PROPOSED IHO WORK PROGRAMME AND BUDGET FOR 2016

Veeteede Amet · 5. oktoober 2015
Viit
1-3.-9./15/3160
Registreeritud
5. oktoober 2015
Dokumendi liik
Sissetulev kiri
Adressaat
IHO
Saabumis/saatmisviis
e-mail
Funktsioon
1-3. Avalikkussuhted (2003-2016)
Sari
1-3.-9. Kirjavahetus Rahvusvahelise hüdrograafia (IHO) kohta
Toimik
1-3.-9./15
Vastutaja
Taivo Kivimäe (HNT juhtkond)
Lahendamise tähtaeg
28. november 2015

Failid

  • 📎CL74.pdf691 KB

Sisu (failidest)

THIS CIRCULAR LETTER REQUIRES YOU TO VOTE IHB File N° S1/1001/WP-FO/592/16 CIRCULAR LETTER 74/2015 1 October 2015 PROPOSED IHO WORK PROGRAMME AND BUDGET FOR 2016 References: A. IHO Financial Regulations, Article 8 (b) B. IHO Resolution 12/2002 as amended - Planning Cycle C. IHO Resolution 1/2014 - Guiding Principles for IHO Funds D. XVIIIth International Hydrographic Conference - Decision 18 - Approval of the 5-Year Work Plan E. XVIIIth International Hydrographic Conference - Decision 21 - Approval of IHO 5-Year Budget 2013-2017 F. IHO FCCL 02/2015 dated 4 August - Proposed IHO Work Programme and Budget for 2016 G. 5th Extraordinary International Hydrographic Conference - Decision 2.6 - Technical Capacity of the International Hydrographic Bureau H. Staff Regulations - Article II.2.1(b) - Composition of the Staff I. IHO Publication P-7 - IHO Annual Report 2014 - Part 2 - Finances, paragraphs 1 to 17 Dear Hydrographer, 1. Following the guidance in References A, B and C, the Directing Committee has formulated the proposed Budget for 2016. This is based on the proposed Work Programme for 2016, which, in turn, is guided by the IHO five-year Work Plan and Budget approved by the XVIIIth International Hydrographic Conference (References D and E). It also takes into account the progressive adjustments that are approved annually by the Member States when each year’s Work Programme and Budget are approved. 2. In accordance with Reference B, the draft Budget was provided to the Members of the Finance Committee in August for their review and comments (see Reference F). Three Member States (Australia, France and Tunisia) approved the draft Budget. The USA provided substantive comments requiring additional information. These comments related mainly to the identification of certain supporting references and an inference by the USA that a significant cash balance was available in the accounts for redistribution to Member States. The Directing Committee has provided the USA with clarifying information, in particular to show that a significant cash balance is not available for redistribution. 3. This Circular Letter now invites Member States to consider and approve: a. the proposed Budget for 2016 as shown in Annex A, and b. the associated Work Programme as shown in Annex B. 4. In addition to the proposed figures for 2016, the Budget tabled at Annex A shows the figures previously approved in the IHO five-year Budget. In addition, comparison figures indicating the difference between the approved Budget for 2015 and that proposed for 2016 is provided. Where there are differences between the 2015 and the 2016 Budget, supporting comments have been provided. 5. Member States should take particular note of the following remarks in relation to the proposed Budget for 2016: Share Value 5.1. The share value for membership contributions that was forecast to increase by 1% (39.84€ per share) in the approved five-year Budget 2013-2017 has been incorporated. The proposed share value for 2016 is 4 024.32€. This will be the first increase in the share value since 2005. 5.2. The Budget being proposed for 2016 takes into account a net increase of shares compared to the number of shares forecast in the five-year Budget (737 shares rather than the forecast of 694 shares) and an increase in shares compared to 2015 (there were 715 shares in 2015). This is due to changes in declared tonnages, and the addition of three new Member States not forecast in the five-year Budget. The forecast contribution income for 2016 is 2,965,924€. This is 173,043€ more than the figure approved in the five-year Budget forecast and 117,021€ more than the approved Budget for 2015. 5.3. Taking into account all forms of income, the total forecast income for 2016 is 3,206,924€. This is 182,467€ (6%) more than the figure forecast in the five-year Budget. Travel 5.4. The overseas travel component of the Budget has been maintained at the same level as 2015. This has been achieved by the Directing Committee continuing its policy of not attending all intergovernmental and other international meetings in which the IHB has participated in the past. In some cases, the Member States where international meetings are taking place will be asked to represent the IHO. In addition, some savings are anticipated from proposed changes to the Staff Regulations that more closely align IHB travel reimbursement rules with the UN Common System. Medical Cover for Staff and Retirees 5.5. The costs associated with medical cover for Staff and retirees are an estimate based on the latest figures for 2015. Contributions to Retirement Plans 5.6. 30k€ has been included in the total value of the Chapter on personnel costs in anticipation of proposed changes to the Staff Regulations that will more closely align the pension rights of Locally Recruited IHB staff with the Monaco Civil Service and will also include all salary components in the pensionable salary. This will result in an increase in the employer contribution paid by the IHO through the Chapter on personnel costs, as well as an increase in the personal contribution made by the relevant Members of Staff. Provision for a Technical Standards Support Officer 5.7. The Chapter on personnel costs includes 80k€ to enable the recruitment on a permanent basis of a Technical Standards Support Officer. 80k€ represents the total cost (salary, allowances, 2 medical cover, and pension) for this position. The establishment of this position has been consistently supported by the Hydrographic Services and Standards Committee (HSSC) and acknowledged by Member States at the 5th Extraordinary International Hydrographic Conference in October 2014 (see Reference G). In accordance with Reference H, and as part of the submission of the Budget for 2016, the Directing Committee is seeking Member States’ approval to establish this urgently required position. IHO Funds 5.8. Internal Retirement Fund (IRF). As indicated in paragraphs 13 to 17 of the Finance Report for 2014 (see Reference I), the Directing Committee has realized that the IHO has provided a long-standing option for some Locally Recruited Staff to choose a pension from their commercial personalized retirement plan contract or, in the case that the pension from the personalized retirement plan is worth less than the value of a similar pension under the Monaco Caisse autonome des retraites (CAR) system at the time of retirement, they may opt to allocate the capital in their personalized retirement plan to the IHO and draw a pension at the CAR rate from the IHO instead. In the current era of extremely low investment rates, this has placed an increased financial liability on the IHO since it is, in effect, underwriting any failure of the commercially-based personalized retirement plans. Accordingly, a provision of 65k€ is being proposed for the IRF to increase the capital required in the Fund to meet its potential liabilities. This figure also anticipates consequential changes to the Staff Regulations that aim to ensure that the retirement plans of Locally Recruited Staff are not inferior to those of the Monaco Civil Service by underwriting the pensions of all relevant Locally Recruited Staff in addition to those currently affected. 5.9. Renovation and Enhancement Fund, and Relocation Fund. The assets in the Renovation and Enhancement Fund, and the Relocation Fund are sufficient to meet all anticipated requirements. Accordingly, the Directing Committee considers that there is no requirement to allocate additional monies to either of these Funds in 2016. 5.10. Conference Fund. The Directing Committee proposes to allocate the sum of 20k€ to the Conference Fund, as forecast in the approved five-year Budget, in accordance with the schedule of conferences. 5.11. ABLOS Fund. The ABLOS Fund supports the biennial ABLOS Conference. It is maintained directly from the attendance fees levied for ABLOS Conferences. No allocation from the IHO Budget was forecast in the five-year Budget and none is required in 2016. 5.12. Capacity Building Fund. Expenditure from the Capacity Building Fund will be in accordance with the Capacity Building Work Programme for 2016 that will be promulgated shortly together with the report of the 13th meeting of the Capacity Building Sub-Committee. 5.13. Presentation Library Fund and Special Projects Fund. Expenditures from the Presentation Library and Special Projects Funds will be in accordance with the work plan of the HSSC to be considered and approved at the 7th meeting of the Committee in November 2015. Spending from these funds is expected to be used primarily for the on-going high priority development of the S-100 series of standards and related activities. 