowledge Education
Development financed
by the European
Social Fund
Narodowy Wdrożenie systemu 1/01/2019- COO 1,400,000 Hospital-Based
Fundusz Hospital-Based HTA 30/06/2022 HTA (HB-HTA) |
Zdrowia (HB-HTA) – System Szpitalnej
[National Szpitalnej Oceny Oceny
Health Innowacyjnych Innowacyjnych
Fund] Technologii Technologii
Medycznych; Medycznych
Narodowe Centrum
https://hbhta.pl/
Badań i Rozwoju w
ramach Strategiczneg
o programu badań
naukowych i prac
rozwojowych
„Społeczny
i gospodarczy rozwój
Polski w warunkach
globalizujących się
rynków”
GOSPOSTRATEG.
(no. 395107)
SLOVENIA
Radivoje Agreement no. C2711- 1 Sept COO 2.436.273 € https://www.krepite
Pribaković 18-031037, The 2017 – v-zdravja.si/eng/
Brinovec Upgrade and 31.Dec
Development of 2020
Preventive
Programmes and their
Implementation in
Primary Health Care
and Local
Communities – Project
MoST; European
Social Fund,
European Regional
Development Fund.
Radivoje Agreement no. C2711- 1 October COO 5.844.624 € https://www.sopa.si
Pribaković 17-031004, Together 2016 – 31
Brinovec for a Responsible January
Attitude Towards 2022
Alcohol Consumption
– SOPA; European
101
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Social Fund,
European Regional
Development Fund.
Claudia GA 951442, 1 October Beneficiary 375.570 € https://www.jadecar
Adamič JADECARE, 3rd 2020 – 30 e.eu/
Health Programme Sept. 2023
Radivoje GA 761307, JA 1 Sept. Beneficiary 219.157 € http://chrodis.eu/
Pribaković CHRODIS PLUS, 3rd 2017 - 30
Brinovec, Health Programme Nov 2020
Claudia
Adamič
ROMANIA
Costin Iliuta Development and 2019-2022 COO 4.5 mil http://www.ms.ro/20
introduction of Euro 21/03/10/dezvoltare
systems and a-si-introducerea-
standards in the de-sisteme-si-
Ministry of Health that standarde-in-
optimize decision- ministerul-sanatatii-
making processes ce-optimizeaza-
regarding vaccination procesele-
activity in Romania decizionale-privind-
activitatea-de-
vaccinare-in-
romania-rovac/
Andrei Luca Increasing institutional 2020-2023 COO 5 mil Euro http://www.ms.ro/pa
capacity for l-plan/
coordinated national
development of
palliative care and
home care
Amalia Addressing the 2018-2021 COO 5 mil Euro https://insp.gov.ro/r
Serban challenges of the ou-t-moh-
health system abordarea-
regarding the control provocarilor-
of tuberculosis in sistemului-de-
Romania sanatate-privind-
controlul-
tuberculozei-in-
romania/
Amalia Structural Reform 2020-2022 COO - -
Serban Support Program
(SRSS) on the
reorganization of the
102
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Romanian transfusion
system
Marius- Transfer of 2018-2021 Partner
Ionuț Organisational
UNGUREA innovations for
NU Resilient, Effective,
equitable, Accessible,
sustainable and
Comprehensive
Health Services and
Systems (TO-REACH)
Marius- Joint Action on Health 2013-2016 Partner
Ionuț Workforce Planning
UNGUREA and Forecasting
NU
Marius- Joint Action for the 2014-2016 WP Leader
Ionuț Support of the eHealth on
UNGUREA Network (JAseHN) Evaluation
NU
Marius- Joint Action on Cancer 2014-2016 WP Leader
Ionuț Control (CanCon) on
UNGUREA Evaluation
NU (on behalf
of the
Oncology
Institute
Cluj-
Napoca)
Marius- COST Action on The 2020-2024 WG Leader
Ionuț European
UNGUREA Researchers' Network
NU Working on Second
Victims (ERNST)
Marius- Interdisciplinary study 2020 Coordinator
Ionuț on young people’s
UNGUREA needs and
NU opportunities
assessment Cluj–
Napoca, Romania
(LEAP)
Elena Maria Strengthening public 2018-2021 Coordinator
BOZDOG health research
capacity to inform
103
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
evidence based
policies in Tunisia
(CONFIDE)
Răzvan Strengthening public 2018-2021 Coordinator
Mircea health research
CHERECH capacity to inform
EȘ evidence based
policies in Tunisia
(CONFIDE)
Răzvan Iowa Non- 2012-2015 Co-
Mircea communicable coordinator
CHERECH Chronic Diseases
EȘ Research Training
Program in Romania
(ROCDIRT)
Furtunesc GA 1762, ROU-T- 1 oct 2018 COO 5,049,472 €
u MoH, Addressing – 31 mar
Florentina health system-related 2022
Ligia challenges in TB care
in Romania. Funded
by The Global Fund to
Fight AIDS,
Tuberculosis and
Malaria
Daniela GA 1762, ROU-T- 1 oct 2018 COO 5,049,472 €
Valceanu MoH, Addressing – 31 mar
health system-related 2022
challenges in TB care
in Romania. Funded
by The Global Fund to
Fight AIDS,
Tuberculosis and
Malaria
Topor Vlad GA 1762, ROU-T- oct 2020 - 8,763,016 €
Cristian MoH, Addressing sept 2023
health system-related
challenges in TB care
in Romania. Funded
by The Global Fund to
Fight AIDS,
Tuberculosis and
Malaria
Cucu Strengthening the oct 2020 - 8,763,016 €
Alexandra National Network of sept 2023
104
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Primary Health Care
Providers to Improve
the Health Status of
population, children
and adults (including
vulnerable population)
- nr NT
2311/13.05.2020
Adriana Strengthening the oct 2020 - 8,763,016 €
Galan National Network of sept 2023
Primary Health Care
Providers to Improve
the Health Status of
population, children
and adults (including
vulnerable population)
- nr NT
2311/13.05.2020
Livia Nicola Strengthening the oct 2020 - 8,763,016 €
Cioran National Network of sept 2023
Primary Health Care
Providers to Improve
the Health Status of
population, children
and adults (including
vulnerable population)
- nr NT
2311/13.05.2020
Eugenia Everything for your July 2020 20,000,000
Bratu heart - Screening to €
program to identify December
patients with 2023
cardiovascular risk
factors. Project co-
financed by the
European Social
Fund, Human Capital
Operational Program
2014-2020,
POCU/805/4/9/137424
.
PORTUGAL
Vanessa 951442 - JADECARE 1/10/2020 – COO, BEN € 61 607.18 https://www.jadecar
Ribeiro — HP-JA-2019 31/09/2023 (for ACSS) e.eu/
105
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Administrati
on of the
health
System
(ACSS)
Vanessa European Network for 01/06/2016 COO, BEN EC https://www.eunetht
Ribeiro Health Technology - Contributio a.eu/ja3-archive/
Assessment 31/05/2021 n for all
Administrati
(EUnetHTA) - Joint beneficiarie
on of the
Action 3 [EUnetHTA s: € 11 999
health
JA3] [724130] 798,74
System
(ACSS) 3HP.1.1.3.
Call: (HP-ADHOC-
2014-2020-JA-2015)
Health Programme
Adhoc Call for invited
(named) beneficiaries
Maria “RISCAR Project - 01/01/2015 BEN 2.418.345,9 https://www.riscar.p
Bárbara Iberian Network for the - 3€ t/projeto-riscar/
Catanho de Promotion of 31/12/2019
Menezes Children's Health”
(extended
Directorate- Project reference to 2020)
General of 0263_RISCAR_6_P
Health
European Regional
(DGS)
Development Fund
(ERDF) through the
Interreg V-A Spain-
Portugal Program
(POCTEP) 2014-2020
Dina “RISCAR Project - 01/01/2015 BEN 2.418.345,9 https://www.riscar.p
Cláudia Iberian Network for the - 3€ t/projeto-riscar/
Simões de Promotion of 31/12/2019
Oliveira Children's Health”
(extended
Directorate- Project reference to 2020)
General of 0263_RISCAR_6_P
Health
European Regional
(DGS)
Development Fund
(ERDF) through the
Interreg V-A Spain-
Portugal Program
(POCTEP) 2014-2020
106
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
Marta “Health. Algarve 01/10/2020 BEN 462046.16€ NA
Chaves da ONline” –
Silva 31/12/2022
Project reference
Violence
Regional ALG-06-4538-FSE-
Prevention
Health 000013
Area –
Administrati
European Social Fund 43709.58€
on of the
Algarve, I.P. Portugal 2020 -
European structure
and investment funds -
CRESC - Algarve
Regional Operational
Program Competition
Daniela de “Health. Algarve 01/10/2020 BEN 462046.16€ NA
Sousa ONline” –
Pereira 31/12/2022
Project reference
Machado Violence
ALG-06-4538-FSE-
Prevention
Regional 000013
Area –
Health
European Social Fund 43709.58€
Administrati
on of the Portugal 2020 -
Algarve, I.P. European structure
and investment funds -
CRESC - Algarve
Regional Operational
Program Competition
AUSTRIA
GÖG JA National Focal 01.10.2022 AE 279.338 € https://www.nfp4he
Point for EU4Health – alth.eu/
30.09.2024
Horizon2020
GÖG 01.11.2020 BEN 449.875 € https://www.phiri.eu
Population Health – /
Information Research 30.10.2023
Infrastructure for
COVID-19 (PHIRI)
III. Health Programme
GÖG 01.02.2019 BEN 267.602 € https://euripid.eu/
EU
-
EURIPID III. 01.01.2022
Supporting Member
States voluntary
cooperation in the
area of pricing through
107
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
the Euripid
Collaboration
Horizon2020
GÖG 01.01.2021 BEN 307.800 € https://www.pancar
PanCareSurPass - - esurpass.eu/
Implementation 31.12.2024
research for scaling up
and transfer of
innovative solutions
involving digital tools
for people-centred
care
CROATIA
5.999.985,0
CIPH CANCON 24.02.2014. BEN https://ecpc.org/poli
0€
– cy/joint-action-on-
23.02.2017. cancer-control-
cancon/parent
569.929,08
CIPH PARENT 02.05.2012. BEN
€
–
30.11.2015.
