Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border (No. RBR 2018/28)
Design Priority Section 1
Public Road 19271 Design
June, 2020
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
Design and design supervision services for the
construction of the new line Pärnu –
Estonian/Latvia border
Design Priority Section 1
Public Road 19271 Design
[Design Phase-Submission]
Document Submittal History:
Rev.: Date: Doc Status: Prepared Checked Approved Accepted
001 10/06/2020 Released GP MS
The sole responsibility of this publication lies with the author.
The European Union is not responsible for any use that may be made of the information contained therein.
June 2020
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
CONTENTS
1 EXECUTIVE SUMMARY ......................................................................................................... 5
1.1 Format of activity description including any abbreviations used ...................................... 5
2 INTRODUCTION.................................................................................................................... 5
3 STARTING POINT .................................................................................................................. 5
3.1 Tender documents ........................................................................................................... 5
3.2 Previous Designs .............................................................................................................. 6
3.2.1 Preliminary option ................................................................................................... 6
3.2.2 CPTD option ............................................................................................................. 6
3.3 Standards ......................................................................................................................... 7
3.3.1 Alignment ................................................................................................................. 7
3.3.2 Cross section ............................................................................................................ 7
3.3.3 Traffic ....................................................................................................................... 7
4 ALTERNATIVE PROPOSALS.................................................................................................... 8
4.1 Option 1 ........................................................................................................................... 8
4.1.1 Description ............................................................................................................... 8
4.1.2 Stopping distance..................................................................................................... 9
4.2 Option 2 ......................................................................................................................... 10
4.2.1 Description ............................................................................................................. 10
4.2.2 Stopping distance................................................................................................... 10
CONTENTS
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
INDEX OF TABLES
Table 3-1. Daily traffic intensities in 19271 road. .................................................................................... 7
Table 4-1. Stopping distance analysis in 19271 road option 1 (outwards). ............................................. 9
Table 4-2. Stopping distance analysis in 19271 road option 1 (return). .................................................. 9
Table 4-3. Stopping distance analysis in 19271 road option 2 (outwards). ........................................... 11
Table 4-4. Stopping distance analysis in 19271 road option 2 (return). ................................................ 11
CONTENTS
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
1 Executive Summary
1.1 Format of activity description including any abbreviations
used
PTD Preliminary Technical Design
RB Rail Baltica
TS Technical Specification
2 Introduction
The main objective of this report is to describe the different solutions of design for the
maintenance of Public Road 19271 Tootsi-Piistaoja in the Design Priority Section 1 of the new
Line Pärnu-Estonian/Latvia border of RAIL BALTICA.
3 Starting point
3.1 Tender documents
In the context of the elaboration of the present report the following documents have been taken
into consideration:
CPTD EE003: Sections 1, 2, 3 and 4 (up to km 15+000) of preliminary design (Pärnu-
Estonian/Latvia border).
Preliminary Design of the railway and railway related construction works for the RAIL BALTICA
1,435 mm gauge line Häädemeeste municipality Pärnu county. Design section 4.
5
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
3.2 Previous Designs
3.2.1 Preliminary option
The Preliminary Design of the railway and railway related construction works for the RAIL
BALTICA defines the new Line Pärnu- Estonian/Latvia border in many documents both reports
and blueprints. On the other hand, road construction works for the maintenance of Public
Roads are defined in an independent TS.
In document ““01-Annexes of Technical Specification- Annex no. 3.4” the following blueprints
for section 4 (0+00 to 27+00) stand out:
Drawings “RB-EP-04-RD-2AP-xx” with plan definition of roads
Drawings “RB-EP-04-RD-3PP-xx” with profile definition of roads
Drawings “RB-EP-04-RD-3PP-xx” with definition of roads pavements
In the document mentioned above there are a previous design for the overpass of Public Road
19271 Tootsi-Piistaoja, that considers a roadway structure named as 04-BR05. This structure
will be renamed as BR-2205 in Design Priority Section 1.