3 6. A two-thirds majority of IHO Member States is required to approve the proposed Budget for 2016. Responses are requested no later than 30 November 2015 so that any comments and/or changes proposed by Member States can be taken into account by the Directing Committee when preparing the final version of the documents which then will be implemented on 1 January 2016. A Voting Form is provided in Annex C. On behalf of the Directing Committee Yours sincerely, Robert WARD President Annex A: Proposed Budget for 2016 (bilingual English/French) Annex B: Proposed Work Programme for 2016 Annex C: Voting Form 4 Annex A to IHO CL 74/2015 S1/1001/WP-FO/592/16 PROPOSED IHO BUDGET FOR 2016 PROPOSED BUDGET FOR 2016 PROJET DE BUDGET POUR 2016 TABLE 1 TABLEAU 1 PROPOSED IHO BUDGET DETAILS FOR 2016 PROJET DETAILLE DE BUDGET DE L'OHI POUR 2016 SUMMARY RECAPITULATIF 5-Year Budget Approved Proposed Difference Chapters and Items budget budget (2016) 2015 2016 2016 - 2015 Budget Chapitres et postes budgétaires Budget Budget Différence quinquennal approuvé révisé Nouveaux Etats membres: Brunei, Georgie, New Member States: Brunei, Georgia, Vietnam and Number of shares - Nombre de parts 726 748 22 Vietnam et ajustement de tonnages tonnage adjustments Provision for suspended Member States -11 -11 Provision pour Etats membres suspendus 694 Final number of shares 715 737 22 Nombre de parts définitif (Euros) (Euros) (Euros) (Euros) 3 024 457 Income - Revenus 3 062 403 3 206 924 144 521 3 024 133 Net Expenditure - Dépenses nettes 3 060 600 3 206 650 146 050 ------------ ------------ ------------ 324 Budget Excess/Deficit - Excédent/Déficit budgétaire 1 803 274 ------------ ------------ ------------ 324 Effect on capital - Effet sur le capital 1 803 274 =========== =========== =========== 1 TABLE 2 TABLEAU 2 INCOME REVENUS 5-Year Budget Approved Proposed Difference Chapters and Items budget budget (2016) 2015 2016 2016-2015 Commentaires Comment Budget Chapitres et postes budgétaires Budget Budget Différence quinquennal approuvé révisé (Euros) (Euros) (Euros) (Euros) Augmentation de la valeur de la part 1% + Increase 1% value of share + new MS + tonnage 2 792 881 CONTRIBUTIONS 2 848 903 2 965 924 117 021 adjustments nouveaux Etats Membres + ajustement tonnages Contributions SALES OF PUBLICATIONS 0 1 500 Ventes de publications INTEREST ON BANK ACCOUNTS 40 000 60 000 20 000 Basé sur l'intérêt perçu en 2014 Based on interest accrued in 2014 40 000 Intérêts sur comptes en banques EXTRAORDINARY INCOME 8 200 Revenus exceptionnels INTERNAL TAX 181 876 173 500 181 000 7 500 Recrutement d'une personne supplémentaire Recruitment of one additional staff Imposition interne ---------- ---------- ---------- 3 024 457 3 062 403 3 206 924 144 521 ========== ========== ========== 2 TABLE 3 TABLEAU 3 DETAILED EXPENDITURE DETAIL DES DEPENSES 5-Year Budget Approved Proposed Difference Chapters and Items budget budget (2016) 2015 2016 2016-2015 Commentaires Comment Budget Chapitres et postes budgétaires Budget Budget Différence quinquennal approuvé révisé Chapter 1 - Personnel Costs Chapitre 1 - Dépenses de personnel (Euros) (Euros) (Euros) (Euros) Variation due à l'augmentation de salaires pour les Salary increase due to the directors after 3 years in 478 663 Salaries - Directing Committee - Salaires - Comité de direction 474 000 485 000 11 000 directeurs (après 3 ans) office 617 168 - Category A - Personnel de catégorie A 575 000 575 000 0 142 962 - Translators - Personnel de traduction 220 000 210 000 -10 000 Changement de traductrice Change of translator 479 088 - General Services (B & C) - Services généraux (B & C) 425 000 490 000 65 000 Recruitement d'une personne supplémentaire Recruitment of one additional staff 6 192 Overtime for B & C Categories - Heures suppplémentaires pour les catégories B et C 6 500 6 500 0 Costs dependent on Salaries - Coûts liés aux salaires 39 924 Annual Bonus (B & C Categories) - Gratification annuelle (catégories B & C) 33 500 38 700 5 200 Recruitement d'une personne supplémentaire Recruitment of one additional staff Recruitement d'une personne + augmentation des Recruitment of one staff+ increase in pensionable 351 186 Payment to Retirement schemes - Cotisation patronale de retraite 352 000 395 650 43 650 contributions retraites salary 16 650 Insurances based on wages - Assurances assises sur salaires 17 000 17 000 0 Augmentation des cotisations pour un meilleur Increase of contributions in order to receive better 70 000 Medical (GAN premiums) - Primes médicales versées au GAN 80 000 110 000 30 000 remboursement reimbursement 11 000 Family Allowances - Allocations familiales 18 000 18 000 0 35 000 Education Grants - Allocations pour frais d'études 25 000 25 000 0 Costs independent of Salaries - Autres charges indépendantes des salaires 85 000 Medical claims paid - Remboursements de soins 85 000 90 000 5 000 Recruitement d'une personne Recruitment of one staff -35 000 Medical refunds from GAN - Remboursements médicaux du GAN -30 000 -60 000 -30 000 Augmentation des remboursements Increase of reimbursements Home rental - Indemnité de logement 13 000 7 000 -6 000 Allocation versée à une seule personne Allocation for one staff member instead of two 15 000 Home Leave - Congés dans les foyers 15 000 15 000 0 12 000 Miscellan. Personnel Expenses - Autres dépenses de personnel 2 000 3 000 1 000 exceptionnelle Provision for exceptional performance bonus Controllable Personnel costs - Coûts de personnel modulables 2 000 Salaries - Temporary staff - Personnel temporaire 1 000 1 000 0 8 000 IHB Staff training - Formation du personnel du BHI 7 000 7 000 0 ---------- ---------- ------------ 2 334 833 TOTAL CHAPTER I - TOTAL CHAPITRE I 2 319 000 2 433 850 114 850 3 5-Year Budget Approved Proposed Difference Chapters and Items budget budget (2016) 2015 2016 2016-2015 Commentaires Comment Budget Chapitres et postes budgétaires Budget Budget Différence quinquennal approuvé révisé Chapter II - Current Operating Costs Chapitre II - Dépenses de gestion courante Maintenance, communications, etc - Entretien, communications, etc (Euros) (Euros) (Euros) (Euros) 50 000 Maintenance of building - Entretien des locaux 42 000 42 000 0 2 700 Multirisk insurance - Assurance multi-risques 3 000 3 000 0 50 000 Maintenance of IT equipment - Entretien des équipements 60 000 60 000 0 10 000 Office Stationery - Fournitures de bureau 10 000 8 000 -2 000 Basé sur l'historique des dépenses Based on historical expenditure 40 000 Postage, telephone, telefax - Courrier, télécommunications 34 000 34 000 0 3 300 Local Travel - Déplacements locaux 1 500 1 500 0 6 000 Bank Charges - Frais bancaires 6 000 7 000 1 000 Basé sur l'historique des dépenses Based on historical expenditure Diminution pour absorber l'augmentation des Cut back to cover increase in retirement 61 000 Contract support - Support contractuel 25 000 10 000 -15 000 contributions retraites contributions 4 400 Auditors fees - Honoraires du commissaire aux comptes 8 000 8 000 0 15 000 Public Relations - Relations publiques 12 000 12 000 0 1 000 Miscellan. Operating Expenses - Autres charges d'exploitation 1 000 1 000 0 Travel costs - Frais de déplacements Conformément aux besoins recensés par le CBSC Based on requirements identified by the CBSC for 50 000 Technical Assistance (CB) - Assistance technique (CB) 50 000 50 000 0 pour 2016 2016 Conformément aux prévisions du projet de Based on the projections of the draft proposed IHO 235 000 Long Distance - Grands déplacements 265 000 265 000 0 programme de travail OHI pour 2016 work programme for 2016 Publications costs - Frais de publications 12 000 I.H. Review - Revue hydrographique internationale 10 000 10 000 0 2 000 Other publications - Autres publications 1 600 1 600 0 Provision for bad debts - Provisions pour créances douteuses 50 000 50 000 0 ---------- --------- ------------ 542 400 TOTAL CHAPTER II - TOTAL CHAPITRE II 579 100 563 100 -16 000 4 5-Year Budget Approved Proposed Difference Chapters and Items budget budget (2016) 2015 2016 2016-2015 Commentaires Comment Budget Chapitres et postes budgétaires Budget Budget Différence quinquennal approuvé révisé Chapter III - Capital Expenditure Chapitre III - Dépenses d'équipement (Euros) (Euros) (Euros) (Euros) 30 000 Purchase of IT equipment - Equipements informatiques 8 000 8 000 0 12 000 Furniture & other equipment - Mobilier et autres équipements 3 000 3 000 0 1 200 Purchase Publications & Binding - Reliures et publications 1 300 500 -800 20 000 Depreciation of fixed assets - Dépréciation des immobilisations 22 000 15 000 -7 000 immobilisations Reduction due to ageing of assets ---------- --------- ------------ Allocation séparée désormais en 2 parties: Allocation now separated in two parts: chapters III 63 200 TOTAL CHAPTER III - TOTAL CHAPITRE III 34 300 26 500 -7 800 chapitres III et IV and IV ============== ============================================================== ============== ============== 2 940 433 Annual Operating Costs - Coût opérationnel annuel 2 932 400 3 023 450 91 050 ============== ============================================================== ============== ============== Chapter IV - Asset Allocation Chapitre IV - Immobilisations (Euros) (Euros) (Euros) (Euros) Purchase of IT equipment - Equipements informatiques 15 000 15 000 0 Furniture & other equipment - Mobilier et autres équipements 10 000 10 000 0 25 000 25 000 0 Chapter V Allocation to Funds Chapitre V Dotations aux fonds dédiés (Euros) (Euros) (Euros) (Euros) 8 200 GEBCO Fund - Fonds pour la GEBCO 8 200 8 200 0 3 000 Renovation and Enhancement Fund - Fonds de rénovation et d'amélioration 0 0 0 20 000 Conference Fund - Fonds pour les conférences 20 000 20 000 0 7 500 Relocation Fund - Fonds pour les déménagements 0 0 0 45 000 Capacity Building Fund - Fonds pour le renforcement des capacités 