2.499.746,7
CIPH JARC 01.10.2016. BEN https://jointactionrar
0€
– ecancers.eu/
01.10.2019.
5. 624.
CIPH iPAAC 01.04.2018. BEN https://www.ipaac.e
999,97 €
– u/ja
31.12.2021.
5. 624.
CIPH JA CHRODIS + 01.09.2017. BEN http://chrodis.eu/
999,97 €
–
30.11.2020.
CIPH INFACT 01.03.2018. BEN https://www.inf-
4.999.631,3
– act.eu/
5€
31.05.2021.
CIPH EUnetHTA Joint 01.16.2016. BEN https://www.eunetht
19.999.731,
Action 3 – a.eu/
54 €
31.05.2021.
CIPH ADVANTAGE 01.01.2017. BEN https://www.advant
5.737.450,0
– ageja.eu/
6€
01.01.2020.
108
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
CIPH EMERGE 01.06.2015. BEN www.emerge.rki.eu
5.833.515,1
–
9€
01.04.2019.
CIPH HA REACT 01.10.2015. BEN http://www.hareact.
3.749.683,8
– eu
7€
01.02.2019.
CIPH INTEGRATE 01.09.2017. BEN http://integrateja.eu/
2.499.846,3
– integrate/
5€
31.05.2021.
CIPH EU-JAMRAI 01.09.2017. BEN www.eu-jamrai.eu
6.963.604,6
–
0€
28.02.2021.
3.311.917,0
CIPH RARHA 01.01.2014. BEN www.rarha.eu
0€
–
01.01.2017.
CIPH JATC2 01.10.2021. BEN https://jaotc.eu/
3.124.999,5
–
1€
01.10.2024.
CIPH JA ImpleMental 01.10.2021. BEN
6.748.030,0
–
4€
01.10.2024.
CIPH JANPA 01.09.2015. BEN http://www.janpa.eu
2.024.413,8
– /
0€
01.12.2017.
2.111.437,1
CIPH CARE 01.04.2016. BEN www.careformigran
2€
– ts.eu
01.04.2017.
CIPH Best-ReMaP 01.10.2020. BEN https://bestremap.e
7.500.000,0
– u/
0€
01.10.2023.
CIPH JA TEHDAS 01.02.2021. BEN https://tehdas.eu/
4.166.666,6
–
7€
01.08.2023.
CIPH SHARP JA 01.04.2019. BEN https://www.sharpja
9.875.000,0
– .eu/
0€
31.03.2022.
109
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
CIPH NFP4Health 01.10.2021. BEN
2.499.881,9
–
7€
01.10.2024.
JADECARE
CIPH 01.10.2020. BEN https://www.jadecar
4.999.032,5
– e.eu/
1€
30.09.2023.
JA TERROR
CIPH 01.01.2021. BEN https://www.jaterror
6.241.045,2
– .eu/
1€
01.01.2024.
3. 750.
CIPH Healthy GateWays 01.05.2018. BEN https://www.healthy
000,00 €
– gateways.eu/
31.12.2021.
5. 851
CIPH EU - JAV 01.08.2018. BEN https://eu-jav.com/
961,71 €
–
31.03.2022.
CIPH JA-HEE 01.06.2018. BEN https://jahee.iss.it/
3.124.996,2
–
9€
30.11.2021.
CIPH RECOVER-E (H2020) 01.01.2018. BEN http://www.recover-
3.355.000,0
– e.eu/
0€
31.12.2021.
CIPH HBM4EU (H2020) 01.01.2017. BEN https://www.hbm4e
71.333.965,
– u.eu/
64 €
01.01.2022.
CIPH PHIRI (H2020) 01.11.2020. BEN https://www.phiri.eu
4.999.577,5
– /
0€
01.11.2023.
CIPH unCOVer (H2020) 15.11.2020. BEN https://uncover-
2.997.440,0
– eu.net/
0€
15.11.2022.
4.033.379,7
CIPH Healthy Living (ESF) 07.12.2016. COO https://zivjetizdravo.
0€
– eu/
07.12.2022.
CIPH EHIS 3 (EUROSTAT) 01.12.2018. COO https://ec.europa.eu
27.141,84 €
– /eurostat/web/produ
01.10.2020. cts-manuals-and-
110
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
guidelines/-/KS-02-
18-240
CIPH MORBIDITY 01.03.2019. COO
75.354,71 €
(EUROSTAT) –
01.09.2020.
ESTONIA
Ruth Kalda Project INTEGRATE 2012-2015 coordinator 194 960
Benchmarking and the eur
Integrated Care for accountabl
better Management of e partner in
Chronic and Age- Estonia
related Conditions in
Europe. EU 7
Framework
Programme.
Ruth Kalda Clinical pilot projects 1.01.2018 – Leader of 220 520
of personalised 31.05.2021 the EUR
medicine in the cardiocascu
precise prevention of lar disease
breast cancer and project
cardiovascular
diseases. Estonian
Science Foundation
Ruth Kalda Development of the 1.01.2020- Holder of 325 000
clinical guidelines 31.12.2023 the project Eur
Estonian Health
Insurance
Ruth Kalda 22.02.2021 Leader of 18 952 Eur
Development
- the project
evidence for policy
31.10.2021
brief on antimicrobial
resistance
Ruth Kalda 14.09.2020 Leader of 48 000 Eur
Analysis of Covid-19
- the project
cases and
21.03.2022 part
identification of risk
provided in
groups in Estonia,
family
Estonian Science practices
Foundation
HUNGARY
111
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
List of previous projects
Please provide a list of your previous projects for the last 4 years.
Participant Project Reference No Period Role (COO, Amount Website (if any)
and Title, Funding (start and BEN, AE, (EUR)
programme end date) OTHER)
National no. 773830, The One 2018-2022 BEN Hungary’s https://onehealthejp
Public Health European Joint amount: 62 .eu
Health Programme 322,94€
Center
National No 733032, HBM4EU 2020-2022 BEN Overall https://www.hbm4e
Public budget: 74 u.eu
Health 930
Center 474,17€
National no. 2017-19 BEN Hungary’s https://www.advant
Public 724099ADVANTAGE budget: ageja.eu/
Health Joint Action, 49,9961.85
Center 7.495,00 €
112
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
Annex 4. Initial Adopting Sites
5. Portugal
4. Health
2. 3. 6.
1. Belgium Spain_CAT Action for
Spain_GAL Spain_AND Slovenia Nº
Integrated Adding Children-
COUNTRY N. Reference Partner name Home Personalized Health of BP implementation level
Health Value to Youth-
Telemonitori Care Action Promotion BPs
Association Clinical PC Gender-
ng in PC Plans Centres
Practice Violence-
Lifecycle
Spain 1.2 Servizo Galego de Saúde X 1 Santiago de Compostela
Servicio Cántabro de
Spain 1.7 X 1 Regional / Cantabria
Salud
Agencia de Conocimiento Regional level. The region of
Spain 1.3 X 1
en Salud Madrid
urban (2 neighborhood)
Servicio Madrileño de
Spain 1.8 X X 1 valencia and rural 2 deprived
Salud
neibourhoods) Alzira
Regional: (BP 3) 3 pilot sites
Dioikhsh Ygeionomikhs /
Greece 2 X X Χ X 4
Perifereias Krhths (BP4) 3 pilot sites/ (BP5) 4
pilot sites/ (BP6) 7 pilot sites
Regione Umbria USL Um
Italy 3.1 X 1 Decisio to be taken
bria 2 Terni
(1) the region of Marche (2)
Italy 3.2 ASUR Marche X 1 some municipalities (3)
regional
Regione Piemonte ASL local health agency ASLCN2,
Italy 3.3 X 1
CN2 Italy
113
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
5. Portugal
4. Health
2. 3. 6.
1. Belgium Spain_CAT Action for
Spain_GAL Spain_AND Slovenia Nº
Integrated Adding Children-
COUNTRY N. Reference Partner name Home Personalized Health of BP implementation level
Health Value to Youth-
Telemonitori Care Action Promotion BPs
Association Clinical PC Gender-
ng in PC Plans Centres
Practice Violence-
Lifecycle
Regione Piemonte ASL
Italy 3.4 X 1 Alessandria province
AL
Regione Lazio ASL Local - 6 Municipalities of the
Italy 3.5 X 1
ROMA 1 city of Rome
Regione Lazio ASL
Italy 3.6 X 1 Local level. ASL Roma 3
ROMA 3
Regione Lazio ASL Local level. Provincia di
Italy 3.7 X 1
Viterbo Viterbo (Lazio region, Italy)
Regione Lombardia ATS Sub-regional level. Bergamo
Italy 3.8 X 1
Bergamo and other near provinces
4 Health District , Regional
Italy 3.9 Regione Liguria A.Li.Sa X 1
Health Direction FVG,
Italy 3.10 Regione Liguria ASL 1 X 1 Local: province of Teramo
local , modena province ,
Italy 3.11 Regione Liguria ASL 4 X 1 health distrct Pavullo and
Mirandola
Fiuli Venezia Giulia Local/ Province of Bologna
Italy 3.12 X 1
ASU Giuliano Isontina (Excluding Imola)
114
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
5. Portugal
4. Health
2. 3. 6.