3.2.2 CPTD option
The Consolidated Preliminary Techical Design (CPTD), dated in october 2018, defines several
alignment adjustments in order to improve some of the technical standards of the main track
or to allow a better placement for other elements (road crossings, station tracks, culverts, etc.).
The adjustments of CPTD option are defined in document “01 Annexes of Technical
Specification – Annex no. 2.1”. More concretely, in document “CPTD report EE03 Pärnu-
EELV_20181029” there is a table with comments about changes to be made to meet the
requirements of CPTD option. As a main conclusion, the CPTD document proposes a new
location for overpass structure BR05 with an alignment that should cross the new railway
infrastructure at 90-degree angle.
6
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
3.3 Standards
3.3.1 Alignment
The plan alignments for road 19271 will be designed according to “Tee projekteerimise
normed”, published in MTM 05.08.2015.a. määrus nr 106. More specifically, the main plan
and profile requirements in roads are described in section 2.4 of the Annex of this document.
This section also includes general criteria for the stopping distance calculations. Furthermore,
in section 2.3 includes general criteria for cross sections in roads, according to the class
assigned to them.
3.3.2 Cross section
On the other hand, attending to PTD document, it is considered a class IV for road 19271, with
a pavement named as type P-I (8 cm of bituminous mixture, 20 cm of gravel base and 20 cm
of drainage layer with a geotextile between them). The road width considered is variable from
8 to 9 meters, that sums up to a maximum width of 12,4m with the considered shoulders. With
an optional pedestrian road in north side for the access to platform and parking lots in the
future Tootsi station the maximum width would be 14,3m. A speed of 60 km/h has been
considered for this road in the proposals analyzed in this document.
At last, it is consider a vehicle parapet of level H2 of Containment in both borders of the traffic
lanes along the structure. In outer edges of the structure an overhead catenary system
protection (OCS) will be foreseen.
3.3.3 Traffic
In PTD document is included a table with daily traffic intensities, with growth forecast up to the
year 2045, as shown in table below.
Table 3-1. Daily traffic intensities in 19271 road.
Station in Daily traffic intensities
Road Section DPS-4 2015 2025 2035 2045
19271 Tootsi-Piistaoja ~km 2,6 (11+602) 363 410 436 443
7
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
4 Alternative proposals
This section includes the description corresponding to the different solutions for the
maintenance of road 19271 Tootsi-Piistaoja in the section where it crosses with the future RAIL
BALTICA infraestructure.
The solutions are as follows:
Option 1: As shown in Preliminary with some adjustments in order to meet the
requirements described in section 3.3
Option 2: Solution that considers a different solution in the overpass structure
4.1 Option 1
4.1.1 Description
In this option is defined a road alignment similar to that one designed in PTD, with some
adjustments:
- Spiral curves for transition to horizontal curves are included. There is one horizontal
curve with a radius of 200 m in the west section of the road. Transition curves of 40 m
are provided for this curve.
- The vertical alignment has been designed in order to provide a constant gradient in the
overpass BR-2205. The maximum gradient is 6% and the minimum gradient is 0,5%.
This solution provides an overpass with a 58-degree angle with the railway alignment.
On the other hand, in the crossroad with road 19270 Suigu-Tootsi is foreseen a central waiting
line with a length of 75 m and a width of 3m, with transition edges of 45 and 60 m. This new
crossroad will be located in a section where the road 19271 has a profile adjusted to the
existing terrain.
8
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
4.1.2 Stopping distance
In the tables below is analyzed the stopping distance of option 1 according to requirements of
standard “Tee projekteerimise normed” described in section 3.3 of this report. It has been
verified that a stopping distance of 80 m is met (recommended for 60 km/h in flat profile that
will be adjusted in every point of gradient).
Table 4-1. Stopping distance analysis in 19271 road option 1 (outwards).