45 000 45 000 0 Special Project Fund - Fonds pour les projets spéciaux 30 000 20 000 -10 000 Engagements supplémentaires liés au plan de Increased obligation in connexion with Personalized Internal Retirement Fund - Fonds de Retraite Interne 65 000 65 000 retraite externe (NSM) Pension Plan (NSM) ---------- --------- ------------ 83 700 TOTAL CHAPTER V - TOTAL CHAPITRE V 103 200 158 200 146 050 ------------ ------------ ------------ 3 024 133 TOTAL EXPENDITURE - Dépense totale 3 060 600 3 206 650 ============ ============ ============ 5 TABLE 3A TABLEAU 3A SUMMARY OF EXPENDITURE RECAPITULATIF DES DEPENSES 5-Year Budget Approved Proposed Difference Chapters and Items budget budget (2016) 2015 2016 2016-2015 Commentaires Comment Budget Chapitres et postes budgétaires Budget Budget Différence quinquennal approuvé révisé (Euros) (Euros) (Euros) (Euros) PERSONNEL COSTS DEPENSES DE PERSONNEL 2 334 833 Salaries Directing Committee - Salaires Comité de direction 2 319 000 2 433 850 114 850 Recrutement d'une personne et augmentation des Recruitment of one staff and increase in retirement Salaries Other staff - Salaires autres membres du personnel contributions retraites contributions Social charges - Charges sociales Benefits and Pensions - Prestations de retraite Controllable Personnal cost - Coûts de personnel modulables 542 400 CURRENT OPERATING COSTS 579 100 563 100 -16 000 Diminution du support contractuel pour absorber le Cut back on contract support to absorb the increase DEPENSES DE GESTION COURANTE coût des contributions de retraites in retirement contributions Maintenance, communications, etc.. - Entretien et communications Contract support - Support contractuel Travels - Déplacements Publications - Publications 63 200 CAPITAL EXPENDITURE 34 300 26 500 -7 800 Diminution des dépréciations due au vieillissement Reduction of depreciation due to ageing of assets DEPENSES DE CAPITAL des immobilisations ASSET ALLOCATION 25 000 25 000 0 IMMOBILISATIONS ALLOCATIONS TO FUNDS DOTATIONS AUX FONDS DEDIES 8 200 GEBCO Fund - Fonds pour la GEBCO 8 200 8 200 0 3 000 Renovation and Enhancement Fund - Fonds de rénovation et d'amélioration 0 0 0 20 000 Conference Fund - Fonds pour les conférences 20 000 20 000 0 7 500 Relocation Fund - Fonds pour les déménagements 0 0 0 45 000 Capacity Building Fund - Fonds pour le renforcement des capacités 45 000 45 000 0 Special Projects Fund - Fonds pour les projets spéciaux 30 000 20 000 -10 000 Engagements supplémentaires liés au plan de Increased obligation in connexion with Personalized Internal Retirement Fund - Fonds de Retraite Interne 65 000 65 000 retraite externe (NSM) Pension Plan (NSM) ---------- --------- ------------ 3 024 133 Net Expenditure - Dépenses nettes 3 060 600 3 206 650 146 050 6 ANNEX - FUNDS / ANNEXE - FONDS Funds available Anticipated Expected Proposed Anticipated Approved beginning of Funds available income in Expenditure for Funds remaining budget for 2015 V - FUNDS 2015 at end 2015 2016 2016 at end of 2016 Budget Commentaires Comments V - FONDS Fonds Fonds prévus Revenus Propositions de Fonds prévus approuvé pour disponible disponibles à la prévus en dépenses pour restants à la fin 2015 début 2015 fin 2015 2016 2016 2016 L'allocation inclut la subvention Allocation includes the contribution reçue de Monaco. from Monaco. GEBCO FUND Budget 2016 pas encore présenté 2016 budget not yet submitted by 175 328,00 25 000,00 150 328,00 16 500,00 10 000,00 156 828,00 FONDS POUR LA GEBCO par le comité directeur GEBCO - GEBCO Guiding Committee - dépenses estimées sur la base estimated expenditure based on des années précédentes previous years Le budget approuvé pour 2015 est The approved budget for 2015 is an l'estimation du surplus minimum estimate of the minimum excess ABLOS CONFERENCE FUND de la conférence ABLOS de 2015. income from the ABLOS 2015 98,88 -3 000,00 3 098,88 0,00 0,00 3 098,88 FONDS POUR LA CONFERENCE ABLOS Aucune dépense n'est prévue en Conference. No expenditure is planned 2016 sauf en cas de surplus in 2016 except in case of excess supérieur à 3 000 euros income greater than 3 000 euros RENOVATION AND ENHANCEMENT FUND Pas de besoin de dotation en 80 489,46 0,00 80 489,46 0,00 0,00 80 489,46 No requirement to add to fund in 2016 FONDS DE RENOVATION ET D'AMELIORATION 2016 CONFERENCE FUND Conférence ou Assemblée en 340 357,99 0,00 340 357,99 20 000,00 0,00 360 357,99 Conference or Assembly in 2017 FONDS POUR LES CONFERENCES 2017 Les dépenses éventuelles à Eventual expenditures to be approved approuver par le HSSC devraient PRESENTATION LIBRARY FUND FONDS POUR LA by HSSC should be balanced by the 42 974,00 27 695,00 15 279,00 0,00 0,00 15 279,00 être équilibrées par les ventes de BIBLIOTHEQUE DE PRESENTATION income from the sales of new editions la nouvelle édition de la of the S-52 Presentation Library bibliothèque de présentation S-52 RELOCATION FUND Pas de besoin de dotation en 298 546,36 0,00 298 546,36 0,00 0,00 298 546,36 No requirement to add to fund in 2016 FONDS POUR LES DEMENAGEMENTS 2016 Les montants de début et de fin de période tiennent compte des Opening and closing balances take into INTERNAL RETIREMENT FUND pensions versées aux retraités, account pension payments to retired 3 167 006,00 -152 000,00 3 319 006,00 120 000,00 145 000,00 3 294 006,00 FONDS DE RETRAITE INTERNE des contributions du personnel en staff, contributions by active staff and activité et des intérêts sur le interest on capital sum capital Dépenses estimées en attente du Estimated expenditures subject to the SPECIAL PROJECTS FUND 80 242,33 8 635,00 71 607,33 20 000,00 30 000,00 61 607,33 programme de travail 2016 à 2016 work programme to be approved FONDS POUR LES PROJETS SPECIAUX approuver par le HSSC by HSSC CAPACITY BUILDING FUND - IHO FUNDED Dépenses estimées en attente du Estimated expenditures subject to the FONDS POUR LE RENFORCEMENT DES 210 604,00 192 332,00 18 272,00 45 000,00 60 000,00 3 272,00 programme de travail CB 2016 à 2016 CB work programme to be CAPACITES - FINANCEMENT OHI approuver par le CBSC approved by CBSC CAPACITY BUILDING FUND - EXTERNAL FUNDING Dépenses estimées en attente du Estimated expenditures subject to the FONDS POUR LE RENFORCEMENT DES 996 689,00 738 575,00 258 114,00 80 000,00 338 000,00 114,00 programme de travail CB 2016 à 2016 CB work programme to be CAPACITES - FINANCEMENT EXTERNE approuver par le CBSC approved by CBSC TOTAL 5 392 336,02 837 237,00 4 555 099,02 301 500,00 583 000,00 4 273 599,02 Annex B to CL 74/2015 S1/1001/WP-FO/592/16 Proposed IHO Work Programme for 2016 - (as submitted to MS for approval) Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue PROGRAMME 1 - CORPORATE AFFAIRS Objective / Deliverable: 1&3 1.1 Co-operation with International Organizations and participation in relevant meetings To maintain relationships with relevant international organizations in order to further the interests of the IHO by enlisting their support and cooperation and to participate in projects of common interest Santiago, Chile, 6-15 June. ensure HCA activities are recognised by 1.1.1 Antarctic Treaty Consultative Meeting (ATCM) Pres ADCS Consider representation by Chile or ATCM, coordination and liaison Monaco present relevant IHO programmes, Annual meeting 1.1.2 Comité International Radio Maritime (CIRM) DTech ADSO coordinate activities with OEMs, Genoa, Italy, April outreach, coordination and liaison present relevant IHO programmes, Council of Managers of National Antarctic Programs No meetings anticipated, low level 1.1.3 Pres ADCS coordinate data acquisition activities with (COMNAP) correspondence only COMNAP, outreach, liaison ensure IHO activities are recognised and European Union Initiatives, 1.1.4 Pres ADCS supported as appropriate by the EU, including: coordination and liaison ensure that the maritime dimension of Up to 4 meetings in Europe 1.1.4.1 INSPIRE DTech ADDT spatial data infrastructures is recognized in the Inspire framework 1.1.4.2 IHO-EU Network WG DTech ADCS FIG working week 2016, present relevant IHO programmes, Christchurch, New Zealand, 2-6 1.1.5 International Federation of Surveyors (FIG) DCoord ADCC coordinate activities with FIG, outreach May. and liaison Consider representation by NZ present relevant IHO programmes, 1.1.6 International Federation of Hydrographic Societies (IFHS) Pres ADSO outreach via annual HYDRO meetings Rostock, Germany, 8-10 Nov. present relevant IHO programmes, 1.1.6.1 HYDRO16 Pres ADSO Consider representation by outreach Germany? International Association of Antarctic Tour Operators 1.1.7 Pres ADCS No meetings anticipated (IAATO) 1.1.8 IALA, such as: DTech ADSO Coordinate IHO representation with present relevant IHO programmes, UKHO representative (IHO 1.1.8.1 e-NAV Committee DTech ADSO provide S-100 liaison activities rapporteur) Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Possibly meeting back-to-back with 1.1.8.2 Annual secretariat liaison meeting Pres ADSO coordinate programmes, particularly CB another meeting London, 3 Mar, IHO normally 1.1.8.3 World VTS Guide Advisory board meeting DTech ADSO represented by UKHO 1.1.9 International Association of Ports and Harbours (IAPH) Pres ADDT No meetings anticipated coordinate programmes, particularly in 1.1.10 International Cartographic Association (ICA) such as: DTech ADCC relation with GI and training standards ICA Commission on Geoinformation Infrastructures 2016 Calendar of meetings not yet 1.1.10.1 DTech ADCC available and Standards) 1.1.10.2 ICA Working Group