1. Belgium Spain_CAT Action for
Spain_GAL Spain_AND Slovenia Nº
Integrated Adding Children-
COUNTRY N. Reference Partner name Home Personalized Health of BP implementation level
Health Value to Youth-
Telemonitori Care Action Promotion BPs
Association Clinical PC Gender-
ng in PC Plans Centres
Practice Violence-
Lifecycle
Regione Abruzzo ASL 4 Local level. Municipality of
Italy 3.13 X 1
Teramo San Secondo Parmense
Regione Emilia -
Italy 3.14 X 1 Local level. Romagna Area
Romagna - USL Bologna
Regione Emilia-
Italy 3.15 X 1 Province of Imperia
Romagna- USL Modena
Regione Emilia Romagna Regional level (Regione
Italy 3.16 X 1
-USL Parma Liguria)
Regione Emilia-Romagna
Italy 3.17 X 1 Tigullio
- USL Romagna
Regione Lazio ASL
Italy 3.18 X 1 Regional level
ROMA 2
Narodowy Fundusz
Poland 4 X X X X 4 National
Zdrowia
Nacionalni inštitut za
Slovenia 5 X 1 National
javno zdravje
Ministerul Sănătății
Romania 6 România/ Ministry of x X X 3 National
Health Romania
115
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
5. Portugal
4. Health
2. 3. 6.
1. Belgium Spain_CAT Action for
Spain_GAL Spain_AND Slovenia Nº
Integrated Adding Children-
COUNTRY N. Reference Partner name Home Personalized Health of BP implementation level
Health Value to Youth-
Telemonitori Care Action Promotion BPs
Association Clinical PC Gender-
ng in PC Plans Centres
Practice Violence-
Lifecycle
Ministerio da Saude/
Portugal 8.1 Directorate-General of X 1 National level
Health
Unidade Local de Saúde
Portugal 8.2 X 1 Regional level
de Matosinhos, E.P.E.
CENTRO HOSPITALAR
Portugal 8.3 DE LISBOA CENTRAL, X 1 Regional level
EPE
Centro Hospitalar de
Portugal 8.4 X 1 Regional level
Lisboa Ocidental, EPE
ADMINISTRAÇÃO
REGIONAL DE SAÚDE
DE LISBOA E VALE DO
Portugal 8.5 X 1 Regional level
TEJO/ Agrupamento de
centros de saúde de
Lisboa Central
Croatian Institute of
Croatia 10 X 1 Regional, several counties.
Public Health
Decision pending: possiby
Estonia 11 Sotsiaalministeerium X X 2 local level, municipalities and
health centres
Nemzeti
Népegészségügyyi
Hungary 12 X 1 regional; Central Hungary
Központ (National Public
Health Center)
116
Call: EU4H-2021-JA — Joint actions
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU Grants: Application form (EU4H): V1.0 – 15.04.2021
5. Portugal
4. Health
2. 3. 6.
1. Belgium Spain_CAT Action for
Spain_GAL Spain_AND Slovenia Nº
Integrated Adding Children-
COUNTRY N. Reference Partner name Home Personalized Health of BP implementation level
Health Value to Youth-
Telemonitori Care Action Promotion BPs
Association Clinical PC Gender-
ng in PC Plans Centres
Practice Violence-
Lifecycle
local, 2-3 municipalities and
Ministry of Health of
Lithuania 13 X 1 then development to
Republic of Lithuania
national)
The National Board of
Sweden 14 X 1 Decision to be taken
Health and Welfare
TOTAL 5 5 13 3 4 16 45
117
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572
Project acronym: CIRCE
ATTENTION! Delete columns that do not apply for your grant.
CONSOLIDATED COSTS PER WORK PACKAGE (PROJECT)
PROJECT COSTS PER WORK PACKAGE
A.1 Employees D. Other cost
C. Purchase costs
A.2 + A.3 Natural categories
B. Subcontracting E. Indirect costs
persons under direct A.4 SME owners
costs D.1 Financial
contract and seconded C.1 Travel and C.3 Other goods,
persons subsistence
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
works and services
support to third Total
parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1
+ d2 + d3 + d4 + d5 + d6)
01-SAS
TOTAL COSTS PARTICIPANT
665.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 97.500,00 0,00 53.375,00 815.875,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
665.000,00 46.550,00 711.550,00
(Grant Preparation Step)
1.2-FPS
TOTAL COSTS PARTICIPANT
266.000,00 0,00 0,00 28.833,00 16.800,00 7.213,50 4.819,50 0,00 30.500,00 0,00 22.773,31 348.106,31
(Proposal Step)
TOTAL COSTS PARTICIPANT
266.000,00 28.833,00 16.800,00 7.213,50 4.819,50 0,00 140.020,00 0,00 30.439,71 465.292,71
(Grant Preparation Step)
1.3-SERGAS
TOTAL COSTS PARTICIPANT
157.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 11.025,00 168.525,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.4-ACIS
TOTAL COSTS PARTICIPANT
153.000,00 0,00 0,00 21.355,00 11.900,00 5.652,50 3.802,50 0,00 12.500,00 0,00 13.079,85 199.934,85
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.5-AQUAS
TOTAL COSTS PARTICIPANT
117.000,00 0,00 0,00 15.103,00 8.800,00 3.778,50 2.524,50 0,00 7.500,00 0,00 9.772,21 149.375,21
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.6-FISABIO
TOTAL COSTS PARTICIPANT
206.700,00 0,00 0,00 21.355,00 12.760,00 5.152,50 3.442,50 0,00 5.000,00 0,00 16.313,85 249.368,85
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.7-IDIVAL
TOTAL COSTS PARTICIPANT
74.250,00 0,00 0,00 21.355,00 12.760,00 5.152,50 3.442,50 0,00 5.000,00 0,00 7.042,35 107.647,35
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.8-SCS
TOTAL COSTS PARTICIPANT
147.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 10.290,00 157.290,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.9-SERMAS
TOTAL COSTS PARTICIPANT
145.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 10.150,00 155.150,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
1.10-FIIBAP
TOTAL COSTS PARTICIPANT
120.000,00 0,00 0,00 21.355,00 12.760,00 5.152,50 3.442,50 0,00 5.000,00 0,00 10.244,85 156.599,85
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
2-7HRC
TOTAL COSTS PARTICIPANT
1.389.500,00 0,00 0,00 48.681,00 27.480,00 12.709,50 8.491,50 0,00 10.000,00 0,00 101.372,67 1.549.553,67
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
3-AGENAS
TOTAL COSTS PARTICIPANT
420.431,68 0,00 0,00 28.833,00 16.800,00 7.213,50 4.819,50 0,00 10.000,00 0,00 32.148,53 491.413,21
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.1-uslumbria2
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.2-ASUR
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.3-ASLCN2
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.4-ASL AL
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.5-ASL ROMA 1
TOTAL COSTS PARTICIPANT
182.275,76 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 13.216,48 202.023,41
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.6- ASL ROMA D
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.7-AUSL VITERBO
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.8-ATS Bergamo
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.9- A.Li.Sa
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.10- Liguria ASL 1
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.11- Liguria ASL 4
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.12-ASUGI
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.13- ASL TERAMO
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.14- Bologna
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.15- Modena
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.16-Parma
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.17- Romagna
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
3.18-ASL ROMA 2
TOTAL COSTS PARTICIPANT
137.509,02 0,00 0,00 6.253,39 2.922,22 1.882,42 1.448,75 0,00 277,78 0,00 10.082,81 154.123,00
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
4- NFZ
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
TOTAL COSTS PARTICIPANT
711.100,00 0,00 0,00 54.120,00 31.200,00 13.740,00 9.180,00 0,00 98.660,00 0,00 60.471,60 924.351,60
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
5- NIJZ
TOTAL COSTS PARTICIPANT
525.000,00 0,00 30.000,00 20.605,00 12.010,00 5.152,50 3.442,50 0,00 27.500,00 0,00 42.217,35 645.322,35
(Proposal Step)
TOTAL COSTS PARTICIPANT
525.000,00 0,00 30.000,00 20.605,00 12.010,00 5.152,50 3.442,50 4.000,00 27.500,00 0,00 42.497,35 649.602,35
(Grant Preparation Step)
6- MS-MoH
TOTAL COSTS PARTICIPANT
285.600,00 0,00 0,00 35.791,00 20.893,00 8.931,00 5.967,00 0,00 7.500,00 0,00 23.022,37 351.913,37
(Proposal Step)
TOTAL COSTS PARTICIPANT
144.600,00 0,00 0,00 35.791,00 20.893,00 8.931,00 5.967,00 0,00 9.000,00 0,00 13.257,37 202.648,37
(Grant Preparation Step)
6.1- UMF-CD
TOTAL COSTS PARTICIPANT
172.440,00 0,00 0,00 9.611,00 6.173,00 2.061,00 1.377,00 0,00 0,00 0,00 12.743,57 194.794,57
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
6.2-INSP
TOTAL COSTS PARTICIPANT
7.287,00 0,00 0,00 9.611,00 6.173,00 2.061,00 1.377,00 0,00 0,00 0,00 1.182,86 18.080,86
(Proposal Step)
TOTAL COSTS PARTICIPANT
131.166,00 0,00 0,00 9.611,00 6.173,00 2.061,00 1.377,00 0,00 15.618,26 0,00 10.904,39 167.342,93
(Grant Preparation Step)
7- AVIQ
TOTAL COSTS PARTICIPANT
242.882,10 0,00 0,00 15.703,00 9.400,00 3.778,50 2.524,50 0,00 5.000,00 0,00 18.450,96 282.036,06
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
8- ACSS
TOTAL COSTS PARTICIPANT
32.190,99 0,00 0,00 9.611,00 6.173,00 2.061,00 1.377,00 0,00 0,00 0,00 2.926,14 44.728,13
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
8.1- MS-DGS
TOTAL COSTS PARTICIPANT
80.939,98 0,00 0,00 9.611,00 6.173,00 2.061,00 1.377,00 0,00 2.500,00 0,00 6.513,57 99.564,55
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
8.2- ULSM
TOTAL COSTS PARTICIPANT
117.000,00 0,00 0,00 7.751,48 3.900,00 2.152,26 1.699,22 0,00 1.250,00 0,00 8.820,10 134.821,58
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
8.3-CHLC
TOTAL COSTS PARTICIPANT
117.000,00 0,00 0,00 7.751,48 3.900,00 2.152,26 1.699,22 0,00 1.250,00 0,00 8.820,10 134.821,58
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
8.4-CHLO
TOTAL COSTS PARTICIPANT
117.000,00 0,00 0,00 7.751,48 3.900,00 2.152,26 1.699,22 0,00 1.250,00 0,00 8.820,10 134.821,58
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
8.5- ARSLVT
TOTAL COSTS PARTICIPANT
117.000,00 0,00 0,00 7.751,48 3.900,00 2.152,26 1.699,22 0,00 1.250,00 0,00 8.820,10 134.821,58
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
9-GÖG
TOTAL COSTS PARTICIPANT
154.809,44 0,00 0,00 16.476,00 9.600,00 4.122,00 2.754,00 0,00 0,00 0,00 11.989,98 183.275,42
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
10-CIPH
TOTAL COSTS PARTICIPANT
140.788,59 0,00 0,00 20.995,00 12.400,00 5.152,50 3.442,50 0,00 5.000,00 0,00 11.674,85 178.458,44
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
11- MSAE
TOTAL COSTS PARTICIPANT
185.500,00 0,00 0,00 20.755,00 12.733,00 4.809,00 3.213,00 0,00 5.000,00 0,00 14.787,85 226.042,85
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
11.1- UTARTU
TOTAL COSTS PARTICIPANT
222.600,00 0,00 0,00 20.755,00 12.733,00 4.809,00 3.213,00 0,00 5.000,00 0,00 17.384,85 265.739,85
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
12- NNK
TOTAL COSTS PARTICIPANT
106.000,00 0,00 0,00 21.475,00 11.800,00 5.752,50 3.922,50 0,00 5.000,00 0,00 9.273,25 141.748,25
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
13-MoH-RL
TOTAL COSTS PARTICIPANT
163.950,20 0,00 0,00 20.995,00 11.650,00 5.602,50 3.742,50 0,00 5.000,00 0,00 10,00 189.955,20
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
14- NBHW
TOTAL COSTS PARTICIPANT
418.700,00 0,00 0,00 23.155,00 14.560,00 5.152,50 3.442,50 0,00 10.000,00 0,00 31.629,85 483.484,85
(Proposal Step)
TOTAL COSTS PARTICIPANT
0,00
(Grant Preparation Step)
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 17/10/2022 7:31
Project acronym: CIRCE
Participant short name: SAS
Participant PIC: 998853621
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and Description of project role/activities/responsibilities
the action)
(monthly/other) which WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 39,00 195.000,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 195.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 195.000,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 24,00 120.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 120.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 120.000,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 4,00 20.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 20.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 20.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 3,00 15.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 15.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 15.000,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 3,00 15.000,00
monthly 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 15.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 15.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 56,00 280.000,00
monthly 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 280.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 280.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 4,00 20.000,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 20.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 20.000,00
Total personnel (all WPs) 665.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00
Accomodation costs 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Subsistence costs 0,00
Personnel
Travel real costs of 2 person that will attend to the KoM
Travel costs 0,00 Yes, all WPs
Accomodation real costs of 2 person that will attend to