Start End Average Stopping Distance Distance
fl
Station Station Gradient required (m) available
0+000 0+020 0,303 1,00% 78,62 ok
0+020 0+120 0,303 3,59% 75,23 ok
0+120 0+195 0,303 6,00% 72,38 ok
0+195 0+280 0,303 2,87% 76,20 ok
0+280 0+405 0,303 -0,50% 80,90 ok
0+405 0+490 0,303 -3,28% 85,96 ok
0+490 0+560 0,303 -6,00% 91,66 ok
0+560 0+670 0,303 -3,34% 86,10 ok
0+670 0+689 0,303 -0,50% 80,90 ok
Table 4-2. Stopping distance analysis in 19271 road option 1 (return).
Start End Stopping Distance Distance
fl Average Gradient
Station Station required (m) available
0+689 0+669 0,303 0,50% 79,35 ok
0+669 0+564 0,303 3,25% 75,67 ok
0+564 0+489 0,303 6,00% 72,38 ok
0+489 0+404 0,303 3,25% 75,67 ok
0+404 0+279 0,303 0,50% 79,35 ok
0+279 0+199 0,303 -2,72% 84,94 ok
0+199 0+119 0,303 -6,00% 91,66 ok
0+119 0+019 0,303 -3,56% 86,50 ok
0+019 0+000 0,303 -1,00% 81,71 ok
9
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
4.2 Option 2
4.2.1 Description
This option provides a different design for overpass BR-2205, with a straight alignment that
defines a less value of deviation angle respect to rail track. This requirement forces to use a
curve in the east section of the road and two curves in the west section. The alignments
designed are the described below:
- Horizontal alignment:
o Two curves in west section of the road: One curve with a radius of 170 m and
transition curves of 46 m and another curve with a radius of 300 m and transition
curves of 26 m.
o A horizontal curve with a radius of 600 m in the east section of the road, with
transition curves of 15 m.
- The vertical alignment has been designed as in option 1 in order to provide a constant
gradient in the overpass BR-2205. The maximum gradient is 6% and the minimum
gradient is 0,5%.
The solution provides an overpass with a 66-degree angle with the railway alignment.
As considered for option 1 in the crossroad with road 19270 Suigu-Tootsi is foreseen a central
waiting line with a length of 75 m, with transition edges of 45 and 60 m. This new crossroad
will be located in a section where the road 19271 has a profile adjusted to the existing terrain
4.2.2 Stopping distance
As in section 4.1.2, the stopping distance of option 2 is analysed in the tables below, according
to requirements of standard “Tee projekteerimise normed” described in section 3.3 of this
report. In this option (as in option 1) has been verified that a stopping distance of 80 m is met
(recommended for 60 km/h in flat profile that will be adjusted in every point of gradient).
10
Design and design supervision services for the construction of the
new line Pärnu – Estonian/Latvia border
Table 4-3. Stopping distance analysis in 19271 road option 2 (outwards).
Start End Average Stopping Distance Distance
fl
Station Station Gradient required (m) available
0+000 0+050 0,303 1,00% 78,62 ok
0+050 0+160 0,303 3,43% 75,44 ok
0+160 0+230 0,303 6,00% 72,38 ok
0+230 0+315 0,303 2,62% 76,53 ok
0+315 0+435 0,303 -0,50% 80,90 ok
0+435 0+520 0,303 -3,23% 85,89 ok
0+520 0+585 0,303 -6,00% 91,66 ok
0+585 0+715 0,303 -3,19% 85,81 ok
Table 4-4. Stopping distance analysis in 19271 road option 2 (return).