on Marine Cartography DTech ADCS present relevant IHO programmes, International Electrotechnical Commission (IEC) Participation by at least 1 MS would 1.1.11 DTech ADDT coordinate S-100 and other IHO (such as IEC Technical Committee 80) be desirable standards developments, liaison 1.1.12 International Maritime Organization (IMO), including: present relevant IHO programmes and 1.1.12.1 Assembly Pres ADSO No meeting in 2016 activities, outreach and liaison C116, London, UK, 4-8 July present relevant IHO programmes and 1.1.12.2 Council Pres ADSO C117, London, UK 5-9 Dec activities, outreach and liaison No participation anticipated present relevant IHO programmes and 1.1.12.3 MSC Pres ADSO MSC96, London, 11-20 May activities, outreach and liaison MSC97, London, 21-25 Nov present relevant IHO programmes and 1.1.12.4.1 NCSR DTech ADSO NCSR3, London, 29 Feb-4 March activities, outreach and liaison present relevant IHO programmes and 1.1.12.4.2 Intersessional meetings on e-Nav or other issues DTech ADSO activities, outreach and liaison present relevant IHO programmes and 1.1.12.5 TCC DCoord ADCC activities, coordination with IMO TC, TCC66, London, 20-22 June outreach and liaison Not anticipating IHO attendance at 1.1.13 International Maritime Pilots’ Association (IMPA) Pres ADSO IMPA Congress 2016 Intergovernmental Oceanographic Commission (IOC) of 1.1.14 DCoord ADSO UNESCO, including: present relevant IHO programmes and 1.1.14.1 Assembly DCoord ADSO No meeting in 2016 activities, outreach and liaison EC49, Paris, 6-10 June 1.1.14.2 Executive Council DCoord ADSO B-2 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Promote the use of S-100 by the IOC, 1.1.14.3 IODE Committee DTech ADDT No participation anticipated in 2016 outreach and liaison ensure appropriate levels of coordination MS may not have resources MS to be requested to represent 1.1.14.4 Specialized WGs -(such as GLOSS) DTech ADSO with IHO work items related to tides and or technical background to IHO if IHO technical support surface currents participate required International Organization for Standardization (ISO), 1.1.15 DTech ADDT including: present relevant IHO programmes and activities, coordinate IHO standards 2 meetings - one in Europe, one in 1.1.15.1 ISO Technical Committee 211 DTech ADDT development with ISO programmes, USA outreach and liaison present relevant IHO programmes and Normally undertaken as a short side activities, outreach, coordination and 1.1.16 Joint Board of GIS (JB-GIS) Pres ADCS trip from another meeting = very liaison with other geospatial limited extra cost organisations 1.1.17 NATO geospatial bodies, such as: DTech ADDT coordination and liaison with other UKHO will provide IHO 1.1.17.1 DGIWG DTech ADDT geospatial organisations representative 1.1.18 UN, including: Pres ADCS present relevant IHO programmes and 1.1.18.1 UN General Assembly Pres ADSO activities, outreach, recruitment of new No participation anticipated in 2016 IHO Member States present relevant IHO programmes and 1.1.18.2 UNICPOLOS & SPLOS Pres ADSO activities, outreach, recruitment of new New York, April or June IHO Member States 1.1.18.4.1 UN-GGIM Pres ADCS present relevant IHO programmes and UNGGIM-6, New York, August activities in relation to UN-GGIM programme to ensure that hydrography is appropriately represented in doctrine 4th Forum, 1.1.18.4.2 UN-GGIM High Level Forum Pres ADCS being developed by UN-GGIM and Addis Ababa Ethiopia, April adopted by UN ensure that hydrography is appropriately accounted for in the implementation of 1.1.18.5 UNISDR Pres ADSO No participation anticipated in 2016 the Sendai Framework for Disaster Risk Reduction 2015-2030 present relevant IHO programmes and activities in relation to UNEP programme 1.1.18.6 UN Environment Assembly Pres ADSO to ensure that hydrography is 2nd UNEA, 23-27 May appropriately represented in doctrine being developed by UNEA B-3 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue ensure appropriate levels of coordination No meetings anticipated, low level 1.1.19 World Meteorological Organization (WMO) Pres ADSO with IHO work items related to WWNWS correspondence only, and MSI delivery ensure appropriate levels of coordination Participation at ETMSS, ETSI and other JCOMM 1.1.19.1 DTech ADSO with IHO work items related to S-100 and meetings to WWNWS and MSI delivery Other organizations when their agendas have relevance to the programme of the IHO, such as : The Group on Earth Observation (GEO); the Scientific Committee on Antarctic Research (SCAR); Global Partnership for Oceans (GPO); Pres or Director and AD ensure IHO programmes and outcomes The International Cable Protection Committee (ICPC), The 1.1.20 responsible for the relevant are recognised and coordinated with International Seabed Authority (ISA); The Maritime RHC when appropriate other organizations as appropriate Organizations of West and Central Africa (MOWCA; The Pan-American Institute of Geography and History (PAIGH); The Port Management Association West and Central Africa (PMAWCA) 17th meeting, Queenstown, New ensure IHO regional programmes are Zealand Asia Pacific Heads of Maritime Safety Agencies recognised and coordinated with 1.1.20.1 Pres ADSO 14-18 Mar. (APHoMSA) APHoSMA regional programmes as Chair SWPHC or LINZ will be asked appropriate to represent IHO Local MS will be requested to ensure IHO programmes and outcomes MS may not have resources International Steering Committee for Global Mapping represent IHO unless meeting held 1.1.20.2 Pres ADCS are recognised and coordinated with or technical background to (ISCGM) back-to-back with other event ISCGM as appropriate participate attended by IHB ensure IHO programmes and outcomes 1.1.20.3 Group on Earth Observation (GEO) DTech ADCS are recognised and coordinated with GEO-XIII Plenary GEO as appropriate African Union Extraordinary Summit on Maritime 1.1.20.4 DTech ADCS Lomé, Togo Security and Safety and Development in Africa 22nd Session, Kingston, Jamaica, 1.1.20.5 International Seabed Authority Pres ADSO July present relevant IHO programmes and 1.1.20.6 International Harbour Masters Association (IHMA) Pres ADSO Correspondence only activities, outreach and liaison Objective / Deliverable: 1&4 1.2 Information Management To provide MS and IHO stakeholders with accurate and relevant information in a timely and accessible manner Compile and publish the following documents that are not 1.2.1 allocated to a specific IHO body, including: 1.2.1.1 P-5 – IHO Yearbook DTech ADDT B-4 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue P-7 – IHO Annual Report 1.2.1.2 DCoord ADCC 1.2.1.3 S-11 Part B - Catalogue of INT Charts Pres ADCS S-11 database and auto-publisher see 2.3.2.6 Appropriateness and currency of 1.2.1.4 M-3 – IHO Resolutions Pres ADSO Resolutions related to current WP items 1.2.2 Maintain and extend IHB Admin IT infrastructure, including: Pres ADDT 1.2.2.1 high volume printers and photocopiers 1.2.2.2 IT maintenance and development 1.2.2.3 IT equipment purchases Communication between the IHB and Member States 1.2.3 Pres ADSO through Circular Letters 1.2.4 IHB Technical Library – incorporate new material Pres ADSO Objective / Deliverable: 3 1.3 Public Relations To raise awareness of the role of the IHO and its Member States and the importance of hydrography, particularly by government and in the user community Maintain relationships with the Government of Monaco and 1.3.1 Pres MFA the diplomatic corps accredited in Monaco Compile and publish P-1 – International Hydrographic Contribution of suitable 1.3.2 DCoord ADCC Review in collaboration with IHR editor papers from MS and others 1.3.3 World Hydrography Day, including: DCoord ADCC 1.3.3.1 Preparation of support materiel DCoord ADCC 1.3.3.2 Celebratory events in Monaco DCoord ADCC 1.3.3.3 Celebratory events in Member States DCoord ADCC Raising levels of awareness of IHO and 1.3.4 General Public Relation support. Representation expenses Pres ADCC hydrography 1.3.4.1 Compile and publish International Hydrographic Bulletin Pres ADSO B-5 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Objective / Deliverable: To ensure that the formulation and the execution of the IHO Work Programme and Budget is managed, 1 1.4 Work Programme & Budget, Strategic Plan and Performance Monitoring monitored and executed efficiently to best meet the requirements of Member States and the interests of stakeholders. This Element focuses on the implementation of the IHO’s Strategic Plan particularly with regard to risk assessment and performance indicators Implement and administer processes for programme management, performance monitoring and risk assessment, Continuing development of processes to Included in the overall IT support 1.4.1 including the acquisition and operation of suitable business Pres ADCC better monitor progress, execution and budget software tools achievement of the IHO WP Execute the IHO Work Programme and Budget approved by 1.4.2 the XVIIIth IHC, monitoring its progress and adopting the Pres MFA necessary adjustment according to the circumstances as required Input from and participation Collect feedback from stakeholders on 1.4.3 Conduct biennial IHO stakeholders’ forums DTech according to of the relevant IHO Working No meeting anticipated in 2016 critical issues topics Groups 1.4.4 Initiate review of IHO Strategic Plan Pres ADCC Objective / Deliverable: 1 1.5 IHB Management To ensure that the IHB meets the requirements set by the Member States, by providing the best