Accomodation costs 0,00 Yes, all WPs
the KoM
Subsistence real costs of 2 person that will attend to the
Subsistence costs 0,00 Yes, all WPs
KoM
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 1st
Travel costs 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 0,00 Yes, all WPs
the 1st consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 0,00 Yes, all WPs
1st consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 2nd
Travel costs 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 0,00 Yes, all WPs
the 2nd consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 0,00 Yes, all WPs
2nd consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
4 Consortium Meeting 3 (Final conference)
Speakers
Travel costs 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 3rd
Travel costs 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 0,00 Yes, all WPs
the 3rd consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 0,00 Yes, all WPs
3rd consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel real costs of 1 person that attends to a
Travel costs 0,00 Yes, all WPs
disemination meeting
Accomodation real costs of 1 person that attends to a
Accomodation costs 0,00 Yes, all WPs
disemination meeting
Subsistence real costs of 1 person that attends to a
Subsistence costs 0,00 Yes, all WPs
disemination meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
2 Additional person for Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel real costs of 1 additional person that will attend to
Travel costs 0,00 Yes, all WPs
the Final Conference
Accomodation real costs of 1 additional person that will
Accomodation costs 0,00 Yes, all WPs
attend to the Final Conference
Subsistence real costs of 1 additional person that will
Subsistence costs 0,00 Yes, all WPs
attend to the Final Conference
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Total travel costs (all WPs) 0,00
Total accomodation (all WPs) 0,00
Total subsistence (all WPs) 0,00
Total travel and subsistence (all WPs) 0,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes) Associated with document Ref. Ares(2022)7858729 - 14/11/2022
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
Price
method (e.g. Number of months action (100% or Total
packages? YES/NO and which
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Description of tasks/activities for which the equipment is
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS)
4 Project evaluation 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Total goods, works and services (all WPs) 0,00
Total purchase costs (all WPs) 0,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
665.000,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 46.550,00
Total indirect costs 46.550,00
TOTAL COSTS PARTICIPANT 711.550,00
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 711.550,00
Single Funding rate (%) 80%
Maximum EU contribution 569.240,00
Requested EU contribution 569.240,00
EU CONTRIBUTION 569.240,00 Associated with document Ref. Ares(2022)7858729 - 14/11/2022
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Description of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 142.310,00
OWN RESOURCES 142.310,00
TOTAL INCOME PARTICIPANT 711.550,00
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: SAS
Participant PIC: 998853621
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1
+ d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
195.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 195.000,00
COORDINATION
WP2 DISSEMINATION 120.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 120.000,00
WP3 EVALUATION 20.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 20.000,00
WP4 SUSTAINABILITY 15.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 15.000,00
WP5 METHODOLOGY FOR TRANSFERRING
15.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 15.000,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
280.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 280.000,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 20.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 20.000,00
TOTAL COSTS PARTICIPANT 665.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 46.550,00 711.550,00
Total eligible costs (for controls) 665.000,00
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 02/11/2022 12:18
Project acronym: CIRCE
Participant short name: FPS
Participant PIC: 998619463
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 23,00 92.000,00
Technical personnel monthly 4.000,00 13,00 52.000,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 144.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 144.000,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 15,00 60.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 60.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 60.000,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 3,00 12.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 12.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 12.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Technical personnel monthly 4.000,00 0,50 2.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 2.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 2.000,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 1,00 4.000,00
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 4.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 4.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 9,00 36.000,00
monthly 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 36.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 36.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 2,00 8.000,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 8.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 8.000,00
Total personnel (all WPs) 266.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Personnel
Travel real costs of 2 person that will attend to the KoM
Travel costs 3.200,00 0,00 Yes, all WPs
Accomodation real costs of 2 person that will attend to
Accomodation costs 1.374,00 0,00 Yes, all WPs
the KoM
Subsistence real costs of 2 person that will attend to the
Subsistence costs 918,00 0,00 Yes, all WPs
KoM
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 3.200,00
Total accomodation costs for this travel 1.374,00
Total subsistence costs for this travel 918,00
Total travel 5.492,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 1st
Travel costs 3.200,00 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 1.374,00 0,00 Yes, all WPs
the 1st consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 918,00 0,00 Yes, all WPs
1st consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 3.200,00
Total accomodation costs for this travel 1.374,00
Total subsistence costs for this travel 918,00
Total travel 5.492,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 2nd
Travel costs 3.200,00 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 1.374,00 0,00 Yes, all WPs
the 2nd consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 918,00 0,00 Yes, all WPs
2nd consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 3.200,00
Total accomodation costs for this travel 1.374,00
Total subsistence costs for this travel 918,00
Total travel 5.492,00
4 Consortium Meeting 3
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 3rd
Travel costs 3.200,00 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 1.374,00 0,00 Yes, all WPs
the 3rd consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 918,00 0,00 Yes, all WPs
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
3rd consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 3.200,00
Total accomodation costs for this travel 1.374,00
Total subsistence costs for this travel 918,00
Total travel 5.492,00
Total travel costs for this WP 12.800,00
Total accomodation costs for this WP 5.496,00
Total subsistence costs for this WP 3.672,00
Total travel for this WP 21.968,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel real costs of 1 person that attends to a
Travel costs 1.600,00 0,00 Yes, all WPs
disemination meeting
Accomodation real costs of 1 person that attends to a
Accomodation costs 687,00 0,00 Yes, all WPs
disemination meeting
Subsistence real costs of 1 person that attends to a
Subsistence costs 459,00 0,00 Yes, all WPs
disemination meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
2 Additional person for Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel real costs of 1 additional person that will attend to
Travel costs 1.600,00 0,00 Yes, all WPs
the Final Conference
Accomodation real costs of 1 additional person that will
Accomodation costs 687,00 0,00 Yes, all WPs
attend to the Final Conference
Subsistence real costs of 1 additional person that will
Subsistence costs 459,00 0,00 Yes, all WPs
attend to the Final Conference
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Total travel costs for this WP 3.200,00
Total accomodation costs for this WP 1.374,00
Total subsistence costs for this WP 918,00
Total travel for this WP 5.492,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
Focus group
Speakers
Travel costs 800,00 0,00 0,00 0,00
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 800,00
Total accomodation costs for this WP 343,50
Total subsistence costs for this WP 229,50
Total travel for this WP 1.373,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel for this WP 0,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Total travel costs (all WPs) 16.800,00
Total accomodation (all WPs) 7.213,50
Total subsistence (all WPs) 4.819,50
Total travel and subsistence (all WPs) 28.833,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also
(EUR)
Associated with document
packages? YES/NO and which Ref. Ares(2022)7858729 needed - 14/11/2022
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0%
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
No
3 Audit fees (CFS) 5.000,00
4 Project evaluation 0,00
KoM Organization 20.000,00
Consortium Meeting Organization 1 20.000,00
Final Conference Organization 2 20.000,00
Consortium Meeting Organization 3 10.000,00
Total goods, works and services for this WP 75.000,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Final Int Conference Organisation 37.520,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[6 short name other] 0,00
Total goods, works and services for this WP 37.520,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Translation of BP 2.500,00
[6 short name other] 0,00
Total goods, works and services for this WP 2.500,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
BP Workshop translation and other organisational costs 5.000,00
[6 short name other] 0,00
Total goods, works and services for this WP 5.000,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Policy Dialogues organisational costs 20.000,00
[6 short name other] 0,00
Total goods, works and services for this WP 20.000,00
Total goods, works and services (all WPs) 140.020,00
Total purchase costs (all WPs) 168.853,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
434.853,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 30.439,71
Total indirect costs 30.439,71
TOTAL COSTS PARTICIPANT 465.292,71
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 465.292,71
Single Funding rate (%) 80%
Maximum EU contribution 372.234,17
Requested EU contribution 372.234,17
EU CONTRIBUTION 372.234,17
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Description of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 93.058,54
OWN RESOURCES 93.058,54
TOTAL INCOME PARTICIPANT 465.292,71
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: FPS
Participant PIC: 998619463
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1
+ d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
144.000,00 0,00 0,00 21.968,00 12.800,00 5.496,00 3.672,00 0,00 75.000,00 0,00 240.968,00
COORDINATION
WP2 DISSEMINATION 60.000,00 0,00 0,00 5.492,00 3.200,00 1.374,00 918,00 0,00 37.520,00 0,00 103.012,00
WP3 EVALUATION 12.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 12.000,00
WP4 SUSTAINABILITY 2.000,00 0,00 0,00 1.373,00 800,00 343,50 229,50 0,00 2.500,00 0,00 5.873,00
WP5 METHODOLOGY FOR TRANSFERRING
4.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4.000,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
36.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.000,00 0,00 41.000,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 8.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 20.000,00 0,00 28.000,00
TOTAL COSTS PARTICIPANT 266.000,00 0,00 0,00 28.833,00 16.800,00 7.213,50 4.819,50 0,00 140.020,00 0,00 30.439,71 465.292,71
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 15/02/2022 22:06
Project acronym: CIRCE
Participant short name: SERGAS
Participant PIC: 974720409
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and Description of project role/activities/responsibilities
the action)
(monthly/other) which WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 0,00 0,00