Start End Stopping Distance Distance
fl Average Gradient
Station Station required (m) available
0+720 0+585 0,303 3,09% 75,88 ok
0+585 0+520 0,303 6,00% 72,38 ok
0+520 0+435 0,303 3,23% 75,70 ok
0+435 0+315 0,303 0,50% 79,35 ok
0+315 0+230 0,303 -2,62% 84,77 ok
0+230 0+160 0,303 -6,00% 91,66 ok
0+160 0+050 0,303 -3,43% 86,23 ok
0+050 0+000 0,303 -1,00% 81,71 ok
11
1 2 3 4 5 6 7 8
A 19271 A
DO NOT SCALE FROM THIS DRAWING
Tootsi-Piistaoja
Design Priority Section 1
Road
N
km DPS1/0+000
Tootsi
Station
B B
Design Priority Section 1 km DPS1/36+656
Design Priority Section 2 km DPS2/0+000
19270
Suigu-Tootsi
Road
C C
Kilksama
Station
Pärnu
Freight Pärnu International
D Station Station D
E E
REVISIONS PROJECT CONTRACT NO. 1.19/EE-EE-1 CLIENT CONSULTANT DATE SCALE PAPER SIZE DRAWING TITLE
No Date Description Originator Checker Approver
RB Rail AS
001 12/06/2020 Issue 1 xxxx xxxx xxxx K. Valdemāra iela 8
Association OBERMEYER
PLANEN + BERATEN GmbH
12/06/2020 1:100,000 A3 Design Priority Section 1 Map
and PROINTEC S.A. DRAWING STATUS
Riga, Latvia
LV-1010 Hanstrs. 40, postcode 80686, S4 Road 19271 Location
Reg.No. 40103845025 Munchen, Germany
NAME SIGNATURE DATE
Reg.No. PROJECT CODE DISCIPLINE CODE
ORIGINATOR G. Peña 12/06/2020
Design and Design Supervision Services SUB-CONTRACTOR
CHECKER xxxx 12/06/2020 PROJECT SECTION SUB-SECTION VOLUME/
ZONE LOCATION RBR CODE LOCAL CODE
PROJECT
F for the construction of the new line REVIEWER xxxx 12/06/2020
ID ID ID SYSTEM STAGE
F
RBDTD-EE DS3 DPS1 ZZZZZZ ZZ ZZZZ ---- TR VE
APPROVER xxxx 12/06/2020
Co-financed by the Connecting Europe
from Pärnu to Estonian - Latvian Border SHEET NUMBER: REVISION
RBDTD-EE-DS3-DPS1_OBR_ZZZZZZ-ZZ_ZZZZ_--_-----_VE_00002
Facility of the European Union 001
ARCHIVE NO. SHEET NAME:
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Roa
d 19 9271
271 Road 1
B B
Roa N
d 19
270
C C
Wing Wall 2
Wing Wall 1
Pier 4
Pier 5
Pier 2
Pier 3
Pier 1
D D
E E
REVISIONS PROJECT CONTRACT NO. 1.19/EE-EE-1 CLIENT CONSULTANT DATE SCALE PAPER SIZE DRAWING TITLE
No Date Description Originator Checker Approver
RB Rail AS
001 12/06/2020 Issue 1 xxxx xxxx xxxx K. Valdemāra iela 8
Association OBERMEYER
PLANEN + BERATEN GmbH
12/06/2020 1:1,000 A1 Road 19271
and PROINTEC S.A. DRAWING STATUS
Riga, Latvia
LV-1010 Hanstrs. 40, postcode 80686, S4 Plan and Profile Alignment Option 1
Reg.No. 40103845025 Munchen, Germany
NAME SIGNATURE DATE
Reg.No. PROJECT CODE DISCIPLINE CODE
ORIGINATOR G. Peña 12/06/2020
Design and Design Supervision Services SUB-CONTRACTOR
CHECKER xxxx 12/06/2020 PROJECT SECTION SUB-SECTION VOLUME/
ZONE LOCATION RBR CODE LOCAL CODE
PROJECT
F for the construction of the new line REVIEWER xxxx 12/06/2020
ID ID ID SYSTEM STAGE
F