service (quality, opportunity, reasonable cost) within the resources available Maintain, update and develop necessary procedures to 1.5.1 facilitate and improve effectiveness of the general and Pres MFA permanent Finance and Administrative work. Enhancement of staff skills to meet 1.5.1.1 Staff training Pres MFA changing job requirements Provide in-house translation service English/French and French/English in support of the IHO WP. Include Spanish 1.5.2 Pres ADSO IHB staff capacity translations as much as possible in accordance with relevant IHO Resolutions Engage contract support to provide on-off development or Advancement of one-off IHB tasks 1.5.3 maintenance support beyond the resources or competence Pres MFA beyond the capability or resources of IHB of the IHB, including: 1.5.3.1 Translation Pres ADSO As required 1.5.3.2 Technical editing DTech according to topic Monitor and maintain the Staff Regulations and the Job Descriptions of the IHB Staff in step with the evolution of the 1.5.4 Pres MFA IHO work programme and IHO requirements. B-6 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Maintain the IHB premises as required as the occupant. Maintain furniture, carry out renovations or modifications as 1.5.5 requirements arise Pres MFA Objective / Deliverable: 1&4 1.6 International Hydrographic Conference To ensure the successful functioning of Conferences or Assemblies so that they fulfil their top-level governance and decision-making functions in accordance with Convention and the other Instruments of the Organization DCoord ADCC 1.6.1 Organize IHC-19 / Assembly-1 in 2017 PROGRAMME 2 - SERVICES AND STANDARDS Objective / Deliverable: To monitor technical developments, oversee the development of IHO technical standards, specifications and 2 2.1 Technical Programme Coordination publications through the coordination and interaction of relevant IHO Working Groups, and to make recommendations to Member States Implementation of HSSC Work Plan 2.1.1 Conduct annual meeting of HSSC DTech ADCS HSSC forward WP HSSC-8, Monaco, November Performance statistics 2.1.1.1 Chair briefing DTech ADCS Efficient running of HSSC-8 Support the IHB to implement the planning mechanism 2.1.2 DTech ADCS annually and at the end of each 5-year (3-year) cycle by: 2.1.2.1 Contributing to the IHO Annual Report. DTech ADCS 2.1.2.2 Updating and implementing the HSSC Work Programme DTech ADCS Implementing the restructuring of HSSC Working 2.1.2.3 DTech ADCS Feedback at HSSC-8 Groups Includes participation in e- Provide technical advice and guidance on IHO technical Promote uptake of S-100 and S-100 Navigation underway conference. 2.1.3 DTech ADDT standards, specification and publications based product specifications In support of 2.2.5 Objective / Deliverable: 3&4 2.2 Hydrographic Data Transfer Standards To monitor developments related to transfer standards for digital hydrographic data, to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate Implementation of the new HSSC Conduct meetings of S-100 and ENC Standards structure : S-100 WG-1 & ENCWG- 2.2.1 DTech ADDT Implementation of HSSC Work Plan Maintenance WGs 1, Tokyo, March B-7 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Funded from Special Projects Maintain and extend the relevant IHO standards, and/or PL Fund according to funding 2.2.2 specifications and publications, using contract support DTech ADDT Implementation of HSSC Work Plan availability and on a priority basis assistance as appropriate, including: set by HSSC-7 S-57 IHO Transfer Standard for Digital Hydrographic Encoding Bulletins as required to keep 2.2.2.1 DTech ADDT Data S-57 fit for purpose S-100 IHO Universal Hydrographic Data Model 2.2.2.2 DTech ADDT Edition 2.0.0 approved by MS Support the end-to-end testing of S-101 2.2.2.2.1 S-100 /S-101 Test bed DTech ADDT and other S-10x specifications in S-100 TSM4, Monaco, August? compliance with IHO Resolution 2/2007 Edition 0.0.0 (draft) approved by Member 2.2.2.3 S-101 ENC Product Specification DTech ADDT States for test-bed purposes Revision may be required from task 2.2.2.4 S-102 Bathymetric Surface Product Specification DTech ADDT 2.7.5 Implementation of Edition 5.0.0 in 2.2.2.5 S-58 ENC Validation Checks DTech ADDT conjunction with new edition of IEC 61174 2.2.2.6 S-65 ENC Production Guidance DTech ADDT Implementation of Edition 3.0.0 in 2.2.2.7 S-64 IHO Test Data Sets for ECDIS DTech ADDT conjunction with new edition of IEC 61174 S-61 Product Specification for Raster Navigational 2.2.2.8 DTech ADDT No action required Charts S-99 Operational Procedures for the Organization and 2.2.2.9 Management of the S-100 Geospatial Information DTech ADDT Keep S-99 fit for purpose Registry S-66 Facts about Electronic Charts and Carriage 2.2.2.10 DTech ADCS NE of S-66 released in 2016 Requirements Participate in RENC Joint Technical Experts WG possibility of meeting in 2016 in 2.2.2.11 DTech ADDT (JTEWG) Europe Appendix 1 to S-52 - Guidance on Updating the 2.2.2.12 DTech ADCS Keep S-52 Appendix 1 fit for purpose Electronic Navigational Chart S-52 and its accompanying Presentation Library - PB as required to keep S-52 fit for 2.2.2.13 Specifications for Chart Content and Display Aspects of DTech ADCS purpose ECDIS B-8 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue funded from Special Projects and/or Develop and maintain as-yet undefined S-100-based Template Product Specification for PL Fund according to funding 2.2.3 DTech ADDT Product Specifications Marine Information Overlays (MIO) availability and on a priority basis set by HSSC-7 Dependent of continuing Keep the Registry fit for purpose support from ROK, UK and 2.2.4 Maintain and extend S-100 Registry DTech ADDT including recruitment of Technical USA and limited IHB Standards Support Officer at IHB resources Provide outreach and technical assistance regarding 2.2.5 DTech ADDT see 2.1.3 transfer standards Objective / Deliverable: To monitor developments related to nautical cartography for paper nautical charts and the colours, symbols and 2 2.3 Nautical Cartography display rules used to show SENC information on ECDIS, to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate 2.3.1 Conduct meetings of Nautical Cartography Working Group DTech ADCS Implementation of HSSC Work Plan Monaco, April Maintain and extend the relevant IHO standards, 2.3.2 specifications and publications, using contract support DTech assistance as appropriate, including: S-4 Chart Specifications of the IHO and Regulations for 2.3.2.1 DTech ADCS Keep S-4 fit for purpose Routine maintenance International (INT) Charts INT 1 - Symbols, Abbreviations and Terms used on 2.3.2.2 DTech ADCS New edition(s) in 2015-2016 Charts 2.3.2.3 INT 2 - Borders, Graduations, Grids and Linear Scales DTech ADCS 2.3.2.4 INT 3 - Use of Symbols and Abbreviations DTech ADCS S-11 Part A - Guidance for the Preparation and New edition of S-11 Part A released in 2.3.2.5 DTech ADCS Maintenance of INT Chart schemes 2016 New edition of S-11 Part B database 2.3.2.6 S-11 Part B - Catalogue of INT Charts DTech ADCS See also 1.2.1.3 released in 2016 Objective / Deliverable: 2 2.4 Digital Data Protection and Authentication To monitor developments related to data protection and data authentication, to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate Conduct meetings of Data Protection Scheme WG 2.4.1 DTech ADDT Implementation of HSSC Work Plan 1 meeting in Europe Maintain and extend the relevant IHO standards, 2.4.2 specifications and publications, including: DTech B-9 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue 2.4.2.1 :S-63 IHO Data Protection Scheme ADDT Keep S-63 fit for purpose 2.4.2.2 Data protectionand authentication related elements of ADDT 2.4.2.2.1 S-100 - IHO Universal Hydrographic Data Model ADDT see 2.2.2.2 Data protection and authentication related elements 2.4.2.2.2 ADDT see 2.2.2.3 of S-101 - ENC Product Specification Objective / Deliverable: To monitor developments related to methods of classifying and depicting the quality of hydrographic information, 2 2.5 Data Quality to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate 2.5.1 Conduct meetings of Data Quality WG DTech ADCS Implementation of HSSC Work Plan 1 meeting, possibly in USA, May? Maintain and extend the relevant IHO standards, 2.5.2 DTech specifications and publications, including: Data quality related elements of S-57 - IHO Transfer 2.5.2.1 DTech ADCS see 2.2.2.1 Standard for Digital Hydrographic Data Data quality related elements of S-100 - IHO Universal 2.5.2.2 DTech ADCS see 2.2.2.2 Hydrographic Data Model 2.5.2.3 Data quality related elements of: DTech S-52 - Specifications for Chart Content and Display 2.5.2.3.1 DTech ADCS see 2.2.2.13 Aspects of ECDIS S-101 - ENC Product Specification and other S-100- 2.5.2.3.2 DTech ADCS see 2.2.2.3 & 2.2.3 based Product Specifications Objective / Deliverable: 2 2.6 Nautical Publications To monitor developments related to the preparation of nautical publications, to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate Conduct meetings of Nautical Information Provision WG 1 meeting, possibly in UK or 2.6.1 DTech ADCS Implementation of HSSC Work Plan (NIPWG) Monaco, March? Develop, maintain and extend S-10n - Nautical Information Draft Product Specification for Marine 2.6.2 DTech ADCS Product Specification Protected Areas (S-122) Maintain and extend the relevant IHO standards, 2.6.3 DTech specifications and publications, including: 2.6.3.1 IHO Resolutions in M-3 relating