monthly 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 2,00 9.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 9.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 9.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 7,00 31.500,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 31.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 31.500,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 1,00 4.500,00
monthly 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 4.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 4.500,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 22,00 99.000,00
monthly 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 99.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 99.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 3,00 13.500,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 13.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 13.500,00
Total personnel (all WPs) 157.500,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00
Accomodation costs 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Subsistence costs 0,00
Personnel
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
4 Consortium Meeting 3
Speakers
Travel costs 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
2 Additional person for Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
Focus group
Speakers
Travel costs 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Total travel costs (all WPs) 0,00
Total accomodation (all WPs) 0,00
Total subsistence (all WPs) 0,00 Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel and subsistence (all WPs) 0,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Description of tasks/activities for which the equipment is
Total
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant Associated with document Ref. Ares(2022)7858729 - 14/11/2022
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Final Conference Organisation 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Total goods, works and services (all WPs) 0,00
Total purchase costs (all WPs) 0,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
157.500,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 11.025,00
Total indirect costs 11.025,00 Associated with document Ref. Ares(2022)7858729 - 14/11/2022
TOTAL COSTS PARTICIPANT 168.525,00
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 168.525,00
Single Funding rate (%) 80%
Maximum EU contribution 134.820,00
Requested EU contribution 134.820,00
EU CONTRIBUTION 134.820,00
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Description of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 33.705,00
OWN RESOURCES 33.705,00
TOTAL INCOME PARTICIPANT 168.525,00
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: SERGAS
Participant PIC: 974720409
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1
+ d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
COORDINATION
WP2 DISSEMINATION 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
WP3 EVALUATION 9.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 9.000,00
WP4 SUSTAINABILITY 31.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 31.500,00
WP5 METHODOLOGY FOR TRANSFERRING
4.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4.500,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
99.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 99.000,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 13.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 13.500,00
TOTAL COSTS PARTICIPANT 157.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 11.025,00 168.525,00
Total eligible costs (for controls) 157.500,00
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 15/02/2022 22:19
Project acronym: CIRCE
Participant short name: ACIS
Participant PIC: 923156858
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 2,00 9.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 9.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 9.000,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 3,00 13.500,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 13.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 13.500,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Project managers monthly 4.000,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 5,00 22.500,00
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 22.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 22.500,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 18,00 81.000,00
monthly 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 81.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 81.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 6,00 27.000,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 27.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 27.000,00
Total personnel (all WPs) 153.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00
Accomodation costs 0,00
Subsistence costs 0,00
Personnel
Travel real costs of 2 person that will attend to the KoM
Travel costs 1.600,00 0,00 Yes, all WPs
Accomodation real costs of 2 person that will attend to
Accomodation costs 687,00 0,00 Yes, all WPs
the KoM
Subsistence real costs of 2 person that will attend to the
Subsistence costs 459,00 0,00 Yes, all WPs
KoM
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 1st
Travel costs 1.600,00 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 687,00 0,00 Yes, all WPs
the 1st consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 459,00 0,00 Yes, all WPs
1st consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 2nd
Travel costs 1.600,00 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 687,00 0,00 Yes, all WPs
the 2nd consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 459,00 0,00 Yes, all WPs
2nd consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
4 Consortium Meeting 3
Speakers
Travel costs 0,00 0,00
Accomodation costs 0,00 0,00
Subsistence costs 0,00 0,00
Personnel
Travel real costs of 2 person that will attend to the 3rd
Travel costs 1.600,00 0,00 Yes, all WPs
consortium meeting
Accomodation real costs of 2 person that will attend to
Accomodation costs 687,00 0,00 Yes, all WPs
the 3rd consortium meeting
Subsistence real costs of 2 person that will attend to the
Subsistence costs 459,00 0,00 Yes, all WPs
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
3rd consortium meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Total travel costs for this WP 6.400,00
Total accomodation costs for this WP 2.748,00
Total subsistence costs for this WP 1.836,00
Total travel for this WP 10.984,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel real costs of 1 person that attends to a
Travel costs 800,00 0,00 Yes, all WPs
disemination meeting
Accomodation real costs of 1 person that attends to a
Accomodation costs 343,50 0,00 Yes, all WPs
disemination meeting
Subsistence real costs of 1 person that attends to a
Subsistence costs 229,50 0,00 Yes, all WPs
disemination meeting
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
2 Additional person for Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel real costs of 1 additional person that will attend to
Travel costs 800,00 0,00 Yes, all WPs
the Final Conference
Accomodation real costs of 1 additional person that will
Accomodation costs 343,50 0,00 Yes, all WPs
attend to the Final Conference
Subsistence real costs of 1 additional person that will
Subsistence costs 229,50 0,00 Yes, all WPs
attend to the Final Conference
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 1.600,00
Total accomodation costs for this WP 687,00
Total subsistence costs for this WP 459,00
Total travel for this WP 2.746,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
Focus group
Speakers
Travel costs 800,00 0,00 0,00 0,00
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 800,00
Total accomodation costs for this WP 343,50
Total subsistence costs for this WP 229,50
Total travel for this WP 1.373,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Study Visit
Speakers
Travel costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Secondment
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 800,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 1.946,00
Total travel costs for this WP 2.400,00
Total accomodation costs for this WP 1.374,00
Total subsistence costs for this WP 918,00
Total travel for this WP 4.692,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Intra Member travels
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 700,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 500,00 0,00 0,00 0,00
Subsistence costs 360,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 700,00
Total accomodation costs for this travel 500,00
Total subsistence costs for this travel 360,00
Total travel 1.560,00
Total travel costs for this WP 700,00
Total accomodation costs for this WP 500,00
Total subsistence costs for this WP 360,00
Total travel for this WP 1.560,00 0,00
Total travel costs (all WPs) 11.900,00
Total accomodation (all WPs) 5.652,50
Total subsistence (all WPs) 3.802,50
Total travel and subsistence (all WPs) 21.355,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the Associated
Also partwith document
of other work Ref. Ares(2022)7858729 - 14/11/2022
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS)
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Translation of BP key documents into English 2.500,00
[6 short name other] 0,00
Total goods, works and services for this WP 2.500,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
BP Workshop translation and other organisational costs s related to
5.000,00
Workshop, Visits and Secondments
[6 short name other] 0,00
Total goods, works and services for this WP 5.000,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
Implementers meeting (organisational costs) 5.000,00
[6 short name other] 0,00
Total goods, works and services for this WP 5.000,00
Total goods, works and services (all WPs) 12.500,00
Total purchase costs (all WPs) 33.855,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
YES/NO and which WP
[Support scheme short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
186.855,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 13.079,85
Total indirect costs 13.079,85
TOTAL COSTS PARTICIPANT 199.934,85
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 199.934,85
Single Funding rate (%) 80%
Maximum EU contribution 159.947,88
Requested EU contribution 159.947,88
EU CONTRIBUTION 159.947,88
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Associated with documentDescription
Ref. Ares(2022)7858729 - 14/11/2022
of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 39.986,97
OWN RESOURCES 39.986,97
TOTAL INCOME PARTICIPANT 199.934,85
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: ACIS
Participant PIC: 923156858
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1
+ d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
9.000,00 0,00 0,00 10.984,00 6.400,00 2.748,00 1.836,00 0,00 0,00 0,00 19.984,00
COORDINATION
WP2 DISSEMINATION 13.500,00 0,00 0,00 2.746,00 1.600,00 687,00 459,00 0,00 0,00 0,00 16.246,00
WP3 EVALUATION 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
WP4 SUSTAINABILITY 0,00 0,00 0,00 1.373,00 800,00 343,50 229,50 0,00 2.500,00 0,00 3.873,00
WP5 METHODOLOGY FOR TRANSFERRING
22.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 22.500,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
81.000,00 0,00 0,00 4.692,00 2.400,00 1.374,00 918,00 0,00 5.000,00 0,00 90.692,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 27.000,00 0,00 0,00 1.560,00 700,00 500,00 360,00 0,00 5.000,00 0,00 33.560,00
TOTAL COSTS PARTICIPANT 153.000,00 0,00 0,00 21.355,00 11.900,00 5.652,50 3.802,50 0,00 12.500,00 0,00 13.079,85 199.934,85
a Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 03/11/2022 7:59
Project acronym: CIRCE
Participant short name: AQUAS
Participant PIC: 949799169
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 2,00 9.000,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 9.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 9.000,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 3,00 13.500,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 13.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 13.500,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 1,00 4.500,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 4.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 4.500,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 3,00 13.500,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 13.500,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 13.500,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 3,00 13.500,00
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 13.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 13.500,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 12,00 54.000,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 54.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 54.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 2,00 9.000,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 9.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 9.000,00