RBDTD-EE DS3 DPS1 ZZZZZZ ZZ ZZZZ ---- TR VE
APPROVER xxxx 12/06/2020
Co-financed by the Connecting Europe
from Pärnu to Estonian - Latvian Border SHEET NUMBER: REVISION
RBDTD-EE-DS3-DPS1_OBR_ZZZZZZ-ZZ_ZZZZ_--_-----_VE_00002
Facility of the European Union 001
ARCHIVE NO. SHEET NAME:
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Roa 9271
d 19 Road 1
2 71
B B
Ro
ad N
19
27
0
C C
Wing Wall 2
Wing Wall 1
Pier 4
Pier 5
Pier 2
Pier 3
Pier 1
D D
E E
REVISIONS PROJECT CONTRACT NO. 1.19/EE-EE-1 CLIENT CONSULTANT DATE SCALE PAPER SIZE DRAWING TITLE
No Date Description Originator Checker Approver
RB Rail AS
001 12/06/2020 Issue 1 xxxx xxxx xxxx K. Valdemāra iela 8
Association OBERMEYER
PLANEN + BERATEN GmbH
12/06/2020 1:1,000 A1 Road 19271
and PROINTEC S.A. DRAWING STATUS
Riga, Latvia
LV-1010 Hanstrs. 40, postcode 80686, S4 Plan and Profile Alignment Option 2
Reg.No. 40103845025 Munchen, Germany
NAME SIGNATURE DATE
Reg.No. PROJECT CODE DISCIPLINE CODE
ORIGINATOR G. Peña 12/06/2020
Design and Design Supervision Services SUB-CONTRACTOR
CHECKER xxxx 12/06/2020 PROJECT SECTION SUB-SECTION VOLUME/
ZONE LOCATION RBR CODE LOCAL CODE
PROJECT
F for the construction of the new line REVIEWER xxxx 12/06/2020
ID ID ID SYSTEM STAGE
F
RBDTD-EE DS3 DPS1 ZZZZZZ ZZ ZZZZ ---- TR VE
APPROVER xxxx 12/06/2020
Co-financed by the Connecting Europe
from Pärnu to Estonian - Latvian Border SHEET NUMBER: REVISION
RBDTD-EE-DS3-DPS1_OBR_ZZZZZZ-ZZ_ZZZZ_--_-----_VE_00002
Facility of the European Union 001
ARCHIVE NO. SHEET NAME:
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
DO NOT SCALE FROM THIS DRAWING
Cross section in enbankment with waiting line (crossroad with Road 19270)
B B
Cross section in enbankment
C C
Cross section in enbankment with guardrail (optional pedestrian road)
Roadway
D D
Cross section in overpass
Pedestrian Road Roadway
E E
REVISIONS PROJECT CONTRACT NO. 1.19/EE-EE-1 CLIENT CONSULTANT DATE SCALE PAPER SIZE DRAWING TITLE
No Date Description Originator Checker Approver
RB Rail AS
001 12/06/2020 Issue 1 xxxx xxxx xxxx K. Valdemāra iela 8
Association OBERMEYER
PLANEN + BERATEN GmbH
12/06/2020 1:100 A3 Road 19271
and PROINTEC S.A. DRAWING STATUS
Riga, Latvia
LV-1010 Hanstrs. 40, postcode 80686, S4 Cross Sections
Reg.No. 40103845025 Munchen, Germany
NAME SIGNATURE DATE
Reg.No. PROJECT CODE DISCIPLINE CODE
ORIGINATOR G. Peña 12/06/2020
Design and Design Supervision Services SUB-CONTRACTOR
CHECKER xxxx 12/06/2020 PROJECT SECTION SUB-SECTION VOLUME/
ZONE LOCATION RBR CODE LOCAL CODE
PROJECT
F for the construction of the new line REVIEWER xxxx 12/06/2020
ID ID ID SYSTEM STAGE
F
RBDTD-EE DS3 DPS1 ZZZZZZ ZZ ZZZZ ---- TR VE
APPROVER xxxx 12/06/2020
Co-financed by the Connecting Europe