to Nautical Publications DTech ADSO Keep the Resolutions fit for purpose 2.6.3.2 S-12 Standardization of List of Lights and Fog Signals DTech ADSO Keep S-12 fit for purpose 2.6.3.3 S-49 Standardization of Mariners' Routeing Guides DTech ADCS Keep S-49 fit for purpose B-10 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Objective / Deliverable: To monitor developments related to tidal and water level observation, analysis and prediction and other related 2 2.7 Tides and Water Levels information including vertical and horizontal datums, to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate Conduct meetings of the Tides, Water Level and Currents 2.7.1 DTech ADSO Implementation of HSSC Work Plan Niteroi, Brazil, 25-29 Aug WG (TWCWG) Maintain and extend the relevant IHO standards, 2.7.2 DTech specifications and publications, including: 2.7.2.1 Relevant IHO Resolutions in M-3 DTech ADSO Keep the Resolutions fit for purpose S-60 User´s Handbook on Datum Transformations 2.7.2.2 DTech ADSO Publication frozen involving WGS 84 2.7.2.3 Standard Tidal Constituent List DTech ADSO Keep the List fit for purpose Inventory of Tide Gauges and Current Meters used by 2.7.2.4 DTech ADSO Keep the inventory current Member States Develop, maintain and extend a Product Specification for Lack of WG expertise and 2.7.3 DTech ADSO Prepare draft Standard digital tide tables OEM participation Compare XML datasets to create Develop, maintain and extend a Product Specification for Lack of WG expertise and 2.7.4 DTech ADSO common format aligned to INSPIRE and the transmission of real-time tidal data (S-112) OEM participation other developed formats in use Develop, maintain and extend a Product Specification for Meet the requirements of the E- Lack of WG expertise and 2.7.5 DTech ADSO dynamic tides in ECDIS Navigation Strategy Implementation Plan OEM participation Objective / Deliverable: To monitor developments in standardized processes for the updating of digital hydrographic data products, to 2 2.8 Digital Data Updating develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate Maintain and extend the relevant IHO standards, 2.8.1 DTech specifications and publications, including: Digital data updating related elements of S-65 - ENC 2.8.1.1 DTech ADCS see 2.2.2.6 Production Guidance S-52 Appendix 1 - Guidance on Updating the Electronic 2.8.1.2 DTech ADCS see 2.2.2.12 Navigational Chart Objective / Deliverable: 2 2.10 Hydrographic Data Acquisition and Processing To monitor developments related to hydrographic data acquisition and processing, to develop and maintain the relevant IHO publications, and to provide technical advice as appropriate Conduct meetings of Hydrographic Survey WG (if WG Subject to consideration by HSSC7 2.10.1 DTech ADSO activated) of the outcome of IHO CL 25/2015 Maintain and extend, when required, the relevant IHO 2.10.2 DTech standards, specifications and publications, including: 2.10.2.1 S-44 - IHO Standards for Hydrographic Surveys DTech ADSO B-11 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Objective / Deliverable: 4 2.11 Hydrographic Dictionary To develop, maintain and extend S-32 - Hydrographic Dictionary in English, French and Spanish and to provide technical advice as appropriate more active participation of MS during definition Maintain and extend the IHO Hydrographic Dictionary in For WP to progress, a face-to-face 2.11.1 DTech ADSO Implementation of HSSC Work Plan development stage - English, French and Spanish. meeting is required especially Spanish speaking MS Task being addressed by seconded 2.11.2 Develop the Spanish language Wiki version of S-32 DTech ADSO Officer from Peru Objective / Deliverable: 2&4 2.12 ABLOS To monitor developments related to the hydrographic aspects of the UN Convention on the Law of the Sea, to develop and maintain the relevant IHO publications, and to provide technical advice as appropriate 2.12.1 Organize and prepare ABLOS annual business meeting DTech ADSO Implementation of HSSC Work Plan BM32, Seoul, RoK, October 2.12.2 Organize and prepare the biennial ABLOS Conference DTech ADSO Next ABLOS Conference is in 2017 Contribute to the revision of IHO publication C-51- TALOS 2.12.3 DTech ADSO Manual Objective / Deliverable: To monitor developments related to surface current observation, analysis and prediction and other related 2 2.13 Surface Currents information including vertical and horizontal datums, to develop and maintain the relevant IHO standards, specifications and publications, and to provide technical advice as appropriate Maintain and extend the relevant IHO standards, 2.13.2 DTech specifications and publications, including: 2.13.2.1 Relevant IHO Resolutions in M-3 DTech ADSO Keep the Resolutions fit for purpose Develop, maintain and extend a Product Specification for Create mature draft S-111 PS, including Limited WG expertise and 2.13.3 DTech ADSO the transmission of real-time surface current data draft list of attributes and encoding OEM participation Limited WG expertise and OEM participation Develop, maintain and extend a Product Specification for 2.13.4 DTech ADSO Demonstrate test portrayal S-111 PS dynamic surface currents in ECDIS PROGRAMME 3 - INTER REGIONAL COORDINATION AND SUPPORT Objective / Deliverable: To promote and coordinate those activities that might benefit from a regional approach: - establish, coordinate and enhance cooperation in hydrographic activities amongst States on a regional basis, 1&2 3.0 Inter-Regional Coordination Committee (IRCC) and between regions; - establish co-operation to enhance the delivery of capacity building programs; - monitor the work of specified IHO Inter-Organizational Bodies engaged in activities that require inter-regional cooperation and coordination. B-12 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Implementation of IRCC WP IRCC8, 29-31 May, Abu Dhabi 3.01 Conduct annual meeting of IRCC DCoord ADCC IRCC forward WP held back-to-back with CBSC14, - Performance statistics see 3.3.1.1 3.0.1.1 Chair briefing DCoord ADCC Efficient running of IRCC-8 Support the IHB to implement the planning mechanism 3.0.2 DCoord annually and at the end of each 5-year (3-year) cycle by: 3.0.2.1 Contributing to the IHO Annual Report. DCoord ADCC 3.0.2.2 Updating and implementing the IRCC Work Programme DCoord ADCC Objective / Deliverable: 1&2 3.1 Cooperation with Member States and attendance at relevant meetings To facilitate IHO MS coordination, cooperation and collaboration to improve hydrographic services and the provision of hydro-cartographic products through the structure of the RHCs 3.1.1 ARHC – Arctic Region Hydrographic Commission Pres ADCS ARHC6,Canada BSHC21, 3.1.2 BSHC - Baltic Sea Hydrographic Commission DCoord ADSO Klaipeda, Lithuania EAHC - East Asia Hydrographic Commission Steering Committee Meeting 3, 3.1.3 Pres ADDT EAHC region 3.1.4 EAtHC - Eastern Atlantic Hydrographic Commission DTech ADCS EAtHC14, Cadiz, October MACHC - Meso American and Caribbean Sea Hydrographic MACHC17, MACHC region, 3.1.5 Pres ADCC Commission December? No plenary meeting anticipated in MBSHC - Mediterranean and Black Seas Hydrographic 3.1.6 DCoord ADCS 2016. Commission BASWG will meet in Istanbul, April 3.1.7 NHC - Nordic Hydrographic Commission DTech ADDT NHC60, 11-13 April, Norway NIOHC16, 14-16 March, Chittagong, 3.1.8 NIOHC - North Indian Ocean Hydrographic Commission DCoord ADSO Bangladesh, 3.1.9 NSHC - North Sea Hydrographic Commission DTech ADSO NSHC32, 22-24 June, Dublin No RHC meeting anticipated in 2016. 3.1.10 RSAHC - ROPME Sea Area Hydrographic Commission DCoord ADSO ICCWG meeting in Tehran, Sep/Oct? SAIHC - Southern Africa and Islands Hydrographic SAIHC13, 3.1.11 Pres ADDT Commission September, Cape Town SEPRHC - South East Pacific Regional Hydrographic 3.1.12 DTech ADCC No meeting anticipated in 2016 Commission 3.1.13 SWAtHC - South West Atlantic Hydrographic Commission DTech ADCC CHAtSO10, April, Buenos Aires SWPHC14, late 2016, Nouméa, 3.1.14 SWPHC - South West Pacific Hydrographic Commission Pres ADCC New Caledonia B-13 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue USCHC39, 16 May & Canadian 3.1.15 USCHC - USA and Canada Hydrographic Commission DCoord ADDT Hydrographic Conference 2016 16- 19 May, Halifax, Canada 3.1.16 HCA - Hydrographic Commission on Antarctica Pres ADCS HCA14, June, Guayaquil, Ecuador HCA to conduct a risk assessment for the Antarctic region 3.1.16.1 and develop a Work Program to improve Antarctic Pres ADCS charting WENDWG6, 3.1.17 WEND Working Group DCoord ADCS 8-10 March, Stavanger, Norway, See also 3.6.2 Director & AD 3.1.18 Industry participation in RHC meetings responsible for relevant RHC Contribute to improving the framework of IHO response to 3.1.19 DCoord ADSO marine disasters Objective / Deliverable: To raise awareness in non-Member States of the importance of hydrography and nautical charting services and their related products. Give advice to Coastal States on how to comply with international regulations such as 1&3 3.2 Increase participation by non-Member States SOLAS Chapter V and highlight the importance of coordinated efforts in providing for safety of navigation and protection of the marine environment. Stress the importance of becoming an IHO Member State and of integration in the work of the RHCs EAHC - Execute strategy to increase participation of non- 3.2.1 Member States in IHO activities and advise them on how to Pres ADDT comply with international regulations such as SOLAS V. EAtHC - Execute