Total personnel (all WPs) 117.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
4 Consortium Meeting 3
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Total travel costs for this WP 6.400,00
Total accomodation costs for this WP 2.748,00
Total subsistence costs for this WP 1.836,00
Total travel for this WP 10.984,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00
Personnel
1 person participation in a meeting to
Travel costs 0,00 800,00 1,00 800,00 disseminate/communicate JA objectives, progress or
results
Accomodation costs 0,00 343,50 1,00 343,50
Subsistence costs 0,00 229,50 1,00 229,50
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
2 Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Participation of 1 additional person in the FC
Travel costs 0,00 800,00 1,00 800,00
Accomodation costs 0,00 343,50 1,00 343,50
Subsistence costs 0,00 229,50 1,00 229,50
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 1.600,00
Total accomodation costs for this WP 687,00
Total subsistence costs for this WP 459,00
Total travel for this WP 2.746,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 Focus group
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Task 4.2 Focus Group 1 persn per BP originator/adopter
Travel costs 0,00 800,00 1,00 800,00
Accomodation costs 0,00 343,50 1,00 343,50
Subsistence costs 0,00 229,50 1,00 229,50
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 800,00
Total accomodation costs for this WP 343,50
Total subsistence costs for this WP 229,50
Total travel for this WP 1.373,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel for this WP 0,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Total travel costs (all WPs) 8.800,00
Total accomodation (all WPs) 3.778,50
Total subsistence (all WPs) 2.524,50
Total travel and subsistence (all WPs) 15.103,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or 60 allocated to the action less if used also for (EUR) needed
WP
month) other purposes)
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00 Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
Also part of other work
action (100% or Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action packages? YES/NO and which
less if used also for (EUR) needed
WP
other purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
ORIGINATORS Translation of BP keay documents into
Information & publications 2.500,00
English
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 2.500,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
BP Workshop translation and other organisational costs
Conferences, seminars, workshops, trainings & events 5.000,00 related to Workshop, Visits and Secondments
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 5.000,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work
Description of tasks/activities for which the goods/services
(actual costs) packages? YES/NO and which
are needed; types of goods services needed; how much
WP
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Total goods, works and services (all WPs) 7.500,00
Total purchase costs (all WPs) 22.603,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
AssociatedDescription
Costs of support
with document scheme (estimated number
Ref. Ares(2022)7858729 of
- 14/11/2022
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
139.603,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 9.772,21
Total indirect costs 9.772,21
TOTAL COSTS PARTICIPANT 149.375,21
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 149.375,21
Single Funding rate (%) 80%
Maximum EU contribution 119.500,17
Requested EU contribution 119.500,17
EU CONTRIBUTION 119.500,17
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Description of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 29.875,04
OWN RESOURCES 29.875,04
TOTAL INCOME PARTICIPANT 149.375,21
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: AQUAS
Participant PIC: 949799169
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 +
d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
9.000,00 0,00 0,00 10.984,00 6.400,00 2.748,00 1.836,00 0,00 0,00 0,00 19.984,00
COORDINATION
WP2 DISSEMINATION 13.500,00 0,00 0,00 2.746,00 1.600,00 687,00 459,00 0,00 0,00 0,00 16.246,00
WP3 EVALUATION 4.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4.500,00
WP4 SUSTAINABILITY 13.500,00 0,00 0,00 1.373,00 800,00 343,50 229,50 0,00 2.500,00 0,00 17.373,00
WP5 METHODOLOGY FOR TRANSFERRING
13.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 13.500,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
54.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.000,00 0,00 59.000,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 9.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 9.000,00
TOTAL COSTS PARTICIPANT 117.000,00 0,00 0,00 15.103,00 8.800,00 3.778,50 2.524,50 0,00 7.500,00 0,00 9.772,21 149.375,21
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 07/11/2022 12:16
Project acronym: CIRCE
Participant short name: FISABIO
Participant PIC: 951714046
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Project managers monthly 4.500,00 2,00 9.000,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 9.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 9.000,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 1,00 4.500,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Junior experts/advisors/researchers monthly 3.500,00 2,00 7.000,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 11.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 11.500,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 1,00 4.500,00
Junior experts/advisors/researchers monthly 3.500,00 1,00 3.500,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 8.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 8.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 2,00 9.000,00
Junior experts/advisors/researchers monthly 3.500,00 3,00 10.500,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 19.500,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 19.500,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 2,00 9.000,00
Junior experts/advisors/researchers monthly 3.500,00 4,00 14.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 23.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 23.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 10,00 45.000,00
Junior experts/advisors/researchers monthly 3.500,00 12,00 42.000,00
Technical personnel monthly 3.200,00 6,00 19.200,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 106.200,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 106.200,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 4.500,00 5,00 22.500,00
Junior experts/advisors/researchers monthly 3.500,00 2,00 7.000,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 29.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 29.500,00
Total personnel (all WPs) 206.700,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel 2.746,00
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
4 Consortium Meeting 3 + Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Total travel costs for this WP 6.400,00
Total accomodation costs for this WP 2.748,00
Total subsistence costs for this WP 1.836,00
Total travel for this WP 10.984,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
1 person participation in a meeting to
Travel costs 800,00 0,00 0,00 0,00 disseminate/communicate JA objectives, progress or
results
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
2 Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Participation of 1 additional person in the Final
Travel costs 800,00 0,00 0,00 0,00
Conference
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 1.600,00
Total accomodation costs for this WP 687,00
Total subsistence costs for this WP 459,00
Total travel for this WP 2.746,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 Focus group
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Task 4.2 Focus Group 1 person per BP
Travel costs 800,00 0,00 0,00 0,00
originator/adopterr
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 800,00
Total accomodation costs for this WP 343,50
Total subsistence costs for this WP 229,50
Total travel for this WP 1.373,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 Study Visit
Speakers
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
2 Secondments
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
1 person
Travel costs 800,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 1.946,00
Total travel costs for this WP 2.400,00
Total accomodation costs for this WP 1.374,00
Total subsistence costs for this WP 918,00
Total travel for this WP 4.692,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 Implementors meetings
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Intra Member travel
Travel costs 1.560,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.560,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 1.560,00
Total travel costs for this WP 1.560,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 1.560,00 0,00
Total travel costs (all WPs) 12.760,00
Total accomodation (all WPs) 5.152,50
Total subsistence (all WPs) 3.442,50
Total travel and subsistence (all WPs) 21.355,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP document Ref. Ares(2022)7858729 - 14/11/2022
Associated with
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) Associated with document
packages? YES/NO and which Ref. Ares(2022)7858729
goods/services - 14/11/2022
are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
7.3 Implementers meeting (organisational costs)
Conferences, seminars, workshops, trainings & events 5.000,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 5.000,00
Total goods, works and services (all WPs) 5.000,00
Total purchase costs (all WPs) 26.355,00
D. Other cost categories
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
233.055,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 16.313,85
Total indirect costs 16.313,85
TOTAL COSTS PARTICIPANT 249.368,85
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 249.368,85
Single Funding rate (%) 80%
Maximum EU contribution 199.495,08
Requested EU contribution 199.495,08
EU CONTRIBUTION 199.495,08
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Revenues
Income generated by the action
Amount Description of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 49.873,77
OWN RESOURCES 49.873,77
TOTAL INCOME PARTICIPANT 249.368,85
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: FISABIO
Participant PIC: 951714046
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 +
d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
9.000,00 0,00 0,00 10.984,00 6.400,00 2.748,00 1.836,00 0,00 0,00 0,00 19.984,00
COORDINATION
WP2 DISSEMINATION 11.500,00 0,00 0,00 2.746,00 1.600,00 687,00 459,00 0,00 0,00 0,00 14.246,00
WP3 EVALUATION 8.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 8.000,00
WP4 SUSTAINABILITY 19.500,00 0,00 0,00 1.373,00 800,00 343,50 229,50 0,00 0,00 0,00 20.873,00
WP5 METHODOLOGY FOR TRANSFERRING
23.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 23.000,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
106.200,00 0,00 0,00 4.692,00 2.400,00 1.374,00 918,00 0,00 0,00 0,00 110.892,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 29.500,00 0,00 0,00 1.560,00 1.560,00 0,00 0,00 0,00 5.000,00 0,00 36.060,00
TOTAL COSTS PARTICIPANT 206.700,00 0,00 0,00 21.355,00 12.760,00 5.152,50 3.442,50 0,00 5.000,00 0,00 16.313,85 249.368,85
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 15/02/2022 22:30
Project acronym: CIRCE
Participant short name: IDIVAL
Participant PIC: 946556944
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Project managers monthly 3.900,00 2,00 7.800,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 7.800,00
A.2 + A.3 Natural persons under direct contract and seconded persons
monthly 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 7.800,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Project managers monthly 3.900,00 0,50 1.950,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Technical personnel monthly 3.000,00 1,50 4.500,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 6.450,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 6.450,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Junior experts/advisors/researchers monthly 3.000,00 1,00 3.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 3.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 3.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Junior experts/advisors/researchers monthly 3.000,00 4,00 12.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 12.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 12.000,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Junior experts/advisors/researchers monthly 3.000,00 4,00 12.000,00