from Pärnu to Estonian - Latvian Border SHEET NUMBER: REVISION
RBDTD-EE-DS3-DPS1_OBR_ZZZZZZ-ZZ_ZZZZ_--_-----_VE_00002
Facility of the European Union 001
ARCHIVE NO. SHEET NAME:
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
x=5 x=5
473 720 4
A A
DO NOT SCALE FROM THIS DRAWING
00 0
y=6
y=6
y=6
y=6
y=6
492
4
4
4
4
921
920
919
918
200
00
00
00
00
351
70
x=5
471
00
x=5
473
00
B B
Tori vald
Vändra vald
684
158
y=6
422 162
C C
492
300
x=5
158
470
351 00
684
30
351
x=5 50
472
00
163 351 351
les
ent eho 50 70
gnm Bor
Ali
S1 351
DP
30
158
Tootsi vald
y=6
D D
491
351
800
50
351 351
50 70
158
x=5
469
00
351
50
x=5
471
00
E E
351
70
y=6
y=6
y=6
y=6
y=6
492
492
492
492
491
300
200
100
000
900
x=5 x=5
470 469
00 00
REVISIONS PROJECT CONTRACT NO. 1.19/EE-EE-1 CLIENT CONSULTANT DATE SCALE PAPER SIZE DRAWING TITLE
No Date Description Originator Checker Approver
RB Rail AS
001 12/06/2020 Issue 1 xxxx xxxx xxxx K. Valdemāra iela 8
Association OBERMEYER
PLANEN + BERATEN GmbH
12/06/2020 1:1.500 A3 Road 19270 Suigu-Tootsi Road
and PROINTEC S.A. DRAWING STATUS
Riga, Latvia
LV-1010 Hanstrs. 40, postcode 80686, S4 Boreholes
Reg.No. 40103845025 Munchen, Germany
NAME SIGNATURE DATE
Reg.No. PROJECT CODE DISCIPLINE CODE
ORIGINATOR G. Peña 12/06/2020
SUB-CONTRACTOR
Design and Design Supervision Services CHECKER xxxx 12/06/2020 PROJECT SECTION SUB-SECTION VOLUME/
ZONE LOCATION RBR CODE LOCAL CODE
PROJECT
F for the construction of the new line REVIEWER xxxx 12/06/2020
ID ID ID SYSTEM STAGE
F
RBDTD-EE DS3 DPS1 ZZZZZZ ZZ ZZZZ ---- TR VE
APPROVER xxxx 12/06/2020
Co-financed by the Connecting Europe
from Pärnu to Estonian - Latvian Border SHEET NUMBER: REVISION
RBDTD-EE-DS3-DPS1_OBR_ZZZZZZ-ZZ_ZZZZ_--_-----_VE_00002
Facility of the European Union 001
ARCHIVE NO. SHEET NAME:
1 2 3 4 5 6 7 8
Saatja: Margus Viiklepp <
[email protected]>
Saadetud: 28.07.2020 08:29
Adressaat: Liivika Sarapu <
[email protected]>
Teema: FW: Tehniliste tingimuste taotlus kõrvalmaantee Tootsi-Piistaoja nr. 19271 ja
kõrvalmaantee Suigu-Tootsi nr 19270
Manused: image001.jpg; Road 19271 in PS1 Report.pdf
Tere
Saadan registreerimiseks.
Margus
From: Janis Erilaid [mailto:
[email protected]]
Sent: Thursday, July 16, 2020 5:10 PM
To: Margus Viiklepp <
[email protected]>
Subject: Tehniliste tingimuste taotlus kõrvalmaantee Tootsi-Piistaoja nr. 19271 ja kõrvalmaantee Suigu-
Tootsi nr 19270
Tere!
Palun väljastada projekteerimistingimused Rail Baltica raudtee ristumisele kõrvalmaanteega nr 19271
Tootsi-Piistaoja. Ristumise ulatus on 1,6 km-2,3 km ja maantee läheb üle raudtee.
Samad tehnilised tingimused peaksid laienema ka vast kõrvalmaanteele nr 19270 Suigu-Tootsi kuna
ristumine on täpselt kahe kõrvalmaantee ristumisel.
Tervitades
Janis Erilaid
Interface Manager