strategy to increase participation of non- 3.2.2 Member States in IHO activities and advise them on how to DTech ADCS comply with international regulations such as SOLAS V Maintain contact with pending applicants in the region to Ratification of the IHO Convention by 3.2.2.1 DTech ADCS encourage the ratification of the IHO Convention Mauritania and Sierra Leone Maintain contact with suspended Member State in the Re-integration of the Democratic 3.2.2.2 DTech ADCS region to encourage its re-insertion in IHO Republic of Congo MACHC OECS Project - to develop MACHC - Execute strategy to increase participation of non- hydrographic services in the Eastern 3.2.3 Member States in IHO activities and advise them on how to Pres ADCC Caribbean: complete scoping study and comply with international regulations such as SOLAS V. seek donors Maintain contact with pending applicant in the region to Ratification of the IHO Convention by 3.2.3.1 encourage the ratification of the IHO Convention Pres ADCC Haiti B-14 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Maintain contact with suspended Member State in the 3.2.3.2 Pres ADCC Re-integration of the Dominican Republic region to encourage its re-insertion in IHO MBSHC - Execute strategy to increase participation of non- Target non-Member States: Albania, 3.2.4 Member States in IHO activities and advise them on how to DCoord ADCS Bulgaria, Israel, Lebanon, Libya comply with international regulations such as SOLAS V Maintain contact with pending applicants in the region to Ratification of the IHO Convention by 3.2.4.1 DCoord ADCS encourage the ratification of the IHO Convention Bulgaria Maintain contact with suspended Member State in the 3.2.4.2 DCoord ADCS region to encourage its re-insertion in IHO Target non-Member States: Jordan, Sudan, Maldives, Seychelles , NIOHC - Execute strategy to increase participation of non- Yemen, Eritrea, Djibouti, Somalia 3.2.5 Member States in IHO activities and advise them on how to DCoord ADSO comply with international regulations such as SOLAS V (side-visits as part of other programmes) RSAHC - Execute strategy to increase participation of non- 3.2.6 Member States in IHO activities and advise them on how to DCoord ADSO Target non-Member State: Iraq comply with international regulations such as SOLAS V Target non-Member States: Angola, SAIHC - Execute strategy to increase participation of non- Comoros, Kenya, Madagascar, 3.2.7 Member States in IHO activities and advise them on how to Pres ADDT Malawi, Namibia, Seychelles & comply with international regulations such as SOLAS V. Tanzania SEPRHC - Execute strategy to increase participation of non-Member States in IHO activities and advise them on 3.2.8 DTech ADCC how to comply with international regulations such as SOLAS V. Continue the efforts to include Panama as Observer 3.2.8.1 DTech ADCC Participation of Panama in SEPRHC Country to the Commission. SWAtHC - Execute strategy to increase participation of non- Target non-Member States: Bolivia 3.2.9 Member States in IHO activities and advise them on how to DTech ADCC and Paraguay comply with international regulations such as SOLAS V SWPHC - Execute strategy to increase participation of non- Member States in IHO activities and advise them on how to comply with international regulations such as SOLAS V 3.2.10 Pres ADCC B-15 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Director & AD RHCs to encourage the approval of pending applications for 3.2.11 responsible IHO membership for relevant RHC Director & AD 3.2.12 IHO Convention responsible for relevant RHC RHCs to encourage the ratification of the IHO 3.2.12.1 Convention by approved applicants. Secure the ratification of the Protocol of Amendments to 3.2.12.2 Secure ratification before end of 2016 the IHO Convention. Objective / Deliverable: To maintain an IHO Strategy on Capacity Building (CB), and the establishment of coordination, operational and 1&4 3.3 Capacity Building Management control procedures directed to achieve effective and efficient interaction between all parties involved in the IHO CB effort 3.3.1 CBSC - Capacity Building Sub-Committee, including: DCoord ADCC CBSC14, 24-26 May, Abu Dhabi, Organize, prepare, conduct and report annual CBSC 3.3.1.1 DCoord ADCC Efficient running of CBSC14 held back-to-back with IRCC8, meetings see 3.0.1 3.3.1.2 Chair briefing DCoord ADCC Efficient running of CBSC14 Follow-up the coordination required to execute the 3.3.1.3 DCoord ADCC action lists agreed Maintain IHO publication M-2 - The Need for National 3.3.1.4 DCoord ADCC Hydrographic Services 3.3.1.5 Contribute to the development of MSDI DCoord ADCC 3.3.2 Manage Capacity Building Fund DCoord ADCC, MFA 3.3.2.1 Develop and maintain a CB Management system DCoord ADCC Meetings with other organizations, funding agencies, private 3.3.3 DCoord ADCC Increase the CB Fund sector and academia Joint IHO/IMO/WMO/IOC/IAEA/IALA/FIG Capacity 3.3.3.1 DCoord ADCC Venue in W. Europe Building Meeting 3.3.3.2 Capacity Building Stakeholders Forum DCoord ADCC No meeting planned in 2016 B-16 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue IHO Capacity Building Strategy. CBSC to keep the IHO Capacity Building Strategy updated. At each CBSC meeting, 3.3.4 the Sub-Committee is to review the Strategy in the light of DCoord ADCC new elements, update it accordingly and display it in the IHO website. 3.3.5 Capacity Building Work Programme DCoord ADCC CBSC to study the CB needs presented to the CBSC by the 3.3.5.1 RHCs, to foster the sharing of lessons learned and to help DCoord ADCC RHCs to develop best practices CBSC to develop and propose an annual IHO Capacity 3.3.5.2 Building Work Program (CBWP) to be included in the DCoord ADCC general IHO WP CBSC to maintain and control the execution of the approved 3.3.5.3 DCoord ADCC See CBWP 2016 CBWP 3.3.6 Follow-up of CB activities and initiatives, including: DCoord CBSC to follow-up the CB activities and initiatives, 3.3.6.1 especially those for which the CB Fund and MSs have DCoord ADCC contributed To study and install measures to improve the technical work 3.3.6.2 with the Management Plan, i.e. developing a database, DCoord ADCC aiming at reducing the administrative work IBSC - International Board on Standards of Competence for 3.3.7 DCoord ADCC Hydrographic Surveyors and Nautical Cartographers 3.3.7.1 Conduct and report annual IBSC meetings DCoord ADCC IBSC39, March, Paris 3.3.7.2 Implement the IBSC Work Programme including DCoord ADCC 3.3.7.2.1 IBSC Stakeholders' Seminar DCoord ADCC To be decided 3.3.7.3 Manage the IBSC Fund and report to IHO DCoord ADCC 3.3.8 Provide guidance to training institutions DCoord ADCC lack of availability of IBSC 3.3.9 Maintain IBSC Publications (C-6, C-47, S-5, S-8) DCoord ADCC members IBSC to develop a new Standards framework to 3.3.9.1 DCoord ADCC x IBSC meetings, to be decided separate competency requirements for Cat A and Cat B B-17 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Objective / Deliverable: To assess the hydrographic surveying, nautical charting and nautical information status of nations and regions where hydrography is developing. Provide guidelines for the development of local hydrographic capabilities taking into account the regional context and possibilities of support for shared capabilities. Identify regional 3&4 3.4 Capacity Building Assessment requirements and study the possibilities for capacity building assistance and training from the CB Fund and other sources Technical and advisory visits. RHCs, with the support of the Director & CBSC Chair and IHB, CBSC Chair and IHB, to establish AD appropriate teams of experts and to schedule and In accordance with the Agreed2016 3.4.1 responsible undertake Technical and Advisory Visits to assess the status CB Work Programme (CBWP) for relevant of hydrography, cartography and aids to navigation in RHC accordance with the IHO CBWP Enhance publication C-55. IHB with the support of the 3.4.2 RHCs, CBSC and GGC to develop a new framework for C- DCoord ADCC 55 Objective / Deliverable: To undertake initiatives for the provision of general support, training and education to address identified CB 3&4 3.5 Capacity Building Provision shortcomings; identify aid agencies and other sources of funds; liaise with MS, other organizations and funding agencies for such provision and establish and participate in joint development projects 3.5.1 Raise Awareness on the Importance of Hydrography DCoord ADCC In accordance with the Agreed 2016 3.5.2 Technical Workshops, Seminars, Short Courses DCoord ADCC CB Work Programme (CBWP) IHB, in conjunction with IBSC and CBSC, to encourage the development and delivery of new Hydrographic and Nautical 3.5.3 Cartography Programs, including the establishment of new DCoord ADCC Hydrographic Schools where that regional capacity does not exist. Report to the IHO on the results On the Job Training (ashore / on board). CBSC, with IHB 3.5.4 support, to investigate “on-the-job training opportunities” DCoord ADCC ashore and on board (ships of opportunity) IHB, with the support of CBSC and RHCs, to ensure awareness of multilateral or bilateral projects with hydrographic and/or cartographic components, and to 3.5.5 provide advice to governments, project managers and DCoord ADCC funding agencies on the importance of including a hydrographic Capacity Building Component. Report to IHO annually on the results obtained CBSC to foster bilateral agreements in order to help satisfy 3.5.6 DCoord ADCC