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 12.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 12.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Junior experts/advisors/researchers monthly 3.000,00 8,50 25.500,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 25.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 25.500,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Junior experts/advisors/researchers monthly 3.000,00 2,50 7.500,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 7.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 7.500,00
Total personnel (all WPs) 74.250,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
4 Consortium Meeting 3
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Participants
Travel costs 0,00 2,00 0,00
Accomodation costs 0,00 2,00 0,00
Subsistence costs 0,00 2,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Total travel costs for this WP 6.400,00
Total accomodation costs for this WP 2.748,00
Total subsistence costs for this WP 1.836,00
Total travel for this WP 10.984,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
1 person participation in a meeting to
Travel costs 0,00 800,00 1,00 800,00 disseminate/communicate JA objectives, progress or
results
Accomodation costs 0,00 343,50 1,00 343,50
Subsistence costs 0,00 229,50 1,00 229,50
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
2 F Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
1 additional person participationg in the Final Conference
Travel costs 0,00 800,00 1,00 800,00
Accomodation costs 0,00 343,50 1,00 343,50
Subsistence costs 0,00 229,50 1,00 229,50
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 1.600,00
Total accomodation costs for this WP 687,00
Total subsistence costs for this WP 459,00
Total travel for this WP 2.746,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 Focus Group
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Task 4.2 Focus Group 1 persn per BP originator/adopter
Travel costs 0,00 800,00 1,00 800,00
Accomodation costs 0,00 343,50 1,00 343,50
Subsistence costs 0,00 229,50 1,00 229,50
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 800,00
Total accomodation costs for this WP 343,50
Total subsistence costs for this WP 229,50
Total travel for this WP 1.373,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
STUDY VISIT
Speakers
Travel costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 800,00 2,00 1.600,00
Accomodation costs 0,00 343,50 2,00 687,00
Subsistence costs 0,00 229,50 2,00 459,00
Participants
Travel costs 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
2 Secondment
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 800,00 1,00 800,00
Accomodation costs 0,00 687,00 1,00 687,00
Subsistence costs 0,00 459,00 1,00 459,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 1.946,00
Total travel costs for this WP 2.400,00
Total accomodation costs for this WP 1.374,00
Total subsistence costs for this WP 918,00
Total travel for this WP 4.692,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
3 Intra Meber travel per pilot
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 520,00 3,00 1.560,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.560,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 1.560,00
Total travel costs for this WP 1.560,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 1.560,00 0,00
Total travel costs (all WPs) 12.760,00
Total accomodation (all WPs) 5.152,50
Total subsistence (all WPs) 3.442,50
Total travel and subsistence (all WPs) 21.355,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the Associated
Also partwith document
of other work Ref. Ares(2022)7858729 - 14/11/2022
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Implementors meeting
Conferences, seminars, workshops, trainings & events 5.000,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 5.000,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Total goods, works and services (all WPs) 5.000,00
Total purchase costs (all WPs) 26.355,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
YES/NO and which WP
[Support scheme short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
100.605,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 7.042,35
Total indirect costs 7.042,35
TOTAL COSTS PARTICIPANT 107.647,35
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 107.647,35
Single Funding rate (%) 80%
Maximum EU contribution 86.117,88
Requested EU contribution 86.117,88
EU CONTRIBUTION 86.117,88
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Associated with documentDescription
Ref. Ares(2022)7858729 - 14/11/2022
of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 21.529,47
OWN RESOURCES 21.529,47
TOTAL INCOME PARTICIPANT 107.647,35
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: IDIVAL
Participant PIC: 946556944
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 +
d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
7.800,00 0,00 0,00 10.984,00 6.400,00 2.748,00 1.836,00 0,00 0,00 0,00 18.784,00
COORDINATION
WP2 DISSEMINATION 6.450,00 0,00 0,00 2.746,00 1.600,00 687,00 459,00 0,00 0,00 0,00 9.196,00
WP3 EVALUATION 3.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3.000,00
WP4 SUSTAINABILITY 12.000,00 0,00 0,00 1.373,00 800,00 343,50 229,50 0,00 0,00 0,00 13.373,00
WP5 METHODOLOGY FOR TRANSFERRING
12.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 12.000,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
25.500,00 0,00 0,00 4.692,00 2.400,00 1.374,00 918,00 0,00 5.000,00 0,00 35.192,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 7.500,00 0,00 0,00 1.560,00 1.560,00 0,00 0,00 0,00 0,00 0,00 9.060,00
TOTAL COSTS PARTICIPANT 74.250,00 0,00 0,00 21.355,00 12.760,00 5.152,50 3.442,50 0,00 5.000,00 0,00 7.042,35 107.647,35
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 03/11/2022 8:55
Project acronym: CIRCE
Participant short name: SCS
Participant PIC: 991294023
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
monthly 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Technical personnel monthly 4.000,00 1,00 4.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 4.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 4.000,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Junior experts/advisors/researchers monthly 4.000,00 2,00 8.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 8.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 8.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 1,00 5.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 5.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 5.000,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 2,00 10.000,00
Select a staff category monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 10.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 10.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 19,50 97.500,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 97.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 97.500,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 4,50 22.500,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 22.500,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 22.500,00
Total personnel (all WPs) 147.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 2 DISSEMINATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Total travel costs (all WPs) 0,00
Total accomodation (all WPs) 0,00
Total subsistence (all WPs) 0,00
Total travel and subsistence (all WPs) 0,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the Associated
Also partwith document
of other work Ref. Ares(2022)7858729 - 14/11/2022
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Total goods, works and services (all WPs) 0,00
Total purchase costs (all WPs) 0,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
YES/NO and which WP
[Support scheme short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
147.000,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 10.290,00
Total indirect costs 10.290,00
TOTAL COSTS PARTICIPANT 157.290,00
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 157.290,00
Single Funding rate (%) 80%
Maximum EU contribution 125.832,00
Requested EU contribution 125.832,00
EU CONTRIBUTION 125.832,00
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Associated with documentDescription
Ref. Ares(2022)7858729 - 14/11/2022
of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 31.458,00
OWN RESOURCES 31.458,00
TOTAL INCOME PARTICIPANT 157.290,00
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: SCS
Participant PIC: 991294023
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 +
d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
COORDINATION
WP2 DISSEMINATION 4.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4.000,00
WP3 EVALUATION 8.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 8.000,00
WP4 SUSTAINABILITY 5.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.000,00
WP5 METHODOLOGY FOR TRANSFERRING
10.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 10.000,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
97.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 97.500,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 22.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 22.500,00
TOTAL COSTS PARTICIPANT 147.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 10.290,00 157.290,00
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 15/02/2022 22:37
Project acronym: CIRCE
Participant short name: SERMAS
Participant PIC: 999481987
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 2,00 10.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 10.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 10.000,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 1,00 5.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 5.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 5.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 4,00 20.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 20.000,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 20.000,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
Technical personnel monthly 5.000,00 4,00 20.000,00
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 20.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 20.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
Technical personnel monthly 5.000,00 14,00 70.000,00
monthly 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 70.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 70.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 5.000,00 4,00 20.000,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 20.000,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 20.000,00
WORK PACKAGE 8 NAME 8
A.1 Employees (or equivalent)
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 0,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 0,00
Total personnel (all WPs) 145.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 8 NAME 8
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
4 Consortium Meeting 3
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 3 EVALUATION
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 8 NAME 8
1 [Travel short name]
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 0,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 0,00
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
Total travel costs (all WPs) 0,00
Total accomodation (all WPs) 0,00
Total subsistence (all WPs) 0,00
Total travel and subsistence (all WPs) 0,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP document Ref. Ares(2022)7858729 - 14/11/2022
Associated with
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 8 NAME 8
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total equipment (all WPs) 0,00
C.3 Other goods, works and services
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 3 EVALUATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total goods, works and services for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
WORK PACKAGE 8 NAME 8
Costs Also part of other work Description of tasks/activities for which the
(actual costs) packages? YES/NO and which goods/services are needed; types of goods services
WP needed; how much
Consumables 0,00
Conferences, seminars, workshops, trainings & events 0,00
Information & publications 0,00
Other expenses
1 IPR costs 0,00
2 Bank fees (pre-financing guarantee) 0,00
3 Audit fees (CFS) 0,00
4 Project evaluation 0,00
[5 short name other] 0,00
[6 short name other] 0,00
Total goods, works and services for this WP 0,00
Total goods, works and services (all WPs) 0,00
Total purchase costs (all WPs) 0,00
D. Other cost categories
D.1. Financial support to third parties
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 3 EVALUATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
YES/NO and which WP
[Support scheme short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
WORK PACKAGE 8 NAME 8
Also used for other work
Costs Description of support scheme (estimated number of
Financial support to third parties packages?
recipients; maximum amount per recipient)
(actual costs)
YES/NO and which WP
[Support scheme short name] 0,00
[Support scheme short name] 0,00
0,00
Total other cost category D.1 for this WP 0,00
Total D.1 (all WPs) 0,00
Total other cost categories (all WPs) 0,00
E. Indirect costs
Costs (flat-rate)
Total estimated direct costs (on which indirect cost flat-rate is based,
145.000,00
see GA eligibility article)
ALL WORK PACKAGES Flat-rate (%) 7%
Total indirect costs 10.150,00
Total indirect costs 10.150,00
TOTAL COSTS PARTICIPANT 155.150,00
PROJECT INCOME
EU CONTRIBUTION (GRANT)
Amount
(EUR)
Total costs 155.150,00
Single Funding rate (%) 80%
Maximum EU contribution 124.120,00
Requested EU contribution 124.120,00
EU CONTRIBUTION 124.120,00
REVENUES AND CONTRIBUTIONS BY THIRD PARTIES
Revenues
Income generated by the action
Amount Associated with documentDescription
Ref. Ares(2022)7858729 - 14/11/2022
of the income (type of generated income and
(EUR) number of users, etc)
ALL WORK PACKAGES Estimated income generated by the action 0,00
Total income generated by the action 0,00
Revenues 0,00
In-kind contributions by third parties
In-kind contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose etc)
ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00
Total in-kind contributions 0,00
In-kind contributions 0,00
Financial contributions by third parties
Financial contributions by third parties
Amount Description of the contribution (type of contribution,
(EUR) donor, purpose, etc)
ALL WORK PACKAGES Estimated financial contributions by third parties 0,00
Total financial contributions 0,00
Financial contributions 0,00
TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00
OWN RESOURCES
Amount
(EUR)
Own resources 31.030,00
OWN RESOURCES 31.030,00
TOTAL INCOME PARTICIPANT 155.150,00
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Project number: 101082572
Project acronym: CIRCE
Participant short name: SERMAS
Participant PIC: 999481987
CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT)
COSTS PER WORK PACKAGE
A.1 Employees
C. Purchase costs D. Other cost categories
A.2 + A.3 Natural persons
B. Subcontracting E. Indirect costs
under direct contract and A.4 SME owners
costs
Total
seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to
C.1 Travel C.1 Accomodation C.1 Subsistence C.2 Equipment
subsistence work and services third parties
e = flat-rate * (a1 + a2 + a3 + a5 + b [+
a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 +
d2 + d3 + d4 + d5 + d6)
WP1 PROJECT MANAGEMENT AND
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
COORDINATION
WP2 DISSEMINATION 10.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 10.000,00
WP3 EVALUATION 5.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.000,00
WP4 SUSTAINABILITY 20.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 20.000,00
WP5 METHODOLOGY FOR TRANSFERRING
20.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 20.000,00
PROCESS
WP6 TRANSFERRING PROCESS & PILOT
70.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 70.000,00
IMPLEMENTATION
WP7 CAPACITY BUILDING 20.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 20.000,00
WP8 NAME 8 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
TOTAL COSTS PARTICIPANT 145.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 10.150,00 155.150,00
a
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
EU GRANTS DETAILED BUDGET TABLE (ACTION GRANTS)
Project number: 101082572 15/02/2022 22:40
Project acronym: CIRCE
Participant short name: FIIBAP
Participant PIC: 919231753
ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity)
ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR.
ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP.
ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically.
EU PROJECT BUDGET TABLE (PER PARTICIPANT)
PROJECT COSTS
A. Personnel costs
Costs (actual costs)
Time
Rate Total Also working for other work
(months/other of work on
Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities
the action)
(monthly/other) WP
a b c=a*b
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
A.1 Employees (or equivalent)
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Project managers monthly 5.000,00 2,00 10.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 10.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 10.000,00
WORK PACKAGE 2 DISSEMINATION
A.1 Employees (or equivalent)
Administrative personnel monthly 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Project managers monthly 5.000,00 1,00 5.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 5.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 5.000,00
WORK PACKAGE 3 EVALUATION
A.1 Employees (or equivalent)
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Project managers monthly 5.000,00 1,00 5.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 5.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 5.000,00
WORK PACKAGE 4 SUSTAINABILITY
A.1 Employees (or equivalent)
Select a staff category monthly 0,00 0,00 0,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
A.2 + A.3 Natural persons under direct contract and seconded persons
Project managers monthly 5.000,00 1,00 5.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 5.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 5.000,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
A.1 Employees (or equivalent)
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Project managers monthly 5.000,00 2,00 10.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 10.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 10.000,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
A.1 Employees (or equivalent)
monthly 0,00 0,00 0,00
monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Project managers monthly 5.000,00 14,00 70.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 70.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 70.000,00
WORK PACKAGE 7 CAPACITY BUILDING
A.1 Employees (or equivalent)
Senior experts/advisors/researchers monthly 0,00 0,00 0,00
Technical personnel monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total employees (or equivalent) 0,00
A.2 + A.3 Natural persons under direct contract and seconded persons
Senior experts/advisors/researchers monthly 5.000,00 3,00 15.000,00
Select a staff category monthly 0,00 0,00 0,00
Other
[category 1] monthly 0,00 0,00 0,00
[category 2] monthly 0,00 0,00 0,00
Total natural persons under direct contract and seconded persons 15.000,00
A.4 SME owners and natural person beneficiaries without salary
SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00
Total SME owners and natural person beneficiaries without salary 0,00
Total personnel for this WP 15.000,00
Total personnel (all WPs) 120.000,00
B. Subcontracting costs
Also used for other work
Costs
packages? Description of subcontracted project tasks/activities
(actual costs)
YES/NO and which WP
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 3 EVALUATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total subcontracting for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 [Subcontract short name] 0,00
2 [Subcontract short name] 0,00
Total subcontracting for this WP 0,00
Total subcontracting (all WPs) 0,00
C. Purchase costs
C.1 Travel and subsistence
Costs Description (e.g. international/not international; place of
Costs (unit cost) Also part of other work activity/destination; number of days; number of persons
(actual costs)
packages? (speakers, personnel and participants whose costs will be
Amount per Total YES/NO and which WP covered); transport means; average price per person;
Number of units
unit ( EUR) subsistence costs/daily allowances)
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
1 Kick of Meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
2 Consortium Meeting 1
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
3 Consortium Meeting 2
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
4 Consortium Meeting 3 + Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
Total travel costs for this WP 6.400,00
Total accomodation costs for this WP 2.748,00
Total subsistence costs for this WP 1.836,00
Total travel for this WP 10.984,00 0,00
WORK PACKAGE 2 DISSEMINATION
1 Dissemination meeting
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
1 person participation in a meeting to
Travel costs 800,00 0,00 0,00 0,00 disseminate/communicate JA objectives, progress or
results
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
2 Final Conference
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Participation of 1 additional person in the Final
Travel costs 800,00 0,00 0,00 0,00
Conference
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 1.600,00
Total accomodation costs for this WP 687,00
Total subsistence costs for this WP 459,00
Total travel for this WP 2.746,00 0,00
WORK PACKAGE 3 EVALUATION
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 4 SUSTAINABILITY
1 Focus group
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Task 4.2 Focus Group 1 person per BP originator/adopter
Travel costs 800,00 0,00 0,00 0,00
Accomodation costs 343,50 0,00 0,00 0,00
Subsistence costs 229,50 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 343,50
Total subsistence costs for this travel 229,50
Total travel 1.373,00
Total travel costs for this WP 800,00
Total accomodation costs for this WP 343,50
Total subsistence costs for this WP 229,50
Total travel for this WP 1.373,00 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
Total travel costs for this WP 0,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 0,00 0,00
WORK PACKAGE 6 TRANSFERRING PROCESS & PILOT IMPLEMENTATION
1 Study Visit
Speakers
Travel costs 0,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
2 persons
Travel costs 1.600,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.600,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 2.746,00
2 Secondments
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
1 person
Travel costs 800,00 0,00 0,00 0,00
Accomodation costs 687,00 0,00 0,00 0,00
Subsistence costs 459,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 800,00
Total accomodation costs for this travel 687,00
Total subsistence costs for this travel 459,00
Total travel 1.946,00
Total travel costs for this WP 2.400,00
Total accomodation costs for this WP 1.374,00
Total subsistence costs for this WP 918,00
Total travel for this WP 4.692,00 0,00
WORK PACKAGE 7 CAPACITY BUILDING
1 Implementors meetings
Speakers
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Personnel
Intra Member travel
Travel costs 1.560,00 0,00 0,00 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Participants
Travel costs 0,00 0,00 0,00 0,00
Accomodation costs 0,00 0,00 0,00 0,00
Subsistence costs 0,00 0,00 0,00 0,00
Total travel costs for this travel 1.560,00
Total accomodation costs for this travel 0,00
Total subsistence costs for this travel 0,00
Total travel 1.560,00
Total travel costs for this WP 1.560,00
Total accomodation costs for this WP 0,00
Total subsistence costs for this WP 0,00
Total travel for this WP 1.560,00 0,00
Total travel costs (all WPs) 12.760,00
Total accomodation (all WPs) 5.152,50
Total subsistence (all WPs) 3.442,50
Total travel and subsistence (all WPs) 21.355,00
C.2 Equipment
WORK PACKAGE 1 PROJECT MANAGEMENT AND COORDINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 2 DISSEMINATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the Associated
Also partwith document
of other work Ref. Ares(2022)7858729 - 14/11/2022
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 3 EVALUATION
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 4 SUSTAINABILITY
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
Associated with document Ref. Ares(2022)7858729 - 14/11/2022
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work
Total Description of tasks/activities for which the equipment is
Monthly rent/fee Number of months of use for the action less if used also packages? YES/NO and which
(EUR) needed
for other WP
purposes)
a b c d= a*b*c
1 [Equipment short name] 0,00 0,00 0% 0,00
2 [Equipment short name] 0,00 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total rental and leasing 0,00
Total equipment for this WP 0,00
WORK PACKAGE 5 METHODOLOGY FOR TRANSFERRING PROCESS
C.2.1 Purchase (depreciation/full cost)
Costs (actual costs)
Depreciation Rate of use for the
Also part of other work
method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is
Price packages? YES/NO and which
36 month or allocated to the action less if used also (EUR) needed
WP
60 month) for other
a b c d e =(c/b *d) * a
1 [Equipment short name] 0,00 0 0,00 0% 0,00
2 [Equipment short name] 0,00 0 0,00 0% 0,00
ATTENTION! Can be used only if full cost option in the grant
3 [Equipment short name] 0,00 0,00
agreement
Total depreciation 0,00
C.2.2 Rental and leasing (rate of use/full cost)
Costs (actual costs)
Rate of use for the
action (100% or Also part of other work