SOLAS V/9 B-18 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Objective / Deliverable: To facilitate the achievement of a world-wide quality nautical charting coverage to suit the needs of the mariner 2 3.6 Coordination of Global Surveying and Charting in support of safe and efficient navigation through the development of specifications and standards for the production, distribution and updating of cartographic products and supporting publications C-55 Status of Hydrographic Surveying and Nautical 3.6.1 DCoord ADCC Charting World-wide 3.6.1.1 MS to provide annual updates to C-55 DCoord ADCC lack of funds for on-going 3.6.1.2 IHB to implement new framework for publication C-55 DCoord ADCC C-55 GIS solution implemented support and maintenance of GIS software solution IHB to report periodically to IMO on limitations and 3.6.1.3 requirements for improvements in global charting and DCoord ADCS associated services WEND WG to foster the implementation of the WEND 3.6.2 DCoord ADCS See also 3.1.17 principles, monitor progress and report to IRCC WG to facilitate the production, distribution and updating 3.6.2.1 of ENC cartographic products ensuring uniform ENC DCoord ADCS quality and consistency WG to facilitate the resolution of gaps and overlaps in 3.6.2.2 DCoord ADCS ENC coverage WG to facilitate the promotion of RENC co-operation for 2 meetings, Venues probably in 3.6.2.3 DCoord ADCS the benefit of ENC end-users Europe Maintain and coordinate ENC schemes, consistency and 3.6.3 DCoord ADCS quality RHCs to develop ENC schemes in their regions and 3.6.3.1 DCoord ADCS coordinate the production and maintenance of ENC Maintain and coordinate INT Chart Schemes and improve 3.6.4 DTech ADCS the availability of the INT Chart Series RHCs to coordinate INT Chart Schemes and coordinate ICCWG workshop in conjunction 3.6.4.1 DTech ADCS the production of INT Chart in their region with NCWG2 Contribute to monitoring and improving the global status of 3.6.5 DCoord ADCC hydrographic surveying Objective / Deliverable: 1&2 3.7 Maritime Safety Information To facilitate the efficient provision of MSI to mariners through coordination and the establishment of relevant standards between agencies WWNWS-SC - World-Wide Navigational Warning Service Review customer survey results and 3.7.1 Sub-Committee. Organize, prepare, attend and report DCoord ADSO development action plan to initiate WWNWS8, September? Norway annual WWNWS-SC meetings identified service delivery improvements WWNWS Document Review Working Group. Conduct DRWG14, 8-10 March, London, held 3.7.2 DCoord ADSO Keep documentation fit for purpose annual meetings of the WWNWS Document Review WG back-to-back with NCSR3 B-19 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Maintain and extend the following IHO standards, 3.7.3 DCoord ADSO specifications and publications: 3.7.3.1 relevant IHO Resolutions in M-3 DCoord ADSO M-3 kept up to date S-53 - Joint IMO/IHO/WMO Manual on Maritime Safety S-53 kept up to date by incorporating 3.7.3.2 DCoord ADSO Information IMO decisions as required Monitor GMDSS modernization Liaise with IMO and WMO on the delivery of MSI within the 3.7.4 DCoord ADSO programme to ensure maintenance of GMDSS service delivery Monitor projects to ensure maintenance Participate and contribute to the IMO work items on the of service delivery at least at current 3.7.5 modernization of the GMDSS and the development of the DCoord ADSO levels, investigation areas for e-navigation implementation plan improvement Improve the delivery and exploitation of MSI to global Progress development of S-124 PS to 3.7.6 shipping by taking full advantage of technological DCoord ADSO align with the development of e- developments navigation and GMDSS modernization Objective / Deliverable: To contribute to global ocean mapping programmes through the IHO/IOC General Bathymetric Chart of the 1&2&3 3.8 Ocean Mapping Programme Oceans (GEBCO) Project, the International Bathymetric Chart (IBC) Projects and other related international initiatives 3.8.1 Conduct meetings of relevant GEBCO bodies: DCoord 3.8.1.1 Guiding Committee DCoord ADSO Strategic goals for the next decade GGC33, Santiago, Chile, late 2016? 3.8.1.2 TSCOM DCoord ADDT Joint meeting, late 2016? 3.8.1.3 SCRUM DCoord ADDT SCUFN29 3.8.1.4 SCUFN DCoord ADCS 2nd semester? Enhance DCDB interface for upload, Ensure effective operation of IHO Data Centre for Digital 3.8.2 DCoord ADDT ingest, discovery and download of Funds and resources Bathymetry (DCDB) bathymetric data Coordinate with IHO on Crowd Sourced Bathymetry project Lack of MS willingness to Encourage the contribution of bathymetric data to the provide data. Participation in RHC meetings GEBCO representatives participate in 3.8.2.1 IHO DCDB through GEBCO participation in RHC DCoord ADDT No NF funds for NF Scholar according to GEBCO priority of RHC meetings meetings alumni to travel to RHC regional mapping needs meetings Prepare a new IHO publication on policy for trusted 3.8.3 Pres ADSO Progress report to IRCC8 crowd-sourced bathymetry CSBWG-2, USA? 3.8.3.1 Conduct meetings of CSBWG DCoord ADSO Implementation of CSB Work Plan Efficient running of CSBWG2 See also 3.8.2 B-20 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Participate in N. Atlantic seabed mapping programme 3.8.3.2 DTech ADSO Funded by EU meetings (Galway Statement) 3.8.4 Maintain IHO bathymetric publications, including: DCoord 3.8.4.1 B-4 - Information concerning recent bathymetric data DCoord ADDT Primarily an IHB activity 3.8.4.2 B-6 - Standardisation of undersea feature names DCoord ADCS Primarily an IHB activity 3.8.4.3 B-7 - GEBCO guidelines DCoord ADSO Primarily an IHB activity 3.8.4.4 B-8 - Gazetteer DCoord ADCS Primarily an IHB activity 3.8.4.5 B-9 - GEBCO digital atlas DCoord ADDT Primarily an IHB activity 3.8.4.6 B-10 - The history of GEBCO DCoord ADSO Primarily an IHB activity 3.8.4.7 B-11 - GEBCO Cookbook DCoord ADDT Primarily an IHB activity 3.8.4.8 Develop the on-line function of B-4 DCoord ADDT Primarily an IHB activity Contribute to outreach and education about ocean mapping. Development of Roadmap for outreach Increase understanding of the importance of hydrography 3.8.5 DCoord ADSO and education Working Group and interest in following ocean mapping as a career through Development of Education Materials activities such as: Development of outreach materials (paper maps, Development of Roadmap for outreach 3.8.5.1 brochures, web-based presentations) and educational DCoord ADSO Funding under task 3.8.5 and education Working Group materials; Printing of GEBCO World Map at various locations in 3.8.5.2 DCoord ADSO Printing of GEBCO World Map in MS Funding under task 3.8.5 MS Facilitate the “Future of the Ocean” GEBCO celebration Monaco, 14-17 June 3.8.5.3 DCoord ADSO event Content of GEBCO web site continually updated with news items; information 3.8.6 GEBCO Web site kept current and updated regularly DCoord ADDT about meetings and events and information about and links to new products Develop short course and course material on compiling digital bathymetric models (DBMs) to be included in GEBCO Course curriculum and schedule for first 3.8.7 DCoord ADSO from a heterogeneous bathymetric source database. course occasion Associated deliverables: -a course curriculum Continuing enhancement and Update and enhance the GEBCO Gazetteer (B-8) for 3.8.8 DCoord ADCS maintenance to incorporate new names internet access from each SCUFN meeting B-21 Remarks / Element Principal Principal Strategic Title Key deliverables in 2016 Significant risk to delivery Dates / / Task Director Manager Direction Venue Objective / Deliverable: 2&4 3.9 Marine Spatial Data Infrastructures To monitor developments related to the hydrographic component of Spatial Data Infrastructures, to develop and maintain the relevant IHO publications, and to provide technical advice as appropriate MSDIWG7 and Open Forum, 25-29 3.9.1 Conduct meetings of MSDIWG DCoord ADCC Implementation of MSDI Work Plan January, Tokyo Maintain the relevant IHO standards, specifications and 3.9.2 DCoord ADCC publications, including: C-17 Spatial Data Infrastructures: “The Marine 3.9.2.1 DCoord ADCC Keep C-17 fit for purpose Dimension” - Guidance for Hydrographic Offices Develop training syllabi for MSDI and associated learning 3.9.3 DCoord ADCC subjects, including: 3.9.3.1 Content for an “Introduction to MSDI” training course DCoord ADCC Content tested in experimental course(s) B-22 Annex C to IHO CL 74/2015 S1/1001/WP-FO/592/16 MEMBER STATES’ APPROVAL OF AND COMMENTS ON PROPOSED IHO WORK PROGRAMME AND BUDGET FOR 2016 VOTING FORM (to be returned to the IHB by 30 November 2015 E-mail: [email protected] - Fax: +377 93 10 81 40) Member State: ……………………………………………………………………………………. 1. Do you approve the adoption of the proposed IHO Budget for 2016, as contained in Annex A to IHO CL 74/2015? YES NO Do you have any comments or reservations on specific aspects of the proposed Budget? ………………………………………………………………………………………………………………. ……………………………………………………………………………………………………………… 2. Do you approve the adoption of the proposed IHO Work Programme for 2016, as contained in Annex B to IHO CL 74/2015? YES NO Do you have any comments or reservations on specific aspects of the proposed Work Programme? ………………………………………………………………………………………………………………. ………………………………………………………………………………………………………………. .……………………………………………………………………………………………………………… ………………………………………………………………………………………………………………. Name/Signature: ………………………………………………………. Date: ………………………